Construction Drawings for Wheatland Woods Park – Sports Courts and Related Improvements

These are construction drawings for the Wheatland Woods Park Sports Courts and Related Improvements project in Jackson Township, Lebanon County, Pennsylvania, prepared by Steckbeck Engineering & Surveying, Inc. The project encompasses approximately 5.766 acres and includes the construction of one basketball court and two pickleball courts with associated infrastructure. The scope includes removal of select trees and brush, construction of a new 6-foot-wide ADA-compliant access path from an existing parking lot, overlay of an existing 10-foot-wide stone walking path with new asphalt paving, installation of PVC-coated chain link fencing around the courts, tree planting (24 Eastern redcedars and 22 American hollies), and comprehensive grading and utility work. The drawing set consists of nine sheets including a cover sheet, existing conditions and demolition plan, proposed improvements layout, grading and profiles, site details, athletic court details, landscaping plan, and erosion and sediment control plans. The project was dated March 30, 2026, indicating a planned summer 2026 construction start date. Sealed proposals are due electronically via PennBid by 10:00 a.m. on May 1, 2026, with bid results posted thereafter.

The project is funded through a Greenways, Trails, and Recreation Program Grant Contract between Jackson Township and the Commonwealth Financing Authority, which imposes specific compliance requirements on both the township and contractor. Bidders must submit a bank cashier's check or bid bond for ten percent of the bid total with their proposals and must acknowledge awareness of and commitment to Greenways, Trails, and Recreation Program requirements outlined in Exhibit A of the bid package. The contractor bears responsibility for verifying all dimensions and elevations on-site prior to construction, protecting and maintaining existing utilities, conducting all testing and record drawings required by the municipality, managing traffic control in accordance with PennDOT Publication 213, and implementing the erosion and sediment control plan. All construction must conform to current Commonwealth of Pennsylvania Department of Transportation specifications and PennDOT Standards for Roadway Construction (Publications 408 and 72M), with wearing course asphalt installation restricted to April 15 through October 15 unless an alternate date is approved by the municipal engineer. The contractor assumes full responsibility for repairing any property damage caused during construction and for stabilizing all disturbed areas with permanent vegetation or temporary seeding measures.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

C O

VE

R

S H

EE

T

JACKSON TOWNSHIP,

LEBANON COUNTY, PENNSYLVANIA

LOCATED IN

WHEATLAND WOODS PARK

SPORTS COURTS AND RELATED IMPROVEMENTS

CONSTRUCTION DRAWINGS

LIST OF DRAWINGS

OWNER

CONTRACTOR NOTES:

GENERAL NOTES

LOCATION MAP

SCALE: 1" = 500'

APRIL, 2026

PROJECT LOCATION

KU

TZTO

W N

R O

AD

LADYBUG

LANE

FIR

EBUG D

RIVE

N . Z

IN

N

S M

IL

L

RO

A

D , L

EB

A

N O

N , P

A

7-

2-

W

W W

.S

TE

C K

BE

C

K .N

ET

AutoCAD SHX Text

OF 9 SHEETS

AutoCAD SHX Text

REVISION

AutoCAD SHX Text

DATE

AutoCAD SHX Text

BY

AutoCAD SHX Text Lebanon County, Pennsylvania

AutoCAD SHX Text Jackson Township

AutoCAD SHX Text located in

AutoCAD SHX Text for

AutoCAD SHX Text

WHEATLAND WOODS PARK - SPORTS COURTS AND RELATED IMPROVEMENTS

AutoCAD SHX Text

AutoCAD SHX Text

FIELD CREW:

AutoCAD SHX Text

BASE MAP:

AutoCAD SHX Text

AutoCAD SHX Text

CDS/DJH/GJU

AutoCAD SHX Text

DRAWN:

AutoCAD SHX Text

DESIGN:

AutoCAD SHX Text

SAS

AutoCAD SHX Text

AutoCAD SHX Text

CHECKED:

AutoCAD SHX Text

DATE:

AutoCAD SHX Text

AS NOTED

AutoCAD SHX Text

SCALE:

AutoCAD SHX Text

PROJECT #

AutoCAD SHX Text 008-23-008

AutoCAD SHX Text

JACKSON TOWNSHIP

AutoCAD SHX Text 3/30/26

AutoCAD SHX Text COVER SHEET 1 1 1 EXISTING CONDITIONS/DEMOLITION PLAN 2 2 PROPOSED LAYOUT PLAN 3 3 GRADING AND UTILITY PLAN 4 4 SITE DETAILS 5 5 ATHLETIC COURT DETAILS 6 6 LANDSCAPING 7 7 EROSION & SEDIMENT CONTROL 8 8 EROSION & SEDIMENT CONTROL DETAILS 99

