BR2026-1 Bonnybrook Trail Bridges Rehabilitation Project

This is a detailed engineering bid set and project specification document for the City of Norwalk, Connecticut, prepared by Weston & Sampson Engineers, Inc. for the bridge rehabilitation and preservation project at two bridge locations on Bonnybrook Trail: Bridge No. 102-025 (Bonnybrook Trail over Holy Ghost Fathers Brook) and Bridge No. 102-029 (Bonnybrook Trail over Holy Ghost Fathers Brook). The project encompasses comprehensive rehabilitation work including removal of existing cable guiderails and wood posts, repair and repointing of stone masonry headwalls, replacement of missing mortar and stones, concrete repair work, installation of steel-backed timber guiderails, riprap scour protection, water handling and sedimentation control measures, and roadway surface repairs. The final bid set was advertised on January 12, 2026, and includes detailed plan sheets, elevation drawings, water handling plans for staged construction, headwall elevations documenting existing conditions, and typical sections with miscellaneous construction details. The project incorporates phased water handling plans to manage the Holy Ghost Fathers Brook during construction, with cofferdams and sedimentation control systems shown on separate staging sheets for each bridge location.

The specifications include detailed requirements for steel-backed timber guiderail systems with W6x15 steel posts spaced at varying intervals depending on design deflection requirements, concrete repairs using partial depth repair methodologies, stone masonry repointing techniques, and riprap placement for scour areas with water depths up to 36 inches. Material standards referenced include ASTM specifications for steel bolts, galvanizing in accordance with ASTM A123 and A153, welding procedures conforming to AASHTO/AWS D1.5-2020 Bridge Welding Code, and structural steel fabricator certification through the AISC Certification Program. The project specifications address post foundation details, timber guiderail end anchorage systems, sedimentation and erosion control measures including silt fencing, catch basin inlet protection, and existing tree protection requirements. Optional foundation details and base plate configurations are provided for cases where timber rail spans across bridge culverts cannot be achieved. Construction notes indicate mandatory investigation of post locations for ledge presence and underground utilities prior to installation, with controlled low strength material (CLSM) backfill as an alternative to compacted granular fill.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DETAILED

ESTIMATE SHEET

DET-1

P:

\C

T\ No rw alk

\O n-

Ca ll D

PW

-2

3\E

NG

-3

6 B on ny br oo k B rid ge s\5 P ro jec t N am e C

AD

\N or wa lk

Bo nn yb ro ok B rid ge s.d wg

COPYRIGHT © 2023 WESTON & SAMPSON, INC.

Project:

www.westonandsampson.com Consultants:

Seal:

Revisions:

No. Date Description

Issued For:

Drawing Title:

Sheet Number:

Scale:

W&S File No.:

W&S Project No.:

Approved By:

Date:

Reviewed By:

Drawn By:

COA:

BRIDGE REHABILITATION

BONNYBROOK TRAIL OVER

HOLY GHOST FATHERS BROOK

NORWALK CT

BID SET

JANUARY 2026

ENG 23-3266

Weston & Sampson Engineers, Inc.

712 Brook Street

Rocky Hill, CT 06067

978.532.1900 800.SAMPSON

JR / BL

BM

BONNYBROOK T

RAIL

BONNYBROOK ROAD

PC STA 10+45.99

PT STA 11+26.93

PC STA 12+00.01

PT STA 12+88.77

+0

11+00

12+00

+0

+0

+3

N 30 ° 3

9'

" E

.99

N 69° 18' 07" E

73.08'

N

5°

7'

3" W

1.

L=80.94' R=120.00' Δ=38° 38' 47"

L=88.76' R=60.00' Δ=84° 45' 50"

W W

W W

GENERAL PLAN

EXIST. CONDITIONS

CS-1

BRIDGE NO. 102-025 (N-S10)

BRIDGE NO. 102-029

ORDINARY HIGH WATER

ORDINARY HIGH WATER

ORDINARY HIGH WATER

LIMIT OF EXIST. CABLE GUIDERAIL

(TO BE REMOVED)

BONNY BROOK

TRAIL

HOLY GHOST

FATHERS BROOK

OVERHEAD WIRES

TREE LOCATION

BASE FLOOD ELEVATION

PROPERTY LINE

EXISTING STONE WALL

EXISTING CABLE GUIDERAIL

OHW OHW

LEGEND

TIMBER GUIDERAIL

TIMBER GUIDERAIL

TIMBER GUIDERAIL

EXIST. CABLE GUIDERAIL

(TO BE REMOVED)

PLAN

FL

O

W

FLOW

FLOW

P:

\C

T\ No rw alk

\O n-

Ca ll D

PW

-2

3\E

NG

-3

6 B on ny br oo k B rid ge s\5 P ro jec t N am e C

AD

\N or wa lk

Bo nn yb ro ok B rid ge s.d wg

COPYRIGHT © 2023 WESTON & SAMPSON, INC.

Project:

www.westonandsampson.com Consultants:

Seal:

Revisions:

No. Date Description

Issued For:

Drawing Title:

Sheet Number:

Scale:

W&S File No.:

W&S Project No.:

Approved By:

Date:

Reviewed By:

Drawn By:

COA:

BRIDGE REHABILITATION

BONNYBROOK TRAIL OVER

HOLY GHOST FATHERS BROOK

NORWALK CT

BID SET

JANUARY 2026

ENG 23-3266

Weston & Sampson Engineers, Inc.

712 Brook Street

Rocky Hill, CT 06067

978.532.1900 800.SAMPSON

30" RCP

30" RCP

30" RCP

17'-6"L X 1/4"W

ROADWAY CRACK

FW ROADWAY X 1"W CRACK

FW ROADWAY X 1"W CRACK

ROADWAY

MAPCRACKING

UP TO 1"W

ROADWAY

MAPCRACKING

UP TO 1"W

POTHOLES

3'L X 8"W X 1"D

EXIST. 19 WOOD POSTS

WITH 2 STEEL CABLES

(TO BE REMOVED)

68 69

EDGE OF CHANNEL

EXIST. STONE WALL

13" DIA. X 1" DEEP

DEPRESSION FILLED

WITH DIRT

2'-0"±

(TYP.)

1'-6"±(TYP.)

EXIST. STEEL CABLE WITH

BURIED END TREATMENT

(TO BE REMOVED)

HO

LY G

HO

ST

FATHERS BRO

O

K

FLOW

PT STA 11+26.93

N

9°

8'

7" E

.0

8'

DRIVEWAY TO PRIVATE PROPERTY

+5

STEEL-BACKED TIMBER

GUIDERAIL SYSTEM

4'-6" (MIN.)

4'-6" (MIN.)

TOP OF MASONRY WALL

EL. 73.2

OHW

O H

W

OHW

O

HW

OHW

OHW

OHW

OHW

O H

W

ROW

ROW

W W

W W

W W

W

W

INSTALLATION OF POSTS AT 1' CLEAR

FROM THE 30" RCP SHALL BE

CAREFULLY DUG/DRILLED TO AVOID

CONFLICT WITH RCP

PLAN

BRIDGE NO.

102-025 (N-S10)

S-1

OVERHEAD WIRES

ORDINARY HIGH WATER

EXISTING STEEL CABLE

GUIDERAIL WITH WOOD

POSTS

OHW OHW

LEGEND

OHW

PLAN

FLOW

P:

\C

T\ No rw alk

\O n-

Ca ll D

PW

-2

3\E

NG

-3

6 B on ny br oo k B rid ge s\5 P ro jec t N am e C

AD

\N or wa lk

Bo nn yb ro ok B rid ge s.d wg

COPYRIGHT © 2023 WESTON & SAMPSON, INC.

Project:

www.westonandsampson.com Consultants:

Seal:

Revisions:

No. Date Description

Issued For:

Drawing Title:

Sheet Number:

Scale:

W&S File No.:

W&S Project No.:

Approved By:

Date:

Reviewed By:

Drawn By:

COA:

BRIDGE REHABILITATION

BONNYBROOK TRAIL OVER

HOLY GHOST FATHERS BROOK

NORWALK CT

BID SET

JANUARY 2026

ENG 23-3266

Weston & Sampson Engineers, Inc.

712 Brook Street

Rocky Hill, CT 06067

978.532.1900 800.SAMPSON

30" RCP

30" RCP

EXIST. 19 WOOD POSTS

WITH 2 STEEL CABLES

(TO BE REMOVED)

68 69

EDGE OF CHANNEL

EXIST. STONE WALL

2'-0"±

(TYP.)

1'-6"±(TYP.)

EXIST. STEEL CABLE WITH

BURIED END TREATMENT

(TO BE REMOVED)

2'

(TYP.)

2'

(TYP.)

HO

LY G

HO

ST

FATHERS BRO

O

K

PT STA 11+26.93

N

9°

8'

7" E

.0

8'

DRIVEWAY TO PRIVATE PROPERTY

+5

4'-6" (MIN.)

4'-6" (MIN.)

TOP OF MASONRY WALL

EL. 73.2

OHW

OHW

O H

W

OHW

O

HW

OHW

OHW

OHW

OHW

O H

W

W

W W

W W

W W

W

W

WATER HANDLING

PLAN STAGE 1

BRIDGE NO.

102-025 (N-S10)

S-2

OVERHEAD WIRES

ORDINARY HIGH WATER

COFFERDAMS

SEDIMENTATION CONTROL SYSTEM

PROPERTY LINE

OHW OHW

LEGEND

OHW

WATER HANDLING PLAN STAGE 1

FLOW

FLOWFLOW

P:

\C

T\ No rw alk

\O n-

Ca ll D

PW

-2

3\E

NG

-3

6 B on ny br oo k B rid ge s\5 P ro jec t N am e C

AD

\N or wa lk

Bo nn yb ro ok B rid ge s.d wg

COPYRIGHT © 2023 WESTON & SAMPSON, INC.

Project:

www.westonandsampson.com Consultants:

Seal:

Revisions:

No. Date Description

Issued For:

Drawing Title:

Sheet Number:

Scale:

W&S File No.:

W&S Project No.:

Approved By:

Date:

Reviewed By:

Drawn By:

COA:

BRIDGE REHABILITATION

BONNYBROOK TRAIL OVER

HOLY GHOST FATHERS BROOK

NORWALK CT

BID SET

JANUARY 2026

ENG 23-3266

Weston & Sampson Engineers, Inc.

712 Brook Street

Rocky Hill, CT 06067

978.532.1900 800.SAMPSON

30" RCP

30" RCP

EXIST. 19 WOOD POSTS

WITH 2 STEEL CABLES

(TO BE REMOVED)

68 69

FLO

W

EDGE OF CHANNEL

EXIST. STONE WALL

2'-0"±

(TYP.)

1'-6"±(TYP.)

EXIST. STEEL CABLE WITH

BURIED END TREATMENT

(TO BE REMOVED)

2'

(TYP.)

HO

LY G

HO

ST

FATHERS BRO

O

K

PT STA 11+26.93

N

9°

8'

7" E

.0

8'

DRIVEWAY TO PRIVATE PROPERTY

+5

4'-6" (MIN.)

4'-6" (MIN.)

TOP OF MASONRY WALL

EL. 73.2

OHW

OHW

O H

W

OHW

O

HW

OHW

OHW

OHW

OHW

O H

W

W

W W

W W

W W

W

W

WATER HANDLING

PLAN STAGE 2

BRIDGE NO.

102-025 (N-S10)

S-3

OVERHEAD WIRES

ORDINARY HIGH WATER

COFFERDAMS

SEDIMENTATION CONTROL SYSTEM

PROPERTY LINE

OHW OHW

LEGEND

OHW

WATER HANDLING PLAN STAGE 2

FLOW

FLOW

FLOW

P:

\C

T\ No rw alk

\O n-

Ca ll D

PW

-2

3\E

NG

-3

6 B on ny br oo k B rid ge s\5 P ro jec t N am e C

AD

\N or wa lk

Bo nn yb ro ok B rid ge s.d wg

COPYRIGHT © 2023 WESTON & SAMPSON, INC.

Project:

www.westonandsampson.com Consultants:

Seal:

Revisions:

No. Date Description

Issued For:

Drawing Title:

Sheet Number:

Scale:

W&S File No.:

W&S Project No.:

Approved By:

Date:

Reviewed By:

Drawn By:

COA:

BRIDGE REHABILITATION

BONNYBROOK TRAIL OVER

HOLY GHOST FATHERS BROOK

NORWALK CT

BID SET

JANUARY 2026

ENG 23-3266

Weston & Sampson Engineers, Inc.

712 Brook Street

Rocky Hill, CT 06067

978.532.1900 800.SAMPSON

12'-5" 6'-0"24'-0"

APPROX. STREAMBED

TOP OF WALL EL. 73.2

TOP OF WALL EL. 70.0±

TOP OF WALL EL. 71.0±

MINOR CONCRETE EDGE

SPALLING AT PIPE OPENING

DEBRIS AT PIPE OPENING

(TO BE REMOVED)

3' -4

CONCRETE HEADWALL

" 16

WOOD FORMWORK LEFT IN PLACE

(TO BE REMOVED)

MODERATE TO HEAVY EFFLORESCENCE

AT HEADWALL (REPOINT THE INTERFACE

BETWEEN STONE MASONRY AND

CONCRETE MASONRY)

INVERT. 67.50INVERT. 67.78INVERT. 67.90

WOOD FORMWORK LEFT IN PLACE

(TO BE REMOVED)

INVERT. 67.80

REPLACE MISSING MORTAR

REPLACE MISSING MORTAR

(TO BE REPOINTED)

2'L X 16" H X 7" DEEP MISSING STONE

8"L X 4"H X 12"D MISSING STONE

2"L X 6"H X 6"D MISSING STONE

(TO BE RECHINKED PRIOR TO

STONE MASONRY REPOINTING)

2 LF OF MISSING MORTAR

(TO BE REPOINTED)

12'-8"6'-6" 6'-6"

30" DIA.(TYP.)

INVERT. 67.54

INVERT. 67.51INVERT. 67.39INVERT. 67.50

" 17

7" UNDERMINING

OF PIPE

12'-6"±

TOP OF WALL EL. 70.0

4' -6

APPROXIMATE STREAMBED

EXIST. GRADE AT REAR OF WALL

REPLACE MISSING MORTAR

TOP OF WALL EL. 71.5

16'-9"±

2' -6

EXIST. GRADE

EXIST. GRADE AT

REAR OF WALL

REPLACE MISSING MORTAR

HEADWALL

ELEVATIONS

BRIDGE NO.

102-025 (N-S10)

S-4

SOUTH HEADWALL ELEVATION - DOWNSTREAM

NORTH HEADWALL ELEVATION - UPSTREAM NORTH HEADWALL ELEVATION - UPSTREAM

NORTH HEADWALL ELEVATION - UPSTREAM

P:

\C

T\ No rw alk

\O n-

Ca ll D

PW

-2

3\E

NG

-3

6 B on ny br oo k B rid ge s\5 P ro jec t N am e C

AD

\N or wa lk

Bo nn yb ro ok B rid ge s.d wg

COPYRIGHT © 2023 WESTON & SAMPSON, INC.

Project:

www.westonandsampson.com Consultants:

Seal:

Revisions:

No. Date Description

Issued For:

Drawing Title:

Sheet Number:

Scale:

W&S File No.:

W&S Project No.:

Approved By:

Date:

Reviewed By:

Drawn By:

COA:

BRIDGE REHABILITATION

BONNYBROOK TRAIL OVER

HOLY GHOST FATHERS BROOK

NORWALK CT

BID SET

JANUARY 2026

ENG 23-3266

Weston & Sampson Engineers, Inc.

712 Brook Street

Rocky Hill, CT 06067

978.532.1900 800.SAMPSON

FLOW

30" RCP

30" RCP

30" RCP

1'

FW ROADWAY X 1"W CRACK

FW ROADWAY X 1"W CRACK

ROADWAY

MAPCRACKING

UP TO 1" W

ROADWAY

MAPCRACKING

UP TO 1" W

748'±

10" DIA. X 2" DEEP

DEPRESSION AREA

HOLY GHOST

FATHERS BROOK

+0

+5

+0

O H

W

OHW

O H

W O

H

WOHW

OHW

OHW

OHW

OHW

OHW

OHW

OHW

OHW

INSTALLATION OF POSTS AT 1' CLEAR

FROM THE 30" RCP SHALL BE

CAREFULLY DUG/DRILLED TO AVOID

CONFLICT WITH RCP

W W

W W

W W

W W

PLAN

BRIDGE NO.

102-029

S-5

OVERHEAD WIRES

ORDINARY HIGH WATER

EXISTING STEEL CABLE

GUIDERAIL WITH WOOD

POSTS

TREE STUMP

TREE

OHW OHW

LEGEND

OHW

PLAN

FLOW

FLOW

P:

\C

T\ No rw alk

\O n-

Ca ll D

PW

-2

3\E

NG

-3

6 B on ny br oo k B rid ge s\5 P ro jec t N am e C

AD

\N or wa lk

Bo nn yb ro ok B rid ge s.d wg

COPYRIGHT © 2023 WESTON & SAMPSON, INC.

Project:

www.westonandsampson.com Consultants:

Seal:

Revisions:

No. Date Description

Issued For:

Drawing Title:

Sheet Number:

Scale:

W&S File No.:

W&S Project No.:

Approved By:

Date:

Reviewed By:

Drawn By:

COA:

BRIDGE REHABILITATION

BONNYBROOK TRAIL OVER

HOLY GHOST FATHERS BROOK

NORWALK CT

BID SET

JANUARY 2026

ENG 23-3266

Weston & Sampson Engineers, Inc.

712 Brook Street

Rocky Hill, CT 06067

978.532.1900 800.SAMPSON

30" RCP

30" RCP

1'

748'±

1' (T

YP.)

1' (TYP.)

FLOW

HOLY GHOST

FATHERS BROOK

+0

N

5°

7'

3" W

1.

+5

+0

O H

W

OHW

O H

W O

H

WOHW

OHW

OHW

OHW

OHW

OHW

OHW

OHW

OHW

OHW

W W

W W

W W

W W

W W

S-6

WATER HANDLING

PLAN STAGE 1

BRIDGE NO. 102-029

OVERHEAD WIRES

ORDINARY HIGH WATER

COFFERDAMS

SEDIMENTATION CONTROL SYSTEM

EXISTING GUIDERAIL

PROPERTY LINE

TREE STUMP

TREE

OHW OHW

LEGEND

OHW

WATER HANDLING PLAN STAGE 1

FLOW

FLOW

P:

\C

T\ No rw alk

\O n-

Ca ll D

PW

-2

3\E

NG

-3

6 B on ny br oo k B rid ge s\5 P ro jec t N am e C

AD

\N or wa lk

Bo nn yb ro ok B rid ge s.d wg

COPYRIGHT © 2023 WESTON & SAMPSON, INC.

Project:

www.westonandsampson.com Consultants:

Seal:

Revisions:

No. Date Description

Issued For:

Drawing Title:

Sheet Number:

Scale:

W&S File No.:

W&S Project No.:

Approved By:

Date:

Reviewed By:

Drawn By:

COA:

BRIDGE REHABILITATION

BONNYBROOK TRAIL OVER

HOLY GHOST FATHERS BROOK

NORWALK CT

BID SET

JANUARY 2026

ENG 23-3266

Weston & Sampson Engineers, Inc.

712 Brook Street

Rocky Hill, CT 06067

978.532.1900 800.SAMPSON

30" RCP

30" RCP

1'

748'±

1' (TYP.)1' (TYP.)

FLOW

HOLY GHOST

FATHERS BROOK

+0

N

5°

7'

3" W

1.

+5

+0

O H

W

OHW

O H

W O

H

WOHW

OHW

OHW

OHW

OHW

OHW

OHW

OHW

OHW

OHW

W W

W W

W W

W W

W W

WATER HANDLING

PLAN STAGE 2

BRIDGE NO. 102-029

S-7

OVERHEAD WIRES

ORDINARY HIGH WATER

COFFERDAMS

SEDIMENTATION CONTROL SYSTEM

PROPERTY LINE

TREE STUMP

TREE

OHW OHW

LEGEND

OHW

WATER HANDLING PLAN STAGE 2

FLOW

FLOW

FLOW

P:

\C

T\ No rw alk

\O n-

Ca ll D

PW

-2

3\E

NG

-3

6 B on ny br oo k B rid ge s\5 P ro jec t N am e C

AD

\N or wa lk

Bo nn yb ro ok B rid ge s.d wg

COPYRIGHT © 2023 WESTON & SAMPSON, INC.

Project:

www.westonandsampson.com Consultants:

Seal:

Revisions:

No. Date Description

Issued For:

Drawing Title:

Sheet Number:

Scale:

W&S File No.:

W&S Project No.:

Approved By:

Date:

Reviewed By:

Drawn By:

COA:

BRIDGE REHABILITATION

BONNYBROOK TRAIL OVER

HOLY GHOST FATHERS BROOK

NORWALK CT

BID SET

JANUARY 2026

ENG 23-3266

Weston & Sampson Engineers, Inc.

712 Brook Street

Rocky Hill, CT 06067

978.532.1900 800.SAMPSON

18'-6"

MEASURED ALONG FRONT FACE OF WALL

30" DIA.

12"L X 12"H X 4" D VOID

(SEE NOTE 2)

14"L X 3"H X 6" D VOID

(SEE NOTE 2)

3"L X 6"W X 5" D VOID

(SEE NOTE 2)

8"L X 1"H X 6"D VOID

(SEE NOTE 2)

2"L X 2"H X 3"D

(SEE NOTE 2)

9"L X 6"H X 1'-10"D VOID

(SEE NOTE 2)

1'L X 1'-4"W X 2'D

VOID WITH

MISSING STONE

10" APPROX. SCOUR DEPTHDEBRIS OBSTRUCTING

PIPE OPENING

TOP OF WALL EL. 75.18'±

4' -0

EXIST. GRADE AT REAR OF WALL

EXISTING CHAIN LINK FENCE

EXIST. GRADE

" 9" 6" 6"

6'-0"±

MEASURED ALONG FRONT FACE OF WALL

10"L X 2"H X 9"D VOID

(SEE NOTE 2)

8"L X 5"H X 10"D VOID

(SEE NOTE 2)

4'L X 2"H X 4"D VOID

(SEE NOTE 2)

6"L X 5"H X 5"D VOID

(SEE NOTE 2)

4' -0

4 1/2"L X 1 1/2"H X 3"D VOID

(SEE NOTE 2)

9"L X 2"H X 3"D VOID

(SEE NOTE 2)

12"L X 2"H X 3"D VOID

(SEE NOTE 2)

10"L X 16"W X 9"D

MISSING STONE (SEE NOTE 2)

4"L X 2"H X 14" D VOID

(SEE NOTE 2)

6"L X 6"H X 10"D VOID

BETWEEN PIPES

6"L X 6"H X 10"D VOID

BETWEEN PIPES

TOP OF WALL EL. 73.81'±

4' -0

" 9"

14'-0"±

MEASURED ALONG FRONT FACE OF WALL

4'-0"±

MEASURED ALONG FRONT FACE OF WALL

HEADWALL

ELEVATIONS

BRIDGE NO.

102-029

S-8

WEST HEADWALL ELEVATION - DOWNSTREAM

EAST HEADWALL ELEVATION - UPSTREAM

P:

\C

T\ No rw alk

\O n-

Ca ll D

PW

-2

3\E

NG

-3

6 B on ny br oo k B rid ge s\5 P ro jec t N am e C

AD

\N or wa lk

Bo nn yb ro ok B rid ge s.d wg

COPYRIGHT © 2023 WESTON & SAMPSON, INC.

Project:

www.westonandsampson.com Consultants:

Seal:

Revisions:

No. Date Description

Issued For:

Drawing Title:

Sheet Number:

Scale:

W&S File No.:

W&S Project No.:

Approved By:

Date:

Reviewed By:

Drawn By:

COA:

BRIDGE REHABILITATION

BONNYBROOK TRAIL OVER

HOLY GHOST FATHERS BROOK

NORWALK CT

BID SET

JANUARY 2026

ENG 23-3266

Weston & Sampson Engineers, Inc.

712 Brook Street

Rocky Hill, CT 06067

978.532.1900 800.SAMPSON

SCOUR AREA WITH WATER

DEPTH UP TO 36" DEEP

(TO BE FILLED WITH RIPRAP)

FLOW

SCOUR AREA WITH WATER

DEPTH UP TO 36" DEEP

(TO BE FILLED WITH RIPRAP)

FLOW

TYPICAL SECTIONS

AND MISC DETAILS

S-9

TYPICAL HEADWALL SECTION

STONE MASONRY REPOINTING DETAIL

TYPICAL CONCRETE REPAIR - PLAN VIEW

PARTIAL DEPTH REPAIR DETAIL

RIPRAP DETAIL

WATER HANDLING COFFERDAM

BRIDGE NO. 102-029 (N-S10)

TYPICAL ROADWAY SECTION

BRIDGE NO. 102-025 (N-S10)

TYPICAL ROADWAY SECTION

P:

\C

T\ No rw alk

\O n-

Ca ll D

PW

-2

3\E

NG

-3

6 B on ny br oo k B rid ge s\5 P ro jec t N am e C

AD

\N or wa lk

Bo nn yb ro ok B rid ge s.d wg

COPYRIGHT © 2023 WESTON & SAMPSON, INC.

Project:

www.westonandsampson.com Consultants:

Seal:

Revisions:

No. Date Description

Issued For:

Drawing Title:

Sheet Number:

Scale:

W&S File No.:

W&S Project No.:

Approved By:

Date:

Reviewed By:

Drawn By:

COA:

BRIDGE REHABILITATION

BONNYBROOK TRAIL OVER

HOLY GHOST FATHERS BROOK

NORWALK CT

BID SET

JANUARY 2026

ENG 23-3266

Weston & Sampson Engineers, Inc.

712 Brook Street

Rocky Hill, CT 06067

978.532.1900 800.SAMPSON

TYPICAL STEEL

BACKED TIMBER

GUIDERAIL

DETAILS

GR-1

SYSTEM 3 SYSTEM 2

System 3

System 2

Standard System

Standard System LArea Of Concern Plus 2 Posts (see sketch)

Min. Length Needed

Maximum Design

Deflection (ft)

1'

2' - 6''

4'

10' 10'

10'

50' 70'

70'

70'70'

60'

W6x15 Posts Spaced at

2'- 6''

W6x15 Posts Spaced at

5'

W6x15 Posts Spaced at

10'

TIMBER GUIDERAIL

DESIGN DEFLECTION CHART

POST INSTALLATION NOTES:

1. SEE SHEETS S-1 AND S-2 FOR TIMBER GUIDERAIL CONNECTION DETAILS

TO CONCRETE END BLOCK.

2. PRIOR TO GUIDERAIL POST INSTALLATION THE CONTRACTOR SHALL

INVESTIGATE POST LOCATIONS FOR THE PRESENCE AND DEPTH OF LEDGE

AND UNDERGROUND UTILITIES.

3. 20" DIA. EXCAVATED HOLE SHALL BE BACKFILLED WITH SUITABLE

MATERIAL, OR GRANULAR FILL COMPACTED IN 6" LIFTS BEFORE DRIVING POST

OR POSTS MAY BE SET IN EXCAVATED HOLE AND BACKFILLED WITH

CONTROLLED LOW STRENGTH MATERIAL (CLSM).

TOP OF SLOPE

DELINEATOR

DELINEATOR

SEE DETAIL "D"

6'

DIA. x 8'' ROUND

HEAD BOLT WITH HEX NUT

& WASHER (TYP.)

DIA. x 6'' ROUND

HEAD BOLT WITH HEX NUT

& WASHER (TYP.)

6'' x x 2'- 6''

STRAIGHT SPLICE PLATE

1''

3''

3''

1''

1''

1'' 1''

4'' 4''

W6 x 15 STEEL POST, 6' - 6'' LONG

4'' x 8'' x 11''

WOOD BLOCKOUT

2' - 6''

2''

1 ''

3'

2' - 6''

3'' 3'' 7�'' 3''

8"' x 11

4''

BOLT SLOTS (TYP.)

" x 2 "

BOLT SLOTS

7�'' 3'' 3''

1'' MIN.

EXPOSED

GALVANIZING

3''

1''

3''

1'' MIN.

EXPOSED

GALVANIZING

W6 x 15

STEEL POST

6'' x 12'' x 10'

ROUGH SAWN

TIMBER RAIL

'' DIA. HOLE (TYP.)

6'' x 12'' x 10'

ROUGH SAWN

TIMBER RAIL

TIMBER GUIDERAIL NOTES:

POST CONNECTIONPOST CONNECTION

A

DELINEATOR SEE NOTE 2,

TABLE 1 AND DETAIL D

STRAIGHT

SPLICE

PLATE

STEEL SPLICE PLATE DETAIL

6'' x 3/8'' x 2'- 6''

2'

- 6

(S

EE

N

O

TE

TIMBER GUIDERAIL AT SIDEWALK

2:1 MAX.

5. GUIDERAIL HEIGHT MAY VARY UP TO 2" PLUS OR MINUS THE HEIGHT SHOWN

IN THE DETAILS TO ACHIEVE A SMOOTH AND CONTINUOUS GUIDERAIL PROFILE.

6. 7'-6" LONG POSTS MAY BE USED IN LOCATIONS WHERE 2' MIN SHELF

IS NOT ATTAINABLE. GALVANIZED COATING LIMITS SHALL BE INCREASED BY

1'. PAYMENT FOR EXTRA LONG POSTS SHALL BE INCLUDED WITH THE ITEM

FOR TIMBER GUIDERAIL.

1. MATERIALS AND CONSTRUCTION OF THE TIMBER GUIDERAIL

SHALL CONFORM TO SPECIAL PROVISION PROVIDED WITH THE PROJECT.

2. DELINEATORS SHALL BE PLASTIC INVERTED T-SECTIONS IN ACCORDANCE

WITH DETAIL "D". REFLECTOR SPACING SHALL BE 50 FEET, AND POSITIONED

PERPENDICULAR TO THE ADJACENT EDGE OF LANE.

DO NOT ATTACH REFLECTORS ON FLARE OR TERMINAL SECTIONS. REFLECTIVE

SHEETING SHALL BE SILVER-WHITE ON ALL RAIL SECTIONS ADJACENT TO THE

RIGHT SHOULDER OF TRAVEL LANES. DELINEATORS SHALL BE INCLUDED IN THE

COST FOR "TIMBER GUIDERAIL."

3. TWO ADDITIONAL 5 8" DIA. X 4" LONG LAG SCREWS AND WASHERS

SHALL BE INSTALLED AT ALL MID-SPAN POINTS FOR STANDARD SYSTEMS.

4. ALL CONNECTION HARDWARE SHALL BE SUFFICIENTLY TIGHTENED TO

ACCOMMODATE FOR SHRINKAGE OF THE WOOD ELEMENTS.

2' (TYP.)

SEE NOTE 6

1 ''

6'

6'

3'' 3 "

4" DIA.

HOLES

POST DETAIL W6 X 15

WITH CURBING

2'-0"

UNCOATED

ASTM A 588

STEEL

4' - 6''

GALVANIZED IN

ACCORDANCE

WITH

ASTM A 123

SEE NOTE 6

CLEAR ZONE OFFSET

EDGE OF

PAVEMENT

a b

TOP OF FILL

SIDE SLOPE

GROUND

LINE

C

#4

#4

#4 (TYP.)

FULLY

GALVANIZED

POSTS

TIMBER RAIL

SEE DETAIL A

L

CLASS ''A''

CONCRETE

SLOPE 10:1 MAX.

PAY LIMIT

TIMBER GUIDERAIL

END ANCHORAGE 30'

2'

3' -4

" 6"

10'

(TYP.)

1 ''

3'' 3''

3'

5'

1' 1'

2'

'' DIA. HOLES FOR (4)

'' DIA. ROUND HEAD

BOLTS. TWO EXTRA SETS OF

HOLES FOR POSITIONING

TIMBER RAIL

ELEVATION

TIMBER GUIDERAIL END ANCHORAGE

DETAIL B

PLAN VIEW FOR ANCHOR

ELEVATION

ELEVATIONPLAN

PLAN

6'' x 12'' x 10'

TIMBER RAIL

3''(4) 1 ‚'' DIA

ANCHOR BOLTS

MIN. 1'-3''

INTO CONCRETE

WT 15 x 86.5

SEE DETAIL C

1'- 6''

2'-3''

3'' MIN.

COVER

3'

WT 15 x 86.5

SEE DETAIL C

(4) 11

4" DIA.

ANCHOR BOLTS

MIN. 1'-3''

INTO CONCRETE

(4) 3 4" DIA. x 8''

LONG ROUND HEAD BOLT

WITH NUT & WASHER (TYP.)

#4 (Typ.)

4" MIN.

DETAIL C

WT 15 x 86.5 (GALVANIZED)

END ANCHORAGE NOTES:

1. MATERIALS AND CONSTRUCTION OF THE TIMBER GUIDERAIL

END ANCHORS SHALL CONFORM TO THE SPECIAL PROVISIONS PROVIDED

WITH THE PROJECT. ALL HARDWARE IN CONTACT WITH THE GROUND

SHALL BE GALVANIZED IN ACCORDANCE WITH THE SPECIAL PROVISION.

2. BEGIN THE FLARE AT THE NEAREST POST TO A TRANSITION POINT

BETWEEN FILL AND CUT AS DIRECTED BY THE ENGINEER.

3. THE GUIDERAIL FLARE SHOWN ON THE PLAN SHEETS IS THE MINIMUM

LENGTH AND RATE REQUIRED AS DIRECTED BY THE ENGINEER.

FLARE THE GUIDERAIL SO THAT THE TERMINAL SECTION IS OUTSIDE THE

CLEAR ZONE.

SIDE VIEW FRONT VIEW

FRONT VIEW

ELEVATION

3'

1 ''

7 '' 7 ''

3 " 1 ''

1 ''

8 "

TYPE V

RETROREFLECTIVE

SHEETING

POLYURETHANE/VINYL

HINGE

2"

4"

3"

3"

‚" x " SLOT USE

(4) 1" LONG " DIA.

WOOD SCREWS FOR ATTACHING

DELINEATOR. SCREW SHALL BE

GALVANIZED AFTER FABRICATION

IN ACCORDANCE W/ ASTM A-153.

DELINEATOR

DETAIL D

REAR VIEW ELEVATION

DETAIL A

ELEVATION VIEW FOR END ANCHORAGE

N.T.S.

N.T.S.

N.T.S.

N.T.S.

N.T.S.

N.T.S.

N.T.S.

N.T.S.

N.T.S.

N.T.S.N.T.S.

TOP VIEW

FLARE LENGTH VARIES

(SEE NOTE 3)

SEE DETAIL B

NOTE: SEE PLAN SHEET FOR

FLARE RATE a:b

18"

P:

\C

T\ No rw alk

\O n-

Ca ll D

PW

-2

3\E

NG

-3

6 B on ny br oo k B rid ge s\5 P ro jec t N am e C

AD

\N or wa lk

Bo nn yb ro ok B rid ge s.d wg

COPYRIGHT © 2023 WESTON & SAMPSON, INC.

Project:

www.westonandsampson.com Consultants:

Seal:

Revisions:

No. Date Description

Issued For:

Drawing Title:

Sheet Number:

Scale:

W&S File No.:

W&S Project No.:

Approved By:

Date:

Reviewed By:

Drawn By:

COA:

BRIDGE REHABILITATION

BONNYBROOK TRAIL OVER

HOLY GHOST FATHERS BROOK

NORWALK CT

BID SET

JANUARY 2026

ENG 23-3266

Weston & Sampson Engineers, Inc.

712 Brook Street

Rocky Hill, CT 06067

978.532.1900 800.SAMPSON

POST FOUNDATION

DETAILS

(OPTIONAL)

GR-2

℄ 1" x 1 38"

SLOTTED HOLES

℄ 1" x 1 38"

SLOTTED HOLES

BASE PLATE DETAIL (OPTIONAL)

SCALE: 3" = 1'-0"

4" THICK

BASE PLATE

12"

8"

8"

STANDARD TIMBER GUIDERAIL

W6x15 STEEL POST

BACK FLANGE AND WEB

1/2

FRONT FLANGE

1/2

GENERAL NOTES

1. STEEL BACKED TIMBER GUIDERAIL FOUNDATION DETAIL IS OPTIONAL IF CONTRACTOR CANNOT FIND

TIMBER RAIL TO SPAN BETWEEN POST OVER BRIDGE CULVERT.

2. CONTRACTOR TO MODIFY TIMBER GUIDERAIL W6x15 STEEL POST AS SHOWN AND CAST IN PLACE A 2'x1.5' CONCRETE BLOCK TO ANCHOR THE POST AT THE LOCATION SHOWN.

3. WELDING DETAILS & NOTES -

3.1 WELDING DETAILS, PROCEDURES, AND TESTING METHODS SHALL CONFORM TO THE

AASHTO/AWS D1.5 - 2020 BRIDGE WELDING CODE, UNLESS OTHERWISE NOTED ON THE

PLANS.

3.2 ALL BOLTS SHALL MEET THE REQUIREMENTS OF ASTM A325 TYPE 1, EXCEPT AS NOTED

OTHERWISE. ALL NUTS SHALL MEET THE REQUIREMENTS OF ASTM A653 AND ALL WASHERS

SHALL MEET THE REQUIREMENTS OF OF ASTM F436. ALL BOLTS, NUTS, AND WASHERS

SHALL BE MECHANICALLY GALVANIZED IN ACCORDANCE WITH ASTM B695, CLASS 50.

3.3 FIELD SPLICES WILL NOT BE ALLOWED EXCEPT WITH THE WRITTEN PERMISSION OF THE

ENGINEER PRIOR TO THE SUBMISSION OF SHOP DRAWINGS. IF ALLOWED, THESE SPLICES

SHALL BE DESIGNED BY THE CONTRACTOR, AND APPROVED BY THE ENGINEER. THE COST

OF THESE SPLICES, INCLUDING THE COST OF DESIGN, SHALL BE AT NO EXTRA EXPENSE

TO THE CITY OF NORWALK.

3.4 ALL WEB TO FLANGE, WEB TO BEARING STIFFENER AND BEARING STIFFENER TO FLANGE

FILLET WELDS SHALL BE INSPECTED BY THE MAGNETIC PARTICLE METHOD.

3.5 MULTIPLE PASS WELDS, INSPECTED BY THE MAGNETIC PARTICLE METHOD SHALL HAVE

EACH PASS OR LAYER INSPECTED AND ACCEPTED BEFORE PROCEEDING TO THE NEXT

PASS OR LAYER, AS DETERMINED BY THE ENGINEER.

3.6 STRUCTURAL STEEL FABRICATORS SHALL BE CERTIFIED UNDER THE AISC CERTIFICATION

PROGRAM CATEGORY BRIDGE FABRICATOR SIMPLE (SBR).

4. NUTS FOR THREADED ANCHOR STUDS CONNECTING THE BASE PLATE TO THE CONCRETE SHALL

BE TIGHTENED TO A SNUG FIT AND GIVEN AN ADDITIONAL 18" TURN.

5. COST OF POST FOUNDATION SHALL BE INCLUDED UNDER ITEM "STEEL BACKED TIMBER GUIDERAIL".

6. CONCRETE TO BE CLASS PCC 04460.

TIMBER GUIDERAIL FOUNDATION DETAIL (OPTIONAL)

SCALE: 1-1/2" = 1'-0"

W6x15 POST

1'-6" x 1'-6"

CHAMFER CORNERS

(TYP.)

2' -0

"* REINFORCING CAPACITY SHALL

MEET OR EXCEED THAT SHOWN

6"

3"

8" THICK APPROVED

PREFORMED PAD

4" BASE PLATE

4" Ф A36 BOLTS (TYP.)

2' -6

6'' x 12'' TIMBER RAIL

WOOD BLOCK OUT

4" x 8" x 11"

4"

4 34"

6"

1 4"

3"

4 - #5

2" CLR. (TYP.)

#4@6" STIRRUPS

P:

\C

T\ No rw alk

\O n-

Ca ll D

PW

-2

3\E

NG

-3

6 B on ny br oo k B rid ge s\5 P ro jec t N am e C

AD

\N or wa lk

Bo nn yb ro ok B rid ge s.d wg

COPYRIGHT © 2023 WESTON & SAMPSON, INC.

Project:

www.westonandsampson.com Consultants:

Seal:

Revisions:

No. Date Description

Issued For:

Drawing Title:

Sheet Number:

Scale:

W&S File No.:

W&S Project No.:

Approved By:

Date:

Reviewed By:

Drawn By:

COA:

BRIDGE REHABILITATION

BONNYBROOK TRAIL OVER

HOLY GHOST FATHERS BROOK

NORWALK CT

BID SET

JANUARY 2026

ENG 23-3266

Weston & Sampson Engineers, Inc.

712 Brook Street

Rocky Hill, CT 06067

978.532.1900 800.SAMPSON

SEDIMENTATION

AND EROSION

CONTROL DETAILS

SD-1

SUPPORT NETTING

FABRIC

SEDIMENT CONTROL

DIRECTION OF FLOW

FABRIC

SUPPORT NETTING

SEDIMENT CONTROL

BACKFILL

DIRECTION OF FLOW

6"

6"

2' -6

1'

-4

1 1/2"x1 1/2" (MIN)

SEDIMENT CONTROL

SUPPORT NETTING

8'

SPACING BETWEEN

POSTS

POST COUPLER

BACKFILL

SECTION B-B ELEVATION

SECTION A-A

(SILT FENCE)

N.T.S.

FABRIC

2"

INTERMEDIATE POST

A

B

B

A

OAK POSTS

CATCH BASIN INLET PROTECTION

SIDE VIEW

GENERAL

SEDIMENTATION AND EROSION CONTROL DETAIL

EXISTING TREE PROTECTION

P:

\C

T\ No rw alk

\O n-

Ca ll D

PW

-2

3\E

NG

-3

6 B on ny br oo k B rid ge s\5 P ro jec t N am e C

AD

\N or wa lk

Bo nn yb ro ok B rid ge s.d wg

COPYRIGHT © 2023 WESTON & SAMPSON, INC.

Project:

www.westonandsampson.com Consultants:

Seal:

Revisions:

No. Date Description

Issued For:

Drawing Title:

Sheet Number:

Scale:

W&S File No.:

W&S Project No.:

Approved By:

Date:

Reviewed By:

Drawn By:

COA:

BRIDGE REHABILITATION

BONNYBROOK TRAIL OVER

HOLY GHOST FATHERS BROOK

NORWALK CT

BID SET

JANUARY 2026

ENG 23-3266

Weston & Sampson Engineers, Inc.

712 Brook Street

Rocky Hill, CT 06067

978.532.1900 800.SAMPSON

JR / BL

SIDE VIEW

Sheets and Views
Norwalk Bonnybrook Bridges-COVER
Norwalk Bonnybrook Bridges-DET-1
Norwalk Bonnybrook Bridges-CS-1 LOC MAP
Norwalk Bonnybrook Bridges-S-1
Norwalk Bonnybrook Bridges-S-2 WH
Norwalk Bonnybrook Bridges-S-3 WH
Norwalk Bonnybrook Bridges-S-4
Norwalk Bonnybrook Bridges-S-5
Norwalk Bonnybrook Bridges-S-6 WH
Norwalk Bonnybrook Bridges-S-7 WH
Norwalk Bonnybrook Bridges-S-8
Norwalk Bonnybrook Bridges-S-9
Norwalk Bonnybrook Bridges-GR-1
Norwalk Bonnybrook Bridges-GR-2
Norwalk Bonnybrook Bridges-SD-1