2-Bid Plans - N. Ramona Road Culvert Replacement.pdf

PDF 4 MB Posted

Attached to
Flanagan Road Culvert Replacements Project
Solicitation number
Not on record
Issued by
Lawrence County, Pennsylvania

About this file

This file is a construction plan cover sheet and general notes for the N. Ramona Road Culvert Replacement Project in Jackson Township, Lebanon County, Pennsylvania. The project involves the demolition and removal of an existing 42-inch corrugated metal pipe (CMP) culvert and concrete endwall, followed by installation of a new 48-inch structural lined corrugated plastic pipe (SLCPP) culvert with precast concrete endwalls, minor grading, riprap and scour protection placement, and roadway restoration. Sealed proposals are due electronically via the PennBid Program by 10:00 a.m. on Friday, July 3, 2026. A non-mandatory pre-bid conference will be held at 9:00 a.m. on Tuesday, June 23, 2026, at the Jackson Township Municipal Building. All bidding documents and specifications are available at no cost on PennBid (https://pennbid.bonfirehub.com), with bid results posted on the platform shortly after opening. Each proposal must be accompanied by a bank cashier's check or bid bond for ten percent of the total bid amount.

The construction drawings prepared by Steckbeck Engineering & Surveying, Inc. comprise five sheets detailing existing conditions and proposed improvements, construction details, erosion and sediment control plans, and erosion and sediment control details. The contractor is responsible for verifying all dimensions and elevations on site prior to construction, obtaining shop drawing approvals from Jackson Township and the township engineer before ordering materials, conducting field verification of underground utilities, maintaining all traffic control and trench protection measures, implementing the grading plan correctly, and repairing any property damaged during construction. Prevailing wage rates and record-keeping procedures established by the Pennsylvania Department of Labor & Industry apply to the project. Jackson Township reserves the right to reject any and all bids and to waive any omissions, errors, mistakes, defects, or irregularities in submissions at its sole discretion.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

C O

VE

R

S H

EE

T

SCALE 1"=1,000'

LOCATION MAP

N

LIST OF DRAWINGS

OWNER

CONTRACTOR NOTES:

GENERAL NOTES

N RAMONA RD

S.R. 422

PROJECT LOCATION

STRACKS DAM RD

N . Z

IN

N

S M

IL

L

RO

A

D , L

EB

A

N O

N , P

A

7-

2-

W

W W

.S

TE

C K

BE

C

K .N

ET

JACKSON TOWNSHIP

LEBANON COUNTY, PENNSYLVANIA

LOCATED IN

JUNE, 2026

NORTH RAMONA ROAD

CULVERT REPLACEMENT

CONSTRUCTION DRAWINGS

AutoCAD SHX Text

REVISION

AutoCAD SHX Text

DATE

AutoCAD SHX Text

BY

AutoCAD SHX Text Lebanon County, Pennsylvania

AutoCAD SHX Text Jackson Township

AutoCAD SHX Text located in

AutoCAD SHX Text for

AutoCAD SHX Text

N. RAMONA ROAD CULVERT REPLACEMENT

AutoCAD SHX Text

FIELD CREW:

AutoCAD SHX Text

BASE MAP:

AutoCAD SHX Text

DRAWN:

AutoCAD SHX Text

DESIGN:

AutoCAD SHX Text

CHECKED:

AutoCAD SHX Text

DATE:

AutoCAD SHX Text

SCALE:

AutoCAD SHX Text

PROJECT #

AutoCAD SHX Text

JACKSON TOWNSHIP

AutoCAD SHX Text COVER SHEET 1 OF 5 1 OF 5 1 OF 5 EX. CONDITIONS & PR. IMPROVEMENTS 2 OF 5 2 OF 5 DETAILS 3 OF 5 3 OF 5 3 OF 5 E&S PLAN 4 OF 5 4 OF 5 4 OF 5 E&S DETAILS 5 OF 5 5 OF 55 OF 5

