This document is a construction plan submission for the State System of Higher Education (SSHE) Commonwealth University's Bloomsburg Campus, specifically for the KUB/Schuyler Drive Steam and Condensate Replacement project (CWU-88-B). The project involves the demolition and replacement of underground steam and condensate piping systems serving the Kehr Union Building and surrounding campus facilities. The scope of work includes excavation and site preparation, demolition of existing steam and condensate piping systems with associated insulation and components, installation of new underground utility piping systems, and restoration of affected areas. The construction documents submitted represent the as-built submission dated April 1, 2026, and consist of 20 sheets including general notes, site plans, existing and proposed conditions, demolition plans, and detailed construction specifications for multiple manhole locations (Manhole C and Manhole 6) and connecting loops. A mandatory pre-bid conference with site visit was scheduled for April 16, 2026, at 11:00 AM at Kehr Union Building Room 343, with electronic bids due May 12, 2026, at 1:00 PM EDT through the PennBid platform.
The project requires mechanical contractors capable of providing all excavation, backfill, sheeting, shoring, dewatering, rock excavation, surveying, layout, and test pitting necessary for utility installation and restoration. Contractors must furnish and install complete steam and condensate piping systems with insulation, valves, supports, expansion components, and associated fittings. The contract is structured as a Separate Prime Contractor arrangement with the mechanical contractor operating as the Lead Prime Contractor responsible for coordination and management. Pennsylvania Prevailing Wage Act requirements apply to the project. Bidders must register with PennBid to access the solicitation documents at no cost and submit proposals through the platform. The construction documents were prepared by a Professional Registered Engineer and include comprehensive technical specifications, existing condition assessments, and detailed construction methodologies for the underground utility replacement work.
View the file
Other files
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATE SYSTEM OF HIGHER EDUCATION
COMMONWEALTH OF PENNSYLVANIA
BLOOMSBURG CAMPUS
COLUMBIA COUNTY, PENNSYLVANIA
PROJECT/CONTRACT NO.: CWU-88-B / CWU-88-B
KUB/SCHUYLER DRIVE STEAM AND CONDENSATE REPLACEMENT
CONSTRUCTION DOCUMENTS - (04-01-2026)
SHEET # SHEET NAME
SHEET INDEX
PROJECT SITE
PRE-FINAL
DOCUMENTS
JOSHUA SHAPIRO, GOVERNOR
