2.a (CUI) CLB RG SOW SECTION C_CGP_5OCT2023.docx
DOCX document 40 KB Posted
- Attached to
- COLUMBIA Class Ropeguard and Duct ICCP Kits
- Solicitation number
- N00167-24-R-0020
About this file
This statement of work outlines requirements for the manufacturing of Columbia Class submarine ropeguard and duct impressed current cathodic protection kits. The Navy seeks a contractor to qualify processes and produce a maximum of seven each of ropeguard kits, reference cell cover kits, anode cover kits, and outer structure inner diameter reference cell kits. The contractor must complete process development, execute destructive first article assessments, and manufacture, paint and deliver a minimum of one of each kit as part of the contract award. Options are provided to order additional kits throughout the period of performance, which runs through April 2030. The contractor will also provide engineering services and participate in biannual progress reviews. Data deliverables include qualification plans, inspection reports, technical data packages, program schedules, status reports, and meeting records. Kit deliveries will occur at Electric Boat in Groton, CT and the Naval Foundry and Propeller Center in Philadelphia, PA.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Section C – Description and Specifications
COLUMBIA Class Ropeguard and Duct ICCP Kits
1.0 Background
The Advanced Propulsor Management Office (APMO, Code 808) in the Naval Architecture and Engineering Department (Code 80) of the Naval Surface Warfare Center, Carderock Division (NSWCCD) is responsible for managing the Research and Development (R&D), design, testing, and delivery of United States Navy submarine propulsors. The COLUMBIA Class submarine (CLB) Ropeguard and Duct Impressed Current Cathodic Protection (ICCP) Kits are key components of the propulsor. This requirement is UNCLASSIFIED.
2.0 Scope
The objective of this procurement is to manufacture a maximum of seven (7) CLB Ropeguard Kits, a maximum of seven (7) Reference Cell Cover Kits, a maximum of seven (7) Anode Cover Kits, and a maximum of seven (7) Outer Structure Inner Diameter (OSID) Reference Cell Kits. The Government plans to award, contingent on funding, a minimum of one (1) Ropeguard Kits, one (1) Reference Cell Cover Kits, one (1) Anode Cover Kits, and one (1) OSID Reference Cell Kits as part of contract award. In addition, this requirement includes priced options for an additional seven (7) Ropeguard Kits, seven (7) Reference Cell Cover Kits, seven (7) Anode Cover Kits, and seven (7) OSID Reference Cell Kits throughout the contract’s period of performance.
References
a) Ropeguard Kit - C24536000B: COLUMBIA CLASS PROPULSOR ROPEGUARD KIT
Propulsor Engineering Request (PER):
A.1) PER 0503, Columbia Class Ropeguard; ICCP Anode A.2) PER 0584, Columbia Class Ropeguard; ICCP Anode A.3) PER 0575, Columbia Class Ropeguard; Ropeguard to Diver Access Panel Fastener A.4) PER 0576, Columbia Class Ropeguard; Panel to Backing Plate Fastener A.5) PER 0618, Columbia Class Ropeguard; Port Panel Inseparable Assembly A.6) PER 0619, Columbia Class Ropeguard; Starboard Panel Inseparable Assembly
b) Reference Cell Cover Kit - C24535000A: COLUMBIA CLASS REFERENCE CELL COVER KIT
Propulsor Engineering Request (PER):
B.1) PER 0334, Columbia Class Reference Cell Cover; OSOD Reference Cell Assembly B.2) PER 0269, Columbia Class Reference Cell Cover; Captive Fastener B.3) PER 0438, Columbia Class Reference Cell Cover; Captive Washer Cover B.4) PER 0238, Columbia Class Reference Cell Cover; OSOD Reference Cell Housing
c) Anode Cover Kit - C24534000B: COLUMBIA CLASS ANODE COVER KIT
Propulsor Engineering Request (PER):
C.1) PER 0269, Columbia Class Anode Cover; Captive Fastener C.2) PER 0438, Columbia Class Anode Cover; Captive Washer Cover C.3) PER 0120, Columbia Class Anode Cover; Duct Outer Contour ICCP Anode C.4) PER 0261, Columbia Class Anode Cover; Duct Outer Contour ICCP Anode C.5) PER 0332, Columbia Class Anode Cover; Duct Outer Contour ICCP Anode C.6) PER 0436, Columbia Class Anode Cover; Duct Outer Contour ICCP Anode
d) OSID Reference Cell Kit - C24538000A: COLUMBIA CLASS OSID REFERENCE CELL KIT
Propulsor Engineering Request (PER):
D.1) PER 0223, Columbia Class OSID Reference Cell; Reference Cell Upper Mounting Shim D.2) PER 0342, Columbia Class OSID Reference Cell; Duct Inner Contour ICCP Reference Cell D.3) PER 0224, Columbia Class OSID Reference Cell; Reference Cell Lower Mounting Cell
3.0 Technical Requirements
3.1 Qualification
The contractor shall develop and execute its approach to become qualified to perform all operations necessary to achieve those qualification requirements. All qualification requirements are noted in references (A) through (D) and their subcomponents (CDRL A001).
