2-Colonel Estill Construction Plans - Bid Set.pdf
PDF 7 MB Posted
- Attached to
- Colonel Estill Drainage Improvements
- Solicitation number
- 26-0047-5
- Issued by
- Chatham County, Georgia
About this file
This is a construction bid set document prepared by Hussey Gay Bell for drainage improvements in unincorporated Chatham County, Georgia, along Colonel Estill Avenue on Isle of Hope. The project scope includes removal of existing drainage pipes and structures, installation of new stormwater pipes and appurtenances, construction or modification of open channels, utility adjustments, and associated work as depicted in the comprehensive construction plans. The plans consist of multiple sheets including cover sheets, construction notes and legends, paving and grading plans, construction details, and erosion and sedimentation control plans and details. The project is dated March 2026 and prepared under job number 124232710. Key project requirements include pre-construction meetings scheduled with Chatham County at 912-652-7100, proper permitting prior to work commencement, traffic control plan submittal for county engineering review and approval, utility coordination with 811 notification required a minimum of 72 hours prior to digging, and protection of existing benchmarks and control points. Roadway and property access must be maintained throughout construction unless otherwise directed, and temporary blockages are acceptable provided stormwater flow capacity is maintained.
The contractor is responsible for locating and protecting all existing utilities, with any damage repairs at the contractor's expense, and must coordinate construction activities with local utility companies. All disturbed areas not covered by other surfaces must be stabilized through grassing by seeding, fertilizing, mulching, and watering. Construction must comply with Georgia's State Soil and Water Conservation Committee Manual for Erosion and Sedimentation Control, with all sediment control features maintained regularly and removed upon site acceptance by the owner. All drainage pipes must be reinforced concrete pipe Class III unless otherwise noted, with storm drain joints double-wrapped in filter fabric at the contractor's cost. The contractor must prepare and submit a traffic control plan to Chatham County Engineering for review and approval prior to beginning construction, with all traffic control measures—including signs, barrels, barricades, and flaggers—included in the lump sum price bid. All work shall conform to project specifications, and any discrepancies between plans and field conditions must be reported immediately to the engineer for direction.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 6-List of Subcontractors (Fillable).pdf | ||
| 1-Bid 26-0047-5.pdf | ||
| 4-26-0047-5 Bid Sheet.xlsx | XLSX spreadsheet | |
| 8-Surety Form (Fillable).pdf | ||
| 3-Colonel Estill Technical Specifications.pdf | ||
| 5-Attachments A - I (Fillable) with Notary Fields.pdf | ||
| 7-References 07.15 Fillable.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
329 COMMERCIAL DRIVE, SAVANNAH, GA 31406 / T:912.354.4626
www.husseygaybell.com
Established 1958
HUSSEY GAY BELL
SAVANNAH ATLANTA STATESBORO BLUE RIDGE CHARLESTON COLUMBIA GREENVILLE NASHVILLE
FOR
E :\C ha th am C ou nt y\
C ol on el
E st ill D riv e
D ra in ag e_
TO
1\
C ad d Fi le s\
C on st ru ct io n\ C
0.
1_
C O
V E
R .d w g
D ec em be r
, 2
- 8
:5
A M
P rin te d B y:
v sm ith
D R
A W
IN
G
S M
A Y
N O
T B
E R
E P
R O
D U
C E
D
IN
A N
Y F
O R
M W
IT
H
O U
T W
R
IT
TE
N
P E
R M
IS
S
IO
N
A
LL
R
IG
H
TS
R E
S E
R V
E D
C C
O P
Y R
IG
H
T
DRAINAGE IMPROVEMENTS
COLONEL ESTILL AVENUE
CHATHAM COUNTY, GEORGIA
CHATHAM COUNTY COMMISSONERS
MARCH, 2026
NOT FOR CONSTRUCTION
AutoCAD SHX Text
FERGUSON AVENEUE
AutoCAD SHX Text
DIAMOND CAUSEWAY
AutoCAD SHX Text C0.1
AutoCAD SHX Text
COVER SHEET, VICINITY MAP, AND SCHEDULE OF DRAWINGS
AutoCAD SHX Text C0.2
AutoCAD SHX Text
CONSTRUCTION NOTES AND LEGEND
AutoCAD SHX Text
SITE
AutoCAD SHX Text
SITE
AutoCAD SHX Text CONSTRUCTION EXIT LATITUDE: 31.974880 N 31.974880° NLONGITUDE: -81.063558 W-81.063558° W
AutoCAD SHX Text
DESCRIPTION
AutoCAD SHX Text
SHEET NO.
AutoCAD SHX Text
VICINITY MAP
AutoCAD SHX Text
SCHEDULE OF DRAWINGS
AutoCAD SHX Text
SCALE:
AutoCAD SHX Text C0.3
AutoCAD SHX Text
PAVING, GRADING, AND DRAINAGE PLAN
AutoCAD SHX Text C0.4
AutoCAD SHX Text
CONSTRUCTION DETAILS
AutoCAD SHX Text
EC0.1-EC0.2
AutoCAD SHX Text
EROSION AND SEDIMENTATION CONTROL NOTES
AutoCAD SHX Text
EC0.3
AutoCAD SHX Text
EROSION AND SEDIMENTATION CONTROL PLAN
AutoCAD SHX Text
EC0.4
AutoCAD SHX Text
EROSION AND SEDIMENTATION CONTROL DETAILS
AutoCAD SHX Text 1"=2000'
E st ab lis he d
H U
SS
E
Y G
A Y
B E
L L
CO
MM
ER
CIA
L D
RIV
E
, S
AV
AN
NA
H , G
A
/ T
:91 2.3
54.
D ec em be r
, 2
- 8 :5 te d
B y:
v sm ith E
:\C ha th am
C ou nt y\
C ol on el E st ill
D riv e D ra in ag e_
TO
1\ C ad d
Fi le s\ C on st ru ct io n\
C 0.
2_ N
O
TE
.d w g D
R A
W
IN
G S
M A
Y N
O T
B E
R E
P R
O D
U C
E D
IN
A
N Y
F O
R M
W
IT
H O
U T
W R
IT
TE
N P
E R
M
IS
S
IO
N
A
LL
R
IG
H
TS
R
E S
E R
V E
D C
C O
P Y
R
IG
H T
CAL
L 811 BEFORE YOU DIG
SAFE DIGGI NG PARTNER
Xx
Xx
ZONE ___
ZONE ___
AutoCAD SHX Text
SCALE:
AutoCAD SHX Text
JOB NO.
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
DESIGNED
AutoCAD SHX Text
DRAWN
AutoCAD SHX Text
CHECKED
AutoCAD SHX Text
REVISIONS:
AutoCAD SHX Text
DRAWING NUMBER
AutoCAD SHX Text
FOR
AutoCAD SHX Text
AutoCAD SHX Text
NOT FOR CONSTRUCTION
AutoCAD SHX Text
BRN
AutoCAD SHX Text
VRS
AutoCAD SHX Text
BRN
AutoCAD SHX Text
MARCH, 2026
AutoCAD SHX Text 124232710
AutoCAD SHX Text
DRAINAGE IMPROVEMENTS
AutoCAD SHX Text
COLONEL ESTILL AVENUE
AutoCAD SHX Text
CHATHAM COUNTY, GEORGIA
AutoCAD SHX Text
THE CHATHAM COUNTY COMMISSIONER
AutoCAD SHX Text
GENERAL NOTES, ABBREVIATIONS, SYMBOLS & LEGEND:
AutoCAD SHX Text
CONSTRUCTION NOTES AND LEGEND
AutoCAD SHX Text C0.2
AutoCAD SHX Text N.T.S.
AutoCAD SHX Text W
AutoCAD SHX Text
LEGEND:
AutoCAD SHX Text
EXISTING
AutoCAD SHX Text
PROPOSED
AutoCAD SHX Text
PAVING (BITUMINOUS ASPHALT PAVING)
AutoCAD SHX Text
ASPHALT (STANDARD DUTY)
AutoCAD SHX Text
ASPHALT (OVERLAY)
AutoCAD SHX Text
ASPHALT (PATCH)
AutoCAD SHX Text
CONCRETE (PEDESTRIAN SIDEWALK)
AutoCAD SHX Text
PAVING (PORTLAND CEMENT CONCRETE)
AutoCAD SHX Text
CONCRETE (STANDARD DUTY)
AutoCAD SHX Text
CONCRETE (PATCH)
AutoCAD SHX Text
CONCRETE (ROLLER COMPACTED CONCRETE)
AutoCAD SHX Text
FINISHED GRADE
AutoCAD SHX Text
SPOT ELEVATIONS
AutoCAD SHX Text
XX.XX
AutoCAD SHX Text
AutoCAD SHX Text
FGXX.XX
AutoCAD SHX Text
(PVI) XX.XX
AutoCAD SHX Text
XX.XX
AutoCAD SHX Text
CONTOUR
AutoCAD SHX Text
BENCHMARK (DATUM NAVD88)
AutoCAD SHX Text
SURVEY FEATURES
AutoCAD SHX Text
HOR. CONTROL POINT (GA. EAST ST. PLANE)
AutoCAD SHX Text
CONCRETE MONUMENT (PROPERTY OR R/W)
AutoCAD SHX Text
SIGN
AutoCAD SHX Text
WOODSLINE
AutoCAD SHX Text
TREE
AutoCAD SHX Text
MAILBOX
AutoCAD SHX Text
UTILITY POLE
AutoCAD SHX Text
ELECTRICAL BOX
AutoCAD SHX Text
COMMUNICATION APPURTENANCE
AutoCAD SHX Text
GAS METER
AutoCAD SHX Text
OVERHEAD ELECTRICITY
AutoCAD SHX Text
UNDERGROUND ELECTRICITY
AutoCAD SHX Text
UNDERGROUND TELEPHONE
AutoCAD SHX Text
UNDERGROUND CABLE/TV
AutoCAD SHX Text
UNDERGROUND FIBER
AutoCAD SHX Text
UNDERGROUND GAS
AutoCAD SHX Text
PROPERTY MARKER (IRON PIPE OR REBAR)
AutoCAD SHX Text
MB
AutoCAD SHX Text E
AutoCAD SHX Text T
AutoCAD SHX Text
GAS VALVE
AutoCAD SHX Text
GM
AutoCAD SHX Text
VALVE
AutoCAD SHX Text
WATER
AutoCAD SHX Text
WATER METER
AutoCAD SHX Text
FIRE HYDRANT
AutoCAD SHX Text
WATER LINE (SIZE UNDETERMINED)
AutoCAD SHX Text
MANHOLE
AutoCAD SHX Text
SEWER
AutoCAD SHX Text
MANHOLE
AutoCAD SHX Text
DRAINAGE
AutoCAD SHX Text
GRATE INLET/DROP INLET/ROOF INLET
AutoCAD SHX Text
STORM DRAIN PIPE
AutoCAD SHX Text
SWALE/DITCH
AutoCAD SHX Text
FLOOD ZONE
AutoCAD SHX Text
SOIL TYPES
AutoCAD SHX Text
ELECTRICAL
AutoCAD SHX Text
TREE PROTECTION
AutoCAD SHX Text
FENCING
AutoCAD SHX Text
CHAIN LINK
AutoCAD SHX Text
BRICK
AutoCAD SHX Text
LIGHT POLE/FIXTURE
AutoCAD SHX Text
TEL
AutoCAD SHX Text
GENERAL
AutoCAD SHX Text
DEMOLITION
AutoCAD SHX Text
PROPERTY/LOT LINE
AutoCAD SHX Text
RIGHT OF WAY
AutoCAD SHX Text
EASEMENT
AutoCAD SHX Text
SETBACK
AutoCAD SHX Text
ROAD CENTERLINE
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
LIGHT POLE
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text
TYP.
