2-Bid No. 83-25 - West Shore Dr and Fontana - Bid Book Final.pdf
PDF 9 MB Posted
- Solicitation number
- 83-25
- Issued by
- Dallas County, Round Rock City, Texas
About this file
The document is a bid package for the City of Richardson, Texas, detailing the West Shore Drive and Fontana Avenue Street and Utility Reconstruction project (Bid No. 83-25). The project involves comprehensive infrastructure improvements, including replacing approximately 24,502 square yards of existing street pavement, 1,467 square yards of alley pavement, 4,753 square yards of sidewalk and ramps, and 1,912 square yards of driveway approaches. The scope of work encompasses 9,516 linear feet of water lines, 5,864 linear feet of wastewater lines, and 1,375 linear feet of storm drain improvements. Electronic bids are due by 2:00 p.m. on Thursday, August 14, 2025, with bid opening at 3:00 p.m. the same day via WebEx. The construction is expected to take 500 calendar days, with a voluntary pre-bid meeting scheduled for Monday, July 28, 2025, at 2:00 p.m.
The bid requires a certified or cashier's check or bid bond for 5% of the total bid amount. The successful contractor must furnish performance, payment, and maintenance bonds for 100% of the contract price and must have completed a minimum of three similar projects within the last five years. The estimated project cost is approximately $12,375,547.94. Bidders must provide a completed Contractor Questionnaire and comply with various technical specifications, including the North Central Texas Council of Governments' Public Works Construction Standards. The project will utilize domestic materials and follow specific City of Richardson standards for materials, construction techniques, and utility installations.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SPECIFICATIONS AND
CONTRACT DOCUMENTS
FOR
West Shore Drive And Fontana Avenue Street And Utility Reconstruction
Poject Bid No. 83-25
Prepared By:
Huitt-Zollars, Inc.
5430 LBJ Freeway Ste 1500 Dallas, TX 75202
Prepared For:
CITY OF RICHARDSON
2360 CAMPBELL CREEK BLVD., SUITE 525
RICHARDSON, TEXAS 75082
JULY 2025
Accommodation requests for persons with disabilities should be made by contacting ADA Coordinator via email at adacoordinator@cor.gov, or by appointment at 2360 Campbell Creek Boulevard, Suite 535, Richardson, Texas 75082.
NOTICE TO CONTRACTORS
West Shore Drive and Fontana Avenue Street and Utility Reconstruction
Bid No. 83-25
Electronic bids through BonFire at COR.BonFireHub.com or sealed bids shall be addressed to the Purchasing
Manager and received in the Purchasing Department located in the City Hall Building at 2360 Campbell Creek Boulevard, Suite 525, Richardson, Texas 75082, prior to 2:00 p.m. on Thursday, August 14, 2025. Bids will be opened and read aloud at 3:00 p.m. the same day via WebEx, for furnishing all labor, materials, tools and equipment, and performing all work required including all appurtenances for:
The project consists of replacing approximately 24,502 square yards of existing 6-inch & 8-inch street pavement, 1,467 square yards of alley pavement, 4,753 square yards of sidewalk, 1,912 square yards of driveway approaches, as well as 9,516 linear feet 8-inch & 6-inch waterline, 5,864 linear feet of 6-inch, 8-inch & 15-inch wastewater and 1375 linear feet of storm drain improvements for West Shore Drive & Fontana Ave.
Bids shall be accompanied by a certified or cashier's check on a state or national bank in an amount not less than five percent (5%) of the possible total of the bid submitted, payable without recourse to the City of Richardson, Texas, or an acceptable bid bond for the same amount from a reliable surety company as a guarantee that the bidder will enter into a contract and execute required Performance and Payment Bonds within ten (10) days after notice of award of the contract.
The successful contractor must furnish a Performance Bond upon the form provided in the amount of one hundred percent (100%) of the contract price, a material and labor Payment Bond upon the form provided in the amount of one hundred percent (100%) of the contract price, and a Maintenance Bond upon the form provided in the amount of one hundred percent (100%) of the contract price, from a surety authorized under the laws of the State of Texas to act as a surety on bonds for principals within ten (10) days after the notice of award of the contract.
The right is reserved, as the interest of the Owner may require, to reject any and all bids, to waive any informality in the bids received, and to select the bid best suited to the Owner's best interest. The successful contractor must have completed a minimum of three similar projects within the last five years.
The construction is expected to take five hundred (500) calendar days. If the City awards Bid Alternate #1, additional calendar days will be added to the base contract duration.
A set of plans, specifications and bid documents will be available beginning at 12:00 p.m. on Monday, July, 14, 2025. Documents are available at no charge through BonFire at COR.BonFireHub.com.
A voluntary pre-bid meeting will be held on Monday, July 28, 2025 at 2:00pm via WebEx. All requests for additional information or clarification concerning this invitation to bid must be submitted, in writing, no later than Wednesday, July 30, 2025 @ 12:00 p.m. Central Time. All questions must be submitted through the BonFire system and answers will be posted on COR.BonFireHub.com for all prospective Bidders to review. For any questions not able to be submitted through Bonfire prior to the question deadline, please contact purchasing at 972-744-4130 or purchasing@cor.gov.
Nonmaterial changes to the request for bids and any extension of the date for submission of bids and the date for bid opening will be communicated through BonFire at COR.BonFireHub.com via addendum.
