2-26-37-4099 Plan Set.pdf
PDF 12 MB Posted
- Attached to
- Waverly Site Improvements
- Solicitation number
- US.262483
- Issued by
- Montgomery County, Gibraltar CDP, Pennsylvania
About this file
Waverly Site Improvements Plan Set Summary
This plan set document pertains to the Township of Lower Merion's Waverly Site Improvements project located at 1700 Waverly Road, Gladwyne, Pennsylvania. The project encompasses site grading and earthwork modifications, stormwater drainage improvements including a proposed conveyance channel with Geoweb lining and riprap aprons, pavement improvements consisting of an Emergency Vehicle Operations Course (EVOC) and driveway construction, and all incidental work required for completion. The scope includes demolition and removal of existing pavements and materials, installation of erosion and sediment control measures, construction of a 10-foot-wide conveyance channel with varying slopes and depths, installation of area drains and perforated pipe drainage systems, and placement of topsoil and permanent vegetation stabilization across approximately 15.89 acres. A non-mandatory pre-bid conference is scheduled for November 20, 2026, at 10:00 AM at the project site, with an alternate rain date of November 23, 2026. Sealed proposals are due by 11:00 AM on Thursday, December 17, 2026, via the PennBid program, with award planned for January 20, 2027, and construction notice to proceed planned for late February 2027.
The plan set includes detailed construction specifications, site improvement plans, erosion and sediment control details, and general notes developed by Pennoni Associates, Inc. A bid guaranty, performance bond, and labor and materials bond in the amount of 100 percent are required, along with a maintenance bond of 25 percent. The project site contains multiple utility lines operated by Crown Castle, Comcast, Aqua Pennsylvania, PECO Energy, Lumen, Zayo Bandwidth, and Verizon Business; the contractor must notify the Pennsylvania One Call System at least three working days before excavation commences. No specific pricing information, set-asides, or funding source details are provided in the plan set documentation.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 1-26-37-4099 Project Manual.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
COMPANY: LOWER MERION TOWNSHIP
ADDRESS: 75 E LANCASTER AVE
ARDMORE, PA 19003
CONTACT: JOSEPH STOBERL
EMAIL: JSTOBERL@LOWERMERION.ORG
PHONE: 610-645-6136
COMPANY: CROWN CASTLE
ADDRESS: 1500 CORPORATE DR
CANONSBURG, PA 15317
CONTACT: FIBER DIG TEAM PERSONNEL
EMAIL: FIBER.DIG@CROWNCASTLE.COM
PHONE: 800-654-3110
COMPANY: COMCAST
ADDRESS: 1004 CORNERSTONE BLVD
DOWNINGTOWN, PA 19335
CONTACT: JOHN CEDRICK SALVATIERRA
EMAIL: JOHNCEDRICK_SALVATIERRA@COMCAST.COM
PHONE: 267-271-9781
COMPANY: AQUA PENNSYLVANIA
ADDRESS: 762 LANCASTER AVE
BRYN MAWR, PA 19010
CONTACT: THOMAS WADDY
EMAIL: TBWADDY@AQUAAMERICA.COM
PHONE: 610-525-1400 EXT. 52105
COMPANY: PECO AN EXELON COMPANY C/O USIC
ADDRESS: 450 S HENDERSON RD, SUITE B
KING OF PRUSSIA, PA 19406
CONTACT: NIKKIA SIMPKINS
EMAIL: NIKKIASIMPKINS@USICLLC.COM
PHONE: 484-681-5720
COMPANY: LUMEN FORMERLY LEVEL 3
ADDRESS: 931 14TH ST
DENVER, CO 80202
CONTACT: LUMEN OPERATOR PERSONNEL
EMAIL: RELOCATIONS@LUMEN.COM
PHONE: 877-366-8344 EXT. 3
COMPANY: ZAYO BANDWIDTH FORMERLY PPL TELECOM LLC
ADDRESS: 170 ROBBINS RD
DOWNINGTOWN, PA 19335
CONTACT: JOHN HOWELLS
EMAIL: JOHN.HOWELLS@ZAYO.COM
PHONE: 610-476-1634
COMPANY: VERIZON BUSINESS FORMERLY MCI
ADDRESS: 400 INTERNATIONAL PKWY
RICHARDSON, TX 75081
CONTACT: ROBERT BUTLER
EMAIL: ROBERT.BUTLER@ONE.VERIZON.COM
PHONE: 469-886-4091
UTILITY USERS LIST
12. REFERENCE IS MADE TO PENNSYLVANIA ONE CALL SYSTEM, ASSIGNED SERIAL NUMBER 20251493573, IN ACCORDANCE WITH PA ACT 287 OF 1974 AS AMENDED BY PA ACT 127 OF 2024 ENTITLED "UNDERGROUND UTILITY LINE PROTECTION LAW". THE CONTRACTOR SHALL NOTIFY ALL UTILITIES WITHIN THE WORK AREA, VIA THE PENNSYLVANIA ONE CALL SYSTEM, A MINIMUM OF
3 WORKING DAYS BEFORE THE START OF EXCAVATION. (800) 242-1776
SITE
N O
R
TH
CALL 1-800-242-1776
CALL BEFORE YOU DIG
BEFORE YOU DIG ANYWHERE IN PENNSYLVANIA
PA. ACT 287 OF 1974 REQUIRES THREE WORKING DAYS
NOTICE TO UTILITIES BEFORE YOU EXCAVATE, DRILL OR
BLAST PENNSYLVANIA ONE-CALL SYSTEM, INC.
SERIAL NUMBER(S): 20263172584
SHEET LIST TABLE
SHEET SHEET
NUMBER Sheet Title ISSUED
DATE
CM0001 1 COVER SHEET 11/16/26
CM0002 2 GENERAL NOTES 11/16/26
CM0200 3 OVERALL EXISTING CONDITIONS, DEMO, AND E&S PLAN 11/16/26
CM0201 4 EXISTING CONDITIONS, DEMO, AND E&S PLAN 1 11/16/26
CM0202 5 EXISTING CONDITIONS, DEMO, AND E&S PLAN 2 11/16/26
CM0203 6 EXISTING CONDITIONS, DEMO, AND E&S PLAN 3 11/16/26
CM0204 7 EXISTING CONDITIONS, DEMO, AND E&S PLAN 4 11/16/26
CM0205 8 EXISTING CONDITIONS, DEMO, AND E&S PLAN 5 11/16/26
CM1000 9 OVERALL SITE IMPROVEMENT PLAN 11/16/26
CM1001 10 SITE IMPROVEMENT PLAN 1 11/16/26
CM1002 11 SITE IMPROVEMENT PLAN 2 11/16/26
CM1003 12 SITE IMPROVEMENT PLAN 3 11/16/26
CM1004 13 SITE IMPROVEMENT PLAN 4 11/16/26
CM1005 14 SITE IMPROVEMENT PLAN 5 11/16/26
CM6000 15 CONSTRUCTION DETAILS 11/16/26
CM6001 16 EROSION & SEDIMENT CONTROL DETAILS 11/16/26
SITE PREPARATION AND DEMOLITION NOTES:
1. CONTRACTOR SHALL REMOVE AND LEGALLY DISPOSE OF ALL EXISTING PAVING AND MATERIALS WITHIN THE WORK AREA LABELED FOR REMOVAL. REMOVAL INCLUDES, BUT IS NOT LIMITED TO, ALL SUBBASE MATERIALS AND FOUNDATIONS AND AS NECESSARY TO CONSTRUCT NEW IMPROVEMENTS. ALL DEBRIS SHALL BE REMOVED FROM SITE AND DISCARDED BY CONTRACTOR ON A DAILY BASIS.
2. PAVEMENTS AND CURB TO BE REMOVED ARE TO BE SAWCUT TO A CLEAN STRAIGHT EDGE TO FULL DEPTH OF PAVEMENT OR CURB.
3. CONTRACTOR SHALL PROTECT BUILDINGS, UTILITIES, FACADES, WALLS, PAVING TO REMAIN AND ALL OTHER EXISTING ITEMS TO
REMAIN FROM DAMAGE DURING CONSTRUCTION. THE CONTRACTOR SHALL REPLACE OR RESTORE DAMAGED AND DISTURBED AREAS, AS DIRECTED BY THE ENGINEER, AT NO ADDITIONAL COST TO THE PROPERTY OWNER.
4. ALL EXISTING UTILITY BOXES, CLEANOUTS, MANHOLES, ETC. ARE TO REMAIN, UNLESS NOTED OTHERWISE. REMOVE PAVING AROUND THESE STRUCTURES WITHOUT DISTURBANCE. CONTRACTOR MUST ADJUST / RESET TOPS OF ALL UTILITY STRUCTURES IN THE WORK AREA AS NECESSARY TO MATCH FINISHED GRADE. CONTRACTOR MUST PREVENT SOIL, SILT, STONES AND OTHER DEBRIS FROM
ENTERING UTILITY AT ALL TIMES.
5. DO NOT DISTURB FOUNDATIONS OF LIGHTPOSTS OR SIGNS INDICATED AS TO REMAIN. CONTACT ENGINEER AND OWNER IMMEDIATELY
IF DISRUPTION OCCURS.
6. OWNER WILL DESIGNATE AREA TO BE USED AS A TEMPORARY STAGING / STORAGE AREA, IF REQUIRED. ANY DAMAGE TO PAVING, SIDEWALK, CURB, LAWN, ETC. MUST BE REPAIRED/REPLACED BY THE CONTRACTOR AT NO ADDITIONAL COST TO THE OWNER.
SEQUENCE OF CONSTRUCTION:
OVERALL SITE IMPROVEMENTS
THE SEQUENCE IS A GENERAL CONSTRUCTION GUIDE AND DOES NOT RELIEVE THE CONTRACTOR FROM RESPONSIBILITY FOR MEANS, METHODS, SEQUENCING, TEMPORARY WORKS, SITE SAFETY, OR PROTECTION OF COMPLETED WORK.
CONSTRUCTION OF THE EMERGENCY VEHICLE OPERATIONS COURSE (EVOC) AND NEW PAVED DRIVEWAY SHALL BE COORDINATED TO
PREVENT DAMAGE TO COMPLETED PAVEMENT.
1. SURVEY AND CONSTRUCTION STAKEOUT: STAKE OUT THE PROPOSED LIMITS OF DISTURBANCE, E&S CONTROLS, WINDROWS AREAS, DRAINAGE CHANNEL, EVOC, NEW PAVED DRIVEWAY, AND OTHER PROPOSED SITE IMPROVEMENTS.
2. INSTALLATION OF EROSION AND SEDIMENT CONTROLS (E&S): INSTALL ALL REQUIRED TEMPORARY EROSION AND SEDIMENT CONTROL MEASURES, INCLUDING STABILIZED CONSTRUCTION ENTRANCES, SILT FENCE, INLET PROTECTION, SEDIMENT TRAPS, AND OTHER CONTROLS SHOWN ON THE APPROVED E&S PLANS. OBTAIN REQUIRED INSPECTIONS AND APPROVALS PRIOR TO EARTH
DISTURBANCE.
3. TEMPORARY CONSTRUCTION ACCESS: ESTABLISH STABILIZED CONSTRUCTION ACCESS TO THE SITE. WHERE FEASIBLE, UTILIZE THE PROPOSED DRIVEWAY ALIGNMENT FOR CONSTRUCTION ACCESS WHILE PROTECTING THE FUTURE PAVEMENT SUBGRADE.
4. SITE CLEARING AND GRUBBING: PERFORM CLEARING, GRUBBING, STRIPPING OF TOPSOIL, AND REMOVAL OF EXISTING VEGETATION AND OBSTRUCTIONS WITHIN THE APPROVED LIMITS OF DISTURBANCE. STOCKPILE SUITABLE MATERIALS IN DESIGNATED AREAS WITH
APPROPRIATE E&S PROTECTION.
5. WINDROWS IMPROVEMENTS: PERFORM THE REQUIRED EARTHWORK, GRADING, AND CONSTRUCTION ACTIVITIES WITHIN THE PROPOSED WINDROWS AREAS IN ACCORDANCE WITH THE APPROVED SITE PLANS. MAINTAIN PROPER DRAINAGE AND EROSION
CONTROL MEASURES THROUGHOUT CONSTRUCTION.
6. ROUGH GRADING AND EARTHWORK: PERFORM EXCAVATION, FILLING, AND ROUGH GRADING THROUGHOUT THE PROJECT SITE, INCLUDING THE DRAINAGE CHANNEL, EVOC, AND NEW PAVED DRIVEWAY. ESTABLISH PROPOSED SUBGRADE ELEVATIONS AND
COMPACT FILL MATERIALS IN ACCORDANCE WITH PROJECT SPECIFICATIONS.
7. CHANNEL CONSTRUCTION: FOLLOW SEQUENCE OF CONSTRUCTION STAND ALONE NOTES FOR CHANNEL GRADING AND
STABILIZATION.
8. STORMWATER AND DRAINAGE IMPROVEMENTS: INSTALL PROPOSED STORM DRAINAGE PIPES, INLETS, AND OTHER DRAINAGE STRUCTURES AS INDICATED ON THE APPROVED PLANS. CONNECT DRAINAGE SYSTEMS TO THE PROPOSED CHANNEL WHERE
REQUIRED AND STABILIZE DISTURBED DRAINAGE AREAS.
9. UNDERGROUND UTILITIES: INSTALL OR RELOCATE UNDERGROUND UTILITIES AND ASSOCIATED INFRASTRUCTURE AS SHOWN ON THE APPROVED PLANS. COMPLETE REQUIRED INSPECTIONS, BACKFILLING, AND COMPACTION BEFORE PAVEMENT CONSTRUCTION.
10. EVOC CONSTRUCTION: COMPLETE GRADING, SUBGRADE PREPARATION, AND COMPACTION FOR THE PROPOSED EMERGENCY VEHICLE OPERATIONS COURSE (EVOC). INSTALL AGGREGATE BASE MATERIALS AND CONSTRUCT THE PROPOSED ASPHALT PAVEMENT AND OTHER APPROVED DRIVING SURFACES. COMPLETE ASSOCIATED DRAINAGE AND GRADING IMPROVEMENTS.
11. NEW PAVED DRIVEWAY CONSTRUCTION: COMPLETE EXCAVATION, FINE GRADING, PROOF-ROLLING, AND COMPACTION OF THE PROPOSED DRIVEWAY SUBGRADE. INSTALL THE REQUIRED AGGREGATE SUBBASE AND BASE COURSE, FOLLOWED BY ASPHALT PAVEMENT IN ACCORDANCE WITH THE APPROVED PAVEMENT SECTION. COMPLETE DRIVEWAY ENTRANCE AND TRANSITIONS TO
EXISTING PAVEMENT AS SHOWN ON THE PLANS.
12. COMPLETION OF WINDROWS: COMPLETE FINAL GRADING, SHAPING, AND STABILIZATION OF THE WINDROWS AREAS.
13. FINAL SITE GRADING AND RESTORATION: COMPLETE FINAL GRADING OF ALL DISTURBED AREAS. PLACE TOPSOIL AND INSTALL
PERMANENT STABILIZATION MEASURES, INCLUDING SEEDING, MULCHING, EROSION CONTROL MATTING, OR OTHER TREATMENTS AS
SPECIFIED ON THE APPROVED PLANS.
14. FINAL INSPECTIONS AND SITE CLEANUP: REMOVE CONSTRUCTION DEBRIS, EXCESS MATERIALS, AND TEMPORARY CONSTRUCTION FACILITIES. INSPECT THE COMPLETED WINDROWS IMPROVEMENTS, DRAINAGE CHANNEL, EVOC, NEW PAVED DRIVEWAY, AND
STORMWATER DRAINAGE SYSTEMS. CORRECT DEFICIENCIES AS REQUIRED.
15. REMOVAL OF TEMPORARY E&S CONTROLS: MAINTAIN TEMPORARY EROSION AND SEDIMENT CONTROLS UNTIL ALL CONTRIBUTING DISTURBED AREAS HAVE ACHIEVED PERMANENT STABILIZATION. UPON REQUIRED APPROVAL, REMOVE TEMPORARY E&S MEASURES
AND STABILIZE AREAS DISTURBED BY THEIR REMOVAL.
16. PROJECT COMPLETION: COMPLETE ALL REQUIRED FINAL INSPECTIONS, OBTAIN NECESSARY APPROVALS, AND TURN OVER THE
COMPLETED SITE IMPROVEMENTS FOR THEIR INTENDED USE.
PREPAREDNESS PREVENTION AND CONTINGENCY PLAN:
IF THERE IS AN ACCIDENTAL DISCHARGE FROM CONSTRUCTION EQUIPMENT, THE CONTRACTOR IS RESPONSIBLE FOR DEPLOYING IMMEDIATE ACTION TO CONTAIN THE DISCHARGE. WHILE CONTAINING THE DISCHARGE THE CONTRACTOR SHALL CONTACT A
LICENSED AND BONDED FIRM TO CLEANUP AND MITIGATE DISCHARGE.
CONTRACTOR SHALL HAVE ON SITE A CONTAINMENT KIT WITH AT LEAST A CONTAINMENT BOOM AND ABSORBENT AT A MINIMUM.
THE EMERGENCY CONTACT PHONE NUMBER ARE:
P.A.D.E.P. 24 HOUR RESPONSE PHONE:
(717) 705-4700 E.P.A.
NATIONAL RESPONSE CENTER PHONE:
(800) 424-8802
GENERAL NOTES:
1. ALL EARTH DISTURBANCE ACTIVITIES SHALL PROCEED IN ACCORDANCE WITH THE SEQUENCE PROVIDED ON THE PLAN
DRAWINGS.
2. AREAS TO BE FILLED ARE TO BE CLEARED, GRUBBED, AND STRIPPED OF TOPSOIL TO REMOVE STUMPS, VEGETATION, ROOTS, AND OTHER OBJECTIONABLE MATERIAL.
3. AT NO TIME SHALL CONSTRUCTION VEHICLES BE ALLOWED TO ENTER AREAS OUTSIDE THE LIMIT OF DISTURBANCE BOUNDARIES SHOWN ON THE PLANS. THESE AREAS MUST BE CLEARLY MARKED AND FENCED OFF BEFORE SELECTIVE
DEMOLITION OPERATIONS BEGIN.
4. TOPSOIL REQUIRED FOR THE ESTABLISHMENT OF VEGETATION SHALL BE STOCKPILED AT THE LOCATION(S) SHOWN ON THE PLAN MAPS(S) IN THE AMOUNT NECESSARY TO COMPLETE THE FINISH GRADING OF ALL EXPOSED AREAS THAT ARE TO BE STABILIZED BY VEGETATION. EACH STOCKPILE SHALL BE PROTECTED IN THE MANNER SHOWN ON THE PLAN DRAWINGS.
STOCKPILE HEIGHTS SHALL NOT EXCEED 35 FEET. STOCKPILE SLOPES SHALL BE 2H:1V OR FLATTER.
5. IMMEDIATELY UPON DISCOVERING UNFORESEEN CIRCUMSTANCES POSING THE POTENTIAL FOR ACCELERATED EROSION AND/OR SEDIMENT POLLUTION, THE OPERATOR SHALL IMPLEMENT APPROPRIATE BEST MANAGEMENT PRACTICES TO MINIMIZE
THE POTENTIAL FOR EROSION AND SEDIMENT POLLUTION.
6. ALL MATERIALS AND WASTES SHALL BE REMOVED FROM THE SITE AND RECYCLED OR DISPOSED OF IN ACCORDANCE WITH THE DEPARTMENT'S SOLID WASTE MANAGEMENT REGULATIONS AT 25 PA. CODE 260.1 ET SEQ., 271.1, AND 287.1 ET. SEQ. NO BUILDING MATERIALS OR WASTES OR UNUSED BUILDING MATERIALS SHALL BE BURNED, BURIED, DUMPED, OR DISCHARGED AT
THE SITE.
7. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ANY MATERIAL BROUGHT ON SITE IS CLEAN FILL. FORM FP-001 MUST BE RETAINED BY THE PROPERTY OWNER FOR ANY FILL MATERIAL AFFECTED BY A SPILL OR RELEASE OF A REGULATED
SUBSTANCE BUT QUALIFYING AS CLEAN FILL DUE TO ANALYTICAL TESTING.
8. ALL PUMPING OF WATER FROM ANY WORK AREA SHALL BE DONE ACCORDING TO THE PROCEDURE DESCRIBED IN THIS PLAN, OVER UNDISTURBED VEGETATED AREAS.
9. UNTIL THE SITE IS STABILIZED, ALL EROSION AND SEDIMENT BMPS SHALL BE MAINTAINED PROPERLY. MAINTENANCE SHALL INCLUDE INSPECTIONS OF ALL EROSION AND SEDIMENT BMPS AFTER EACH RUNOFF EVENT AND ON A WEEKLY BASIS. ALL PREVENTATIVE AND REMEDIAL MAINTENANCE WORK, INCLUDING CLEAN OUT, REPAIR, REPLACEMENT, REGRADING, RESEEDING, REMULCHING AND RENETTING MUST BE PERFORMED IMMEDIATELY. IF THE E&S BMPS FAIL TO PERFORM AS EXPECTED, REPLACEMENT BMPS, OR MODIFICATIONS OF THOSE INSTALLED WILL BE REQUIRED.
10. A LOG SHOWING DATES THAT E&S BMPS WERE INSPECTED AS WELL AS ANY DEFICIENCIES FOUND AND THE DATE THEY WERE CORRECTED SHALL BE MAINTAINED ON THE SITE SEDIMENT TRACKED ONTO ANY PUBLIC ROADWAY OR SIDEWALK SHALL BE RETURNED TO THE CONSTRUCTION SITE BY THE END OF EACH WORK DAY AND DISPOSED IN THE MANNER DESCRIBED IN THIS PLAN. IN NO CASE SHALL THE SEDIMENT BE WASHED, SHOVELED, OR SWEPT INTO ANY ROADSIDE DITCH, STORM SEWER, OR
SURFACE WATER.
11. ALL SEDIMENT REMOVED FROM BMPS SHALL BE DISPOSED OF IN THE MANNER DESCRIBED ON THE PLAN DRAWINGS.
12. AREAS WHICH ARE TO BE TOPSOILED SHALL BE SCARIFIED TO A MINIMUM DEPTH OF 3 TO 5 INCHES -- 6 TO 12 INCHES ON
COMPACTED SOILS -- PRIOR TO PLACEMENT OF TOPSOIL. AREAS TO BE VEGETATED SHALL HAVE A MINIMUM 4 INCHES OF TOPSOIL IN PLACE PRIOR TO SEEDING AND MULCHING. FILL OUTSLOPES SHALL HAVE A MINIMUM OF 2 INCHES OF TOPSOIL.
13. ALL FILLS SHALL BE COMPACTED AS REQUIRED TO REDUCE EROSION, SLIPPAGE, SETTLEMENT, SUBSIDENCE OR OTHER RELATED PROBLEMS. FILL INTENDED TO SUPPORT BUILDINGS, STRUCTURES AND CONDUITS, ETC. SHALL BE COMPACTED IN
ACCORDANCE WITH LOCAL REQUIREMENTS OR CODES.
14. ALL EARTHEN FILLS SHALL BE PLACED IN COMPACTED LAYERS NOT TO EXCEED 8 INCHES IN THICKNESS.
15. FILL MATERIALS SHALL BE FREE OF FROZEN PARTICLES, BRUSH, ROOTS, SOD, OR OTHER FOREIGN OR OBJECTIONABLE
MATERIALS THAT WOULD INTERFERE WITH OR PREVENT CONSTRUCTION OF SATISFACTORY FILLS.
16. FROZEN MATERIALS OR SOFT, MUCKY, OR HIGHLY COMPRESSIBLE MATERIALS SHALL NOT BE INCORPORATED INTO FILLS.
17. FILL SHALL NOT BE PLACED ON SATURATED OR FROZEN SURFACES.
18. SEEPS OR SPRINGS ENCOUNTERED DURING CONSTRUCTION SHALL BE HANDLED IN ACCORDANCE WITH THE STANDARD AND
SPECIFICATION FOR SUBSURFACE DRAIN OR OTHER APPROVED METHOD.
19. ALL GRADED AREAS SHALL BE PERMANENTLY STABILIZED IMMEDIATELY UPON REACHING FINISHED GRADE. CUT SLOPES IN
COMPETENT BEDROCK AND ROCK FILLS NEED NOT BE VEGETATED. SEEDED AREAS WITHIN 50 FEET OF A SURFACE WATER, OR AS OTHERWISE SHOWN ON THE PLAN DRAWINGS, SHALL BE BLANKETED ACCORDING TO THE STANDARDS OF THIS PLAN.
20. IMMEDIATELY AFTER EARTH DISTURBANCE ACTIVITIES CEASE IN ANY AREA OR SUBAREA OF THE PROJECT, THE OPERATOR SHALL STABILIZE ALL DISTURBED AREAS. DURING NON-GERMINATING MONTHS, MULCH OR PROTECTIVE BLANKETING SHALL BE APPLIED AS DESCRIBED IN THE PLAN. AREAS NOT AT FINISHED GRADE, WHICH WILL BE REACTIVATED WITHIN 1 YEAR, MAY BE STABILIZED IN ACCORDANCE WITH THE TEMPORARY STABILIZATION SPECIFICATIONS. THOSE AREAS WHICH WILL NOT BE REACTIVATED WITHIN 1 YEAR SHALL BE STABILIZED IN ACCORDANCE WITH THE PERMANENT STABILIZATION SPECIFICATIONS.
21. PERMANENT STABILIZATION IS DEFINED AS A MINIMUM UNIFORM, PERENNIAL 70% VEGETATIVE COVER OR OTHER PERMANENT NON-VEGETATIVE COVER WITH A DENSITY SUFFICIENT TO RESIST ACCELERATED EROSION. CUT AND FILL SLOPES SHALL BE
CAPABLE OF RESISTING FAILURE DUE TO SLUMPING, SLIDING, OR OTHER MOVEMENTS.
22. E&S BMPS SHALL REMAIN FUNCTIONAL AS SUCH UNTIL ALL AREAS TRIBUTARY TO THEM ARE PERMANENTLY STABILIZED OR UNTIL THEY ARE REPLACED BY ANOTHER BMP APPROVED BY THE LOCAL CONSERVATION DISTRICT OR THE DEPARTMENT.
23. UPON COMPLETION OF ALL EARTH DISTURBANCE ACTIVITIES AND PERMANENT STABILIZATION OF ALL DISTURBED AREAS, THE OWNER AND/OR OPERATOR SHALL CONTACT THE LOCAL CONSERVATION DISTRICT FOR AN INSPECTION PRIOR TO
REMOVAL/CONVERSION OF THE E&S BMPS.
24. AFTER FINAL SITE STABILIZATION HAS BEEN ACHIEVED, TEMPORARY EROSION AND SEDIMENT BMPS MUST BE REMOVED OR CONVERTED TO PERMANENT POST CONSTRUCTION STORMWATER MANAGEMENT BMPS. AREAS DISTURBED DURING REMOVAL OR CONVERSION OF THE BMPS SHALL BE STABILIZED IMMEDIATELY. IN ORDER TO ENSURE RAPID REVEGETATION OF DISTURBED AREAS, SUCH REMOVAL/CONVERSIONS ARE TO BE DONE ONLY DURING THE GERMINATING SEASON.
25. ALL CHANNELS SHALL BE KEPT FREE OF OBSTRUCTIONS INCLUDING BUT NOT LIMITED TO FILL, ROCKS, LEAVES, WOODY DEBRIS, ACCUMULATED SEDIMENT, EXCESS VEGETATION, AND CONSTRUCTION MATERIAL/WASTES.
26. FILL MATERIAL FOR EMBANKMENTS SHALL BE FREE OF ROOTS, OR OTHER WOODY VEGETATION, ORGANIC MATERIAL, LARGE STONES, AND OTHER OBJECTIONABLE MATERIALS. THE EMBANKMENT SHALL BE COMPACTED IN MAXIMUM 8" LAYERED LIFTS
AT 95% DENSITY.
APPROVED BY:
DRAWN BY:
DATE:
SCALE:
SHEET:
DRAWING NO.:
TOWNSHIP OF LOWER MERION
OFFICE OF THE TOWNSHIP ENGINEER
75 EAST LANCASTER AVENUE
ARDMORE, MONTGOMERY COUNTY, PENNSYLVANIA 19003
WAVERLY SITE IMPROVEMENTS
1700 WAVERLY ROAD
GLADWYNE, PENNSYLVANIA 19035
11-16-2026
U :\A
C C
O U
N
TS
\L O
W M
M \L
O W
M
W
AV
ER
LY
S
IT
E
IM
PR
O
VE
M
EN
TS
\D
ES
IG
N
SH
EE
TS
R
EV
IS
ED
S H
EE
TS
AS NOTED
AGS
RM
CM0002
GENERAL NOTES
SURVEY NOTES:
1. A FIELD SURVEY OF THE SITE WAS PERFORMED BY PENNONI ASSOCIATES INC. IN MAY AND JUNE OF 2025.
2. UNLESS SPECIFICALLY STATED OR SHOWN HEREON TO THE CONTRARY, THIS SURVEY IS MADE SUBJECT TO AND DOES NOT LOCATE
OR DELINEATE:
§ RIGHTS OR INTERESTS OF THE UNITED STATES OF AMERICA OR COMMONWEALTH OF PENNSYLVANIA OVER LANDS NOW OR
FORMERLY FLOWED BY TIDEWATER BUT NO LONGER VISIBLE OR PHYSICALLY EVIDENT, OR LANDS CONTAINING ANY ANIMAL, MARINE, OR BOTANICAL SPECIES REGULATED BY OR UNDER THE JURISDICTION OF ANY FEDERAL, STATE, OR LOCAL AGENCY.
§ ANY SUBSURFACE OR SUBTERRANEAN CONDITION, EASEMENTS OR RIGHTS INCLUDING BUT NOT LIMITED TO MINERAL OR MINING RIGHTS, OR THE LOCATION OF OR RIGHTS TO ANY SUBSURFACE STRUCTURES, CONTAINERS, OR FACILITIES OR ANY OTHER NATURAL OR MAN-MADE SUBSURFACE CONDITION WHICH MAY OR MAY NOT AFFECT THE USE OR DEVELOPMENT
POTENTIAL OF THE SUBJECT PROPERTY.
3. ALL UNITS ARE SHOWN IN U.S. SURVEY FEET UNLESS OTHERWISE NOTED.
4. THE HORIZONTAL DATUM FOR THE PLANIMETRIC FEATURES AND COORDINATE VALUES INDICATED ON THIS PLAN REFERENCE THE
“PENNSYLVANIA STATE PLANE COORDINATE SYSTEM, SOUTH ZONE AS REFERENCED TO THE NORTH AMERICAN DATUM OF 1983 (NAD 83)” WITH THE 2011 ADJUSTMENT (PASPCS-S NAD83-2011) AND WAS DETERMINED FROM GNSS OBSERVATIONS ON MAY 2025.
5. THE VERTICAL DATUM FOR THE ELEVATIONS AND CONTOURS INDICATED ON THIS PLAN REFERENCE THE NATIONAL GEODETIC VERTICAL DATUM OF 1929 (NGVD 29) AND WAS DETERMINED FROM GNSS OBSERVATIONS ON MAY 2025.
6. TO CONVERT THE ELEVATIONS AND CONTOURS SHOWN ON THIS PLAN TO NAVD 88 DATUM THE FOLLOWING CONVERSION FORMULA
IS PROVIDED.
PLAN DATUM - 1.1 = NAVD88
7. TEMPORARY SITE BENCHMARK NOTE:
VERTICAL BENCHMARK 400
DESCRIPTION: MAG NAIL SET IN ASPHALT
ELEVATION = 58.79' (NGVD29)
VERTICAL BENCHMARK 404
DESCRIPTION: IRON ROD SET IN ASPHALT
ELEVATION = 58.94' (NGVD29)
8. AT THE TIME OF SURVEY, THERE WAS NO OBSERVED EVIDENCE OF A WETLANDS DELINEATION HAVING BEEN COMPLETED NOR WAS
THE SURVEYOR PROVIDED A WETLANDS DELINEATION REPORT.
9. LOCATIONS OF ON AND OFF-SITE UTILITIES AS SHOWN ARE APPROXIMATE AND MAY OR MAY NOT BE COMPLETE. THE NATURE AND EXACT LOCATION OF EXISTING UTILITIES SHOULD BE VERIFIED PRIOR TO INITIATING ANY ACTIVITY THAT MAY AFFECT THEIR USE OR
LOCATION.
10. THE LOCATION OF THE EXISTING UNDERGROUND UTILITIES SHOWN ON THIS PLAN HAVE BEEN TAKEN FROM EXISTING UTILITY RECORDS AVAILABLE AT THE TIME THESE PLANS WERE PREPARED AND FROM SURFACE OBSERVATION OF THE SITE.
11. COMPLETENESS OR ACCURACY OF LOCATION AND DEPTH OF UNDERGROUND UTILITIES AND STRUCTURES IS NOT GUARANTEED.
12. IN ACCORDANCE WITH PA ACT 287 OF 1974 AS AMENDED BY PA ACT 127 OF 2024 ENTITLED "UNDERGROUND UTILITY LINE
PROTECTION LAW". THE CONTRACTOR SHALL NOTIFY UTILITIES WITHIN THE WORK AREA VIA THE PENNSYLVANIA ONE CALL SYSTEM, INC. (800-242-1776) A MINIMUM OF 3 WORKING DAYS BEFORE THE START OF EXCAVATION.
13. THE CONTRACTOR SHALL VERIFY LOCATIONS AND DEPTHS OF UNDERGROUND UTILITIES AND STRUCTURES BEFORE THE START OF
WORK.
14. UNDERGROUND/SUBSURFACE UTILITY INFORMATION OBTAINED THROUGH THE USE OF A SUBSURFACE UTILITY ENGINEER (SUE) WAS COMPLETED IN ACCORDANCE WITH THE STANDARD GUIDELINE FOR THE COLLECTION AND DEPICTION OF EXISTING SUBSURFACE UTILITY DATA AS PUBLISHED BY THE AMERICAN SOCIETY OF CIVIL ENGINEERS (ASCE) (CI/ASCE 38-02) OF UTILITY
QUALITY LEVEL D. HTTPS://WWW.FHWA.DOT.GOV/PROGRAMADMIN/SUEINDEX.CFM
15. BOUNDARY INFORMATION SHOWN REFERENCES DEED BOOK 5031, PAGE 276.
16. THIS PLAN WAS COMPLETED IN ACCORDANCE WITH SECTION E - STANDARDS FOR BOUNDARY SURVEYS IN THE “STANDARDS OF
PRACTICE FOR PROFESSIONAL LAND SURVEYORS IN THE COMMONWEALTH OF PENNSYLVANIA” AS ADOPTED BY THE PENNSYLVANIA
SOCIETY OF LAND SURVEYORS ON NOVEMBER 19, 2021.”
17. THIS SURVEY WAS PREPARED WITHOUT THE BENEFIT OF A TITLE REPORT AND IS SUBJECT TO ANY EASEMENT, RESTRICTION AND/OR COVENANTS THAT A CURRENT REPORT OF TITLE, OR COMPLETE SEARCH OF THE PUBLIC RECORD, MAY DISCLOSE.
18. THE INDICATION OF POTENTIAL ENCROACHMENTS AS SHOWN IS NOT AN OPINION OF THE SURVEYOR AS TO WHETHER THE
ENCROACHMENT IS LEGAL AND/OR HAS BEEN AUTHORIZED BY AGREEMENT.
19. THE BEARINGS SHOWN REFERENCE THE RECORDED DEED BEARING.
20. PLOTTABLE EASEMENTS AND SERVITUDES, LOCATED ON THE PROPERTY AND WHICH THE SURVEYOR WAS AWARE OF AT THE TIME
OF THE SURVEY, HAVE BEEN INDICATED ON THIS PLAN.
21. THE WORD "CERTIFY" AS USED IN ITS VARIOUS FORMS HEREON, IS UNDERSTOOD TO BE AN EXPRESSION OF PROFESSIONAL
OPINION BY THE SURVEYOR, WHICH IS BASED ON HIS BEST KNOWLEDGE, INFORMATION, AND BELIEF. AS SUCH, IT CONSTITUTES
NEITHER A GUARANTEE OR WARRANTY, EITHER EXPRESSED OR IMPLIED.
FLOOD ZONE INFORMATION
1. BY GRAPHIC PLOTTING ONLY, BASED UPON THE FLOOD INSURANCE RATE MAP, PANEL NO. 367 OF 451 COMMUNITY MAP NO.
42091C0367G, WHICH BEARS AN EFFECTIVE DATE OF MARCH 2, 2016, THE SITE IS LOCATED IN THE FOLLOWING ZONE(S):
ZONE X AREAS DETERMINED TO BE OUTSIDE THE 0.2% ANNUAL CHANCE FLOODPLAIN.
NO FIELD SURVEYING WAS PERFORMED TO DETERMINE THIS ZONE AND AN ELEVATION CERTIFICATE MAY BE NEEDED TO VERIFY THIS DETERMINATION OR TO APPLY FOR A VARIANCE FROM THE FEDERAL EMERGENCY MANAGEMENT AGENCY.
GEOWEB CHANNEL GRADING AND STABILIZATION
THE SEQUENCE IS A GENERAL CONSTRUCTION GUIDE AND DOES NOT RELIEVE THE CONTRACTOR FROM RESPONSIBILITY FOR MEANS, METHODS, SEQUENCING, TEMPORARY WORKS, SITE SAFETY, OR PROTECTION OF COMPLETED WORK.
FINAL STABILIZATION LIMITS AND ANCHORAGE REQUIREMENTS SHALL BE BASED ON THE APPROVED MANUFACTURER DESIGN AND
HYDRAULIC/GEOTECHNICAL CRITERIA APPLICABLE TO THE SELECTED SYSTEM.
NO PERMANENT FLOW SHALL BE DIRECTED ONTO AN INCOMPLETE OR UNACCEPTED STABILIZATION REACH.
IF FIELD CONDITIONS DIFFER MATERIALLY FROM THE PLANS OR APPROVED SHOP DRAWINGS, STOP WORK IN THE AFFECTED AREA AND
OBTAIN DIRECTION FROM THE ENGINEER BEFORE PROCEEDING.
THIS SEQUENCE IS INTENDED TO GOVERN CONSTRUCTION OF THE PROPOSED CHANNEL GEOMETRY AND INSTALLATION OF AN APPROVED PROPRIETARY SLOPE/CHANNEL STABILIZATION SYSTEM. IT IS WRITTEN TO BE APPLICABLE TO GEOWEB OR ANOTHER APPROVED EQUIVALENT. FINAL PRODUCT-SPECIFIC MATERIALS, ANCHORAGE, TENDONS, SEAMS, CONNECTIONS, INFILL, AND TERMINATION DETAILS
SHALL BE ESTABLISHED BY THE APPROVED MANUFACTURER DESIGN AND SHOP DRAWINGS.
CONSTRUCT LONGITUDINALLY FROM DOWNSTREAM TO UPSTREAM SO EACH NEW SECTION DISCHARGES TO A COMPLETELY STABILIZED SECTION. WITHIN EACH CROSS-SECTION, INSTALL THE STABILIZATION SYSTEM FROM THE CREST/TOP-OF-SLOPE TOWARD THE INVERT AND OPPOSING SLOPE IN ACCORDANCE WITH THE APPROVED MANUFACTURER DESIGN.
1. NOTIFY PENNSYLVANIA ONE CALL AND VERIFY EXISTING UTILITIES BEFORE EARTH DISTURBANCE. FIELD-LOCATE AND PROTECT ALL EXISTING UTILITIES, DRAINAGE FACILITIES, PROPERTY BOUNDARIES, AND OTHER FEATURES TO REMAIN.
2. STAKE THE LIMITS OF DISTURBANCE AND PROPOSED GRADING INCLUDING CHANNEL CENTERLINE, FLOW LINE, TOPS AND TOES OF THE 1H:1V SIDE SLOPES, 2-FOOT BERM WHERE SHOWN, LONGITUDINAL GRADE BREAKS, THE EXISTING 36-INCH PIPE, DOWNSTREAM OUTLET, AND UPSTREAM/DOWNSTREAM TIE-INS. THE ENGINEER SHALL REVIEW THE LAYOUT BEFORE GRADING BEGINS.
3. INSTALL AND STABILIZE ALL REQUIRED EROSION AND SEDIMENT CONTROLS AND CONSTRUCTION ACCESS BEFORE CLEARING OR EARTH DISTURBANCE. LIMIT CLEARING AND GRADING TO THE ACTIVE WORK AREA AND MAINTAIN ALL E&S CONTROLS THROUGHOUT
CONSTRUCTION.
4. IDENTIFY ALL ACTIVE DRAINAGE ENTERING THE WORK AREA AND PROVIDE AN APPROVED TEMPORARY DIVERSION, BYPASS, OR OTHER CONTROL WHERE NECESSARY TO PREVENT UNCONTROLLED FLOW THROUGH AN UNSTABILIZED PORTION OF THE PROPOSED SWALE.
MAINTAIN DRAINAGE FUNCTION THROUGHOUT CONSTRUCTION.
5. BEGIN CONSTRUCTION AT THE DOWNSTREAM END AND PROCEED UPSTREAM SO THAT EACH SUBSEQUENT SECTION DISCHARGES TO A COMPLETED AND STABILIZED DOWNSTREAM SECTION. CONSTRUCT THE DOWNSTREAM RIPRAP OUTFALL BEFORE ADVANCING
UPSTREAM.
6. CLEAR, GRUB, AND STRIP TOPSOIL ONLY WITHIN THE ACTIVE CONSTRUCTION SECTION AND STOCKPILE SUITABLE MATERIAL ONLY AT APPROVED LOCATIONS. PROTECT STOCKPILES AND ADJACENT AREAS IN ACCORDANCE WITH THE E&S PLAN.
7. PERFORM ROUGH GRADING OF THE CHANNEL AND ADJACENT EMBANKMENT, 10-FOOT CHANNEL WIDTH WHERE SHOWN, 1H:1V SIDE SLOPES, BERMS, AND TIE-INS. PLACE AND COMPACT FILL IN ACCORDANCE WITH THE PROJECT EARTHWORK REQUIREMENTS.
8. FINE-GRADE THE CHANNEL SUBGRADE AND REMOVE LOOSE MATERIAL, RUTS, PROTRUDING STONES, UNSUITABLE MATERIAL, SOFT AREAS, AND ABRUPT GRADE CHANGES. COMPACT AND PREPARE THE SUBGRADE AS REQUIRED BY THE APPROVED STABILIZATION-SYSTEM DESIGN WHILE MAINTAINING THE SPECIFIED LONGITUDINAL GRADES AND UNIFORM 1H:1V SIDE SLOPES.
9. PREPARE CREST ANCHORAGE AND TERMINATION FEATURES BEFORE FINAL INSTALLATION OF THE STABILIZATION SYSTEM, IN ACCORDANCE WITH PRESTO GEOSYSTEM OR APPROVED EQUAL. ADD EROSION CONTROL BLANKET BEYOND THE TOP OF SLOPE, CONSTRUCT THESE FEATURES ACCORDING TO THE NAG OR APPROVED EQUAL. CONSTRUCT THESE FEATURES WITHOUT DISTURBING
THE COMPLETED SLOPE FACE.
10. INSPECTION 1 - OBTAIN INSPECTION OF THE PREPARED SUBGRADE AND ANCHORAGE LAYOUT BY THE ENGINEER AND, WHEN REQUIRED, PRESTO REPRESENTATIVE (OR APPROVED EQUAL REPRESENTATIVE). DO NOT COVER THE PREPARED SUBGRADE OR BEGIN FINAL STABILIZATION-SYSTEM INSTALLATION UNTIL THE GEOMETRY AND ANCHORAGE LAYOUT ARE ACCEPTED. CORRECT UNACCEPTABLE GRADES, SOFT AREAS, EROSION, SETTLEMENT, OR OTHER DEFICIENCIES BEFORE PROCEEDING.
11. COMPLETE THE RECEIVING AREA AT THE EXISTING 36-INCH PIPE DISCHARGE INCLUDING, CONCRETE BASIN, RETAINING WALL AND ENDWALLS, REQUIRED TRANSITION GEOMETRY AND ANCHORAGE, BEFORE RESTORING FULL DISCHARGE TO THE SWALE. MAINTAIN TEMPORARY BYPASS/DIVERSION MEASURES UNTIL THE RECEIVING AREA IS CAPABLE OF SAFELY ACCEPTING FLOW.
12. INSTALL THE APPROVED PROPRIETARY STABILIZATION SYSTEM IN ACCORDANCE WITH THE APPROVED SHOP DRAWINGS AND MANUFACTURER REQUIREMENTS. FOR THE 1H:1V GEOMETRY, INSTALLATION SHALL GENERALLY PROCEED FROM CREST ANCHORAGE DOWN THE SIDE SLOPE, THROUGH THE INVERT/CHANNEL AREA, AND UP THE OPPOSING SIDE SLOPE TO THE REQUIRED TERMINATION ELEVATION. INSTALL ALL SEAMS, CONNECTORS, INTERMEDIATE ANCHORS, TENDONS, AND TERMINAL ANCHORAGE BEFORE THE
SYSTEM IS SUBJECTED TO PERMANENT FLOW.
13. COMPLETE THE REQUIRED SYSTEM TREATMENT AND STABILIZE ADJACENT DISTURBED AREAS INCLUDING ANY PRODUCT-SPECIFIC MATERIAL NECESSARY TO MAKE THE STABILIZATION SYSTEM FULLY FUNCTIONAL. COMPLETE GRADING AND PERMANENT STABILIZATION OUTSIDE THE PROPRIETARY SYSTEM LIMITS. KEEP CONSTRUCTION EQUIPMENT OFF UNSUPPORTED OR INCOMPLETELY
INSTALLED SLOPE PROTECTION.
14. COMPLETE EACH CONSTRUCTION SECTION BEFORE ADVANCING UPSTREAM AND DO NOT OPEN A NEW SECTION OF 1H:1V SLOPE UNLESS ADEQUATE TEMPORARY STABILIZATION AND DRAINAGE PROTECTION CAN BE MAINTAINED. PROTECT PARTIALLY COMPLETED
WORK FROM FORECAST RUNOFF.
15. VERIFY FINAL GRADES AND TRANSITIONS INCLUDING CONTINUOUS POSITIVE DRAINAGE, CHANNEL DIMENSIONS, 1H:1V SIDE SLOPES, BERM ELEVATIONS, UPSTREAM/DOWNSTREAM TIE-INS, AND THE 36-INCH PIPE RECEIVING AREA. CORRECT LOCALIZED DEPRESSIONS, ABRUPT TRANSITIONS, DAMAGED ANCHORAGE, DISPLACED STABILIZATION MATERIALS, OR OTHER DEFICIENCIES.
16. INSPECTION 2 - OBTAIN ENGINEER ACCEPTANCE BEFORE RESTORING PERMANENT FLOW THROUGH THE COMPLETED REACH OR
REMOVING TEMPORARY BYPASS/DIVERSION MEASURES.
17. RESTORE PERMANENT DRAINAGE THROUGH THE COMPLETED SYSTEM ONLY AFTER INSPECTION 2 ACCEPTANCE. REMOVE TEMPORARY BYPASS/DIVERSION MEASURES IN A MANNER THAT DOES NOT DAMAGE THE FINISHED CHANNEL OR ADJACENT
STABILIZED AREAS.
18. MAINTAIN E&S CONTROLS AND INSPECT THE COMPLETED WORK AFTER RUNOFF EVENTS AND THROUGHOUT THE STABILIZATION PERIOD. REPAIR EROSION, SETTLEMENT, DISPLACED MATERIALS, EXPOSED ANCHORS, UNDERMINING, OR OTHER DEFICIENCIES IMMEDIATELY. AFTER PERMANENT STABILIZATION IS ACHIEVED AND ACCEPTED, REMOVE TEMPORARY MEASURES AS AUTHORIZED, RESTORE AREAS DISTURBED BY THEIR REMOVAL, REMOVE EXCESS MATERIALS, AND DEMOBILIZE.
EROSION AND SEDIMENT CONTROL MEASURE NOTES
1. ALL EARTH DISTURBANCES, INCLUDING CLEARING AND GRUBBING AS WELL AS CUTS AND FILLS SHALL BE DONE IN ACCORDANCE WITH THE E&S PLAN. A COPY OF THE DRAWINGS MUST BE AVAILABLE AT THE PROJECT SITE AT ALL TIMES. NOTIFY THE ENGINEER OF ANY CHANGES TO THE E&S PLAN PRIOR TO IMPLEMENTATION OF THOSE CHANGES.
2. AT NO TIME SHALL CONSTRUCTION VEHICLES BE ALLOWED TO ENTER AREAS OUTSIDE THE LIMIT OF DISTURBANCE BOUNDARIES SHOWN ON THE PLAN MAPS. THESE AREAS MUST BE CLEARLY MARKED AND FENCED OFF BEFORE CLEARING AND GRUBBING
OPERATIONS BEGIN.
3. TOPSOIL REQUIRED FOR THE ESTABLISHMENT OF VEGETATION SHALL BE STOCKPILED AT THE LOCATION(S) SHOWN ON THE PLAN IN THE AMOUNT NECESSARY TO COMPLETE THE FINISH GRADING OF ALL EXPOSED AREAS THAT ARE TO BE STABILIZED BY VEGETATION. EACH STOCKPILE SHALL BE PROTECTED IN THE MANNER SHOWN ON THE PLAN DRAWINGS. STOCKPILE HEIGHTS
SHALL NOT EXCEED 35 FEET. STOCKPILE SLOPES SHALL BE 2H:1V OR FLATTER.
4. IMMEDIATELY UPON DISCOVERING UNFORESEEN CIRCUMSTANCES POSING THE POTENTIAL FOR ACCELERATED EROSION AND/OR SEDIMENT POLLUTION, THE OPERATOR SHALL IMPLEMENT APPROPRIATE BEST MANAGEMENT PRACTICES TO MINIMIZE
THE POTENTIAL FOR EROSION AND SEDIMENT POLLUTION.
5. ALL DEMOLISHED / EXCAVATED MATERIALS AND WASTES SHALL BE REMOVED FROM THE SITE AND DISPOSED OF IN ACCORDANCE WITH THE PADEP SOLID WASTE MANAGEMENT REGULATIONS AT 25 PA. CODE 260.1 ET SEQ., 271.1, AND 287.1 ET.
SEQ. NO MATERIALS OR WASTES OR UNUSED MATERIALS SHALL BE BURNED, BURIED, DUMPED, OR DISCHARGED AT THE SITE.
6. ALL PUMPING OF WATER FROM ANY WORK AREA SHALL BE DONE ACCORDING TO PADEP STANDARD PROCEDURES.
7. THE FILTER BAG IN THE STREAM MUST BE REMOVED NIGHTLY. FILTER BAG IS TO BE PLACED WHERE WATER DISCHARGE FROM
FILTER BAG WILL NOT CAUSE FURTHER EROSION.
8. UNTIL THE SITE IS STABILIZED, ALL EROSION AND SEDIMENT BMPS SHALL BE MAINTAINED PROPERLY. MAINTENANCE SHALL
INCLUDE INSPECTIONS OF ALL EROSION AND SEDIMENT BMPS AFTER EACH RUNOFF EVENT AND ON A WEEKLY BASIS. ALL PREVENTATIVE AND REMEDIAL MAINTENANCE WORK, INCLUDING CLEAN OUT, REPAIR, REPLACEMENT, REGRADING, RESEEDING, REMULCHING AND RENETTING MUST BE PERFORMED IMMEDIATELY. IF THE E&S BMPS FAIL TO PERFORM AS EXPECTED, REPLACEMENT BMPS, OR MODIFICATIONS OF THOSE INSTALLED WILL BE REQUIRED.
9. SEDIMENT TRACKED ONTO ANY DRIVEWAY AND PUBLIC ROADWAY SHALL BE RETURNED TO THE CONSTRUCTION SITE BY THE END OF EACH WORK DAY AND DISPOSED IN THE MANNER DESCRIBED IN THIS PLAN. IN NO CASE SHALL THE SEDIMENT BE WASHED, SHOVELED, OR SWEPT INTO ANY ROADSIDE DITCH, STORM SEWER, OR SURFACE WATER.
10. ALL SEDIMENT REMOVED FROM BMPS SHALL BE DISPOSED OF PROPERLY.
11. AREAS WHICH ARE TO BE TOPSOILED SHALL BE SCARIFIED TO A MINIMUM DEPTH OF 3 TO 5 INCHES -- 6 TO 12 INCHES ON
COMPACTED SOILS -- PRIOR TO PLACEMENT OF TOPSOIL.
12. ALL GRADED AREAS SHALL BE PERMANENTLY STABILIZED IMMEDIATELY UPON REACHING FINISHED GRADE. SEED, PLANT, ETC.
PER LANDSCAPE AND SITE PLANS.
13. IMMEDIATELY AFTER EARTH DISTURBANCE ACTIVITIES CEASE IN ANY AREA OR SUBAREA OF THE PROJECT, THE OPERATOR
SHALL STABILIZE ALL DISTURBED AREAS. DURING NON-GERMINATING MONTHS, MULCH OR PROTECTIVE BLANKETING SHALL BE APPLIED AS DESCRIBED IN THE PLAN. AREAS NOT AT FINISHED GRADE, WHICH WILL BE REACTIVATED WITHIN 1 YEAR, MAY BE STABILIZED IN ACCORDANCE WITH THE TEMPORARY STABILIZATION SPECIFICATIONS. THOSE AREAS WHICH WILL NOT BE REACTIVATED WITHIN 1 YEAR SHALL BE STABILIZED IN ACCORDANCE WITH THE PERMANENT STABILIZATION SPECIFICATIONS.
14. PERMANENT STABILIZATION IS DEFINED AS A MINIMUM UNIFORM, PERENNIAL 70% VEGETATIVE COVER OR OTHER PERMANENT NON-VEGETATIVE COVER WITH A DENSITY SUFFICIENT TO RESIST ACCELERATED EROSION. CUT AND FILL SLOPES SHALL BE
CAPABLE OF RESISTING FAILURE DUE TO SLUMPING, SLIDING, OR OTHER MOVEMENTS.
15. E&S BMPS SHALL REMAIN FUNCTIONAL AS SUCH UNTIL ALL AREAS TRIBUTARY TO THEM ARE PERMANENTLY STABILIZED OR UNTIL THEY ARE REPLACED BY ANOTHER BMP APPROVED BY THE LOCAL CONSERVATION DISTRICT OR THE DEPARTMENT.
16. AFTER FINAL SITE STABILIZATION HAS BEEN ACHIEVED, TEMPORARY EROSION AND SEDIMENT BMPS MUST BE REMOVED OR CONVERTED TO PERMANENT POST CONSTRUCTION STORMWATER MANAGEMENT BMPS. AREAS DISTURBED DURING REMOVAL OR CONVERSION OF THE BMPS SHALL BE STABILIZED IMMEDIATELY. IN ORDER TO ENSURE RAPID REVEGETATION OF DISTURBED AREAS, SUCH REMOVAL/CONVERSIONS ARE TO BE DONE ONLY DURING THE GERMINATING SEASON.
18. ALL CHANNELS SHALL BE KEPT FREE OF OBSTRUCTIONS INCLUDING BUT NOT LIMITED TO FILL, ROCKS, LEAVES, WOODY DEBRIS, ACCUMULATED SEDIMENT, EXCESS VEGETATION, AND CONSTRUCTION MATERIAL/WASTES.
19. UNDERGROUND UTILITIES CUTTING THROUGH ANY ACTIVE CHANNEL SHALL BE IMMEDIATELY BACKFILLED AND THE CHANNEL RESTORED TO ITS ORIGINAL CROSS-SECTION AND PROTECTIVE LINING. ANY BASE FLOW WITHIN THE CHANNEL SHALL BE CONVEYED PAST THE WORK AREA IN THE MANNER DESCRIBED IN THIS PLAN UNTIL SUCH RESTORATION IS COMPLETE.
20. UPON COMPLETION OF ALL EARTH DISTURBANCE ACTIVITIES AND PERMANENT STABILIZATION OF ALL DISTURBED AREAS, THE CONTRACTOR SHALL CONTACT THE OFFICE OF THE TOWNSHIP ENGINEER FOR AN INSPECTION PRIOR TO THE REMOVAL/
CONVERSION OF THE E&S BMPS.
21. UPON COMPLETION OF ALL EARTH DISTURBANCE ACTIVITIES AND PERMANENT STABILIZATION OF ALL DISTURBED AREAS, THE CONTRACTOR SHALL CONTACT THE OFFICE OF THE TOWNSHIP ENGINEER TO SCHEDULE A FINAL INSPECTION.
STREAM DIVERSION NOTES
1. PROPOSED STAGING AND LOCATION OF STREAM DIVERSION MEASURES ARE SHOWN FOR REFERENCE ONLY. CONTRACTOR MAY PROVIDE AN ALTERNATE WORK PLAN WITH ADJUSTMENTS TO THE LOCATION, NUMBER OF STAGES, ETC FOR ENGINEER'S
REVIEW AND APPROVAL PRIOR TO START OF WORK.
2. REFER TO DETAILS ON SHEET CM6001
TEMPORARY SEEDING SITE PREPARATION :
1. TEMPORARY STABILIZATION OF ALL EXPOSED EARTH SURFACES WHERE CONSTRUCTION ACTIVITY HAS CEASED, SHALL BE
STABILIZED IMMEDIATELY BY THE FOLLOWING METHODS AND MATERIALS.
2. APPLY ONE (1) TON OF AGRICULTURAL GRADE LIMESTONE PER ACRE PLUS FERTILIZER (10-10-10) AT THE RATE OF 1000 LBS PER
ACRE AND WORK INTO SOIL WHEREVER POSSIBLE.
3. APPLY 100% ANNUAL RYEGRASS SEED AT A RATE OF 4 OR 5 LBS PER 1000 SQUARE FEET.
4. AFTER SEEDING MULCH WITH HAY OR STRAW AT A RATE OF THREE (3) TONS PER ACRE.
TEMPORARY AND PERMANENT STABILIZATION
1. HAY OR STRAW MULCH MUST BE APPLIED AT 3.0 TONS PER ACRE.
2. MULCH WITH MULCH CONTROL NETTING OR EROSION CONTROL BLANKETS MUST BE INSTALLED ON ALL SLOPES 3:1 OR
STEEPER.
3. STRAW MULCH SHALL BE APPLIED IN LONG STRANDS, NOT CHOPPED OR FINELY BROKEN.
4. UNTIL THE SITE IS STABILIZED, ALL EROSION AND SEDIMENT BMP'S MUST BE MAINTAINED PROPERLY. MAINTENANCE MUST
INCLUDE INSPECTIONS OF ALL EROSION AND SEDIMENT CONTROL BMP'S AFTER EACH RUNOFF EVENT AND ON A WEEKLY BASIS.
ALL PREVENTATIVE AND REMEDIAL MAINTENANCE WORK, INCLUDING CLEAN OUT, REPAIR, REPLACEMENT, REGARDING, RESEEDING, REMULCHING, AND RENETTING, MUST BE DONE IMMEDIATELY. IF EROSION AND SEDIMENT CONTROL BMP'S FAIL TO PERFORM AS EXPECTED, REPLACEMENT BMP'S, OR MODIFICATIONS TO THOSE INSTALLED WILL BE REQUIRED. E&SPCPM P. 168
5. ALL DISTURBED AREAS MUST BE STABILIZED WITH EROSION CONTROL MATTING.
(TEMPORARY) SEED MIX: PENNDOT FORMULA E
% PURE LIVE SEED: 98%
APPLICATION RATE: 10 LBS/1000 SY
FERTILIZER TYPE: 10-10-10
FERTILIZER APP. RATE: 500 LBS/ACRE
LIMING RATE: 1 TON/ACRE
MULCH TYPE: HAY OR STRAW
MULCHING RATE: 3 TONS/ACRE
ADDITIONAL SEEDING: 0.5LB/1000 SY INOCULATED RED/WHITE
CLOVER MIX
(PERMANENT SEED MIX: PENNDOT FORMULA B
FLATTER THAN % PURE LIVE SEED: 98%
3:1 SLOPE) APPLICATION RATE: 21 LBS/1000 SY
FERTILIZER TYPE: 10-20-20
FERTILIZER APP. RATE: 1000 LBS/ACRE
LIMING RATE: 6 TONS/ACRE
MULCH TYPE: HAY OR STRAW
MULCHING RATE: 3 TONS/ACRE
ADDITIONAL SEEDING: 0.5 LB/1000 SY INOCULATED RED/WHITE
CLOVER MIX
(PERMANENT SEED MIX: PENNDOT FORMULA D
3:1 SLOPE OR % PURE LIVE SEED: 98%
STEEPER) APPLICATION RATE: 9 LBS/1000 SY
FERTILIZER TYPE: 10-20-20
FERTILIZER APP. RATE: 1000 LBS/ACRE
LIMING RATE: 6 TONS/ACRE
ANCHOR MATERIAL: FLEXTERRA FLEXIBLE GROWTH MEDIUM
(OR APPROVED EQUAL)
ANCHOR METHOD: HYDRAULICALLY
RATE OF ANCHOR MATERIAL: PER MATERIAL SUPPLIER
TEMPORARY AND PERMANENT SEEDING SPECIFICATIONS :
SPECIFICATIONS: THE DEPARTMENT RECOMMENDS THE USE OF THE PENN STATE AGRONOMY GUIDE AS THE STANDARD TO USE FOR SELECTION OF SPECIES, SEED SPECIFICATIONS, MIXTURES, LIMING AND FERTILIZING, TIME OF SEEDING, AND SEEDING METHODS. SPECIFICATIONS FOR THESE ITEMS MAY ALSO BE OBTAINED FROM PENNDOT'S PUBLICATION #408, SECTION 80 OR BY CONTACTING THE TOWNSHIP ENGINEER. UPON SELECTION OF A REFERENCE, THAT REFERENCE MUST BE USED TO PROVIDE ALL SPECIFICATIONS FOR SEEDING, MULCHING, AND SOIL AMENDMENTS. THE FOLLOWING SPECIFICATION WILL BE USED FOR THIS
PROJECT:
MAINTENANCE OF EROSION AND SEDIMENT CONTROLS:
1. UNTIL THE SITE ACHIEVES FINAL STABILIZATION, THE PERMITTEE AND COPERMITTEE SHALL ASSURE THAT THE BEST MANAGEMENT PRACTICES ARE IMPLEMENTED, OPERATED, AND MAINTAINED PROPERLY AND COMPLETELY. MAINTENANCE SHALL INCLUDE INSPECTIONS OF ALL BEST MANAGEMENT PRACTICES FACILITIES AND MAINTAIN AND MAKE AVAILABLE TO THE MONTGOMERY COUNTY CONSERVATION DISTRICT COMPLETE, WRITTEN INSPECTION LOGS OF ALL THOSE INSPECTIONS. ALL MAINTENANCE WORK INCLUDING CLEANING, REPAIR, REPLACEMENT, REGRADING, RESEEDING, AND RESTABILIZATION SHALL BE
PERFORMED IMMEDIATELY.
2. IMMEDIATELY UPON DISCOVERING UNFORESEEN CIRCUMSTANCES POSING THE POTENTIAL FOR ACCELERATED EROSION AND/OR SEDIMENT POLLUTION, THE OPERATOR SHALL IMPLEMENT APPROPRIATE BEST MANAGEMENT PRACTICES TO ELIMINATE
POTENTIAL FOR ACCELERATED EROSION AND/OR SEDIMENT POLLUTION.
3. BEFORE INITIATING ANY REVISIONS TO THE APPROVED EROSION AND SEDIMENTATION CONTROL PLAN OR REVISION TO THE OTHER PLANS WHICH MAY AFFECT THE EFFECTIVENESS OF THE APPROVED E&S CONTROL PLAN, THE OPERATOR MUST RECEIVE
APPROVAL OF THE REVISIONS FROM THE MONTGOMERY COUNTY AND CONSERVATION DISTRICT.
4. UNTIL THE SITE IS STABILIZED, ALL EROSION AND SEDIMENT BMP'S MUST BE MAINTAINED PROPERLY. MAINTENANCE MUST INCLUDE INSPECTIONS OF ALL EROSION AND SEDIMENT CONTROL BMP'S AFTER EACH RUNOFF EVENT AND ON A WEEKLY BASIS.
ALL PREVENTATIVE AND REMEDIAL MAINTENANCE WORK, INCLUDING CLEAN OUT, REPAIR, REPLACEMENT, REGARDING, RESEEDING, REMULCHING, AND RENETTING, MUST BE DONE IMMEDIATELY. IF EROSION AND SEDIMENT CONTROL BMP'S FAIL TO PERFORM AS EXPECTED, REPLACEMENT BMP'S, OR MODIFICATIONS TO THOSE INSTALLED WILL BE REQUIRED. E&SPCPM P. 168
5. SEDIMENT REMOVED FROM BMP'S SHALL BE DISPOSED OF IN LANDSCAPE AREAS OUTSIDE OF STEEP SLOPES, WETLANDS, FLOODPLAINS OR DRAINAGE SWALES AND IMMEDIATELY STABILIZED, OR PLACED IN TOPSOIL STOCKPILES.
6. THE OPERATOR SHALL REMOVE FROM THIS SITE, RECYCLE, OR DISPOSE OF ALL BUILDING MATERIALS AND WASTES IN ACCORDANCE WITH THE DEPARTMENT'S SOLID WASTE MANAGEMENT REGULATIONS AT 25 PA. CODE 260.1 ET SEQ., 271.1 ET SEQ. THE CONTRACTOR SHALL NOT ILLEGALLY BURY, DUMP, OR DISCHARGE ANY BUILDING MATERIAL OR WASTES AT THIS SITE.
7. ALL PUMPING OF SEDIMENT LADEN WATER SHALL BE THROUGH A SEDIMENT CONTROL BMP, SUCH AS A PUMPED WATER FILTER
BAG DISCHARGING OVER NON-DISTURBED AREAS.
LAYOUT NOTES:
1. CONTRACTOR SHALL BE RESPONSIBLE FOR LAYOUT OF PROPOSED IMPROVEMENTS. THE ENGINEER MUST BE NOTIFIED IMMEDIATELY OF ANY DISCREPANCIES BETWEEN FIELD CONDITIONS AND THIS PLAN WHICH WILL AFFECT THE LAYOUT OF THE PROPOSED IMPROVEMENTS PRIOR TO CONSTRUCTION. THE ENGINEER WILL PROVIDE DIRECTION TO RESOLVE CONFLICTS.
2. DIGITAL AUTOCAD FILES CAN BE SUPPLIED TO THE CONTRACTOR/CONTRACTOR'S SURVEYOR FOR LAYOUT OF SITE ELEMENTS.
3. NO WORK OR ACTIVITIES SHALL BE PERFORMED BEYOND THE LIMITS OF DISTURBANCE.
WESTBOUND
EASTBOUND
SCHUYLKILL EXPRESSWAY
WESTBOUND
EASTBOUND
LANDS N/F
LOWER MERION
TOWNSHIP
1700 WAVERLY ROAD
APN# 40-00-64765-00-4
DB 5031 PG 276
692,184 SF / 15.89036 AC
DB 6267 PG 0812
W
AV
ER
LY
R O
AD
L.
R
. 4
NORTH
00 100' 200'
SHEET CM0201
APPROVED BY:
DRAWN BY:
DATE:
SCALE:
SHEET:
DRAWING NO.:
TOWNSHIP OF LOWER MERION
OFFICE OF THE TOWNSHIP ENGINEER
75 EAST LANCASTER AVENUE
ARDMORE, MONTGOMERY COUNTY, PENNSYLVANIA 19003
WAVERLY SITE IMPROVEMENTS
1700 WAVERLY ROAD
GLADWYNE, PENNSYLVANIA 19035
11-16-2026
U :\A
C C
O U
N
TS
\L O
W M
M \L
O W
M
W
AV
ER
LY
S
IT
E
IM
PR
O
VE
M
EN
TS
\D
ES
IG
N
SH
EE
TS
R
EV
IS
ED
S H
EE
TS
AS NOTED
AGS
RM
CM0200
OVERALL EXISTING CONDITIONS PLAN
SHEET CM0202 SHEET CM0203 SHEET CM0204 SHEET CM0205
100.5
100.55
STORM SEWER, INLET
POWER, TRANSFORMER
POWER, METER
JUNCTION BOX
VALVES
MANHOLES
UNIDENTIFIED, OVERHEAD
WATER, UNDERGROUND
STORM SEWER, UNDERGROUND
STEAM, UNDERGROUND
SANITARY SEWER, UNDERGROUND
POWER, UNDERGROUND
NATURAL GAS, UNDERGROUND
COMMUNICATION, UNDERGROUND
SPOT ELEVATION, HARD SURFACE
SPOT ELEVATION, SOFT SURFACE
MAJOR CONTOUR
MINOR CONTOUR
BRUSH LINE
LANDSCAPED AREA
CONIFEROUS TREE
DECIDUOUS TREE
LEGEND
LSA
SH
EE
T C
M
(I
N
SE
T)
SH
EE
T C
M
(I
N
SE
T)
SPOT LIGHT
LIGHT
GUY WIRE
GUY POLE
UTILITY POLE
SIGN
SIGN POST AND BOARD
GUIDE RAIL
FENCE, METAL
FENCE, WOOD
ASPHALT PAVING
EDGE OF GRAVEL
EDGE OF PAVEMENT
CURB DEPRESSION
CURB
BUILDING
PROPERTY MARKER
EASEMENT
LEGAL RIGHT-OF-WAY
PROPERTY, LINE
SCHUYLKILL EXPRESSWAY
BRUSH AREA TO BE REMOVED
LIMIT OF DISTURBANCE
TOPSOIL STOCKPILE
AND STAGING AREA
TEMPORARY COFFERDAM
STREAM DIVERSION
24" COMPOST FILTER SOCK - PHASE 1
AFTER PHASE 1 IS COMPLETED, RELOCATE TO PHASE 2 LOCATIONS
24" COMPOST FILTER SOCK - PHASE 1
AFTER PHASE 1 IS COMPLETED, RELOCATE TO PHASE 2 LOCATIONS
APPROVED BY:
DRAWN BY:
DATE:
SCALE:
SHEET:
DRAWING NO.:
TOWNSHIP OF LOWER MERION
OFFICE OF THE TOWNSHIP ENGINEER
75 EAST LANCASTER AVENUE
ARDMORE, MONTGOMERY COUNTY, PENNSYLVANIA 19003
WAVERLY SITE IMPROVEMENTS
1700 WAVERLY ROAD
GLADWYNE, PENNSYLVANIA 19035
11-16-2026
U :\A
C C
O U
N
TS
\L O
W M
M \L
O W
M
W
AV
ER
LY
S
IT
E
IM
PR
O
VE
M
EN
TS
\D
ES
IG
N
SH
EE
TS
R
EV
IS
ED
S H
EE
TS
AS NOTED
AGS
RM
CM0201
EXISTING CONDITIONS, DEMO, AND E&S PLAN 1
M
AT
C H
LI
N
E A-
A
00 20' 40'
NORTH
DEMO AND E&S LEGEND
LIMIT OF DISTURBANCE
ROCK CONSTRUCTION ENTRANCE
TEMPORARY COFFERDAM
BRUSH AREA TO BE REMOVED
ASPHALT TO BE REMOVED
LEAF/PILE AREA TO BE REMOVED BY OWNER
COMPOST FILTER SOCK
100.5
100.55
STORM SEWER, INLET
POWER, TRANSFORMER
POWER, METER
JUNCTION BOX
VALVES
MANHOLES
UNIDENTIFIED, OVERHEAD
WATER, UNDERGROUND
STORM SEWER, UNDERGROUND
STEAM, UNDERGROUND
SANITARY SEWER, UNDERGROUND
POWER, UNDERGROUND
NATURAL GAS, UNDERGROUND
COMMUNICATION, UNDERGROUND
SPOT ELEVATION, HARD SURFACE
SPOT ELEVATION, SOFT SURFACE
MAJOR CONTOUR
MINOR CONTOUR
LANDSCAPED AREA
CONIFEROUS TREE
DECIDUOUS TREE
EXISTING LEGEND
LSA
BRUSH LINE
SPOT LIGHT
LIGHT
GUY WIRE
GUY POLE
UTILITY POLE
SIGN
SIGN POST AND BOARD
GUIDE RAIL
FENCE, METAL
FENCE, WOOD
ASPHALT PAVING
EDGE OF GRAVEL
EDGE OF PAVEMENT
CURB DEPRESSION
CURB
BUILDING
PROPERTY MARKER
EASEMENT
LANDS N/F
LOWER MERION
TOWNSHIP
1700 WAVERLY ROAD
APN# 40-00-64765-00-4
DB 5031 PG 276
692,184 SF / 15.89036 AC
LANDS N/F
CONSOLIDATED RAIL
CORPORATION
ASPHALT TO BE REMOVED
BRUSH AREA TO BE REMOVED
LIMIT OF DISTURBANCE
TOPSOIL STOCKPILE
AND STAGING AREA
TEMPORARY COFFERDAM
STREAM DIVERSION TEMPORARY COFFERDAM
STREAM DIVERSION
24" COMPOST FILTER SOCK - PHASE 2
24" COMPOST FILTER SOCK - PHASE 1
AFTER PHASE 1 IS COMPLETED, RELOCATE TO PHASE 2 LOCATIONS
AFTER PHASE 1 IS COMPLETED, RELOCATE TO PHASE 2 LOCATIONS
LIMIT OF DISTURBANCE
APPROVED BY:
DRAWN BY:
DATE:
SCALE:
SHEET:
DRAWING NO.:
TOWNSHIP OF LOWER MERION
OFFICE OF THE TOWNSHIP ENGINEER
75 EAST LANCASTER AVENUE
ARDMORE, MONTGOMERY COUNTY, PENNSYLVANIA 19003
WAVERLY SITE IMPROVEMENTS
1700 WAVERLY ROAD
GLADWYNE, PENNSYLVANIA 19035
11-16-2026
U :\A
C C
O U
N
TS
\L O
W M
M \L
O W
M
W
AV
ER
LY
S
IT
E
IM
PR
O
VE
M
EN
TS
\D
ES
IG
N
SH
EE
TS
R
EV
IS
ED
S H
EE
TS
AS NOTED
AGS
RM
CM0202
EXISTING CONDITIONS, DEMO, AND E&S PLAN 2
00 20' 40'
NORTH
M
AT
C H
LI
N
E B-
B
M
AT
C H
LI
N
E A-
A
100.5
100.55
STORM SEWER, INLET
POWER, TRANSFORMER
POWER, METER
JUNCTION BOX
VALVES
MANHOLES
UNIDENTIFIED, OVERHEAD
WATER, UNDERGROUND
STORM SEWER, UNDERGROUND
STEAM, UNDERGROUND
SANITARY SEWER, UNDERGROUND
POWER, UNDERGROUND
NATURAL GAS, UNDERGROUND
COMMUNICATION, UNDERGROUND
SPOT ELEVATION, HARD SURFACE
SPOT ELEVATION, SOFT SURFACE
MAJOR CONTOUR
MINOR CONTOUR
LANDSCAPED AREA
CONIFEROUS TREE
DECIDUOUS TREE
SPOT LIGHT
LIGHT
GUY WIRE
GUY POLE
UTILITY POLE
SIGN
SIGN POST AND BOARD
GUIDE RAIL
FENCE, METAL
FENCE, WOOD
ASPHALT PAVING
EDGE OF GRAVEL
EDGE OF PAVEMENT
CURB DEPRESSION
CURB
BUILDING
PROPERTY MARKER
EASEMENT
LEGAL RIGHT-OF-WAY
PROPERTY, LINE
EXISTING LEGEND
LSA
BRUSH LINE
DEMO AND E&S LEGEND
LIMIT OF DISTURBANCE
ROCK CONSTRUCTION ENTRANCE
TEMPORARY COFFERDAM
BRUSH AREA TO BE REMOVED
ASPHALT TO BE REMOVED
LEAF/PILE AREA TO BE REMOVED BY OWNER
COMPOST FILTER SOCK
ASPHALT TO BE REMOVED
LEAF/PILE AREA TO BE REMOVED BY OWNER.
BRUSH AREA TO BE REMOVED
LIMIT OF DISTURBANCE
TOPSOIL STOCKPILE
AND STAGING AREA
24" COMPOST FILTER SOCK - PHASE 2 24" COMPOST FILTER SOCK - PHASE 2
24" COMPOST FILTER SOCK - PHASE 1
AFTER PHASE 1 IS COMPLETED, RELOCATE TO PHASE 2 LOCATIONS
ASPHALT TO BE REMOVED
APPROVED BY:
DRAWN BY:
DATE:
SCALE:
SHEET:
DRAWING NO.:
TOWNSHIP OF LOWER MERION
OFFICE OF THE TOWNSHIP ENGINEER
75 EAST LANCASTER AVENUE
ARDMORE, MONTGOMERY COUNTY, PENNSYLVANIA 19003
WAVERLY SITE IMPROVEMENTS
1700 WAVERLY ROAD
GLADWYNE, PENNSYLVANIA 19035
11-16-2026
U :\A
C C
O U
N
TS
\L O
W M
M \L
O W
M
W
AV
ER
LY
S
IT
E
IM
PR
O
VE
M
EN
TS
\D
ES
IG
N
SH
EE
TS
R
EV
IS
ED
S H
EE
TS
AS NOTED
AGS
RM
CM0203
EXISTING CONDITIONS, DEMO, AND E&S PLAN 3
00 20' 40'
NORTH
M
AT
C H
LI
N
E C
-C
M
AT
C H
LI
N
E B-
B
100.5
100.55
STORM SEWER, INLET
POWER, TRANSFORMER
POWER, METER
JUNCTION BOX
VALVES
MANHOLES
UNIDENTIFIED, OVERHEAD
WATER, UNDERGROUND
STORM SEWER, UNDERGROUND
STEAM, UNDERGROUND
SANITARY SEWER, UNDERGROUND
POWER, UNDERGROUND
NATURAL GAS, UNDERGROUND
COMMUNICATION, UNDERGROUND
SPOT ELEVATION, HARD SURFACE
SPOT ELEVATION, SOFT SURFACE
MAJOR CONTOUR
MINOR CONTOUR
LANDSCAPED AREA
CONIFEROUS TREE
DECIDUOUS TREE
EXISTING LEGEND
LSA
DEMO AND E&S LEGEND
LIMIT OF DISTURBANCE
ROCK CONSTRUCTION ENTRANCE
18" SILT FENCE
TEMPORARY BYPASS PUMPING
TEMPORARY COFFERDAM
BRUSH AREA TO BE REMOVED
ASPHALT TO BE REMOVED
COMPOST FILTER SOCK
BRUSH LINE
LEAF/PILE AREA TO BE REMOVED BY OWNER
SPOT LIGHT
LIGHT
GUY WIRE
GUY POLE
UTILITY POLE
SIGN
SIGN POST AND BOARD
GUIDE RAIL
FENCE, METAL
FENCE, WOOD
ASPHALT PAVING
EDGE OF GRAVEL
EDGE OF PAVEMENT
CURB DEPRESSION
CURB
BUILDING
PROPERTY MARKER
EASEMENT
LANDS N/F
CONSOLIDATED RAIL
CORPORATION
LANDS N/F
LOWER MERION
TOWNSHIP
1700 WAVERLY ROAD
APN# 40-00-64765-00-4
DB 5031 PG 276
692,184 SF / 15.89036 AC
RIGHT-OF-WAY
LIMIT OF DISTURBANCE
BRUSH AREA TO BE REMOVED
TOPSOIL STOCKPILE
AND STAGING AREA
24" COMPOST FILTER SOCK - PHASE 2
24" COMPOST FILTER SOCK - PHASE 1
AFTER PHASE 1 IS COMPLETED, RELOCATE TO PHASE 2 LOCATIONS
APPROVED BY:
DRAWN BY:
DATE:
SCALE:
SHEET:
DRAWING NO.:
TOWNSHIP OF LOWER MERION
OFFICE OF THE TOWNSHIP ENGINEER
75 EAST LANCASTER AVENUE
ARDMORE, MONTGOMERY COUNTY, PENNSYLVANIA 19003
WAVERLY SITE IMPROVEMENTS
1700 WAVERLY ROAD
GLADWYNE, PENNSYLVANIA 19035
11-16-2026
U :\A
C C
O U
N
TS
\L O
W M
M \L
O W
M
W
AV
ER
LY
S
IT
E
IM
PR
O
VE
M
EN
TS
\D
ES
IG
N
SH
EE
TS
R
EV
IS
ED
S H
EE
TS
AS NOTED
AGS
RM
CM0204
EXISTING CONDITIONS, DEMO, AND E&S PLAN 4
00 20' 40'
NORTH
M
AT
C H
LI
N
E D
-D
M
AT
C H
LI
N
E C
-C
100.5
100.55
STORM SEWER, INLET
POWER, TRANSFORMER
POWER, METER
JUNCTION BOX
VALVES
MANHOLES
UNIDENTIFIED, OVERHEAD
WATER, UNDERGROUND
STORM SEWER, UNDERGROUND
STEAM, UNDERGROUND
SANITARY SEWER, UNDERGROUND
POWER, UNDERGROUND
NATURAL GAS, UNDERGROUND
COMMUNICATION, UNDERGROUND
SPOT ELEVATION, HARD SURFACE
SPOT ELEVATION, SOFT SURFACE
MAJOR CONTOUR
MINOR CONTOUR
LANDSCAPED AREA
CONIFEROUS TREE
DECIDUOUS TREE
EXISTING LEGEND
LSA
BRUSH LINE
SPOT LIGHT
LIGHT
GUY WIRE
GUY POLE
UTILITY POLE
SIGN
SIGN POST AND BOARD
GUIDE RAIL
FENCE, METAL
FENCE, WOOD
ASPHALT PAVING
EDGE OF GRAVEL
EDGE OF PAVEMENT
CURB DEPRESSION
CURB
BUILDING
PROPERTY MARKER
EASEMENT
LEGAL RIGHT-OF-WAY
PROPERTY, LINE
DEMO AND E&S LEGEND
LIMIT OF DISTURBANCE
ROCK CONSTRUCTION ENTRANCE
TEMPORARY COFFERDAM
BRUSH AREA TO BE REMOVED
ASPHALT TO BE REMOVED
RIGHT-OF-WAY
LIMIT OF DISTURBANCE
TOPSOIL STOCKPILE
AND STAGING AREA
TOPSOIL STOCKPILE
AND STAGING AREA
24" COMPOST FILTER SOCK - PHASE 2
W
AV
ER
LY
R O
AD
L.
R
. 4
LIMIT OF DISTURBANCE
INSTALL GME EXIT GRID
(SEE DETAIL 1/CM6001)24" COMPOST FILTER SOCK - PHASE 2
RELOCATE SIGN
APPROVED BY:
DRAWN BY:
DATE:
SCALE:
SHEET:
DRAWING NO.:
TOWNSHIP OF LOWER MERION
OFFICE OF THE TOWNSHIP ENGINEER
75 EAST LANCASTER AVENUE
ARDMORE, MONTGOMERY COUNTY, PENNSYLVANIA 19003
WAVERLY SITE IMPROVEMENTS
1700 WAVERLY ROAD
GLADWYNE, PENNSYLVANIA 19035
11-16-2026
U :\A
C C
O U
N
TS
\L O
W M
M \L
O W
M
W
A V
E R
LY
S
IT
E
IM
P
R O
V E
M E
N
TS
\D E
S
IG
N
S H
E E
TS
R E
V
IS
E D
S H
E E
TS
AS NOTED
AGS
RM
CM0205
EXISTING CONDITIONS, DEMO, AND E&S PLAN 5
00 20' 40'
NORTH
M A
TC
H
LI
N
E D
-D
M A
TC
H
LI
N
E E
-E
M A
TC
H
LI
N
E E
-E
100.5
100.55
STORM SEWER, INLET
POWER, TRANSFORMER
POWER, METER
JUNCTION BOX
VALVES
MANHOLES
UNIDENTIFIED, OVERHEAD
WATER, UNDERGROUND
STORM SEWER, UNDERGROUND
STEAM, UNDERGROUND
SANITARY SEWER, UNDERGROUND
POWER, UNDERGROUND
NATURAL GAS, UNDERGROUND
COMMUNICATION, UNDERGROUND
SPOT ELEVATION, HARD SURFACE
SPOT ELEVATION, SOFT SURFACE
MAJOR CONTOUR
MINOR CONTOUR
LANDSCAPED AREA
CONIFEROUS TREE
DECIDUOUS TREE
EXISTING LEGEND
LSA
BRUSH LINE
SPOT LIGHT
LIGHT
GUY WIRE
GUY POLE
UTILITY POLE
SIGN
SIGN POST AND BOARD
GUIDE RAIL
FENCE, METAL
FENCE, WOOD
ASPHALT PAVING
EDGE OF GRAVEL
EDGE OF PAVEMENT
CURB DEPRESSION
CURB
BUILDING
PROPERTY MARKER
EASEMENT
LEGAL RIGHT-OF-WAY
PROPERTY, LINE
DEMO AND E&S LEGEND
LIMIT OF DISTURBANCE
ROCK CONSTRUCTION ENTRANCE
TEMPORARY COFFERDAM
BRUSH AREA TO BE REMOVED
ASPHALT TO BE REMOVED
SCHUYLKILL EXPRESSWAY
WESTBOUND
EASTBOUND
20'
OPEN AREA
±0.73 AC
OPEN AREA
±2.89 AC FUTURE
WINDROWS AREA
(BY OTHERS)
3.58 AC
EVOC AREA
2.75 AC
600'
0'
0'
1225'
20'
HEAVY-DUTY
ASPHALT PAVEMENT
(BASE BID)
PROPOSED CONVEYANCE
CHANNEL, TYP.
ASPHALT PAVEMENT A
5" SELECTIVE BASE REPAIR
OF EXISTING DRIVEWAY
ASPHALT PAVEMENT A
(BASE BID)
5" SELECTIVE BASE REPAIR
OF EXISTING DRIVEWAY
(BASE BID)
W
AV
ER
LY
R O
AD
L.
R
. 4
20'
ASPHALT PAVEMENT A
(BASE BID)
5" SELECTIVE BASE REPAIR
OF EXISTING DRIVEWAY
(BASE BID)
NORTH
00 100' 200'
SHEET CM1001
APPROVED BY:
DRAWN BY:
DATE:
SCALE:
SHEET:
DRAWING NO.:
TOWNSHIP OF LOWER MERION
OFFICE OF THE TOWNSHIP ENGINEER
75 EAST LANCASTER AVENUE
ARDMORE, MONTGOMERY COUNTY, PENNSYLVANIA 19003
WAVERLY SITE IMPROVEMENTS
1700 WAVERLY ROAD
GLADWYNE, PENNSYLVANIA 19035
11-16-2026
U :\A
C C
O U
N
TS
\L O
W M
M \L
O W
M
W
AV
ER
LY
S
IT
E
IM
PR
O
VE
M
EN
TS
\D
ES
IG
N
SH
EE
TS
R
EV
IS
ED
S H
EE
TS
AS NOTED
AGS
RM
CM1000
OVERALL SITE IMPROVEMENT PLAN
SHEET CM1002 SHEET CM1003 SHEET CM1004 SHEET CM1005
SH
EE
T C
M
(I
N
SE
T)
SH
EE
T C
M
(I
N
SE
T)SITE IMPROVEMENT LEGEND
GEOWEB CHANNEL LINING
HEAVY-DUTY ASPHALT PAVEMENT
ASPHALT PAVEMENT A
5" BC BC BASE REPAIR
PROPOSED CONTOUR101
100.5
100.55
STORM SEWER, INLET
POWER, TRANSFORMER
POWER, METER
JUNCTION BOX
VALVES
MANHOLES
UNIDENTIFIED, OVERHEAD
WATER, UNDERGROUND
STORM SEWER, UNDERGROUND
STEAM, UNDERGROUND
SANITARY SEWER, UNDERGROUND
POWER, UNDERGROUND
NATURAL GAS, UNDERGROUND
COMMUNICATION, UNDERGROUND
SPOT ELEVATION, HARD SURFACE
SPOT ELEVATION, SOFT SURFACE
MAJOR CONTOUR
MINOR CONTOUR
BRUSH LINE
LANDSCAPED AREA
CONIFEROUS TREE
DECIDUOUS TREE
LEGEND
LSA
SPOT LIGHT
LIGHT
GUY WIRE
GUY POLE
UTILITY POLE
SIGN
SIGN POST AND BOARD
GUIDE RAIL
FENCE,…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .