2-Attachment G - LS-S057 Mechanical and Electrical Specifications.pdf

PDF 752 KB Posted

Attached to
Lift Station – S057 Control Panel, Floats, Transducer
Solicitation number
IFB-26-001
Issued by
Osceola County, Florida

About this file

These documents are technical specifications and requirements for electrical systems and components for a construction or infrastructure project, developed by an organization referencing 2022 and 2017 TWA Standards and Specifications. The specifications cover multiple electrical system sections including basic instrumentation requirements, level measurement, control panels and consoles, grounding, electrical identification, wires and cables, raceways, circuit and motor disconnects, and motor controllers. The documents provide detailed technical requirements for equipment manufacturers, installation standards, submittal requirements, quality assurance guidelines, and product specifications for various electrical components such as conduits, cables, controllers, disconnects, and related accessories.

The specifications emphasize compliance with national electrical standards including UL, NEMA, ANSI, and IEEE requirements, and specify precise technical details for equipment including material types, enclosure ratings, performance characteristics, and installation protocols. Manufacturers must meet stringent quality standards, with many sections listing approved manufacturers and specifying exact product types and models. The documents require comprehensive documentation including shop drawings, operation and maintenance manuals, and detailed product data submissions. Key requirements include using specific materials like 316 stainless steel for enclosures in certain environments, providing color-coded wiring, implementing proper grounding techniques, and ensuring equipment is suitable for specific voltage ranges and operational conditions.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

13410-1

SECTION 13410

BASIC INSTRUMENTATION REQUIREMENTS

PART 1 - GENERAL

1.01 SUMMARY

A. Section Includes: General administrative and procedural requirements for instrumentation installations.

1.02 SUBMITTALS

A. Shop Drawings: Submit Shop Drawings covering the items included under this Section. Shop Drawing submittals shall include:

1. Product data for each product specified.

2. Wiring diagrams, both elementary and schematic, differentiating between manufacturer installed and field-installed wiring.

3. Digital Systems: Provide the following:

a. Digital equipment layouts of input and output racks showing complete module model number and addressing assignment. Layouts of port pin assignment, connection schematic indicating cable types and port addresses.

B. Record Drawings: At Project closeout, submit record drawings of installed products.

1. Where Drawings are drafted by computer equipment, CONTRACTOR shall furnish files on a disk. These Drawings shall include changes made by Field Orders, Change Orders, Addenda, and errors discovered during start-up and acceptance.

2. Drawings shall include terminal numbers at each wiring termination and piping termination.

A complete system diagram shall be included.

C. Operation and Maintenance Manuals: Submit operation and maintenance manuals for items included under this Section.

1. Instructions shall be short, easy-to-understand directions specifically written for this Project describing various possible methods of operating equipment. Instructions shall include procedures for tests required, adjustments to be made, and safety precautions to be taken with equipment. These documents are to be submitted to ENGINEER's office.

2. Provide 1 complete set of manufacturer's documentation covering programmable equipment supplied. Include hardware manuals and prints as manufacturer normally ships with programmable equipment.

a. Include complete software manuals for operating system, as well as manuals for any other software. Written instructions for the operations and maintenance of software shall be provided. The instructions shall be short, easy-to-understand directions specifically written for this Project describing various possible methods of operating software.

13410-2

b. Include program listings, point/address lists, cross-reference listings, images of screens, data entry forms, and sample reports.

c. Manuals shall include instructions for program users and instructions for maintenance programmers.

D. Warranty: Submit warranties covering the items included under this Section.

1. Warranty time periods shall start from Start-up date and not ship dates.

1.03 QUALITY ASSURANCE

A. Manufacturer’s Qualifications: Firms regularly engaged in manufacture of equipment, of types and sizes required, and whose products have been in satisfactory use in similar service for not less than 5 years.

B. Codes and Standards:

1. National Electric Code.

2. Applicable State and local requirements.

3. UL listing and labeling shall be adhered to.

C. Items covered by this Section are designated as undelivered specifically manufactured equipment for which associated progress payments will be made in accordance with this Specification.

D. Equipment that does not have a UL, FM, CSA, or other listed testing laboratory label shall be furnished with a notarized letter signed by the supplier stating that equipment furnished has been manufactured in accordance with National Electric Code and OSHA requirements.

E. CONTRACTOR shall provide permits and licenses, observe and abide by applicable laws, regulations, ordinances, and rules of State, territory or political subdivision thereof, wherein the Work is done. CONTRACTOR shall pay fees for permits, inspections, licenses, and certifications when such fees are required.

F. To ensure timely performance and conformance with Specifications, Project meetings shall be held at OWNER's facility once every 3 months during course of Project. Cost of such meetings shall be included.

G. Component Requirements: For the purposes of uniformity and conformance to industry standards, signal transmission modes shall be electronic 4-20 mA DC. No other signal characteristics are acceptable,; 4-20 mA DC signals shall be such that devices may be wired in parallel for 1-5 volt DC as required. 1-5 volt DC mode shall be employed only within control panel enclosures.

H. Responsibility and Coordination: Drawings and Specifications are intended to include details of a complete equipment installation for purposes specified. CONTRACTOR shall be responsible for details which may be necessary to properly install, adjust, and place in operation complete installation. Any error on Drawings or in Specifications which prevents

13410-3 proper operation of supplied system shall be shown correct at time of Shop Drawing submittal for approval or brought to attention of ENGINEER with or prior to submittal.

I. CONTRACTOR shall be responsible for costs incurred to correct aforementioned errors brought to ENGINEER's attention. CONTRACTOR shall assume full responsibility for additional costs which may result from unauthorized deviations from Specifications.

1.04 DELIVERY, STORAGE, AND HANDLING

A. Manufactured material shall be adequately packed to prevent damage during shipping, handling, storage, and erection. Material shipped to Site shall be packed in a container properly marked for identification. Blocks and padding shall be used to prevent movement.

B. CONTRACTOR shall inspect the material prior to removing it from carrier. If damage is observed, CONTRACTOR shall immediately notify carrier so that a claim can be made. If no such notice is given, material shall be assumed to be in undamaged condition; any subsequent damage that occurs to the equipment shall be the responsibility of CONTRACTOR. Repair and replacement of damaged parts will be done at no expense to OWNER.

C. CONTRACTOR shall be responsible for any damage charges resulting from handling of materials.

PART 2 - PRODUCTS

2.01 EQUIPMENT SUPPLIERS

A. References made in these Specifications to specific manufacturer’s products are intended to serve as a guide to type, construction, and materials. Listing of a manufacturer does not imply acceptance by ENGINEER of a manufacturer's particular product, product line, or latest product revision if it does not meet Specifications.

B. Equipment Supplier: Equipment specified under Sections 13413 through 13899 and shown on Drawings shall be designed as a system, fabricated or purchased, shipped to Site, and started up by one of the qualified and approved equipment suppliers listed under this Section. Intent is for unit responsibility.

1. Equipment supplier shall not assign any of its rights or delegate any of its obligations under these Sections without prior written acceptance by ENGINEER.

2. Direct purchase of any items in these Sections by CONTRACTOR is not in compliance with this Specification and will not be permitted.

3. When a Service Contract is included, it shall be performed by factory-trained personnel employed by equipment supplier. Equipment supplier shall assign a qualified Engineer employed by the supplier as Project Engineer/Project Manager.

a. Project Engineer/Project Manager's name shall be forwarded to CONTRACTOR and

ENGINEER within 30 days after receipt of a purchase order by equipment supplier.

13410-4

b. Project Engineer/Project Manager shall be focal point for design, fabrication, Contract communications, and shall be responsible for start-up and acceptance. Project Engineer/Project Manager shall be at factory test at Site for start-up and at the Site during entire acceptance procedure. Only qualified and approved equipment suppliers shall be accepted as meeting this Specification.

2.02 EQUIPMENT

A. Transmitted electronic signals to equipment of other vendors and between control panels shall be a separate isolated-floating output for each item of equipment and shall conform to ISA Standard S50.1.

B. Enclosures shall be 316 SS NEMA 4X as indicated on Drawings. Intrinsically safe systems, as approved by Factory Mutual, shall be furnished when called for.

C. No external power connections shall be allowed unless specifically called for in Specification.

Where an external power source is called for, unit shall accept 120 VAC, plus or minus 10 percent power.

D. Size and style of instruments are defined in Specifications.

E. Charts and scales are shown on Drawings. Standard scales shall not be accepted without ENGINEER's approval if it differs from those shown. Ratio station scales and other scales shall be graduated such that major graduations fall on whole numbers (i.e., 1, 2, 3, or 5, 10, 15, etc.)

and minor graduations fall on 0.1 or 0.2 intervals (i.e., 1.1, 1.2 or 11, 12, etc.). If two scales are called for on ratio stations, each scale shall be indexed to meet Specification. Drawing of each scale for ratio stations shall be submitted with Shop Drawings for approval.

F. Solid-state output switches, where used, shall be overvoltage transient protected and not be damaged by dI/dT or dv/dt for their design application under this Contract.

G. Instruments shall be equipped with permanently attached identification tag. Tag shall be included on field- and panel-mounted devices. Tags shall include ENGINEER's tag identification and manufacturer's tag identification if different from ENGINEER's.

1. Tags shall be either stamped metal or laminated phenolic with white letters engraved on a black background. Field-mounted devices shall have tags fastened with screws. Devices mounted in panels will be tagged inside panel on subplates or on device itself where it can be easily read.

H. Finish on instruments and accessories shall provide protection against corrosion by elements in environment in which they are to be installed. Both the interior and exterior of enclosures shall be finished. Extra paint of each color used on material shall be provided by manufacturer for touch-up purposes.

13410-5

I. Provide equipment identification nameplates complying with Section 16075. Nameplates shall contain ENGINEER's item designation and, for indicators and transmitters, design range and units of device shown.

2.03 SOURCE QUALITY CONTROL

A. Control and monitoring system control panels and computer equipment, if any, shall be tested at the factory and witnessed by ENGINEER prior to shipment to Site. ENGINEER shall be given 4 weeks notice before factory test date. Factory test shall include checking for conformity to Specifications, fabrication, and nomenclature. Control and monitoring system logic and terminals shall be checked line by line and function by function in total for conformity of Drawings.

B. Conduct preliminary testing prior to factory checkout by executing programs supplied for this Project. Exercise inputs to test logic for correct function and proper response of outputs. Verify correct interface with programs. Verify correct communications.

C. Factory testing shall be used to validate fieldbus and plant LAN/WAN interconnections. Proper communication between devices and software components shall be demonstrated. Data Collection and Data Management Reporting shall be demonstrated.

D. Equipment supplier shall have test equipment available at the factory. A full set of annotated logic programs and wiring diagrams with the latest revisions shall be made available to ENGINEER at factory for checking purposes. Drawings shall include wire numbers and terminal numbers.

E. Control panels and programmable equipment shall not be shipped to Site until logic conforms to Contract requirements, physical changes required by testing are made, and tags conform to factory test corrections. Equipment delivered to Site without factory test or corrections will be returned to factory at CONTRACTOR's expense.