AutoCAD SHX Text

60 NORTH RAMONA ROAD MYERSTOWN PA 17067 PHONE:717-866-2159

AutoCAD SHX Text

1. THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS AND ELEVATIONS ON SITE PRIOR TO THE START OF CONSTRUCTION. UNDERGROUND THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS AND ELEVATIONS ON SITE PRIOR TO THE START OF CONSTRUCTION. UNDERGROUND CONTRACTOR SHALL VERIFY ALL DIMENSIONS AND ELEVATIONS ON SITE PRIOR TO THE START OF CONSTRUCTION. UNDERGROUND CONTRACTOR SHALL VERIFY ALL DIMENSIONS AND ELEVATIONS ON SITE PRIOR TO THE START OF CONSTRUCTION. UNDERGROUND SHALL VERIFY ALL DIMENSIONS AND ELEVATIONS ON SITE PRIOR TO THE START OF CONSTRUCTION. UNDERGROUND SHALL VERIFY ALL DIMENSIONS AND ELEVATIONS ON SITE PRIOR TO THE START OF CONSTRUCTION. UNDERGROUND VERIFY ALL DIMENSIONS AND ELEVATIONS ON SITE PRIOR TO THE START OF CONSTRUCTION. UNDERGROUND VERIFY ALL DIMENSIONS AND ELEVATIONS ON SITE PRIOR TO THE START OF CONSTRUCTION. UNDERGROUND ALL DIMENSIONS AND ELEVATIONS ON SITE PRIOR TO THE START OF CONSTRUCTION. UNDERGROUND ALL DIMENSIONS AND ELEVATIONS ON SITE PRIOR TO THE START OF CONSTRUCTION. UNDERGROUND DIMENSIONS AND ELEVATIONS ON SITE PRIOR TO THE START OF CONSTRUCTION. UNDERGROUND DIMENSIONS AND ELEVATIONS ON SITE PRIOR TO THE START OF CONSTRUCTION. UNDERGROUND AND ELEVATIONS ON SITE PRIOR TO THE START OF CONSTRUCTION. UNDERGROUND AND ELEVATIONS ON SITE PRIOR TO THE START OF CONSTRUCTION. UNDERGROUND ELEVATIONS ON SITE PRIOR TO THE START OF CONSTRUCTION. UNDERGROUND ELEVATIONS ON SITE PRIOR TO THE START OF CONSTRUCTION. UNDERGROUND ON SITE PRIOR TO THE START OF CONSTRUCTION. UNDERGROUND ON SITE PRIOR TO THE START OF CONSTRUCTION. UNDERGROUND SITE PRIOR TO THE START OF CONSTRUCTION. UNDERGROUND SITE PRIOR TO THE START OF CONSTRUCTION. UNDERGROUND PRIOR TO THE START OF CONSTRUCTION. UNDERGROUND PRIOR TO THE START OF CONSTRUCTION. UNDERGROUND TO THE START OF CONSTRUCTION. UNDERGROUND TO THE START OF CONSTRUCTION. UNDERGROUND THE START OF CONSTRUCTION. UNDERGROUND THE START OF CONSTRUCTION. UNDERGROUND START OF CONSTRUCTION. UNDERGROUND START OF CONSTRUCTION. UNDERGROUND OF CONSTRUCTION. UNDERGROUND OF CONSTRUCTION. UNDERGROUND CONSTRUCTION. UNDERGROUND CONSTRUCTION. UNDERGROUND UNDERGROUND UNDERGROUND UTILITIES HAVE BEEN SHOWN ACCORDING TO INFORMATION PROVIDED BY OTHERS AND MUST BE FIELD VERIFIED PRIOR TO HAVE BEEN SHOWN ACCORDING TO INFORMATION PROVIDED BY OTHERS AND MUST BE FIELD VERIFIED PRIOR TO HAVE BEEN SHOWN ACCORDING TO INFORMATION PROVIDED BY OTHERS AND MUST BE FIELD VERIFIED PRIOR TO BEEN SHOWN ACCORDING TO INFORMATION PROVIDED BY OTHERS AND MUST BE FIELD VERIFIED PRIOR TO BEEN SHOWN ACCORDING TO INFORMATION PROVIDED BY OTHERS AND MUST BE FIELD VERIFIED PRIOR TO SHOWN ACCORDING TO INFORMATION PROVIDED BY OTHERS AND MUST BE FIELD VERIFIED PRIOR TO SHOWN ACCORDING TO INFORMATION PROVIDED BY OTHERS AND MUST BE FIELD VERIFIED PRIOR TO ACCORDING TO INFORMATION PROVIDED BY OTHERS AND MUST BE FIELD VERIFIED PRIOR TO ACCORDING TO INFORMATION PROVIDED BY OTHERS AND MUST BE FIELD VERIFIED PRIOR TO TO INFORMATION PROVIDED BY OTHERS AND MUST BE FIELD VERIFIED PRIOR TO TO INFORMATION PROVIDED BY OTHERS AND MUST BE FIELD VERIFIED PRIOR TO INFORMATION PROVIDED BY OTHERS AND MUST BE FIELD VERIFIED PRIOR TO INFORMATION PROVIDED BY OTHERS AND MUST BE FIELD VERIFIED PRIOR TO PROVIDED BY OTHERS AND MUST BE FIELD VERIFIED PRIOR TO PROVIDED BY OTHERS AND MUST BE FIELD VERIFIED PRIOR TO BY OTHERS AND MUST BE FIELD VERIFIED PRIOR TO BY OTHERS AND MUST BE FIELD VERIFIED PRIOR TO OTHERS AND MUST BE FIELD VERIFIED PRIOR TO OTHERS AND MUST BE FIELD VERIFIED PRIOR TO AND MUST BE FIELD VERIFIED PRIOR TO AND MUST BE FIELD VERIFIED PRIOR TO MUST BE FIELD VERIFIED PRIOR TO MUST BE FIELD VERIFIED PRIOR TO BE FIELD VERIFIED PRIOR TO BE FIELD VERIFIED PRIOR TO FIELD VERIFIED PRIOR TO FIELD VERIFIED PRIOR TO VERIFIED PRIOR TO VERIFIED PRIOR TO PRIOR TO PRIOR TO TO TO CONSTRUCTION, EXCAVATION OR BLASTING. THE ACTUAL LOCATIONS OF THESE UTILITIES HAVE NOT BEEN FIELD VERIFIED AND THE EXCAVATION OR BLASTING. THE ACTUAL LOCATIONS OF THESE UTILITIES HAVE NOT BEEN FIELD VERIFIED AND THE EXCAVATION OR BLASTING. THE ACTUAL LOCATIONS OF THESE UTILITIES HAVE NOT BEEN FIELD VERIFIED AND THE OR BLASTING. THE ACTUAL LOCATIONS OF THESE UTILITIES HAVE NOT BEEN FIELD VERIFIED AND THE OR BLASTING. THE ACTUAL LOCATIONS OF THESE UTILITIES HAVE NOT BEEN FIELD VERIFIED AND THE BLASTING. THE ACTUAL LOCATIONS OF THESE UTILITIES HAVE NOT BEEN FIELD VERIFIED AND THE BLASTING. THE ACTUAL LOCATIONS OF THESE UTILITIES HAVE NOT BEEN FIELD VERIFIED AND THE THE ACTUAL LOCATIONS OF THESE UTILITIES HAVE NOT BEEN FIELD VERIFIED AND THE THE ACTUAL LOCATIONS OF THESE UTILITIES HAVE NOT BEEN FIELD VERIFIED AND THE ACTUAL LOCATIONS OF THESE UTILITIES HAVE NOT BEEN FIELD VERIFIED AND THE ACTUAL LOCATIONS OF THESE UTILITIES HAVE NOT BEEN FIELD VERIFIED AND THE LOCATIONS OF THESE UTILITIES HAVE NOT BEEN FIELD VERIFIED AND THE LOCATIONS OF THESE UTILITIES HAVE NOT BEEN FIELD VERIFIED AND THE OF THESE UTILITIES HAVE NOT BEEN FIELD VERIFIED AND THE OF THESE UTILITIES HAVE NOT BEEN FIELD VERIFIED AND THE THESE UTILITIES HAVE NOT BEEN FIELD VERIFIED AND THE THESE UTILITIES HAVE NOT BEEN FIELD VERIFIED AND THE UTILITIES HAVE NOT BEEN FIELD VERIFIED AND THE UTILITIES HAVE NOT BEEN FIELD VERIFIED AND THE HAVE NOT BEEN FIELD VERIFIED AND THE HAVE NOT BEEN FIELD VERIFIED AND THE NOT BEEN FIELD VERIFIED AND THE NOT BEEN FIELD VERIFIED AND THE BEEN FIELD VERIFIED AND THE BEEN FIELD VERIFIED AND THE FIELD VERIFIED AND THE FIELD VERIFIED AND THE VERIFIED AND THE VERIFIED AND THE AND THE AND THE THE THE LOCATIONS ARE APPROXIMATE. STECKBECK ENGINEERING & SURVEYING, INC. (SESI) DOES NOT MAKE ANY REPRESENTATION, ARE APPROXIMATE. STECKBECK ENGINEERING & SURVEYING, INC. (SESI) DOES NOT MAKE ANY REPRESENTATION, ARE APPROXIMATE. STECKBECK ENGINEERING & SURVEYING, INC. (SESI) DOES NOT MAKE ANY REPRESENTATION, APPROXIMATE. STECKBECK ENGINEERING & SURVEYING, INC. (SESI) DOES NOT MAKE ANY REPRESENTATION, APPROXIMATE. STECKBECK ENGINEERING & SURVEYING, INC. (SESI) DOES NOT MAKE ANY REPRESENTATION, STECKBECK ENGINEERING & SURVEYING, INC. (SESI) DOES NOT MAKE ANY REPRESENTATION, STECKBECK ENGINEERING & SURVEYING, INC. (SESI) DOES NOT MAKE ANY REPRESENTATION, ENGINEERING & SURVEYING, INC. (SESI) DOES NOT MAKE ANY REPRESENTATION, ENGINEERING & SURVEYING, INC. (SESI) DOES NOT MAKE ANY REPRESENTATION, & SURVEYING, INC. (SESI) DOES NOT MAKE ANY REPRESENTATION, & SURVEYING, INC. (SESI) DOES NOT MAKE ANY REPRESENTATION, SURVEYING, INC. (SESI) DOES NOT MAKE ANY REPRESENTATION, SURVEYING, INC. (SESI) DOES NOT MAKE ANY REPRESENTATION, INC. (SESI) DOES NOT MAKE ANY REPRESENTATION, INC. (SESI) DOES NOT MAKE ANY REPRESENTATION, (SESI) DOES NOT MAKE ANY REPRESENTATION, (SESI) DOES NOT MAKE ANY REPRESENTATION, DOES NOT MAKE ANY REPRESENTATION, DOES NOT MAKE ANY REPRESENTATION, NOT MAKE ANY REPRESENTATION, NOT MAKE ANY REPRESENTATION, MAKE ANY REPRESENTATION, MAKE ANY REPRESENTATION, ANY REPRESENTATION, ANY REPRESENTATION, REPRESENTATION, REPRESENTATION, WARRANTY, ASSURANCE OR GUARANTEE THAT THE UNDERGROUND UTILITY LOCATION INFORMATION PROVIDED BY OTHERS AND ASSURANCE OR GUARANTEE THAT THE UNDERGROUND UTILITY LOCATION INFORMATION PROVIDED BY OTHERS AND ASSURANCE OR GUARANTEE THAT THE UNDERGROUND UTILITY LOCATION INFORMATION PROVIDED BY OTHERS AND OR GUARANTEE THAT THE UNDERGROUND UTILITY LOCATION INFORMATION PROVIDED BY OTHERS AND OR GUARANTEE THAT THE UNDERGROUND UTILITY LOCATION INFORMATION PROVIDED BY OTHERS AND GUARANTEE THAT THE UNDERGROUND UTILITY LOCATION INFORMATION PROVIDED BY OTHERS AND GUARANTEE THAT THE UNDERGROUND UTILITY LOCATION INFORMATION PROVIDED BY OTHERS AND THAT THE UNDERGROUND UTILITY LOCATION INFORMATION PROVIDED BY OTHERS AND THAT THE UNDERGROUND UTILITY LOCATION INFORMATION PROVIDED BY OTHERS AND THE UNDERGROUND UTILITY LOCATION INFORMATION PROVIDED BY OTHERS AND THE UNDERGROUND UTILITY LOCATION INFORMATION PROVIDED BY OTHERS AND UNDERGROUND UTILITY LOCATION INFORMATION PROVIDED BY OTHERS AND UNDERGROUND UTILITY LOCATION INFORMATION PROVIDED BY OTHERS AND UTILITY LOCATION INFORMATION PROVIDED BY OTHERS AND UTILITY LOCATION INFORMATION PROVIDED BY OTHERS AND LOCATION INFORMATION PROVIDED BY OTHERS AND LOCATION INFORMATION PROVIDED BY OTHERS AND INFORMATION PROVIDED BY OTHERS AND INFORMATION PROVIDED BY OTHERS AND PROVIDED BY OTHERS AND PROVIDED BY OTHERS AND BY OTHERS AND BY OTHERS AND OTHERS AND OTHERS AND AND AND REFLECTED ON THESE DRAWINGS IS CORRECT AND ACCURATE. SESI ASSUMES NO LIABILITY FOR ANY DAMAGE INCURRED AS A RESULT ON THESE DRAWINGS IS CORRECT AND ACCURATE. SESI ASSUMES NO LIABILITY FOR ANY DAMAGE INCURRED AS A RESULT ON THESE DRAWINGS IS CORRECT AND ACCURATE. SESI ASSUMES NO LIABILITY FOR ANY DAMAGE INCURRED AS A RESULT THESE DRAWINGS IS CORRECT AND ACCURATE. SESI ASSUMES NO LIABILITY FOR ANY DAMAGE INCURRED AS A RESULT THESE DRAWINGS IS CORRECT AND ACCURATE. SESI ASSUMES NO LIABILITY FOR ANY DAMAGE INCURRED AS A RESULT DRAWINGS IS CORRECT AND ACCURATE. SESI ASSUMES NO LIABILITY FOR ANY DAMAGE INCURRED AS A RESULT DRAWINGS IS CORRECT AND ACCURATE. SESI ASSUMES NO LIABILITY FOR ANY DAMAGE INCURRED AS A RESULT IS CORRECT AND ACCURATE. SESI ASSUMES NO LIABILITY FOR ANY DAMAGE INCURRED AS A RESULT IS CORRECT AND ACCURATE. SESI ASSUMES NO LIABILITY FOR ANY DAMAGE INCURRED AS A RESULT CORRECT AND ACCURATE. SESI ASSUMES NO LIABILITY FOR ANY DAMAGE INCURRED AS A RESULT CORRECT AND ACCURATE. SESI ASSUMES NO LIABILITY FOR ANY DAMAGE INCURRED AS A RESULT AND ACCURATE. SESI ASSUMES NO LIABILITY FOR ANY DAMAGE INCURRED AS A RESULT AND ACCURATE. SESI ASSUMES NO LIABILITY FOR ANY DAMAGE INCURRED AS A RESULT ACCURATE. SESI ASSUMES NO LIABILITY FOR ANY DAMAGE INCURRED AS A RESULT ACCURATE. SESI ASSUMES NO LIABILITY FOR ANY DAMAGE INCURRED AS A RESULT SESI ASSUMES NO LIABILITY FOR ANY DAMAGE INCURRED AS A RESULT SESI ASSUMES NO LIABILITY FOR ANY DAMAGE INCURRED AS A RESULT ASSUMES NO LIABILITY FOR ANY DAMAGE INCURRED AS A RESULT ASSUMES NO LIABILITY FOR ANY DAMAGE INCURRED AS A RESULT NO LIABILITY FOR ANY DAMAGE INCURRED AS A RESULT NO LIABILITY FOR ANY DAMAGE INCURRED AS A RESULT LIABILITY FOR ANY DAMAGE INCURRED AS A RESULT LIABILITY FOR ANY DAMAGE INCURRED AS A RESULT FOR ANY DAMAGE INCURRED AS A RESULT FOR ANY DAMAGE INCURRED AS A RESULT ANY DAMAGE INCURRED AS A RESULT ANY DAMAGE INCURRED AS A RESULT DAMAGE INCURRED AS A RESULT DAMAGE INCURRED AS A RESULT INCURRED AS A RESULT INCURRED AS A RESULT AS A RESULT AS A RESULT A RESULT A RESULT RESULT RESULT OF UNDERGROUND UTILITIES OMITTED OR INACCURATELY SHOWN. 2. THE CONTRACTOR SHALL TAKE ALL NECESSARY PRECAUTIONS TO PROTECT THE EXISTING UTILITIES AND MAINTAIN UNINTERRUPTED THE CONTRACTOR SHALL TAKE ALL NECESSARY PRECAUTIONS TO PROTECT THE EXISTING UTILITIES AND MAINTAIN UNINTERRUPTED CONTRACTOR SHALL TAKE ALL NECESSARY PRECAUTIONS TO PROTECT THE EXISTING UTILITIES AND MAINTAIN UNINTERRUPTED CONTRACTOR SHALL TAKE ALL NECESSARY PRECAUTIONS TO PROTECT THE EXISTING UTILITIES AND MAINTAIN UNINTERRUPTED SHALL TAKE ALL NECESSARY PRECAUTIONS TO PROTECT THE EXISTING UTILITIES AND MAINTAIN UNINTERRUPTED SHALL TAKE ALL NECESSARY PRECAUTIONS TO PROTECT THE EXISTING UTILITIES AND MAINTAIN UNINTERRUPTED TAKE ALL NECESSARY PRECAUTIONS TO PROTECT THE EXISTING UTILITIES AND MAINTAIN UNINTERRUPTED TAKE ALL NECESSARY PRECAUTIONS TO PROTECT THE EXISTING UTILITIES AND MAINTAIN UNINTERRUPTED ALL NECESSARY PRECAUTIONS TO PROTECT THE EXISTING UTILITIES AND MAINTAIN UNINTERRUPTED ALL NECESSARY PRECAUTIONS TO PROTECT THE EXISTING UTILITIES AND MAINTAIN UNINTERRUPTED NECESSARY PRECAUTIONS TO PROTECT THE EXISTING UTILITIES AND MAINTAIN UNINTERRUPTED NECESSARY PRECAUTIONS TO PROTECT THE EXISTING UTILITIES AND MAINTAIN UNINTERRUPTED PRECAUTIONS TO PROTECT THE EXISTING UTILITIES AND MAINTAIN UNINTERRUPTED PRECAUTIONS TO PROTECT THE EXISTING UTILITIES AND MAINTAIN UNINTERRUPTED TO PROTECT THE EXISTING UTILITIES AND MAINTAIN UNINTERRUPTED TO PROTECT THE EXISTING UTILITIES AND MAINTAIN UNINTERRUPTED PROTECT THE EXISTING UTILITIES AND MAINTAIN UNINTERRUPTED PROTECT THE EXISTING UTILITIES AND MAINTAIN UNINTERRUPTED THE EXISTING UTILITIES AND MAINTAIN UNINTERRUPTED THE EXISTING UTILITIES AND MAINTAIN UNINTERRUPTED EXISTING UTILITIES AND MAINTAIN UNINTERRUPTED EXISTING UTILITIES AND MAINTAIN UNINTERRUPTED UTILITIES AND MAINTAIN UNINTERRUPTED UTILITIES AND MAINTAIN UNINTERRUPTED AND MAINTAIN UNINTERRUPTED AND MAINTAIN UNINTERRUPTED MAINTAIN UNINTERRUPTED MAINTAIN UNINTERRUPTED UNINTERRUPTED UNINTERRUPTED SERVICE. DAMAGE TO ANY UTILITY SHALL BE REPAIRED TO THE SATISFACTION OF THE OWNER, UTILITY COMPANY OR AUTHORITY, AT DAMAGE TO ANY UTILITY SHALL BE REPAIRED TO THE SATISFACTION OF THE OWNER, UTILITY COMPANY OR AUTHORITY, AT DAMAGE TO ANY UTILITY SHALL BE REPAIRED TO THE SATISFACTION OF THE OWNER, UTILITY COMPANY OR AUTHORITY, AT TO ANY UTILITY SHALL BE REPAIRED TO THE SATISFACTION OF THE OWNER, UTILITY COMPANY OR AUTHORITY, AT TO ANY UTILITY SHALL BE REPAIRED TO THE SATISFACTION OF THE OWNER, UTILITY COMPANY OR AUTHORITY, AT ANY UTILITY SHALL BE REPAIRED TO THE SATISFACTION OF THE OWNER, UTILITY COMPANY OR AUTHORITY, AT ANY UTILITY SHALL BE REPAIRED TO THE SATISFACTION OF THE OWNER, UTILITY COMPANY OR AUTHORITY, AT UTILITY SHALL BE REPAIRED TO THE SATISFACTION OF THE OWNER, UTILITY COMPANY OR AUTHORITY, AT UTILITY SHALL BE REPAIRED TO THE SATISFACTION OF THE OWNER, UTILITY COMPANY OR AUTHORITY, AT SHALL BE REPAIRED TO THE SATISFACTION OF THE OWNER, UTILITY COMPANY OR AUTHORITY, AT SHALL BE REPAIRED TO THE SATISFACTION OF THE OWNER, UTILITY COMPANY OR AUTHORITY, AT BE REPAIRED TO THE SATISFACTION OF THE OWNER, UTILITY COMPANY OR AUTHORITY, AT BE REPAIRED TO THE SATISFACTION OF THE OWNER, UTILITY COMPANY OR AUTHORITY, AT REPAIRED TO THE SATISFACTION OF THE OWNER, UTILITY COMPANY OR AUTHORITY, AT REPAIRED TO THE SATISFACTION OF THE OWNER, UTILITY COMPANY OR AUTHORITY, AT TO THE SATISFACTION OF THE OWNER, UTILITY COMPANY OR AUTHORITY, AT TO THE SATISFACTION OF THE OWNER, UTILITY COMPANY OR AUTHORITY, AT THE SATISFACTION OF THE OWNER, UTILITY COMPANY OR AUTHORITY, AT THE SATISFACTION OF THE OWNER, UTILITY COMPANY OR AUTHORITY, AT SATISFACTION OF THE OWNER, UTILITY COMPANY OR AUTHORITY, AT SATISFACTION OF THE OWNER, UTILITY COMPANY OR AUTHORITY, AT OF THE OWNER, UTILITY COMPANY OR AUTHORITY, AT OF THE OWNER, UTILITY COMPANY OR AUTHORITY, AT THE OWNER, UTILITY COMPANY OR AUTHORITY, AT THE OWNER, UTILITY COMPANY OR AUTHORITY, AT OWNER, UTILITY COMPANY OR AUTHORITY, AT OWNER, UTILITY COMPANY OR AUTHORITY, AT UTILITY COMPANY OR AUTHORITY, AT UTILITY COMPANY OR AUTHORITY, AT COMPANY OR AUTHORITY, AT COMPANY OR AUTHORITY, AT OR AUTHORITY, AT OR AUTHORITY, AT AUTHORITY, AT AUTHORITY, AT AT AT THE CONTRACTOR'S EXPENSE. 3. THE CONTRACTOR IS RESPONSIBLE FOR ALL TESTING AND RECORD DRAWINGS AS MAY BE REQUIRED BY THE MUNICIPALITY AND/OR THE CONTRACTOR IS RESPONSIBLE FOR ALL TESTING AND RECORD DRAWINGS AS MAY BE REQUIRED BY THE MUNICIPALITY AND/OR CONTRACTOR IS RESPONSIBLE FOR ALL TESTING AND RECORD DRAWINGS AS MAY BE REQUIRED BY THE MUNICIPALITY AND/OR CONTRACTOR IS RESPONSIBLE FOR ALL TESTING AND RECORD DRAWINGS AS MAY BE REQUIRED BY THE MUNICIPALITY AND/OR IS RESPONSIBLE FOR ALL TESTING AND RECORD DRAWINGS AS MAY BE REQUIRED BY THE MUNICIPALITY AND/OR IS RESPONSIBLE FOR ALL TESTING AND RECORD DRAWINGS AS MAY BE REQUIRED BY THE MUNICIPALITY AND/OR RESPONSIBLE FOR ALL TESTING AND RECORD DRAWINGS AS MAY BE REQUIRED BY THE MUNICIPALITY AND/OR RESPONSIBLE FOR ALL TESTING AND RECORD DRAWINGS AS MAY BE REQUIRED BY THE MUNICIPALITY AND/OR FOR ALL TESTING AND RECORD DRAWINGS AS MAY BE REQUIRED BY THE MUNICIPALITY AND/OR FOR ALL TESTING AND RECORD DRAWINGS AS MAY BE REQUIRED BY THE MUNICIPALITY AND/OR ALL TESTING AND RECORD DRAWINGS AS MAY BE REQUIRED BY THE MUNICIPALITY AND/OR ALL TESTING AND RECORD DRAWINGS AS MAY BE REQUIRED BY THE MUNICIPALITY AND/OR TESTING AND RECORD DRAWINGS AS MAY BE REQUIRED BY THE MUNICIPALITY AND/OR TESTING AND RECORD DRAWINGS AS MAY BE REQUIRED BY THE MUNICIPALITY AND/OR AND RECORD DRAWINGS AS MAY BE REQUIRED BY THE MUNICIPALITY AND/OR AND RECORD DRAWINGS AS MAY BE REQUIRED BY THE MUNICIPALITY AND/OR RECORD DRAWINGS AS MAY BE REQUIRED BY THE MUNICIPALITY AND/OR RECORD DRAWINGS AS MAY BE REQUIRED BY THE MUNICIPALITY AND/OR DRAWINGS AS MAY BE REQUIRED BY THE MUNICIPALITY AND/OR DRAWINGS AS MAY BE REQUIRED BY THE MUNICIPALITY AND/OR AS MAY BE REQUIRED BY THE MUNICIPALITY AND/OR AS MAY BE REQUIRED BY THE MUNICIPALITY AND/OR MAY BE REQUIRED BY THE MUNICIPALITY AND/OR MAY BE REQUIRED BY THE MUNICIPALITY AND/OR BE REQUIRED BY THE MUNICIPALITY AND/OR BE REQUIRED BY THE MUNICIPALITY AND/OR REQUIRED BY THE MUNICIPALITY AND/OR REQUIRED BY THE MUNICIPALITY AND/OR BY THE MUNICIPALITY AND/OR BY THE MUNICIPALITY AND/OR THE MUNICIPALITY AND/OR THE MUNICIPALITY AND/OR MUNICIPALITY AND/OR MUNICIPALITY AND/OR AND/OR AND/OR THE VARIOUS AUTHORITIES RELATIVE TO THE CONSTRUCTION SHOWN ON THESE PLANS. 4. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL TRAFFIC CONTROL AS THE NEED ARISES. ALL TRAFFIC CONTROL SHALL BE IN THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL TRAFFIC CONTROL AS THE NEED ARISES. ALL TRAFFIC CONTROL SHALL BE IN CONTRACTOR SHALL BE RESPONSIBLE FOR ALL TRAFFIC CONTROL AS THE NEED ARISES. ALL TRAFFIC CONTROL SHALL BE IN CONTRACTOR SHALL BE RESPONSIBLE FOR ALL TRAFFIC CONTROL AS THE NEED ARISES. ALL TRAFFIC CONTROL SHALL BE IN SHALL BE RESPONSIBLE FOR ALL TRAFFIC CONTROL AS THE NEED ARISES. ALL TRAFFIC CONTROL SHALL BE IN SHALL BE RESPONSIBLE FOR ALL TRAFFIC CONTROL AS THE NEED ARISES. ALL TRAFFIC CONTROL SHALL BE IN BE RESPONSIBLE FOR ALL TRAFFIC CONTROL AS THE NEED ARISES. ALL TRAFFIC CONTROL SHALL BE IN BE RESPONSIBLE FOR ALL TRAFFIC CONTROL AS THE NEED ARISES. ALL TRAFFIC CONTROL SHALL BE IN RESPONSIBLE FOR ALL TRAFFIC CONTROL AS THE NEED ARISES. ALL TRAFFIC CONTROL SHALL BE IN RESPONSIBLE FOR ALL TRAFFIC CONTROL AS THE NEED ARISES. ALL TRAFFIC CONTROL SHALL BE IN FOR ALL TRAFFIC CONTROL AS THE NEED ARISES. ALL TRAFFIC CONTROL SHALL BE IN FOR ALL TRAFFIC CONTROL AS THE NEED ARISES. ALL TRAFFIC CONTROL SHALL BE IN ALL TRAFFIC CONTROL AS THE NEED ARISES. ALL TRAFFIC CONTROL SHALL BE IN ALL TRAFFIC CONTROL AS THE NEED ARISES. ALL TRAFFIC CONTROL SHALL BE IN TRAFFIC CONTROL AS THE NEED ARISES. ALL TRAFFIC CONTROL SHALL BE IN TRAFFIC CONTROL AS THE NEED ARISES. ALL TRAFFIC CONTROL SHALL BE IN CONTROL AS THE NEED ARISES. ALL TRAFFIC CONTROL SHALL BE IN CONTROL AS THE NEED ARISES. ALL TRAFFIC CONTROL SHALL BE IN AS THE NEED ARISES. ALL TRAFFIC CONTROL SHALL BE IN AS THE NEED ARISES. ALL TRAFFIC CONTROL SHALL BE IN THE NEED ARISES. ALL TRAFFIC CONTROL SHALL BE IN THE NEED ARISES. ALL TRAFFIC CONTROL SHALL BE IN NEED ARISES. ALL TRAFFIC CONTROL SHALL BE IN NEED ARISES. ALL TRAFFIC CONTROL SHALL BE IN ARISES. ALL TRAFFIC CONTROL SHALL BE IN ARISES. ALL TRAFFIC CONTROL SHALL BE IN ALL TRAFFIC CONTROL SHALL BE IN ALL TRAFFIC CONTROL SHALL BE IN TRAFFIC CONTROL SHALL BE IN TRAFFIC CONTROL SHALL BE IN CONTROL SHALL BE IN CONTROL SHALL BE IN SHALL BE IN SHALL BE IN BE IN BE IN IN IN ACCORDANCE WITH PENNDOT PUBLICATION 213, LATEST EDITION. 5. IT WILL BE THE CONTRACTOR'S RESPONSIBILITY TO ENSURE THAT THE GRADING PLAN IS IMPLEMENTED CORRECTLY, THAT A MINIMUM IT WILL BE THE CONTRACTOR'S RESPONSIBILITY TO ENSURE THAT THE GRADING PLAN IS IMPLEMENTED CORRECTLY, THAT A MINIMUM WILL BE THE CONTRACTOR'S RESPONSIBILITY TO ENSURE THAT THE GRADING PLAN IS IMPLEMENTED CORRECTLY, THAT A MINIMUM WILL BE THE CONTRACTOR'S RESPONSIBILITY TO ENSURE THAT THE GRADING PLAN IS IMPLEMENTED CORRECTLY, THAT A MINIMUM BE THE CONTRACTOR'S RESPONSIBILITY TO ENSURE THAT THE GRADING PLAN IS IMPLEMENTED CORRECTLY, THAT A MINIMUM BE THE CONTRACTOR'S RESPONSIBILITY TO ENSURE THAT THE GRADING PLAN IS IMPLEMENTED CORRECTLY, THAT A MINIMUM THE CONTRACTOR'S RESPONSIBILITY TO ENSURE THAT THE GRADING PLAN IS IMPLEMENTED CORRECTLY, THAT A MINIMUM THE CONTRACTOR'S RESPONSIBILITY TO ENSURE THAT THE GRADING PLAN IS IMPLEMENTED CORRECTLY, THAT A MINIMUM CONTRACTOR'S RESPONSIBILITY TO ENSURE THAT THE GRADING PLAN IS IMPLEMENTED CORRECTLY, THAT A MINIMUM CONTRACTOR'S RESPONSIBILITY TO ENSURE THAT THE GRADING PLAN IS IMPLEMENTED CORRECTLY, THAT A MINIMUM RESPONSIBILITY TO ENSURE THAT THE GRADING PLAN IS IMPLEMENTED CORRECTLY, THAT A MINIMUM RESPONSIBILITY TO ENSURE THAT THE GRADING PLAN IS IMPLEMENTED CORRECTLY, THAT A MINIMUM TO ENSURE THAT THE GRADING PLAN IS IMPLEMENTED CORRECTLY, THAT A MINIMUM TO ENSURE THAT THE GRADING PLAN IS IMPLEMENTED CORRECTLY, THAT A MINIMUM ENSURE THAT THE GRADING PLAN IS IMPLEMENTED CORRECTLY, THAT A MINIMUM ENSURE THAT THE GRADING PLAN IS IMPLEMENTED CORRECTLY, THAT A MINIMUM THAT THE GRADING PLAN IS IMPLEMENTED CORRECTLY, THAT A MINIMUM THAT THE GRADING PLAN IS IMPLEMENTED CORRECTLY, THAT A MINIMUM THE GRADING PLAN IS IMPLEMENTED CORRECTLY, THAT A MINIMUM THE GRADING PLAN IS IMPLEMENTED CORRECTLY, THAT A MINIMUM GRADING PLAN IS IMPLEMENTED CORRECTLY, THAT A MINIMUM GRADING PLAN IS IMPLEMENTED CORRECTLY, THAT A MINIMUM PLAN IS IMPLEMENTED CORRECTLY, THAT A MINIMUM PLAN IS IMPLEMENTED CORRECTLY, THAT A MINIMUM IS IMPLEMENTED CORRECTLY, THAT A MINIMUM IS IMPLEMENTED CORRECTLY, THAT A MINIMUM IMPLEMENTED CORRECTLY, THAT A MINIMUM IMPLEMENTED CORRECTLY, THAT A MINIMUM CORRECTLY, THAT A MINIMUM CORRECTLY, THAT A MINIMUM THAT A MINIMUM THAT A MINIMUM A MINIMUM A MINIMUM MINIMUM MINIMUM COVER IS MAINTAINED OVER ALL UTILITY PIPES, AND THAT PROPER DRAINAGE IS PROVIDED DURING CONSTRUCTION. 