By: /s/ Amir Omar, Mayor City of Richardson
P. O. Box 830309
Richardson, Texas 75083
No Item Quantity
Unit of
Measure Unit Price Total Cost
#1-1
MOBILIZATION, BONDS, AND INSURANCE (5%)
1 LS
#1-2
ALL TRAFFIC CONTROL, BARRICADING, AND SIGNAGE
MEASURES (INCLUDING MIN. 2" HOT MIX TEMPORARY
ASPHALT PAVING, AND ARROW BOARDS)
1 LS
#1-3
CONSTRUCTION ENTRANCE (INSTALL, MAINTAIN,
REMOVE) (20' x 15')
3 EA
#1-4
TREE PROTECTION
47 EA
#1-5
PROJECT SIGNS
2 EA
#1-6
Construction Contingency (Authorized for use by City Only)
PLEASE ENTER UNIT PRICE $1 ONLY 500,000 EA
#2-1
3,000 PSI REINFORCED CONCRETE SIDEWALK
(VARIABLE WIDTH) 4,753 SY
#2-2
BARRIER FREE RAMP (TYPE A)
12 EA
#2-3
BARRIER FREE RAMP (TYPE B)
28 EA
#2-4
BARRIER FREE RAMP (TYPE C)
2 EA
#2-5
BARRIER FREE RAMP (TYPE D)
8 EA
#2-6
TXDOT BARRIER FREE RAMP
2 EA
#2-7
6" THICK 3,600 PSI REINFORCED CONCRETE ALLEY
PAVEMENT 1,467 SY
#2-8
6" THICK 3,600 PSI REINFORCED CONCRETE STREET
PAVEMENT W/ 6-INCH CURB 4,292 SY
#2-9
8" THICK 3,600 PSI REINFORCED CONCRETE STREET
PAVEMENT W/ 6-INCH CURB 19,414 SY
#2-10
6" THICK 3,600 PSI REINFORCED CONCRETE DRIVEWAY
PAVEMENT 1,912 SY
#2-11
FLEXBASE (SUBGRADE) (6")
20,726 SY
#2-12
6" COMPACTED SUBGRADE
3,936 SY
#2-13
REINFORCED CONCRETE PAVEMENT (ALL THICKNESS)
(ARAPAHO RD WATER LINE) 254 SY
#2-14
8" REINFORCED CONCRETE PAVEMENT WITH MIN. 2-
INCH ASPHALT OVERLAY (ALL THICKNESS)(ARAPAHO
RD WATER LINE)
542 SY
#2-15
PREPARATION AND TREATMENT OF SUBGRADE
(ARAPAHO RD WATER LINE) 542 SY
#2-16
INTEGRAL CURB (ARAPAHO RD WATER LINE)
74 LF
#2-17
FURNISH & INSTALL 4-INCH TOPSOIL & BLOCK SOD
(MATCH EXISTING) 4,725 SY
#2-18
REMOVE AND INSTALL SMALL SIGN
119 EA
#2-19
REMOVE INLET TOP (5-FOOT)
2 EA
BASE BID
West Shore Drive and Fontana Avenue
Bid Schedule - Bid # 83-25 Street and Utility Reconstruction
Basket Total:
BASE BID BASKET #1 - GENERAL
BASKET #2 - PAVEMENT IMPROVEMENTS
Measure Unit Price Total Cost
West Shore Drive and Fontana Avenue
Bid Schedule - Bid # 83-25 Street and Utility Reconstruction
#2-20
REMOVE INLET TOP (10-FOOT)
15 EA
#2-21
PAINTED CURB NUMBERS (MATCH EXISTING)
110 EA
#2-22
REMOVE CONCRETE PAVEMENT, ALLEY & DRIVEWAY
6,098 SY
#2-23
REMOVE ASPHALT PAVEMENT
23,775 SY
#2-24
REMOVE CONCRETE SIDEWALK AND RAMPS
4,533 SY
#2-25
TREE PROTECTION
20 EA
#3-1
24" WHITE MMA STOP BAR
129 LF
#3-2
24" WHITE MMA CROSSING STRIPING
299 LF
#3-3
WHITE MMA ARROW
8 EA
#3-4
4" TWO WAY REFLECTIVE YELLOW MARKER
(STANDARD DOUBLE YELLOW LINE) 1,179 EA
#3-5
4" TWO WAY REFLECTIVE RED/WHITE MARKER
(STANDARD BAY LINE) 36 EA
#3-6
4" NON REFLECTIVE WHITE MARKER (STANDARD BAY
LINE) 64 EA
#3-7
4" NON REFLECTIVE YELLOW MARKER (STANDARD
DOUBLE YELLOW LINE) 1,380 EA
#4-1
6" PVC DR-14 WATER PIPE, FITTINGS, BLOCKING,
TESTING, EMBEDMENT 391 LF
#4-2
8" PVC DR-14 WATER PIPE, FITTINGS, BLOCKING,
TESTING, EMBEDMENT 9,125 LF
#4-3
8" PVC WATER LINE IN STEEL CASING (OPEN CUT)
18 LF
#4-4
6" GATE VALVE/BOX
16 EA
#4-5
8" GATE VALVE/BOX
65 EA
#4-6
8" X 8" TAPPING SLEEVE AND 8" VALVE ASSEMBLY
3 EA
#4-7
1" SDR-9 CLASS 250 POLY WATER SERVICE, METER
BOX, FITTINGS, EMBEDMENT, STIFFENERS, REMOVING
EXISTING WATER METER & BOX, INCLUDING
TEMPORARY PAVEMENT 61 EA
#4-8
1 1/2" SDR-9 CLASS 250 POLY WATER SERVICE, METER
BOX, FITTINGS, EMBEDMENT, STIFFENERS, REMOVING
EXISTING WATER METER & BOX, INCLUDING
TEMPORARY PAVEMENT 6 EA
#4-9
2" SDR-9 CLASS 250 POLY WATER SERVICE, METER
BOX, FITTINGS, EMBEDMENT, STIFFENERS, REMOVING
EXISTING WATER METER & BOX, INCLUDING
TEMPORARY PAVEMENT 5 EA
Basket Total:
Basket Total:
BASE BID BASKET #3 - PAVEMENT MARKING IMPROVEMENTS (WEST SHORE DRIVE)
BASE BID BASKET #4 - WATER IMPROVEMENTS
Measure Unit Price Total Cost
West Shore Drive and Fontana Avenue
Bid Schedule - Bid # 83-25 Street and Utility Reconstruction
#4-10
4" SDR-9 CLASS 250 POLY WATER SERVICE, METER
BOX, FITTINGS, EMBEDMENT, STIFFENERS, REMOVING
EXISTING WATER METER & BOX, INCLUDING
TEMPORARY PAVEMENT 1 EA
#4-11
INSTALL FIRE HYDRANT ASSEMBLY INCLUDING SPLASH
PAD
20 EA
#4-12
REMOVE FIRE HYDRANT
7 EA
#4-13
DELIVER FIRE HYDRANT
7 EA
#4-14
CUT & PLUG EXISTING WATER MAIN
27 EA
#4-15
CONNECT TO EXISTING WATER MAIN
25 EA
#4-16
FURNISH & INSTALL TRENCH SAFETY
9,516 LF
#4-17
2" (MIN) HOT MIX TEMPORARY ASPHALT PAVEMENT
365 TON
#5-1
6" PVC SDR-35 WASTEWATER PIPE, EMBEDMENT,
ENCASEMENT, BYPASS PUMP 378 LF
#5-2
8" PVC SDR-35 WASTEWATER PIPE, EMBEDMENT,
ENCASEMENT, BYPASS PUMP 2,129 LF
#5-3
15" PVC SDR-35 WASTEWATER PIPE, EMBEDMENT,
ENCASEMENT, BYPASS PUMP 3,274 LF
#5-4
18" PVC SDR-35 WASTEWATER PIPE, EMBEDMENT,
ENCASEMENT, BYPASS PUMP 83 LF
#5-5
4" SANITARY SEWER SERVICE, DOUBLE CLEANOUT
AND SEWER BOX (INCLUDING TEMPORARY PAVEMENT)
26 EA
#5-6
CONNECT TO EX. SANITARY SEWER SERVICE
26 EA
#5-7
4' DIAMETER SANITARY SEWER MANHOLE
(REGARDLESS OF DEPTH) 7 EA
#5-8
5' DIAMETER SANITARY SEWER MANHOLE
(REGARDLESS OF DEPTH) 17 EA
#5-9
REMOVE AND DISPOSE EX. SANITARY SEWER
MANHOLE 20 EA
#5-10
TV INSPECTION (PRE & POST CONSTRUCTION)
5,864 LF
#5-11
FURNISH & INSTALL TRENCH SAFETY
5,864 LF
#5-12
GROUT AND ABANDON 8-INCH SANITARY SEWER