13410-6

PART 3 - EXECUTION

3.01 INSTALLATION

A. Equipment provided under this Section shall be fabricated, assembled, erected, and placed in proper operating condition in full conformity with detail drawings, specifications, engineering data, instructions, and recommendations of equipment manufacturer as approved by ENGINEER.

B. Install equipment as indicated, in accordance with manufacturer's written instruction, and in compliance with recognized industry practices to ensure that products fulfill requirements.

C. Drawings are not intended to show every detail of construction or location of piping, ductwork, or equipment. Where proper operation or construction makes it necessary or advisable to change location of piping, instrumentation equipment, air ducts, or other equipment, CONTRACTOR shall so inform ENGINEER for his approval and permission.

3.02 FIELD QUALITY CONTROL

A. Calibrate equipment in accordance with manufacturer's instructions to ranges or set points indicated on Drawings.

B. Installation and Start-up: Equipment supplier shall have an established service facility from which qualified technical service personnel and parts may be dispatched upon call. Such a service facility shall be no more than 6 hours travel time from Site.

1. Equipment supplier shall provide an experienced, factory-trained, competent, and authorized service representative for a minimum of 3 times at Site, including once during installation and start-up and once during acceptance to inspect, check, and calibrate any part of system.

Supplier's service representative shall revisit Site for 8 hours per day as often as necessary after installation until trouble is corrected and equipment has passed acceptance test and is operating satisfactorily to OWNER and ENGINEER.

2. Third trip is after equipment has been accepted and shall be used to instruct OWNER's personnel in aspects of operation and maintenance, such as fuse locations, use of controls, instruction manuals, etc. Third trip shall be for duration of one, 8-hour day at OWNER's facility.

3.03 DEMONSTRATION

A. Upon completion of installation and calibration, demonstrate functioning of equipment in accordance with requirements. Where possible, correct malfunctioning units at Site, then retest to demonstrate compliance; otherwise, remove and replace with new or repaired units, and retest to demonstrate compliance.

END OF SECTION

13423-1

SECTION 13423

LEVEL MEASUREMENT

PART 1 - GENERAL

1.01 SUMMARY

A. Section includes the following:

1. Cord type float switch.

2. Radar level sensor.

1.02 SUBMITTALS

A. Shop Drawings: Submit Shop Drawings covering the items included under this Section.

PART 2 - PRODUCTS

2.01 MANUFACTURERS

A. Subject to compliance with specified requirements, manufacturers offering products which may be incorporated in Work include:

1. Cord Type Float Switch:

a. Anchor Scientific, Inc.

2. Radar Level Sensor:

a. VEGA VEGAPULS C23

2.02 FLOAT SWITCH (CORD TYPE)

A. Direct acting float switch shall be furnished to automatically detect liquid level change. Liquid rise of 1 inch from rest position shall operate float switch and reset will occur when liquid level drops 1 inch. Float shall be free suspended. Free cable hanging floats with weights shall not be acceptable.

B. Float switch shall consist of plypropylene housing, flexible 3-conductor cable with a synthetic rubber jacket, and mercury switch. Inside float housing will be a (normally closed) mercury switch potted in epoxy. Electrical load for switch contacts shall be rated 115 volt AC at 0.5 horsepower inductive load.

C. Three-conductor cable shall be 18 AWG with 41 strands per conductor made for heavy flexing service and underwater use. A green grounding wire shall connect internally to float housing. Float cable shall be made from chemically resistant polypropylene.

D. Float switch shall be Roto Float type S.

13423-2

2.10 RADAR LEVEL SENSOR

A. RADAR level device shall include sensing head and cable.

B. Length of cable shall be sufficient for application shown.

C. Sensor shall automatically compensate for ambient temperature changes.

D. CONTRACTOR, equipment supplier, and manufacturer shall examine Drawings for each installation to determine equipment supplied will work in each application.

E. Drawings shall contain a typical installation detail and show location of sensors.

F. Equipment supplier must ensure beam angle of sensor shall not have interference from walls, pipes, or other objects at each location. Shop Drawings shall be specific about model numbers at each location, and detail sketches showing mounting height, zero dimensions, span dimensions, and beam angle data for each location.

G. Any device that will not function reliably to specifications in its application shall be replaced at CONTRACTOR's expense.

H. RADAR shall be intrinsically safe for NEMA 7 areas (explosion-proof). Sensor head shall be epoxy-coated metal, encapsulated or mylar for corrosion resistance.

I. Provide with VEGA stainless steel cable clamp hanging hardware.

J. Operational Data:

1. Power Supply: Loop powered 4-20mA 24VDC.

2. Output: 4-20 mA output.

PART 3 - EXECUTION

3.01 GENERAL

A. Examination, Installation, Field Quality Control, Demonstration: In accordance with Section 13410.

13430-1

SECTION 13430

CONTROL PANELS AND CONSOLES

PART 1 - GENERAL

1.01 SUMMARY

A. Section Includes:

1. Control panels and consoles.

2. Switches, push-buttons, lights.

3. Relays.

4. Intrinsically safe isolator relays.

5. Timing devices.

6. Terminal blocks.

7. Control power transformers.

8. Phase monitor

1.02 SUBMITTALS

A. Shop Drawings: Submit Shop Drawings covering the items included under this Section.

1.03 QUALITY ASSURANCE

A. Regulatory Requirements:

1. Codes, Ordinances, and Industrial Standards: Design, testing, assembly, and methods of installation for materials, electrical equipment, and accessories proposed under this Section shall conform to National Electric Code and to applicable State and local requirements.

