2.03a RFP Attachment (I)-2 TGI_38K6A49503A01_c0v0.pdf
PDF 1 MB Posted
- Solicitation number
- N6264925RB008
About this file
This document is a WebAIM Short Form Task Group Instruction (TGI) for scaffolding installation and removal on the USS Rafael Peralta (DDG-115) located at Commander, Fleet Activities Yokosuka. The TGI covers a specific maintenance task for antenna number 6-13, with scaffolding to be erected and removed by ship's force between 8/30/2025 and 9/20/2025. The work will be performed at the Pole Mast, Frame 179, Ship's Center Line, with SRF-JRMC providing supplemental services including crane and rigging service, safety inspections, and quality assurance inspections.
Key references include NAVSEA Standard Items, Local Standard Items, and the Code of Federal Regulations (29 CFR Part 1915.71) regarding scaffolding and staging. The instruction is marked FOUO (For Official Use Only) and involves personnel from Code 231B (Planner K. Ishikawa) and Code 333 (Work Integration Manager T. Yaginuma). No government-furnished material is required, and the job is associated with Job Control Number (JCN) OT01-0649.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 2.03b RFP Attachment (II) Price Proposal Form (blank).xlsx | XLSX spreadsheet | |
| 2.03a RFP Attachment (I)-1 TGI_38K6A52103A02_c1v1.pdf | ||
| 2.03 RFP N6264925RB008.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FOUO
WebAIM Short Form TASK GROUP INSTRUCTION
24-JUN-2025 1138
20.14.15.2.9020 (September 2024) ICN: 38K6A49503 KeyOp: A01
COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: TEMPORARY STAGING SF TST A 0 0/0
SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:
DDG-115 USS RAFAEL PERALTA K6A 86512
CU PHASE TITLE: *F/O - INSTALL AND REMOVE SCAFFOLDING TO/FROM ANT NO. 6-13 FOR SHIP’S FORCE WORK
WORK CERTIFICATION SIGNATURES: DLs
COMPLETION OF WORK REVIEW: BADGE NO: SHOP/CODE: PHONE: DATE:
RECORDS REVIEW: BADGE NO: SHOP/CODE: PHONE: DATE:
FOUO Pg 1 of 3
OT010649
PREPARING ACTIVITY: STATUS: APP WORKING STATUS:
PREPARED BY: CODE: PHONE: DATE:
ISHIKAWA, KENICHIRO 231B 3152432479 20-JUN-2025
APPROVED BY: CODE: PHONE: DATE:
TAKEISHI, TAKAYUKI 231B 3152436704 20-JUN-2025
CONCURRED BY: CODE: PHONE: DATE:
REASON FOR WORK/NEED FOR CHANGE:
JCN:
OT01-0649
SPECIAL REQUIREMENTS:
CU PHASE DESCRIPTION:
ZONE MANAGER: ZONE: COMPARTMENT: LEVEL: FRAME: SIDE:
YAGINUMA, TAKEHIDE VARIOUS U
JOB SUMMARY ID: TOT MAN HR.: TOT DUR: TOT JML COST: PLANNING ACCEPTANCE:
495A4103
1. SCOPE/PURPOSE:
1.1 Title: Scaffolding for Ship’s Force Work; install and remove
1.2 Location of Work:
1.2.1 Pole Mast, Frame 179, Ship’s Center Line
1.3 Identification:
1.3.1 Quantity (One Lot), Scaffolding Assembly
Location: 1.2.1 Remarks: Maintenance work of antenna number 6-13 will be accomplished by Ship's Force.
1.4 Security Classification: None.
TGI Short Form
24-JUN-2025 1138
20.14.15.2.9020 (September 2024) (Continued) ICN: 38K6A49503 KeyOp: A01
COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: TEMPORARY STAGING SF TST A 0 0/0
SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:
DDG-115 USS RAFAEL PERALTA K6A 86512
CU PHASE TITLE: *F/O - INSTALL AND REMOVE SCAFFOLDING TO/FROM ANT NO. 6-13 FOR SHIP’S FORCE WORK
FOUO Pg 2 of 3
CU PHASE DESCRIPTION (Cont.)
Ref.
No.
Document/Drawing Number DOCUMENT/DRAWING TITLE REV
CHG
NO.
CPY
REQ PARAGRAPH SECT PG CHPT
1.5 Initial Condition: None.
1.6 Contractor work start date:
1.7 Contractor work completion date:
2. PROCEDURE:
2.1 Erect/hang scaffolding listed in 1.3.1 in accordance with Ref. No. 3.
2.2 Remove scaffolding listed in 1.3.1 upon completion of the work in accordance with Ref. Ref. No. 3 when requested by Ship’s Force via Code 333.
2.3 Notes:
2.3.1 Planner: Code 231B K. Ishikawa, 243-2479
2.3.2 Work Integration Manager (WIM): Code 333 T. Yaginuma, 080-5419-0598
2.3.3 JCN OT01-0649 is related to this TGI.
2.4 Government Furnished Material (GFM): None.
2.5 SRF-JRMC will provide the following service work: (TGI No. 38K6A49503S02).
2.5.1 [C740] Crane and crane rigging service.
2.5.2 [C106.1] Safety inspection for SRF-JRMC employees.
2.5.3 [C133] QA inspection for (G) symbol(s).
Kouichi.Yoshida.ja Typewritten Text 8/30/2025
Kouichi.Yoshida.ja Typewritten Text 9/20/2025
24-JUN-2025 1138
20.14.15.2.9020 (September 2024) (Continued) ICN: 38K6A49503 KeyOp: A01
COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: TEMPORARY STAGING SF TST A 0 0/0
SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:
DDG-115 USS RAFAEL PERALTA K6A 86512
CU PHASE TITLE: *F/O - INSTALL AND REMOVE SCAFFOLDING TO/FROM ANT NO. 6-13 FOR SHIP’S FORCE WORK
FOUO Pg 3 of 3
Ref.
No.
Document/Drawing Number DOCUMENT/DRAWING TITLE REV
CHG
NO.
CPY
REQ PARAGRAPH SECT PG CHPT
1 NSI FY-25 NAVSEA Standard Items - 1 N 2 LI FY-25 Local Standard Items - ORG N
3 TM 29 CFR PART
1915.71 Scaffolding or Staging - N
SHOP/
TSD TS
SF
WC
CREW
# MHRS RWRK
MATERIAL LIST
ITEM
NO.
PC
NO.
REF
NO.
M
C DESCRIPTION
STOCK
NUMBER
GENERIC
MATL
TYPE LVL QA
HAZ
MAT
DOC
NO.
QTY
REQD/
UNIT
QTY
USED/
UNIT
MATERIAL REFERENCES
REF
NO.
DOCUMENT/DRAWING NUMBER DOCUMENT/DRAWING TITLE
REV
ICN: 38K6A49503 KEY OP: A01
File details come from the government source that posted it. Updated .