AutoCAD SHX Text

JACKSON TOWNSHIP 60 N RAMONA ROAD MYERSTOWN PA 17067 PHONE:717-866-4771

AutoCAD SHX Text

1. THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS AND ELEVATIONS ON SITE PRIOR TO THE START OF CONSTRUCTION. THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS AND ELEVATIONS ON SITE PRIOR TO THE START OF CONSTRUCTION. CONTRACTOR SHALL VERIFY ALL DIMENSIONS AND ELEVATIONS ON SITE PRIOR TO THE START OF CONSTRUCTION. CONTRACTOR SHALL VERIFY ALL DIMENSIONS AND ELEVATIONS ON SITE PRIOR TO THE START OF CONSTRUCTION. SHALL VERIFY ALL DIMENSIONS AND ELEVATIONS ON SITE PRIOR TO THE START OF CONSTRUCTION. SHALL VERIFY ALL DIMENSIONS AND ELEVATIONS ON SITE PRIOR TO THE START OF CONSTRUCTION. VERIFY ALL DIMENSIONS AND ELEVATIONS ON SITE PRIOR TO THE START OF CONSTRUCTION. VERIFY ALL DIMENSIONS AND ELEVATIONS ON SITE PRIOR TO THE START OF CONSTRUCTION. ALL DIMENSIONS AND ELEVATIONS ON SITE PRIOR TO THE START OF CONSTRUCTION. ALL DIMENSIONS AND ELEVATIONS ON SITE PRIOR TO THE START OF CONSTRUCTION. DIMENSIONS AND ELEVATIONS ON SITE PRIOR TO THE START OF CONSTRUCTION. DIMENSIONS AND ELEVATIONS ON SITE PRIOR TO THE START OF CONSTRUCTION. AND ELEVATIONS ON SITE PRIOR TO THE START OF CONSTRUCTION. AND ELEVATIONS ON SITE PRIOR TO THE START OF CONSTRUCTION. ELEVATIONS ON SITE PRIOR TO THE START OF CONSTRUCTION. ELEVATIONS ON SITE PRIOR TO THE START OF CONSTRUCTION. ON SITE PRIOR TO THE START OF CONSTRUCTION. ON SITE PRIOR TO THE START OF CONSTRUCTION. SITE PRIOR TO THE START OF CONSTRUCTION. SITE PRIOR TO THE START OF CONSTRUCTION. PRIOR TO THE START OF CONSTRUCTION. PRIOR TO THE START OF CONSTRUCTION. TO THE START OF CONSTRUCTION. TO THE START OF CONSTRUCTION. THE START OF CONSTRUCTION. THE START OF CONSTRUCTION. START OF CONSTRUCTION. START OF CONSTRUCTION. OF CONSTRUCTION. OF CONSTRUCTION. CONSTRUCTION. CONSTRUCTION. UNDERGROUND UTILITIES HAVE BEEN SHOWN ACCORDING TO INFORMATION PROVIDED BY OTHERS AND MUST BE FIELD VERIFIED UTILITIES HAVE BEEN SHOWN ACCORDING TO INFORMATION PROVIDED BY OTHERS AND MUST BE FIELD VERIFIED UTILITIES HAVE BEEN SHOWN ACCORDING TO INFORMATION PROVIDED BY OTHERS AND MUST BE FIELD VERIFIED HAVE BEEN SHOWN ACCORDING TO INFORMATION PROVIDED BY OTHERS AND MUST BE FIELD VERIFIED HAVE BEEN SHOWN ACCORDING TO INFORMATION PROVIDED BY OTHERS AND MUST BE FIELD VERIFIED BEEN SHOWN ACCORDING TO INFORMATION PROVIDED BY OTHERS AND MUST BE FIELD VERIFIED BEEN SHOWN ACCORDING TO INFORMATION PROVIDED BY OTHERS AND MUST BE FIELD VERIFIED SHOWN ACCORDING TO INFORMATION PROVIDED BY OTHERS AND MUST BE FIELD VERIFIED SHOWN ACCORDING TO INFORMATION PROVIDED BY OTHERS AND MUST BE FIELD VERIFIED ACCORDING TO INFORMATION PROVIDED BY OTHERS AND MUST BE FIELD VERIFIED ACCORDING TO INFORMATION PROVIDED BY OTHERS AND MUST BE FIELD VERIFIED TO INFORMATION PROVIDED BY OTHERS AND MUST BE FIELD VERIFIED TO INFORMATION PROVIDED BY OTHERS AND MUST BE FIELD VERIFIED INFORMATION PROVIDED BY OTHERS AND MUST BE FIELD VERIFIED INFORMATION PROVIDED BY OTHERS AND MUST BE FIELD VERIFIED PROVIDED BY OTHERS AND MUST BE FIELD VERIFIED PROVIDED BY OTHERS AND MUST BE FIELD VERIFIED BY OTHERS AND MUST BE FIELD VERIFIED BY OTHERS AND MUST BE FIELD VERIFIED OTHERS AND MUST BE FIELD VERIFIED OTHERS AND MUST BE FIELD VERIFIED AND MUST BE FIELD VERIFIED AND MUST BE FIELD VERIFIED MUST BE FIELD VERIFIED MUST BE FIELD VERIFIED BE FIELD VERIFIED BE FIELD VERIFIED FIELD VERIFIED FIELD VERIFIED VERIFIED VERIFIED PRIOR TO CONSTRUCTION, EXCAVATION OR BLASTING. THE ACTUAL LOCATIONS OF THESE UTILITIES HAVE NOT BEEN FIELD TO CONSTRUCTION, EXCAVATION OR BLASTING. THE ACTUAL LOCATIONS OF THESE UTILITIES HAVE NOT BEEN FIELD TO CONSTRUCTION, EXCAVATION OR BLASTING. THE ACTUAL LOCATIONS OF THESE UTILITIES HAVE NOT BEEN FIELD CONSTRUCTION, EXCAVATION OR BLASTING. THE ACTUAL LOCATIONS OF THESE UTILITIES HAVE NOT BEEN FIELD CONSTRUCTION, EXCAVATION OR BLASTING. THE ACTUAL LOCATIONS OF THESE UTILITIES HAVE NOT BEEN FIELD EXCAVATION OR BLASTING. THE ACTUAL LOCATIONS OF THESE UTILITIES HAVE NOT BEEN FIELD EXCAVATION OR BLASTING. THE ACTUAL LOCATIONS OF THESE UTILITIES HAVE NOT BEEN FIELD OR BLASTING. THE ACTUAL LOCATIONS OF THESE UTILITIES HAVE NOT BEEN FIELD OR BLASTING. THE ACTUAL LOCATIONS OF THESE UTILITIES HAVE NOT BEEN FIELD BLASTING. THE ACTUAL LOCATIONS OF THESE UTILITIES HAVE NOT BEEN FIELD BLASTING. THE ACTUAL LOCATIONS OF THESE UTILITIES HAVE NOT BEEN FIELD THE ACTUAL LOCATIONS OF THESE UTILITIES HAVE NOT BEEN FIELD THE ACTUAL LOCATIONS OF THESE UTILITIES HAVE NOT BEEN FIELD ACTUAL LOCATIONS OF THESE UTILITIES HAVE NOT BEEN FIELD ACTUAL LOCATIONS OF THESE UTILITIES HAVE NOT BEEN FIELD LOCATIONS OF THESE UTILITIES HAVE NOT BEEN FIELD LOCATIONS OF THESE UTILITIES HAVE NOT BEEN FIELD OF THESE UTILITIES HAVE NOT BEEN FIELD OF THESE UTILITIES HAVE NOT BEEN FIELD THESE UTILITIES HAVE NOT BEEN FIELD THESE UTILITIES HAVE NOT BEEN FIELD UTILITIES HAVE NOT BEEN FIELD UTILITIES HAVE NOT BEEN FIELD HAVE NOT BEEN FIELD HAVE NOT BEEN FIELD NOT BEEN FIELD NOT BEEN FIELD BEEN FIELD BEEN FIELD FIELD FIELD VERIFIED AND THE LOCATIONS ARE APPROXIMATE. STECKBECK ENGINEERING & SURVEYING, INC. (SESI) DOES NOT MAKE ANY AND THE LOCATIONS ARE APPROXIMATE. STECKBECK ENGINEERING & SURVEYING, INC. (SESI) DOES NOT MAKE ANY AND THE LOCATIONS ARE APPROXIMATE. STECKBECK ENGINEERING & SURVEYING, INC. (SESI) DOES NOT MAKE ANY THE LOCATIONS ARE APPROXIMATE. STECKBECK ENGINEERING & SURVEYING, INC. (SESI) DOES NOT MAKE ANY THE LOCATIONS ARE APPROXIMATE. STECKBECK ENGINEERING & SURVEYING, INC. (SESI) DOES NOT MAKE ANY LOCATIONS ARE APPROXIMATE. STECKBECK ENGINEERING & SURVEYING, INC. (SESI) DOES NOT MAKE ANY LOCATIONS ARE APPROXIMATE. STECKBECK ENGINEERING & SURVEYING, INC. (SESI) DOES NOT MAKE ANY ARE APPROXIMATE. STECKBECK ENGINEERING & SURVEYING, INC. (SESI) DOES NOT MAKE ANY ARE APPROXIMATE. STECKBECK ENGINEERING & SURVEYING, INC. (SESI) DOES NOT MAKE ANY APPROXIMATE. STECKBECK ENGINEERING & SURVEYING, INC. (SESI) DOES NOT MAKE ANY APPROXIMATE. STECKBECK ENGINEERING & SURVEYING, INC. (SESI) DOES NOT MAKE ANY STECKBECK ENGINEERING & SURVEYING, INC. (SESI) DOES NOT MAKE ANY STECKBECK ENGINEERING & SURVEYING, INC. (SESI) DOES NOT MAKE ANY ENGINEERING & SURVEYING, INC. (SESI) DOES NOT MAKE ANY ENGINEERING & SURVEYING, INC. (SESI) DOES NOT MAKE ANY & SURVEYING, INC. (SESI) DOES NOT MAKE ANY & SURVEYING, INC. (SESI) DOES NOT MAKE ANY SURVEYING, INC. (SESI) DOES NOT MAKE ANY SURVEYING, INC. (SESI) DOES NOT MAKE ANY INC. (SESI) DOES NOT MAKE ANY INC. (SESI) DOES NOT MAKE ANY (SESI) DOES NOT MAKE ANY (SESI) DOES NOT MAKE ANY DOES NOT MAKE ANY DOES NOT MAKE ANY NOT MAKE ANY NOT MAKE ANY MAKE ANY MAKE ANY ANY ANY REPRESENTATION, WARRANTY, ASSURANCE OR GUARANTEE THAT THE UNDERGROUND UTILITY LOCATION INFORMATION PROVIDED WARRANTY, ASSURANCE OR GUARANTEE THAT THE UNDERGROUND UTILITY LOCATION INFORMATION PROVIDED WARRANTY, ASSURANCE OR GUARANTEE THAT THE UNDERGROUND UTILITY LOCATION INFORMATION PROVIDED ASSURANCE OR GUARANTEE THAT THE UNDERGROUND UTILITY LOCATION INFORMATION PROVIDED ASSURANCE OR GUARANTEE THAT THE UNDERGROUND UTILITY LOCATION INFORMATION PROVIDED OR GUARANTEE THAT THE UNDERGROUND UTILITY LOCATION INFORMATION PROVIDED OR GUARANTEE THAT THE UNDERGROUND UTILITY LOCATION INFORMATION PROVIDED GUARANTEE THAT THE UNDERGROUND UTILITY LOCATION INFORMATION PROVIDED GUARANTEE THAT THE UNDERGROUND UTILITY LOCATION INFORMATION PROVIDED THAT THE UNDERGROUND UTILITY LOCATION INFORMATION PROVIDED THAT THE UNDERGROUND UTILITY LOCATION INFORMATION PROVIDED THE UNDERGROUND UTILITY LOCATION INFORMATION PROVIDED THE UNDERGROUND UTILITY LOCATION INFORMATION PROVIDED UNDERGROUND UTILITY LOCATION INFORMATION PROVIDED UNDERGROUND UTILITY LOCATION INFORMATION PROVIDED UTILITY LOCATION INFORMATION PROVIDED UTILITY LOCATION INFORMATION PROVIDED LOCATION