AutoCAD SHX Text
OVERHEAD TELEPHONE
AutoCAD SHX Text
OVERHEAD CABLE/TV
AutoCAD SHX Text
AutoCAD SHX Text
GAS
AutoCAD SHX Text
OVERHEAD ELECTRICITY
AutoCAD SHX Text
UNDERGROUND ELECTRICITY
SITE DATA: 1. PROPERTY OWNER ADDRESS: 124 BULL STREET PROPERTY OWNER ADDRESS: 124 BULL STREET 124 BULL STREET SAVANNAH, GEORGIA 31401 2. SITE ZONING: N/A SITE ZONING: N/A N/A 3. SURVEY INFORMATION: HUSSEY, GAY, BELL INC. SURVEY INFORMATION: HUSSEY, GAY, BELL INC. HUSSEY, GAY, BELL INC. 329 COMMERCIAL DRIVE SAVANNAH, GEORGIA (912)354-4626 DATE FIRM PROJECT NUMBER....................124232710 VERTICAL DATUM...............................NAD 1988 HORIZONTAL DATUM..........................NAV 83 4. LOCAL ISSUING AUTHORITY: CHATHAM COUNTY LOCAL ISSUING AUTHORITY: CHATHAM COUNTY CHATHAM COUNTY 5. WATER AND SEWER PROVIDER: CITY OF SAVANNAH WATER AND SEWER PROVIDER: CITY OF SAVANNAH CITY OF SAVANNAH 6. ROAD AND DRAINAGE OPERATOR: CHATHAM COUNTY PUBLIC WORKS ROAD AND DRAINAGE OPERATOR: CHATHAM COUNTY PUBLIC WORKS CHATHAM COUNTY PUBLIC WORKS 7. FLOOD ZONE: IN ACCORDANCE WITH FIRM MAP NO. 13051C0290G, EFFECTIVE DATE: AUGUST 16, 2018, THIS PROPERTY FLOOD ZONE: IN ACCORDANCE WITH FIRM MAP NO. 13051C0290G, EFFECTIVE DATE: AUGUST 16, 2018, THIS PROPERTY IN ACCORDANCE WITH FIRM MAP NO. 13051C0290G, EFFECTIVE DATE: AUGUST 16, 2018, THIS PROPERTY ACCORDANCE WITH FIRM MAP NO. 13051C0290G, EFFECTIVE DATE: AUGUST 16, 2018, THIS PROPERTY ACCORDANCE WITH FIRM MAP NO. 13051C0290G, EFFECTIVE DATE: AUGUST 16, 2018, THIS PROPERTY WITH FIRM MAP NO. 13051C0290G, EFFECTIVE DATE: AUGUST 16, 2018, THIS PROPERTY WITH FIRM MAP NO. 13051C0290G, EFFECTIVE DATE: AUGUST 16, 2018, THIS PROPERTY FIRM MAP NO. 13051C0290G, EFFECTIVE DATE: AUGUST 16, 2018, THIS PROPERTY FIRM MAP NO. 13051C0290G, EFFECTIVE DATE: AUGUST 16, 2018, THIS PROPERTY MAP NO. 13051C0290G, EFFECTIVE DATE: AUGUST 16, 2018, THIS PROPERTY MAP NO. 13051C0290G, EFFECTIVE DATE: AUGUST 16, 2018, THIS PROPERTY NO. 13051C0290G, EFFECTIVE DATE: AUGUST 16, 2018, THIS PROPERTY NO. 13051C0290G, EFFECTIVE DATE: AUGUST 16, 2018, THIS PROPERTY 13051C0290G, EFFECTIVE DATE: AUGUST 16, 2018, THIS PROPERTY 13051C0290G, EFFECTIVE DATE: AUGUST 16, 2018, THIS PROPERTY , EFFECTIVE DATE: AUGUST 16, 2018, THIS PROPERTY EFFECTIVE DATE: AUGUST 16, 2018, THIS PROPERTY EFFECTIVE DATE: AUGUST 16, 2018, THIS PROPERTY DATE: AUGUST 16, 2018, THIS PROPERTY DATE: AUGUST 16, 2018, THIS PROPERTY AUGUST 16, 2018, THIS PROPERTY AUGUST 16, 2018, THIS PROPERTY 16, 2018, THIS PROPERTY 16, 2018, THIS PROPERTY 2018, THIS PROPERTY 2018, THIS PROPERTY , THIS PROPERTY THIS PROPERTY THIS PROPERTY PROPERTY PROPERTY DOES FALL WITHIN THE LIMITS OF THE 100 - YEAR FLOOD PLAIN. (ZONE "AE 10 & AE 11"). FALL WITHIN THE LIMITS OF THE 100 - YEAR FLOOD PLAIN. (ZONE "AE 10 & AE 11"). FALL WITHIN THE LIMITS OF THE 100 - YEAR FLOOD PLAIN. (ZONE "AE 10 & AE 11"). AE 10 & AE 11"). "). GENERAL NOTES: 8. THE CONTRACTOR SHALL NOT BEGIN CONSTRUCTION UNTIL THE PROPER PERMITS HAVE BEEN ISSUED. THE CONTRACTOR SHALL NOT BEGIN CONSTRUCTION UNTIL THE PROPER PERMITS HAVE BEEN ISSUED. 9. WORK IS NOT PERMITTED UNTIL THE PRE-CONSTRUCTION MEETING IS HELD AS REQUIRED. CONTACT CHATHAM COUNTY AT WORK IS NOT PERMITTED UNTIL THE PRE-CONSTRUCTION MEETING IS HELD AS REQUIRED. CONTACT CHATHAM COUNTY AT IS NOT PERMITTED UNTIL THE PRE-CONSTRUCTION MEETING IS HELD AS REQUIRED. CONTACT CHATHAM COUNTY AT IS NOT PERMITTED UNTIL THE PRE-CONSTRUCTION MEETING IS HELD AS REQUIRED. CONTACT CHATHAM COUNTY AT NOT PERMITTED UNTIL THE PRE-CONSTRUCTION MEETING IS HELD AS REQUIRED. CONTACT CHATHAM COUNTY AT NOT PERMITTED UNTIL THE PRE-CONSTRUCTION MEETING IS HELD AS REQUIRED. CONTACT CHATHAM COUNTY AT PERMITTED UNTIL THE PRE-CONSTRUCTION MEETING IS HELD AS REQUIRED. CONTACT CHATHAM COUNTY AT PERMITTED UNTIL THE PRE-CONSTRUCTION MEETING IS HELD AS REQUIRED. CONTACT CHATHAM COUNTY AT UNTIL THE PRE-CONSTRUCTION MEETING IS HELD AS REQUIRED. CONTACT CHATHAM COUNTY AT UNTIL THE PRE-CONSTRUCTION MEETING IS HELD AS REQUIRED. CONTACT CHATHAM COUNTY AT THE PRE-CONSTRUCTION MEETING IS HELD AS REQUIRED. CONTACT CHATHAM COUNTY AT THE PRE-CONSTRUCTION MEETING IS HELD AS REQUIRED. CONTACT CHATHAM COUNTY AT PRE-CONSTRUCTION MEETING IS HELD AS REQUIRED. CONTACT CHATHAM COUNTY AT PRE-CONSTRUCTION MEETING IS HELD AS REQUIRED. CONTACT CHATHAM COUNTY AT MEETING IS HELD AS REQUIRED. CONTACT CHATHAM COUNTY AT MEETING IS HELD AS REQUIRED. CONTACT CHATHAM COUNTY AT IS HELD AS REQUIRED. CONTACT CHATHAM COUNTY AT IS HELD AS REQUIRED. CONTACT CHATHAM COUNTY AT HELD AS REQUIRED. CONTACT CHATHAM COUNTY AT HELD AS REQUIRED. CONTACT CHATHAM COUNTY AT AS REQUIRED. CONTACT CHATHAM COUNTY AT AS REQUIRED. CONTACT CHATHAM COUNTY AT REQUIRED. CONTACT CHATHAM COUNTY AT REQUIRED. CONTACT CHATHAM COUNTY AT CONTACT CHATHAM COUNTY AT CONTACT CHATHAM COUNTY AT CHATHAM COUNTY AT CHATHAM COUNTY AT COUNTY AT COUNTY AT AT AT 912-652-7100 TO SCHEDULE THE PRE-CONSTRUCTION MEETING. TO SCHEDULE THE PRE-CONSTRUCTION MEETING. 10. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO OBTAIN A COPY OF THE NOTICE OF INTENT. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO OBTAIN A COPY OF THE NOTICE OF INTENT. 11. CAD FILES OF THE DESIGN MAY BE OBTAINED BY THE CONTRACTOR UPON REQUEST, BUT THE LATEST ISSUED PLANS AND CAD FILES OF THE DESIGN MAY BE OBTAINED BY THE CONTRACTOR UPON REQUEST, BUT THE LATEST ISSUED PLANS AND FILES OF THE DESIGN MAY BE OBTAINED BY THE CONTRACTOR UPON REQUEST, BUT THE LATEST ISSUED PLANS AND FILES OF THE DESIGN MAY BE OBTAINED BY THE CONTRACTOR UPON REQUEST, BUT THE LATEST ISSUED PLANS AND OF THE DESIGN MAY BE OBTAINED BY THE CONTRACTOR UPON REQUEST, BUT THE LATEST ISSUED PLANS AND OF THE DESIGN MAY BE OBTAINED BY THE CONTRACTOR UPON REQUEST, BUT THE LATEST ISSUED PLANS AND THE DESIGN MAY BE OBTAINED BY THE CONTRACTOR UPON REQUEST, BUT THE LATEST ISSUED PLANS AND THE DESIGN MAY BE OBTAINED BY THE CONTRACTOR UPON REQUEST, BUT THE LATEST ISSUED PLANS AND DESIGN MAY BE OBTAINED BY THE CONTRACTOR UPON REQUEST, BUT THE LATEST ISSUED PLANS AND DESIGN MAY BE OBTAINED BY THE CONTRACTOR UPON REQUEST, BUT THE LATEST ISSUED PLANS AND MAY BE OBTAINED BY THE CONTRACTOR UPON REQUEST, BUT THE LATEST ISSUED PLANS AND MAY BE OBTAINED BY THE CONTRACTOR UPON REQUEST, BUT THE LATEST ISSUED PLANS AND BE OBTAINED BY THE CONTRACTOR UPON REQUEST, BUT THE LATEST ISSUED PLANS AND BE OBTAINED BY THE CONTRACTOR UPON REQUEST, BUT THE LATEST ISSUED PLANS AND OBTAINED BY THE CONTRACTOR UPON