2-Addendum 1 S-LD-27009 final.pdf
PDF 165 KB Posted
- Solicitation number
- S-LD-27009
- Issued by
- Prince William County, Virginia
About this file
This addendum to RFP S-LD-27009 issued by Prince William County Public Schools (PWCS) Procurement Department provides clarifications and responses to inquiries regarding architectural and engineering services for the Elizabeth Vaughan Elementary School Additions and Renovation Project in Woodbridge, Virginia. The RFP, issued November 2, 2026, seeks a qualified A/E firm to assume construction administration and project completion responsibilities for an active construction project at an occupied elementary school. Sealed proposals are due November 12, 2026, at 2:00 p.m. ET. The selected A/E will inherit approximately 75 percent of remaining construction administration services upon Notice to Proceed, anticipated in January 2027. The project encompasses structural, mechanical, electrical, plumbing, fire protection, civil/site, stormwater, and technology work, with LEED Silver certification in progress. Services include construction administration, professional interpretation of Construction Documents, authorized design modifications and revisions, project closeout, and warranty-phase services extending 11 months beyond substantial completion.
Key clarifications provided in this addendum address project continuity, change-in-architect procedures requiring coordination with the PWCS Building Official and authorities having jurisdiction, and confirmation that current construction schedules and phasing plans will be provided to the selected firm for review and revision as necessary. The selected A/E will receive available construction documents and native Revit/CAD files in formats maintained by PWCS and the current project team. Regarding LEED Silver documentation, the selected firm will be responsible for completing remaining construction-phase documentation and coordinating certification submissions. Photovoltaic coordination may be required as applicable to project scope. No formal claims are known at this time, though any identified defective or nonconforming work will be addressed through established construction administration processes. Offerors must acknowledge receipt of this addendum with a signed acknowledgment included in their proposal submission.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 1-RFP S-LD-27009 Vaughan ES final.pdf | ||
| 3-Addendum 2 S-LD-27009 HH.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PROCUREMENT
P.O. BOX 389, MANASSAS, VA 20108 • WWW.PWCS.EDU/PURCHASING • 703.791.8743, FAX 703.791.7462
ADDENDUM # 1 DATE: November 5, 2026
REFERENCE: Request for Proposal: S-LD-27009 RFP Issue Date: November 2, 2026
Title: Elizabeth Vaughan Elementary School Architectural & Engineering Services for Construction Administration and Project Completion
Sealed Proposal Due Date: November 12, 2026, no later than 2:00 p.m. ET
All Offerors are advised of the following changes and clarifications in the referenced solicitation:
Questions & Responses:
1. Question: With award anticipated in January 2027, what percentage of construction administration is expected to remain at Notice to Proceed? (Is it 75%) Will the current A/E team members and its consultants continue services until the new A/E’s Notice to Proceed?
Response: PWCS anticipates that approximately 75% of contract administration services will remain at Notice to Proceed. This estimate is based on the current status of the project and may change as work progresses, including as additional design changes are identified and completed.
A/E services will continue as necessary to support progress and completion of the project. This RFP is being conducted through a competitive procurement process, and no determination has been made regarding the firm that will ultimately be awarded the contract. Accordingly, continuity or transition of A/E services will depend on the outcome of the procurement process.
2. Question: Has a change in architects been discussed with PWCS Building Officials? Is it known what will be required from them to process the change, including professionals of record and the Statement of Special Inspections?
Response: If there is a change in architects, PWCS will coordinate the change with the PWCS Building Official and other authorities having jurisdiction. The selected A/E will be responsible for providing the documentation required to establish or revise the applicable professionals of record and for coordinating any required updates to the Statement of Special Inspections. Specific submission requirements will be confirmed with the Building Official during the transition.
3. Question: Is there a current (and relevant) phasing plan and project schedule upon which the project will be performed? Or will the AE need to create these documents?
Response: A current construction schedule and phasing information are available and will be provided to the selected A/E. The selected A/E will be expected to review the existing schedule and phasing plan, advise PWCS regarding design, sequencing, phased occupancy, and continued school operations, and assist with revisions or updates as necessary to support completion of the project.
4. Question: Are there any known claims, or known nonconforming work?
Response: PWCS is not aware of any formal claims at this time. The project is under construction, and apparent defective or nonconforming work, if identified, will be addressed through the established construction administration process. Available project records concerning outstanding items will be provided to the selected A/E during transition.
PROCUREMENT
P.O. BOX 389, MANASSAS, VA 20108 • WWW.PWCS.EDU/PURCHASING • 703.791.8743, FAX 703.791.7462
5. Question: Are the current A/E and their consultants eligible to propose or serve on another offeror’s team?
Response: PWCS has not made an advanced determination regarding the eligibility or qualifications of any particular firm or subconsultant to participate in this procurement. We are not conducting a pre-qualification process prior to receipt of proposals. Consistent with the Virginia Public Procurement Act's declaration of intent that all qualified vendors have access to public business, the solicitation is open to all qualified firms wishing to submit a proposal. Proposals received will be evaluated in accordance with the requirements and criteria of the RFP and applicable law.
6. Question: Will the existing Revit/CAD files be provided in native format?
Response: PWCS will provide the selected A/E with the available Construction Documents and electronic design files prepared for the project, including available native Revit/CAD files. Files will be provided in the formats and software versions maintained by PWCS and the current project team.
7. Question: What is the status of LEED registration and documentation?
Response: The project is pursuing LEED Silver certification. Construction-phase LEED documentation is ongoing. The selected A/E will be responsible for completing the applicable remaining documentation and coordinating responses and submissions required to support certification.
8. Question: Is there any anticipated photovoltaic work?
Response: Photovoltaic-related coordination may be required as applicable to the project and the Construction Documents. The selected A/E should include coordination necessary to support the photovoltaic scope, including review of related submittals, RFIs, design coordination, and record documentation.
ALL OTHER SPECIFICATIONS, TERMS AND CONDITIONS REMAIN UNCHANGED.
A signed acknowledgment of this addendum must be received by the Procurement Department included in the Proposal on the due date and hour specified. Signature on this addendum does not constitute the Offeror’s signature on the original solicitation document. The original solicitation document shall also be signed.
Lesley Dean, VCO, VCA Senior Buyer
ACKNOWLEDGMENT:
Name of Firm Signature
Date Print Name and Title
END OF ADDENDUM #1