1,831 LF
#5-13
GROUT AND ABANDON 15-INCH SANITARY SEWER
3,371 LF
#5-14
2" (MIN) HOT MIX TEMPORARY ASPHALT PAVEMENT
201 TON
#6-1
INSTALL 5' X 4' RCB
603 LF
Basket Total:
BASE BID BASKET #5 - WASTEWATER IMPROVEMENTS
Basket Total:
BASE BID BASKET #6 - STORM DRAIN IMPROVEMENTS
Measure Unit Price Total Cost
West Shore Drive and Fontana Avenue
Bid Schedule - Bid # 83-25 Street and Utility Reconstruction
#6-2
INSTALL 8' CURB INLET
1 EA
#6-3
INSTALL 10' CURB INLET
2 EA
#6-4
INSTALL 15' CURB INLET
4 EA
#6-5
INSTALL 20' CURB INLET
2 EA
#6-6
INSTALL 18" RCP
204 LF
#6-7
INSTALL 4'X4' RCB
247 LF
#6-8
INSTALL 36" RCP
293 LF
#6-9
INSTALL 42" RCP
26 LF
#6-10
CONCRETE RIPRAP
107 SY
#6-11
REMOVE CONCRETE FLUME
1 LS
#6-12
CONCRETE FLUME
11 SY
#6-13
CONCRETE HEADWALL
1 EA
#6-14
REMOVE & DISPOSE OF EXISTING RCP
247 LF
#6-15
LATERAL PIPE WYE CONNECTIONS
9 EA
#6-16
INSTALL INLET TOP (5-FOOT)
2 EA
#6-17
INSTALL INLET TOP (10-FOOT)
17 EA
#6-18
REMOVE INLETS
3 EA
#6-19
REMOVE CHAIN LINK FENCE
123 LF
#6-20
REPLACE CHAIN LINK FENCE
123 LF
#6-21
FURNISH & INSTALL TRENCH SAFETY
1,200 LF
#6-22
TV INSPECTION (PRE & POST CONSTRUCTION)
1,200 LF
#7-1
EROSION CONTROL (INSTALLATION AND REMOVAL)
(ARAPAHO RD WATER LINE) 1 LS
#7-2
BIODEGRADABLE EROSION CONTROL LOGS (12")
513 LF
#7-3
INLET PROTECTION (FOR ALL PHASES OF
CONSTRUCTION) 25 EA
#7-4
STORMWATER POLLUTION CONTROL PLAN &
IMPLEMENTATION 1 LS
#8-1
CONDT (PVC) (SCHD 80) (2")
20 LF
#8-2
ELEC CONDR (NO. 6) BARE
24 LF
#8-3
REMOVE GROUND BOX
3 EA
BASKET #8 - PEDESTRIAN SIGNAL INFRASTRUCTURE IMPROVEMENTS
BASE BID BASKET #7 - EROSION CONTROL IMPROVEMENTS
Basket Total:
Basket Total:
BASE BID
Measure Unit Price Total Cost
West Shore Drive and Fontana Avenue
Bid Schedule - Bid # 83-25 Street and Utility Reconstruction
#8-4
TRF SIG CBL (TY A)(14 AWG)(5 CONDR)
30 LF
#8-5
TRF SIG CBL (TY A)(14 AWG)(7 CONDR)
43 LF
#8-6
TRF SIG CBL (TY C)(14 AWG)(2 CONDR)
440 LF
#8-7
PED POLE ASSEMBLY
1 EA
#8-8
PED DETECT PUSH BUTTON (APS)
4 EA
#8-9
REMOVAL OF SIGNAL HEAD ASSM
2 EA
#8-10
INSTALL OF SIGNAL HEAD ASSM
2 EA
#8-12
PED DETECTOR CONTROLLER UNIT
1 EA
No Item Quantity
Unit of
Measure Unit Price Total Cost
#9-1
THE CONTRACTOR SHALL COMPLETE THE WATER,
SEWER, STORM DRAIN UTILITY IMPROVEMENTS, AND
PAVING FOR EACH SECTION (PHASE) BEFORE
PROCEEDING TO THE NEXT SECTION. THE PROJECT IS
BROKEN UP INTO SEVEN (7) SECTIONS, PER THE
CONSTRUCTION SEQUENCE PLAN ON SHEET 30-38.
Bidders are required to indicate the estimated number of additional calendar days necessary to complete the work in accordance with this phased approach on attached
CONTRACT ALTERNATE BID FORM #001
1 LS
ALT #1 Grand Total:
Basket Total:
ALTERNATE BID BASKET #9 - ADD Alt #1 - Construction Sequencing
Base Bid Grand Total:
CONTRACT ALTERNATE BID FORM # 001
If the City elects to award Bid Alternate #1, the Contractor shall complete the project in a phased construction sequence as described in the Bid Alternate #1. Bidders are required to indicate the estimated number of additional calendar days necessary to complete the work in accordance with this phased approach.
Bid Alternate #1 – Time Extension (Phased Construction)
Estimated Additional Calendar Days: ___________ Days.
Note: This time extension is not a bid item and will not be considered in the bid evaluation.
CONTRACTOR:
(Signature)
(Type/Print Name and Title):
(Street Address)
(City/State/Zip)
CPT-BidSig1
CONTRACT BID SCHEDULE
CITY OF RICHARDSON
The undersigned certifies that the bid prices contained in this proposal have been carefully checked and are submitted as correct and final.
The undersigned Bidder hereby declares that he has visited the site of the work to be performed and has carefully examined the Contract Documents pertaining to the work covered by the above Bid, and further agrees to commence work within ten (10) calendar days after date of written notice to proceed and to substantially complete the work within the contract time specified within the contract documents.
The undersigned Bidders understands that the Owner reserves the right to reject any or all Bids, to waive any informalities in the Bidding, and to select the combination of base bid and alternates as deemed to be in the best interest of the Owner.
SEAL
(If Proposer is a Corporation)
Company
Signed
By
Title
Address
City State Zip
Email Address:
Telephone: Fax #:
Dun & Bradstreet #
Addendum No. _____ Date Rec'd Signature
Addendum No. _____ Date Rec'd Signature
Addendum No. _____ Date Rec'd Signature
Enclosed with this project is a Certified Check in the amount of:
or a Proposal Bond in the sum of:
which it is agreed shall be collected and retained by the Owner in the event this proposal is accepted by the Owner within ninety (90) days after the bids are received and the undersigned fails to execute the contract and the required bonds for the Owner within ten (10) days after the dated said proposal is accepted, other-wise said check or bond shall be returned to the undersigned upon request.
Questionnaire
CONTRACTOR QUESTIONNAIRE
1.
Company’s Legal Name
2. C Appropriate
Individual Registered Limited Liability Partnership Corporation
S Corporation General Partnership
Limited Liability Company (LLC)
3. ( ) Post Office Box Zip Code Area Code Telephone Number
Street Address City State Zip Code
E-mail address Area Code Fax Number
4. Provide your Texas Payee I.D. No. (if available)
Is your Company authorized to do business in the State of Texas? (Please check one) Yes No
5. Provide your Dun and Bradstreet No. (if available)
6. Provide date of incorporation (if corporation) or date business established
7. Complete the information which applies to your business entity in the space provided:
a. The name of the owner of the individual business entity whether operating under an assumed name or own name.
b. The names of all the general partners of a partnership.
c. The names and titles of all corporate officers (or members/managers of LLC).
8. Give names and addresses of all affiliated and/or subsidiary companies
9. Give the name and the percentage owned of each individual or entity owning five percent or more of your business.
10. Have you ever failed to complete any work awarded to you?
If so, please explain where and why on a separate attachment
11. By separate attachment please furnish the following:
a. List of six larger items of equipment which you own or which are available by renting, along with the source.
b. Detailed resume of your experience showing similar projects to the project you have bid on, along with names, phone numbers, and addresses of a person familiar with the work described.
c. Financial statements are being requested to determine the eligibility of a bidder to receive a contract.
Financial statements shall be composed of a balance sheet, income statement, and appropriate supporting schedules, such as note disclosures or cash flows, as of the end of the company’s most recent fiscal year. Financial statements are to be audited, reviewed, or compiled by an independent Certified Public Accountant. Pro-forma financial statements will not be accepted by the City.
All financial statements are considered confidential information, are reviewed by a member of the City of Richardson Finance Division, and will be returned to the bidder/proposer upon request.
d. The name, address, and contact persons of the bonding and insurance companies you propose to use.
e. Provide name, address, and phone number of subcontractors, and work to be performed by each.
The Contractor shall return this completed form, along with all necessary attachments, within ten (10) calendar days.
The undersigned bidder certifies that the bidder’s firm and all persons associated therewith in the capacity of owner, partner, stockholder, director, officer, manager, auditor, or any position involving the administration of any part of the firm’s operations have not been indicted, convicted, or had a civil judgment rendered against it or any person indicated above by a court of competent jurisdiction in any matter involving fraud or official misconduct within the past three years. (If so, explain on separate attachment)
The undersigned authorizes the City of Richardson to verify any and all information provided as determined necessary. In addition, the undersigned bidder understands that failure to provide the requested information, or false information on this form or related attachments may result in the bidder being disqualified.
Signature
Print Name
Title
ACKNOWLEDGMENT
Before me, the undersigned authority, a Notary Public, on this day personally appeared who, being by me duly sworn, upon oath says that he/she is qualified and authorized to make affidavit for and on behalf of and is fully cognizant of the facts herein set out and affirms to the truth and accuracy of the certifications made herein by signing above.
GIVEN UNDER MY HAND AND SEAL OF OFFICE,
This day of , 20 .
Notary Public, in and for the State of Texas.
Completed questionnaire, with original signatures and attachments shall be returned to:
Contract Administrator City of Richardson – Engineering & Capital Projects 2360 Campbell Creek Blvd., Suite 525 ichardson X 2
CONFLICT OF INTEREST QUESTIONNAIRE
Chapter 176 Texas Local Government Code requires the public disclosure of certain information concerning persons doing business or seeking to do business with the City, including family, business, and financial relationships such persons may have with City officers and employees involved in the planning, recommending, selecting, and contracting of a vendor for this procurement.
For a copy of Form CIQ and CIS:
The Bidder acknowledges by doing business or seeking to do business with the City that he/she has been notified of the requirements under Chapter 176 of the Texas Local Government Code and that he/she is solely responsible for complying with the terms and conditions therein. Furthermore, any individual or business entity seeking to do business with the City who does not comply with this practice may risk award consideration of any City contract.
For a listing of current City Officers:
www.cor.net/modules/showdocument.aspx?documentid=9001 https://www.ethics.state.tx.us/forms/conflict http://www.cor.net/modules/showdocument.aspx?documentid=9001 https://www.ethics.state.tx.us/forms/conflict
CERTIFICATE OF INTERESTED PARTIES
Texas Government Code section 2252.908 provides that a governmental entity or state agency may not enter into certain contracts with a business entity unless the business entity submits a disclosure of interested parties form to the governmental entity or state agency at the time the business entity submits the signed contract to the governmental entity or state agency. The form discloses any interested parties who have a controlling interest (10% or more ownership) in the business entity and those who actively participate in facilitating the contract or negotiate the terms of the contract (broker, intermediary, advisor, and/or attorney), if any.
The Texas Ethics Commission was required to adopt rules necessary to implement that law, prescribe the disclosure of interested parties form, and post a copy of the form on the commission's website. The commission adopted the Certificate of Interested Parties form (Form 1295) on October 5, 2015 and new rules (Chapter 46) on November 30, 2015.
The successful Bidder will be required to submit a signed 1295 form to the City prior to the award of this bid and/or prior to signing a contract with the City. The successful Bidder will be required to download the form via the Texas Ethics Commission's website at:
https://www.ethics.state.tx.us/filinginfo/1295/
The "identification number" to be used on the 1295 form for this procurement is:
Bid No. 83-25
All prospective Bidders shall familiarize themselves with this requirement and agree to provide the completed Form 1295 if selected as the successful Bidder for this procurement.
https://www.ethics.state.tx.us/filinginfo/1295/ https://www.ethics.state.tx.us/filinginfo/1295/
GENERAL PROVISIONS
THIS CONTRACT ADOPTS THE NORTH CENTRAL TEXAS COUNCIL OF GOVERNMENTS’ PUBLIC
WORKS CONSTRUCTION STANDARDS, 5TH EDITION AS CONTRACT GENERAL PROVISIONS EXCEPT
AS AMENDED HEREIN:
105.1.1 Priority of Contract Documents
Item 105.1.1 ‘Priority of Contract Documents’ shall be replaced in its entirety with the following:
In case of conflict between Contract documents, priority of interpretation shall be in the following order: signed agreement (or Contract), performance and payment bonds, special specifications (or conditions), these General Provisions, specifications, advertisement for bids (or invitation to bidders, or request for proposals), proposal, project (Plan or Contract) drawings, City of Richardson Standard Details, the Standard Specifications for Public Works Construction – North Central Texas (the COG Standard Specifications), other referenced specifications (including, but not limited, to the latest edition of the Texas Department of Transportation (TxDOT) Standard Specifications for Construction of Highways, Streets and Bridges and the Texas Manual on Uniform Traffic Control Devices). See also Item 105.1.3 Contract Drawings and Specifications, Item 105.1.6. Errors and Corrections in Drawings and Specifications, Item 104.3. Disputed Work and Claims for Additional Compensation, and Item 105.7. Owner’s Representatives.
It shall be the responsibility of the Contractor to become familiar with the referenced specifications and details.
In the event the Contractor discovers a discrepancy between specifications, the Contractor shall notify the Owner, in writing, and request clarification. When in conflict, the provisions of this contract shall prevail and shall be deemed controlling over the COG Standard Specifications for Public Works Construction and the Texas Department of Transportation Standard Specifications for Construction and Maintenance of Highways, Streets, and bridges.
Whenever, in these Specifications or on the Plans for the work, the terms or descriptions of various qualities relative to finish workmanship, or other qualities of similar kind cannot, because of their nature, be specifically and briefly described and are customarily described in general terms, the Owner shall be the final judge as to whether or not the workmanship so described is being performed in accordance with the intent of the Plans and Specifications therefore, and the work shall be completed in accordance with his interpretation of the meaning of such words, terms or clauses.
102.1 PROPOSAL FORM
Item 102.1 shall be amended to add the following to the end:
For the purpose of bidding on the project, information including: forms, contract, bonds, plans and specifications may be obtained through Bonfire, COR.BonFireHub.com at no charge.
102.4 PREPARATION OF PROPOSAL
Item 102.4 shall be amended to add the following to the end of the first paragraph:
A computer generated form may be submitted in lieu of the enclosed bid schedule. The form must be 8-½” x 11” in size and must be attached to the signature page of the Contract Bid Schedule. This form will be made part of the proposal and contract documents. This option is for the convenience of the Contractor, and no wording in the form shall modify or amend the wording in the contract documents. The computer form shall present each item in the order and number shown in the City of Richardson Bid Schedule and shall include the following items:
Item Number Quantity Unit of Measure Description
Unit Price Extended Amount
The City of Richardson Bid Schedule Sheet must be completed in full.
103.2 AWARD OF CONTRACT
Item 103.2 ‘Award of Contract’ shall be amended to add the following to the end:
The Owner reserves the right to accept or reject any or all bids or any of the bid alternates, where applicable. The Owner reserves the right to waive informalities and irregularities. The Contract will be awarded based upon the combination of base bid and alternates most advantageous to the Owner. The Contractor must provide bids for all alternates in order for the bid package to remain complete and be considered for award.
Prior to the awarding of any contract, the Owner may require the bidders to submit a completed City of Richardson Confidential Contractor Questionnaire. The Questionnaire includes, but is not limited to, references, safety record, work history, and a certified financial statement. Upon review of the completed questionnaire, the Project Engineer will determine the Contractor’s eligibility for award of the Project. If the Contractor would like to review the submittal requirements stated in the City of Richardson Confidential Contractor Questionnaire, it is available upon request at the office of the City Engineer.
103.4 INSURANCE
Item 103.4 shall be amended to add and include the requirements, coverages and endorsements shown in the Insurance Attachment to these General Provisions.
107.22 WORKING AREA
Item 107.22 shall be amended to add the following to the end:
The Owner has provided rights-of-way or easements as shown on the plans for the purpose of construction without cost to the Contractor. The Contractor, at his expense, shall secure additional work or storage area desired by the Contractor and not provided for by the Owner. A copy of the agreement must be provided to the Owner prior to construction. It shall be the responsibility of the Contractor, prior to the initiation of construction on easements through private property, to inform the property owner of his intent to begin construction. Before beginning construction in areas of public dedication, the Contractor shall inform the agency having jurisdiction in the area forty-eight (48) hours prior to initiation of the work.
108.2 PROSECUTION OF WORK
Item 108.2, Paragraphs 2 and 3, are deleted and replaced with the following:
Work shall be done between the hours of 7:00 AM and 6:00 PM Monday through Friday, Saturday work, if approved, shall not commence until 9:00 AM. No work shall be done on nights, Saturdays, Sundays, or regular holidays, unless written permission is given by the Owner. The owner reserves the right to suspend the Contractor’s permission to work on nights, Saturdays, Sundays, or regular holidays at their discretion. No additional days will be added to the contract if the Owner chooses to suspend work on the days specified above.
Requests for Saturday work must be submitted by 12:00 noon the previous Thursday.
Where the contract time is expressed as calendar days or a specific date, the concept of “working days” shall not be relevant to the Contract.
Any work done without proper inspection or materials testing is subject to removal and replacement at the direction of the Owner.
107.29 SAFETY REQUIREMENTS
Item 107.29 shall be added as follows:
The Contractor has full responsibility for the safety of workers and for all damages to personal property caused by its operations. The Contractor is responsible for following all Federal, State, and Local Regulations and
Guidelines with regards to worker and public safety. Unless otherwise indicated on the proposal, the necessary tools, equipment, procedures, etc. for following the appropriate regulations and guidelines will be considered subsidiary to other bid items.
107.30 WAGE RATE
Item 107.30 shall be added as follows:
The Contractor shall comply in all respects with all requirements imposed by any laws, ordinances or resolutions applicable to the Project with regard to the minimum prevailing wage rates for all classes of employees, laborers, subcontractors, mechanics, workmen and persons furnishing labor and services to the Project. The City of Richardson has adopted, via Resolution No. 20-04 of the City Council, the US Department of Labor prevailing wage rates for Dallas County (classes TX14, TX17, TX18, TX24, TX25, TX33, TX34, TX51, & TX55), as may be amended from time to time. Detailed wage rates by class of laborer can be found at the BLS.gov website (https://www.bls.gov/oes/current/oes_4800002. htm#47-0000). The Contractor shall pay not less than the minimum wage rates established thereby for each class, craft, or type of labor, workman, or mechanic employed in the execution of this Contract. Upon request by the Owner, Contractor shall make available for inspection and copying its books and records, including but not limited to its payroll records, account information and other documents as may be required by the Owner to insure compliance with this provision.
109.5.1 MONTHLY ESTIMATE
Item 109.5.1, next to last sentence in the second paragraph shall be deleted and replaced with:
Payment shall be made by the owner about thirty (30) days after the receipt of the estimate from the Contractor,” shall be deleted and replaced with the following:
The Owner shall send payment to the Contractor within fifteen (15) days after the monthly estimate has been reconciled and signed by the Contractor and Owner for the amount which is owed, less required retainage and any outstanding debt due the Owner from the Contractor.
An updated construction schedule, showing completion by the contract time, on a form approved by the City, shall be submitted with the Contractor’s pay request. The revised schedule shall be dated and signed by the Contractor. If requesting payment for materials on hand, the Contractor must submit invoices, prior to payment, to the City. Failure to submit the required information may allow the Owner to withhold payment according to COG Standard Specifications for Public Works Construction Items 109.4 and 109.5.
109.5.4 FINAL PAYMENT
Item 109.5.4 “Final Payment” shall be modified to include the following requirement before final payment is made:
The Contractor shall provide to the Owner a set of As-Built plans showing all changes, modifications, deletions and additions to the plans, which have occurred during the project, as well as its affidavit that all payrolls, invoices for materials and equipment, and other liabilities connected with the Work for which the Owner, or the Owner’s property might be responsible, have been fully paid or otherwise satisfied; releases and waivers of lien from all Subcontractors of the Contractor and of any and all other parties required by the Engineer or the Owner;
consent of Surety, if any, to final payment.
103.4.1 WORKERS’ COMPENSATION
Item 103.4.1 shall be replaced in its entirety with the following:
A. Definitions:
Certificate of Coverage (“certificate”) – A copy of a certificate of insurance, a certificate of authority to self-insure issued by the commission, or a coverage agreement (TWCC-81, TWCC-82, TWCC-83, or TWCC-84), showing statutory workers’ compensation insurance coverage for the person’s or entity’s employees providing services on a project, as well as Persons providing services on the project, for the duration of the project.
Duration of the Project – Includes the time from the beginning of the work on the project until the Contractor’s/person’s work on the project has been completed and accepted by the governmental entity.
Persons providing services on the project (“Subcontractor” in Section §406.096 of the Texas Labor Code, as amended) – includes all persons or entities performing all or part of the services the Contractor has undertaken to perform on the project, regardless of whether that person contracted directly with the Contractor and regardless of whether that person has employees. This includes, without limitation, independent contractors, subcontractors, leasing companies, motor carriers, owner-operators, employees of any such entity, or employees of any entity which furnishes persons to provide services on the project. “Services” include, without limitation, providing, hauling, or delivering equipment or materials, or providing labor, transportation, or other service related to a project. “Services” does not include activities unrelated to the project, such as food/beverage vendors, maintenance services not related to building or construction, office supply deliveries, and delivery of portable toilets.
B. The Contractor shall provide coverage, based on proper reporting of classification codes and payroll amounts and filing of any coverage agreements, which meets the statutory requirements of Texas Labor Code, Section 401.011 (44), as amended for all employees of the Contractor providing services on the project, for the duration of the project.
C. The Contractor must provide a certificate of coverage to the City prior to being awarded the contract.
D. If the coverage period shown on the Contractor’s current certificate of coverage ends during the duration of the project, the Contractor must, prior to the end of the coverage period, file a new certificate of coverage with the City showing that coverage has been extended.
E. The Contractor shall obtain from each person providing services on a project, and provide to the governmental entity:
a. a certificate of coverage, prior to that person beginning work on the project, so the City will have on file certificates of coverage showing coverage for all persons providing services on the project; and
b. no later than seven (7) days after receipt by the Contractor, a new certificate of coverage showing extension of coverage, if the coverage period shown on the current certificate of coverage ends during the duration of the project.
F. The Contractor shall retain all required certificates of coverage for the duration of the project and for one year thereafter.
G. The Contractor shall notify the City in writing by certified mail or personal delivery, within ten (10) days after the Contractor knew or should have known, of any change that materially affects the provision of coverage of any person providing services on the project.
H. The Contractor shall post on each project site a notice, in the text, form and manner prescribed by the Texas Workers’ Compensation Commission, informing all persons providing services on the project that they are required to be covered, and stating how a person may verify coverage and report lack of coverage.
I. The Contractor shall contractually require each person with whom it contracts to provide services on a project, to:
a. provide coverage, based on proper reporting of classification codes and payroll amounts and filing of any coverage agreements, which meets the statutory requirements of Texas Labor Code, Section 401.011 (44), as amended for all of its employees providing services on the project, for the duration of the project;
b. provide to the Contractor, prior to that person beginning work on the project, a certificate of coverage showing that coverage is being provided for all employees of the person providing services on the project, for the duration of the project;
c. provide the Contractor, prior to the end of the coverage period, a new certificate of coverage showing extension of coverage, if the coverage period shown on the current certificate of coverage ends during the duration of the project;
d. obtain from each other person with whom it contracts, and provide to the Contractor;
i. a certificate of coverage, prior to the other person beginning work on the project; and
ii. a new certificate of coverage showing extension of coverage, prior the end of the coverage period, if the coverage period shown on the current certificate of coverage ends during the duration of the project;
e. retain all required certificates of coverage on file for the duration of the project and for one year thereafter;
f. notify the governmental entity in writing by certified mail or personal delivery, within ten (10) days after the person knew or should have known, of any change that materially affects the provision of coverage of any person providing services on the project, and
g. contractually require each person with whom it contracts, to perform as required by paragraphs (a)-(g), with the certificates of coverage to be provided to the person for whom they are providing services.
J. By signing this contract or providing or causing to be provided a certificate of coverage, the Contractor is representing to the City that all employees of the Contractor who will provide services on the project will be covered by workers’ compensation coverage for the duration of the project, that the coverage will be based on proper reporting of classification codes and payroll amounts, and that all coverage agreements will be filed with the appropriate insurance carrier or, in the case of a self-insured, with the commission’s Division of Self- Insurance Regulation. Providing false or misleading information may subject the Contractor to administrative penalties, criminal penalties, civil penalties, or other civil actions.
K. The Contractor’s failure to comply with any of these provisions is a breach of contract by the Contractor which entitles the City to declare the contract void if the Contractor does not remedy the breach within the (10) days after receipt of notice of breach from the City.
L. Notwithstanding any contrary provision contained in 103.4.1, a motor carrier (defined as an individual, association, corporation, or other legal entity that controls, operates, or directs the operation of one or more vehicles that transport persons or cargo over a road or highway in Texas) required to register under Section
643.051 of the Texas Transportation Code, as amended shall protect its employees by obtaining worker’s compensation insurance coverage as defined under the Texas Worker’s Compensation Act (Subtitle A, Title 5, Labor Code) or accidental insurance coverage in an amount fixed by the Texas Department of Transportation from a reliable insurance company or companies authorized to write such policies in Texas approved by the Texas Department of Transportation.
104.5 CONSTRUCTION CONTINGENCY
Item 104.5 shall be added as follows:
The construction contingency item, if any, shall be used at the sole discretion of the Owner to pay the Contractor for unforeseen items or additional quantities necessary to construct the project in accordance with the intent of the contract documents. No portion of the construction contingency shall be paid to the Contractor, nor shall any extra work be performed by the Contractor, without authorization from the Owner. The Owner shall retain all construction contingency moneys not used during the construction of the project.
108.8 DELAYS, EXTENSION OF TIME; LIQUIDATED DAMAGES
Item 108.8 shall be amended by adding the following before the first sentence/paragraph:
Time is of the essence. This project is to be completed in the contract time specified. The time of completion is of the essence of this contract. The COG Standard Specifications for Public Works Construction will be used to determine and apply liquidated damages; the City has made an independent determination that the daily liquidated damages are accurate and correct for this project, and that the amounts are not penalties but are instead, reasonable forecasts of the actual damages that will be sustained should the Contractor fail to achieve substantial completion and finish the Work within the time allowed. No claim shall be made by the contractor to the owner, and no damages, costs or extra compensation shall be allowed or paid by the owner to the contractor for any delay or hindrance from any cause in the progress of completion of the work for this contract and the Contractor waives and releases the Owner for any claim for back charges or damages for delay. The contractor’s sole remedy in the event of any delay or hindrance shall be to request time extensions by written change orders as provided for in Section 108.8 of the COG Standard Specifications for Public Works Construction or as otherwise provided in this contract. Should the contractor be delayed by an act of the owner or the owner’s representatives or employees, or should the owner order a stoppage of the work for sufficient cause, an extension of time may only be granted by the owner in accordance with Section 108.8 of the COG Standard Specifications, and by written authorization upon written application.
Item 108.8 shall be amended by adding the following to the end of the third paragraph, immediately preceding Item 108.8.1:
Weather Delays. It is anticipated that adverse weather conditions will cause delays in the progress of the Work and that those delays have been considered in the determination of the Contract Time and the Contract Price.
Accordingly, unusually severe weather under Section 108.8 of the COG Standard Specifications shall not constitute an event of force majeure that justifies a delay unless the weather conditions are extreme. The Contractor may be entitled to an adjustment in Contract Time if and only if: i) extreme weather conditions prevailing at the Project site prevent work on a critical item for a period of more than three (3) days in the calendar month in which the weather event occurs, and ii) written notice of delay is given by the Contractor to Owner within not less than five (5) days after the force majeure event. Any adjustment will be limited to the number of days in the calendar month that exceed three.
105.5 MEANS AND METHODS OF CONSTRUCTION
Item 105.5 shall be amended by adding the following paragraph after the third paragraph:
Blasting. The use of explosives will not be allowed.
107.3 INDEMNIFICATION
Item 107.3 shall be replaced in its entirety with the following:
OWNER SHALL NOT BE LIABLE FOR ANY BODILY INJURY TO, OR DEATH OF ANY
PERSON, LOSS OF PROFIT OR BUSINESS OPPORTUNITY, OR PROPERTY DAMAGE
INCLUDING THE LOSS OF USE OF PROPERTY, ARISING FROM THE SERVICES OR
WORK PROVIDED BY CONTRACTOR PURSUANT TO THIS CONTRACT.
CONTRACTOR HEREBY WAIVES AND RELEASES ALL CLAIMS AGAINST OWNER,
ITS OFFICERS, AGENTS AND EMPLOYEES (COLLECTIVELY REFERRED TO IN
THIS SECTION AS “OWNER”) FOR DAMAGE TO ANY PROPERTY OR INJURY TO,
OR DEATH OF ANY PERSON, ARISING FROM THE CONTRACTOR’S OBLIGATIONS
UNDER THIS CONTRACT, THE PERFORMANCE OF THIS CONTRACT BY THE
CONTRACTOR, ITS AGENTS, EMPLOYEES, SUBCONTRACTORS AND ANY ENTITY
OVER WHICH CONTRACTOR EXERCISES CONTROL EXCLUDING DAMAGE TO OR
LOSS OF USE OF ANY PROPERTY, OR INJURY TO, OR DEATH OF ANY PERSON
CAUSED BY THE GROSS NEGLIGENCE OR WILLFUL MISCONDUCT OF OWNER.
TO THE FULLEST EXTENT PERMITTED BY LAW AND EXCEPT AS OTHERWISE
PROVIDED HEREIN, CONTRACTOR SHALL INDEMNIFY, HOLD HARMLESS AND
DEFEND THE OWNER FROM AND AGAINST ALL CLAIMS, DAMAGES, LOSSES
AND EXPENSES, SUITS, ACTIONS, EXPENSES, COSTS AND REASONABLE
ATTORNEYS’ FEES, ARISING OUT OF, OR RESULTING FROM BODILY INJURY TO,
OR DEATH OF A PERSON, OR PROPERTY DAMAGE, INCLUDING THE LOSS OF USE
OF PROPERTY, ARISING OR ALLEGED TO ARISE OUT OF OR IN ANY WAY
RELATED TO THE PERFORMANCE OF THIS CONTRACT BY THE CONTRACTOR,
ITS AGENTS, EMPLOYEES, SUBCONTRACTORS AND ANY ENTITY OVER WHICH
CONTRACTOR EXERCISES CONTROL, OR DUE TO THE VIOLATION OF ANY
ORDINANCE, REGULATION, STATUTE, OR OTHER LEGAL REQUIREMENT BY
CONTRACTOR, ITS AGENTS, EMPLOYEES, SUBCONTRACTORS, OR ANY OF
THEIR AGENTS AND EMPLOYEES, BUT ONLY TO THE EXTENT CAUSED BY ANY
NEGLIGENT OR WILLFUL ACT OR OMISSION OF THE CONTRACTOR, ITS AGENTS,
EMPLOYEES, SUBCONTRACTORS, ANY ENTITY OVER WHICH CONTRACTOR
EXERCISES CONTROL, OR ANYONE DIRECTLY OR INDIRECTLY EMPLOYED BY
THE CONTRACTOR, ITS CONTRACTOR OR ANYONE FOR WHOSE ACTS THE
CONTRACTOR OR SUBCONTRACTOR MAY BE LIABLE.
WITHOUT LIMITING THE FOREGOING, AND TO THE FULLEST EXTENT
PERMITTED BY LAW, CONTRACTOR HEREBY INDEMNIFIES AND HOLDS
HARMLESS THE OWNER FROM AND AGAINST ALL CLAIMS, DAMAGES, LOSSES,
COSTS, AND EXPENSES, INCLUDING BUT NOT LIMITED TO REASONABLE
ATTORNEYS’ FEES, ARISING OUT OF OR RESULTING FROM BODILY INJURY TO,
OR SICKNESS, DISEASE OR DEATH OF, ANY EMPLOYEE, AGENT OR
REPRESENTATIVE OF CONTRACTOR, ITS SUBCONTRACTORS, ANY ENTITY
OVER WHICH CONTRACTOR EXERCISES CONTROL, OR ANYONE DIRECTLY OR
INDIRECTLY EMPLOYED BY THE CONTRACTOR, (EXCLUDING ANY CLAIM,
DAMAGE, LOSS OR EXPENSE IS CAUSED BY THE GROSS NEGLIGENCE OR
WILLFUL MISCONDUCT OF THE OWNER). WITH REGARD TO CLAIMS AGAINST
ANY PARTY SEEKING INDEMNITY UNDER THIS CONTRACT WHICH ARE MADE
BY AN EMPLOYEE OF THE CONTRACTOR, ITS SUBCONTRACTOR OR ANYONE
DIRECTLY OR INDIRECTLY EMPLOYED OR CONTROLLED BY THE
CONTRACTOR, ITS SUBCONTRACTOR OR ANYONE FOR WHOSE ACTS THE
CONTRACTOR OR SUBCONTRACTOR MAY BE LIABLE, THE INDEMNIFICATION
OBLIGATION UNDER THIS CONTRACT SHALL NOT BE LIMITED BY ANY
LIMITATION ON AMOUNT OR TYPE OF DAMAGES, COMPENSATION OR
BENEFITS PAYABLE BY OR FOR THE CONTRACTOR, ITS SUBCONTRACTOR OR
ANY OTHER EMPLOYER UNDER WORKERS COMPENSATION ACTS, DISABILITY
BENEFIT ACTS OR OTHER SIMILAR EMPLOYEE BENEFIT ACTS. CONTRACTOR
SHALL PROCURE LIABILITY INSURANCE COVERING CONTRACTOR’S
OBLIGATIONS UNDER THIS SECTION.
IN ADDITION TO THE INDEMNIFICATION PROVIDED ABOVE, THE CONTRACTOR
HEREBY AGRES TO AND SHALL INDEMNIFY, DEFEND AND HOLD HARMLESS
THE OWNER FROM AND AGAINST ANY CLAIM, DAMAGE, LOSS, OR EXPENSE
AND REASONABLE ATTORNEYS’ FEES ARISING OUT OF OR RELATING TO ANY
CLAIM AGAINST THE OWNER ASSERTING INFRINGEMENT OR ALLEGED
INFRINGEMENT OF A PATENT, TRADEMARK, COPYRIGHT OR OTHER
INTELLECTUAL PROPERTY RIGHT IN CONNECTION WITH THE INSTRUMENTS OF
SERVICE FURNISHED BY OR THROUGH THE CONTRACTOR, ITS
SUBCONTRACTORS OR ITS CONSULTANTS, EXCEPT TO THE EXTENT THE
INFRINGEMENT IS CAUSED BY THE GROSS NEGLIGENCE OR WILLFUL ACTS OR
OMISSIONS OF THE OWNER.
IT IS AGREED WITH RESPECT TO ANY LEGAL LIMITATIONS NOW OR
HEREAFTER IN EFFECT AND AFFECTING THE VALIDITY OR ENFORCEABILITY
OF THE INDEMNIFICATION OBLIGATIONS UNDER THIS CONTRACT, SUCH
LEGAL LIMITATIONS ARE MADE A PART OF THE CONTRACTUAL OBLIGATIONS
AND SHALL OPERATE TO AMEND THE OBLIGATIONS TO THE MINIMUM EXTENT
NECESSARY TO BRING THE PROVISION INTO CONFORMITY WITH THE
REQUIREMENTS OF SUCH LIMITATIONS, AND AS SO MODIFIED, THE
OBLIGATIONS SHALL CONTINUE IN FULL FORCE AND EFFECT. SHOULD ANY
PROVISION OR ANY PART OF ANY PROVISION OF THIS CONTRACT BE HELD
INVALID, UNENFORCEABLE OR CONTRARY TO PUBLIC POLICY, LAW, STATUTE
OR ORDINANCE, THEN THE REMAINDER OF THE PROVISION, PARAGRAPH, THIS
SECTION AND/OR THIS CONTRACT SHALL NOT BE AFFECTED THEREBY AND
SHALL REMAIN VALID AND FULLY ENFORCEABLE.
INDEMNIFIED ITEMS SHALL INCLUDE REASONABLE ATTORNEYS’ FEES AND
COSTS, COURT COSTS, AND SETTLEMENT COSTS IN PROPORTION TO THE
CONTRACTOR’S LIABILITY.
THE CONTRACTOR’S OBLIGATIONS UNDER THIS SECTION SHALL NOT BE
LIMITED TO THE LIMITS OF COVERAGE OF INSURANCE MAINTAINED OR
REQUIRED TO BE MAINTAINED BY CONTRACTOR UNDER THIS CONTRACT.
THE INDEMNIFICATION OBLIGATIONS CONTAINED IN THIS CONTRACT SHALL
SURVIVE THE COMPLETION OR ABANDONMENT OF THE WORK OR SERVICES
PROVIDED PURSUANT TO THIS CONTRACT AND THE TERMINATION OF THE
CONTRACT FOR A PERIOD OF FOUR (4) YEARS.
107.7 SEVERABILITY
Item 107.7 shall be replaced in its entirety with the following:
The provisions of this contract are herein declared to be severable; in any event that any term, provision, or part hereof is determined to be invalid, void or unenforceable, such determination shall not affect the validity of enforceability of the remaining terms, provisions and parts, and this contract shall be read as if the invalid, void or unenforceable portion had not been included herein.
SPECIAL SPECIFICATIONS
TABLE OF CONTENTS
SS.1 WATER FOR CONSTRUCTION 2
SS.2 RESTORATION OF PROPERTY 2
SS.3 INSPECTIONS AND TESTS 2
SS.4 DENSITIES FOR PAVEMENT SUBGRADE 2
SS.5 REMOVALS AND ADJUSTMENTS 2
SS.6 PORTLAND CEMENT CONCRETE 3
SS.7 SUBGRADE, SUBBASE, AND BASE PREPARATION 3
SS.8 LINES AND GRADES 3
SS.9 RIGHT-OF-WAY PREPARATION 3
SS.10 SODDING 4
SS.11 SEEDING 4
SS.12 PRESERVATION AND PROTECTION OF PLANT MATERIALS 4
SS.13 CEMENT TREATED BASE 5
SS.14 RAISED PAVEMENT MARKERS AND PAVEMENT MARKINGS 5
SS.15 UNCLASSIFIED EXCAVATION 8
SS.16 BARRICADES, TRAFFIC CONTROL, PROTECTION OF PUBLIC 8
SS.17 MOBILIZATION 9
SS.18 FIELD OFFICES TO BE PROVIDED [NOT USED] 9
SS.19 INCREASED OR DECREASED QUANTITIES OF WORK 10
SS.20 PROJECT SITE SIGNAGE 10
SS.21 STORM WATER POLLUTION PREVENTION PLAN (SWPPP) 10
SS.22 WORK ON PRIVATE PROPERTY AND RESIDENTIAL LEADWALKS 11
SS.23 TOPSOIL 11
SS.24 STONE MASONRY 12
SS.25 MASONRY MORTAR 14
SS.26 PROTECTIVE COATINGS FOR BRIDGE RAILING [NOT USED] 14
SS.27 STRUCTURAL STEEL 16
SS.28 BRIDGE RAILINGS [NOT USED] 17
SS.29 CAST STONE 18
SS.30 TRAFFIC SIGNS 20
SS.31 PRECONSTRUCTION VIDEO 22
SS.32 INFLOW MAHOLE INSERTS 22
SS.33 SANITARY SEWER MANHOLE GATOR WRAP 22
SS.34 REPAIR OF RUPTURED WATER AND SANITARY SEWER MAIN AND SERVICE LINES 23
SS.35 WASTEWATER MAINS (PVC SDR-35) 23
SS.36 CCTV INSPECTION FOR SANITARY SEWER AND STORM SEWER LINES 24
SS.37 CONSTRUCTION CONTINGENCY 28
SS.38 CONSTRUCTION PARKING 28
SS.39 LANDSCAPE AND IRRIGATION 29
SS.40 PROJECT SCHEDULE AND DURATION 33
SS.41 TRAFFIC CONTROL PLAN - REQUEST FOR LANE CLOSURE 34
Special Specifications Page 2
SS.1 WATER FOR CONSTRUCTION
Standard Specifications for Public Works Construction-Item 107.13 shall be modified to include the following:
Water used for the mixing of concrete, testing, flushing or any other purpose incidental to the construction of this project may be obtained from existing City of Richardson fire hydrants at no cost to the Contractor.
The Contractor shall make the necessary arrangements with the City of Richardson Customer Service Department to secure a temporary water meter which shall be requested by the Contractor and approved by the OWNER prior to installation. A deposit of One Thousand Dollars ($1,000.00) (refundable upon return of meter) is to be left with the Customer Service Department at 2360 Campbell Creek Boulevard, Suite 550, Richardson, Texas.