2. RockCreek_Appendix A.pdf
PDF 327 KB Posted
- Solicitation number
- 12363N22Q4071
- Issued by
-
Department of Agriculture Forest Service
About this file
This is a solicitation for a stewardship integrated resource service contract to perform forest health and fuels reduction work on the Santa Fe National Forest in New Mexico. Work includes cutting and removing timber on 776 acres, cutting, skidding, and decking timber on 274 acres, road maintenance on 18.82 miles of road, installing a closure gate, and road repair not exceeding 0.5 miles. Additional optional work includes additional road repair up to 2 miles. The period of performance is through September 2027. Sawtimber and non-sawtimber volumes are estimated. The contractor must furnish all labor, materials, equipment and perform all work in accordance with specifications. Bid bonds, payment bonds and performance bonds are not required. Contractors must be registered in SAM.gov. The contracting officer is located in Georgia.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Rock Creek Stewardship IRSC Santa Fe National Forest Page 1 of 12 Cuba Ranger District
Revised 01.06.2022
APPENDIX A
TECHNICAL SPECIFICATIONS FOR SERVICE WORK ITEMS
SECTION I – DESCRIPTION OF WORK:
The primary objective of the Rock Creek IRSC is to increase forest health and vigor of the project area, reduce hazardous fuel loading. Specific objectives include:
1) Reduce the risk of uncharacteristic, stand-replacing wildfire by decreasing stand density, ladder fuels, and crown fuel continuity. Create conditions conducive to the reintroduction of low severity surface fire by creating a mosaic of tree groups, individual trees and interspaces comprised of grass/forb/shrubs.
2) Create a forest structure and composition that more closely resembles the conditions that existed prior to interruption of the historic fire regime (uneven-aged, grouped trees with interspaces, dominated by shade intolerant/fire resistant species).
3) Improve forest health by decreasing inter-tree competition and overall stand density.
4) Provide public fuelwood areas to relieve communities impacted by the COVID-19 pandemic and the MSO injunction (Cut, Skid, and Deck Units)
SECTION II – WORK ITEMS
MANDATORY WORK ITEMS
Item 1: Cut and Remove Included Timber; Units 3, 4, 5, 6, 7, 8, 9 and 10 [776 acres]
Cut and remove from Contract Area all trees which meet the Utilization Standards in Appendix B, Division AT. These Units are listed as LTM on the Contract Area Map. Trees left uncut are marked above and below stump height with orange tracer paint. Trees shall be whole tree yarded and machine piles (see CT6.7# Slash Treatment) shall be placed at landings.
Item 2: Cut, Skid, & Deck; Units 1, 2 and 7a [274 acres]
Cut, whole tree yard, process, and deck all live trees meeting the Utilization Standards in Appendix B, Division AT.
Units 1 and 2 are listed as LTM, and Unit 7a is listed as CTM on the Contract Area Map and the requirements are specified below. Trees to be left uncut are marked above and below stump height with orange tracer paint.
LEAVE TREE MARK (LTM)/CUT TREE MARK (CTM) SPECIFICATIONS
UNIT TYPE REQUIREMENTS
1, 2, 7a Non-Sawtimber and Sawtimber
In Units 1 and 2, trees 6.0 inches DBH and greater shall be cut, yarded, processed (slash component already included in Item 3), and decked at a designated landing location unless marked for retention with orange paint. In Unit 7a trees 6.0 inches DBH and greater shall be cut, yarded, processed, and decked at a designated landing location marked for cut with blue paint. Decks shall not exceed 6 feet in height.
Operations will be conducted to avoid damage to leave trees and other resources. If operations cause damage to any posted monuments, fences or other protected improvements identified on Contract Area Map, the Contractor will be responsible for restoration or replacement cost. Erosion control work shall be completed by
Page 2 of 12 Cuba Ranger District
6ft
6ft
Length Will Vary
LEAVE TREE MARK (LTM)/CUT TREE MARK (CTM) SPECIFICATIONS
UNIT TYPE REQUIREMENTS
Contractor and work shall adjust to ground and weather conditions and the need for controlling runoff. Erosion control work shall be kept current immediately preceding expected seasonal periods of precipitation or runoff.
1) Cut, Skid, & Deck involves the following items: Mechanical Thinning, followed by, whole-tree yarding and decking of bole-wood material. Contractor shall follow all timber removal provisions in Appendix B. The objective is to deck the trees to facilitate public access for ease of firewood removal. Trees 6.0 inches DBH and larger shall be skidded to and decked along existing roads or corridors defined by the COR. Decks shall not be taller than 6 feet unless approved by COR and shall not topple over easily; length of decks will vary.
Decks will be built in a neat and orderly fashion; do not place decks up against a leave tree for support. Slash material shall be piled per specifications in CT6.7# Slash Treatment in Appendix B. See figure below for deck specifications.
Page 3 of 12 Cuba Ranger District
Item 3A: Pre-Haul Road Maintenance [15.24 miles] Units: 1, 2, 3, 4, 5, 6, 7, 7a, 8, 9, 10
Contractor shall maintain roads commensurate with use in accordance with the contract road maintenance requirements in Appendix C. Also, see CT5.46 – Snow Removal in Appendix B. Payment will be made upon acceptable completion of pre-haul road maintenance for all road segments.
Item 3B: During-Haul Road Maintenance [15.24 miles] Units: 1, 2, 3, 4, 5, 6, 7, 7a, 8, 9, 10
Contractor shall maintain roads commensurate with use in accordance with the contract road maintenance requirements in Appendix C. Also, see CT5.46 – Snow Removal in Appendix B Payment will be made upon acceptable completion of during-haul road maintenance for all road segments.
Item 3C: Post-Haul Road Maintenance [18.62 miles] Units: 1, 2, 3, 4, 5, 6, 7, 7a, 8, 9, 10
Contractor shall maintain roads commensurate with use in accordance with the contract road maintenance requirements in Appendix C. For road closures (T-811), see Best Management Practices attachment under Section 4.3. Payment will be made upon acceptable completion of post-haul road maintenance for all road segments.
Item 4: Closure Gate Installation [1 gate]
Completion of this service item will be required before opening Units 8, 9, and 10 as well as before road maintenance of FR264 beyond MP 1.49.
Contractor shall install a steel road closure gate on Forest Road 264 at MP 1.49 as shown on the Contract Area Map.
The gate will be furnished by the government. Concrete and other supplies necessary (e.g., welder) to install the gate shall be furnished by the Contractor. Signs for gate shall be installed by the government.
Gate installation:
Gate location shall be staked by a designated representative. All excavated material shall be neatly placed and contoured. Concrete must be placed in undisturbed soil. All concrete shall be 3000 PSI. Welding gate to hinge post shall be done by a certified welder and all welds be treated with approved coating to prevent rusting. Gate posts must be secured for 7 days to insure curing of freshly placed concrete.
Technical specifications and a detail for the gate are shown in Attachment I. The attached detail may differ slightly from the final gate furnished by the government and is intended to give a generalized example for bidding work.
Fence removal:
The installed gate must be tied into the existing fence line. Contractor shall remove portion of the fence necessary to install the gate. Fence shall be reconstructed by the contractor so that the fence ties into the closure gate. If available at the time of installation the Government may furnish some materials for fencing or the removed fence materials for placement of the closure gate may be reused. Otherwise, the Contractor shall furnish all necessary materials for the fence to be reconstructed into the closure gate.
Page 4 of 12 Cuba Ranger District
Item 5: Road Repair; Forest System Road 264FC [0.5 miles]
The end-results performance objective for Road Repair is to re-establish the road template and create adequate drainage for hauling included timber on Forest System Road 264FC.
Work may include construction of drainage dips, repair of road templates, creation of sediment traps, and other reshaping activities. Excavation and rock placement may be needed to repair road template. Additional details regarding work specifications can be found in the Attached “Santa Fe National Forest Best Management Practices for Road Repair” document. Please address specific repair work activities you propose to complete to meet this end-results objective in your technical proposal.
This work shall be considered separate from work included under Item 3.
OPTIONAL WORK ITEMS:
Optional Item 6: Additional Road Repair; Forest System Road 264 [up to 2.0 miles]
The end-results performance objective for Road Repair is to reestablish the road template and create adequate drainage for improvement and storage of Forest System Road 264.
As identified by the Forest Service, work may include construction of drainage dips, repair of road templates, creation of sediment traps, and other reshaping activities. Excavation and rock placement may be required, as needed, to repair roadway and/or shuttle borrowed material. Work would occur on FR264 from MP 1.49 to MP 3.49. Additional details regarding work specifications can be found in the Attached “Santa Fe National Forest Best Management Practices for Road Repair” document.
The unit of measure for this work item is MILES (TENTHS) and shall be rounded to the nearest 0.1 mile for award and payment.
SECTION III – CONTROL OF WORK
The Contractor agrees to conduct its operations under this contract and other related business activities in compliance with Federal, State, and local statutes, standards, orders, permits and other regulations.
The Contractor shall meet all State and local environmental quality laws applicable to National Forest system lands.
Work may be done any time during the term of the contract, except under the following conditions:
(1) When conditions are such that operations shall be restricted or ceased due to increased fire risk.
When seasonal operating restrictions for active raptor nests are in effect. All active nest sites and areas of restriction are shown on CAM and listed in the solicitation under Protection Measures Needed for Plants Animals, Cultural Resources, and Cave Resources. Restrictions would apply:
(2) If new nests are discovered,
(3) When soil moisture conditions create excessive risk of damage to the soil,
(4) When snow depth creates a situation where requirements cannot be met and/or work cannot be inspected, as determined by the COR.
(5) The government reserves the right to prioritize the order in which Units are treated.
Page 5 of 12 Cuba Ranger District
(6) If any cultural or archeological sites are discovered during operations of this contract, work will be suspended in the immediate vicinity of the site until a reconnaissance survey is completed by the Forest Archeologist. Areas excluded from treatment shall be deleted from the contract.
SECTION IV – INSPECTION AND ACCEPTANCE
For All Work Items:
At any point during the project, the Contractor and/or Project Manager may request (documented through email, text, or hand-written request) an in the field consultation with the Forest Service to inspect work progress, review contract specifications, or clarify issues. The Forest Service shall respond to Contractor’s request within 5 working days, excluding weekends and federal holidays.
GOVERNMENT QUALITY ASSURANCE SURVEILLANCE PLAN
Government Inspection Procedures Common to All Items – The COR, or a designated inspector (GTM), will make periodic inspections while work is in progress, usually daily at first, as needed to assure work is proceeding satisfactorily.
The Contractor shall notify the COR when units are started, when problems are encountered and when contract work needs government oversight.
Inspections may include a combination of both informal (visual) and formal inspection methods. The COR will use visual inspections to ensure Contractor compliance with the contract items. Unsatisfactory findings noted by visual inspection will be reported on an inspection report form and shared with the Contractor in a timely manner. Findings will include the type, severity, and estimated extent of unsatisfactory work.
Government Inspection Procedures for Item #2: Cut, Skid, and Deck
Each subdivision unit will be inspected separately. Units will not be averaged with other subdivisions for acceptance and payment.
When units are completed and ready for government inspection, the Contractor or a designated project manager shall request unit inspection in writing, prior to moving out of the general area.
The COR, or designated inspector, will determine compliance with contract specification through informal visual inspection. In the event visual inspection indicates work to be in non-compliance with specifications, prompt corrective action and/or rework shall be required.
Formal Inspection Procedure for Item #2: Cut, Skid and Deck
1. The COR, or designated inspector, may also elect to utilize formal methods, as needed. Formal plots will typically be used as a secondary method to determining compliance with specifications.
2. A series of verification plots will be installed by the Government to determine compliance with specifications and percent of satisfactory work for treatment of each unit not meeting specific as observed with visual inspection.
Verification plot locations will be pre-determined on a map (similar to the Contract Area Map) prior to contract award (this map will not be available to contractor until after plots have been installed if formal plots are deemed necessary for compliance and payment).
3. Government verification plots will consist of a series of fixed area plots. Plot size (1/20th acre or 1/30th acre) will be determined by the Government. Plots will be distributed on a grid so that a representative sample of the unit is obtained.
Page 6 of 12 Cuba Ranger District
4. The COR or designated inspector will mark the center of each plot on the ground, using flagging, stakes, or pin flags. Additional flagging will be hung near the plot center so that it may be seen for a distance. The inspector will include the plot number, their initials and date on the flagging.
5. Plots will be numbered to correlate with the inspection form and transects on a unit map.
6. The minimum / maximum number of verification plots per treatment unit shall be as follows:
Subdivision Unit
Number Total Acres Minimum No. Plots Maximum No.
Plots 1 42 11 20 2 203 40 66 7a 29 10 15
7. At each plot, the Government will examine the plot area and record findings on the items listed below:
a. Plot number
b. Number of trees to be retained on plot
c. Number of trees to be cut and removed (stumps)
d. Number of deficient trees.
- Stumps exceeding maximum stump height (12”) or an incompletely severed bole will be counted as deficient trees.
- Trees designated for retention, that were damaged as a result of Contractor’s activities will be counted a deficient [damage is defined as 1/3 diameter or more (bole of tree) tree damaged and/or multiple tree limbs broken out of crown or top].
- Trees designated for retention that were cut (without prior agreement) will result in an automatic plot failure.
- Any cut trees (meeting merchantability specifications) which are still attached at the stump or pushed over will result in an automatic plot failure.
8. Work quality will be calculated at the plot level as follows:
% 𝑊𝑊𝑊𝑊𝑊𝑊𝑊𝑊 𝑄𝑄𝑄𝑄𝑄𝑄𝑄𝑄𝑄𝑄𝑄𝑄𝑄𝑄 = 100% − % 𝑈𝑈𝑈𝑈𝑈𝑈𝑄𝑄𝑄𝑄𝑄𝑄𝑈𝑈𝑈𝑈𝑄𝑄𝑈𝑈𝑄𝑄𝑊𝑊𝑊𝑊𝑄𝑄 𝑊𝑊𝑊𝑊𝑊𝑊𝑊𝑊
% 𝑈𝑈𝑈𝑈𝑈𝑈𝑄𝑄𝑄𝑄𝑄𝑄𝑈𝑈𝑈𝑈𝑄𝑄𝑈𝑈𝑄𝑄𝑊𝑊𝑊𝑊𝑄𝑄 𝑊𝑊𝑊𝑊𝑊𝑊𝑊𝑊 =
𝑁𝑁𝑊𝑊. 𝑊𝑊𝑈𝑈 𝐷𝐷𝐷𝐷𝑈𝑈𝑄𝑄𝑈𝑈𝑄𝑄𝐷𝐷𝑈𝑈𝑄𝑄 𝑇𝑇𝑊𝑊𝐷𝐷𝐷𝐷𝑈𝑈
𝑁𝑁𝑊𝑊. 𝑊𝑊𝑈𝑈 𝑇𝑇𝑊𝑊𝐷𝐷𝐷𝐷𝑈𝑈 𝑄𝑄𝑊𝑊 𝑏𝑏𝐷𝐷 𝑅𝑅𝐷𝐷𝑄𝑄𝑄𝑄𝑄𝑄𝑈𝑈𝐷𝐷𝑅𝑅 + 𝑁𝑁𝑊𝑊.𝑇𝑇𝑊𝑊𝐷𝐷𝐷𝐷𝑈𝑈 𝑄𝑄𝑊𝑊 𝑏𝑏𝐷𝐷 𝐶𝐶𝑄𝑄𝑄𝑄 𝑄𝑄𝑈𝑈𝑅𝑅 𝑅𝑅𝐷𝐷𝑅𝑅𝑊𝑊𝑅𝑅𝐷𝐷𝑅𝑅 × 100
9. Plots that receive a Work Quality calculation less than 95% will be considered as FAIL.
10. The AQL for Item 2 is 95% Plot PASS rate, rounded to the nearest whole number. See Acceptance and Payment.
Page 7 of 12 Cuba Ranger District
Reinspection Upon Contractor Request
1. If Government inspection results are unacceptable to the Contractor, a single reinspection may be requested, in writing, within 5 business days after receipt of notice of said inspection results. The same inspection procedure will be used; however, the inspection pattern will be shifted so that new inspection plots will not overlap previously inspected plots. This secondary series of reinspection plots will also be pre-determined on a map (prior to award) and will not be available to contractor until after plots are established if needed.
2. If reinspection results – rounded up to the nearest whole percent – indicate a variance of more than 5 percent from the first inspection, the results of the second inspection will be used to calculate work quality and payment, and the Government will bear the cost of reinspection.
3. If reinspection results – rounded up to the nearest whole percent – are within 5 percent of the first inspection, plots from the initial inspection and the reinspection will be combined and used to calculate work quality and payment, and the Contractor shall bear the cost of reinspection.
Government Inspection Procedures for Item #3: A, B, & C: Road Maintenance (pre-, during-, and post haul)
The COR, or designated inspector, will determine compliance with contract specification through informal visual inspection. In the event visual inspection indicates work to be in non-compliance with specifications, prompt corrective action and/or rework shall be required.
The AQL for Item 3a-3c is 95%
Government Inspection Procedures for Item #4: Gate Installation
The COR, or designated inspector, will determine compliance with contract specification through informal visual inspection. In the event visual inspection indicates work to be in non-compliance with specifications, prompt corrective action and/or rework shall be required.
The AQL for Item 5 is 100%
Government Inspection Procedures for Item #5: Road Repair
The COR, or designated inspector, will determine compliance with contract specification through informal visual inspection. In the event visual inspection indicates work to be in non-compliance with specifications, prompt corrective action and/or rework shall be required.
The AQL for Item 6 is 90%.
Government Inspection Procedures for Item #6: Additional Road Repair
The COR, or designated inspector, will determine compliance with contract specification through informal visual inspection. In the event visual inspection indicates work to be in non-compliance with specifications, prompt corrective action and/or rework shall be required.
The AQL for Item 7 is 90%
Page 8 of 12 Cuba Ranger District
Government Inspection Procedures – All Items
Table 1 – Minimum Acceptable Quality Levels (AQL) of Work ITEM DESCRIPTION SCHEDULE UNIT Min AQL
1 Cut and Remove Included Timber MANDATORY ACRE NA 2 Cut, Skid, & Deck MANDATORY ACRE 95%
3a-3c Road Maintenance (Pre, During, and Post Haul) MANDATORY MILE 95% 4 Gate Installation MANDATORY EACH 100% 5 Road Repair MANDATORY MILE 90% 6 Additional Road Repair OPTIONAL MILE 90%
SECTION V – PAYMENT METHODS
Method of Measurement for Acreages
Acreages were determined by using Global Positioning Systems (GPS). The acreage for each work item will be rounded to the nearest acre and is final unless:
a. The contract is modified or,
b. The Government makes a determination to remeasure or,
c. The Contractor exercises his/her option under the following Remeasurement provisions:
Remeasurement
1. The Contractor may request, in writing, remeasurement of any units under this contract if he/she feels that acreage stated on the project maps is incorrect. The remeasurement must be within the existing perimeter of the respective unit. No variance of the unit perimeters as laid out on the ground for this contract will be allowed. All requests for remeasurement must be made prior to payment for each completed unit.
Remeasurement will be performed by the Government.
2. If remeasurement indicates that a variance of ten percent or less exists on units of 1 to 5 acres, five percent or less exists on units of more than five but less than 20 acres, or if three percent or less exists on units of 20 acres or larger, the Contractor shall pay for the actual costs of the remeasurement. Under this condition, payment will be made on the acreage stated on the project maps. If the remeasurement indicates the actual acreage varies by more than the above factors from that stated on the project maps, the payment will be made on the remeasured acreage and the Forest Service will pay for the cost of the remeasurement.
Acceptance and Payment
1. Percentages as calculated herein shall be rounded to the nearest whole percent.
2. No allowance for variation or portion of a variation will be added which will create a percentage greater than 100 percent.
Acceptance and Payment –Item 2 Cut, Skid, & Deck
If informal visual inspection indicates acceptable work quality, the Contractor will be paid 100 percent of their bid rate.
1. In the event that formal inspections are used, the rate of payment to the Contractor will be calculated as follows:
(a) For work quality of 95 percent or higher, 5 percent (adjustment for statistical variation) will be added and the Contractor will be paid 100 percent of their bid rate.
(b) For work quality from 85 to 94 percent, the 5 percent will be added to the work quality percent and the Contractor will be paid the total multiplied by the bid rate.
Page 9 of 12 Cuba Ranger District
(c) For work quality 84 percent and less, the 5 percent will not be added and there will be no payment made to the Contractor.
(d) If, after rework, the percentage of satisfactory work is between 85% and 94%, payment will be made by the actual percentage. If the percentage is less than 85%, the work is unacceptable, and no payment will be made.
Plot Inspections
1. Percentages as calculated herein shall be rounded to the nearest whole percent.
2. No allowance for variation or portion of a variation will be added which will create a percentage greater than
100 percent.
3. Payment rate for work quality at or above 85% will be calculated as follows
# 𝑊𝑊𝑈𝑈 𝐹𝐹𝑄𝑄𝑄𝑄𝑄𝑄𝐷𝐷𝑅𝑅 𝑃𝑃𝑄𝑄𝑊𝑊𝑄𝑄𝑈𝑈
# 𝑇𝑇𝑊𝑊𝑄𝑄𝑄𝑄𝑄𝑄 𝑆𝑆𝑄𝑄𝑅𝑅𝑆𝑆𝑄𝑄𝐷𝐷𝑅𝑅 𝑃𝑃𝑄𝑄𝑊𝑊𝑄𝑄𝑈𝑈
× 100% = % 𝑈𝑈𝑈𝑈𝑈𝑈𝑄𝑄𝑄𝑄𝑄𝑄𝑈𝑈𝑈𝑈𝑄𝑄𝑈𝑈𝑄𝑄𝑊𝑊𝑊𝑊𝑄𝑄 𝑊𝑊𝑊𝑊𝑊𝑊𝑊𝑊
100% - % Unsatisfactory Work = % Work Quality
% Work Quality + 5 % Statistical Variation (SV) = % Payment rate
4. Examples:
a.
2 𝐹𝐹𝑄𝑄𝑄𝑄𝑄𝑄𝐷𝐷𝑅𝑅 𝑃𝑃𝑄𝑄𝑊𝑊𝑄𝑄𝑈𝑈
40 𝑆𝑆𝑄𝑄𝑅𝑅𝑆𝑆𝑄𝑄𝐷𝐷𝑅𝑅 𝑃𝑃𝑄𝑄𝑊𝑊𝑄𝑄𝑈𝑈
× 100% = 5% 𝑈𝑈𝑈𝑈𝑈𝑈𝑄𝑄𝑄𝑄𝑄𝑄𝑈𝑈𝑈𝑈𝑄𝑄𝑈𝑈𝑄𝑄𝑊𝑊𝑊𝑊𝑄𝑄 𝑊𝑊𝑊𝑊𝑊𝑊𝑊𝑊
100% – 5 % = 95% Work Quality
95% + 5% (SV) = 100% Payment rate b.
5 𝐹𝐹𝑄𝑄𝑄𝑄𝑄𝑄𝐷𝐷𝑅𝑅 𝑃𝑃𝑄𝑄𝑊𝑊𝑄𝑄𝑈𝑈
40 𝑆𝑆𝑄𝑄𝑅𝑅𝑆𝑆𝑄𝑄𝐷𝐷𝑅𝑅 𝑃𝑃𝑄𝑄𝑊𝑊𝑄𝑄𝑈𝑈
× 100% = 12.5% = 13% 𝑈𝑈𝑈𝑈𝑈𝑈𝑄𝑄𝑄𝑄𝑄𝑄𝑈𝑈𝑈𝑈𝑄𝑄𝑈𝑈𝑄𝑄𝑊𝑊𝑊𝑊𝑄𝑄 𝑊𝑊𝑊𝑊𝑊𝑊𝑊𝑊
100% – 13 % = 87% Work Quality
87 + 5% (SV) = 92% Payment rate c.
7 𝐹𝐹𝑄𝑄𝑄𝑄𝑄𝑄𝐷𝐷𝑅𝑅 𝑃𝑃𝑄𝑄𝑊𝑊𝑄𝑄𝑈𝑈
40 𝑆𝑆𝑄𝑄𝑅𝑅𝑆𝑆𝑄𝑄𝐷𝐷𝑅𝑅 𝑃𝑃𝑄𝑄𝑊𝑊𝑄𝑄𝑈𝑈
× 100% = 17.5% = 18% 𝑈𝑈𝑈𝑈𝑈𝑈𝑄𝑄𝑄𝑄𝑄𝑄𝑈𝑈𝑈𝑈𝑄𝑄𝑈𝑈𝑄𝑄𝑊𝑊𝑊𝑊𝑄𝑄 𝑊𝑊𝑊𝑊𝑊𝑊𝑊𝑊
100% – 18% = 82% Work Quality = No Payment Made
Page 10 of 12 Cuba Ranger District
Acceptance and Payment – Items 3A, 3B, 3C Road Maintenance
1. If informal visual inspection indicates acceptable work quality, the Contractor will be paid 100 percent of their bid rate.
2. Once the quality of work is acceptable, the Contractor Shall be Paid.
3. During-haul road maintenance is commensurate with Contractor use as well as in accordance with the contract road maintenance requirements in Appendix C. Payment will be made upon acceptable completion of post-haul road maintenance for each road segment, except for roads in Units 1 and 2 which only require pre-haul maintenance.
Acceptance and Payment – Item 4 Gate Installation
If informal visual inspection indicates acceptable work quality, the Contractor will be paid 100 percent of their bid rate. If visual inspection indicates a FAIL, work shall be redone until it passes.
Acceptance and Payment – Item 5 Road Repair
Full payment will be made when visual and/or measurement inspection indicates specifications have been met and other work assigned by Contracting Officer is performed to an acceptable standard.
Acceptance and Payment – Optional Item 6 Additional Road Repair
Full payment will be made when visual and/or measurement inspection indicates specifications have been met and other work assigned by Contracting Officer is performed to an accetpable standard.
* Stewardship Credits will be earned first, whenever practical. Forest Service Funds will be used if the availability of Stewardship Credits is exhausted or if appropriated dollars are obligated to a specific item.
SECTION VI – DEFINITIONS
ACCEPTABLE QUALITY LEVEL (AQL): Acceptance of work will be based on compliance with all specifications corresponding to the appropriate task(s); refer to the Performance Requirements Summary in Section E.4 of the contract.
A minimum AQL is required for all service work – hand or mechanical. The minimum AQL will receive a satisfactory performance rating.
BIOMASS TREES: Any conifer material 2 feet in height to 4.9 inches DBH.
BOLE SPACING: The horizontal distance in feet from the edge of one leave tree bole to another leave tree bole, measured from the outside bark of each tree.
CIRCULAR PLOT: A sample plot within a thinning unit that is used to determine the number of desirable trees and other contract specifications.
COARSE WOODY DEBRIS: Woody material left on the ground to meet wildlife habitat requirements.
CROWN RATIO: The ratio of live crown length (tip of leader to base of the crown) to total tree length/height.
CROWN SPACING: The horizontal distance in feet between the dripline of a live crown to another live crown.
CLEARCUT: A cutting prescription in which all trees within a boundary are designated to be cut.
CROWN RATIO: The ratio of live crown length (tip of leader to base of the crown) to total tree length/height.
CROWN SPACING: The horizontal distance in feet between the dripline of a live crown to another live crown.
Page 11 of 12 Cuba Ranger District
CUT TREES: Trees that do not possess the characteristics of desirable leave trees and are required to be cut. As described by the contract or otherwise marked to be cut.
CUTTING UNIT: See Treatment Unit definition
DAMAGED TREES: Trees damaged beyond recovery. A tree that is larger than 2 feet in height, and has the top knocked out, is leaning more than 10 degrees, has less than one half of its original limbs, or has approximately 50% of bark removed from the circumference of the bole.
DBH: Diameter at breast height, measured at a point of 4.5 feet above the ground level on the uphill side of the tree.
DECKING: Stockpiling of trees in a designated area.
DEAD/DYING TREES: Trees with the crown foliage changing from green to red, yellow, or needleless. Any tree that has pitch tubes indicating Mountain Pine Beetle infestation.
DESIGNATION BY SPECIES AND DIAMETER (DXSD): A cutting prescription in which species and diameter are used to determine which trees will be left and which will be cut.
DIB: Diameter inside bark.
HANG-UP TREE: Any cut tree suspended above ground level.
HEALTHY REGENERATION: Young, healthy, dwarf mistletoe free conifers, less than 4.9 inches in diameter, free of defect or characteristics listed in Section II, 2.2.2.
LEAVE TREE: Trees that possess desirable characteristics and that serve to create the basis for designated spacing requirements or are otherwise designated to be left.
NON-SAWTIMBER TREE: For all conifer species, minimum diameter of 5 inches DBH to minimum diameter by species identified in Appendix B, Division A.
OVERSTORY REMOVAL: A cutting prescription where all trees greater than a specified size are cut. Trees less than the specified size are protected.
PAYMENT UNIT: See Treatment Unit.
PERFORMANCE REQUIREMENTS SUMMARY (PRS): Identifies the key service outputs of the contract that will be evaluated by the Government to assure contract performance standards are met by the Contractor.
PILING: Material moved to an agreed upon location shall be piled for future treatment by Forest Service.
PROGRESSION OF WORK: Work conducted in a progressive, workmanlike and orderly manner by the Contractor.
RESERVE CLUMPS: Groups of trees within a treatment area that are protected from cutting, may also include Individual Reserve trees.
SAWTIMBER TREE: Included timber meeting sawlog size specifications as defined in Appendix B, Division A.2.
SKIDDING: Transportation of felled whole trees or snags, trimmed boles, bucked boles, and/or slash from the point of origin to designated landings along haul roads. Skidding is done only on pre-approved skid trail locations. lt may include transport by machine, vehicle, animal, or hand.
SLASH: Woody material existing or created that has accumulated on the forest floor. Woody material includes logs, pieces of logs, tops, and branches.
UNIT: See Treatment Unit.
Page 12 of 12 Cuba Ranger District
TEMPORARY ROADS: Non-permanent roads that are constructed by Contractor for the purpose of treatment unit access.
TREATMENT UNIT: An individual area on the ground in which activities will be performed and which may appear as a separate pay item in the Schedule of Items.
UNSATISFACTORY WORK: If work quality falls below the AQL, the COR will issue a work order or notice of noncompliance to the Contractor in writing. Untreated or unsatisfactory treated areas shall be reworked to obtain satisfactory work quality.
WHOLE TREE YARDING: Whole tree logging includes cutting tree and removing the entire tree, including tops and branches, to the landing.
| Acceptance and Payment |
| Acceptance and Payment – Items 3A, 3B, 3C Road Maintenance |
| 2. Once the quality of work is acceptable, the Contractor Shall be Paid. |
| 3. During-haul road maintenance is commensurate with Contractor use as well as in accordance with the contract road maintenance requirements in Appendix C. Payment will be made upon acceptable completion of post-haul road maintenance for each road seg... |
| Acceptance and Payment – Item 4 Gate Installation |