6. THESE PLANS, PREPARED BY SESI, DO NOT EXTEND TO OR INCLUDE SYSTEMS PERTAINING TO THE SAFETY OF THE CONSTRUCTION THESE PLANS, PREPARED BY SESI, DO NOT EXTEND TO OR INCLUDE SYSTEMS PERTAINING TO THE SAFETY OF THE CONSTRUCTION PLANS, PREPARED BY SESI, DO NOT EXTEND TO OR INCLUDE SYSTEMS PERTAINING TO THE SAFETY OF THE CONSTRUCTION PLANS, PREPARED BY SESI, DO NOT EXTEND TO OR INCLUDE SYSTEMS PERTAINING TO THE SAFETY OF THE CONSTRUCTION PREPARED BY SESI, DO NOT EXTEND TO OR INCLUDE SYSTEMS PERTAINING TO THE SAFETY OF THE CONSTRUCTION PREPARED BY SESI, DO NOT EXTEND TO OR INCLUDE SYSTEMS PERTAINING TO THE SAFETY OF THE CONSTRUCTION BY SESI, DO NOT EXTEND TO OR INCLUDE SYSTEMS PERTAINING TO THE SAFETY OF THE CONSTRUCTION BY SESI, DO NOT EXTEND TO OR INCLUDE SYSTEMS PERTAINING TO THE SAFETY OF THE CONSTRUCTION SESI, DO NOT EXTEND TO OR INCLUDE SYSTEMS PERTAINING TO THE SAFETY OF THE CONSTRUCTION SESI, DO NOT EXTEND TO OR INCLUDE SYSTEMS PERTAINING TO THE SAFETY OF THE CONSTRUCTION DO NOT EXTEND TO OR INCLUDE SYSTEMS PERTAINING TO THE SAFETY OF THE CONSTRUCTION DO NOT EXTEND TO OR INCLUDE SYSTEMS PERTAINING TO THE SAFETY OF THE CONSTRUCTION NOT EXTEND TO OR INCLUDE SYSTEMS PERTAINING TO THE SAFETY OF THE CONSTRUCTION NOT EXTEND TO OR INCLUDE SYSTEMS PERTAINING TO THE SAFETY OF THE CONSTRUCTION EXTEND TO OR INCLUDE SYSTEMS PERTAINING TO THE SAFETY OF THE CONSTRUCTION EXTEND TO OR INCLUDE SYSTEMS PERTAINING TO THE SAFETY OF THE CONSTRUCTION TO OR INCLUDE SYSTEMS PERTAINING TO THE SAFETY OF THE CONSTRUCTION TO OR INCLUDE SYSTEMS PERTAINING TO THE SAFETY OF THE CONSTRUCTION OR INCLUDE SYSTEMS PERTAINING TO THE SAFETY OF THE CONSTRUCTION OR INCLUDE SYSTEMS PERTAINING TO THE SAFETY OF THE CONSTRUCTION INCLUDE SYSTEMS PERTAINING TO THE SAFETY OF THE CONSTRUCTION INCLUDE SYSTEMS PERTAINING TO THE SAFETY OF THE CONSTRUCTION SYSTEMS PERTAINING TO THE SAFETY OF THE CONSTRUCTION SYSTEMS PERTAINING TO THE SAFETY OF THE CONSTRUCTION PERTAINING TO THE SAFETY OF THE CONSTRUCTION PERTAINING TO THE SAFETY OF THE CONSTRUCTION TO THE SAFETY OF THE CONSTRUCTION TO THE SAFETY OF THE CONSTRUCTION THE SAFETY OF THE CONSTRUCTION THE SAFETY OF THE CONSTRUCTION SAFETY OF THE CONSTRUCTION SAFETY OF THE CONSTRUCTION OF THE CONSTRUCTION OF THE CONSTRUCTION THE CONSTRUCTION THE CONSTRUCTION CONSTRUCTION CONSTRUCTION CONTRACTOR, OF ITS EMPLOYEES, AGENTS OR REPRESENTATIVES IN THE PERFORMANCE OF THE WORK. THE SEAL OF STECKBECK OF ITS EMPLOYEES, AGENTS OR REPRESENTATIVES IN THE PERFORMANCE OF THE WORK. THE SEAL OF STECKBECK OF ITS EMPLOYEES, AGENTS OR REPRESENTATIVES IN THE PERFORMANCE OF THE WORK. THE SEAL OF STECKBECK ITS EMPLOYEES, AGENTS OR REPRESENTATIVES IN THE PERFORMANCE OF THE WORK. THE SEAL OF STECKBECK ITS EMPLOYEES, AGENTS OR REPRESENTATIVES IN THE PERFORMANCE OF THE WORK. THE SEAL OF STECKBECK EMPLOYEES, AGENTS OR REPRESENTATIVES IN THE PERFORMANCE OF THE WORK. THE SEAL OF STECKBECK EMPLOYEES, AGENTS OR REPRESENTATIVES IN THE PERFORMANCE OF THE WORK. THE SEAL OF STECKBECK AGENTS OR REPRESENTATIVES IN THE PERFORMANCE OF THE WORK. THE SEAL OF STECKBECK AGENTS OR REPRESENTATIVES IN THE PERFORMANCE OF THE WORK. THE SEAL OF STECKBECK OR REPRESENTATIVES IN THE PERFORMANCE OF THE WORK. THE SEAL OF STECKBECK OR REPRESENTATIVES IN THE PERFORMANCE OF THE WORK. THE SEAL OF STECKBECK REPRESENTATIVES IN THE PERFORMANCE OF THE WORK. THE SEAL OF STECKBECK REPRESENTATIVES IN THE PERFORMANCE OF THE WORK. THE SEAL OF STECKBECK IN THE PERFORMANCE OF THE WORK. THE SEAL OF STECKBECK IN THE PERFORMANCE OF THE WORK. THE SEAL OF STECKBECK THE PERFORMANCE OF THE WORK. THE SEAL OF STECKBECK THE PERFORMANCE OF THE WORK. THE SEAL OF STECKBECK PERFORMANCE OF THE WORK. THE SEAL OF STECKBECK PERFORMANCE OF THE WORK. THE SEAL OF STECKBECK OF THE WORK. THE SEAL OF STECKBECK OF THE WORK. THE SEAL OF STECKBECK THE WORK. THE SEAL OF STECKBECK THE WORK. THE SEAL OF STECKBECK WORK. THE SEAL OF STECKBECK WORK. THE SEAL OF STECKBECK THE SEAL OF STECKBECK THE SEAL OF STECKBECK SEAL OF STECKBECK SEAL OF STECKBECK OF STECKBECK OF STECKBECK STECKBECK STECKBECK ENGINEERING & SURVEYING, INC. (SESI) REGISTERED PROFESSIONAL HEREON DOES NOT EXTEND TO ANY SUCH SAFETY SYSTEMS THAT & SURVEYING, INC. (SESI) REGISTERED PROFESSIONAL HEREON DOES NOT EXTEND TO ANY SUCH SAFETY SYSTEMS THAT & SURVEYING, INC. (SESI) REGISTERED PROFESSIONAL HEREON DOES NOT EXTEND TO ANY SUCH SAFETY SYSTEMS THAT SURVEYING, INC. (SESI) REGISTERED PROFESSIONAL HEREON DOES NOT EXTEND TO ANY SUCH SAFETY SYSTEMS THAT SURVEYING, INC. (SESI) REGISTERED PROFESSIONAL HEREON DOES NOT EXTEND TO ANY SUCH SAFETY SYSTEMS THAT INC. (SESI) REGISTERED PROFESSIONAL HEREON DOES NOT EXTEND TO ANY SUCH SAFETY SYSTEMS THAT INC. (SESI) REGISTERED PROFESSIONAL HEREON DOES NOT EXTEND TO ANY SUCH SAFETY SYSTEMS THAT (SESI) REGISTERED PROFESSIONAL HEREON DOES NOT EXTEND TO ANY SUCH SAFETY SYSTEMS THAT (SESI) REGISTERED PROFESSIONAL HEREON DOES NOT EXTEND TO ANY SUCH SAFETY SYSTEMS THAT REGISTERED PROFESSIONAL HEREON DOES NOT EXTEND TO ANY SUCH SAFETY SYSTEMS THAT REGISTERED PROFESSIONAL HEREON DOES NOT EXTEND TO ANY SUCH SAFETY SYSTEMS THAT PROFESSIONAL HEREON DOES NOT EXTEND TO ANY SUCH SAFETY SYSTEMS THAT PROFESSIONAL HEREON DOES NOT EXTEND TO ANY SUCH SAFETY SYSTEMS THAT HEREON DOES NOT EXTEND TO ANY SUCH SAFETY SYSTEMS THAT HEREON DOES NOT EXTEND TO ANY SUCH SAFETY SYSTEMS THAT DOES NOT EXTEND TO ANY SUCH SAFETY SYSTEMS THAT DOES NOT EXTEND TO ANY SUCH SAFETY SYSTEMS THAT NOT EXTEND TO ANY SUCH SAFETY SYSTEMS THAT NOT EXTEND TO ANY SUCH SAFETY SYSTEMS THAT EXTEND TO ANY SUCH SAFETY SYSTEMS THAT EXTEND TO ANY SUCH SAFETY SYSTEMS THAT TO ANY SUCH SAFETY SYSTEMS THAT TO ANY SUCH SAFETY SYSTEMS THAT ANY SUCH SAFETY SYSTEMS THAT ANY SUCH SAFETY SYSTEMS THAT SUCH SAFETY SYSTEMS THAT SUCH SAFETY SYSTEMS THAT SAFETY SYSTEMS THAT SAFETY SYSTEMS THAT SYSTEMS THAT SYSTEMS THAT THAT THAT MAY NOW OR HEREAFTER BE INCORPORATED IN THESE PLANS. THE CONSTRUCTION CONTRACTOR SHALL PREPARE OR OBTAIN THE NOW OR HEREAFTER BE INCORPORATED IN THESE PLANS. THE CONSTRUCTION CONTRACTOR SHALL PREPARE OR OBTAIN THE NOW OR HEREAFTER BE INCORPORATED IN THESE PLANS. THE CONSTRUCTION CONTRACTOR SHALL PREPARE OR OBTAIN THE OR HEREAFTER BE INCORPORATED IN THESE PLANS. THE CONSTRUCTION CONTRACTOR SHALL PREPARE OR OBTAIN THE OR HEREAFTER BE INCORPORATED IN THESE PLANS. THE CONSTRUCTION CONTRACTOR SHALL PREPARE OR OBTAIN THE HEREAFTER BE INCORPORATED IN THESE PLANS. THE CONSTRUCTION CONTRACTOR SHALL PREPARE OR OBTAIN THE HEREAFTER BE INCORPORATED IN THESE PLANS. THE CONSTRUCTION CONTRACTOR SHALL PREPARE OR OBTAIN THE BE INCORPORATED IN THESE PLANS. THE CONSTRUCTION CONTRACTOR SHALL PREPARE OR OBTAIN THE BE INCORPORATED IN THESE PLANS. THE CONSTRUCTION CONTRACTOR SHALL PREPARE OR OBTAIN THE INCORPORATED IN THESE PLANS. THE CONSTRUCTION CONTRACTOR SHALL PREPARE OR OBTAIN THE INCORPORATED IN THESE PLANS. THE CONSTRUCTION CONTRACTOR SHALL PREPARE OR OBTAIN THE IN THESE PLANS. THE CONSTRUCTION CONTRACTOR SHALL PREPARE OR OBTAIN THE IN THESE PLANS. THE CONSTRUCTION CONTRACTOR SHALL PREPARE OR OBTAIN THE THESE PLANS. THE CONSTRUCTION CONTRACTOR SHALL PREPARE OR OBTAIN THE THESE PLANS. THE CONSTRUCTION CONTRACTOR SHALL PREPARE OR OBTAIN THE PLANS. THE CONSTRUCTION CONTRACTOR SHALL PREPARE OR OBTAIN THE PLANS. THE CONSTRUCTION CONTRACTOR SHALL PREPARE OR OBTAIN THE THE CONSTRUCTION CONTRACTOR SHALL PREPARE OR OBTAIN THE THE CONSTRUCTION CONTRACTOR SHALL PREPARE OR OBTAIN THE CONSTRUCTION CONTRACTOR SHALL PREPARE OR OBTAIN THE CONSTRUCTION CONTRACTOR SHALL PREPARE OR OBTAIN THE CONTRACTOR SHALL PREPARE OR OBTAIN THE CONTRACTOR SHALL PREPARE OR OBTAIN THE SHALL PREPARE OR OBTAIN THE SHALL PREPARE OR OBTAIN THE PREPARE OR OBTAIN THE PREPARE OR OBTAIN THE OR OBTAIN THE OR OBTAIN THE OBTAIN THE OBTAIN THE THE THE APPROPRIATE SAFETY SYSTEMS WHICH MAY BE REQUIRED BY OSHA. 7. CONTRACTORS SHALL NOT STORE CONSTRUCTION MATERIALS OR LOCATE TRASH RECEPTACLES (DUMPSTERS) ON PAVED CARTWAYS OF CONTRACTORS SHALL NOT STORE CONSTRUCTION MATERIALS OR LOCATE TRASH RECEPTACLES (DUMPSTERS) ON PAVED CARTWAYS OF SHALL NOT STORE CONSTRUCTION MATERIALS OR LOCATE TRASH RECEPTACLES (DUMPSTERS) ON PAVED CARTWAYS OF SHALL NOT STORE CONSTRUCTION MATERIALS OR LOCATE TRASH RECEPTACLES (DUMPSTERS) ON PAVED CARTWAYS OF NOT STORE CONSTRUCTION MATERIALS OR LOCATE TRASH RECEPTACLES (DUMPSTERS) ON PAVED CARTWAYS OF NOT STORE CONSTRUCTION MATERIALS OR LOCATE TRASH RECEPTACLES (DUMPSTERS) ON PAVED CARTWAYS OF STORE CONSTRUCTION MATERIALS OR LOCATE TRASH RECEPTACLES (DUMPSTERS) ON PAVED CARTWAYS OF STORE CONSTRUCTION MATERIALS OR LOCATE TRASH RECEPTACLES (DUMPSTERS) ON PAVED CARTWAYS OF CONSTRUCTION MATERIALS OR LOCATE TRASH RECEPTACLES (DUMPSTERS) ON PAVED CARTWAYS OF CONSTRUCTION MATERIALS OR LOCATE TRASH RECEPTACLES (DUMPSTERS) ON PAVED CARTWAYS OF MATERIALS OR LOCATE TRASH RECEPTACLES (DUMPSTERS) ON PAVED CARTWAYS OF MATERIALS OR LOCATE TRASH RECEPTACLES (DUMPSTERS) ON PAVED CARTWAYS OF OR LOCATE TRASH RECEPTACLES (DUMPSTERS) ON PAVED CARTWAYS OF OR LOCATE TRASH RECEPTACLES (DUMPSTERS) ON PAVED CARTWAYS OF LOCATE TRASH RECEPTACLES (DUMPSTERS) ON PAVED CARTWAYS OF LOCATE TRASH RECEPTACLES (DUMPSTERS) ON PAVED CARTWAYS OF TRASH RECEPTACLES (DUMPSTERS) ON PAVED CARTWAYS OF TRASH RECEPTACLES (DUMPSTERS) ON PAVED CARTWAYS OF RECEPTACLES (DUMPSTERS) ON PAVED CARTWAYS OF RECEPTACLES (DUMPSTERS) ON PAVED CARTWAYS OF (DUMPSTERS) ON PAVED CARTWAYS OF (DUMPSTERS) ON PAVED CARTWAYS OF ON PAVED CARTWAYS OF ON PAVED CARTWAYS OF PAVED CARTWAYS OF PAVED CARTWAYS OF CARTWAYS OF CARTWAYS OF OF OF DEDICATED AND UNDEDICATED STREETS UNLESS EXPRESS PERMISSION IS GRANTED BY JACKSON TOWNSHIP. 8. ALL MUD FROM CONSTRUCTION ACTIVITIES THAT GETS TRACKED ONTO STREETS, EITHER DEDICATED OR UNDEDICATED, SHALL BE ALL MUD FROM CONSTRUCTION ACTIVITIES THAT GETS TRACKED ONTO STREETS, EITHER DEDICATED OR UNDEDICATED, SHALL BE MUD FROM CONSTRUCTION ACTIVITIES THAT GETS TRACKED ONTO STREETS, EITHER DEDICATED OR UNDEDICATED, SHALL BE MUD FROM CONSTRUCTION ACTIVITIES THAT GETS TRACKED ONTO STREETS, EITHER DEDICATED OR UNDEDICATED, SHALL BE FROM CONSTRUCTION ACTIVITIES THAT GETS TRACKED ONTO STREETS, EITHER DEDICATED OR UNDEDICATED, SHALL BE FROM CONSTRUCTION ACTIVITIES THAT GETS TRACKED ONTO STREETS, EITHER DEDICATED OR UNDEDICATED, SHALL BE CONSTRUCTION ACTIVITIES THAT GETS TRACKED ONTO STREETS, EITHER DEDICATED OR UNDEDICATED, SHALL BE CONSTRUCTION ACTIVITIES THAT GETS TRACKED ONTO STREETS, EITHER DEDICATED OR UNDEDICATED, SHALL BE ACTIVITIES THAT GETS TRACKED ONTO STREETS, EITHER DEDICATED OR UNDEDICATED, SHALL BE ACTIVITIES THAT GETS TRACKED ONTO STREETS, EITHER DEDICATED OR UNDEDICATED, SHALL BE THAT GETS TRACKED ONTO STREETS, EITHER DEDICATED OR UNDEDICATED, SHALL BE THAT GETS TRACKED ONTO STREETS, EITHER DEDICATED OR UNDEDICATED, SHALL BE GETS TRACKED ONTO STREETS, EITHER DEDICATED OR UNDEDICATED, SHALL BE GETS TRACKED ONTO STREETS, EITHER DEDICATED OR UNDEDICATED, SHALL BE TRACKED ONTO STREETS, EITHER DEDICATED OR UNDEDICATED, SHALL BE TRACKED ONTO STREETS, EITHER DEDICATED OR UNDEDICATED, SHALL BE ONTO STREETS, EITHER DEDICATED OR UNDEDICATED, SHALL BE ONTO STREETS, EITHER DEDICATED OR UNDEDICATED, SHALL BE STREETS, EITHER DEDICATED OR UNDEDICATED, SHALL BE STREETS, EITHER DEDICATED OR UNDEDICATED, SHALL BE EITHER DEDICATED OR UNDEDICATED, SHALL BE EITHER DEDICATED OR UNDEDICATED, SHALL BE DEDICATED OR UNDEDICATED, SHALL BE DEDICATED OR UNDEDICATED, SHALL BE OR UNDEDICATED, SHALL BE OR UNDEDICATED, SHALL BE UNDEDICATED, SHALL BE UNDEDICATED, SHALL BE SHALL BE SHALL BE BE BE CLEANED BY THE BUILDER/CONTRACTOR AT THE END OF EACH WORKDAY. 9. THE CONTRACTOR SHALL SUBMIT AND OBTAIN APPROVAL OF SHOP DRAWINGS FROM THE MUNICIPAL ENGINEER FOR ALL MATERIALS. THE CONTRACTOR SHALL SUBMIT AND OBTAIN APPROVAL OF SHOP DRAWINGS FROM THE MUNICIPAL ENGINEER FOR ALL MATERIALS. CONTRACTOR SHALL SUBMIT AND OBTAIN APPROVAL OF SHOP DRAWINGS FROM THE MUNICIPAL ENGINEER FOR ALL MATERIALS. CONTRACTOR SHALL SUBMIT AND OBTAIN APPROVAL OF SHOP DRAWINGS FROM THE MUNICIPAL ENGINEER FOR ALL MATERIALS. SHALL SUBMIT AND OBTAIN APPROVAL OF SHOP DRAWINGS FROM THE MUNICIPAL ENGINEER FOR ALL MATERIALS. SHALL SUBMIT AND OBTAIN APPROVAL OF SHOP DRAWINGS FROM THE MUNICIPAL ENGINEER FOR ALL MATERIALS. SUBMIT AND OBTAIN APPROVAL OF SHOP DRAWINGS FROM THE MUNICIPAL ENGINEER FOR ALL MATERIALS. SUBMIT AND OBTAIN APPROVAL OF SHOP DRAWINGS FROM THE MUNICIPAL ENGINEER FOR ALL MATERIALS. AND OBTAIN APPROVAL OF SHOP DRAWINGS FROM THE MUNICIPAL ENGINEER FOR ALL MATERIALS. AND OBTAIN APPROVAL OF SHOP DRAWINGS FROM THE MUNICIPAL ENGINEER FOR ALL MATERIALS. OBTAIN APPROVAL OF SHOP DRAWINGS FROM THE MUNICIPAL ENGINEER FOR ALL MATERIALS. OBTAIN APPROVAL OF SHOP DRAWINGS FROM THE MUNICIPAL ENGINEER FOR ALL MATERIALS. APPROVAL OF SHOP DRAWINGS FROM THE MUNICIPAL ENGINEER FOR ALL MATERIALS. APPROVAL OF SHOP DRAWINGS FROM THE MUNICIPAL ENGINEER FOR ALL MATERIALS. OF SHOP DRAWINGS FROM THE MUNICIPAL ENGINEER FOR ALL MATERIALS. OF SHOP DRAWINGS FROM THE MUNICIPAL ENGINEER FOR ALL MATERIALS. SHOP DRAWINGS FROM THE MUNICIPAL ENGINEER FOR ALL MATERIALS. SHOP DRAWINGS FROM THE MUNICIPAL ENGINEER FOR ALL MATERIALS. DRAWINGS FROM THE MUNICIPAL ENGINEER FOR ALL MATERIALS. DRAWINGS FROM THE MUNICIPAL ENGINEER FOR ALL MATERIALS. FROM THE MUNICIPAL ENGINEER FOR ALL MATERIALS. FROM THE MUNICIPAL ENGINEER FOR ALL MATERIALS. THE MUNICIPAL ENGINEER FOR ALL MATERIALS. THE MUNICIPAL ENGINEER FOR ALL MATERIALS. MUNICIPAL ENGINEER FOR ALL MATERIALS. MUNICIPAL ENGINEER FOR ALL MATERIALS. ENGINEER FOR ALL MATERIALS. ENGINEER FOR ALL MATERIALS. FOR ALL MATERIALS. FOR ALL MATERIALS. ALL MATERIALS. ALL MATERIALS. MATERIALS. MATERIALS. MATERIALS ORDERED PRIOR TO SHOP DRAWING APPROVAL ARE ORDERED AT THE CONTRACTOR'S RISK OF NOT BEING APPROVED. 