3.2 Process Development & Destructive First Articles
The contractor shall develop and demonstrate its process to manufacture references (A) through (D) to include, if necessary, process development articles, risk reduction demonstration articles, etc. This includes all requirements in references (A) through (D) to execute destructive first article assessments (CDRL A001).
3.3 Ropeguard and Duct ICCP Component Manufacturing Requirements
3.3.1 The contractor shall manufacture, paint, and deliver one (1) Ropeguard Kit as defined in reference (A), PERs (A.1 – A.6) and the specifications and requirements referenced therein. Each delivered kit shall include the items and quantities specified in reference (A). The contractor shall provide a final certification package for each kit in accordance with reference (A). In the event of a conflict between reference (A) and PERs (A.1 – A.6), the PER references take precedence. (CDRL A002).
| 3.3.2 | The contractor shall manufacture, paint, and deliver one (1) Reference Cell Cover Kit as defined in reference (B), PERs (B.1 – B.4) and the specifications and requirements referenced therein. Each delivered kit shall include the items and quantities specified in reference (B). The contractor shall provide a final certification package for each kit in accordance with reference (B). In the event of a conflict between reference (B) and PERs (B.1 – B.4), the PER references take precedence. (CDRL A002) |
| 3.3.3 | The contractor shall manufacture, paint, and deliver one (1) Anode Cover Kit as defined in reference (C), PERs (C.1 – C.6) and the specifications and requirements referenced therein. Each delivered kit shall include the items and quantities specified in reference (C). The contractor shall provide a final certification package for each kit in accordance with reference (C). In the event of a conflict between reference (C) and PERs (C.1 – C.6), the PER references take precedence. (CDRL A002) |
| 3.3.4 | The contractor shall manufacture, paint and, deliver one (1) OSID Reference Cell Kit as defined in reference (D), PERs (D.1 – D.3) and the specifications and requirements referenced therein. Each delivered kit shall include the items and quantities specified in reference (D). The contractor shall provide a final certification package for each kit in accordance with reference (D). In the event of a conflict between reference (D) and PERs (D.1 – D.3), the PER references take precedence. (CDRL A002) |
3.4 Engineering Services
Upon receipt of a written request from the Contracting Officer, the contractor may perform engineering services in support of CLB Propulsor related design review, design change or other engineering related tasking.
4.0 General Requirements
4.1 Manufacturing Plan (CDRL A003)
| The contractor shall develop a Manufacturing Plan that provides, in detail, the internal | (prime vendor) and external (sub-vendor/supplier) processes required to complete the | delivery of all end items. | |
| 4.2 | Project Planning Chart (CDRL A004) | ||
| 4.2.1 | The contractor shall design and develop a project-planning chart that graphically depicts a composite schedule of all planned technical activities and milestones. This data item shall be submitted as an appendix to the Monthly Status Report. | ||
| 4.2.1 | The contractor shall design the logical sequence of activities to execute manufacturing of each kit. The sequence of activities shall include designation of all Production Milestone Tasks that capture critical path production processes, top-level production processes, and/or sub-contracted production processes that have the potential to impact end item delivery dates if they are delayed. |
4.2.2 Gantt chart essential elements shall include discrete tasks and activities consistent with authorized work and relationships for contract completion by identifying items from contract award through completion of each Contract Line Item Number (CLIN). Further, identify the critical path, all major events, and program milestones. The contractor shall define baseline Planned Start Dates for each Production Milestone Task. The contractor shall also define the Latest Start Dates for each Production Milestone Task which are the latest that a production task can begin that does not affect the end item delivery date. The contractor shall inform the Contracting Officer’s Representative (COR) in writing of any changes to the baseline Production Milestone Task Planned or Latest Start dates at least 30 days prior to changing the baseline.
| 4.2.3 | Activities shall have a total slack or float identified for critical path analysis and impact analysis from delays. Subordinate level elements (3rd thru 5th level or greater activities) shall not exceed 30 work days in duration. The contractor shall propose any exceptions to this parameter in its proposal and to the Procuring Contracting Officer (PCO) and COR for approval in writing. The contractor may implement any exceptions only upon approval in writing by the PCO or COR. |
| 4.3 | Risk Status Management Report (CDRL A003) |
The contractor shall develop a Risk Status Management Report (RSMR). The RSMR shall provide a risk assessment for each Production Milestone Task as identified in the Project Planning Chart, Planned Start Dates, Actual Start Dates (where applicable), and whether future Planned Start Dates are on track or at risk of exceeding the Latest Start Dates shall be visually illustrated for each Production Milestone Task. The RSMR shall also include risk-mitigating recommendations to the Government based on risks associated with each milestone.
4.4 Monthly Status Reports (CDRL A005)
The contractor shall submit monthly status reports. The report shall clearly demonstrate progress against key milestone dates in the Project Planning Chart. The report shall include the progress/status of all work, including that of subcontractors, inventory of all parts in production and in stock, action items, discussion topics, and rationale for schedule delays and improvements. The contractor shall also provide machine status, action item tracking, and risk identification and management strategies. The monthly report shall include a separate attachment containing key milestones through completion of each kit and shall include schedule impacts to each key milestone if schedule delays or accelerations are achieved by the contractor.
5.0 Biannual Progress Reviews and Kickoff Meeting
The contractor shall host a kick-off meeting no later than 30 days after contract award. Thereafter, the contractor shall be responsible for planning, scheduling, and conducting biannual progress reviews with Government representatives (CDRL A006, CDRL A007). These reviews shall be held at the contractor’s facility, or a subcontractor’s facility, as agreed to by the Government. Each review shall include, at a minimum:
· Status briefing
· Facility tour of the work in progress;
· Manufacturing status;
· Configuration control/quality assurance;
· Contractor-requested requests for variance;
· Adherence to contract delivery schedule;
· Any outstanding action items; and,
· Any other information which may impact contract performance or delivery.
6.0 Requests for Variance
During production, the contractor shall submit all requests for deviations and/or waivers on DD Form 1694 to the Contracting Officer’ Representative (COR), Contract Specialist, and the Contracting Officer for Government approval.
7.0 Deliverables
7.1 End-Item and Report Deliverable Target Delivery Dates
| CLIN |
| Description |
| Target Award Date |
| Delivery Date |
| 0001AA |
| Qualification |
| 10/31/2024 |
| 10/31/2025 |
| 0002AA |
| Process Development & Destruction First Articles |
| 10/31/2024 |
| 10/31/2025 |
| 0003AA |
| Shipset 1 (1 Ropeguard, 1 Reference Cell Kit, 1 Anode Kit, and 1 Outer Structure Kit) |
| 10/31/2024 |
| 04/30/2027 |
| 0004AA |
| Engineering Services |
| 10/31/2024 |
| 10/30/2025 |
| 1001AA |
| Shipset 2 (1 Ropeguard, 1 Reference Cell Kit, 1 Anode Kit, and 1 Outer Structure Kit) |
| 10/31/2024 |
| 10/31/2027 |
| 1002AA |
| Shipset 3 (1 Ropeguard, 1 Reference Cell Kit, 1 Anode Kit, and 1 Outer Structure Kit) |
| 10/31/2025 |
| 04/30/2028 |
| 1003AA |
| Engineering Services |
| 10/31/2025 |
| 10/30/2026 |
| 2001AA |
| Shipset 4 (1 Ropeguard, 1 Reference Cell Kit, 1 Anode Kit, and 1 Outer Structure Kit) |
| 01/31/2027 |
| 10/31/2028 |
| 2002AA |
| Shipset 5 (1 Ropeguard, 1 Reference Cell Kit, 1 Anode Kit, and 1 Outer Structure Kit) |
| 10/31/2027 |
| 04/30/2029 |
| 2003AA |
| Engineering Services |
| 10/31/2026 |
| 10/30/2027 |
| 3001AA |
| Shipset 6 (1 Ropeguard, 1 Reference Cell Kit, 1 Anode Kit, and 1 Outer Structure Kit) |
| 10/31/2027 |
| 04/30/2029 |
| 3002AA |
| Shipset 7 (1 Ropeguard, 1 Reference Cell Kit, 1 Anode Kit, and 1 Outer Structure Kit) |
| 10/31/2028 |
| 04/30/2030 |
| 3003AA |
| Engineering Services |
| 10/31/2027 |
| 10/31/2028 |
The contractor shall deliver of base and option CLINs (if awarded) according to the anticipated delivery schedule below.
7.2 Contract Data Requirements Lists (CDRLs)
| The contractor shall deliver the following CDRLs for this requirement in accordance with | Section C. |
| CDRL | |
| Title |
| A001 |
| Test Plan |
| A002 |
| Test/Inspection Report |
| A003 |
| Technical Data Package (TDP) |
| A004 |
| Project Planning Chart |
| A005 |
| Status Report |
| A006 |
| Presentation Material |
| A007 |
| Report, Record of Meeting/Minutes |
7.3 End-Item Deliverable Destinations:
Ropeguard Kit Deliveries:
General Dynamics Electric Boat 75 Eastern Point Rd Groton CT, 06340 Duct ICCP Kit Deliveries:
Naval Foundry & Propeller Center 1701 Kitty Hawk Ave. Gate #3 Philadelphia, PA 19112
8.0 Travel
The contractor shall travel to the Washington D.C area once per year to support this effort. The contractor shall propose the travel required to execute the additional options added to this requirement.