CHRISTOPHER FIORENTINO, CHANCELLOR
JEFFERY L OSGOOD, INTERIM PRESIDENT
L&I
SUBMISSION
VICINITY MAP
PROJECT
AREA
JS
JSD
CS
1 of
COVER SHEET
CONSTRUCTION
SUBMISSION
PROJECT
LOCATION
STATE SYSTEM OF HIGHER EDUCATION
Scale:
Date:
Project/Contract No.
Drawn By:
Checked By:
Drawing No.
Title:
Submitted:
Authorized By:
Reviewed By:
Submitted:
Description DescriptionDateDate
System Representative:
Construction Manager:
Consultant:
Professional:
BLOOMSBURG CAMPUS
BLOOMSBURG, COLUMBIA COUNTY, PENNSYLVANIA
AS NOTED
CWU-88-B / CWU-88-B
COMMONWEALTH UNIVERSITY
KUB/SCHUYLER DRIVE STEAM AND CONDENSATE REPLACEMENT
AS-BUILT
SUBMISSION
PROFESSIONAL
REGISTERED
ENGINEER
NO.0398 5-E
04-01-2026
CS COVER SHEET
G-1 GENERAL NOTES AND LEGEND
G-2 OVERALL SITE PLAN
RC-1 EXISTING CONDITIONS MH C TO MH 6
RC-2 EXISTING CONDITIONS MH 7 TO MH 6 LOOP
D-1 MH C TO MH 6 DEMOLITION PLAN
D-2 MH 7 TO MH 6 LOOP DEMOLITION PLAN
C-1 MH C TO MH 6 PLAN AND PROFILE
C-2 MH 7 TO MH 6 PLAN AND PROFILE
C-3 EXISTING MANHOLE 6 DETAILS
C-4 MANHOLE 6 DEMOLITION DETAILS
C-5 PROPOSED MANHOLE 6 DETAILS
C-6 EXISTING MANHOLE 6 PIPE PENETRATION DETAILS
C-7 EXISTING AND DEMOLITION MANHOLE C DETAILS
C-8 PROPOSED MANHOLE C DETAILS
C-9 EXISTING MANHOLE C PIPE PENETRATION DETAILS
C-10 CONSTRUCTION DETAILS
C-11 CONSTRUCTION DETAILS
C-12 CONSTRUCTION DETAILS
C-13 CONSTRUCTION DETAILS
C-14 CONSTRUCTION DETAILS
C-15 EXISTING MANHOLE PHOTOS
Z:
\2
.0 6-
C om m on w ea lth U ni v-
KU
B-
Sc hu yl er
D r S te am
-C on de ns at e
R ep
\0
D es ig n\
_C
AD
\0 4-
D ra w in gs \C on st r\C V-
C om m on w ea lth U ni v-
KU
B-
Sc hu yl er
D r S te am
-C on de ns at e
R ep
.d w g, /1 /2
:3
8:
A M
GENERAL NOTES AND LEGEND
G-1
PROFESSIONAL
REGISTERED
ENGINEER
NO.0398 5-E
Z:
\2
.0 6-
C om m on w ea lth U ni v-
KU
B-
Sc hu yl er
D r S te am
-C on de ns at e
R ep
\0
D es ig n\
_C
AD
\0 4-
D ra w in gs \C on st r\G N
-C om m on w ea lth U ni v-
KU
B-
Sc hu yl er
D r S te am
-C on de ns at e.
dw g, /1
/2
:3 9:
MOTORCYCLES
NO
E N
TE
R
STOP
TU
N
N E
L
OSUNA DRIVE
TUNNEL
C O
U N
TR
Y
C
LU
B R
O A
D
LIGHTSTREET ROAD (RT. 487)
RESIDENCE)
GARAGE
SUTLIFF HALL HALL
WALLER
STUDENT
RECREATION
C O
LU
M
B
IA
ANDRUSS
H A
R
TLIN
E
S P
R U
C E
S
TR
E E
T
EAST 1ST STREET
ALUMNI HOUSE
LIBRARY
HOUSE
MITCHELL
BUS
SHELTER
LIGHTSTREET ROAD
BUS
SH
EL
TE
R
TUNNEL
BUCKALEW
STOP
STOP
13 H eating P lant P arking Lo t
2.2
3.9
3.8
3.6 4.1
3.75
(4.6)
4.12.65
3.14
3.3
3.6
1.3
5.0
2.75
1.1
(.85)
(2.7) (2.8)
(4.0)
(2.3)
(3.6)
(2.8)
(3.7)
(4.8)
(2.9)
(2.9)
(2.5)
(3.09)
(3.2)
(2.84) (2.1)
(3.6)
(5.1)
(2.4)
(4.0)
(2.7)
(2.0) - LARSON'S READINGS
3.14 - CARL'S READINGS
(2.7) (5.0) (4.0)
(2.3)
(4.0) (4.3)
(4.2)
(3.6)
(2.0) (1.7)
(4.6)
(3.7)(2.4)
(3.7)
(3.2)
(2.8) (3.75)
(3.5)
(3.0) (0.8) (2.2)
(2.2)
(1.8)
(1.0)
(2.3) (1.9)
(2.3)
(5.5)
(2.3)
(2.0)
(2.6)
X
X
X
X
X
EAST SECOND STREET
PARKING
E X
IT
LA
U
B A
C H
D R
IV
E
(alley)
LO
C
U S
T S
TR
E E
T
WILSON
HOUSE
(PRESIDENT'S
CENTER
DEVELOPMENT
TO I-8
S W
IS
H
E R
C
IR
C
LE
CENTENNIAL
SERVICES
STUDENT
CENTER
PARKING
GARAGE
H A
LL
SWISHER CIRCLE
TO DOWNTOWN BLOOMSBURG
FENSTEMAKER
CENTER
f e n c e f e n c e f e n c e
S
TO
P
H
IP
P E
N S
TIE
L D
R
IV
E
BOOK DEPOSIT BOX
f e n c e flag pole
PLACE
BUS LANE
1.4
2.47
3.26
1.72.3
4.9
4.6
3.2
2.32 3.84 2.7
4.15
.46
7.9
1.55
4.2
3.6
3.14
2.2
(3.2) (2.7)
(2.0)
(2.2)
(3.0)
(3.6)
(3.2)
(2.2)
(2.5)
(2.0)
(1.8)
(1.73)
(4.0) (2.6)
(3.7)
(2.1)(2.48) (3.8) (1.1)(2.2)
(4.4)
(4.5)
(2.44)
(4.0)
(1.8)
(2.8)(3.5)
(2.8)
(3.8)
(2.26) (4.2)
(1.6)
(1.6)
(2.1)
(3.9)
(4.3)
(5.8)
(4.0)
(2.85)
(2.9)
(2.3)
(1.75)
(3.0)
(1.7)
(1.5) (1.8)
(4.9)
(2.35)
(1.5)
X
X
X
M O
TO
R
C Y
C
LE
S
NO
PARKING
P A
R K
IN
G
N O
P
R K
IN
G
P A
R K
IN
G
O
SU
N A
D R
IV
E
OSUNA DRIVE
H A
LL
H A
LL
S H
O P
ELWELL HALL
LY
C
O M
IN
G
COMMONS
D R
IV
E
SCRANTON
M O
N
TO
U R
DAY CARE
NORTHUMBERLAND
HALL
U P
D N
D N
EAST PINE AVENUE
EAST SECOND STREET
P A
R K
IN
G
P E
N N
S
TR
E E
T
S C
H U
Y
LE
R D
R
IV
E
S C
H U
Y
LK
ILL
H A
LL
C A
R V
E R
S
IM
O N
KEHR
UNION
C A
R P
E N
TE
R
HALL
LUZERNE HALL
OLD
SCIENCE
O S
U
GATE
PLAYGROUND
MEMORIAL
D N
E
LM
A
LLE
Y
POLICE
PARKING
POLICE
PARKING
POLICE
PARKING
POLICE
PARKING
POLICE
PARKING
POLICE
PARKING
POLICE
PARKING
N A
V Y
WARREN
GREEN VASEJAPANESE ZELKOVA
HAAS
H A
LL
OSUNA DRIVE
BAKELESS
McCORMICK f e n c e
UNIVERSITY
POLICE
H E
A
TIN
G P
LA
N
T
B E
N
FR
A N
K
LIN
WALLER
BUILDING
OVERALL SITE PLAN
G-2
PROFESSIONAL
REGISTERED
ENGINEER
NO.0398 5-E
Z:
\2
.0 6-
C om m on w ea lth U ni v-
KU
B-
Sc hu yl er
D r S te am
-C on de ns at e
R ep
\0
D es ig n\
_C
AD
\0 4-
D ra w in gs \C on st r\G N
-C om m on w ea lth U ni v-
KU
B-
Sc hu yl er
D r S te am
-C on de ns at e.
dw g, /1
/2
:3 9:
EXISTING CONDITIONS
MH C TO MH 6
RC-1
PROFESSIONAL
REGISTERED
ENGINEER
NO.0398 5-E
Z:
\2
.0 6-
C om m on w ea lth U ni v-
KU
B-
Sc hu yl er
D r S te am
-C on de ns at e
R ep
\0
D es ig n\
_C
AD
\0 4-
D ra w in gs \C on st r\C -E
X C
O N
D -C om m on w ea lth
U ni v-
KU
B- Sc hu yl er D r S te am -C on de ns at e R ep .d w g, /1
/2
:4 0:
EXISTING CONDITIONS
MH 7 TO MH 6 LOOP
RC-2
PROFESSIONAL
REGISTERED
ENGINEER
NO.0398 5-E
Z:
\2
.0 6-
C om m on w ea lth U ni v-
KU
B-
Sc hu yl er
D r S te am
-C on de ns at e
R ep
\0
D es ig n\
_C
AD
\0 4-
D ra w in gs \C on st r\C -E
X C
O N
D -C om m on w ea lth
U ni v-
KU
B- Sc hu yl er D r S te am -C on de ns at e R ep .d w g, /1
/2
:4 0:
DEMOLITION PLAN
D-1
PROFESSIONAL
REGISTERED
ENGINEER
NO.0398 5-E
Z:
\2
.0 6-
C om m on w ea lth U ni v-
KU
B-
Sc hu yl er
D r S te am
-C on de ns at e
R ep
\0
D es ig n\
_C
AD
\0 4-
D ra w in gs \C on st r\C -D
EM
O
-C om m on w ea lth U ni v-
KU
B-
Sc hu yl er
D r S te am
-C on de ns at e
R ep
_r ec ov er
.d w g, /1 /2
:4
0:
DEMOLITION PLAN
D-2
PROFESSIONAL
REGISTERED
ENGINEER
NO.0398 5-E
Z:
\2
.0 6-
C om m on w ea lth U ni v-
KU
B-
Sc hu yl er
D r S te am
-C on de ns at e
R ep
\0
D es ig n\
_C
AD
\0 4-
D ra w in gs \C on st r\C -D
EM
O
-C om m on w ea lth U ni v-
KU
B-
Sc hu yl er
D r S te am
-C on de ns at e
R ep
_r ec ov er
.d w g, /1 /2
:4
0:
PLAN AND PROFILE
C-1
PROFESSIONAL
REGISTERED
ENGINEER
NO.0398 5-E
Z:
\2
.0 6-
C om m on w ea lth U ni v-
KU
B-
Sc hu yl er
D r S te am
-C on de ns at e
R ep
\0
D es ig n\
_C
AD
\0 4-
D ra w in gs \C on st r\C -P
LA
N
-C om m on w ea lth U ni v-
KU
B-
Sc hu yl er
D r S te am
-C on de ns at e
R ep
_r ec ov er
.d w g, /1 /2
:4
1:
PLAN AND PROFILE
C-2
PROFESSIONAL
REGISTERED
ENGINEER
NO.0398 5-E
Z:
\2
.0 6-
C om m on w ea lth U ni v-
KU
B-
Sc hu yl er
D r S te am
-C on de ns at e
R ep
\0
D es ig n\
_C
AD
\0 4-
D ra w in gs \C on st r\C -P
LA
N
-C om m on w ea lth U ni v-
KU
B-
Sc hu yl er
D r S te am
-C on de ns at e
R ep
_r ec ov er
.d w g, /1 /2
:4
1:
EXISTING MANHOLE 6
DETAILS
C-3
PROFESSIONAL
REGISTERED
ENGINEER
NO.0398 5-E
Z:
\2
.0 6-
C om m on w ea lth U ni v-
KU
B-
Sc hu yl er
D r S te am
-C on de ns at e
R ep
\0
D es ig n\
_C
AD
\0 4-
D ra w in gs \C on st r\C -D
ET
AI
LS
-C om m on w ea lth
U ni v-
KU
B- Sc hu yl er D r S te am -C on de ns at e R ep _r ec ov er .d w g, /1
/2
:4 2:
MANHOLE 6
DEMOLITION DETAILS
C-4
PROFESSIONAL
REGISTERED
ENGINEER
NO.0398 5-E
Z:
\2
.0 6-
C om m on w ea lth U ni v-
KU
B-
Sc hu yl er
D r S te am
-C on de ns at e
R ep
\0
D es ig n\
_C
AD
\0 4-
D ra w in gs \C on st r\C -D
ET
AI
LS
-C om m on w ea lth
U ni v-
KU
B- Sc hu yl er D r S te am -C on de ns at e R ep _r ec ov er .d w g, /1
/2
:4 2:
PROPOSED MANHOLE 6
DETAILS
C-5
PROFESSIONAL
REGISTERED
ENGINEER
NO.0398 5-E
Z:
\2
.0 6-
C om m on w ea lth U ni v-
KU
B-
Sc hu yl er
D r S te am
-C on de ns at e
R ep
\0
D es ig n\
_C
AD
\0 4-
D ra w in gs \C on st r\C -D
ET
AI
LS
-C om m on w ea lth
U ni v-
KU
B- Sc hu yl er D r S te am -C on de ns at e R ep _r ec ov er .d w g, /1
/2
:4 2:
EXISTING MANHOLE 6
PIPE PENETRATION DETAILS
C-6
PROFESSIONAL
REGISTERED
ENGINEER
NO.0398 5-E
Z:
\2
.0 6-
C om m on w ea lth U ni v-
KU
B-
Sc hu yl er
D r S te am
-C on de ns at e
R ep
\0
D es ig n\
_C
AD
\0 4-
D ra w in gs \C on st r\C -D
ET
AI
LS
-C om m on w ea lth
U ni v-
KU
B- Sc hu yl er D r S te am -C on de ns at e R ep _r ec ov er .d w g, /1
/2
:4 3:
EXISTING AND DEMOLITION
MANHOLE C DETAILS
C-7
PROFESSIONAL
REGISTERED
ENGINEER
NO.0398 5-E
Z:
\2
.0 6-
C om m on w ea lth U ni v-
KU
B-
Sc hu yl er
D r S te am
-C on de ns at e
R ep
\0
D es ig n\
_C
AD
\0 4-
D ra w in gs \C on st r\C -D
ET
AI
LS
-C om m on w ea lth
U ni v-
KU
B- Sc hu yl er D r S te am -C on de ns at e R ep _r ec ov er .d w g, /1
/2
:4 3:
PROPOSED
MANHOLE C DETAILS
C-8
PROFESSIONAL
REGISTERED
ENGINEER
NO.0398 5-E
Z:
\2
.0 6-
C om m on w ea lth U ni v-
KU
B-
Sc hu yl er
D r S te am
-C on de ns at e
R ep
\0
D es ig n\
_C
AD
\0 4-
D ra w in gs \C on st r\C -D
ET
AI
LS
-C om m on w ea lth
U ni v-
KU
B- Sc hu yl er D r S te am -C on de ns at e R ep _r ec ov er .d w g, /1
/2
:4 3:
EXISTING MANHOLE C
PIPE PENETRATION DETAILS
C-9
PROFESSIONAL
REGISTERED
ENGINEER
NO.0398 5-E
Z:
\2
.0 6-
C om m on w ea lth U ni v-
KU
B-
Sc hu yl er
D r S te am
-C on de ns at e
R ep
\0
D es ig n\
_C
AD
\0 4-
D ra w in gs \C on st r\C -D
ET
AI
LS
-C om m on w ea lth
U ni v-
KU
B- Sc hu yl er D r S te am -C on de ns at e R ep _r ec ov er .d w g, /1
/2
:4 3:
CONSTRUCTION
DETAILS
C-10
PROFESSIONAL
REGISTERED
ENGINEER
NO.0398 5-E
Z:
\2
.0 6-
C om m on w ea lth U ni v-
KU
B-
Sc hu yl er
D r S te am
-C on de ns at e
R ep
\0
D es ig n\
_C
AD
\0 4-
D ra w in gs \C on st r\C -D
ET
AI
LS
-C om m on w ea lth
U ni v-
KU
B- Sc hu yl er D r S te am -C on de ns at e R ep _r ec ov er .d w g, /1
/2
:4 3:
PROFESSIONAL
REGISTERED
ENGINEER
NO.0398 5-E
CONSTRUCTION
DETAILS
C-11
Z:
\2
.0 6-
C om m on w ea lth U ni v-
KU
B-
Sc hu yl er
D r S te am
-C on de ns at e
R ep
\0
D es ig n\
_C
AD
\0 4-
D ra w in gs \C on st r\C -D
ET
AI
LS
-C om m on w ea lth
U ni v-
KU
B- Sc hu yl er D r S te am -C on de ns at e R ep _r ec ov er .d w g, /1
/2
:4 4:
CONSTRUCTION
DETAILS
C-12
PROFESSIONAL
REGISTERED
ENGINEER
NO.0398 5-E
Z:
\2
.0 6-
C om m on w ea lth U ni v-
KU
B-
Sc hu yl er
D r S te am
-C on de ns at e
R ep
\0
D es ig n\
_C
AD
\0 4-
D ra w in gs \C on st r\C -D
ET
AI
LS
-C om m on w ea lth
U ni v-
KU
B- Sc hu yl er D r S te am -C on de ns at e R ep _r ec ov er .d w g, /1
/2
:4 4:
C-13
PROFESSIONAL
REGISTERED
ENGINEER
NO.0398 5-E
Z:
\2
.0 6-
C om m on w ea lth U ni v-
KU
B-
Sc hu yl er
D r S te am
-C on de ns at e
R ep
\0
D es ig n\
_C
AD
\0 4-
D ra w in gs \C on st r\C -D
ET
AI
LS
-C om m on w ea lth
U ni v-
KU
B- Sc hu yl er D r S te am -C on de ns at e R ep _r ec ov er .d w g, /1
/2
:4 4:
C-14
PROFESSIONAL
REGISTERED
ENGINEER
NO.0398 5-E
Z:
\2
.0 6-
C om m on w ea lth U ni v-
KU
B-
Sc hu yl er
D r S te am
-C on de ns at e
R ep
\0
D es ig n\
_C
AD
\0 4-
D ra w in gs \C on st r\C -D
ET
AI
LS
-C om m on w ea lth
U ni v-
KU
B- Sc hu yl er D r S te am -C on de ns at e R ep _r ec ov er .d w g, /1
/2
:4 4:
EXISTING MANHOLE PHOTOS
C-15
PROFESSIONAL
REGISTERED
ENGINEER
NO.0398 5-E
Z:
\2
.0 6-
C om m on w ea lth U ni v-
KU
B-
Sc hu yl er
D r S te am
-C on de ns at e
R ep
\0
D es ig n\
_C
AD
\0 4-
D ra w in gs \C on st r\C -D
ET
AI
LS
-C om m on w ea lth
U ni v-
KU
B- Sc hu yl er D r S te am -C on de ns at e R ep _r ec ov er .d w g, /1
/2
:4 5:
| 0 - CV-Commonwealth Univ-KUB-Schuyler Dr Steam-Condensate Rep-CV |
| CV |
| 1 - GN-Commonwealth Univ-KUB-Schuyler Dr Steam-Condensate-GNL |
| GNL |
| 1.2 - GN-Commonwealth Univ-KUB-Schuyler Dr Steam-Condensate-SITE PLAN AND FENCING |
| SITE PLAN AND FENCING |
| 2 - C-EX COND-Commonwealth Univ-KUB-Schuyler Dr Steam-Condensate Rep-RC-1 |
| RC-1 |
| 3 - C-EX COND-Commonwealth Univ-KUB-Schuyler Dr Steam-Condensate Rep-RC-2 |
| RC-2 |
| 4 - C-DEMO-Commonwealth Univ-KUB-Schuyler Dr Steam-Condensate Rep_recover-D-1 |
| D-1 |
| 5 - C-DEMO-Commonwealth Univ-KUB-Schuyler Dr Steam-Condensate Rep_recover-D-2 |
| D-2 |
| 6 - C-PLAN-Commonwealth Univ-KUB-Schuyler Dr Steam-Condensate Rep_recover-C-1 |
| C-1 |
| 7 - C-PLAN-Commonwealth Univ-KUB-Schuyler Dr Steam-Condensate Rep_recover-C-2 |
| C-2 |
| 8 - C-DETAILS-Commonwealth Univ-KUB-Schuyler Dr Steam-Condensate Rep_recover-C-3 |
| C-3 |
| 9 - C-DETAILS-Commonwealth Univ-KUB-Schuyler Dr Steam-Condensate Rep_recover-C-4 |
| C-4 |
| 10 - C-DETAILS-Commonwealth Univ-KUB-Schuyler Dr Steam-Condensate Rep_recover-C-5 |
| C-5 |
| 11 - C-DETAILS-Commonwealth Univ-KUB-Schuyler Dr Steam-Condensate Rep_recover-C-6 |
| C-6 |
| 12 - C-DETAILS-Commonwealth Univ-KUB-Schuyler Dr Steam-Condensate Rep_recover-C-7 |
| C-7 |
| 13 - C-DETAILS-Commonwealth Univ-KUB-Schuyler Dr Steam-Condensate Rep_recover-C-8 |
| C-8 |
| 14 - C-DETAILS-Commonwealth Univ-KUB-Schuyler Dr Steam-Condensate Rep_recover-C-9 |
| C-9 |
| 15 - C-DETAILS-Commonwealth Univ-KUB-Schuyler Dr Steam-Condensate Rep_recover-C-10 |
| C-10 |
| 16 - C-DETAILS-Commonwealth Univ-KUB-Schuyler Dr Steam-Condensate Rep_recover-C-11 |
| C-11 |
| 17 - C-DETAILS-Commonwealth Univ-KUB-Schuyler Dr Steam-Condensate Rep_recover-C-12 |
| C-12 |
| 18 - C-DETAILS-Commonwealth Univ-KUB-Schuyler Dr Steam-Condensate Rep_recover-C-13 |
| C-13 |
| 19 - C-DETAILS-Commonwealth Univ-KUB-Schuyler Dr Steam-Condensate Rep_recover-C-14 |
| C-14 |
| 20 - C-DETAILS-Commonwealth Univ-KUB-Schuyler Dr Steam-Condensate Rep_recover-C-15 |
| C-15 |