10. DIGGING TEST PITS: IN LOCATIONS WHERE NEW UNDERGROUND UTILITIES ARE TO BE CONNECTED TO EXISTING UNDERGROUND UTILITIES, DIGGING TEST PITS: IN LOCATIONS WHERE NEW UNDERGROUND UTILITIES ARE TO BE CONNECTED TO EXISTING UNDERGROUND UTILITIES, TEST PITS: IN LOCATIONS WHERE NEW UNDERGROUND UTILITIES ARE TO BE CONNECTED TO EXISTING UNDERGROUND UTILITIES, TEST PITS: IN LOCATIONS WHERE NEW UNDERGROUND UTILITIES ARE TO BE CONNECTED TO EXISTING UNDERGROUND UTILITIES, PITS: IN LOCATIONS WHERE NEW UNDERGROUND UTILITIES ARE TO BE CONNECTED TO EXISTING UNDERGROUND UTILITIES, PITS: IN LOCATIONS WHERE NEW UNDERGROUND UTILITIES ARE TO BE CONNECTED TO EXISTING UNDERGROUND UTILITIES, IN LOCATIONS WHERE NEW UNDERGROUND UTILITIES ARE TO BE CONNECTED TO EXISTING UNDERGROUND UTILITIES, IN LOCATIONS WHERE NEW UNDERGROUND UTILITIES ARE TO BE CONNECTED TO EXISTING UNDERGROUND UTILITIES, LOCATIONS WHERE NEW UNDERGROUND UTILITIES ARE TO BE CONNECTED TO EXISTING UNDERGROUND UTILITIES, LOCATIONS WHERE NEW UNDERGROUND UTILITIES ARE TO BE CONNECTED TO EXISTING UNDERGROUND UTILITIES, WHERE NEW UNDERGROUND UTILITIES ARE TO BE CONNECTED TO EXISTING UNDERGROUND UTILITIES, WHERE NEW UNDERGROUND UTILITIES ARE TO BE CONNECTED TO EXISTING UNDERGROUND UTILITIES, NEW UNDERGROUND UTILITIES ARE TO BE CONNECTED TO EXISTING UNDERGROUND UTILITIES, NEW UNDERGROUND UTILITIES ARE TO BE CONNECTED TO EXISTING UNDERGROUND UTILITIES, UNDERGROUND UTILITIES ARE TO BE CONNECTED TO EXISTING UNDERGROUND UTILITIES, UNDERGROUND UTILITIES ARE TO BE CONNECTED TO EXISTING UNDERGROUND UTILITIES, UTILITIES ARE TO BE CONNECTED TO EXISTING UNDERGROUND UTILITIES, UTILITIES ARE TO BE CONNECTED TO EXISTING UNDERGROUND UTILITIES, ARE TO BE CONNECTED TO EXISTING UNDERGROUND UTILITIES, ARE TO BE CONNECTED TO EXISTING UNDERGROUND UTILITIES, TO BE CONNECTED TO EXISTING UNDERGROUND UTILITIES, TO BE CONNECTED TO EXISTING UNDERGROUND UTILITIES, BE CONNECTED TO EXISTING UNDERGROUND UTILITIES, BE CONNECTED TO EXISTING UNDERGROUND UTILITIES, CONNECTED TO EXISTING UNDERGROUND UTILITIES, CONNECTED TO EXISTING UNDERGROUND UTILITIES, TO EXISTING UNDERGROUND UTILITIES, TO EXISTING UNDERGROUND UTILITIES, EXISTING UNDERGROUND UTILITIES, EXISTING UNDERGROUND UTILITIES, UNDERGROUND UTILITIES, UNDERGROUND UTILITIES, UTILITIES, UTILITIES, THE CONTRACTOR WILL NOT BE PERMITTED TO PROCEED WITH THE NEW CONSTRUCTION UNTIL HE HAS DUG TEST PITS AND CONTRACTOR WILL NOT BE PERMITTED TO PROCEED WITH THE NEW CONSTRUCTION UNTIL HE HAS DUG TEST PITS AND CONTRACTOR WILL NOT BE PERMITTED TO PROCEED WITH THE NEW CONSTRUCTION UNTIL HE HAS DUG TEST PITS AND WILL NOT BE PERMITTED TO PROCEED WITH THE NEW CONSTRUCTION UNTIL HE HAS DUG TEST PITS AND WILL NOT BE PERMITTED TO PROCEED WITH THE NEW CONSTRUCTION UNTIL HE HAS DUG TEST PITS AND NOT BE PERMITTED TO PROCEED WITH THE NEW CONSTRUCTION UNTIL HE HAS DUG TEST PITS AND NOT BE PERMITTED TO PROCEED WITH THE NEW CONSTRUCTION UNTIL HE HAS DUG TEST PITS AND BE PERMITTED TO PROCEED WITH THE NEW CONSTRUCTION UNTIL HE HAS DUG TEST PITS AND BE PERMITTED TO PROCEED WITH THE NEW CONSTRUCTION UNTIL HE HAS DUG TEST PITS AND PERMITTED TO PROCEED WITH THE NEW CONSTRUCTION UNTIL HE HAS DUG TEST PITS AND PERMITTED TO PROCEED WITH THE NEW CONSTRUCTION UNTIL HE HAS DUG TEST PITS AND TO PROCEED WITH THE NEW CONSTRUCTION UNTIL HE HAS DUG TEST PITS AND TO PROCEED WITH THE NEW CONSTRUCTION UNTIL HE HAS DUG TEST PITS AND PROCEED WITH THE NEW CONSTRUCTION UNTIL HE HAS DUG TEST PITS AND PROCEED WITH THE NEW CONSTRUCTION UNTIL HE HAS DUG TEST PITS AND WITH THE NEW CONSTRUCTION UNTIL HE HAS DUG TEST PITS AND WITH THE NEW CONSTRUCTION UNTIL HE HAS DUG TEST PITS AND THE NEW CONSTRUCTION UNTIL HE HAS DUG TEST PITS AND THE NEW CONSTRUCTION UNTIL HE HAS DUG TEST PITS AND NEW CONSTRUCTION UNTIL HE HAS DUG TEST PITS AND NEW CONSTRUCTION UNTIL HE HAS DUG TEST PITS AND CONSTRUCTION UNTIL HE HAS DUG TEST PITS AND CONSTRUCTION UNTIL HE HAS DUG TEST PITS AND UNTIL HE HAS DUG TEST PITS AND UNTIL HE HAS DUG TEST PITS AND HE HAS DUG TEST PITS AND HE HAS DUG TEST PITS AND HAS DUG TEST PITS AND HAS DUG TEST PITS AND DUG TEST PITS AND DUG TEST PITS AND TEST PITS AND TEST PITS AND PITS AND PITS AND AND AND DETERMINED THE EXACT LOCATION AND ELEVATION OF THE EXISTING UNDERGROUND UTILITIES. THE CONTRACTOR IS ADVISED THAT NO THE EXACT LOCATION AND ELEVATION OF THE EXISTING UNDERGROUND UTILITIES. THE CONTRACTOR IS ADVISED THAT NO THE EXACT LOCATION AND ELEVATION OF THE EXISTING UNDERGROUND UTILITIES. THE CONTRACTOR IS ADVISED THAT NO EXACT LOCATION AND ELEVATION OF THE EXISTING UNDERGROUND UTILITIES. THE CONTRACTOR IS ADVISED THAT NO EXACT LOCATION AND ELEVATION OF THE EXISTING UNDERGROUND UTILITIES. THE CONTRACTOR IS ADVISED THAT NO LOCATION AND ELEVATION OF THE EXISTING UNDERGROUND UTILITIES. THE CONTRACTOR IS ADVISED THAT NO LOCATION AND ELEVATION OF THE EXISTING UNDERGROUND UTILITIES. THE CONTRACTOR IS ADVISED THAT NO AND ELEVATION OF THE EXISTING UNDERGROUND UTILITIES. THE CONTRACTOR IS ADVISED THAT NO AND ELEVATION OF THE EXISTING UNDERGROUND UTILITIES. THE CONTRACTOR IS ADVISED THAT NO ELEVATION OF THE EXISTING UNDERGROUND UTILITIES. THE CONTRACTOR IS ADVISED THAT NO ELEVATION OF THE EXISTING UNDERGROUND UTILITIES. THE CONTRACTOR IS ADVISED THAT NO OF THE EXISTING UNDERGROUND UTILITIES. THE CONTRACTOR IS ADVISED THAT NO OF THE EXISTING UNDERGROUND UTILITIES. THE CONTRACTOR IS ADVISED THAT NO THE EXISTING UNDERGROUND UTILITIES. THE CONTRACTOR IS ADVISED THAT NO THE EXISTING UNDERGROUND UTILITIES. THE CONTRACTOR IS ADVISED THAT NO EXISTING UNDERGROUND UTILITIES. THE CONTRACTOR IS ADVISED THAT NO EXISTING UNDERGROUND UTILITIES. THE CONTRACTOR IS ADVISED THAT NO UNDERGROUND UTILITIES. THE CONTRACTOR IS ADVISED THAT NO UNDERGROUND UTILITIES. THE CONTRACTOR IS ADVISED THAT NO UTILITIES. THE CONTRACTOR IS ADVISED THAT NO UTILITIES. THE CONTRACTOR IS ADVISED THAT NO THE CONTRACTOR IS ADVISED THAT NO THE CONTRACTOR IS ADVISED THAT NO CONTRACTOR IS ADVISED THAT NO CONTRACTOR IS ADVISED THAT NO IS ADVISED THAT NO IS ADVISED THAT NO ADVISED THAT NO ADVISED THAT NO THAT NO THAT NO NO NO EXCAVATION IS PERMITTED IN THE UNDERGROUND UTILITY LOCATION WITHOUT THE PRESENCE OR WRITTEN APPROVAL OF AN IS PERMITTED IN THE UNDERGROUND UTILITY LOCATION WITHOUT THE PRESENCE OR WRITTEN APPROVAL OF AN IS PERMITTED IN THE UNDERGROUND UTILITY LOCATION WITHOUT THE PRESENCE OR WRITTEN APPROVAL OF AN PERMITTED IN THE UNDERGROUND UTILITY LOCATION WITHOUT THE PRESENCE OR WRITTEN APPROVAL OF AN PERMITTED IN THE UNDERGROUND UTILITY LOCATION WITHOUT THE PRESENCE OR WRITTEN APPROVAL OF AN IN THE UNDERGROUND UTILITY LOCATION WITHOUT THE PRESENCE OR WRITTEN APPROVAL OF AN IN THE UNDERGROUND UTILITY LOCATION WITHOUT THE PRESENCE OR WRITTEN APPROVAL OF AN THE UNDERGROUND UTILITY LOCATION WITHOUT THE PRESENCE OR WRITTEN APPROVAL OF AN THE UNDERGROUND UTILITY LOCATION WITHOUT THE PRESENCE OR WRITTEN APPROVAL OF AN UNDERGROUND UTILITY LOCATION WITHOUT THE PRESENCE OR WRITTEN APPROVAL OF AN UNDERGROUND UTILITY LOCATION WITHOUT THE PRESENCE OR WRITTEN APPROVAL OF AN UTILITY LOCATION WITHOUT THE PRESENCE OR WRITTEN APPROVAL OF AN UTILITY LOCATION WITHOUT THE PRESENCE OR WRITTEN APPROVAL OF AN LOCATION WITHOUT THE PRESENCE OR WRITTEN APPROVAL OF AN LOCATION WITHOUT THE PRESENCE OR WRITTEN APPROVAL OF AN WITHOUT THE PRESENCE OR WRITTEN APPROVAL OF AN WITHOUT THE PRESENCE OR WRITTEN APPROVAL OF AN THE PRESENCE OR WRITTEN APPROVAL OF AN THE PRESENCE OR WRITTEN APPROVAL OF AN PRESENCE OR WRITTEN APPROVAL OF AN PRESENCE OR WRITTEN APPROVAL OF AN OR WRITTEN APPROVAL OF AN OR WRITTEN APPROVAL OF AN WRITTEN APPROVAL OF AN WRITTEN APPROVAL OF AN APPROVAL OF AN APPROVAL OF AN OF AN OF AN AN AN AUTHORIZED REPRESENTATIVE OF THE OWNER OF THE SUBSURFACE UTILITY. DIG SUCH TEST PITS AT THE LOCATIONS AGREED TO BY REPRESENTATIVE OF THE OWNER OF THE SUBSURFACE UTILITY. DIG SUCH TEST PITS AT THE LOCATIONS AGREED TO BY REPRESENTATIVE OF THE OWNER OF THE SUBSURFACE UTILITY. DIG SUCH TEST PITS AT THE LOCATIONS AGREED TO BY OF THE OWNER OF THE SUBSURFACE UTILITY. DIG SUCH TEST PITS AT THE LOCATIONS AGREED TO BY OF THE OWNER OF THE SUBSURFACE UTILITY. DIG SUCH TEST PITS AT THE LOCATIONS AGREED TO BY THE OWNER OF THE SUBSURFACE UTILITY. DIG SUCH TEST PITS AT THE LOCATIONS AGREED TO BY THE OWNER OF THE SUBSURFACE UTILITY. DIG SUCH TEST PITS AT THE LOCATIONS AGREED TO BY OWNER OF THE SUBSURFACE UTILITY. DIG SUCH TEST PITS AT THE LOCATIONS AGREED TO BY OWNER OF THE SUBSURFACE UTILITY. DIG SUCH TEST PITS AT THE LOCATIONS AGREED TO BY OF THE SUBSURFACE UTILITY. DIG SUCH TEST PITS AT THE LOCATIONS AGREED TO BY OF THE SUBSURFACE UTILITY. DIG SUCH TEST PITS AT THE LOCATIONS AGREED TO BY THE SUBSURFACE UTILITY. DIG SUCH TEST PITS AT THE LOCATIONS AGREED TO BY THE SUBSURFACE UTILITY. DIG SUCH TEST PITS AT THE LOCATIONS AGREED TO BY SUBSURFACE UTILITY. DIG SUCH TEST PITS AT THE LOCATIONS AGREED TO BY SUBSURFACE UTILITY. DIG SUCH TEST PITS AT THE LOCATIONS AGREED TO BY UTILITY. DIG SUCH TEST PITS AT THE LOCATIONS AGREED TO BY UTILITY. DIG SUCH TEST PITS AT THE LOCATIONS AGREED TO BY DIG SUCH TEST PITS AT THE LOCATIONS AGREED TO BY DIG SUCH TEST PITS AT THE LOCATIONS AGREED TO BY SUCH TEST PITS AT THE LOCATIONS AGREED TO BY SUCH TEST PITS AT THE LOCATIONS AGREED TO BY TEST PITS AT THE LOCATIONS AGREED TO BY TEST PITS AT THE LOCATIONS AGREED TO BY PITS AT THE LOCATIONS AGREED TO BY PITS AT THE LOCATIONS AGREED TO BY AT THE LOCATIONS AGREED TO BY AT THE LOCATIONS AGREED TO BY THE LOCATIONS AGREED TO BY THE LOCATIONS AGREED TO BY LOCATIONS AGREED TO BY LOCATIONS AGREED TO BY AGREED TO BY AGREED TO BY TO BY TO BY BY BY THE OWNER OF THE SUBSURFACE UTILITY AND THE ENGINEER, AS SHOWN ON THE UTILITY PLAN SHEETS. 11. MATERIALS AND DETAILS SPECIFIED ON THE APPROVED PLAN SHALL NOT BE ALTERED DURING CONSTRUCTION WITHOUT WRITTEN MATERIALS AND DETAILS SPECIFIED ON THE APPROVED PLAN SHALL NOT BE ALTERED DURING CONSTRUCTION WITHOUT WRITTEN AND DETAILS SPECIFIED ON THE APPROVED PLAN SHALL NOT BE ALTERED DURING CONSTRUCTION WITHOUT WRITTEN AND DETAILS SPECIFIED ON THE APPROVED PLAN SHALL NOT BE ALTERED DURING CONSTRUCTION WITHOUT WRITTEN DETAILS SPECIFIED ON THE APPROVED PLAN SHALL NOT BE ALTERED DURING CONSTRUCTION WITHOUT WRITTEN DETAILS SPECIFIED ON THE APPROVED PLAN SHALL NOT BE ALTERED DURING CONSTRUCTION WITHOUT WRITTEN SPECIFIED ON THE APPROVED PLAN SHALL NOT BE ALTERED DURING CONSTRUCTION WITHOUT WRITTEN SPECIFIED ON THE APPROVED PLAN SHALL NOT BE ALTERED DURING CONSTRUCTION WITHOUT WRITTEN ON THE APPROVED PLAN SHALL NOT BE ALTERED DURING CONSTRUCTION WITHOUT WRITTEN ON THE APPROVED PLAN SHALL NOT BE ALTERED DURING CONSTRUCTION WITHOUT WRITTEN THE APPROVED PLAN SHALL NOT BE ALTERED DURING CONSTRUCTION WITHOUT WRITTEN THE APPROVED PLAN SHALL NOT BE ALTERED DURING CONSTRUCTION WITHOUT WRITTEN APPROVED PLAN SHALL NOT BE ALTERED DURING CONSTRUCTION WITHOUT WRITTEN APPROVED PLAN SHALL NOT BE ALTERED DURING CONSTRUCTION WITHOUT WRITTEN PLAN SHALL NOT BE ALTERED DURING CONSTRUCTION WITHOUT WRITTEN PLAN SHALL NOT BE ALTERED DURING CONSTRUCTION WITHOUT WRITTEN SHALL NOT BE ALTERED DURING CONSTRUCTION WITHOUT WRITTEN SHALL NOT BE ALTERED DURING CONSTRUCTION WITHOUT WRITTEN NOT BE ALTERED DURING CONSTRUCTION WITHOUT WRITTEN NOT BE ALTERED DURING CONSTRUCTION WITHOUT WRITTEN BE ALTERED DURING CONSTRUCTION WITHOUT WRITTEN BE ALTERED DURING CONSTRUCTION WITHOUT WRITTEN ALTERED DURING CONSTRUCTION WITHOUT WRITTEN ALTERED DURING CONSTRUCTION WITHOUT WRITTEN DURING CONSTRUCTION WITHOUT WRITTEN DURING CONSTRUCTION WITHOUT WRITTEN CONSTRUCTION WITHOUT WRITTEN CONSTRUCTION WITHOUT WRITTEN WITHOUT WRITTEN WITHOUT WRITTEN WRITTEN WRITTEN APPROVAL BY THE TOWNSHIP. 12. CONTRACTOR IS RESPONSIBLE FOR REPAIRING/RESTORING ANY PROPERTY DAMAGED DURING CONSTRUCTION. CONTRACTOR IS RESPONSIBLE FOR REPAIRING/RESTORING ANY PROPERTY DAMAGED DURING CONSTRUCTION. 13. ALL OPEN TRENCHES SHALL BE BACKFILLED COMPLETELY AT THE END OF EACH WORK DAY. STEEL PLATES MAY BE ALLOWED IF ALL OPEN TRENCHES SHALL BE BACKFILLED COMPLETELY AT THE END OF EACH WORK DAY. STEEL PLATES MAY BE ALLOWED IF OPEN TRENCHES SHALL BE BACKFILLED COMPLETELY AT THE END OF EACH WORK DAY. STEEL PLATES MAY BE ALLOWED IF OPEN TRENCHES SHALL BE BACKFILLED COMPLETELY AT THE END OF EACH WORK DAY. STEEL PLATES MAY BE ALLOWED IF TRENCHES SHALL BE BACKFILLED COMPLETELY AT THE END OF EACH WORK DAY. STEEL PLATES MAY BE ALLOWED IF TRENCHES SHALL BE BACKFILLED COMPLETELY AT THE END OF EACH WORK DAY. STEEL PLATES MAY BE ALLOWED IF SHALL BE BACKFILLED COMPLETELY AT THE END OF EACH WORK DAY. STEEL PLATES MAY BE ALLOWED IF SHALL BE BACKFILLED COMPLETELY AT THE END OF EACH WORK DAY. STEEL PLATES MAY BE ALLOWED IF BE BACKFILLED COMPLETELY AT THE END OF EACH WORK DAY. STEEL PLATES MAY BE ALLOWED IF BE BACKFILLED COMPLETELY AT THE END OF EACH WORK DAY. STEEL PLATES MAY BE ALLOWED IF BACKFILLED COMPLETELY AT THE END OF EACH WORK DAY. STEEL PLATES MAY BE ALLOWED IF BACKFILLED COMPLETELY AT THE END OF EACH WORK DAY. STEEL PLATES MAY BE ALLOWED IF COMPLETELY AT THE END OF EACH WORK DAY. STEEL PLATES MAY BE ALLOWED IF COMPLETELY AT THE END OF EACH WORK DAY. STEEL PLATES MAY BE ALLOWED IF AT THE END OF EACH WORK DAY. STEEL PLATES MAY BE ALLOWED IF AT THE END OF EACH WORK DAY. STEEL PLATES MAY BE ALLOWED IF THE END OF EACH WORK DAY. STEEL PLATES MAY BE ALLOWED IF THE END OF EACH WORK DAY.