2. UL listing and labeling of custom-built panels (UL 508) shall be adhered to under this Contract.

PART 2 - PRODUCTS

2.01 PANEL SHOP MANUFACTURERS

A. Control panel manufacturer shall be one from the following list with out exception:

1. Flygt

2. Sta-Con

2.02 MANUFACTURERS

A. All materials and manufacturers shall be per the 2022 TWA Standards and Specifications Appendix E “Approved Manufacturers and Materials”.

13430-2

2.03 CONTROL PANELS AND CONSOLES

A. Sheet Metal Construction:

1. Panels and consoles shall be fabricated from sheet steel welded and bolted into a rigid self-supporting structure a maximum of 90 inches high and a minimum of 20 inches deep.

Overall length shall be coordinated with space requirements as indicated by Drawings.

Changes in length from that shown on Drawings must be brought to attention of ENGINEER within 90 days of Contract Award. Cost to modify floor plan or wall opening shall be at CONTRACTOR's expense after this 90-day period. Panel face layouts shown on Drawings are intended to indicate relative position of all components. Supplier shall fix exact locations and overall dimensions to meet requirements of its equipment.

2. Panel and console bodies shall be 12 gauge minimum steel for panels up to 42 inches in width, and 10 gauge minimum steel for panels exceeding 42 inches in width. Panel subplates shall be same gauge as enclosure. Stiffening members shall be provided for strength and stiffness as required.

3. A minimum of 3 inches shall be provided between edge of panel subplate and outside walls of panel body to ensure adequate wire-way space for external wires entering panel.

Panel subplate shall be mounted on collar studs for easy removal. Print pockets shall be provided on each panel. Brackets welded to inside of panel, complete with lights, shall be provided on panels where indicated by Drawings.

4. Identification plates shall be laminated phenolic with white letters engraved on a black background and mounted with screws or double-back adhesive foam tape.

5. All components inside panel shall have identification plates. This includes instruments, relays, switches, circuit boards in plug-in racks, etc. Identification plates shall include engineering symbols (FBQ-1, SW-3, FIC-4, CR-1, etc.). Switches and circuit breakers inside panel shall have names (Horn, Audio Tone, Panel Power, etc.) on identification plates as well as engineering symbol.

6. Identification plates shall be located on or adjacent to device they are identifying and shall be readable without looking around, under, or on top of device to find identification plate.

7. Panels shall be constructed with a deadfront. The switches, lights, and pushbuttons shall be mounted to an internally hinged lexan door.

B. Access:

1. Wall- and/or floor-mounted control panels shall have continuous piano-hinged doors for ease of access. Door openings shall expose a minimum of 80 percent of panel interior.

Door openings shall be sealed with a 0.125-inch thick minimum cellular neoprene gasket cemented with oil-resistant adhesive and held in place with a retaining strip. Print pockets shall be provided on each door. Two door enclosures shall have a removable center post.

Panel doors less than 40 inches high shall be equipped with a 2-point latching mechanism.

Panel doors 40 inches high or more shall be equipped with a 3-point latching mechanism.

13430-3

2. Components and terminals shall be accessible without removing another component except covers. Swing out sections shall be used if mounting space is required that is not normally accessible.

C. Finish:

1. Panel face openings for mounting equipment shall be smoothly finished cut with counterboring and trim strips provided as required to give a neat finished appearance.

Bezels shall be used on all front panel-mounted devices to cover panel cutouts. A chrome-plated or stainless steel bezel shall be used at parting line of panels that have shipping splits or at parting line of panels placed end to end.

D. Electrical:

1. Internal panel wiring shall be 19 strand No. 16 AWG, 90oC MTW, Class C stranded, or

THHN/THWN approved as 90oC MTW. All panel wiring not run in wire ducts shall be bundled and tied. Each wire shall be identified at both ends with same exclusive number.

Number shall be same number shown on control schematic. Number shall not be used again for any other purpose. Wires marked differently on each end will not be accepted.

Wire markers shall be provided on end of each wire at termination point.

2. Control wiring associated with control circuits de-energized when main disconnect is opened shall be color-coded red. Control wiring associated with control circuits which remains "hot" when main disconnect is opened shall be color-coded yellow. DC control wiring shall be color-coded blue. Ground wires shall be color-coded green. Terminal blocks shall be numbered in numerical order. Yellow wiring leaving panel shall be brought to an isolated set of terminal blocks.

3. Provide an instrument common bus 0.1 by 0.5 by 6-inch minimum in enclosure and isolated from enclosure. A separate instrument common wire shall be run from each common terminal on an instrument to instrument common bus. Instrument common wires looped from one terminal to another and then to instrument common bus will not be accepted.

4. Instrument common bus shall be connected to power supply common with a wire or wire braid strap as short as practical and of sufficient capacity to prevent troublesome voltage drop. Common terminals and common bus for instrument common shall be tagged "Instrument Common." Instrument signal wires of 4-20 mA or 1-5V shall be shielded wire.

Telephone wires and telemetry equipment interconnection wires shall be shielded wires.

5. Provide a copper ground bus 0.1 by 0.5 by 6-inch minimum in enclosure to which all instrument grounds and panel enclosure are tied. Separate ground wire shall be run from instrument enclosure ground terminal directly to ground bus. Instrument ground wires looped from one instrument to another will not be accepted. Under no circumstances shall neutral side of power source or any other terminals used for grounding power circuits be used as an instrument common.

6. Wires to internal components shall be connected to inside of terminal strip. Wires to external components shall be connected to outside of terminal strip. No more than 2 wires shall be connected to one terminal point.

7. Panel wire duct shall be provided between each row of components and adjacent to each terminal strip. Wire ducts shall be a minimum of 1-inch wide and 3 inches deep with

13430-4 removable snap-on covers and perforated walls for easy wire entrance. Wire ducts shall be constructed of nonmetallic materials with a voltage insulation in excess of maximum voltage carried therein.