REQUEST, BUT THE LATEST ISSUED PLANS AND OBTAINED BY THE CONTRACTOR UPON REQUEST, BUT THE LATEST ISSUED PLANS AND BY THE CONTRACTOR UPON REQUEST, BUT THE LATEST ISSUED PLANS AND BY THE CONTRACTOR UPON REQUEST, BUT THE LATEST ISSUED PLANS AND THE CONTRACTOR UPON REQUEST, BUT THE LATEST ISSUED PLANS AND THE CONTRACTOR UPON REQUEST, BUT THE LATEST ISSUED PLANS AND CONTRACTOR UPON REQUEST, BUT THE LATEST ISSUED PLANS AND CONTRACTOR UPON REQUEST, BUT THE LATEST ISSUED PLANS AND UPON REQUEST, BUT THE LATEST ISSUED PLANS AND UPON REQUEST, BUT THE LATEST ISSUED PLANS AND REQUEST, BUT THE LATEST ISSUED PLANS AND REQUEST, BUT THE LATEST ISSUED PLANS AND BUT THE LATEST ISSUED PLANS AND BUT THE LATEST ISSUED PLANS AND THE LATEST ISSUED PLANS AND THE LATEST ISSUED PLANS AND LATEST ISSUED PLANS AND LATEST ISSUED PLANS AND ISSUED PLANS AND ISSUED PLANS AND PLANS AND PLANS AND AND AND SPECIFICATIONS SHALL GOVERN IN CONFLICT. THE CONTRACTOR SHALL NOTIFY THE ENGINEER OF ANY DISCREPANCY SHALL GOVERN IN CONFLICT. THE CONTRACTOR SHALL NOTIFY THE ENGINEER OF ANY DISCREPANCY SHALL GOVERN IN CONFLICT. THE CONTRACTOR SHALL NOTIFY THE ENGINEER OF ANY DISCREPANCY GOVERN IN CONFLICT. THE CONTRACTOR SHALL NOTIFY THE ENGINEER OF ANY DISCREPANCY GOVERN IN CONFLICT. THE CONTRACTOR SHALL NOTIFY THE ENGINEER OF ANY DISCREPANCY IN CONFLICT. THE CONTRACTOR SHALL NOTIFY THE ENGINEER OF ANY DISCREPANCY IN CONFLICT. THE CONTRACTOR SHALL NOTIFY THE ENGINEER OF ANY DISCREPANCY CONFLICT. THE CONTRACTOR SHALL NOTIFY THE ENGINEER OF ANY DISCREPANCY CONFLICT. THE CONTRACTOR SHALL NOTIFY THE ENGINEER OF ANY DISCREPANCY THE CONTRACTOR SHALL NOTIFY THE ENGINEER OF ANY DISCREPANCY THE CONTRACTOR SHALL NOTIFY THE ENGINEER OF ANY DISCREPANCY CONTRACTOR SHALL NOTIFY THE ENGINEER OF ANY DISCREPANCY CONTRACTOR SHALL NOTIFY THE ENGINEER OF ANY DISCREPANCY SHALL NOTIFY THE ENGINEER OF ANY DISCREPANCY SHALL NOTIFY THE ENGINEER OF ANY DISCREPANCY NOTIFY THE ENGINEER OF ANY DISCREPANCY NOTIFY THE ENGINEER OF ANY DISCREPANCY THE ENGINEER OF ANY DISCREPANCY THE ENGINEER OF ANY DISCREPANCY ENGINEER OF ANY DISCREPANCY ENGINEER OF ANY DISCREPANCY OF ANY DISCREPANCY OF ANY DISCREPANCY ANY DISCREPANCY ANY DISCREPANCY DISCREPANCY DISCREPANCY BETWEEN THE PLANS AND SPECIFICATIONS. 12. THE CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING ALL EXISTING UTILITIES PRIOR TO BEGINNING CONSTRUCTION THE CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING ALL EXISTING UTILITIES PRIOR TO BEGINNING CONSTRUCTION CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING ALL EXISTING UTILITIES PRIOR TO BEGINNING CONSTRUCTION CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING ALL EXISTING UTILITIES PRIOR TO BEGINNING CONSTRUCTION SHALL BE RESPONSIBLE FOR LOCATING ALL EXISTING UTILITIES PRIOR TO BEGINNING CONSTRUCTION SHALL BE RESPONSIBLE FOR LOCATING ALL EXISTING UTILITIES PRIOR TO BEGINNING CONSTRUCTION BE RESPONSIBLE FOR LOCATING ALL EXISTING UTILITIES PRIOR TO BEGINNING CONSTRUCTION BE RESPONSIBLE FOR LOCATING ALL EXISTING UTILITIES PRIOR TO BEGINNING CONSTRUCTION RESPONSIBLE FOR LOCATING ALL EXISTING UTILITIES PRIOR TO BEGINNING CONSTRUCTION RESPONSIBLE FOR LOCATING ALL EXISTING UTILITIES PRIOR TO BEGINNING CONSTRUCTION FOR LOCATING ALL EXISTING UTILITIES PRIOR TO BEGINNING CONSTRUCTION FOR LOCATING ALL EXISTING UTILITIES PRIOR TO BEGINNING CONSTRUCTION LOCATING ALL EXISTING UTILITIES PRIOR TO BEGINNING CONSTRUCTION LOCATING ALL EXISTING UTILITIES PRIOR TO BEGINNING CONSTRUCTION ALL EXISTING UTILITIES PRIOR TO BEGINNING CONSTRUCTION ALL EXISTING UTILITIES PRIOR TO BEGINNING CONSTRUCTION EXISTING UTILITIES PRIOR TO BEGINNING CONSTRUCTION EXISTING UTILITIES PRIOR TO BEGINNING CONSTRUCTION UTILITIES PRIOR TO BEGINNING CONSTRUCTION UTILITIES PRIOR TO BEGINNING CONSTRUCTION PRIOR TO BEGINNING CONSTRUCTION PRIOR TO BEGINNING CONSTRUCTION TO BEGINNING CONSTRUCTION TO BEGINNING CONSTRUCTION BEGINNING CONSTRUCTION BEGINNING CONSTRUCTION CONSTRUCTION CONSTRUCTION ACTIVITIES AND FOR AVOIDING ALL CONFLICTS WITH SAME. ANY DAMAGE TO EXISTING UTILITIES SHALL BE REPAIRED AT AND FOR AVOIDING ALL CONFLICTS WITH SAME. ANY DAMAGE TO EXISTING UTILITIES SHALL BE REPAIRED AT AND FOR AVOIDING ALL CONFLICTS WITH SAME. ANY DAMAGE TO EXISTING UTILITIES SHALL BE REPAIRED AT FOR AVOIDING ALL CONFLICTS WITH SAME. ANY DAMAGE TO EXISTING UTILITIES SHALL BE REPAIRED AT FOR AVOIDING ALL CONFLICTS WITH SAME. ANY DAMAGE TO EXISTING UTILITIES SHALL BE REPAIRED AT AVOIDING ALL CONFLICTS WITH SAME. ANY DAMAGE TO EXISTING UTILITIES SHALL BE REPAIRED AT AVOIDING ALL CONFLICTS WITH SAME. ANY DAMAGE TO EXISTING UTILITIES SHALL BE REPAIRED AT ALL CONFLICTS WITH SAME. ANY DAMAGE TO EXISTING UTILITIES SHALL BE REPAIRED AT ALL CONFLICTS WITH SAME. ANY DAMAGE TO EXISTING UTILITIES SHALL BE REPAIRED AT CONFLICTS WITH SAME. ANY DAMAGE TO EXISTING UTILITIES SHALL BE REPAIRED AT CONFLICTS WITH SAME. ANY DAMAGE TO EXISTING UTILITIES SHALL BE REPAIRED AT WITH SAME. ANY DAMAGE TO EXISTING UTILITIES SHALL BE REPAIRED AT WITH SAME. ANY DAMAGE TO EXISTING UTILITIES SHALL BE REPAIRED AT SAME. ANY DAMAGE TO EXISTING UTILITIES SHALL BE REPAIRED AT SAME. ANY DAMAGE TO EXISTING UTILITIES SHALL BE REPAIRED AT ANY DAMAGE TO EXISTING UTILITIES SHALL BE REPAIRED AT ANY DAMAGE TO EXISTING UTILITIES SHALL BE REPAIRED AT DAMAGE TO EXISTING UTILITIES SHALL BE REPAIRED AT DAMAGE TO EXISTING UTILITIES SHALL BE REPAIRED AT TO EXISTING UTILITIES SHALL BE REPAIRED AT TO EXISTING UTILITIES SHALL BE REPAIRED AT EXISTING UTILITIES SHALL BE REPAIRED AT EXISTING UTILITIES SHALL BE REPAIRED AT UTILITIES SHALL BE REPAIRED AT UTILITIES SHALL BE REPAIRED AT SHALL BE REPAIRED AT SHALL BE REPAIRED AT BE REPAIRED AT BE REPAIRED AT REPAIRED AT REPAIRED AT AT AT THE EXPENSE OF THE CONTRACTOR. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY FIELD MARKINGS/LOCATES EXPENSE OF THE CONTRACTOR. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY FIELD MARKINGS/LOCATES EXPENSE OF THE CONTRACTOR. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY FIELD MARKINGS/LOCATES OF THE CONTRACTOR. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY FIELD MARKINGS/LOCATES OF THE CONTRACTOR. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY FIELD MARKINGS/LOCATES THE CONTRACTOR. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY FIELD MARKINGS/LOCATES THE CONTRACTOR. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY FIELD MARKINGS/LOCATES CONTRACTOR. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY FIELD MARKINGS/LOCATES CONTRACTOR. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY FIELD MARKINGS/LOCATES IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY FIELD MARKINGS/LOCATES IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY FIELD MARKINGS/LOCATES IS THE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY FIELD MARKINGS/LOCATES IS THE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY FIELD MARKINGS/LOCATES THE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY FIELD MARKINGS/LOCATES THE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY FIELD MARKINGS/LOCATES RESPONSIBILITY OF THE CONTRACTOR TO VERIFY FIELD MARKINGS/LOCATES RESPONSIBILITY OF THE CONTRACTOR TO VERIFY FIELD MARKINGS/LOCATES OF THE CONTRACTOR TO VERIFY FIELD MARKINGS/LOCATES OF THE CONTRACTOR TO VERIFY FIELD MARKINGS/LOCATES THE CONTRACTOR TO VERIFY FIELD MARKINGS/LOCATES THE CONTRACTOR TO VERIFY FIELD MARKINGS/LOCATES CONTRACTOR TO VERIFY FIELD MARKINGS/LOCATES CONTRACTOR TO VERIFY FIELD MARKINGS/LOCATES TO VERIFY FIELD MARKINGS/LOCATES TO VERIFY FIELD MARKINGS/LOCATES VERIFY FIELD MARKINGS/LOCATES VERIFY FIELD MARKINGS/LOCATES FIELD MARKINGS/LOCATES FIELD MARKINGS/LOCATES MARKINGS/LOCATES MARKINGS/LOCATES ARE IN AGREEMENT WITH THE APPROVED PLANS AND SPECIFICATIONS. IF THE FIELD LOCATIONS ARE FOUND TO BE IN IN AGREEMENT WITH THE APPROVED PLANS AND SPECIFICATIONS. IF THE FIELD LOCATIONS ARE FOUND TO BE IN IN AGREEMENT WITH THE APPROVED PLANS AND SPECIFICATIONS. IF THE FIELD LOCATIONS ARE FOUND TO BE IN AGREEMENT WITH THE APPROVED PLANS AND SPECIFICATIONS. IF THE FIELD LOCATIONS ARE FOUND TO BE IN AGREEMENT WITH THE APPROVED PLANS AND SPECIFICATIONS. IF THE FIELD LOCATIONS ARE FOUND TO BE IN WITH THE APPROVED PLANS AND SPECIFICATIONS. IF THE FIELD LOCATIONS ARE FOUND TO BE IN WITH THE APPROVED PLANS AND SPECIFICATIONS. IF THE FIELD LOCATIONS ARE FOUND TO BE IN THE APPROVED PLANS AND SPECIFICATIONS. IF THE FIELD LOCATIONS ARE FOUND TO BE IN THE APPROVED PLANS AND SPECIFICATIONS. IF THE FIELD LOCATIONS ARE FOUND TO BE IN APPROVED PLANS AND SPECIFICATIONS. IF THE FIELD LOCATIONS ARE FOUND TO BE IN APPROVED PLANS AND SPECIFICATIONS. IF THE FIELD LOCATIONS ARE FOUND TO BE IN PLANS AND SPECIFICATIONS. IF THE FIELD LOCATIONS ARE FOUND TO BE IN PLANS AND SPECIFICATIONS. IF THE FIELD LOCATIONS ARE FOUND TO BE IN AND SPECIFICATIONS. IF THE FIELD LOCATIONS ARE FOUND TO BE IN AND SPECIFICATIONS. IF THE FIELD LOCATIONS ARE FOUND TO BE IN SPECIFICATIONS. IF THE FIELD LOCATIONS ARE FOUND TO BE IN SPECIFICATIONS. IF THE FIELD LOCATIONS ARE FOUND TO BE IN IF THE FIELD LOCATIONS ARE FOUND TO BE IN IF THE FIELD LOCATIONS ARE FOUND TO BE IN THE FIELD LOCATIONS ARE FOUND TO BE IN THE FIELD LOCATIONS ARE FOUND TO BE IN FIELD LOCATIONS ARE FOUND TO BE IN FIELD LOCATIONS ARE FOUND TO BE IN LOCATIONS ARE FOUND TO BE IN LOCATIONS ARE FOUND TO BE IN ARE FOUND TO BE IN ARE FOUND TO BE IN FOUND TO BE IN FOUND TO BE IN TO BE IN TO BE IN BE IN BE IN IN IN CONFLICT OR IF UTILITIES ARE MARKED IN THE FIELD THAT ARE NOT SHOWN ON THE PLANS, IT IS THE RESPONSIBILITY OR IF UTILITIES ARE MARKED IN THE FIELD THAT ARE NOT SHOWN ON THE PLANS, IT IS THE RESPONSIBILITY OR IF UTILITIES ARE MARKED IN THE FIELD THAT ARE NOT SHOWN ON THE PLANS, IT IS THE RESPONSIBILITY IF UTILITIES ARE MARKED IN THE FIELD THAT ARE NOT SHOWN ON THE PLANS, IT IS THE RESPONSIBILITY IF UTILITIES ARE MARKED IN THE FIELD THAT ARE NOT SHOWN ON THE PLANS, IT IS THE RESPONSIBILITY UTILITIES ARE MARKED IN THE FIELD THAT ARE NOT SHOWN ON THE PLANS, IT IS THE RESPONSIBILITY UTILITIES ARE MARKED IN THE FIELD THAT ARE NOT SHOWN ON THE PLANS, IT IS THE RESPONSIBILITY ARE MARKED IN THE FIELD THAT ARE NOT SHOWN ON THE PLANS, IT IS THE RESPONSIBILITY ARE MARKED IN THE FIELD THAT ARE NOT SHOWN ON THE PLANS, IT IS THE RESPONSIBILITY MARKED IN THE FIELD THAT ARE NOT SHOWN ON THE PLANS, IT IS THE RESPONSIBILITY MARKED IN THE FIELD THAT ARE NOT SHOWN ON THE PLANS, IT IS THE RESPONSIBILITY IN THE FIELD THAT ARE NOT SHOWN ON THE PLANS, IT IS THE RESPONSIBILITY IN THE FIELD THAT ARE NOT SHOWN ON THE PLANS, IT IS THE RESPONSIBILITY THE FIELD THAT ARE NOT SHOWN ON THE PLANS, IT IS THE RESPONSIBILITY THE FIELD THAT ARE NOT SHOWN ON THE PLANS, IT IS THE RESPONSIBILITY FIELD THAT ARE NOT SHOWN ON THE PLANS, IT IS THE RESPONSIBILITY FIELD THAT ARE NOT SHOWN ON THE PLANS, IT IS THE RESPONSIBILITY THAT ARE NOT SHOWN ON THE PLANS, IT IS THE RESPONSIBILITY THAT ARE NOT SHOWN ON THE PLANS, IT IS THE RESPONSIBILITY ARE NOT SHOWN ON THE PLANS, IT IS THE RESPONSIBILITY ARE NOT SHOWN ON THE PLANS, IT IS THE RESPONSIBILITY NOT SHOWN ON THE PLANS, IT IS THE RESPONSIBILITY NOT SHOWN ON THE PLANS, IT IS THE RESPONSIBILITY SHOWN ON THE PLANS, IT IS THE RESPONSIBILITY SHOWN ON THE PLANS, IT IS THE RESPONSIBILITY ON THE PLANS, IT IS THE RESPONSIBILITY ON THE PLANS, IT IS THE RESPONSIBILITY THE PLANS, IT IS THE RESPONSIBILITY THE PLANS, IT IS THE RESPONSIBILITY PLANS, IT IS THE RESPONSIBILITY PLANS, IT IS THE RESPONSIBILITY IT IS THE RESPONSIBILITY IT IS THE RESPONSIBILITY IS THE RESPONSIBILITY IS THE RESPONSIBILITY THE RESPONSIBILITY THE RESPONSIBILITY RESPONSIBILITY RESPONSIBILITY OF THE CONTRACTOR TO NOTIFY THE ENGINEER IMMEDIATELY AND REQUEST DIRECTION. UNDERGROUND UTILITIES WERE THE CONTRACTOR TO NOTIFY THE ENGINEER IMMEDIATELY AND REQUEST DIRECTION. UNDERGROUND UTILITIES WERE THE CONTRACTOR TO NOTIFY THE ENGINEER IMMEDIATELY AND REQUEST DIRECTION. UNDERGROUND UTILITIES WERE CONTRACTOR TO NOTIFY THE ENGINEER IMMEDIATELY AND REQUEST DIRECTION. UNDERGROUND UTILITIES WERE CONTRACTOR TO NOTIFY THE ENGINEER IMMEDIATELY AND REQUEST DIRECTION. UNDERGROUND UTILITIES WERE TO NOTIFY THE ENGINEER IMMEDIATELY AND REQUEST DIRECTION. UNDERGROUND UTILITIES WERE TO NOTIFY THE ENGINEER IMMEDIATELY AND REQUEST DIRECTION. UNDERGROUND UTILITIES WERE NOTIFY THE ENGINEER IMMEDIATELY AND REQUEST DIRECTION. UNDERGROUND UTILITIES WERE NOTIFY THE ENGINEER IMMEDIATELY AND REQUEST DIRECTION. UNDERGROUND UTILITIES WERE THE ENGINEER IMMEDIATELY AND REQUEST DIRECTION. UNDERGROUND UTILITIES WERE THE ENGINEER IMMEDIATELY AND REQUEST DIRECTION. UNDERGROUND UTILITIES WERE ENGINEER IMMEDIATELY AND REQUEST DIRECTION. UNDERGROUND UTILITIES WERE ENGINEER IMMEDIATELY AND REQUEST DIRECTION. UNDERGROUND UTILITIES WERE IMMEDIATELY AND REQUEST DIRECTION. UNDERGROUND UTILITIES WERE IMMEDIATELY AND REQUEST DIRECTION. UNDERGROUND UTILITIES WERE AND REQUEST DIRECTION. UNDERGROUND UTILITIES WERE AND REQUEST DIRECTION. UNDERGROUND UTILITIES WERE REQUEST DIRECTION. UNDERGROUND UTILITIES WERE REQUEST DIRECTION. UNDERGROUND UTILITIES WERE DIRECTION. UNDERGROUND UTILITIES WERE DIRECTION. UNDERGROUND UTILITIES WERE UNDERGROUND UTILITIES WERE UNDERGROUND UTILITIES WERE UTILITIES WERE UTILITIES WERE WERE WERE LOCATED TO THE EXTENT PRACTICAL DURING THE TOPOGRAPHIC SURVEY BASED ON OBSERVABLE ABOVE GROUND TO THE EXTENT PRACTICAL DURING THE TOPOGRAPHIC SURVEY BASED ON OBSERVABLE ABOVE GROUND TO THE EXTENT PRACTICAL DURING THE TOPOGRAPHIC SURVEY BASED ON OBSERVABLE ABOVE GROUND THE EXTENT PRACTICAL DURING THE TOPOGRAPHIC SURVEY BASED ON OBSERVABLE ABOVE GROUND THE EXTENT PRACTICAL DURING THE TOPOGRAPHIC SURVEY BASED ON OBSERVABLE ABOVE GROUND EXTENT PRACTICAL DURING THE TOPOGRAPHIC SURVEY BASED ON OBSERVABLE ABOVE GROUND EXTENT PRACTICAL DURING THE TOPOGRAPHIC SURVEY BASED ON OBSERVABLE ABOVE GROUND PRACTICAL DURING THE TOPOGRAPHIC SURVEY BASED ON OBSERVABLE ABOVE GROUND PRACTICAL DURING THE TOPOGRAPHIC SURVEY BASED ON OBSERVABLE ABOVE GROUND DURING THE TOPOGRAPHIC SURVEY BASED ON OBSERVABLE ABOVE GROUND DURING THE TOPOGRAPHIC SURVEY BASED ON OBSERVABLE ABOVE GROUND THE TOPOGRAPHIC SURVEY BASED ON OBSERVABLE ABOVE GROUND THE TOPOGRAPHIC SURVEY BASED ON OBSERVABLE ABOVE GROUND TOPOGRAPHIC SURVEY BASED ON OBSERVABLE ABOVE GROUND TOPOGRAPHIC SURVEY BASED ON OBSERVABLE ABOVE GROUND SURVEY BASED ON OBSERVABLE ABOVE GROUND SURVEY BASED ON OBSERVABLE ABOVE GROUND BASED ON OBSERVABLE ABOVE GROUND BASED ON OBSERVABLE ABOVE GROUND ON OBSERVABLE ABOVE GROUND ON OBSERVABLE ABOVE GROUND OBSERVABLE ABOVE GROUND OBSERVABLE ABOVE GROUND ABOVE GROUND ABOVE GROUND GROUND GROUND EVIDENCE AND FLAGGING BY OTHERS. HOWEVER, THE UTILITIES SHOWN MAY NOT BE THE TYPE INDICATED OR IN THE AND FLAGGING BY OTHERS. HOWEVER, THE UTILITIES SHOWN MAY NOT BE THE TYPE INDICATED OR IN THE AND FLAGGING BY OTHERS. HOWEVER, THE UTILITIES SHOWN MAY NOT BE THE TYPE INDICATED OR IN THE FLAGGING BY OTHERS. HOWEVER, THE UTILITIES SHOWN MAY NOT BE THE TYPE INDICATED OR IN THE FLAGGING BY OTHERS. HOWEVER, THE UTILITIES SHOWN MAY NOT BE THE TYPE INDICATED OR IN THE BY OTHERS. HOWEVER, THE UTILITIES SHOWN MAY NOT BE THE TYPE INDICATED OR IN THE BY OTHERS. HOWEVER, THE UTILITIES SHOWN MAY NOT BE THE TYPE INDICATED OR IN THE OTHERS. HOWEVER, THE UTILITIES SHOWN MAY NOT BE THE TYPE INDICATED OR IN THE OTHERS. HOWEVER, THE UTILITIES SHOWN MAY NOT BE THE TYPE INDICATED OR IN THE HOWEVER, THE UTILITIES SHOWN MAY NOT BE THE TYPE INDICATED OR IN THE HOWEVER, THE UTILITIES SHOWN MAY NOT BE THE TYPE INDICATED OR IN THE THE UTILITIES SHOWN MAY NOT BE THE TYPE INDICATED OR IN THE THE UTILITIES SHOWN MAY NOT BE THE TYPE INDICATED OR IN THE UTILITIES SHOWN MAY NOT BE THE TYPE INDICATED OR IN THE UTILITIES SHOWN MAY NOT BE THE TYPE INDICATED OR IN THE SHOWN MAY NOT BE THE TYPE INDICATED OR IN THE SHOWN MAY NOT BE THE TYPE INDICATED OR IN THE MAY NOT BE THE TYPE INDICATED OR IN THE MAY NOT BE THE TYPE INDICATED OR IN THE NOT BE THE TYPE INDICATED OR IN THE NOT BE THE TYPE INDICATED OR IN THE BE THE TYPE INDICATED OR IN THE BE THE TYPE INDICATED OR IN THE THE TYPE INDICATED OR IN THE THE TYPE INDICATED OR IN THE TYPE INDICATED OR IN THE TYPE INDICATED OR IN THE INDICATED OR IN THE INDICATED OR IN THE OR IN THE OR IN THE IN THE IN THE THE THE LOCATION SHOWN, AND OTHER UNDERGROUND UTILITIES MAY EXIST THAT ARE NOT SHOWN ON THE PLANS. FULL SHOWN, AND OTHER UNDERGROUND UTILITIES MAY EXIST THAT ARE NOT SHOWN ON THE PLANS. FULL SHOWN, AND OTHER UNDERGROUND UTILITIES MAY EXIST THAT ARE NOT SHOWN ON THE PLANS. FULL AND OTHER UNDERGROUND UTILITIES MAY EXIST THAT ARE NOT SHOWN ON THE PLANS. FULL AND OTHER UNDERGROUND UTILITIES MAY EXIST THAT ARE NOT SHOWN ON THE PLANS. FULL OTHER UNDERGROUND UTILITIES MAY EXIST THAT ARE NOT SHOWN ON THE PLANS. FULL OTHER UNDERGROUND UTILITIES MAY EXIST THAT ARE NOT SHOWN ON THE PLANS. FULL UNDERGROUND UTILITIES MAY EXIST THAT ARE NOT SHOWN ON THE PLANS. FULL UNDERGROUND UTILITIES MAY EXIST THAT ARE NOT SHOWN ON THE PLANS. FULL UTILITIES MAY EXIST THAT ARE NOT SHOWN ON THE PLANS. FULL UTILITIES MAY EXIST THAT ARE NOT SHOWN ON THE PLANS. FULL MAY EXIST THAT ARE NOT SHOWN ON THE PLANS. FULL MAY EXIST THAT ARE NOT SHOWN ON THE PLANS. FULL EXIST THAT ARE NOT SHOWN ON THE PLANS. FULL EXIST THAT ARE NOT SHOWN ON THE PLANS. FULL THAT ARE NOT SHOWN ON THE PLANS. FULL THAT ARE NOT SHOWN ON THE PLANS. FULL ARE NOT SHOWN ON THE PLANS. FULL ARE NOT SHOWN ON THE PLANS. FULL NOT SHOWN ON THE PLANS. FULL NOT SHOWN ON THE PLANS. FULL SHOWN ON THE PLANS. FULL SHOWN ON THE PLANS. FULL ON THE PLANS. FULL ON THE PLANS. FULL THE PLANS. FULL THE PLANS. FULL PLANS. FULL PLANS. FULL FULL FULL SUBSURFACE INVESTIGATION SHALL BE PERFORMED BY THE CONTRACTOR TO VERIFY LOCATION, TYPE, AND SIZE OF ALL INVESTIGATION SHALL BE PERFORMED BY THE CONTRACTOR TO VERIFY LOCATION, TYPE, AND SIZE OF ALL INVESTIGATION SHALL BE PERFORMED BY THE CONTRACTOR TO VERIFY LOCATION, TYPE, AND SIZE OF ALL SHALL BE PERFORMED BY THE CONTRACTOR TO VERIFY LOCATION, TYPE, AND SIZE OF ALL SHALL BE PERFORMED BY THE CONTRACTOR TO VERIFY LOCATION, TYPE, AND SIZE OF ALL BE PERFORMED BY THE CONTRACTOR TO VERIFY LOCATION, TYPE, AND SIZE OF ALL BE PERFORMED BY THE CONTRACTOR TO VERIFY LOCATION, TYPE, AND SIZE OF ALL PERFORMED BY THE CONTRACTOR TO VERIFY LOCATION, TYPE, AND SIZE OF ALL PERFORMED BY THE CONTRACTOR TO VERIFY LOCATION, TYPE, AND SIZE OF ALL BY THE CONTRACTOR TO VERIFY LOCATION, TYPE, AND SIZE OF ALL BY THE CONTRACTOR TO VERIFY LOCATION, TYPE, AND SIZE OF ALL THE CONTRACTOR TO VERIFY LOCATION, TYPE, AND SIZE OF ALL THE CONTRACTOR TO VERIFY LOCATION, TYPE, AND SIZE OF ALL CONTRACTOR TO VERIFY LOCATION, TYPE, AND SIZE OF ALL CONTRACTOR TO VERIFY LOCATION, TYPE, AND SIZE OF ALL TO VERIFY LOCATION, TYPE, AND SIZE OF ALL TO VERIFY LOCATION, TYPE, AND SIZE OF ALL VERIFY LOCATION, TYPE, AND SIZE OF ALL VERIFY LOCATION, TYPE, AND SIZE OF ALL LOCATION, TYPE, AND SIZE OF ALL LOCATION, TYPE, AND SIZE OF ALL TYPE, AND SIZE OF ALL TYPE, AND SIZE OF ALL AND SIZE OF ALL AND SIZE OF ALL SIZE OF ALL SIZE OF ALL OF ALL OF ALL ALL ALL UNDERGROUND UTILITIES. 13. ALL WORK SHALL CONFORM TO THE PROJECT SPECIFICATIONS. ALL WORK SHALL CONFORM TO THE PROJECT SPECIFICATIONS. 14. ALL DISTURBED AREAS AND PROPOSED EARTH GRADING NOT TO BE COVERED BY OTHER SURFACES SHALL BE GRASSED ALL DISTURBED AREAS AND PROPOSED EARTH GRADING NOT TO BE COVERED BY OTHER SURFACES SHALL BE GRASSED DISTURBED AREAS AND PROPOSED EARTH GRADING NOT TO BE COVERED BY OTHER SURFACES SHALL BE GRASSED DISTURBED AREAS AND PROPOSED EARTH GRADING NOT TO BE COVERED BY OTHER SURFACES SHALL BE GRASSED AREAS AND PROPOSED EARTH GRADING NOT TO BE COVERED BY OTHER SURFACES SHALL BE GRASSED AREAS AND PROPOSED EARTH GRADING NOT TO BE COVERED BY OTHER SURFACES SHALL BE GRASSED AND PROPOSED EARTH GRADING NOT TO BE COVERED BY OTHER SURFACES SHALL BE GRASSED AND PROPOSED EARTH GRADING NOT TO BE COVERED BY OTHER SURFACES SHALL BE GRASSED PROPOSED EARTH GRADING NOT TO BE COVERED BY OTHER SURFACES SHALL BE GRASSED PROPOSED EARTH GRADING NOT TO BE COVERED BY OTHER SURFACES SHALL BE GRASSED EARTH GRADING NOT TO BE COVERED BY OTHER SURFACES SHALL BE GRASSED EARTH GRADING NOT TO BE COVERED BY OTHER SURFACES SHALL BE GRASSED GRADING NOT TO BE COVERED BY OTHER SURFACES SHALL BE GRASSED GRADING NOT TO BE COVERED BY OTHER SURFACES SHALL BE GRASSED NOT TO BE COVERED BY OTHER SURFACES SHALL BE GRASSED NOT TO BE COVERED BY OTHER SURFACES SHALL BE GRASSED TO BE COVERED BY OTHER SURFACES SHALL BE GRASSED TO BE COVERED BY OTHER SURFACES SHALL BE GRASSED BE COVERED BY OTHER SURFACES SHALL BE GRASSED BE COVERED BY OTHER SURFACES SHALL BE GRASSED COVERED BY OTHER SURFACES SHALL BE GRASSED COVERED BY OTHER SURFACES SHALL BE GRASSED BY OTHER SURFACES SHALL BE GRASSED BY OTHER SURFACES SHALL BE GRASSED OTHER SURFACES SHALL BE GRASSED OTHER SURFACES SHALL BE GRASSED SURFACES SHALL BE GRASSED SURFACES SHALL BE GRASSED SHALL BE GRASSED SHALL BE GRASSED BE GRASSED BE GRASSED GRASSED GRASSED BY SEEDING, FERTILIZING, MULCHING AND WATERING AS REQUIRED TO OBTAIN AN ACCEPTABLE GROUND COVER. 15. ALL CONSTRUCTION SHALL BE IN COMPLIANCE WITH THE STATE SOIL AND WATER CONSERVATION COMMITTEE'S "MANUAL ALL CONSTRUCTION SHALL BE IN COMPLIANCE WITH THE STATE SOIL AND WATER CONSERVATION COMMITTEE'S "MANUAL CONSTRUCTION SHALL BE IN COMPLIANCE WITH THE STATE SOIL AND WATER CONSERVATION COMMITTEE'S "MANUAL CONSTRUCTION SHALL BE IN COMPLIANCE WITH THE STATE SOIL AND WATER CONSERVATION COMMITTEE'S "MANUAL SHALL BE IN COMPLIANCE WITH THE STATE SOIL AND WATER CONSERVATION COMMITTEE'S "MANUAL SHALL BE IN COMPLIANCE WITH THE STATE SOIL AND WATER CONSERVATION COMMITTEE'S "MANUAL BE IN COMPLIANCE WITH THE STATE SOIL AND WATER CONSERVATION COMMITTEE'S "MANUAL BE IN COMPLIANCE WITH THE STATE SOIL AND WATER CONSERVATION COMMITTEE'S "MANUAL IN COMPLIANCE WITH THE STATE SOIL AND WATER CONSERVATION COMMITTEE'S "MANUAL IN COMPLIANCE WITH THE STATE SOIL AND WATER CONSERVATION COMMITTEE'S "MANUAL COMPLIANCE WITH THE STATE SOIL AND WATER CONSERVATION COMMITTEE'S "MANUAL COMPLIANCE WITH THE STATE SOIL AND WATER CONSERVATION COMMITTEE'S "MANUAL WITH THE STATE SOIL AND WATER CONSERVATION COMMITTEE'S "MANUAL WITH THE STATE SOIL AND WATER CONSERVATION COMMITTEE'S "MANUAL THE STATE SOIL AND WATER CONSERVATION COMMITTEE'S "MANUAL THE STATE SOIL AND WATER CONSERVATION COMMITTEE'S "MANUAL STATE SOIL AND WATER CONSERVATION COMMITTEE'S "MANUAL STATE SOIL AND WATER CONSERVATION COMMITTEE'S "MANUAL SOIL AND WATER CONSERVATION COMMITTEE'S "MANUAL SOIL AND WATER CONSERVATION COMMITTEE'S "MANUAL AND WATER CONSERVATION COMMITTEE'S "MANUAL AND WATER CONSERVATION COMMITTEE'S "MANUAL WATER CONSERVATION COMMITTEE'S "MANUAL WATER CONSERVATION COMMITTEE'S "MANUAL CONSERVATION COMMITTEE'S "MANUAL CONSERVATION COMMITTEE'S "MANUAL COMMITTEE'S "MANUAL COMMITTEE'S "MANUAL "MANUAL "MANUAL FOR EROSION AND SEDIMENTATION CONTROL IN GEORGIA." ALL SEDIMENT CONTROL FEATURES SHALL BE MAINTAINED ON A EROSION AND SEDIMENTATION CONTROL IN GEORGIA." ALL SEDIMENT CONTROL FEATURES SHALL BE MAINTAINED ON A EROSION AND SEDIMENTATION CONTROL IN GEORGIA." ALL SEDIMENT CONTROL FEATURES SHALL BE MAINTAINED ON A AND SEDIMENTATION CONTROL IN GEORGIA." ALL SEDIMENT CONTROL FEATURES SHALL BE MAINTAINED ON A AND SEDIMENTATION CONTROL IN GEORGIA." ALL SEDIMENT CONTROL FEATURES SHALL BE MAINTAINED ON A SEDIMENTATION CONTROL IN GEORGIA." ALL SEDIMENT CONTROL FEATURES SHALL BE MAINTAINED ON A SEDIMENTATION CONTROL IN GEORGIA." ALL SEDIMENT CONTROL FEATURES SHALL BE MAINTAINED ON A CONTROL IN GEORGIA." ALL SEDIMENT CONTROL FEATURES SHALL BE MAINTAINED ON A CONTROL IN GEORGIA." ALL SEDIMENT CONTROL FEATURES SHALL BE MAINTAINED ON A IN GEORGIA." ALL SEDIMENT CONTROL FEATURES SHALL BE MAINTAINED ON A IN GEORGIA." ALL SEDIMENT CONTROL FEATURES SHALL BE MAINTAINED ON A GEORGIA." ALL SEDIMENT CONTROL FEATURES SHALL BE MAINTAINED ON A GEORGIA." ALL SEDIMENT CONTROL FEATURES SHALL BE MAINTAINED ON A ALL SEDIMENT CONTROL FEATURES SHALL BE MAINTAINED ON A ALL SEDIMENT CONTROL FEATURES SHALL BE MAINTAINED ON A SEDIMENT CONTROL FEATURES SHALL BE MAINTAINED ON A SEDIMENT CONTROL FEATURES SHALL BE MAINTAINED ON A CONTROL FEATURES SHALL BE MAINTAINED ON A CONTROL FEATURES SHALL BE MAINTAINED ON A FEATURES SHALL BE MAINTAINED ON A FEATURES SHALL BE MAINTAINED ON A SHALL BE MAINTAINED ON A SHALL BE MAINTAINED ON A BE MAINTAINED ON A BE MAINTAINED ON A MAINTAINED ON A MAINTAINED ON A ON A ON A A A REGULAR BASIS AND SHALL BE REMOVED BY THE CONTRACTOR UPON ACCEPTANCE OF THE SITE BY THE OWNER. 16. THE CONTRACTOR SHALL FLUSH ALL INLETS AND PIPES AT THE COMPLETION OF CONSTRUCTION TO REMOVE SEDIMENT THE CONTRACTOR SHALL FLUSH ALL INLETS AND PIPES AT THE COMPLETION OF CONSTRUCTION TO REMOVE SEDIMENT CONTRACTOR SHALL FLUSH ALL INLETS AND PIPES AT THE COMPLETION OF CONSTRUCTION TO REMOVE SEDIMENT CONTRACTOR SHALL FLUSH ALL INLETS AND PIPES AT THE COMPLETION OF CONSTRUCTION TO REMOVE SEDIMENT SHALL FLUSH ALL INLETS AND PIPES AT THE COMPLETION OF CONSTRUCTION TO REMOVE SEDIMENT SHALL FLUSH ALL INLETS AND PIPES AT THE COMPLETION OF CONSTRUCTION TO REMOVE SEDIMENT FLUSH ALL INLETS AND PIPES AT THE COMPLETION OF CONSTRUCTION TO REMOVE SEDIMENT FLUSH ALL INLETS AND PIPES AT THE COMPLETION OF CONSTRUCTION TO REMOVE SEDIMENT ALL INLETS AND PIPES AT THE COMPLETION OF CONSTRUCTION TO REMOVE SEDIMENT ALL INLETS AND PIPES AT THE COMPLETION OF CONSTRUCTION TO REMOVE SEDIMENT INLETS AND PIPES AT THE COMPLETION OF CONSTRUCTION TO REMOVE SEDIMENT INLETS AND PIPES AT THE COMPLETION OF CONSTRUCTION TO REMOVE SEDIMENT AND PIPES AT THE COMPLETION OF CONSTRUCTION TO REMOVE SEDIMENT AND PIPES AT THE COMPLETION OF CONSTRUCTION TO REMOVE SEDIMENT PIPES AT THE COMPLETION OF CONSTRUCTION TO REMOVE SEDIMENT PIPES AT THE COMPLETION OF CONSTRUCTION TO REMOVE SEDIMENT AT THE COMPLETION OF CONSTRUCTION TO REMOVE SEDIMENT AT THE COMPLETION OF CONSTRUCTION TO REMOVE SEDIMENT THE COMPLETION OF CONSTRUCTION TO REMOVE SEDIMENT THE COMPLETION OF CONSTRUCTION TO REMOVE SEDIMENT COMPLETION OF CONSTRUCTION TO REMOVE SEDIMENT COMPLETION OF CONSTRUCTION TO REMOVE SEDIMENT OF CONSTRUCTION TO REMOVE SEDIMENT OF CONSTRUCTION TO REMOVE SEDIMENT CONSTRUCTION TO REMOVE SEDIMENT CONSTRUCTION TO REMOVE SEDIMENT TO REMOVE SEDIMENT TO REMOVE SEDIMENT REMOVE SEDIMENT REMOVE SEDIMENT SEDIMENT SEDIMENT AND DEBRIS. THE FLUSHING AND THE CLEANING OF INLETS AND PIPES SHALL BE CONSIDERED INCIDENTAL TO THE COST DEBRIS. THE FLUSHING AND THE CLEANING OF INLETS AND PIPES SHALL BE CONSIDERED INCIDENTAL TO THE COST DEBRIS. THE FLUSHING AND THE CLEANING OF INLETS AND PIPES SHALL BE CONSIDERED INCIDENTAL TO THE COST THE FLUSHING AND THE CLEANING OF INLETS AND PIPES SHALL BE CONSIDERED INCIDENTAL TO THE COST THE FLUSHING AND THE CLEANING OF INLETS AND PIPES SHALL BE CONSIDERED INCIDENTAL TO THE COST FLUSHING AND THE CLEANING OF INLETS AND PIPES SHALL BE CONSIDERED INCIDENTAL TO THE COST FLUSHING AND THE CLEANING OF INLETS AND PIPES SHALL BE CONSIDERED INCIDENTAL TO THE COST AND THE CLEANING OF INLETS AND PIPES SHALL BE CONSIDERED INCIDENTAL TO THE COST AND THE CLEANING OF INLETS AND PIPES SHALL BE CONSIDERED INCIDENTAL TO THE COST THE CLEANING OF INLETS AND PIPES SHALL BE CONSIDERED INCIDENTAL TO THE COST THE CLEANING OF INLETS AND PIPES SHALL BE CONSIDERED INCIDENTAL TO THE COST CLEANING OF INLETS AND PIPES SHALL BE CONSIDERED INCIDENTAL TO THE COST CLEANING OF INLETS AND PIPES SHALL BE CONSIDERED INCIDENTAL TO THE COST OF INLETS AND PIPES SHALL BE CONSIDERED INCIDENTAL TO THE COST OF INLETS AND PIPES SHALL BE CONSIDERED INCIDENTAL TO THE COST INLETS AND PIPES SHALL BE CONSIDERED INCIDENTAL TO THE COST INLETS AND PIPES SHALL BE CONSIDERED INCIDENTAL TO THE COST AND PIPES SHALL BE CONSIDERED INCIDENTAL TO THE COST AND PIPES SHALL BE CONSIDERED INCIDENTAL TO THE COST PIPES SHALL BE CONSIDERED INCIDENTAL TO THE COST PIPES SHALL BE CONSIDERED INCIDENTAL TO THE COST SHALL BE CONSIDERED INCIDENTAL TO THE COST SHALL BE CONSIDERED INCIDENTAL TO THE COST BE CONSIDERED INCIDENTAL TO THE COST BE CONSIDERED INCIDENTAL TO THE COST CONSIDERED INCIDENTAL TO THE COST CONSIDERED INCIDENTAL TO THE COST INCIDENTAL TO THE COST INCIDENTAL TO THE COST TO THE COST TO THE COST THE COST THE COST COST COST OF THE PROJECT AND SHALL BE INCLUDED THE COST OF PIPE AND INLET INSTALLATION. 17. IT IS THE OBLIGATION OF THE CONTRACTORS TO MAKE THEIR OWN INTERPRETATION OF ALL SURFACE AND SUB-SURFACE IT IS THE OBLIGATION OF THE CONTRACTORS TO MAKE THEIR OWN INTERPRETATION OF ALL SURFACE AND SUB-SURFACE IS THE OBLIGATION OF THE CONTRACTORS TO MAKE THEIR OWN INTERPRETATION OF ALL SURFACE AND SUB-SURFACE IS THE OBLIGATION OF THE CONTRACTORS TO MAKE THEIR OWN INTERPRETATION OF ALL SURFACE AND SUB-SURFACE THE OBLIGATION OF THE CONTRACTORS TO MAKE THEIR OWN INTERPRETATION OF ALL SURFACE AND SUB-SURFACE THE OBLIGATION OF THE CONTRACTORS TO MAKE THEIR OWN INTERPRETATION OF ALL SURFACE AND SUB-SURFACE OBLIGATION OF THE CONTRACTORS TO MAKE THEIR OWN INTERPRETATION OF ALL SURFACE AND SUB-SURFACE OBLIGATION OF THE CONTRACTORS TO MAKE THEIR OWN INTERPRETATION OF ALL SURFACE AND SUB-SURFACE OF THE CONTRACTORS TO MAKE THEIR OWN INTERPRETATION OF ALL SURFACE AND SUB-SURFACE OF THE CONTRACTORS TO MAKE THEIR OWN INTERPRETATION OF ALL SURFACE AND SUB-SURFACE THE CONTRACTORS TO MAKE THEIR OWN INTERPRETATION OF ALL SURFACE AND SUB-SURFACE THE CONTRACTORS TO MAKE THEIR OWN INTERPRETATION OF ALL SURFACE AND SUB-SURFACE CONTRACTORS TO MAKE THEIR OWN INTERPRETATION OF ALL SURFACE AND SUB-SURFACE CONTRACTORS TO MAKE THEIR OWN INTERPRETATION OF ALL SURFACE AND SUB-SURFACE TO MAKE THEIR OWN INTERPRETATION OF ALL SURFACE AND SUB-SURFACE TO MAKE THEIR OWN INTERPRETATION OF ALL SURFACE AND SUB-SURFACE MAKE THEIR OWN INTERPRETATION OF ALL SURFACE AND SUB-SURFACE MAKE THEIR OWN INTERPRETATION OF ALL SURFACE AND SUB-SURFACE THEIR OWN INTERPRETATION OF ALL SURFACE AND SUB-SURFACE THEIR OWN INTERPRETATION OF ALL SURFACE AND SUB-SURFACE OWN INTERPRETATION OF ALL SURFACE AND SUB-SURFACE OWN INTERPRETATION OF ALL SURFACE AND SUB-SURFACE INTERPRETATION OF ALL SURFACE AND SUB-SURFACE INTERPRETATION OF ALL SURFACE AND SUB-SURFACE OF ALL SURFACE AND SUB-SURFACE OF ALL SURFACE AND SUB-SURFACE ALL SURFACE AND SUB-SURFACE ALL SURFACE AND SUB-SURFACE SURFACE AND SUB-SURFACE SURFACE AND SUB-SURFACE AND SUB-SURFACE AND SUB-SURFACE SUB-SURFACE SUB-SURFACE SOILS AS TO THE NATURE AND EXTENT OF MATERIALS TO BE EXCAVATED, GRADED AND COMPACTED. THE INFORMATION AS TO THE NATURE AND EXTENT OF MATERIALS TO BE EXCAVATED, GRADED AND COMPACTED. THE INFORMATION AS TO THE NATURE AND EXTENT OF MATERIALS TO BE EXCAVATED, GRADED AND COMPACTED. THE INFORMATION TO THE NATURE AND EXTENT OF MATERIALS TO BE EXCAVATED, GRADED AND COMPACTED. THE INFORMATION TO THE NATURE AND EXTENT OF MATERIALS TO BE EXCAVATED, GRADED AND COMPACTED. THE INFORMATION THE NATURE AND EXTENT OF MATERIALS TO BE EXCAVATED, GRADED AND COMPACTED. THE INFORMATION THE NATURE AND EXTENT OF MATERIALS TO BE EXCAVATED, GRADED AND COMPACTED. THE INFORMATION NATURE AND EXTENT OF MATERIALS TO BE EXCAVATED, GRADED AND COMPACTED. THE INFORMATION NATURE AND EXTENT OF MATERIALS TO BE EXCAVATED, GRADED AND COMPACTED. THE INFORMATION AND EXTENT OF MATERIALS TO BE EXCAVATED, GRADED AND COMPACTED. THE INFORMATION AND EXTENT OF MATERIALS TO BE EXCAVATED, GRADED AND COMPACTED. THE INFORMATION EXTENT OF MATERIALS TO BE EXCAVATED, GRADED AND COMPACTED. THE INFORMATION EXTENT OF MATERIALS TO BE EXCAVATED, GRADED AND COMPACTED. THE INFORMATION OF MATERIALS TO BE EXCAVATED, GRADED AND COMPACTED. THE INFORMATION OF MATERIALS TO BE EXCAVATED, GRADED AND COMPACTED. THE INFORMATION MATERIALS TO BE EXCAVATED, GRADED AND COMPACTED. THE INFORMATION MATERIALS TO BE EXCAVATED, GRADED AND COMPACTED. THE INFORMATION TO BE EXCAVATED, GRADED AND COMPACTED. THE INFORMATION TO BE EXCAVATED, GRADED AND COMPACTED. THE INFORMATION BE EXCAVATED, GRADED AND COMPACTED. THE INFORMATION BE EXCAVATED, GRADED AND COMPACTED. THE INFORMATION EXCAVATED, GRADED AND COMPACTED. THE INFORMATION EXCAVATED, GRADED AND COMPACTED. THE INFORMATION GRADED AND COMPACTED. THE INFORMATION GRADED AND COMPACTED. THE INFORMATION AND COMPACTED. THE INFORMATION AND COMPACTED. THE INFORMATION COMPACTED. THE INFORMATION COMPACTED. THE INFORMATION THE INFORMATION THE INFORMATION INFORMATION INFORMATION SHOWN ON THE PLANS IN NO WAY GUARANTEES THE AMOUNT OR THE NATURE OF THE MATERIAL TO BE ENCOUNTERED. 18. A RIGHT-OF-WAY ENCROACHMENT PERMIT SHALL BE OBTAINED FROM THE CHATHAM COUNTY PUBLIC WORKS PRIOR TO A RIGHT-OF-WAY ENCROACHMENT PERMIT SHALL BE OBTAINED FROM THE CHATHAM COUNTY PUBLIC WORKS PRIOR TO PERFORMING WORK IN THE RIGHT-OF-WAY. 19. ALL STORM DRAIN JOINTS SHALL BE DOUBLE WRAPPED IN FILTER FABRIC COST OF THIS IS TO BE INCLUDED IN PRICE BID ALL STORM DRAIN JOINTS SHALL BE DOUBLE WRAPPED IN FILTER FABRIC COST OF THIS IS TO BE INCLUDED IN PRICE BID STORM DRAIN JOINTS SHALL BE DOUBLE WRAPPED IN FILTER FABRIC COST OF THIS IS TO BE INCLUDED IN PRICE BID STORM DRAIN JOINTS SHALL BE DOUBLE WRAPPED IN FILTER FABRIC COST OF THIS IS TO BE INCLUDED IN PRICE BID DRAIN JOINTS SHALL BE DOUBLE WRAPPED IN FILTER FABRIC COST OF THIS IS TO BE INCLUDED IN PRICE BID DRAIN JOINTS SHALL BE DOUBLE WRAPPED IN FILTER FABRIC COST OF THIS IS TO BE INCLUDED IN PRICE BID JOINTS SHALL BE DOUBLE WRAPPED IN FILTER FABRIC COST OF THIS IS TO BE INCLUDED IN PRICE BID JOINTS SHALL BE DOUBLE WRAPPED IN FILTER FABRIC COST OF THIS IS TO BE INCLUDED IN PRICE BID SHALL BE DOUBLE WRAPPED IN FILTER FABRIC COST OF THIS IS TO BE INCLUDED IN PRICE BID SHALL BE DOUBLE WRAPPED IN FILTER FABRIC COST OF THIS IS TO BE INCLUDED IN PRICE BID BE DOUBLE WRAPPED IN FILTER FABRIC COST OF THIS IS TO BE INCLUDED IN PRICE BID BE DOUBLE WRAPPED IN FILTER FABRIC COST OF THIS IS TO BE INCLUDED IN PRICE BID DOUBLE WRAPPED IN FILTER FABRIC COST OF THIS IS TO BE INCLUDED IN PRICE BID DOUBLE WRAPPED IN FILTER FABRIC COST OF THIS IS TO BE INCLUDED IN PRICE BID WRAPPED IN FILTER FABRIC COST OF THIS IS TO BE INCLUDED IN PRICE BID WRAPPED IN FILTER FABRIC COST OF THIS IS TO BE INCLUDED IN PRICE BID IN FILTER FABRIC COST OF THIS IS TO BE INCLUDED IN PRICE BID IN FILTER FABRIC COST OF THIS IS TO BE INCLUDED IN PRICE BID FILTER FABRIC COST OF THIS IS TO BE INCLUDED IN PRICE BID FILTER FABRIC COST OF THIS IS TO BE INCLUDED IN PRICE BID FABRIC COST OF THIS IS TO BE INCLUDED IN PRICE BID FABRIC COST OF THIS IS TO BE INCLUDED IN PRICE BID COST OF THIS IS TO BE INCLUDED IN PRICE BID COST OF THIS IS TO BE INCLUDED IN PRICE BID OF THIS IS TO BE INCLUDED IN PRICE BID OF THIS IS TO BE INCLUDED IN PRICE BID THIS IS TO BE INCLUDED IN PRICE BID THIS IS TO BE INCLUDED IN PRICE BID IS TO BE INCLUDED IN PRICE BID IS TO BE INCLUDED IN PRICE BID TO BE INCLUDED IN PRICE BID TO BE INCLUDED IN PRICE BID BE INCLUDED IN PRICE BID BE INCLUDED IN PRICE BID INCLUDED IN PRICE BID INCLUDED IN PRICE BID IN PRICE BID IN PRICE BID PRICE BID PRICE BID BID BID FOR PIPE 20. THE CONTRACTOR SHALL PREPARE A TRAFFIC CONTROL PLAN FOR PROPOSED CONSTRUCTION AND SUBMIT TO CHATHAM THE CONTRACTOR SHALL PREPARE A TRAFFIC CONTROL PLAN FOR PROPOSED CONSTRUCTION AND SUBMIT TO CHATHAM CONTRACTOR SHALL PREPARE A TRAFFIC CONTROL PLAN FOR PROPOSED CONSTRUCTION AND SUBMIT TO CHATHAM CONTRACTOR SHALL PREPARE A TRAFFIC CONTROL PLAN FOR PROPOSED CONSTRUCTION AND SUBMIT TO CHATHAM SHALL PREPARE A TRAFFIC CONTROL PLAN FOR PROPOSED CONSTRUCTION AND SUBMIT TO CHATHAM SHALL PREPARE A TRAFFIC CONTROL PLAN FOR PROPOSED CONSTRUCTION AND SUBMIT TO CHATHAM PREPARE A TRAFFIC CONTROL PLAN FOR PROPOSED CONSTRUCTION AND SUBMIT TO CHATHAM PREPARE A TRAFFIC CONTROL PLAN FOR PROPOSED CONSTRUCTION AND SUBMIT TO CHATHAM A TRAFFIC CONTROL PLAN FOR PROPOSED CONSTRUCTION AND SUBMIT TO CHATHAM A TRAFFIC CONTROL PLAN FOR PROPOSED CONSTRUCTION AND SUBMIT TO CHATHAM TRAFFIC CONTROL PLAN FOR PROPOSED CONSTRUCTION AND SUBMIT TO CHATHAM TRAFFIC CONTROL PLAN FOR PROPOSED CONSTRUCTION AND SUBMIT TO CHATHAM CONTROL PLAN FOR PROPOSED CONSTRUCTION AND SUBMIT TO CHATHAM CONTROL PLAN FOR PROPOSED CONSTRUCTION AND SUBMIT TO CHATHAM PLAN FOR PROPOSED CONSTRUCTION AND SUBMIT TO CHATHAM PLAN FOR PROPOSED CONSTRUCTION AND SUBMIT TO CHATHAM FOR PROPOSED CONSTRUCTION AND SUBMIT TO CHATHAM FOR PROPOSED CONSTRUCTION AND SUBMIT TO CHATHAM PROPOSED CONSTRUCTION AND SUBMIT TO CHATHAM PROPOSED CONSTRUCTION AND SUBMIT TO CHATHAM CONSTRUCTION AND SUBMIT TO CHATHAM CONSTRUCTION AND SUBMIT TO CHATHAM AND SUBMIT TO CHATHAM AND SUBMIT TO CHATHAM SUBMIT TO CHATHAM SUBMIT TO CHATHAM TO CHATHAM TO CHATHAM CHATHAM CHATHAM COUNTY ENGINEERING FOR REVIEW AND APPROVAL. PRIOR TO BEGINNING CONSTRUCTION. THE CONTRACTOR SHALL ENGINEERING FOR REVIEW AND APPROVAL. PRIOR TO BEGINNING CONSTRUCTION. THE CONTRACTOR SHALL ENGINEERING FOR REVIEW AND APPROVAL. PRIOR TO BEGINNING CONSTRUCTION. THE CONTRACTOR SHALL FOR REVIEW AND APPROVAL. PRIOR TO BEGINNING CONSTRUCTION. THE CONTRACTOR SHALL FOR REVIEW AND APPROVAL. PRIOR TO BEGINNING CONSTRUCTION. THE CONTRACTOR SHALL REVIEW AND APPROVAL. PRIOR TO BEGINNING CONSTRUCTION. THE CONTRACTOR SHALL REVIEW AND APPROVAL. PRIOR TO BEGINNING CONSTRUCTION. THE CONTRACTOR SHALL AND APPROVAL. PRIOR TO BEGINNING CONSTRUCTION. THE CONTRACTOR SHALL AND APPROVAL. PRIOR TO BEGINNING CONSTRUCTION. THE CONTRACTOR SHALL APPROVAL. PRIOR TO BEGINNING CONSTRUCTION. THE CONTRACTOR SHALL APPROVAL. PRIOR TO BEGINNING CONSTRUCTION. THE CONTRACTOR SHALL PRIOR TO BEGINNING CONSTRUCTION. THE CONTRACTOR SHALL PRIOR TO BEGINNING CONSTRUCTION. THE CONTRACTOR SHALL TO BEGINNING CONSTRUCTION. THE CONTRACTOR SHALL TO BEGINNING CONSTRUCTION. THE CONTRACTOR SHALL BEGINNING CONSTRUCTION. THE CONTRACTOR SHALL BEGINNING CONSTRUCTION. THE CONTRACTOR SHALL CONSTRUCTION. THE CONTRACTOR SHALL CONSTRUCTION. THE CONTRACTOR SHALL THE CONTRACTOR SHALL THE CONTRACTOR SHALL CONTRACTOR SHALL CONTRACTOR SHALL SHALL SHALL PROVIDED ALL TRAFFIC CONTROL MEASURES NEEDED, INCLUDING SIGNS, BARRELS, BARRICADES, FLAGGERS ETC.. ALL COST ALL TRAFFIC CONTROL MEASURES NEEDED, INCLUDING SIGNS, BARRELS, BARRICADES, FLAGGERS ETC.. ALL COST ALL TRAFFIC CONTROL MEASURES NEEDED, INCLUDING SIGNS, BARRELS, BARRICADES, FLAGGERS ETC.. ALL COST TRAFFIC CONTROL MEASURES NEEDED, INCLUDING SIGNS, BARRELS, BARRICADES, FLAGGERS ETC.. ALL COST TRAFFIC CONTROL MEASURES NEEDED, INCLUDING SIGNS, BARRELS, BARRICADES, FLAGGERS ETC.. ALL COST CONTROL MEASURES NEEDED, INCLUDING SIGNS, BARRELS, BARRICADES, FLAGGERS ETC.. ALL COST CONTROL MEASURES NEEDED, INCLUDING SIGNS, BARRELS, BARRICADES, FLAGGERS ETC.. ALL COST MEASURES NEEDED, INCLUDING SIGNS, BARRELS, BARRICADES, FLAGGERS ETC.. ALL COST MEASURES NEEDED, INCLUDING SIGNS, BARRELS, BARRICADES, FLAGGERS ETC.. ALL COST NEEDED, INCLUDING SIGNS, BARRELS, BARRICADES, FLAGGERS ETC..
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .