This is Addendum 1 to the bid solicitation for the Plaza Restoration at Norwalk Police Department, issued by the City of Norwalk Purchasing Department on March 6, 2026. The project involves restoration work at the Norwalk Police Department located at 1 Monroe Street, Norwalk, Connecticut, and includes installation of two new light poles to match existing specifications, curb cut improvements, brick sidewalk borders, and perimeter pavers. A pre-bid conference and walkthrough were held on March 4, 2026 at 10:00 AM at the project site, with an attendee sign-in sheet provided. The electronic bid deadline is 2:00 PM on March 18, 2026, and the hard copy deadline is 2:00 PM on March 20, 2026. The project is scheduled to begin on June 1, 2026, with a completion timeline of 60 calendar days.

Key clarifications provided in this addendum address site-specific requirements and technical specifications. Temporary containment is required only in the work area and staging area. The City will coordinate with the awarded contractor regarding material staging, laydown, and parking, including potential use of the bicycle/parking lane on Monroe Street. The new light poles must match existing specifications as detailed in the attached "SONO T.O.D. & CEDAR ST" Light Pole and Luminaire Specifications. Traffic control is not required, but site fencing is not mandated although recommended as best practice. Encroachment and right-of-way permits are required by the City for work impacting sidewalk access along South Main and Monroe Streets. The contractor should plan to work around the public and utilize the existing flagpole lighting circuit for the new light poles rather than installing entirely new electrical conduit and wiring. Detailed drawings for curb cuts, brick sidewalk borders, and light pole base details are provided as attachments to this addendum.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CITY OF NORWALK

PURCHASING DEPARTMENT

12272024

The bid listed below has had addenda issued. The document number to request will be the same as the project number indicated below.

Project # Addendum # # of Pages Original Issue Date

4495 1 6 02/26/2026

Addendum Issued Date 03/06/2026

Project Number 4495

Addenda Number 1

Electronic Deadline 2:00 PM 03/18/2026

Hard Copy Deadline 2:00 PM 03/20/2026

Project Title Plaza Restoration at Norwalk Police Department

This Addendum is a contract document modifying previously issued documents, which remain in full force except as specifically modified below.

Quotations appearing on the Proposal are to reflect the provisions of this Addendum. Failure to acknowledge receipt of this Addendum in the space provided on the response sheet may subject the candidate to disqualification.

NEW INFORMATION:

1. A pre-bid conference and walkthrough was held for this project at 10:00AM on 03/04/2026 at Norwalk Police Department, 1 Monroe St., Norwalk, CT. A copy of the sign-in sheet from that conference is attached to this addendum. [One (1) page]

2. Photos attached in this addendum, detail showing brick sidewalk border around light pole base.

RESPONSES TO SUBMITTED QUESTIONS

1 Question: Just inquiring about the Plaza Restoration At Norwalk Police

Department project. Will this be in an occupied space, and is there a callout for temporary containment for this job?

Response: Just in the work area and staging area

Page 1 of 6, Addendum 1 4495 - FINAL

CITY OF NORWALK

PURCHASING DEPARTMENT

12272024

RESPONSES TO SUBMITTED QUESTIONS

2 Question: Drawing A-1 indicates there are (2) new light ples required to match existing. Please provide product/specifications for this light pole.

Response: Please see the “SONO T.O.D. & CEDAR ST” Light pole and Luminaire specifications attached in this addendum.

3 Question: Access and phasing at main entrance Response: Please work around the public as best practice 4 Question: Please confirm if site fencing is required for the project.

Response: No but it’s not a bad idea 5 Question: Please confirm if traffic control is required for this project, if an

Owner allowance should be carried.

Response: Traffic control is not required.

6 Question: Please confirm if an Encroachment/ROW Permit is required for work impacting sidewalk access along S. Main, Monroe Street.

Response: Permits are required by the City 7 Question: Drawing A-1 references New City Standard Curb Cut. Can you please provide detail?

Response: Please see Curb Cut Out and Brick Sidewalk Border drawing attached in this addendum.

8 Question: Drawing A-1 references New City Standard Perimeter Pavers. Can you please provide specifications/details?

Response: Please see Curb Cut Out and Brick Sidewalk Border drawing attached in this addendum.

9 Question: Are there provisions made for material staging/laydown, parking? Is it possible to take over the Bicycle/Parking Lane on Monroe Street?

Response: Yes, The City will work it out with the awarded contractor 10 Question: Please provide project schedule, or anticipated start date/milestones/completion date.

Response: PROJECT SCHEDULE: Begin June 1, 2026 and to be completed in 60 calendar days.

11 Question: The note states "NEW LIGHT POLES TO MATCH EXISTING W/CONC

PEDESTALS AS REQ'D BY MFR. / CONNECT TO EXISTING CIRCUIT".

Is there any information on the existing light poles? Is the pedestal & base one unit? Is there any detail on the pedestal or base? Do we utilize the existing conduit and wiring for these lights, or do we have to install new back to some connection point?

Response: Please see the “SONO T.O.D. & CEDAR ST” Light pole and Luminaire specifications attached in this addendum. There is no electrical plans for the conduit. The City recommends using flag pole lighting circuit.

Page 2 of 6, Addendum 1 4495 - FINAL

"SONO T.O.D. & CEDAR ST"

Light Pole and Luminaire

Specifications

Page 3 of 6, Addendum 1 4495 - FINAL

Curb Cut Out and Brick Sidewalk Border

DRAWING

Page 4 of 6, Addendum 1 4495 - FINAL

PHOTOS

Detail Showing Brick Sidewalk Border Around Light Pole Base

Page 5 of 6, Addendum 1 4495 - FINAL

Page 6 of 6, Addendum 1 4495 - FINAL

Addendum 1 4495 DRAFT
Lighting 2
Curb Cut Out and Brick Sidewalk Border
Photos

File details come from the government source that posted it. Updated .