8. Floor-standing panels and consoles shall be equipped with a flange mounted 600V rated main non-automatic trip circuit breaker or disconnect switch. Single phase, 60 hertz power at voltage shown on Drawings shall be supplied to main disconnect. Panel fabricator shall provide any additional voltages and power requirements at control panel to meet requirements of equipment contained therein.

9. Disconnect and transformer shall have enclosed protected terminations to prevent accidental shock.

10. Relays, timers, etc., installed on panel subplate shall be provided with a minimum spacing between component and wire duct of 1.5 inches above and 1 inch below. Minimum spacing between adjacent components shall be 0.25 inch. Relays, timers, etc., shown in schematics are intended to show function. Additional relays may be required in conjunction with items shown to provide total number of contacts required. Where limit, pressure, float switches, etc., are used and more than SPDT contacts are indicated by schematics, provide additional contacts required by using auxiliary relays. However, if a DPDT switch is called for, using a SPDT with a relay will not be accepted. All control and pilot devices such as relays, timers, etc., shall be 120V, 3 amp rated except where noted with coil voltage as required. One N.O. spare contact shall be provided on each relay.

E. Panel/Subplate Layout:

1. Panel face-mounted equipment shall consist of pilot lights, push-buttons, selector switches, meters, indicating timer, etc. Spacing between horizontal rows of components shall be

1.5 inches minimum; spacing between vertical columns of components shall be 1.875 inches minimum. Components shall be grouped and/or located as indicated on Drawings.

Distance from bottom row of components to floor shall be not less than 36 inches. Top row of recording and indicating instruments shall be centered approximately 60 inches above floor. Maximum height for annunciator windows shall be 85 inches above floor. In general, indicating lights, push-buttons, etc., shall be mounted in accordance with sequence of operation from left to right and top to bottom.

2. A minimum of 2 inches shall be provided between terminal strips and wire ducts or terminal strips and terminal strips. In general, terminal strips shall be mounted on vertical edges of subplate. Where terminal strips are mounted side-by-side, terminals shall be elevated 1.5 inches above subplate to allow wires to pass underneath.

3. Subplates shall have a minimum of 15 percent spare mounting space, and terminal strips shall have a minimum of 20 percent spare terminal blocks.

2.04 SWITCH, PUSH BUTTONS, LIGHTS

A. Selector switches shall be 120 VAC rated, oil-tight construction with standard operator knob.

B. Start push buttons shall be 120 VAC rated, oil-tight construction with extended guard and black color insert.

13430-5

C. Stop push-buttons shall have a half-guard with red color insert. Contacts shall be rated NEMA B-150 and P-150.

D. Pilot lights shall be push-to-test oil-tight construction with cap colors and voltages as required.

Nameplates for each switch and light shall conform to manufacturer's series and type with engraving as called for on Drawings.

2.05 RELAYS

A. Control Relays: Switching and output relays shall be plug-in type with contacts rated 120 VAC, 3 amp with 120 VAC or 24 VDC coil, indicating light, manual operator, and plastic transparent cover. Relays shall have a retainer mechanism to prevent loosening from vibration. Relays shall not be used for switching 1-5 VDC or 4-20 mA signals associated with instruments.

B. Intrinsically Safe Isolator Relay:

1. Intrinsically safe relay shall be provided between raw sewage floats and control circuits or where shown on Drawings.

2. Relay shall operate at 24 VAC plus 10 percent with a switch rating of 1 amp rms and maximum holding current of 20 milliamp for solid-state devices. Relay shall be rated for ambient temperatures of 32 degrees F to 120 degrees F.

3. Output shall be N.O. or N.C. Equipment supplier is responsible for choosing proper output for float specified and circuits specified. If float and circuit are not defined, intrinsically safe relay shall be of such a polarity as to fail in a safe condition for function being performed.

4. When intrinsically safe relay is required in panels exposed to outdoor temperatures, relays shall be rated for ambient temperatures of –40 to 120 degrees F, or thermostatically controlled heaters must be added to panel to maintain an ambient in panel of 32 to 120 degrees F.

2.06 TIMING DEVICES

A. Solid-state timers shall be plug-in type.

B. Solid-state timers with ON or OFF delay cycles shall operate at 120 VAC, 60 hertz. Solid-state device may be analog or digital in operation. Time interval shall be as shown on Drawings or as required.

2.07 TERMINAL BLOCKS

A. Terminal blocks shall be 300 or 600 volt rated, channel-mounted box lug with pressure plate type or binding head screw type with pressure plate, and shall have a white marking strip.

Terminal blocks shall be color-coded according to the following coloring scheme:

Black 120V power circuits de-energized when main disconnect is opened.

13430-6

White 120V neutral conductors.

Red 120V control circuits de-energized when main disconnect is opened.

Yellow 120V control circuits which remain hot when main disconnect is opened.

Blue Terminal blocks for DC wiring.

Gray Terminal blocks for shields in DC wiring.

Green Ground terminal blocks.

B. For terminals associated with 120V nonisolated input cards, individually fused terminal blocks shall be used for 120V power to field devices.

C. Provide a minimum of 20 percent spare terminals for each type and color of terminal used. All terminals of a given color shall be grouped with other terminals of the same color.

2.08 CONTROL POWER TRANSFORMERS

A. Control power transformers shall be sized to handle in-rush currents and to accommodate continuous load of circuits plus 25 percent future load with 5 percent or less voltage drop.

Transformer primary voltage shall be as indicated on Drawings.

2.09 PHASE MONITORS

A. The Phase Monitor shall be an 8 pin, plug in style unit for an applied voltage of either a range from 200 to 240 VAC or 425 to 525 VAC. The Phase Monitor shall monitor Under Voltage, Pase Reversal, and Phase Imbalance. The Phase Monitor shall be able to monitor Over Voltage as an option, as well as having optional reset delay time ranges.

B. With the correct voltage applied, the Phase Monitor LED shall blink during the reset delay, and at the end of the reset delay, the LED shall come on steady, and the internal relay shall be energized.

C. The trip points for Under and Over Voltage for the 200 to 240 VAC range shall be 15% of setting, and the reset shall be 12% of setting. The trip points for Under and Over Voltage for the 425 to 525 VAC range shall be 10% of setting, and the reset shall be 8% of setting.

D. The Phase Imbalance shall have a trip delay of 5 seconds at a Phase Imbalance of 5%, and the delay shall approach zero as the Percentage of Phase Imbalance increases, with the reset being 4%.

E. The adjustment range shall be from 200 to 240 VAC or 425 to 525 VAC, with the center of the adjustable monitoring range either 230 VAC or 500 VAC.

F. The output relay shall contain one SPDT relay, rated 10A at 240 VAC, and one normally open contact between pins 6 and 7, also rated 10A, that closes when energized. The Phase Monitor shall be able to function as a diagnostic tool as well, blinking a series of pulses to identify the fault conditions Under Voltage, Over Voltage, Phase Imbalance, or Phase Reversal.

13430-7

G. The Dual Voltage Phase Monitor shall be Model 001-DVM-118, manufactured by Motor Protection Electronics, Apopka, Florida, (407) 229-3825. No substitutions shall be permitted.

PART 3 - EXECUTION

3.01 GENERAL

A. Examination, Installation, Field Quality Control, Demonstration: In accordance with Section 13410.

B. Panel manufacturer shall have a representative present on site to attend final station startup.

16050-1

SECTION 16050

BASIC ELECTRICAL REQUIREMENTS

PART 1 - GENERAL

1.01 SUMMARY

A. Section Includes: General administrative, procedural requirements, and installation methods for electrical installations specified in Division 16.

B. The Drawings are schematic and are not intended to show every detail of construction.

1. In general, conduits/raceways, transitions and offsets shown on Drawings indicate approximate locations in plan and elevation where the systems are intended to be run.

2. CONTRACTOR shall fully coordinate electrical Work with other trades to avoid interferences.

3. In the event of interferences, CONTRACTOR shall request clarification from ENGINEER in writing.

B. Related Documents: Drawings and general provisions of Contract, including General and Supplementary Conditions and Division 1 Sections, apply to Work of this Section.

C. All materials and manufacturers shall be per the 2017 TWA Standards and Specifications Appendix E “Approved Manufacturers and Materials”.

1.02 SUBMITTALS

A. Shop Drawings: Submit Shop Drawings covering the items included under this Section of Work.

Shop Drawing submittals shall include:

1. Submit product data covering the items included under this Section of Work.

B. Conforming to Construction Drawings: Submit a complete set of Drawings showing the locations of the piping, ductwork, etc., as actually installed. Such Drawings shall be submitted to ENGINEER on tracing cloth, mylar, or sepia paper from which blueprints can be obtained.

C. Operation and Maintenance Manuals: Submit operation and maintenance manuals for items included under this Section. Include following information for equipment items:

1. Description of function, normal operating characteristics and limitations, performance curves, engineering data and tests, and complete nomenclature and commercial numbers of replacement parts.

2. Manufacturer's printed operating procedures to include start-up, break-in, and routine and normal operating instructions; regulation, control, stopping, shutdown, and emergency instructions; and summer and winter operating instructions.

16050-2

3. Maintenance procedures for routine preventative maintenance and troubleshooting;

disassembly, repair, and reassembly; aligning and adjusting instructions.

4. Servicing instructions and lubrication charts and schedules.

1.03 RECORD DOCUMENTS

A. Contractor shall prepare record drawings. CONTRACTOR shall submit, prior to final payment, Drawings conforming to construction records of systems it has installed. Vendor drawings shall be sized as manufacturers' standard.

B. Provide typewritten data sheets on motor control circuits with following information on each branch feeder: Load name, horsepower or KVA (transformer), fuse size, starter size, service factor of motor, motor nameplate currents, power factor correction capacitor size (if used), and thermal overload part number.

1.04 QUALITY ASSURANCE

A. National Electrical Code: Comply with NFPA 70, National Electrical Code.

B. UL Compliance and Labeling: Use products and components labeled by UL.

1.05 PERMITS, INSPECTIONS, AND LICENSES

A. CONTRACTOR shall procure all necessary permits and licenses, observe and abide by all applicable laws, codes, regulations, ordinances, and rules of the State, territory, or political subdivision thereof, wherein Work is done, or any other duly constituted public authority, and further agrees to hold OWNER harmless from liability or penalty which might be imposed by reason of an asserted violation of such laws, codes, regulations, ordinances, or other rules.

1. Upon completion of Work, CONTRACTOR shall secure certificates of inspection from the inspector having jurisdiction and shall submit 3 copies of the certificates to OWNER.

CONTRACTOR shall pay the fees for the permits, inspections, licenses, and certifications when such fees are required.

1.06 DELIVERY, STORAGE, AND HANDLING

A. Deliver products to Project properly identified with names, model numbers, types, grades, compliance labels, and other information needed for identification. Equipment shall be packaged to prevent damage during shipment, storage, and handling. Do not install damaged units; replace, and remove damaged units from Site.

PART 2 - PRODUCTS

NOT USED

16050-3

3.01 GENERAL ELECTRICAL INSTALLATION

A. Provide electrical materials and equipment enclosures appropriate for areas in which they are installed. Each area will be designated on Drawings with a type of construction such as NEMA 4X.

An area designated by a name and elevation includes space bounded by floor, ceiling, and enclosing walls.

1. Exception: Provide manufacturer's standard construction for indoor or outdoor application where equipment is not manufactured to NEMA specifications (e.g., switchgear, transformers, high voltage capacitors, bus duct, and light fixtures; materials and equipment used in finished areas such as offices, laboratories, etc.).

B. Provide 316 stainless steel electrical materials and equipment enclosures in NEMA 4X areas;

explosion-proof NEC Class I, Division 1, Group D equipment for NEMA 7 areas.

C. Supporting devices and sleeves shall be set in poured-in-place concrete and other structural components as they are constructed.

D. Install systems, materials, and equipment to conform with approved submittal data, including coordination Drawings, to greatest extent possible. Conform to arrangements indicated by Drawings recognizing that portions of Work are shown only in diagrammatic form. Where coordination requirements conflict with individual system requirements, refer conflict to ENGINEER.

E. Install systems, materials, and equipment level and plumb, parallel and perpendicular to other building systems and components where installed exposed in finished spaces.

F. As much as practical, connect equipment for ease of disconnecting with minimum of interference with other installations.

G. Install systems, materials, and equipment giving right-of-way priority to systems required to be installed at a specified slope.

3.02 RACEWAY INSTALLATION

A. Conduit shall be rigid aluminum.

B. Minimum size conduit shall be 3/4 inch unless shown otherwise.

C. All conduit penetrations shall enter bottom of enclosures unless otherwise approved in advance by

TWA.

D. Provide “Coopers Industries” Myers hub on all conduit entries into enclosure or boxes.

16050-4

E. Instrument Signal Conduit Requirements: Shielded signal wires for 4-20 mA type instruments or thermocouple wires assigned to the same control panel may be run in the same conduit. Shielded instrument signal wires, thermocouple wires, and shielded 2-wire intercom wires may be run in the same conduit. No other wires will be permitted in an instrument signal/2-wire intercom conduit.

F. Conduit Thread Paint: Make threaded conduit joints watertight by coating threaded portions with a spray-on or brush-on zinc-bearing paint. Provide paint containing 90 percent minimum by weight of metallic zinc powder in the dried film. Clean field-cut threads of oil using the recommended solvent prior to coating threads.

G. Concealed Raceways: Raceways embedded in slabs shall be installed in the middle third of the slab thickness where practical and leave at least 1-inch concrete cover. Tie raceways to reinforcing rods or otherwise secure them to prevent sagging or shifting during concrete placement. Space raceways laterally to prevent voids in the concrete. Run 1-inch and smaller raceways with a minimum of bends in the shortest practical distance. Run larger conduit parallel with or at right angles to the main reinforcement; where at right angles to the reinforcement, the conduit shall be close to one of the supports of the slab.

H. Exposed Raceways: Install parallel and perpendicular to nearby surfaces or structural members and follow the surface contours as much as practical. Make bends and offsets so the inside diameter is not effectively reduced. Keep the legs of a bend in the same plane and the straight legs of offsets parallel. Conduits shall slope away from loads to keep moisture from entering the load. Run parallel or banked raceways together. Make bends in parallel or banked runs from the same centerline so that the bends are parallel. Factory elbows may be used in banked runs only where they can be installed parallel. This requires that there be a change in the plane of the run, such as from wall to ceiling and that the raceways be of the same size. In other cases, provide field bends for parallel raceways. Keep raceways at least 6 inches away from parallel runs of flues and steam or hot water pipes. Install horizontal raceway runs above water and steam piping.

I. Space raceways, fittings, and boxes 0.25 inch from mounting surface in NEMA 4X areas. Spacers shall be one-piece construction of stainless steel, galvanized steel, PVC, ABS, or other noncorrosive material.

J. Stub-up Connections: Extend conduits through concrete floor for connection to freestanding equipment with an adjustable top or coupling threaded inside for plugs and set flush with the finished floor. Extend conductors to equipment with rigid metal conduit; flexible metal conduit may be used 6 inches above the floor. Where equipment connections are not made under this Contract, install screwdriver-operated threaded flush plugs with floor.

K. Flexible Connections: Use short length (maximum 3 feet) of flexible conduit for recessed and semi-recessed lighting fixtures, equipment subject to vibration, noise transmission, or movement, and all motors. Use liquidtight flexible conduit in wet locations and rated flexible connections for hazardous locations. Install separate ground conductor across flexible connections.

16050-5

L. Join raceways with fittings designed and approved for the purpose and make joints tight. Where joints cannot be made tight, use bonding jumpers to provide electrical continuity of the raceway system. Where terminations are subject to vibration, use bonding bushings or wedges to assure electrical continuity. Where subject to vibration or dampness, use insulating bushings to protect conductors.

M. Use raceway fittings that are of types compatible with the associated raceway and suitable for the use and location. For intermediate metal conduit, use threaded rigid metal conduit fittings.

N. Install raceway sealing fittings in accordance with the manufacturer's written instructions. Locate fittings at suitable, approved, accessible locations and fill them with UL listed sealing compound.

For concealed raceways, install each fitting in a flush metal box with a blank cover plate having a finish similar to that of adjacent plates or surfaces. Install raceway sealing fittings at the following points and elsewhere as indicated:

1. Where conduits enter or leave hazardous locations.

2. Where conduits enter or leave NEMA 4X areas.

3. Where required by the NEC.

O. Install electrical boxes in those locations which ensure ready accessibility to enclosed electrical wiring. Provide knockout closures to cap unused knockout holes where blanks have been removed.

P. Fasten electrical boxes firmly and rigidly to substrates or structural surfaces to which attached.

Q. Support exposed raceway within 1 foot of an unsupported box and access fittings. In horizontal runs, support at box and access fittings may be omitted where box or access fittings are independently supported and raceway terminals are not made with chase nipples or threadless box connectors.

R. Terminations: Where raceways are terminated with locknuts and bushings, align the raceway to enter squarely and install the locknuts with dished part against the box. Where terminating in threaded hubs, screw the raceway or fitting tight into the hub so the end bears against the wire protection shoulder. Where chase nipples are used, align the raceway so the coupling is square to the box and tighten the chase nipples so no threads are exposed.

S. Complete installation of electrical raceways before starting installation of conductors within raceways and prevent foreign matter from entering raceways by using temporary closure protection.

Cap spare conduit. Protect stub-ups from damage where conduits rise from floor slabs. Arrange so curved portion of bends is not visible above the finished slab.

16050-6

T. Install pull wires in empty raceways: Use No. 14 AWG zinc-coated steel or monofilament plastic line having not less than 200-pound tensile strength. Leave not less than 12 inches of slack at each end of the pull wire.

3.03 WIRE AND CABLE INSTALLATION

A. Use pulling means including fish tape, cable, rope, and basket weave wire/cable grips which will not damage cables or raceways. Pull conductors simultaneously where more than one is being installed in same raceway. Use UL listed pulling compound or lubricant where necessary.

B. Keep branch circuit conductor splices to minimum. Splice feeders only where indicated. Use a standard kit. No splices are allowed for instrument and telephone cables except at indicated splice points.

C. Install splice and tap connectors which possess equivalent or better mechanical strength and insulation rating than conductors being spliced. Use splice and tap connectors which are compatible with conductor material and are UL listed as pressure type connectors.

D. Provide adequate length of conductors within electrical enclosures and train conductors to terminal points with no excess. Bundle multiple conductors, with conductors larger than No. 10 AWG cabled in individual circuits. Make terminations so there is no bare conductor at terminal.

E. Terminate power conductors at equipment using pressure-type terminals specifically designed for type of terminations to be made. Terminate no more than 2 conductors No. 8 AWG and smaller within the same pressure-type terminal. These 2 conductors shall be no more than 4 wire gauge sizes apart. Terminate no more than 1 conductor larger than No. 8 AWG within any pressure-type terminal.

1. Exception: Power factor correction capacitor conductors may be terminated at the motor disconnect switch load terminals.

F. Seal wire and cable ends until ready to splice or terminate.

16050-7

3.04 CUTTING AND PATCHING

A. Perform cutting, fitting, and patching of electrical equipment and materials required to uncover Work to provide for installation of ill-timed Work, remove and replace Work that is either defective or does not conform to requirements of Drawings.

B. Cut, remove, and legally dispose of selected electrical equipment, components, and materials as indicated including, but not limited to, removal of electrical items indicated to be removed and items made obsolete by new Work. Protect structure, furnishings, finishes, and adjacent materials not indicated or scheduled to be removed. Provide and maintain temporary partitions or dust barriers adequate to prevent spread of dust and dirt to adjacent areas.

C. Patch existing finished surfaces using new materials matching existing materials.

3.05 EQUIPMENT CHECKOUT AND TESTING

A. In addition to testing recommended by equipment or material supplier and called for in equipment or material specification, perform the following.

B. Electrical contractor shall be on site to attend final station startup.

C. Equipment Testing: The following tests which are applicable for a particular item of equipment shall be performed:

1. After Work has been completed, demonstrate to OWNER's Representative that entire electrical installation is in proper working order and will perform functions for which it was designed by functional testing.

2. Make any specific tests required by the manufacturer's installation instructions.

D. Check-out Procedures. In general, check-out procedures (as listed below) which are applicable for a particular item of equipment shall be performed:

1. Vacuum interior of electrical equipment and remove foreign material.

2. Check and adjust time delay, under-voltage devices, phase relay, over-current relays, etc., as required by coordination study or ENGINEER.

3. Fill motor bearings requiring oil.

4. Check and change, as required, thermal overload heater elements to correspond with motor full-load current and service factors of installed motor.

5. Check direction of rotation of motors and reverse connections if necessary. Check rotation with motor mechanically uncoupled where reverse rotation could damage equipment.

6. Equipment with two or more sources of power connected by tie breakers, transfer switches, or generator receptacles shall be checked for rotation from each possible combination of power sources. Power sources must have the same phase sequence for each source throughout entire facility.

7. Check exposed bolted power connections for tightness.

8. Check operation of breakers, contactors, etc., and control and safety interlocks.

16050-8

9. Check tightness of bolted structural connections.

10. Check leveling and alignment of enclosures.

11. Check operating parts and linkages for lubrication, freedom from binding, vibration, etc.

12. Check tightness and correctness of control connections at terminal blocks, relays, meters, switches, etc.

13. Clean auxiliary contacts and exposed relay contacts after vacuuming.

16060-1

SECTION 16060

GROUNDING

PART 1 - GENERAL

1.01 SUMMARY

A. Section Includes: Electrical grounding and bonding Work as follows:

1. Solidly grounded.

B. Applications of electrical grounding and bonding Work in this Section:

1. Underground metal piping.

2. Underground metal water piping.

3. Electrical power systems.

4. Grounding electrodes.

5. Raceways.

6. Enclosures.

7. Equipment.

8. Lighting standards.

1.02 SUBMITTALS

A. Shop Drawings: Submit Shop Drawings covering the…