2_31120PR230000146SOW146A.docx
DOCX document 1 MB Posted
- Solicitation number
- 70Z02423Q0000146A
About this file
This scope of work document outlines repair and replacement requirements for roll up doors at two buildings on the United States Coast Guard Base in Boston, Massachusetts. The contractor will replace bottom sections, intermediate sections, weather stripping, track sections, hardware, and fixtures on six roll up doors at Building 16 and two roll up doors at the Sand Shed. Additional requirements include inspecting doors, controls, and safety switches. The period of performance is 30 days from award. The contractor must provide submittals for approval, access lists, and coordinate work with the contracting officer's representative and any other contractors on site. Safety, sanitation, cleanup, and smoking restrictions are also outlined.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 12_31120PR230000146SSPIX2.jpg | JPG image | |
| 7_31120PR230000146WR146A.txt | TXT text file | |
| 12_31120PR230000146SSPIX3.jpg | JPG image | |
| 12_31120PR23000014616PIX4.jpg | JPG image | |
| 12_31120PR23000014616PIX3.jpg | JPG image | |
| 12_31120PR230000146SSPIX5.jpg | JPG image | |
| 12_31120PR23000014616PIX6.jpg | JPG image | |
| 12_31120PR230000146SSPIX4.jpg | JPG image | |
| SF1413-13g.pdf | ||
| 12_31120PR23000014616PIX5.jpg | JPG image | |
| 12_31120PR23000014616PIX2.jpg | JPG image | |
| 12_31120PR0000146RFQPKG146A.doc | DOC document | |
| 12_31120PR23000014616PIX1.jpg | JPG image | |
| 12_31120PR23000014616PIX9.jpg | JPG image | |
| 12_31120PR23000014616PIX8.jpg | JPG image | |
| 12_31120PR23000014616PIX7.jpg | JPG image |
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DEPARTMENT OF HOMELAND SECURITY
UNITED STATES COAST GUARD
SCOPE OF SERVICES FOR
Repair Roll Up Doors Building 16 and Sand Shed USCG Base Boston
REQUEST FOR QUOTE (RFQ) 70Z02423Q0000146A
UNITED STATES COAST GUARD
FIRST DISTRICT
BASE BOSTON
COMMANDING OFFICER
UNITED STATES COAST GUARD
427 Commercial St. Boston MA. 02109 Contents
| 1. Introduction/Background | 2 |
| 2. Scope of Work | 2 |
| 3. Administrative Requirements | 4 |
| 4. Safety | 5 |
| 5. Pictures | 6 |
| 6. Period of Performance | 8 |
| 7. Base Access | 8 |
| 8. General | 9 |
| 9. Submittals | 11 |
| 10. Reference Attachments | 11 |
1. Introduction/Background USCG Base Boston, has existing (2) pre-engineered metal buildings that have roll up doors. One is building 16 which has 6 roll up doors total, and the other is the Sand Shed and it has 2 roll up doors. This project is subject to Prevailing Wages, the Davis-Bacon Act, and the Buy American Act.
2. Scope of Work
1. The contractor shall provide all labor, tools, material, equipment, and work lifts necessary to repair (4) roll up doors on building 16 and 2 roll up doors on the Sand Shed.
2. The following items shall be replaced on the doors of building 16:
a. Replace (4) 12’-2” x 24" 75 bottom sections to include the weather stripping at the bottom.
b. Replace (1) 12’-2”x 24” T175 intermediate section.
c. Replace the bottom fixtures and cables on (1) door.
d. Replace the side weather stripping on all doors.
e. Replace (splice in new) 3 feet of door track (at the bottom) on both sides of 1 door.
f. Inspect and replace any deteriorated/worn hardware and fasteners.
g. Inspect roll up doors, controls and safety switches for proper operation.
3. The following items shall be replaced on the doors of the Sand Shed:
a. Replace (2) 14’-2” x 24” T175 bottom sections to include the weather stripping at the bottom.
b. Replace (1) 14’-2”x 24” T175 intermediate section.
c. Replace the bottom fixtures and cable on (1) door.
d. Replace the side weather stripping on all doors.
e. Inspect and replace any deteriorated/worn hardware and fasteners.
f. Inspect roll up doors, controls, and safety switches for proper operation.
3. Safety
1. Unforeseen Hazardous Material
a. If material(s) that may be hazardous to human health upon disturbance are encountered during construction operations, stop that portion of work, and notify the Contracting Officer’s Representative (COR) immediately. If material is not hazardous or poses no danger, the Government will direct the Contractor to proceed without change. If material is hazardous and handling of the material is necessary to accomplish the work, the Government will issue a modification pursuant to FAR 52.236-2 Differing Site Conditions. The US Coast Guard does not have test reports for known hazardous materials in the work areas.
4. Period of Performance
1. The overall period of performance is 30 days after the award date.
2. Work may be performed between 0600-1600.
3. Prior to work commencing contractor shall provide scheduled start time at least 5 days prior to start.
4. No work shall be allowed on weekends or holidays without prior approval by the COR.
7. Base Access
1. The contractors shall provide an access list of personnel authorized access to the base and work area 48 hours before starting work. All persons must have/present a valid government issued ID to enter the base, there will be no exceptions. Deliveries of materials and equipment can be via the USCG loading dock when not in use by the USCG. Minimize vehicles brought onto the base to only 2 vehicles per day. A site-specific access list will be provided to the contractor upon request.
8. General
1. Inspection
a. The Government will have a COR on the site. The COR for this contract is Mr. Robert Garcia, (857) 416-3442 or Robert.garcia@uscg.mil. The contractor shall inform the COR of day-to-day activities and plans. At the start of each workday, the contractor shall check in with the COR.
2. Coordination with the Coast Guard and other Contractors
a. Other projects may be in progress during this contract execution. In the event of conflicts, arrangements will be made to coordinate all activities between other contractors and/or Coast Guard personnel. The COR will make every attempt to provide notice of changes at least 24 hours prior to established dates to allow for revisions to the schedule.
b. Areas of the facility not under construction shall remain in operation during construction. Keep all construction activities and personnel clear of facility operations. Coast Guard operations shall take priority if conflicts are present.
3. Operation of Government Facilities
a. The facility may have Government personnel working in certain areas during the execution of the contract. The Coast Guard will keep interference with the contractor’s operation to a minimum. However, the contractor shall take precautions to see that no debris, materials, equipment, or personnel shall endanger the safety of Coast Guard or other personnel working in the area.
4. Methods of Materials Qualifications
a. To demonstrate that the materials to be used in this project conform to these specifications and the Buy American Act, the contractor may pursue any of the following:
i. Certificates of compliance with specification requirements signed by an authorized officer of the manufacturer or processor of approved trade association involved. Such certificates shall show the name and address of the contractor and the name and location of the project. The certificate shall be accompanied by all supporting product data so that adequate evaluation by the Government can be made.
ii. Labeling by the manufacturer on unbroken/unopened containers.
iii. Official marking or labeling by recognized grading organization or national code association indicating compliance.
5. Temporary Utilities and Controls
a. Temporary utilities (e.g., electricity and water) will be provided by the Government at no cost to the contractor. The contractor shall provide and remove at no cost to the Government, all additional equipment and other apparatus necessary to serve the work site. The government makes no guarantee as to quality, quantity or continuity of such services and will not be liable for any effects these services have on contractor’s equipment or the progress schedule.
6. Sanitary Facilities
a. The contractor may utilize sanitary facilities as indicated by the COR. If additional sanitary facilities are needed, the contractor shall provide and remove temporary facilities at no cost to the Government, with location coordinated with the COR. The government makes no guarantee as to quality, quantity or continuity of such services and will not be liable for any effects these services have on contractor’s equipment or the progress schedule.
7. Removals
a. All rubbish and trash created because of fulfilling these specifications shall be removed from the site daily at contractor’s expense or as otherwise dictated within this scope. The contractor is responsible for the transfer of material to and from the worksite and/or dumpster area as well as any debris caused in-between.
8. Delivery Storage and Handling
a. The contractor shall deliver all materials to the job site in the manufacturer’s sealed and undamaged containers or wrappings and place in designated storage/lay down areas. Damaged materials shall not be used.
9. Cleanup
a. The contractor shall remove all scraps and debris generated by this operation by the end of each working day. After each job completion/installation/etc. the area shall be cleaned. All debris shall be removed and disposed of in accordance with applicable City, State and Federal Laws.
b. At the completion of the project all spaces must be cleaned and disinfected.
10. Smoking
a. All contractor and subsequent employees shall not smoke cigarettes, cigars, vapes, and/or pipes in any Government Building or within 50ft thereof. Smoking outside the building will be permitted past the 50ft mark and/or in designated areas only. The contractor shall be responsible for maintaining a clean environment in the designated smoking areas if used.
11. Protection of Existing Structures, Utilities, Work
a. The contractor shall supply and maintain protective measures against damage to existing structures, utilities, or interruption of any service. Failure to do so may result in cessation of all work. All damages or interruption of utilities serves resulting from failure to take necessary precautions shall be repaired or restored at no additional cost to the Government.
9. Submittals Contractor shall provide submittals as pdf or word documents to the US Coast Guard for approval, prior to ordering any of the materials. The contractor must receive in writing from the US Coast Guard that the submittals are approved prior to ordering the associated materials.
10. Referenced Attachments: None
6 | Page image1.png
File details come from the government source that posted it. Updated .