INFORMATION PROVIDED LOCATION INFORMATION PROVIDED INFORMATION PROVIDED INFORMATION PROVIDED PROVIDED PROVIDED BY OTHERS AND REFLECTED ON THESE DRAWINGS IS CORRECT AND ACCURATE. SESI ASSUMES NO LIABILITY FOR ANY DAMAGE OTHERS AND REFLECTED ON THESE DRAWINGS IS CORRECT AND ACCURATE. SESI ASSUMES NO LIABILITY FOR ANY DAMAGE OTHERS AND REFLECTED ON THESE DRAWINGS IS CORRECT AND ACCURATE. SESI ASSUMES NO LIABILITY FOR ANY DAMAGE AND REFLECTED ON THESE DRAWINGS IS CORRECT AND ACCURATE. SESI ASSUMES NO LIABILITY FOR ANY DAMAGE AND REFLECTED ON THESE DRAWINGS IS CORRECT AND ACCURATE. SESI ASSUMES NO LIABILITY FOR ANY DAMAGE REFLECTED ON THESE DRAWINGS IS CORRECT AND ACCURATE. SESI ASSUMES NO LIABILITY FOR ANY DAMAGE REFLECTED ON THESE DRAWINGS IS CORRECT AND ACCURATE. SESI ASSUMES NO LIABILITY FOR ANY DAMAGE ON THESE DRAWINGS IS CORRECT AND ACCURATE. SESI ASSUMES NO LIABILITY FOR ANY DAMAGE ON THESE DRAWINGS IS CORRECT AND ACCURATE. SESI ASSUMES NO LIABILITY FOR ANY DAMAGE THESE DRAWINGS IS CORRECT AND ACCURATE. SESI ASSUMES NO LIABILITY FOR ANY DAMAGE THESE DRAWINGS IS CORRECT AND ACCURATE. SESI ASSUMES NO LIABILITY FOR ANY DAMAGE DRAWINGS IS CORRECT AND ACCURATE. SESI ASSUMES NO LIABILITY FOR ANY DAMAGE DRAWINGS IS CORRECT AND ACCURATE. SESI ASSUMES NO LIABILITY FOR ANY DAMAGE IS CORRECT AND ACCURATE. SESI ASSUMES NO LIABILITY FOR ANY DAMAGE IS CORRECT AND ACCURATE. SESI ASSUMES NO LIABILITY FOR ANY DAMAGE CORRECT AND ACCURATE. SESI ASSUMES NO LIABILITY FOR ANY DAMAGE CORRECT AND ACCURATE. SESI ASSUMES NO LIABILITY FOR ANY DAMAGE AND ACCURATE. SESI ASSUMES NO LIABILITY FOR ANY DAMAGE AND ACCURATE. SESI ASSUMES NO LIABILITY FOR ANY DAMAGE ACCURATE. SESI ASSUMES NO LIABILITY FOR ANY DAMAGE ACCURATE. SESI ASSUMES NO LIABILITY FOR ANY DAMAGE SESI ASSUMES NO LIABILITY FOR ANY DAMAGE SESI ASSUMES NO LIABILITY FOR ANY DAMAGE ASSUMES NO LIABILITY FOR ANY DAMAGE ASSUMES NO LIABILITY FOR ANY DAMAGE NO LIABILITY FOR ANY DAMAGE NO LIABILITY FOR ANY DAMAGE LIABILITY FOR ANY DAMAGE LIABILITY FOR ANY DAMAGE FOR ANY DAMAGE FOR ANY DAMAGE ANY DAMAGE ANY DAMAGE DAMAGE DAMAGE INCURRED AS A RESULT OF UNDERGROUND UTILITIES OMITTED OR INACCURATELY SHOWN. 2. THE CONTRACTOR SHALL TAKE ALL NECESSARY PRECAUTIONS TO PROTECT THE EXISTING UTILITIES AND MAINTAIN THE CONTRACTOR SHALL TAKE ALL NECESSARY PRECAUTIONS TO PROTECT THE EXISTING UTILITIES AND MAINTAIN CONTRACTOR SHALL TAKE ALL NECESSARY PRECAUTIONS TO PROTECT THE EXISTING UTILITIES AND MAINTAIN CONTRACTOR SHALL TAKE ALL NECESSARY PRECAUTIONS TO PROTECT THE EXISTING UTILITIES AND MAINTAIN SHALL TAKE ALL NECESSARY PRECAUTIONS TO PROTECT THE EXISTING UTILITIES AND MAINTAIN SHALL TAKE ALL NECESSARY PRECAUTIONS TO PROTECT THE EXISTING UTILITIES AND MAINTAIN TAKE ALL NECESSARY PRECAUTIONS TO PROTECT THE EXISTING UTILITIES AND MAINTAIN TAKE ALL NECESSARY PRECAUTIONS TO PROTECT THE EXISTING UTILITIES AND MAINTAIN ALL NECESSARY PRECAUTIONS TO PROTECT THE EXISTING UTILITIES AND MAINTAIN ALL NECESSARY PRECAUTIONS TO PROTECT THE EXISTING UTILITIES AND MAINTAIN NECESSARY PRECAUTIONS TO PROTECT THE EXISTING UTILITIES AND MAINTAIN NECESSARY PRECAUTIONS TO PROTECT THE EXISTING UTILITIES AND MAINTAIN PRECAUTIONS TO PROTECT THE EXISTING UTILITIES AND MAINTAIN PRECAUTIONS TO PROTECT THE EXISTING UTILITIES AND MAINTAIN TO PROTECT THE EXISTING UTILITIES AND MAINTAIN TO PROTECT THE EXISTING UTILITIES AND MAINTAIN PROTECT THE EXISTING UTILITIES AND MAINTAIN PROTECT THE EXISTING UTILITIES AND MAINTAIN THE EXISTING UTILITIES AND MAINTAIN THE EXISTING UTILITIES AND MAINTAIN EXISTING UTILITIES AND MAINTAIN EXISTING UTILITIES AND MAINTAIN UTILITIES AND MAINTAIN UTILITIES AND MAINTAIN AND MAINTAIN AND MAINTAIN MAINTAIN MAINTAIN UNINTERRUPTED SERVICE. DAMAGE TO ANY UTILITY SHALL BE REPAIRED TO THE SATISFACTION OF THE OWNER, UTILITY COMPANY SERVICE. DAMAGE TO ANY UTILITY SHALL BE REPAIRED TO THE SATISFACTION OF THE OWNER, UTILITY COMPANY SERVICE. DAMAGE TO ANY UTILITY SHALL BE REPAIRED TO THE SATISFACTION OF THE OWNER, UTILITY COMPANY DAMAGE TO ANY UTILITY SHALL BE REPAIRED TO THE SATISFACTION OF THE OWNER, UTILITY COMPANY DAMAGE TO ANY UTILITY SHALL BE REPAIRED TO THE SATISFACTION OF THE OWNER, UTILITY COMPANY TO ANY UTILITY SHALL BE REPAIRED TO THE SATISFACTION OF THE OWNER, UTILITY COMPANY TO ANY UTILITY SHALL BE REPAIRED TO THE SATISFACTION OF THE OWNER, UTILITY COMPANY ANY UTILITY SHALL BE REPAIRED TO THE SATISFACTION OF THE OWNER, UTILITY COMPANY ANY UTILITY SHALL BE REPAIRED TO THE SATISFACTION OF THE OWNER, UTILITY COMPANY UTILITY SHALL BE REPAIRED TO THE SATISFACTION OF THE OWNER, UTILITY COMPANY UTILITY SHALL BE REPAIRED TO THE SATISFACTION OF THE OWNER, UTILITY COMPANY SHALL BE REPAIRED TO THE SATISFACTION OF THE OWNER, UTILITY COMPANY SHALL BE REPAIRED TO THE SATISFACTION OF THE OWNER, UTILITY COMPANY BE REPAIRED TO THE SATISFACTION OF THE OWNER, UTILITY COMPANY BE REPAIRED TO THE SATISFACTION OF THE OWNER, UTILITY COMPANY REPAIRED TO THE SATISFACTION OF THE OWNER, UTILITY COMPANY REPAIRED TO THE SATISFACTION OF THE OWNER, UTILITY COMPANY TO THE SATISFACTION OF THE OWNER, UTILITY COMPANY TO THE SATISFACTION OF THE OWNER, UTILITY COMPANY THE SATISFACTION OF THE OWNER, UTILITY COMPANY THE SATISFACTION OF THE OWNER, UTILITY COMPANY SATISFACTION OF THE OWNER, UTILITY COMPANY SATISFACTION OF THE OWNER, UTILITY COMPANY OF THE OWNER, UTILITY COMPANY OF THE OWNER, UTILITY COMPANY THE OWNER, UTILITY COMPANY THE OWNER, UTILITY COMPANY OWNER, UTILITY COMPANY OWNER, UTILITY COMPANY UTILITY COMPANY UTILITY COMPANY COMPANY COMPANY OR AUTHORITY, AT THE CONTRACTOR'S EXPENSE. 3. THE CONTRACTOR IS RESPONSIBLE FOR ALL TESTING AND RECORD DRAWINGS AS MAY BE REQUIRED BY THE MUNICIPALITY THE CONTRACTOR IS RESPONSIBLE FOR ALL TESTING AND RECORD DRAWINGS AS MAY BE REQUIRED BY THE MUNICIPALITY CONTRACTOR IS RESPONSIBLE FOR ALL TESTING AND RECORD DRAWINGS AS MAY BE REQUIRED BY THE MUNICIPALITY CONTRACTOR IS RESPONSIBLE FOR ALL TESTING AND RECORD DRAWINGS AS MAY BE REQUIRED BY THE MUNICIPALITY IS RESPONSIBLE FOR ALL TESTING AND RECORD DRAWINGS AS MAY BE REQUIRED BY THE MUNICIPALITY IS RESPONSIBLE FOR ALL TESTING AND RECORD DRAWINGS AS MAY BE REQUIRED BY THE MUNICIPALITY RESPONSIBLE FOR ALL TESTING AND RECORD DRAWINGS AS MAY BE REQUIRED BY THE MUNICIPALITY RESPONSIBLE FOR ALL TESTING AND RECORD DRAWINGS AS MAY BE REQUIRED BY THE MUNICIPALITY FOR ALL TESTING AND RECORD DRAWINGS AS MAY BE REQUIRED BY THE MUNICIPALITY FOR ALL TESTING AND RECORD DRAWINGS AS MAY BE REQUIRED BY THE MUNICIPALITY ALL TESTING AND RECORD DRAWINGS AS MAY BE REQUIRED BY THE MUNICIPALITY ALL TESTING AND RECORD DRAWINGS AS MAY BE REQUIRED BY THE MUNICIPALITY TESTING AND RECORD DRAWINGS AS MAY BE REQUIRED BY THE MUNICIPALITY TESTING AND RECORD DRAWINGS AS MAY BE REQUIRED BY THE MUNICIPALITY AND RECORD DRAWINGS AS MAY BE REQUIRED BY THE MUNICIPALITY AND RECORD DRAWINGS AS MAY BE REQUIRED BY THE MUNICIPALITY RECORD DRAWINGS AS MAY BE REQUIRED BY THE MUNICIPALITY RECORD DRAWINGS AS MAY BE REQUIRED BY THE MUNICIPALITY DRAWINGS AS MAY BE REQUIRED BY THE MUNICIPALITY DRAWINGS AS MAY BE REQUIRED BY THE MUNICIPALITY AS MAY BE REQUIRED BY THE MUNICIPALITY AS MAY BE REQUIRED BY THE MUNICIPALITY MAY BE REQUIRED BY THE MUNICIPALITY MAY BE REQUIRED BY THE MUNICIPALITY BE REQUIRED BY THE MUNICIPALITY BE REQUIRED BY THE MUNICIPALITY REQUIRED BY THE MUNICIPALITY REQUIRED BY THE MUNICIPALITY BY THE MUNICIPALITY BY THE MUNICIPALITY THE MUNICIPALITY THE MUNICIPALITY MUNICIPALITY MUNICIPALITY AND/OR THE VARIOUS AUTHORITIES RELATIVE TO THE CONSTRUCTION SHOWN ON THESE PLANS. 4. THE CONTRACTOR IS RESPONSIBLE FOR ANY UTILITY RELOCATION COSTS REQUIRED TO CONSTRUCT THE PROPOSED BRIDGE. THE CONTRACTOR IS RESPONSIBLE FOR ANY UTILITY RELOCATION COSTS REQUIRED TO CONSTRUCT THE PROPOSED BRIDGE. 5. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL TRAFFIC CONTROL, TRENCH BARRICADING, COVERING, SHEETING AND THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL TRAFFIC CONTROL, TRENCH BARRICADING, COVERING, SHEETING AND CONTRACTOR SHALL BE RESPONSIBLE FOR ALL TRAFFIC CONTROL, TRENCH BARRICADING, COVERING, SHEETING AND CONTRACTOR SHALL BE RESPONSIBLE FOR ALL TRAFFIC CONTROL, TRENCH BARRICADING, COVERING, SHEETING AND SHALL BE RESPONSIBLE FOR ALL TRAFFIC CONTROL, TRENCH BARRICADING, COVERING, SHEETING AND SHALL BE RESPONSIBLE FOR ALL TRAFFIC CONTROL, TRENCH BARRICADING, COVERING, SHEETING AND BE RESPONSIBLE FOR ALL TRAFFIC CONTROL, TRENCH BARRICADING, COVERING, SHEETING AND BE RESPONSIBLE FOR ALL TRAFFIC CONTROL, TRENCH BARRICADING, COVERING, SHEETING AND RESPONSIBLE FOR ALL TRAFFIC CONTROL, TRENCH BARRICADING, COVERING, SHEETING AND RESPONSIBLE FOR ALL TRAFFIC CONTROL, TRENCH BARRICADING, COVERING, SHEETING AND FOR ALL TRAFFIC CONTROL, TRENCH BARRICADING, COVERING, SHEETING AND FOR ALL TRAFFIC CONTROL, TRENCH BARRICADING, COVERING, SHEETING AND ALL TRAFFIC CONTROL, TRENCH BARRICADING, COVERING, SHEETING AND ALL TRAFFIC CONTROL, TRENCH BARRICADING, COVERING, SHEETING AND TRAFFIC CONTROL, TRENCH BARRICADING, COVERING, SHEETING AND TRAFFIC CONTROL, TRENCH BARRICADING, COVERING, SHEETING AND CONTROL, TRENCH BARRICADING, COVERING, SHEETING AND CONTROL, TRENCH BARRICADING, COVERING, SHEETING AND TRENCH BARRICADING, COVERING, SHEETING AND TRENCH BARRICADING, COVERING, SHEETING AND BARRICADING, COVERING, SHEETING AND BARRICADING, COVERING, SHEETING AND COVERING, SHEETING AND COVERING, SHEETING AND SHEETING AND SHEETING AND AND AND SHORING, AS THE NEED ARISES. 6. IT WILL BE THE CONTRACTOR'S RESPONSIBILITY TO ENSURE THAT THE GRADING PLAN IS IMPLEMENTED CORRECTLY, THAT A IT WILL BE THE CONTRACTOR'S RESPONSIBILITY TO ENSURE THAT THE GRADING PLAN IS IMPLEMENTED CORRECTLY, THAT A WILL BE THE CONTRACTOR'S RESPONSIBILITY TO ENSURE THAT THE GRADING PLAN IS IMPLEMENTED CORRECTLY, THAT A WILL BE THE CONTRACTOR'S RESPONSIBILITY TO ENSURE THAT THE GRADING PLAN IS IMPLEMENTED CORRECTLY, THAT A BE THE CONTRACTOR'S RESPONSIBILITY TO ENSURE THAT THE GRADING PLAN IS IMPLEMENTED CORRECTLY, THAT A BE THE CONTRACTOR'S RESPONSIBILITY TO ENSURE THAT THE GRADING PLAN IS IMPLEMENTED CORRECTLY, THAT A THE CONTRACTOR'S RESPONSIBILITY TO ENSURE THAT THE GRADING PLAN IS IMPLEMENTED CORRECTLY, THAT A THE CONTRACTOR'S RESPONSIBILITY TO ENSURE THAT THE GRADING PLAN IS IMPLEMENTED CORRECTLY, THAT A CONTRACTOR'S RESPONSIBILITY TO ENSURE THAT THE GRADING PLAN IS IMPLEMENTED CORRECTLY, THAT A CONTRACTOR'S RESPONSIBILITY TO ENSURE THAT THE GRADING PLAN IS IMPLEMENTED CORRECTLY, THAT A RESPONSIBILITY TO ENSURE THAT THE GRADING PLAN IS IMPLEMENTED CORRECTLY, THAT A RESPONSIBILITY TO ENSURE THAT THE GRADING PLAN IS IMPLEMENTED CORRECTLY, THAT A TO ENSURE THAT THE GRADING PLAN IS IMPLEMENTED CORRECTLY, THAT A TO ENSURE THAT THE GRADING PLAN IS IMPLEMENTED CORRECTLY, THAT A ENSURE THAT THE GRADING PLAN IS IMPLEMENTED CORRECTLY, THAT A ENSURE THAT THE GRADING PLAN IS IMPLEMENTED CORRECTLY, THAT A THAT THE GRADING PLAN IS IMPLEMENTED CORRECTLY, THAT A THAT THE GRADING PLAN IS IMPLEMENTED CORRECTLY, THAT A THE GRADING PLAN IS IMPLEMENTED CORRECTLY, THAT A THE GRADING PLAN IS IMPLEMENTED CORRECTLY, THAT A GRADING PLAN IS IMPLEMENTED CORRECTLY, THAT A GRADING PLAN IS IMPLEMENTED CORRECTLY, THAT A PLAN IS IMPLEMENTED CORRECTLY, THAT A PLAN IS IMPLEMENTED CORRECTLY, THAT A IS IMPLEMENTED CORRECTLY, THAT A IS IMPLEMENTED CORRECTLY, THAT A IMPLEMENTED CORRECTLY, THAT A IMPLEMENTED CORRECTLY, THAT A CORRECTLY, THAT A CORRECTLY, THAT A THAT A THAT A A A MINIMUM COVER IS MAINTAINED OVER ALL UTILITY PIPES, AND THAT PROPER DRAINAGE IS PROVIDED DURING CONSTRUCTION. 7. THESE PLANS, PREPARED BY SESI, DO NOT EXTEND TO OR INCLUDE SYSTEMS PERTAINING TO THE SAFETY OF THE THESE PLANS, PREPARED BY SESI, DO NOT EXTEND TO OR INCLUDE SYSTEMS PERTAINING TO THE SAFETY OF THE PLANS, PREPARED BY SESI, DO NOT EXTEND TO OR INCLUDE SYSTEMS PERTAINING TO THE SAFETY OF THE PLANS, PREPARED BY SESI, DO NOT EXTEND TO OR INCLUDE SYSTEMS PERTAINING TO THE SAFETY OF THE PREPARED BY SESI, DO NOT EXTEND TO OR INCLUDE SYSTEMS PERTAINING TO THE SAFETY OF THE PREPARED BY SESI, DO NOT EXTEND TO OR INCLUDE SYSTEMS PERTAINING TO THE SAFETY OF THE BY SESI, DO NOT EXTEND TO OR INCLUDE SYSTEMS PERTAINING TO THE SAFETY OF THE BY SESI, DO NOT EXTEND TO OR INCLUDE SYSTEMS PERTAINING TO THE SAFETY OF THE SESI, DO NOT EXTEND TO OR INCLUDE SYSTEMS PERTAINING TO THE SAFETY OF THE SESI, DO NOT EXTEND TO OR INCLUDE SYSTEMS PERTAINING TO THE SAFETY OF THE DO NOT EXTEND TO OR INCLUDE SYSTEMS PERTAINING TO THE SAFETY OF THE DO NOT EXTEND TO OR INCLUDE SYSTEMS PERTAINING TO THE SAFETY OF THE NOT EXTEND TO OR INCLUDE SYSTEMS PERTAINING TO THE SAFETY OF THE NOT EXTEND TO OR INCLUDE SYSTEMS PERTAINING TO THE SAFETY OF THE EXTEND TO OR INCLUDE SYSTEMS PERTAINING TO THE SAFETY OF THE EXTEND TO OR INCLUDE SYSTEMS PERTAINING TO THE SAFETY OF THE TO OR INCLUDE SYSTEMS PERTAINING TO THE SAFETY OF THE TO OR INCLUDE SYSTEMS PERTAINING TO THE SAFETY OF THE OR INCLUDE SYSTEMS PERTAINING TO THE SAFETY OF THE OR INCLUDE SYSTEMS PERTAINING TO THE SAFETY OF THE INCLUDE SYSTEMS PERTAINING TO THE SAFETY OF THE INCLUDE SYSTEMS PERTAINING TO THE SAFETY OF THE SYSTEMS PERTAINING TO THE SAFETY OF THE SYSTEMS PERTAINING TO THE SAFETY OF THE PERTAINING TO THE SAFETY OF THE PERTAINING TO THE SAFETY OF THE TO THE SAFETY OF THE TO THE SAFETY OF THE THE SAFETY OF THE THE SAFETY OF THE SAFETY OF THE SAFETY OF THE OF THE OF THE THE THE CONSTRUCTION CONTRACTOR, OF ITS EMPLOYEES, AGENTS OR REPRESENTATIVES IN THE PERFORMANCE OF THE WORK. THE SEAL CONTRACTOR, OF ITS EMPLOYEES, AGENTS OR REPRESENTATIVES IN THE PERFORMANCE OF THE WORK. THE SEAL CONTRACTOR, OF ITS EMPLOYEES, AGENTS OR REPRESENTATIVES IN THE PERFORMANCE OF THE WORK. THE SEAL OF ITS EMPLOYEES, AGENTS OR REPRESENTATIVES IN THE PERFORMANCE OF THE WORK. THE SEAL OF ITS EMPLOYEES, AGENTS OR REPRESENTATIVES IN THE PERFORMANCE OF THE WORK. THE SEAL ITS EMPLOYEES, AGENTS OR REPRESENTATIVES IN THE PERFORMANCE OF THE WORK. THE SEAL ITS EMPLOYEES, AGENTS OR REPRESENTATIVES IN THE PERFORMANCE OF THE WORK. THE SEAL EMPLOYEES, AGENTS OR REPRESENTATIVES IN THE PERFORMANCE OF THE WORK. THE SEAL EMPLOYEES, AGENTS OR REPRESENTATIVES IN THE PERFORMANCE OF THE WORK. THE SEAL AGENTS OR REPRESENTATIVES IN THE PERFORMANCE OF THE WORK. THE SEAL AGENTS OR REPRESENTATIVES IN THE PERFORMANCE OF THE WORK. THE SEAL OR REPRESENTATIVES IN THE PERFORMANCE OF THE WORK. THE SEAL OR REPRESENTATIVES IN THE PERFORMANCE OF THE WORK. THE SEAL REPRESENTATIVES IN THE PERFORMANCE OF THE WORK. THE SEAL REPRESENTATIVES IN THE PERFORMANCE OF THE WORK. THE SEAL IN THE PERFORMANCE OF THE WORK. THE SEAL IN THE PERFORMANCE OF THE WORK. THE SEAL THE PERFORMANCE OF THE WORK. THE SEAL THE PERFORMANCE OF THE WORK. THE SEAL PERFORMANCE OF THE WORK. THE SEAL PERFORMANCE OF THE WORK. THE SEAL OF THE WORK. THE SEAL OF THE WORK. THE SEAL THE WORK. THE SEAL THE WORK. THE SEAL WORK. THE SEAL WORK. THE SEAL THE SEAL THE SEAL SEAL SEAL OF STECKBECK ENGINEERING & SURVEYING, INC. (SESI) REGISTERED PROFESSIONAL HEREON DOES NOT EXTEND TO ANY SUCH STECKBECK ENGINEERING & SURVEYING, INC. (SESI) REGISTERED PROFESSIONAL HEREON DOES NOT EXTEND TO ANY SUCH STECKBECK ENGINEERING & SURVEYING, INC. (SESI) REGISTERED PROFESSIONAL HEREON DOES NOT EXTEND TO ANY SUCH ENGINEERING & SURVEYING, INC. (SESI) REGISTERED PROFESSIONAL HEREON DOES NOT EXTEND TO ANY SUCH ENGINEERING & SURVEYING, INC. (SESI) REGISTERED PROFESSIONAL HEREON DOES NOT EXTEND TO ANY SUCH & SURVEYING, INC. (SESI) REGISTERED PROFESSIONAL HEREON DOES NOT EXTEND TO ANY SUCH & SURVEYING, INC. (SESI) REGISTERED PROFESSIONAL HEREON DOES NOT EXTEND TO ANY SUCH SURVEYING, INC. (SESI) REGISTERED PROFESSIONAL HEREON DOES NOT EXTEND TO ANY SUCH SURVEYING, INC. (SESI) REGISTERED PROFESSIONAL HEREON DOES NOT EXTEND TO ANY SUCH INC. (SESI) REGISTERED PROFESSIONAL HEREON DOES NOT EXTEND TO ANY SUCH INC. (SESI) REGISTERED PROFESSIONAL HEREON DOES NOT EXTEND TO ANY SUCH (SESI) REGISTERED PROFESSIONAL HEREON DOES NOT EXTEND TO ANY SUCH (SESI) REGISTERED PROFESSIONAL HEREON DOES NOT EXTEND TO ANY SUCH REGISTERED PROFESSIONAL HEREON DOES NOT EXTEND TO ANY SUCH REGISTERED PROFESSIONAL HEREON DOES NOT EXTEND TO ANY SUCH PROFESSIONAL HEREON DOES NOT EXTEND TO ANY SUCH PROFESSIONAL HEREON DOES NOT EXTEND TO ANY SUCH HEREON DOES NOT EXTEND TO ANY SUCH HEREON DOES NOT EXTEND TO ANY SUCH DOES NOT EXTEND TO ANY SUCH DOES NOT EXTEND TO ANY SUCH NOT EXTEND TO ANY SUCH NOT EXTEND TO ANY SUCH EXTEND TO ANY SUCH EXTEND TO ANY SUCH TO ANY SUCH TO ANY SUCH ANY SUCH ANY SUCH SUCH SUCH SAFETY SYSTEMS THAT MAY NOW OR HEREAFTER BE INCORPORATED IN THESE PLANS. THE CONSTRUCTION CONTRACTOR SHALL SYSTEMS THAT MAY NOW OR HEREAFTER BE INCORPORATED IN THESE PLANS. THE CONSTRUCTION CONTRACTOR SHALL SYSTEMS THAT MAY NOW OR HEREAFTER BE INCORPORATED IN THESE PLANS. THE CONSTRUCTION CONTRACTOR SHALL THAT MAY NOW OR HEREAFTER BE INCORPORATED IN THESE PLANS. THE CONSTRUCTION CONTRACTOR SHALL THAT MAY NOW OR HEREAFTER BE INCORPORATED IN THESE PLANS. THE CONSTRUCTION CONTRACTOR SHALL MAY NOW OR HEREAFTER BE INCORPORATED IN THESE PLANS. THE CONSTRUCTION CONTRACTOR SHALL MAY NOW OR HEREAFTER BE INCORPORATED IN THESE PLANS. THE CONSTRUCTION CONTRACTOR SHALL NOW OR HEREAFTER BE INCORPORATED IN THESE PLANS. THE CONSTRUCTION CONTRACTOR SHALL NOW OR HEREAFTER BE INCORPORATED IN THESE PLANS. THE CONSTRUCTION CONTRACTOR SHALL OR HEREAFTER BE INCORPORATED IN THESE PLANS. THE CONSTRUCTION CONTRACTOR SHALL OR HEREAFTER BE INCORPORATED IN THESE PLANS. THE CONSTRUCTION CONTRACTOR SHALL HEREAFTER BE INCORPORATED IN THESE PLANS. THE CONSTRUCTION CONTRACTOR SHALL HEREAFTER BE INCORPORATED IN THESE PLANS. THE CONSTRUCTION CONTRACTOR SHALL BE INCORPORATED IN THESE PLANS. THE CONSTRUCTION CONTRACTOR SHALL BE INCORPORATED IN THESE PLANS. THE CONSTRUCTION CONTRACTOR SHALL INCORPORATED IN THESE PLANS. THE CONSTRUCTION CONTRACTOR SHALL INCORPORATED IN THESE PLANS. THE CONSTRUCTION CONTRACTOR SHALL IN THESE PLANS. THE CONSTRUCTION CONTRACTOR SHALL IN THESE PLANS. THE CONSTRUCTION CONTRACTOR SHALL THESE PLANS. THE CONSTRUCTION CONTRACTOR SHALL THESE PLANS. THE CONSTRUCTION CONTRACTOR SHALL PLANS. THE CONSTRUCTION CONTRACTOR SHALL PLANS. THE CONSTRUCTION CONTRACTOR SHALL THE CONSTRUCTION CONTRACTOR SHALL THE CONSTRUCTION CONTRACTOR SHALL CONSTRUCTION CONTRACTOR SHALL CONSTRUCTION CONTRACTOR SHALL CONTRACTOR SHALL CONTRACTOR SHALL SHALL SHALL PREPARE OR OBTAIN THE APPROPRIATE SAFETY SYSTEMS WHICH MAY BE REQUIRED BY OSHA. 8. CONTRACTORS SHALL NOT STORE CONSTRUCTION MATERIALS OR LOCATE TRASH RECEPTACLES (DUMPSTERS) ON PAVED CONTRACTORS SHALL NOT STORE CONSTRUCTION MATERIALS OR LOCATE TRASH RECEPTACLES (DUMPSTERS) ON PAVED SHALL NOT STORE CONSTRUCTION MATERIALS OR LOCATE TRASH RECEPTACLES (DUMPSTERS) ON PAVED SHALL NOT STORE CONSTRUCTION MATERIALS OR LOCATE TRASH RECEPTACLES (DUMPSTERS) ON PAVED NOT STORE CONSTRUCTION MATERIALS OR LOCATE TRASH RECEPTACLES (DUMPSTERS) ON PAVED NOT STORE CONSTRUCTION MATERIALS OR LOCATE TRASH RECEPTACLES (DUMPSTERS) ON PAVED STORE CONSTRUCTION MATERIALS OR LOCATE TRASH RECEPTACLES (DUMPSTERS) ON PAVED STORE CONSTRUCTION MATERIALS OR LOCATE TRASH RECEPTACLES (DUMPSTERS) ON PAVED CONSTRUCTION MATERIALS OR LOCATE TRASH RECEPTACLES (DUMPSTERS) ON PAVED CONSTRUCTION MATERIALS OR LOCATE TRASH RECEPTACLES (DUMPSTERS) ON PAVED MATERIALS OR LOCATE TRASH RECEPTACLES (DUMPSTERS) ON PAVED MATERIALS OR LOCATE TRASH RECEPTACLES (DUMPSTERS) ON PAVED OR LOCATE TRASH RECEPTACLES (DUMPSTERS) ON PAVED OR LOCATE TRASH RECEPTACLES (DUMPSTERS) ON PAVED LOCATE TRASH RECEPTACLES (DUMPSTERS) ON PAVED LOCATE TRASH RECEPTACLES (DUMPSTERS) ON PAVED TRASH RECEPTACLES (DUMPSTERS) ON PAVED TRASH RECEPTACLES (DUMPSTERS) ON PAVED RECEPTACLES (DUMPSTERS) ON PAVED RECEPTACLES (DUMPSTERS) ON PAVED (DUMPSTERS) ON PAVED (DUMPSTERS) ON PAVED ON PAVED ON PAVED PAVED PAVED CARTWAYS OF DEDICATED AND UNDEDICATED STREETS UNLESS EXPRESS PERMISSION IS GRANTED BY THE TOWNSHIP. 9. ALL MUD FROM CONSTRUCTION ACTIVITIES THAT GETS TRACKED ONTO STREETS, EITHER DEDICATED OR UNDEDICATED, SHALL BE ALL MUD FROM CONSTRUCTION ACTIVITIES THAT GETS TRACKED ONTO STREETS, EITHER DEDICATED OR UNDEDICATED, SHALL BE MUD FROM CONSTRUCTION ACTIVITIES THAT GETS TRACKED ONTO STREETS, EITHER DEDICATED OR UNDEDICATED, SHALL BE MUD FROM CONSTRUCTION ACTIVITIES THAT GETS TRACKED ONTO STREETS, EITHER DEDICATED OR UNDEDICATED, SHALL BE FROM CONSTRUCTION ACTIVITIES THAT GETS TRACKED ONTO STREETS, EITHER DEDICATED OR UNDEDICATED, SHALL BE FROM CONSTRUCTION ACTIVITIES THAT GETS TRACKED ONTO STREETS, EITHER DEDICATED OR UNDEDICATED, SHALL BE CONSTRUCTION ACTIVITIES THAT GETS TRACKED ONTO STREETS, EITHER DEDICATED OR UNDEDICATED, SHALL BE CONSTRUCTION ACTIVITIES THAT GETS TRACKED ONTO STREETS, EITHER DEDICATED OR UNDEDICATED, SHALL BE ACTIVITIES THAT GETS TRACKED ONTO STREETS, EITHER DEDICATED OR UNDEDICATED, SHALL BE ACTIVITIES THAT GETS TRACKED ONTO STREETS, EITHER DEDICATED OR UNDEDICATED, SHALL BE THAT GETS TRACKED ONTO STREETS, EITHER DEDICATED OR UNDEDICATED, SHALL BE THAT GETS TRACKED ONTO STREETS, EITHER DEDICATED OR UNDEDICATED, SHALL BE GETS TRACKED ONTO STREETS, EITHER DEDICATED OR UNDEDICATED, SHALL BE GETS TRACKED ONTO STREETS, EITHER DEDICATED OR UNDEDICATED, SHALL BE TRACKED ONTO STREETS, EITHER DEDICATED OR UNDEDICATED, SHALL BE TRACKED ONTO STREETS, EITHER DEDICATED OR UNDEDICATED, SHALL BE ONTO STREETS, EITHER DEDICATED OR UNDEDICATED, SHALL BE ONTO STREETS, EITHER DEDICATED OR UNDEDICATED, SHALL BE STREETS, EITHER DEDICATED OR UNDEDICATED, SHALL BE STREETS, EITHER DEDICATED OR UNDEDICATED, SHALL BE EITHER DEDICATED OR UNDEDICATED, SHALL BE EITHER DEDICATED OR UNDEDICATED, SHALL BE DEDICATED OR UNDEDICATED, SHALL BE DEDICATED OR UNDEDICATED, SHALL BE OR UNDEDICATED, SHALL BE OR UNDEDICATED, SHALL BE UNDEDICATED, SHALL BE UNDEDICATED, SHALL BE SHALL BE SHALL BE BE BE CLEANED BY THE BUILDER/CONTRACTOR AT THE END OF EACH WORKDAY. 10. THE WORK SITE SHALL HAVE A DESIGNATED, STABILIZED CONSTRUCTION ENTRANCE DURING CONSTRUCTION. OTHER AREAS OF THE WORK SITE SHALL HAVE A DESIGNATED, STABILIZED CONSTRUCTION ENTRANCE DURING CONSTRUCTION. OTHER AREAS OF WORK SITE SHALL HAVE A DESIGNATED, STABILIZED CONSTRUCTION ENTRANCE DURING CONSTRUCTION. OTHER AREAS OF WORK SITE SHALL HAVE A DESIGNATED, STABILIZED CONSTRUCTION ENTRANCE DURING CONSTRUCTION. OTHER AREAS OF SITE SHALL HAVE A DESIGNATED, STABILIZED CONSTRUCTION ENTRANCE DURING CONSTRUCTION. OTHER AREAS OF SITE SHALL HAVE A DESIGNATED, STABILIZED CONSTRUCTION ENTRANCE DURING CONSTRUCTION. OTHER AREAS OF SHALL HAVE A DESIGNATED, STABILIZED CONSTRUCTION ENTRANCE DURING CONSTRUCTION. OTHER AREAS OF SHALL HAVE A DESIGNATED, STABILIZED CONSTRUCTION ENTRANCE DURING CONSTRUCTION. OTHER AREAS OF HAVE A DESIGNATED, STABILIZED CONSTRUCTION ENTRANCE DURING CONSTRUCTION. OTHER AREAS OF HAVE A DESIGNATED, STABILIZED CONSTRUCTION ENTRANCE DURING CONSTRUCTION. OTHER AREAS OF A DESIGNATED, STABILIZED CONSTRUCTION ENTRANCE DURING CONSTRUCTION. OTHER AREAS OF A DESIGNATED, STABILIZED CONSTRUCTION ENTRANCE DURING CONSTRUCTION. OTHER AREAS OF DESIGNATED, STABILIZED CONSTRUCTION ENTRANCE DURING CONSTRUCTION. OTHER AREAS OF DESIGNATED, STABILIZED CONSTRUCTION ENTRANCE DURING CONSTRUCTION. OTHER AREAS OF STABILIZED CONSTRUCTION ENTRANCE DURING CONSTRUCTION. OTHER AREAS OF STABILIZED CONSTRUCTION ENTRANCE DURING CONSTRUCTION. OTHER AREAS OF CONSTRUCTION ENTRANCE DURING CONSTRUCTION. OTHER AREAS OF CONSTRUCTION ENTRANCE DURING CONSTRUCTION. OTHER AREAS OF ENTRANCE DURING CONSTRUCTION. OTHER AREAS OF ENTRANCE DURING CONSTRUCTION. OTHER AREAS OF DURING CONSTRUCTION. OTHER AREAS OF DURING CONSTRUCTION. OTHER AREAS OF CONSTRUCTION. OTHER AREAS OF CONSTRUCTION. OTHER AREAS OF OTHER AREAS OF OTHER AREAS OF AREAS OF AREAS OF OF OF THE LOT SHALL BE FLAGGED OFF WITH WARNING TAPE TO INDICATE NO TRAFFIC ALLOWED. 11. THE CONTRACTOR SHALL SUBMIT AND OBTAIN APPROVAL OF SHOP DRAWINGS FROM JACKSON TOWNSHIP AND THE TOWNSHIP THE CONTRACTOR SHALL SUBMIT AND OBTAIN APPROVAL OF SHOP DRAWINGS FROM JACKSON TOWNSHIP AND THE TOWNSHIP CONTRACTOR SHALL SUBMIT AND OBTAIN APPROVAL OF SHOP DRAWINGS FROM JACKSON TOWNSHIP AND THE TOWNSHIP CONTRACTOR SHALL SUBMIT AND OBTAIN APPROVAL OF SHOP DRAWINGS FROM JACKSON TOWNSHIP AND THE TOWNSHIP SHALL SUBMIT AND OBTAIN APPROVAL OF SHOP DRAWINGS FROM JACKSON TOWNSHIP AND THE TOWNSHIP SHALL SUBMIT AND OBTAIN APPROVAL OF SHOP DRAWINGS FROM JACKSON TOWNSHIP AND THE TOWNSHIP SUBMIT AND OBTAIN APPROVAL OF SHOP DRAWINGS FROM JACKSON TOWNSHIP AND THE TOWNSHIP SUBMIT AND OBTAIN APPROVAL OF SHOP DRAWINGS FROM JACKSON TOWNSHIP AND THE TOWNSHIP AND OBTAIN APPROVAL OF SHOP DRAWINGS FROM JACKSON TOWNSHIP AND THE TOWNSHIP AND OBTAIN APPROVAL OF SHOP DRAWINGS FROM JACKSON TOWNSHIP AND THE TOWNSHIP OBTAIN APPROVAL OF SHOP DRAWINGS FROM JACKSON TOWNSHIP AND THE TOWNSHIP OBTAIN APPROVAL OF SHOP DRAWINGS FROM JACKSON TOWNSHIP AND THE TOWNSHIP APPROVAL OF SHOP DRAWINGS FROM JACKSON TOWNSHIP AND THE TOWNSHIP APPROVAL OF SHOP DRAWINGS FROM JACKSON TOWNSHIP AND THE TOWNSHIP OF SHOP DRAWINGS FROM JACKSON TOWNSHIP AND THE TOWNSHIP OF SHOP DRAWINGS FROM JACKSON TOWNSHIP AND THE TOWNSHIP SHOP DRAWINGS FROM JACKSON TOWNSHIP AND THE TOWNSHIP SHOP DRAWINGS FROM JACKSON TOWNSHIP AND THE TOWNSHIP DRAWINGS FROM JACKSON TOWNSHIP AND THE TOWNSHIP DRAWINGS FROM JACKSON TOWNSHIP AND THE TOWNSHIP FROM JACKSON TOWNSHIP AND THE TOWNSHIP FROM JACKSON TOWNSHIP AND THE TOWNSHIP JACKSON TOWNSHIP AND THE TOWNSHIP JACKSON TOWNSHIP AND THE TOWNSHIP TOWNSHIP AND THE TOWNSHIP TOWNSHIP AND THE TOWNSHIP AND THE TOWNSHIP AND THE TOWNSHIP THE TOWNSHIP THE TOWNSHIP TOWNSHIP TOWNSHIP ENGINEER FOR ALL MATERIALS. MATERIALS ORDERED PRIOR TO SHOP DRAWING APPROVAL ARE ORDERED AT THE CONTRACTOR'S FOR ALL MATERIALS. MATERIALS ORDERED PRIOR TO SHOP DRAWING APPROVAL ARE ORDERED AT THE CONTRACTOR'S FOR ALL MATERIALS. MATERIALS ORDERED PRIOR TO SHOP DRAWING APPROVAL ARE ORDERED AT THE CONTRACTOR'S ALL MATERIALS. MATERIALS ORDERED PRIOR TO SHOP DRAWING APPROVAL ARE ORDERED AT THE CONTRACTOR'S ALL MATERIALS. MATERIALS ORDERED PRIOR TO SHOP DRAWING APPROVAL ARE ORDERED AT THE CONTRACTOR'S MATERIALS. MATERIALS ORDERED PRIOR TO SHOP DRAWING APPROVAL ARE ORDERED AT THE CONTRACTOR'S MATERIALS. MATERIALS ORDERED PRIOR TO SHOP DRAWING APPROVAL ARE ORDERED AT THE CONTRACTOR'S MATERIALS ORDERED PRIOR TO SHOP DRAWING APPROVAL ARE ORDERED AT THE CONTRACTOR'S MATERIALS ORDERED PRIOR TO SHOP DRAWING APPROVAL ARE ORDERED AT THE CONTRACTOR'S ORDERED PRIOR TO SHOP DRAWING APPROVAL ARE ORDERED AT THE CONTRACTOR'S ORDERED PRIOR TO SHOP DRAWING APPROVAL ARE ORDERED AT THE CONTRACTOR'S PRIOR TO SHOP DRAWING APPROVAL ARE ORDERED AT THE CONTRACTOR'S PRIOR TO SHOP DRAWING APPROVAL ARE ORDERED AT THE CONTRACTOR'S TO SHOP DRAWING APPROVAL ARE ORDERED AT THE CONTRACTOR'S TO SHOP DRAWING APPROVAL ARE ORDERED AT THE CONTRACTOR'S SHOP DRAWING APPROVAL ARE ORDERED AT THE CONTRACTOR'S SHOP DRAWING APPROVAL ARE ORDERED AT THE CONTRACTOR'S DRAWING APPROVAL ARE ORDERED AT THE CONTRACTOR'S DRAWING APPROVAL ARE ORDERED AT THE CONTRACTOR'S APPROVAL ARE ORDERED AT THE CONTRACTOR'S APPROVAL ARE ORDERED AT THE CONTRACTOR'S ARE ORDERED AT THE CONTRACTOR'S ARE ORDERED AT THE CONTRACTOR'S ORDERED AT THE CONTRACTOR'S ORDERED AT THE CONTRACTOR'S AT THE CONTRACTOR'S AT THE CONTRACTOR'S THE CONTRACTOR'S THE CONTRACTOR'S CONTRACTOR'S CONTRACTOR'S RISK OF NOT BEING APPROVED. 12. DIGGING TEST PITS: IN LOCATIONS WHERE NEW UNDERGROUND UTILITIES ARE TO BE CONNECTED TO EXISTING UNDERGROUND DIGGING TEST PITS: IN LOCATIONS WHERE NEW UNDERGROUND UTILITIES ARE TO BE CONNECTED TO EXISTING UNDERGROUND TEST PITS: IN LOCATIONS WHERE NEW UNDERGROUND UTILITIES ARE TO BE CONNECTED TO EXISTING UNDERGROUND TEST PITS: IN LOCATIONS WHERE NEW UNDERGROUND UTILITIES ARE TO BE CONNECTED TO EXISTING UNDERGROUND PITS: IN LOCATIONS WHERE NEW UNDERGROUND UTILITIES ARE TO BE CONNECTED TO EXISTING UNDERGROUND PITS: IN LOCATIONS WHERE NEW UNDERGROUND UTILITIES ARE TO BE CONNECTED TO EXISTING UNDERGROUND IN LOCATIONS WHERE NEW UNDERGROUND UTILITIES ARE TO BE CONNECTED TO EXISTING UNDERGROUND IN LOCATIONS WHERE NEW UNDERGROUND UTILITIES ARE TO BE CONNECTED TO EXISTING UNDERGROUND LOCATIONS WHERE NEW UNDERGROUND UTILITIES ARE TO BE CONNECTED TO EXISTING UNDERGROUND LOCATIONS WHERE NEW UNDERGROUND UTILITIES ARE TO BE CONNECTED TO EXISTING UNDERGROUND WHERE NEW UNDERGROUND UTILITIES ARE TO BE CONNECTED TO EXISTING UNDERGROUND WHERE NEW UNDERGROUND UTILITIES ARE TO BE CONNECTED TO EXISTING UNDERGROUND NEW UNDERGROUND UTILITIES ARE TO BE CONNECTED TO EXISTING UNDERGROUND NEW UNDERGROUND UTILITIES ARE TO BE CONNECTED TO EXISTING UNDERGROUND UNDERGROUND UTILITIES ARE TO BE CONNECTED TO EXISTING UNDERGROUND UNDERGROUND UTILITIES ARE TO BE CONNECTED TO EXISTING UNDERGROUND UTILITIES ARE TO BE CONNECTED TO EXISTING UNDERGROUND UTILITIES ARE TO BE CONNECTED TO EXISTING UNDERGROUND ARE TO BE CONNECTED TO EXISTING UNDERGROUND ARE TO BE CONNECTED TO EXISTING UNDERGROUND TO BE CONNECTED TO EXISTING UNDERGROUND TO BE CONNECTED TO EXISTING UNDERGROUND BE CONNECTED TO EXISTING UNDERGROUND BE CONNECTED TO EXISTING UNDERGROUND CONNECTED TO EXISTING UNDERGROUND CONNECTED TO EXISTING UNDERGROUND TO EXISTING UNDERGROUND TO EXISTING UNDERGROUND EXISTING UNDERGROUND EXISTING UNDERGROUND UNDERGROUND UNDERGROUND UTILITIES, THE CONTRACTOR WILL NOT BE PERMITTED TO PROCEED WITH THE NEW CONSTRUCTION UNTIL HE HAS DUG TEST PITS THE CONTRACTOR WILL NOT BE PERMITTED TO PROCEED WITH THE NEW CONSTRUCTION UNTIL HE HAS DUG TEST PITS THE CONTRACTOR WILL NOT BE PERMITTED TO PROCEED WITH THE NEW CONSTRUCTION UNTIL HE HAS DUG TEST PITS CONTRACTOR WILL NOT BE PERMITTED TO PROCEED WITH THE NEW CONSTRUCTION UNTIL HE HAS DUG TEST PITS CONTRACTOR WILL NOT BE PERMITTED TO PROCEED WITH THE NEW CONSTRUCTION UNTIL HE HAS DUG TEST PITS WILL NOT BE PERMITTED TO PROCEED WITH THE NEW CONSTRUCTION UNTIL HE HAS DUG TEST PITS WILL NOT BE PERMITTED TO PROCEED WITH THE NEW CONSTRUCTION UNTIL HE HAS DUG TEST PITS NOT BE PERMITTED TO PROCEED WITH THE NEW CONSTRUCTION UNTIL HE HAS DUG TEST PITS NOT BE PERMITTED TO PROCEED WITH THE NEW CONSTRUCTION UNTIL HE HAS DUG TEST PITS BE PERMITTED TO PROCEED WITH THE NEW CONSTRUCTION UNTIL HE HAS DUG TEST PITS BE PERMITTED TO PROCEED WITH THE NEW CONSTRUCTION UNTIL HE HAS DUG TEST PITS PERMITTED TO PROCEED WITH THE NEW CONSTRUCTION UNTIL HE HAS DUG TEST PITS PERMITTED TO PROCEED WITH THE NEW CONSTRUCTION UNTIL HE HAS DUG TEST PITS TO PROCEED WITH THE NEW CONSTRUCTION UNTIL HE HAS DUG TEST PITS TO PROCEED WITH THE NEW CONSTRUCTION UNTIL HE HAS DUG TEST PITS PROCEED WITH THE NEW CONSTRUCTION UNTIL HE HAS DUG TEST PITS PROCEED WITH THE NEW CONSTRUCTION UNTIL HE HAS DUG TEST PITS WITH THE NEW CONSTRUCTION UNTIL HE HAS DUG TEST PITS WITH THE NEW CONSTRUCTION UNTIL HE HAS DUG TEST PITS THE NEW CONSTRUCTION UNTIL HE HAS DUG TEST PITS THE NEW CONSTRUCTION UNTIL HE HAS DUG TEST PITS NEW CONSTRUCTION UNTIL HE HAS DUG TEST PITS NEW CONSTRUCTION UNTIL HE HAS DUG TEST PITS CONSTRUCTION UNTIL HE HAS DUG TEST PITS CONSTRUCTION UNTIL HE HAS DUG TEST PITS UNTIL HE HAS DUG TEST PITS UNTIL HE HAS DUG TEST PITS HE HAS DUG TEST PITS HE HAS DUG TEST PITS HAS DUG TEST PITS HAS DUG TEST PITS DUG TEST PITS DUG TEST PITS TEST PITS TEST PITS PITS PITS AND DETERMINED THE EXACT LOCATION AND ELEVATION OF THE