2-Bid26030 Drawings.pdf

PDF 5 MB Posted

Attached to
Ada County Juvenile Water Line Replacement Phase II 2026
Solicitation number
BID 26030
Issued by
Ada County, Idaho

About this file

This file contains construction drawings for Ada County Juvenile Services in Ada County, Idaho, supporting the Water Line Replacement Phase II 2026 project. The drawings provide technical specifications and visual documentation for the removal and replacement of water lines and water heating systems at the juvenile detention facility. The project scope includes removal of existing galvanized piping, installation of new copper piping, placement of a new water heater and mixing valve, and all necessary access work including wall and ceiling cuts with subsequent restoration to original condition. The drawings serve as part of the Project Manual specifications and establish the technical requirements that bidders must follow to complete the water line replacement work.

The drawings are engineering documents that outline the specific locations, dimensions, routing, and installation details for the new copper piping system, water heater placement, and related fixtures throughout the Ada County Juvenile Services facility. These technical plans are essential bid documents that ensure all potential contractors have identical specifications and can provide accurate cost estimates for labor and materials. The drawings complement the written scope of work and establish the baseline requirements for construction execution, quality standards, and facility restoration upon project completion.

View the file

Other files

File Type Posted
3-Bid26030 Specifications.pdf PDF
1-Bid26030 Bidders Bid Form.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .