2. PWS.pdf
PDF 41 KB Posted
- Attached to
- MQ-9 Load Testing
- Solicitation number
- W50SS7-26-Q-0011
About this file
This is a Performance Work Statement for load testing lifting equipment required by the 147th Aircraft Maintenance Squadron (AMXS) maintenance flight. The contractor must load test 15 pieces of equipment upon delivery, including 2 wing slings, 4 propeller straps, 2 center of gravity tools, 2 engine lift fixtures, 2 4-foot straps, 2 30-foot straps, and 1 1/2-ton lifting beam. All testing must be completed according to specification document 1Q-9(M)A-2-4 and performed at the contractor's place of business within 15 calendar days of equipment receipt. The contractor is responsible for furnishing all labor, parts, tools, paint, test equipment, and appliances, and must comply with international, federal, state, and local building codes.
The contractor shall load test all items according to provided documentation and identify any discrepancies, with testing required annually. Deliverables include provision of all test equipment and labor, as well as a certificate or documentation of test results for all equipment. Operating constraints include adherence to facility rules and regulations, testing constraints specified in document 1Q-9(M)A-2-4, and non-performance on 11 recognized U.S. federal holidays (New Year's Day, Martin Luther King Jr.'s Birthday, President's Day, Memorial Day, Juneteenth, Independence Day, Labor Day, Columbus Day, Veteran's Day, Thanksgiving, and Christmas).
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 4. MQ9 load testing technical information.pdf | ||
| EngineFixturesideB.jpg | JPG image | |
| EngineFixturesideA.jpg | JPG image | |
| 3. SCA WD.pdf | ||
| 1. Combo W50S77-26-Q-0011.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PERFORMANCE WORK STATEMENT
LOAD TESTING LIFTING EQUIPMENT
January 23, 2026
1. Purpose: It is the government’s intent for the contractor upon delivery to load test all the pieces of equipment. (2 wing slings, 4 propeller straps, 2 center of gravity tools, 2 engine lift fixtures, 2 4ft straps, 2 30ft straps, 1 1/2 ton lifting beam, 15 items total)
2. Scope: The contractor shall furnish all labor, parts, tools, paint, test equipment and appliances. All work shall be performed in accordance with this Performance Work Statement (PWS) and associated specifications and drawings
(1Q-9(M)A-2-4). All work shall also be performed in accordance with international, federal, state, and local building codes.
3. Period and Place of Performance:
3.1. Contractor shall perform all work at their place of business.
3.2. Contractor shall coordinate equipment delivery with us so that all work is completed no later than fifteen (15) calendar days after receipt of equipment.
4. Background: The 147th AMXS maintenance flight is responsible for the inspection and maintenance of four MQ-9 Aircraft. The equipment mentioned in item 1 are essential in the maintenance of our aircraft.
5. Performance Objectives: The contractor shall provide the following results:
5.1. Load test all the items according to provided documentation
(1Q-9(M)A-2-4) and or identify any discrepancies.
5.2. This testing must be completed annually.
6. Deliverables: The contractor shall provide all the test equipment and labor.
6.1 The contractor shall also provide a certificate or documentation of the results of all the equipment equipment.
7. Operating Constraints: The contractor shall be subject to the following constraints:
7.1 The rules and regulations of their facility.
7.2 Testing constraints indicated in the (1Q-9(M)A-2-4) for the tested equipment.
7.3. Recognized Holidays: The following are recognized United States (US) holidays. The contractor shall not perform service on these days:
7.3.1. New Year’s Day: January 1st
7.3.2. Martin Luther King, Jr.’s Birthday
7.3.3. President’s Day
7.3.4. Memorial Day
7.3.5. Juneteenth National Independence Day: June 19th
7.3.6. Independence Day: July 4th
7.3.7. Labor Day
7.3.8. Columbus Day
7.3.9. Veteran’s Day: November 11th
7.3.10. Thanksgiving Day
7.3.11. Christmas Day: December 25th
This document provides the official performance requirements for the ASN 6.0 Panel Upgrade project. The contractor shall ensure full compliance with the outlined objectives, security standards, and completion timeline.
File details come from the government source that posted it. Updated .