EXISTING UNDERGROUND UTILITIES. THE CONTRACTOR IS ADVISED DETERMINED THE EXACT LOCATION AND ELEVATION OF THE EXISTING UNDERGROUND UTILITIES. THE CONTRACTOR IS ADVISED DETERMINED THE EXACT LOCATION AND ELEVATION OF THE EXISTING UNDERGROUND UTILITIES. THE CONTRACTOR IS ADVISED THE EXACT LOCATION AND ELEVATION OF THE EXISTING UNDERGROUND UTILITIES. THE CONTRACTOR IS ADVISED THE EXACT LOCATION AND ELEVATION OF THE EXISTING UNDERGROUND UTILITIES. THE CONTRACTOR IS ADVISED EXACT LOCATION AND ELEVATION OF THE EXISTING UNDERGROUND UTILITIES. THE CONTRACTOR IS ADVISED EXACT LOCATION AND ELEVATION OF THE EXISTING UNDERGROUND UTILITIES. THE CONTRACTOR IS ADVISED LOCATION AND ELEVATION OF THE EXISTING UNDERGROUND UTILITIES. THE CONTRACTOR IS ADVISED LOCATION AND ELEVATION OF THE EXISTING UNDERGROUND UTILITIES. THE CONTRACTOR IS ADVISED AND ELEVATION OF THE EXISTING UNDERGROUND UTILITIES. THE CONTRACTOR IS ADVISED AND ELEVATION OF THE EXISTING UNDERGROUND UTILITIES. THE CONTRACTOR IS ADVISED ELEVATION OF THE EXISTING UNDERGROUND UTILITIES. THE CONTRACTOR IS ADVISED ELEVATION OF THE EXISTING UNDERGROUND UTILITIES. THE CONTRACTOR IS ADVISED OF THE EXISTING UNDERGROUND UTILITIES. THE CONTRACTOR IS ADVISED OF THE EXISTING UNDERGROUND UTILITIES. THE CONTRACTOR IS ADVISED THE EXISTING UNDERGROUND UTILITIES. THE CONTRACTOR IS ADVISED THE EXISTING UNDERGROUND UTILITIES. THE CONTRACTOR IS ADVISED EXISTING UNDERGROUND UTILITIES. THE CONTRACTOR IS ADVISED EXISTING UNDERGROUND UTILITIES. THE CONTRACTOR IS ADVISED UNDERGROUND UTILITIES. THE CONTRACTOR IS ADVISED UNDERGROUND UTILITIES. THE CONTRACTOR IS ADVISED UTILITIES. THE CONTRACTOR IS ADVISED UTILITIES. THE CONTRACTOR IS ADVISED THE CONTRACTOR IS ADVISED THE CONTRACTOR IS ADVISED CONTRACTOR IS ADVISED CONTRACTOR IS ADVISED IS ADVISED IS ADVISED ADVISED ADVISED THAT NO EXCAVATION IS PERMITTED IN THE UNDERGROUND UTILITY LOCATION WITHOUT THE PRESENCE OR WRITTEN APPROVAL NO EXCAVATION IS PERMITTED IN THE UNDERGROUND UTILITY LOCATION WITHOUT THE PRESENCE OR WRITTEN APPROVAL NO EXCAVATION IS PERMITTED IN THE UNDERGROUND UTILITY LOCATION WITHOUT THE PRESENCE OR WRITTEN APPROVAL EXCAVATION IS PERMITTED IN THE UNDERGROUND UTILITY LOCATION WITHOUT THE PRESENCE OR WRITTEN APPROVAL EXCAVATION IS PERMITTED IN THE UNDERGROUND UTILITY LOCATION WITHOUT THE PRESENCE OR WRITTEN APPROVAL IS PERMITTED IN THE UNDERGROUND UTILITY LOCATION WITHOUT THE PRESENCE OR WRITTEN APPROVAL IS PERMITTED IN THE UNDERGROUND UTILITY LOCATION WITHOUT THE PRESENCE OR WRITTEN APPROVAL PERMITTED IN THE UNDERGROUND UTILITY LOCATION WITHOUT THE PRESENCE OR WRITTEN APPROVAL PERMITTED IN THE UNDERGROUND UTILITY LOCATION WITHOUT THE PRESENCE OR WRITTEN APPROVAL IN THE UNDERGROUND UTILITY LOCATION WITHOUT THE PRESENCE OR WRITTEN APPROVAL IN THE UNDERGROUND UTILITY LOCATION WITHOUT THE PRESENCE OR WRITTEN APPROVAL THE UNDERGROUND UTILITY LOCATION WITHOUT THE PRESENCE OR WRITTEN APPROVAL THE UNDERGROUND UTILITY LOCATION WITHOUT THE PRESENCE OR WRITTEN APPROVAL UNDERGROUND UTILITY LOCATION WITHOUT THE PRESENCE OR WRITTEN APPROVAL UNDERGROUND UTILITY LOCATION WITHOUT THE PRESENCE OR WRITTEN APPROVAL UTILITY LOCATION WITHOUT THE PRESENCE OR WRITTEN APPROVAL UTILITY LOCATION WITHOUT THE PRESENCE OR WRITTEN APPROVAL LOCATION WITHOUT THE PRESENCE OR WRITTEN APPROVAL LOCATION WITHOUT THE PRESENCE OR WRITTEN APPROVAL WITHOUT THE PRESENCE OR WRITTEN APPROVAL WITHOUT THE PRESENCE OR WRITTEN APPROVAL THE PRESENCE OR WRITTEN APPROVAL THE PRESENCE OR WRITTEN APPROVAL PRESENCE OR WRITTEN APPROVAL PRESENCE OR WRITTEN APPROVAL OR WRITTEN APPROVAL OR WRITTEN APPROVAL WRITTEN APPROVAL WRITTEN APPROVAL APPROVAL APPROVAL OF AN AUTHORIZED REPRESENTATIVE OF THE OWNER OF THE SUBSURFACE UTILITY. DIG SUCH TEST PITS AT THE LOCATIONS AN AUTHORIZED REPRESENTATIVE OF THE OWNER OF THE SUBSURFACE UTILITY. DIG SUCH TEST PITS AT THE LOCATIONS AN AUTHORIZED REPRESENTATIVE OF THE OWNER OF THE SUBSURFACE UTILITY. DIG SUCH TEST PITS AT THE LOCATIONS AUTHORIZED REPRESENTATIVE OF THE OWNER OF THE SUBSURFACE UTILITY. DIG SUCH TEST PITS AT THE LOCATIONS AUTHORIZED REPRESENTATIVE OF THE OWNER OF THE SUBSURFACE UTILITY. DIG SUCH TEST PITS AT THE LOCATIONS REPRESENTATIVE OF THE OWNER OF THE SUBSURFACE UTILITY. DIG SUCH TEST PITS AT THE LOCATIONS REPRESENTATIVE OF THE OWNER OF THE SUBSURFACE UTILITY. DIG SUCH TEST PITS AT THE LOCATIONS OF THE OWNER OF THE SUBSURFACE UTILITY. DIG SUCH TEST PITS AT THE LOCATIONS OF THE OWNER OF THE SUBSURFACE UTILITY. DIG SUCH TEST PITS AT THE LOCATIONS THE OWNER OF THE SUBSURFACE UTILITY. DIG SUCH TEST PITS AT THE LOCATIONS THE OWNER OF THE SUBSURFACE UTILITY. DIG SUCH TEST PITS AT THE LOCATIONS OWNER OF THE SUBSURFACE UTILITY. DIG SUCH TEST PITS AT THE LOCATIONS OWNER OF THE SUBSURFACE UTILITY. DIG SUCH TEST PITS AT THE LOCATIONS OF THE SUBSURFACE UTILITY. DIG SUCH TEST PITS AT THE LOCATIONS OF THE SUBSURFACE UTILITY. DIG SUCH TEST PITS AT THE LOCATIONS THE SUBSURFACE UTILITY. DIG SUCH TEST PITS AT THE LOCATIONS THE SUBSURFACE UTILITY. DIG SUCH TEST PITS AT THE LOCATIONS SUBSURFACE UTILITY. DIG SUCH TEST PITS AT THE LOCATIONS SUBSURFACE UTILITY. DIG SUCH TEST PITS AT THE LOCATIONS UTILITY. DIG SUCH TEST PITS AT THE LOCATIONS UTILITY. DIG SUCH TEST PITS AT THE LOCATIONS DIG SUCH TEST PITS AT THE LOCATIONS DIG SUCH TEST PITS AT THE LOCATIONS SUCH TEST PITS AT THE LOCATIONS SUCH TEST PITS AT THE LOCATIONS TEST PITS AT THE LOCATIONS TEST PITS AT THE LOCATIONS PITS AT THE LOCATIONS PITS AT THE LOCATIONS AT THE LOCATIONS AT THE LOCATIONS THE LOCATIONS THE LOCATIONS LOCATIONS LOCATIONS AGREED TO BY THE OWNER OF THE SUBSURFACE UTILITY AND THE ENGINEER, AS SHOWN ON THE UTILITY PLAN SHEETS. 13. MATERIALS AND DETAILS SPECIFIED ON THE APPROVED PLAN SHALL NOT BE ALTERED DURING CONSTRUCTION WITHOUT WRITTEN MATERIALS AND DETAILS SPECIFIED ON THE APPROVED PLAN SHALL NOT BE ALTERED DURING CONSTRUCTION WITHOUT WRITTEN AND DETAILS SPECIFIED ON THE APPROVED PLAN SHALL NOT BE ALTERED DURING CONSTRUCTION WITHOUT WRITTEN AND DETAILS SPECIFIED ON THE APPROVED PLAN SHALL NOT BE ALTERED DURING CONSTRUCTION WITHOUT WRITTEN DETAILS SPECIFIED ON THE APPROVED PLAN SHALL NOT BE ALTERED DURING CONSTRUCTION WITHOUT WRITTEN DETAILS SPECIFIED ON THE APPROVED PLAN SHALL NOT BE ALTERED DURING CONSTRUCTION WITHOUT WRITTEN SPECIFIED ON THE APPROVED PLAN SHALL NOT BE ALTERED DURING CONSTRUCTION WITHOUT WRITTEN SPECIFIED ON THE APPROVED PLAN SHALL NOT BE ALTERED DURING CONSTRUCTION WITHOUT WRITTEN ON THE APPROVED PLAN SHALL NOT BE ALTERED DURING CONSTRUCTION WITHOUT WRITTEN ON THE APPROVED PLAN SHALL NOT BE ALTERED DURING CONSTRUCTION WITHOUT WRITTEN THE APPROVED PLAN SHALL NOT BE ALTERED DURING CONSTRUCTION WITHOUT WRITTEN THE APPROVED PLAN SHALL NOT BE ALTERED DURING CONSTRUCTION WITHOUT WRITTEN APPROVED PLAN SHALL NOT BE ALTERED DURING CONSTRUCTION WITHOUT WRITTEN APPROVED PLAN SHALL NOT BE ALTERED DURING CONSTRUCTION WITHOUT WRITTEN PLAN SHALL NOT BE ALTERED DURING CONSTRUCTION WITHOUT WRITTEN PLAN SHALL NOT BE ALTERED DURING CONSTRUCTION WITHOUT WRITTEN SHALL NOT BE ALTERED DURING CONSTRUCTION WITHOUT WRITTEN SHALL NOT BE ALTERED DURING CONSTRUCTION WITHOUT WRITTEN NOT BE ALTERED DURING CONSTRUCTION WITHOUT WRITTEN NOT BE ALTERED DURING CONSTRUCTION WITHOUT WRITTEN BE ALTERED DURING CONSTRUCTION WITHOUT WRITTEN BE ALTERED DURING CONSTRUCTION WITHOUT WRITTEN ALTERED DURING CONSTRUCTION WITHOUT WRITTEN ALTERED DURING CONSTRUCTION WITHOUT WRITTEN DURING CONSTRUCTION WITHOUT WRITTEN DURING CONSTRUCTION WITHOUT WRITTEN CONSTRUCTION WITHOUT WRITTEN CONSTRUCTION WITHOUT WRITTEN WITHOUT WRITTEN WITHOUT WRITTEN WRITTEN WRITTEN APPROVAL BY THE TOWNSHIP. 14. CONTRACTOR IS RESPONSIBLE FOR REPAIRING/RESTORING ANY PROPERTY DAMAGED DURING CONSTRUCTION.CONTRACTOR IS RESPONSIBLE FOR REPAIRING/RESTORING ANY PROPERTY DAMAGED DURING CONSTRUCTION.

AutoCAD SHX Text : 1. ANY REVISIONS TO THIS PLAN AFTER THE DATE OF PLAN PREPARATION OR LATEST REVISION SHALL NOT BE THE ANY REVISIONS TO THIS PLAN AFTER THE DATE OF PLAN PREPARATION OR LATEST REVISION SHALL NOT BE THE REVISIONS TO THIS PLAN AFTER THE DATE OF PLAN PREPARATION OR LATEST REVISION SHALL NOT BE THE REVISIONS TO THIS PLAN AFTER THE DATE OF PLAN PREPARATION OR LATEST REVISION SHALL NOT BE THE TO THIS PLAN AFTER THE DATE OF PLAN PREPARATION OR LATEST REVISION SHALL NOT BE THE TO THIS PLAN AFTER THE DATE OF PLAN PREPARATION OR LATEST REVISION SHALL NOT BE THE THIS PLAN AFTER THE DATE OF PLAN PREPARATION OR LATEST REVISION SHALL NOT BE THE THIS PLAN AFTER THE DATE OF PLAN PREPARATION OR LATEST REVISION SHALL NOT BE THE PLAN AFTER THE DATE OF PLAN PREPARATION OR LATEST REVISION SHALL NOT BE THE PLAN AFTER THE DATE OF PLAN PREPARATION OR LATEST REVISION SHALL NOT BE THE AFTER THE DATE OF PLAN PREPARATION OR LATEST REVISION SHALL NOT BE THE AFTER THE DATE OF PLAN PREPARATION OR LATEST REVISION SHALL NOT BE THE THE DATE OF PLAN PREPARATION OR LATEST REVISION SHALL NOT BE THE THE DATE OF PLAN PREPARATION OR LATEST REVISION SHALL NOT BE THE DATE OF PLAN PREPARATION OR LATEST REVISION SHALL NOT BE THE DATE OF PLAN PREPARATION OR LATEST REVISION SHALL NOT BE THE OF PLAN PREPARATION OR LATEST REVISION SHALL NOT BE THE OF PLAN PREPARATION OR LATEST REVISION SHALL NOT BE THE PLAN PREPARATION OR LATEST REVISION SHALL NOT BE THE PLAN PREPARATION OR LATEST REVISION SHALL NOT BE THE PREPARATION OR LATEST REVISION SHALL NOT BE THE PREPARATION OR LATEST REVISION SHALL NOT BE THE OR LATEST REVISION SHALL NOT BE THE OR LATEST REVISION SHALL NOT BE THE LATEST REVISION SHALL NOT BE THE LATEST REVISION SHALL NOT BE THE REVISION SHALL NOT BE THE REVISION SHALL NOT BE THE SHALL NOT BE THE SHALL NOT BE THE NOT BE THE NOT BE THE BE THE BE THE THE THE RESPONSIBILITY OF STECKBECK ENGINEERING & SURVEYING, INC. SUBSTITUTIONS FOR ANY MATERIAL NOTED ON THESE PLANS OF STECKBECK ENGINEERING & SURVEYING, INC. SUBSTITUTIONS FOR ANY MATERIAL NOTED ON THESE PLANS OF STECKBECK ENGINEERING & SURVEYING, INC. SUBSTITUTIONS FOR ANY MATERIAL NOTED ON THESE PLANS STECKBECK ENGINEERING & SURVEYING, INC.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .