2 - BOM -Corrected.xlsx
XLSX spreadsheet 71 KB Posted
- Attached to
- Positive Pressure Suits (BSL 4 rated)
- Solicitation number
- RFQ-NIAID-2023479-1
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 3_FAR_52.212-5_JAN_2021.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BSL 4 Suits
| RFQ-NIAID-2023479 |
| Bill of Materials (BOM) |
| Line Item | Description | Manufacturer | Part # | Qty |
| 1 | BSL-4 Positive Protection Suits, with Tygon hosing, Size T2XXL, Cuff Size GT | Honeywell International Inc. | CC8486209-US-TGY | 4 |
2 BSL-4 Positive Protection Suits, with Tygon hosing CC8486209-US-TGY, Size T3, Cuff Size GT, Honeywell International Inc. CC8486209-US-TGY 18
3 BSL-4 Positive Protection Suits, with Tygon hosing, size T3XL, Cuff Size GT Honeywell International Inc. CC8486209-US-TGY 9
4 BSL-4 Positive Protection Suits, with Tygon hosing, Size T1XL, Cuff Size PT Honeywell International Inc. CC8486209-US-TGY 3
5 BSL-4 Positive Protection Suits, with Tygon hosing, Size T2XL, Cuff Size PT Honeywell International Inc. CC8486209-US-TGY 4
6 BSL-4 Positive Protection Suits, with Tygon hosing, Size T4, Cuff Size GT Honeywell International Inc. CC8486209-US-TGY 4
7 BSL-4 Positive Protection Suits, with Tygon hosing, Size T2, Cuff Size PT Honeywell International Inc. CC8486209-US-TGY 18
| Please note: This requirment is being competed as brand name or equal to the Honeywell product listed above. The brand name or equal requirements are listed below: | |||
| 1.) Suits shall be made of a material that is resistant to quaternary virucidal chemical showers on a daily basis. | |||
| Project Management Services | MOIPM | PROJECT MANAGMENT | 10 |
| Subtotal | |||
| Grand Total | |||
| 2.) Each suit shall include an in-line HEPA filtration system that connects to a facility provided breathing air system via standard Parker quick connections. | |||
| 3.) The suits must use the air provided at 60 PSI and utilize an internal suit air distribution system to deliver 25 cfm that is HEPA filter exhausted. | |||
| 4.) Air hose hook up shall be on the right side. | |||
| 5.) All seams shall be air and watertight. | |||
| 6.) The suits feet must be stocking type that will fit into a shoe or boot. | |||
| 7.) Noise level inside the suit must be below the OSHA standard (OSHA's permissible exposure limit (PEL) is 90) and allow clear communication over radio or phone by the user while in the suit. |
| Quotations must include: |
| * Country of origin |
| *technical specifications of suits must be provided |
| *all shipping costs for dock to dock (please included customs fees if applicable. |
| * estimated delivery time |
File details come from the government source that posted it. Updated .