The document is a Request for Proposal (RFP) issued by the City of Norwalk Purchasing Department for Norwalk Public Schools, seeking to procure new band instruments for high school and middle school music programs. The project, identified as RFP #4471, aims to acquire a comprehensive range of musical instruments including marching band equipment, concert instruments, and accessories. The RFP was issued on 10/07/2025, with a question deadline of 10/17/2025 and electronic submission deadline of 10/28/2025 at 2:00 PM. The total project budget is $300,000, and the City reserves the right to award the contract to one or multiple vendors based on the best interests of the city.
The proposal requires detailed submissions including instrument specifications, vendor qualifications, references, and comprehensive insurance documentation. Bidders must provide unit pricing for each instrument across different schools, including items such as trumpets, saxophones, trombones, percussion equipment, and various accessories. The evaluation criteria will be weighted across qualifications and experience (20%), overall proposal impression (20%), additional considerations like interviews (10%), and cost proposal (50%). Vendors must demonstrate technical competence, provide service capabilities, and meet specific requirements such as instrument certification, delivery, installation, and potential repair/maintenance services within 48 hours.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 1-4471 NPS School Band bid list.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CITY OF NORWALK
PURCHASING DEPARTMENT
SEALED RFPS MUST BE RECEIVED BY THE OFFICE OF THE PURCHASING AGENT, 125 EAST AVENUE NORWALK, CT 06851
BY THE DATE AND TIME OF RFP OPENING
PROJECT NUMBER: 4471
REQUESTING DEPARTMENT: Norwalk Public Schools
DATE OF RFP ISSUANCE: 10/07/2025
TITLE OF RFP:
New Band Instruments for NPS High & Middle Schools
RFI/QUESTION DEADLINE: 2:00PM 10/17/2025
ELECTRONIC SUBMISSION DEADLINE: 2:00PM 10/28/2025
HARD COPY SUBMISSION DEADLINE: N/A
MANDATORY WALKTHROUGH:
DATE, TIME, AND LOCATION OF WALKTHROUGH
YES ( ) NO (X )
N/A
TIME/DATE OF RFP OPENING: 2:00 PM 10/28/2025
RFP DEPOSIT REQUIRED:
IF YES, AMOUNT REQUIRED
SUCCESSFUL BIDDERS ONLY:
PERFORMANCE & PAYMENT BOND REQUIRED:
IF YES, AMOUNT REQUIRED
SUCCESSFUL BIDDERS ONLY:
MAINTENANCE BOND REQUIRED:
YES ( ) NO ( X)
ALL TERMS AND CONDITIONS, SPECIFICATIONS AND BID FORMS ARE ATTACHED HERETO.
NOTE: THE FOLLOWING DOCUMENTS WILL BE REQUIRED FOR A BID TO BE COMPLIANT
1. BIDDER’S INFORMATION AND ACKNOWLEDGEMENT FORM
2. RFP FORMS, INCLUDING PRICING SHEETS AND ADDENDA ACKNOWLEDGMENT FORMS
3. EXCEPTIONS (IF ANY)
Page 1 of 48 4471 Norwalk Public School Band Instruments for High School and Middle School
NOTICE TO BIDDERS
1. ALL RFPS WILL BE OPENED PROMPTLY AT THE ADVERTISED TIME OF OPENING. THERE WILL BE NO DELAYS OR
POSTPONEMENTS WHICH ARE NOT PUBLICLY ADVERTISED. ANY RFP RECEIVED AFTER THE ADVERTISED TIME
OF OPENING WILL NOT BE ACCEPTED.
2. OBLIGATION OF BIDDERS:
a. AT THE TIME OF OPENING RFPS, EACH BIDDER SHALL BE PRESUMED TO HAVE INSPECTED THE SITES
AND TO HAVE MADE THEMSELVES THOROUGHLY FAMILIAR WITH THE PLANS AND CONTRACT
DOCUMENTS, INCLUDING ALL ADDENDA. THE FAILURE OR OMISSION OF ANY BIDDER TO RECEIVE OR
EXAMINE ANY FORM, INSTRUMENT OR DOCUMENT SHALL IN NO WAY RELIEVE ANY BIDDER FROM
ANY OBLIGATION IN RESPECT TO THEIR RFP.
b. EACH BIDDER MUST FULLY INFORM THEMSELVES OF THE CONDITONS RELATING TO THE WORK
WHICH WILL BE PERFORMED. FAILURE TO DO SO WILL NOT RELIEVE THE SUCCESSFUL BIDDER OF
THEIR OBLIGATION TO FURNISH ALL LABOR AND MATERIALS NECESSARY TO CARRY OUT THE
PROVISIONS OF THE CONTRACT DOCUMENTS AND TO COMPLETE THE CONTEMPLATED WORK. IN AS
MUCH AS POSSIBLE, THE CONTRACTOR MUST, IN CARRYING OUT THEIR WORK, EMPLOY SUCH MEANS
AND METHODS AS WILL NOT CAUSE ANY INTERRUPTIONS OR INTERFERENCE WITH THE WORK OF ANY
OTHER CONTRACTOR.
3. TIME IS OF THE ESSENCE (IF APPLICABLE):
a. IF THE PROJECT IS NOT COMPLETED BY THE DATE SPECIFIED AS THE SUBSTANTIAL COMPLETION DATE
IN THE CONTRACT ENTERED INTO BY THE CITY AND THE CONTRACTOR, THE CONTRACTOR WILL BE
SUBJECT TO CONSEQUENTIAL AND/OR LIQUIDATED DAMAGES.
Page 2 of 48 4471 Norwalk Public School Band Instruments for High School and Middle School
GENERAL INFORMATION
1. INTRODUCTION
The City of Norwalk - Norwalk Public Schools is requesting Proposals from reputable companies/dealers to purchase band instruments to support the Norwalk High School and Middle School band programs. The budget for this project is $300,000.00. The City and Norwalk Public Schools reserves the right to award one or multiple entities to fulfill the purpose of this Request for Proposal based upon best interest of the City.
The requirements of this project are outlined in greater detail under Section 2 Scope of Work/Project Specifications.
2. RFP DOCUMENTS
All RFP documents for this invitation are available over the internet at http://www.norwalkct.gov. Adobe Acrobat reader is required to view this document. If you do not have this software you may download it for free from Adobe.
3. ADDENDA
All addenda, if issued will be available over the internet at http://www.norwalkct.gov. We strongly suggest that you check for any addenda a minimum of forty-eight hours in advance of the RFP deadline. It is the responsibility of the bidder to check for issuance of any addenda.
4. BIDDER’S LIST
Bidder’s list for this solicitation will not be published.
5. QUESTIONS CONCERNING THIS RFP
All questions concerning this solicitation must be directed, via e-mail, to Chris McCauley, Purchasing Officer at cmccauley@norwalkct.gov. Please include the Project Number and Project Title in the subject line. The deadline for the submission of questions is 2:00 pm, October 17, 2025.
6. SUBMISSION OF RFP
The City of Norwalk requires electronic sealed submission for this project in the City of Norwalk’s BONFIRE portal (https://norwalkct.bonfirehub.com/portal/?tab=openOpportunities)
All sealed electronic submissions must be submitted in Bonfire no later than October 28, 2025, at 2:00PM.
7. SUMMARIES
Page 3 of 48 4471 Norwalk Public School Band Instruments for High School and Middle School http://www.norwalkct.gov/ http://www.norwalkct.gov/ mailto:cmccauley@norwalkct.gov https://norwalkct.bonfirehub.com/portal/?tab=openOpportunities
A list of the proposing firms will be available any time after 5:00 pm on the day of the RFP opening at Purchasing-Bid Postings. RFP results will not be provided over the phone.
SPECIAL NOTES:
1. Public Opening: Per the City of Norwalk Purchasing Guidelines, Bids shall be opened publicly by the Purchasing
Agent or his designee, in the presence of one or more witnesses at the time and place designated in the
Invitation for Bids. Receipt of Proposals: Proposals shall be opened so as to avoid disclosure of contents to competing proposers during the process of negotiation. A Register of Proposals shall be prepared in accordance with these Procurement Guidelines and shall be open for public inspection after contract award. If you wish to hear the bid/RFP opening, please join us through a teleconference.
Access Number: (866) 640-4044 or (678) 302-3554
Participant Code: 968 704
Page 4 of 48 4471 Norwalk Public School Band Instruments for High School and Middle School https://www.norwalkct.gov/Bids.aspx?CatID=showStatus&txtSort=Date&showAllBids=on&Status=open https://www.norwalkct.gov/DocumentCenter/View/334/City-Procurement-Guidelines?bidId=
SECTION 1 – RESPONSE FORMS
Page 5 of 48 4471 Norwalk Public School Band Instruments for High School and Middle School
PROPOSER’S INFORMATION AND ACKNOWLEDGMENT FORM
Proposer’s Name
Street Address
City State Zip
Business Telephone:
Email Address:
Printed Name and Title of Individual Submitting Proposal
The undersigned acknowledges that the terms, conditions and specifications of this RFP are understood and unconditionally accepted.
Signature Date
Page 6 of 48 4471 Norwalk Public School Band Instruments for High School and Middle School
Exceptions: Note any vendor(s) responding to this proposal shall indicate any/all exceptions (if any) taken to language in this proposal. BIDDERS MAY NOT TAKE EXCEPTION TO SUBSTANTIVE TERMS OF STANDARD
CONTRACT FORMS PROVIDED IN THE RFP/RFQ/ITB. Exceptions must be declared below in order to be considered by the City:
Page 7 of 48 4471 Norwalk Public School Band Instruments for High School and Middle School
1.1 PROPOSAL RESPONSE FORM
Vendor Name -
Address -
Phone - Fax -
Email -
Manager -
Fed ID#
The undersigned hereby declares that they have carefully examined the plans, specifications and project sites and has satisfied themselves as to all the quantities and conditions and understands that in signing this proposal they waives all right to plead any misunderstanding regarding the same.
The undersigned further understands and agrees that they will furnish and provide all the necessary material, machinery, implements, tools, labor, services, and other items of whatever nature, and to do and perform all the work necessary under the aforesaid conditions, to carry out the contract and to accept in full compensation therefore the amount of the contract as agreed to by the Contractor and the City.
It is further understood and agreed that all information included in, attached to, or required by the Request for Proposal shall be public record upon delivery to the City.
A. PROPOSED FEES -Attached Exhibit A Excel Bid Table or Bid Table in Bonfire must be completed
Total Lump Sum Fee per attached Bid List
Total Lump Sum Fee in Writing
2. Service –
a) Location of Service Center:
b.) Service Department Coverage: Please indicate the days and hours open and list holidays this Department is closed:
Page 8 of 48 4471 Norwalk Public School Band Instruments for High School and Middle School c.) Response time to a call if instrument needs to be fixed:
d.) Please provide information on how your firm services or repairs the instruments. Also, provide information on if the repair takes longer than forty-eight (48) hours:
e.) Please state repair charges as well as turnaround time for such repairs (if necessary, use a separate sheet of paper):
f.) Please List Organizations Vendor Currently Services:
Page 9 of 48 4471 Norwalk Public School Band Instruments for High School and Middle School g.) Does Vendor provide annual maintenance for the Instruments or is it included in warranty, If extra cost, please state the charges:
h.) Warranties - Include any and all warranty information with your offer:
i.) Attach any additional information that demonstrates your qualification for this work including appropriate certifications.
B. CERTIFICATION
Submitted By: Signature:
Authorized Agent of Company (Name & Title):
Date:
C. The above signatory acknowledges receipt of the following addenda issued during the bidding period and understands that they are a part of the bidding documents (if applicable):
Addendum # Dated Addendum # Dated
Addendum # Dated Addendum # Dated
Page 10 of 48 4471 Norwalk Public School Band Instruments for High School and Middle School
1.2 STATEMENT OF QUALIFICATIONS
Please answer the following questions regarding your company's past performance. Failure to reply to this instruction may be regarded as justification for rejecting a bid.
1. Number of years in business:
2. Number of personnel employed: Part Time Full Time
3. List six contracts of this type/size your firm has completed within the last four years:
Project Date Contact Person Phone No.
4. SUBCONTRACTORS: If subcontractors are to be used, please list firm name, address, name of principal, and phone number below or on a separate sheet. Also indicate portion or section of work subcontractor will be performing.
COMPANY NAME ADDRESS PRINCIPAL PHONE PORTION/SECTION
OF WORK
Page 11 of 48 4471 Norwalk Public School Band Instruments for High School and Middle School
5. ORGANIZATIONAL
STRUCTURE OF
BIDDER (check which applies) general partnership limited partnership limited liability corporation limited liability partnership corporation doing business under a trade name individual doing business under a trade name other (specify)
6. STATUS OF THE
BUSINESS AND ITS
CURRENT STANDING
WITH THE SECRETARY
OF STATE'S OFFICE; e.g., are all required filings current and in good standing or has the entity been withdrawn or canceled
Connecticut corporations - Will the
Secretary of State be able to issue a
Certificate of Good Standing within 30 days of the bid opening?
Yes No
Out-of -State corporations - Do you have a valid license to do business in the State of
Connecticut? (Evidence in the form of a
Certificate of Authority from the
Connecticut Secretary of State will be required within 30 days of the bid opening.)
Yes No
7. CT eLICENSE (https://www.elicense.ct.gov ) / Business Registration (https://business.ct.gov/?language=en_US) :
8. Is your local organization an affiliate of a parent company? If so, Indicate the principal place of business of your company and the name of the agent for service if different from what has been indicated on the response form:
Business
Name
Address
City. State
& Zip
Name of
Agent
Page 12 of 48 4471 Norwalk Public School Band Instruments for High School and Middle School https://www.elicense.ct.gov/ https://business.ct.gov/?language=en_US
NOTE: In the case of a Limited Liability Corporation or a Limited Liability Partnership a certified copy of the Articles of
Organization certified as valid and in effect as of the date of the bid opening will be required within 30 days of the bid opening. A listing of the corporate officers, in the case of a corporation; the general or managing partners, in the case of a partnership; or the managers and members in the case of either a limited liability partnership or company will be required within 30 days of the bid opening.
9. Your company may be asked to submit the following information relative to your company's financial statements prior to receiving an award. This information will not be part of the public bidding record and will remain confidential.
All information should be supported with appropriate audited financials
a. Book Value (Total Assets (-) Total Liabilities)
b. Working Capital (Current Assets (-) Current Liabilities
c. Current Ratio (Current Assets/Current Liabilities)
d. Debt to Equity Ratio (Long Term Debt/Shareholder's Equity)
e. Return on Assets (Net Income/Total Assets)
f. Return on Equity (Net Income/Shareholder's Equity)
g. Return on Invested Capital (Net Income/Long Term Debt = Shareholders' Equity)
All responses to this questionnaire are understood to be proprietary to the vendor, and will be considered confidential.
Additional information may be requested subsequent to your responding to this bid request.
1.3 CITY OF NORWALK VENDOR RECORDS
If you have not done business with the City of Norwalk as a vendor, your business information needs updating or your
City of Norwalk vendor record has not been updated over three (3) years. Please complete and include the latest version of Internal Revenue Service (IRS) W-9 Form with your submission. Here is the URL to the IRS website:
https://www.irs.gov/forms-pubs/about-form-w-9
1.4 INSURANCE
Insurance Agency Name: Tel:
Agency Address: Email:
1.5 CITY OF NORWALK VENDOR QUESTIONNAIRE – IT INFORMATION SECURITY
Page 13 of 48 4471 Norwalk Public School Band Instruments for High School and Middle School https://www.irs.gov/forms-pubs/about-form-w-9
City of Norwalk Vendor Questionnaire
IT Information Security
Rev 8.4.22
1. Third-Party Contact Information (please provide the POC for follow-up questions to this questionnaire):
Vendor Name, Address, Point-of-Contact Name, Phone Number and Email
2. Description of Services/Products: Please provide a detailed description of services/products your organization aims to provide to the City?
3. System and Equipment Access: Will your organization use your own systems and equipment to perform the services, or will your organization need access to the City’s systems, equipment and network? (Yes or
No, If Yes, please explain)
YES ☐ NO ☐
4. Description of Data: Are you using data from the City in order provide the services/product to the City
(Yes or No, if Yes proceed to 3.1)
a. What data is needed to provide the services/products to the City?
Example: Name, Social Security Number, Trade Information, Source Code, Payroll or Accounts Payable data, student or patient data, Law Enforcement data, any Personally Identifiable Information (PII), etc.
Page 14 of 48 4471 Norwalk Public School Band Instruments for High School and Middle School
If your answers to Questions 3 and 4 are BOTH “NO”, thank you for completing the IT
Information Security Questionnaire.
If one or both questions are “YES”, please complete the remaining questions.
5. Office Locations: How many office locations does your organization have? Please include the locations of your organization.
6. Data Center Locations: How many data centers does your organization utilize to provide services/products to the City? Please include the locations of the data centers utilized by your organization.
7. Business Entity: What is your business entity type?
*Example: Sole Proprietorship, Partnership, C Corporation, S Corporation, Limited Liability Corporation (LLC), Limited Liability Partnership (LLP)
8. How many employees and contingent workers do you have in your organization?
1-10 ☐ 10-50 ☐ 50-100 ☐ 100-500 ☐ 500-1000 ☐ 1000 or more ☐
9. Physical Access: Does your organization need to be onsite or offsite to provide services/products to the City?
Page 15 of 48 4471 Norwalk Public School Band Instruments for High School and Middle School
10. Access to Data: How is your organization accessing City data?
*Example: Is the data supposed to be sent to your organization via email or will the data need to be uploaded to an application?
*Note: For third-parties that are providing an application to perform the services, please specify whether the application will be an internally hosted solution, cloud-based solution (i.e. SaaS, IaaS, PaaS), or a traditional web-based application (i.e. eBay, WebEx, online banking application)
11. Data Storage: Does your organization outsource data storage or does your organization utilize its own databases to store data? Does your organization store data outside of the United States?
YES ☐ NO ☐
12. Segregation of Data: Does your organization’s database structure allow segregation of sensitive client data?
YES ☐ NO ☐
13. Independent Attestations: Does your organization have independent attestations such as (i.e. ISO 27001, SSAE-18 SOC-1, SOC-2, PCI- DSS, ISO 9001)?
Page 16 of 48 4471 Norwalk Public School Band Instruments for High School and Middle School
14. Information Security
a. Does your organization have written information security policies and procedures (WISP)?
b. How often are the information security policies and procedures reviewed and updated?
c. Who in the organization is responsible for reviewing and updating the information security policies and procedures?
d. Does your organization have privacy policies and procedures?
e. How often are the privacy policies and procedures updated?
f. Who in the organization is responsible for reviewing and updating the privacy policies and
g. What methods of encryption are utilized for data at rest and in transit?
Page 17 of 48 4471 Norwalk Public School Band Instruments for High School and Middle School
h. Are the encryption methods utilized FIPS 140-2 approved?
i. Does your organization utilize firewalls to filter incoming data and information from the internet into your company network?
j. Does your organization perform penetration testing at least once per year to determine if unauthorized access to the computer network and malicious activity is possible externally?
k. Does your organization perform vulnerability testing at least once per year in order to identify vulnerabilities within the internal network?
l. Does your organization perform background checks on employees and contingent workers prior to onboarding them? Describe the nature of these background checks (i.e., criminal, credit, international, etc.).
Page 18 of 48 4471 Norwalk Public School Band Instruments for High School and Middle School
m. Does your organization utilize multi-factor authentication?
n. Does your organization utilize scan cards or biometric scans to grant employees and contingent workers access to the building and data centers where data is stored?
o. If offering a technology product, does the organization utilize software development life cycle (SDLC) or
Agile to build and maintain technological product?
p. Does the technological product undergo information security testing and quality assurance testing prior to deployment?
q. Does the Vendor provide annual Cybersecurity Awareness training to their employee?
Page 19 of 48 4471 Norwalk Public School Band Instruments for High School and Middle School
r. Does the Vendor provide annual phishing simulations for their employee?
s. Have users been educated on how to report suspected security violations or vulnerabilities?
t. Does the Vendor have an employee identified as the Chief Information Security Officer?
u. Are all the Vendor laptops encrypted?
v. Are all Vendor computers (workstations, notebooks) required to join the Company’s domain and receive Group Policies?
w. Does the Vendor meet the NIST 800-63 password guidelines?
Page 20 of 48 4471 Norwalk Public School Band Instruments for High School and Middle School
15. Risk Management
a. Does your organization have an enterprise risk management framework implemented at your organization?
b. Does your organization have documented enterprise risk management policies and procedures?
c. Who in the organization is responsible for reviewing the enterprise risk management policies and
d. Does your organization utilize an outside third-party to provide services/products to the client?
e. Does your organization have a third-party risk management program (TPRM)?
Page 21 of 48 4471 Norwalk Public School Band Instruments for High School and Middle School
f. Does your organization include right-to audit clauses in contracts with third parties?
g. Does your organization have a certificate of insurance (COI)? Please attach a copy of your COI.
Business Continuity/Disaster Recovery
a. Does your organization have a business continuity plan?
b. How often is the business continuity plan updated?
c. Does your organization conduct business continuity tests once per year?
Page 22 of 48 4471 Norwalk Public School Band Instruments for High School and Middle School
d. Does your organization have a disaster recovery plan?
e. How often is the disaster recovery plan updated?
f. Does your organization conduct disaster recovery tests once per year?
g. Does your organization have business continuity and/or disaster recovery sites?
h. Are the business continuity/disaster recovery sites located in the United States or outside the
United States? Please include the locations of business continuity/disaster recovery sites?
Page 23 of 48 4471 Norwalk Public School Band Instruments for High School and Middle School
SECTION 2 – SCOPE OF WORK / PROJECT SPECIFICATIONS
Page 24 of 48 4471 Norwalk Public School Band Instruments for High School and Middle School
2.1 Introduction
The City of Norwalk - Norwalk Public Schools is requesting proposals from reputable companies/dealers to purchase New instruments and Equipment for High School and Middle School Programs. The awarded Vendor/s will need to supply and deliver instruments to that school. The Instruments/Equipment shall be certified new and unused.
Bid price must include inside delivery and all other freight charges and fees. All equipment supplied must be tested and verified to function properly and be defect free.
Turn around services for repairs or maintenance should be completed within forty-eight (48) hours or a loaner should be provided.
Based upon pricing delivery service and warranty, City and Norwalk Public Schools reserve the right to award to multiple vendors in best interests of City.
2.2 Scope of Services
Brand Instruments Specifications
a. Specifications:
Whenever a particular brand of an item is shown or specified, such items shall be regarded as the exact instrument and comply to the statements listed below:
1. All instruments must be certified new.
2. All instruments must be inspected by a certified repair technician, as well as play tested by an employee of the selected Vendor.
3. All instruments must be hand-delivered, assembled, and installed at the delivery location indicated in section 2.2 by an employee of the selected Vendor. For term of this agreement, “installed” shall be defined has having the instrument in playing condition and useable on arrival.
4. All items of purchase (material, equipment, construction methods and services) shall conform to the provisions of the State of Connecticut Occupational Safety and Health Act or they shall be returned, at the expense of the Vendor, for a full refund of the actual purchase price.
b. Substitutions: The specification specified herein is preferred by the City of Norwalk; however, substitution of an alternate will be considered. If an alternate is offered, the Vendor shall provide documentation as to why and how the offered alternate meets or exceeds specification. The burden of proof as to whether the alternate meets or exceeds specification shall lie with the vendor. The vendor understands and agrees that the City reserves the sole and final right to determine where alternate specification is equivalent to and meet indicated standards of quality.
If an alternate is offered, the bid submission must include the following, in this order:
Page 25 of 48 4471 Norwalk Public School Band Instruments for High School and Middle School
1. Proposed Instrument
2. size (if available)
3. level (if available)
4. Material (if available)
5. Brand
6. Model
7. Indicate/demonstrate how and why the offered alternate meets or exceeds the
8. Specification
2.3 Proposal Submission Format
Proposals should put forth full, accurate, and complete but concise information as required by this request. The City shall not be liable for costs incurred in the preparation of the response to this RFP or in connection with any presentation before a Selection Committee.
Firms should create their submissions in 8½” x 11” document size using a minimum 12-point font size, double sided, include page numbers and any blank pages must be watermarked “Intentionally Left Blank”. Proposals should be prepared simply and economically, providing a straightforward, concise description of the applicant's ability to meet the requirements of the RFP. Emphasis should be on completeness and clarity of content.
The City reserves the right to reject proposals/parts thereof or to solicit new proposal and award contracts as it deems tin its best interest. All proposals will remain property of the City. It is further understood and agreed that all information included in, attached to, or required by the Request for Proposal shall be public record upon delivery to the
City.
To enable the City to compare the proposals received we ask that your proposal include the information specified below, the sequence listed, with each section of your proposal numbered to correspond to the numbers sequenced below.
Request for Proposal (RFP) shall include the following, in this order:
1. Section 1-Executive Summary: Provide a brief history of your firm, company structure, and identify key qualities or services provided that distinguishes your firm from other firms. This section shall include a concise statement of the vendor's approach to the project and a summary of the vendor's ability to provide the required instruments and services. Also include in this section include the Name and address of firm(s) and identification and contact information of the Project Lead.
2. Section 2-Project Team Organization and Staffing: Identification of Project Manager and all other team members
– as well as any subcontractors to this project – and assigned duties, including a percentage breakdown of personnel hours and associated costs.
Page 26 of 48 4471 Norwalk Public School Band Instruments for High School and Middle School
The City reserves the right to interview and specify key staff members on this project.
3. Section 3-Project Approach: A clear description of how your firm would complete this project, including scope and methodology. This section shall also include the following:
- A detailed Work Plan Schedule, including estimated completion times for each milestone, allocated staff time per phase, and an overall timeframe for completion of project.
4. Section 4-References/Statement of Qualifications: Provide four (4) most recent current or previous government clients in which your firm provides the same size and scope of services requested by the City. Highlight how it’s directly related to City of Norwalk. The City, at its discretion may check references in order to determine the Offeror’s experience and ability to provide services described in the Scope of Work. All client reference information must be documented and verifiable. Reference contacts must be aware that they are being used as a reference and agreeable to City interview for follow up. References shall include the following, in this order:
a. Client/Agency Name
b. Contact Name and Title (project manager role preferred), Telephone, and Email
c. Number of Projects Completed for Client/Agency
d. Project Names
e. Project Descriptions
f. Project Approach and Methodology
g. Year of Project and Length of Project
h. Project Budgets and Final Invoiced Amount
i. Contractor Personnel Assigned to Project and Project Role
5. Section 5-Other Information: Provide any other information that you believe will assist the City of Norwalk in making its selection. Such information may be in this section of your proposal
6. Section 6-Forms: Fully Completed Section 1 – Response Forms, Exhibit 1 Excel sheet or Bonfire Bid Table
2.4 Selection Process
If necessary, proposals will be initially reviewed by a Selection Committee. The Selection Committee may select the two or three firms that best meet the City’s requirements. These firms will then be invited to represent their proposals to and respond to questions from the Selection Committee.
Following this selection process, the Selection Committee will make a recommendation to the Common
Council Committee. Approval to enter into a contract has to be authorized by the Norwalk Common Council.
The City of Norwalk reserves the right to reject any and all proposals submitted, to request additional information from all proposers and to negotiate with one or more of the finalists regarding the terms of this engagement. The City of Norwalk also reserves the right to retain the proposals, use any ideas contained in the proposals and is not obligated in any manner to reimburse the proposers for the costs incurred in connection with responding to this Request for Proposals.
The Selection Committee intends to recommend the firm that, in its opinion, best meets the City’s needs, not necessarily the firm with the lowest fees.
The anticipated selection schedule is as follows:
Page 27 of 48 4471 Norwalk Public School Band Instruments for High School and Middle School
Common Council Committee Review November 2025
Common Council Review November 2025
2.5 Criteria for Evaluating Proposal Submissions
The City of Norwalk shall be responsible for reviewing the proposals received and will further evaluate them, using the following criteria. The City reserves its rights to examine any other criteria and take the same under consideration and to reject any firm or proposals despite its compliance with these criteria if it determines that to do so would be in its best interests.
Criteria Weight
Qualifications and Experience:
• Respondent must demonstrate adequate experience in the following areas:
qualification, general experience and technical competence of the project team
• Experience, resources, and technical expertise with similar type/size project
• Feedback from References with projects similar in size & scope
20%
Overall Impression of Proposal
• Organization, clarity, conciseness, and thoroughness.
• Approach to the scope of services and statement of works
• Proposed delievry schedule
• Service
• Warranty
20%
Additional Considerations (applicable only when not in conflict with state or federal guidelines)
• Interview/Presentation 10%
Cost Proposal:
Cost proposal should include any payment schedule setting forth the frequency and amount of progress payments and identifying the tasks and deliverables (“milestones”) to be completed for each payment to be deemed earned.
50%
Total Possible Points 100
2.6 Prime Proposer Responsibility
Firm’s submitting proposals to this RFP may utilize the services of subcontractors. If subcontractors are planned to be used, this should be clearly explained in the proposal. The prime proposer will be responsible for the entire contract performance whether or not subcontractor is to perform.
Page 28 of 48 4471 Norwalk Public School Band Instruments for High School and Middle School
All corporate information required in this RFP must be included for each proposed subcontractor. The proposal must also include copies of any agreements to be executed between the prime proposer and any subcontractors in the event of contract award. Under this RFP, the City of Norwalk retains the right to approve all subcontractors.
2.7 Key Personnel
The personnel and commitments identified on any proposer’s proposal will be considered essential to the work to be performed under this RFP. Prior to diverting any of the specified individuals to other programs or changing the level of effort of the specified individuals, the proposer must notify the City of Norwalk fourteen (14) days in advance and will be required to submit justification, including proposed substitutions, in sufficient detail, to permit evaluation of the impact on the project. The proposer will make no deviation without the prior written consent of the City of Norwalk.
Replacement of personnel will be with personnel or equal ability and qualifications.
Any employee of the proposer, who in the sole opinion of the City of Norwalk is unacceptable, shall be removed from the project pursuant to the request of City of Norwalk. The proposer will have Fourteen (14) Days to fill the vacancy with another employee of acceptable technical experience and skills subject to the written approval of the City of
Norwalk.
2.8 Availability of Funds
The contract award under this RFP is contingent upon the availability of funds to the City of Norwalk for this project. In the event that funds are not available, any contract resulting from this RFP will become void and of no force and effect.
2.9 Payment & Invoices
The proposer will bill the City of Norwalk based on the submission of monthly invoices in a format to be determined by the City.
2.10 Termination for Default or for the Convenience of the Contracting Agency Performance under this contract resulting from this RFP may be terminated by the City of Norwalk whenever;
The proposer, in the sole opinion of the City, is in default in the performance of the contract and shall fail to correct such default within the period specified by the contracting officer in a notice specifying default; or the contracting officer shall determine that termination is the best interest of the City of Norwalk.
Termination will be effected by delivery to the proposer of a notice to terminate, stating the date upon which the termination becomes effective. Upon receipt of the notice to terminate, the proposer shall:
• Stop all work
• Assign to the City of Norwalk all rights, title and interest in the work being developed;
• Deliver forthwith to the City of Norwalk all completed work and work in progress;
• Preserve and protect, until delivery to the City, all material plans, and documents related to this contract which, if the contract had been completed, would have been furnished to the City of Norwalk or necessary to the completion of the work
2.11 Negotiated changes
In the event negotiated changes occur after the awarding of the contract, the same pricing policies called for in the original contract will remain in effect
Page 29 of 48 4471 Norwalk Public School Band Instruments for High School and Middle School
2.12 Contract Agreement(s) and Contract Period(s)
The selected proposer will be required to agree to and sign a formal written contract between the City of Norwalk and the proposer, prepared by the Law Department of the City of Norwalk. A sample of the contract, is provided in a separate section to illustrate the type of contract the City will use to contract for this project.
2.13 Right of Set-Off
The undersigned bidder hereby authorizes the City to set off against monies payable hereunder by the City to the bidder, an amount equal to any unpaid real and personal property taxes and assessments (the collection of which is not barred by the State of Limitations), owing by the bidder to the City, including all interest and lien charges in connection with such paid taxes.
2.14 Duration of Proposals
Proposals will remain in effect for a period of ninety (90) days from the deadline for submission of the proposal.
2.15 Acceptance of RFP Content
Provisions of this RFP and the contents of the successful response will be used to establish final contractual obligations.
The City retains the option of canceling the award if the successful Respondent fails to accept such obligations. The City and the successful Respondent shall enter into a written contract for the work to be performed.
It is understood that this RFP and the Respondent’s proposal shall be attached and included by reference in a contract signed by the City and the successful Respondent.
This RFP is not an offer: Neither this RFP nor any subsequent discussions shall give rise to any commitment on the part of the City of Norwalk or confer any rights on any proposer unless and until a contract is fully executed by the necessary parties. The fully executed contract document will represent the entire agreement between the proposer and the
Department and will supersede all prior negotiations, representations or agreements, alleged or made, between the parties. The City shall assume no liability for costs incurred by the proposer or for payment of services under the terms of the contract until the contract has been accepted and approved by the City’s Corporation Counsel and fully executed by all parties.
2.16 Insurance Coverage Requirements
INSURANCE RIDER – STANDARD SERVICES AGREEMENT
As a provider of services, the Contractor shall provide and maintain insurance coverage related to its services in connection with its service obligations in compliance with the following requirements.
The insurance required shall be written for not less than the scope and limits of insurance specified hereunder, or required by applicable federal, state and/or municipal law, regulation or requirement, whichever coverage requirement is greater. It is agreed and understood that the scope and limits of insurance specified hereunder are minimum requirements and shall in no way limit or preclude the City from requiring additional limits and coverage to be provided under the Contractor's policies.
Page 30 of 48 4471 Norwalk Public School Band Instruments for High School and Middle School
The insurance obligations under this agreement shall be (1) all the insurance coverage and/or limits carried by or available to the Contractor; or (2) the minimum insurance coverage requirements and/or limits shown in this agreement, whichever is greater.
Minimum Scope and Limits of Insurance:
Workers' Compensation: With respect to all operations the Contractor performs, it shall carry workers' compensation insurance in accordance with the requirements of the laws of the State of Connecticut, and Employer's Liability limits of One Hundred Thousand Dollars ($100,000) coverage for each accident, One Hundred Thousand Dollars ($100,000) coverage for each employee by disease, Five
Hundred Thousand Dollars ($500,000) policy limit coverage for disease.
Commercial General Liability: With respect to all operations the Contractor performs it shall carry
Commercial General Liability insurance providing for a total limit of One Million Dollars ($1,000,000) coverage per occurrence for all damages arising out of bodily injury, personal injury, property damage, products/completed operations, and contractual liability coverage for the indemnification obligations arising under this Agreement. The Annual Aggregate limit shall not be less than Two Million Dollars
($2,000,000).
Automobile Liability: With respect to each owned, non-owned, or hired vehicles the Contractor shall carry Automobile Liability insurance providing One Million Dollars ($1,000,000) coverage per accident for bodily injury and property damage.
Acceptability of Insurers: The Contractor's policies shall be written by insurance companies licensed to do business in the State of Connecticut, with an AM Best rating of A-VII, or better. Additionally, all carriers are subject to approval by the City of Norwalk.
Subcontractors: The Contractor shall require all subcontractors to provide the same "minimum scope and limits of insurance" as required herein. All Certificates of Insurance shall be provided to the City's
Corporation Counsel and to the City’s Finance Department (Attn: Risk Manager) as required herein.
Deductibles and Self-Insured Retentions: Any deductible or self-insured retention must be declared to and approved by the City. All deductibles or self-insured retentions are the sole responsibility of the Contractor to pay and/or to indemnify.
Notice of Cancellation or Nonrenewal: Each insurance policy required shall be endorsed to state that coverage shall not be suspended, voided, cancelled, or reduced in coverage or in limits before the expiration date except after thirty (30) days prior written notice by certified mail, return receipt requested, has been given to the City. Notwithstanding this requirement, the Contractor is primarily
Page 31 of 48 4471 Norwalk Public School Band Instruments for High School and Middle School responsible for providing such written notice to the City thirty (30) days prior to any policy change or cancellation that would result in a change of the amount or type of coverage provided. In the event of any such change the Contractor shall provide comparable substitute coverage so that there is no lapse in applicable coverage or reduction in the amount of coverage available to the City related to the Contractor’s Services.
Waiver of Governmental Immunity: Unless requested otherwise by the City, the Contractor and its insurer shall waive governmental immunity as defense and shall not use the defense of governmental immunity in the adjustment of claims or in the defense of any suit brought against the City.
Additional Insured: The liability insurance coverage, (excluding Workers' Compensation) required for the performance of the Services shall include the City as an Additional Insured with respect to the Contractor's activities to be performed under this Agreement. Contractor’s insurance shall be primary and shall not seek contribution from any other insurance carried by the additional insured in the payment of a claim.
Waiver of Subrogation: Contractor hereby waives the right to subrogate or seek recovery from City of Norwalk and its insurance carriers.
Certificate of Insurance: Prior to the commencement of services under the Contract, the Contractor shall furnish Certificate(s) of Insurance to the City. The Certificate(s) will specify all parties who are endorsed on the policy as Additional Insureds (or Loss Payees). The Certificates and endorsements for each insurance policy are to be signed by a person authorized by the insurer to bind coverage on its behalf. Renewals of expiring Certificates shall be provided prior to expiration but no more than fifteen (15) days after policy renewal.
All insurance documents required should be mailed to the City of Norwalk Corporation Counsel and
Finance Department (Attn: Risk Manager), 125 East Avenue, P.O. Box 5125, Norwalk, CT 06856-5125.
Waiver of requirements: The Corporation Counsel may vary these insurance requirements at Corporation Counsel's sole discretion if Corporation Counsel determines that the City's interests will be adequately protected by the provision of different types or other amounts of coverage.
Page 32 of 48 4471 Norwalk Public School Band Instruments for High School and Middle School
2.17 Sample Contract
Page 33 of 48 4471 Norwalk Public School Band Instruments for High School and Middle School
SAMPLE CONTRACT
The following document is the City’s standard Independent Contractor contract. Please be advised that the substantive terms and requirements outlined therein may be revised only with the approval of Norwalk’s Corporation Counsel. Additionally, the terms of the final contract may vary at the City’s option and, this sample agreement has been included to provide you with the general contract terms and conditions typically utilized by the City in the hiring of an independent contractor for consultant services
AGREEMENT WITH INDEPENDENT CONTRACTOR
BY AND BETWEEN
CITY OF NORWALK
AND
«VendorName»
FOR «Project»
THIS AGREEMENT made and entered into this ________ day of ________________, 2020, by and between the CITY OF NORWALK, a municipal corporation organized and existing under the laws of the State of Connecticut (the “City”), acting herein by «ContractAuthorizer», its «ContractAuthorizerTitle», and «VendorName», a corporation authorized and licensed to do business in the State of «LicenseState», having a principal place of business at «VendorAddress1», «VendorAddress2», «VendorCity», «VendorState» «VendorZip», acting herein by «VendorAuthorizer», its «VendorAuthorizerTitle», duly authorized (the “Contractor”).
W I T N E S S E T H:
WHEREAS, the City is in need of «Notes» (the “Project”); and
WHEREAS, the City desires to retain the services of the Contractor based on the Contractor's representations that it is qualified and capable of performing the needed services in a professional and timely manner and in accordance with the goals and requirements of the Project;
WHEREAS, Contractor has agreed to perform the services described herein for the compensation and in compliance with the terms and conditions set forth in this Agreement;
NOW, THEREFORE, in consideration of the mutual covenants and agreements herein contained, the parties agree as follows:
1. ENGAGEMENT OF Contractor
A. Based on the representations of the Contractor set out in its proposal dated
«ProposedDate», a copy of which is annexed hereto and incorporated herein as Exhibit
Page 34 of 48 4471 Norwalk Public School Band Instruments for High School and Middle School
2, the City hereby retains the Contractor to perform the services described herein in accordance with the terms and conditions and for the consideration set out in this Agreement.
B. The person in charge of administering this Agreement on behalf of the City shall be «DepartmentHead», Department of «Department», or such other person as may be designated in writing.
C. The person responsible for the services to be performed by the Contractor hereunder shall be «VendorAuthorizer», «VendorAuthorizerTitle».
2. SERVICES TO BE PERFORMED
A. The scope and details of the Services to be performed by the Contractor and the specifications to which such Services should conform are described in the City's Bid Invitation dated _______________, a copy of which annexed hereto and incorporated herein as Exhibits 1. The Contractor shall perform such Services as may be required by the Director in a professional and timely manner in accordance with the terms and requirements of this Agreement, in order to meet the City's needs. Services will be requested on an as needed basis with no minimum or maximum scope.
B. The parties understand that Contractor is retained solely for the purposes of performing the Services described herein. The Contractor's relationship to the City and its agencies shall, during the period(s) of this Agreement, be that of an independent contractor. The Contractor shall not be considered, under the provisions of this Agreement or for any purposes hereunder, as having an "employee" status or as being entitled to participate in any benefits accrued by or given to City employees.
C. In performing the Services and otherwise meeting its duties and obligations hereunder, Contractor shall ensure that its employees and subcontractors observe high standards of professional and business ethics observed by like professionals in the same or similar business, including, but not limited to, following the requirements, rules and regulations of the City, acting with integrity, and creating a workplace atmosphere free of discrimination and harassment.
D. The City may, from time to time, request changes in the Services to be performed hereunder. Such changes, including any increase or decrease in the amount of the Contractor's compensation, which are mutually agreed upon by and between the City and the Contractor, shall be valid only when incorporated in written amendments signed by both parties to this Agreement.
3. COMPENSATION
A. The Contractor shall be compensated for its performance of this Agreement, a maximum amount not to exceed the sum of
«ContractBudgetInEnglish»($«ContractBudget») payable in accordance with the terms
Page 35 of 48 4471 Norwalk Public School Band Instruments for High School and Middle School of the Contractor’s bid.
B. The compensation provided under this Agreement constitutes full and complete payment for all costs and expenses assumed by the Contractor in performing this Agreement including but not limited to labor, materials, product, tools and machinery, salaries, meetings, and all similar expenses. No costs in excess of this stated amount shall be paid or reimbursed by the City without specific prior written approval of the Director.
C. Payments to the Contractor under this Agreement shall be made by the City on approval of payment requisitions certified by the Contractor and submitted not more often than once a week. Each requisition shall be in a form acceptable to the City and shall set forth the hours of work performed and the tasks completed. The City may, prior to making any payment under this Agreement, require the Contractor to submit to it such additional information and/or documentation as it may deem necessary.
D. The acceptance by the Contractor, its successors or assigns, of any payment made on the final requisition under this Agreement, or of any final payment due on termination of this Agreement, shall constitute a full and complete release of the City from any and all claims, demands and causes of action whatsoever which the Contractor, its successors or assigns have or may have against the City under the provisions of this Agreement.
4. TIME PROVISIONS
A. The term of this Agreement shall commence effective ______________________ and conclude on ______________________. The Contractor shall perform its Services throughout this period.
B. This Agreement shall remain in effect until the services required hereunder are fully completed to the satisfaction of the City, unless otherwise terminated by the parties hereto.
5. TERMINATION AND SUSPENSION
The City may at any time and for any reason, with or without cause, terminate this
Agreement by written notice specifying the termination date, which shall be not less than fifteen (15) days from the date such notice is given. In the event of such termination, the Contractor's Services shall be paid for in such amount as shall compensate the Contractor for the Services…