Gladwyne Fire Company Apron & Engine Room Floor Repairs - Plan Set Summary
This is a construction plan set prepared by Pennoni Associates, Inc. for the Township of Lower Merion, Pennsylvania, detailing selective concrete repairs and trench drain replacement at the Gladwyne Fire Company facility located at 1044 Black Rock Road, Gladwyne, PA 19035. The project scope includes topside concrete repairs to the exterior apron, complete removal and replacement of the interior trench drain system, and associated concrete floor replacement in the engine room. Work is anticipated to begin in early fall 2026, with specific construction sequencing provided for both the apron and engine room repair phases. The apron repairs involve partial-depth concrete slab patching with joint sealant installation, while the engine room work requires demolition of the existing trench drain system and concrete slab, installation of a new Zurn Z882 Perma-Trench HDPE 12" drain system with H-20 rated grates, dowel installation, and high-early-strength concrete placement. The project includes provisions for temporary apparatus relocation due to environmental sensitivity constraints (temperature range of 50°F to 80°F) and coordination with scheduled fire company events. The contractor must provide all materials new unless otherwise noted, with specific product specifications including Sikasil-728 NS sealants, Versaspeed 100 repair mortar, and Eucoweld 2.0 bonding agent.
The plan set establishes comprehensive general notes and construction requirements addressing quality standards, safety protocols, site management, selective demolition procedures, and joint sealant installation standards. All work must comply with federal, state, and local codes, with the contractor responsible for obtaining permits, scheduling inspections, and providing testing and certifications. The contractor must submit a site utilization plan, maintain site safety protocols, protect existing facilities and vegetation, conduct continuous cleanup, and provide operation and maintenance manuals upon completion. The contract documents indicate that construction is scheduled for weekly completion with specific daily sequencing to minimize fire company operational disruption, and all materials and equipment must be protected and stored according to manufacturer specifications. Bonding requirements include a Performance Bond and Labor and Materials Bond in the amount of 100% and a Maintenance Bond of 25%, with an award date planned for July 15, 2026.
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
GENERAL NOTES
1. THE CONTRACT DOCUMENTS INCLUDE THE WORKING DRAWINGS,
PROJECT MANUAL, ADDENDA, MODIFICATIONS, AND THE CONDITIONS
OF THE CONSTRUCTION CONTRACT, SPECIFICATIONS, CUT SHEETS,
ETC.
2. REFER TO CONTRACT DOCUMENTS FOR THE PROJECT, INCLUDING
DRAWINGS AND SPECIFICATIONS.
3. THE CONTRACT DOCUMENTS ARE THE INSTRUMENTS OF SERVICE
AND SHALL REMAIN THE PROPERTY OF THE ENGINEER, WHETHER
THE PROJECT FOR WHICH THEY ARE PREPARED IS EXECUTED OR
NOT. THE CONTRACT DOCUMENTS ARE NOT TO BE USED BY ANYONE
FOR OTHER PROJECTS OR EXTENSIONS TO THE PROJECT, NOR ARE
THEY TO BE MODIFIED IN ANY MANNER WHATSOEVER EXCEPT BY
AGREEMENT IN WRITING BY THE ENGINEER.
4. 'FURNISH' OR 'SUPPLY' MEANS TO PURCHASE, PROCURE, ACQUIRE,
AND DELIVER COMPLETE WITH RELATED ACCESSORIES.
5. 'INSTALL' MEANS TO BE INSTALLED BY CONTRACTOR, COMPLETE AND
IN PLACE.
6. 'PROVIDE' MEANS FURNISH AND INSTALL, COMPLETE AND IN PLACE.
7. 'SIMILAR' (SIM) MEANS COMPARABLE CHARACTERISTICS FOR
CONDITIONS NOTED. CONTRACTOR TO VERIFY DIMENSIONS AND
ORIENTATION.
8. 'TYPICAL' (TYP) MEANS IDENTICAL FOR CONDITIONS NOTED.
9. 'EQUAL' (EQ) MEANS IDENTICAL IN MATERIALS, WEIGHT, SIZE, DESIGN,
FUNCTION, DURABILITY, AND ALL OTHER QUALITIES.
10. 'CONCEALED' MEANS EMBEDDED IN MASONRY OR OTHER
CONSTRUCTION, INSTALLED IN FURRED SPACES, WITHIN DOUBLE
PARTITIONS OR HUNG CEILINGS, IN TRENCHES, IN CRAWL SPACES OR
OTHERWISE ENCLOSED AND NOT EASILY VISIBLE.
11. 'EXPOSED' MEANS NOT INSTALLED UNDERGROUND OR OTHERWISE
'CONCEALED' AS DESCRIBED ABOVE.
12. THE DRAWINGS HAVE BEEN PRODUCED ENTIRELY ON PENNONI CAD
SYSTEMS. ANY OTHER LETTERING, LINES, OR SYMBOLS, OTHER THAN
PROFESSIONAL STAMPS AND SIGNATURES, HAVE BEEN MADE
WITHOUT THE AUTHORIZATION OF PENNONI AND ARE INVALID.
13. SYMBOLS, ABBREVIATIONS, AND GENERAL NOTES INDICATED ON
THESE DRAWINGS ARE TYPICAL AND MAY NOT INCLUDE ALL SYMBOLS
AND ABBREVIATIONS IN THE CONTRACT DOCUMENTS.
14. GENERAL NOTES, ABBREVIATIONS, AND SYMBOLS LISTS ARE
APPLICABLE TO ALL DRAWINGS/SHEETS IN THESE CONTRACT
DOCUMENTS.
15. THE CONTRACTOR'S BID SUBMISSION IS CONFIRMATION THAT THE
CONTRACTOR HAS COMPLETELY FAMILIARIZED THEMSELF WITH THE
CONTRACT DRAWINGS AND SPECIFICATIONS. THE CONTRACTOR HAS
AGREED TO PROVIDE THE NECESSARY LABOR, MATERIALS, AND
SUPERVISION TO COMPLETE THE CONTRACT.
16. THE CONTRACTOR'S BID SUBMISSION FOR ALL WORK SHALL BE
PREDICATED ON THE PERFORMANCE OF THE WORK DURING
REGULAR WORKING HOURS. U.O.N.
17. ALL MATERIALS AND EQUIPMENT TO BE NEW, UNLESS OTHERWISE
NOTED.
18. THE WORK, INCLUDING INSTALLATION OF EACH SYSTEM, ITEM, ETC.,
SHALL BE IN A NEAT AND PROFESSIONAL WORKMANLIKE MANNER IN
ACCORDANCE WITH THE BEST PRACTICES OF THE INDUSTRY AND IN
COMPLIANCE WITH ALL FEDERAL, STATE, LOCAL, AND TOWNSHIP
CODES AND REGULATIONS, AS WELL AS ANY OTHER AUTHORITIES
HAVING JURISDICTION.
19. ATTACHMENTS, CONNECTIONS, AND FASTENINGS OF ANY NATURE
ARE TO BE PROPERLY AND PERMANENTLY (UNLESS OTHERWISE
NOTED) SECURED IN CONFORMANCE WITH BEST PRACTICES (PLUMB,
LEVEL, SQUARE, SMOOTH, WITHOUT DEFECT, ETC.). ALL JOINTS
SHALL BE CLOSE-FITTING AND JOINED TO CONFORM W/EXPANSION
AND CONTRACTION TO PREVENT CRACKING. THE DRAWINGS SHOW
ONLY SPECIAL CONDITIONS TO ASSIST THE CONTRACTOR; THEY DO
NOT ILLUSTRATE EVERY SUCH CONDITION AND DETAIL. CONTRACTOR
SHALL PROVIDE ALL BLOCKING AND FRAMING NECESSARY TO
ACHIEVE THESE CONDITIONS. BLOCKING AND FRAMING TO BE
CONCEALED UNLESS OTHERWISE NOTED.
20. ELEMENTS THAT APPEAR TO BE ALIGNED SHALL BE ASSUMED TO
ALIGN WHETHER OR NOT SPECIFICALLY NOTED.
21. WORK NOT INDICATED ON A PART OF THE DRAWINGS, BUT
REASONABLY IMPLIED TO BE SIMILAR TO THAT SHOWN AT
CORRESPONDING PLACES, SHALL BE REPEATED AND PROVIDED AT
NO ADDITIONAL COST. MINOR DETAILS OR INCIDENTAL ITEMS NOT
SHOW OR SPECIFIED, BUT NECESSARY FOR A PROPER AND
COMPLETE INSTALLATION, SHALL BE INCLUDED IN THE WORK.
22. NO WORK DEFECTIVE IN CONSTRUCTION OR QUALITY OR DEFICIENT
IN ANY REQUIREMENTS OF DRAWINGS AND SPECIFICATIONS WILL BE
ACCEPTABLE IN CONSEQUENCE OF OWNER'S OR ENGINEER'S
FAILURE TO DISCOVER OR TO POINT OUT DEFECTS OR DEFICIENCIES
DURING CONSTRUCTION; NOR WILL PRESENCE OF INSPECTORS ON
WORK SITE RELIEVE CONTRACTOR FROM RESPONSIBILITY FOR
SECURING QUALITY AND PROGRESS OF WORK AS REQUIRED BY
CONTRACT. DEFECTIVE WORK REVEALED WITHIN TIME REQUIRED BY
GUARANTEES SHALL BE REPLACED BY WORK CONFORMING WITH
INTENT OF CONTRACT. NO PAYMENT, WHETHER PARTIAL OR FINAL,
SHALL BE CONSTRUED AS AN ACCEPTANCE OF DEFECTIVE WORK OR
IMPROPER MATERIALS.
23. IN THE EVENT OF CONFLICTING PROVISIONS WITHIN THE
SPECIFICATIONS AND / OR DRAWINGS, THE MORE STRINGENT SHALL
TAKE PRECEDENCE, UNLESS OTHERWISE STATED AND APPROVED BY
THE ENGINEER.
24. MATERIALS AND WORKMANSHIP SPECIFIED BY REFERENCE TO
NUMBER, SYMBOL, TITLE OF A SPECIFICATION SUCH AS COMMERCIAL
STANDARDS, FEDERAL SPECIFICATIONS, TRADE ASSOCIATION
STANDARD, OR OTHER SIMILAR STANDARD, SHALL COMPLY WITH
REQUIREMENTS IN LATEST EDITION OR REVISION THEREOF, AND
WITH ANY AMENDMENT OR SUPPLEMENT THERETO IN EFFECT ON
DATE OF ORIGIN OF THIS PROJECT'S CONTRACT DOCUMENTS. SUCH
STANDARD, EXCEPT AS MODIFIED HEREIN, SHALL HAVE FULL FORCE
AND EFFECT AS THOUGH PRINTED IN CONTRACT DOCUMENTS.
25. CONTRACTOR SHALL WAIVE 'COMMON PRACTICE' AND 'COMMON
USAGE' AS CONSTRUCTION CRITERIA WHEREVER DETAILS AND
CONTRACT DOCUMENTS OR GOVERNING CODES, ORDINANCES, ETC.
REQUIRE GREATER QUANTITY OR BETTER QUALITY THAN 'COMMON
PRACTICE' OR 'COMMON USAGE' WOULD REQUIRE.
26. CONTRACTOR SHALL FOLLOW MANUFACTURER'S RECOMMENDED
SPECIFICATIONS AND INSTALLATION PROCEDURES. IF THESE ARE
CONTRARY TO THE CONTRACT DOCUMENTS, CONTRACTOR SHALL
NOTIFY THE ENGINEER IN WRITING, IMMEDIATELY, TO RESOLVE
DISCREPANCIES PRIOR TO PROCEEDING WITH THE WORK.
27. CONTRACTOR SHALL ORDER AND SCHEDULE DELIVERY OF
MATERIALS IN AMPLE TIME TO AVOID DELAYS IN CONSTRUCTION. IF
AN ITEM IS FOUND TO BE UNAVAILABLE, CONTRACTOR SHALL NOTIFY
ENGINEER IMMEDIATELY TO ALLOW ENGINEER A REASONABLE
AMOUNT OF TIME TO SELECT A SUITABLE SUBSTITUTE.
28. IMMEDIATELY UPON DELIVERY/RECEIPT/ARRIVAL OF MATERIALS AND
EQUIPMENT ON SITE, CONTRACTOR SHALL STORE AND PROTECT
AGAINST ALL WEATHER AND DAMAGE, IN ACCORDANCE WITH EACH
MANUFACTURER'S REQUIREMENTS AND SPECIFICATIONS FOR EACH
TYPE OF MATERIAL AND EQUIPMENT.
29. CONTRACTOR SHALL FIELD VERIFY EXISTING CONDITIONS AND
DIMENSIONS PRIOR TO START OF WORK AND BE RESPONSIBLE FOR
SUCH.
30. SHOULD THE CONTRACTOR AT ANY TIME DISCOVER AN ERROR IN A
DRAWING OR SPECIFICATION, OR A DISCREPANCY OR VARIATION
BETWEEN INFORMATION OR DIMENSIONS ON DRAWINGS AND
CONDITIONS OR MEASUREMENTS AT SITE, OR LACK OF DIMENSIONS
OR OTHER INFORMATION, THEY SHALL REPORT AT ONCE TO THE
ENGINEER FOR CLARIFICATION AND SHALL NOT PROCEED WITH THE
WORK AFFECTED UNTIL CLARIFICATION HAS BEEN MADE.
31. CONTRACTOR SHALL OBTAIN AND PAY FOR ALL TESTING,
INSPECTIONS, AND CERTIFICATIONS AS INDICATED IN THE CONTRACT
DOCUMENTS FOR COMPLETION OF THIS WORK.
32. CONTRACTOR SHALL OBTAIN AND PAY FOR ALL PERMITS AND
LICENSES AND IS RESPONSIBLE FOR SCHEDULING AND PROVIDING
ACCESS FOR ALL REQUIRED INSPECTIONS (TOWNSHIP PERMIT FEE IS
WAIVED).
33. CONTRACTOR SHALL GIVE ALL REQUIRED NOTICES TO AGENCIES,
UTILITIES, AND/OR OTHER PARTIES AFFECTED BY THIS WORK OR THIS
CONTRACT.
34. JOB SITE SAFETY AND PROCEDURES ARE THE SOLE RESPONSIBILITY
OF THE CONTRACTOR.
35. MAINTAIN SAFE PROJECT SITE AT ALL TIMES. COMPLY WITH ALL
APPLICABLE FEDERAL, STATE, AND LOCAL AGENCIES AND
ORDINANCES.
36. ALL ACCESS TO EQUIPMENT SHALL BE REMOVED AND/OR SECURED
PRIOR TO LEAVING THE SITE FOR THE DAY TO PREVENT
UNAUTHORIZED ACCESS.
37. NO MOTORIZED EQUIPMENT, VEHICLES, ETC. SHALL BE LEFT
UNATTENDED ON THE SITE WHILE UNLOCKED AND / OR WITH THE
ENGINE RUNNING.
38. PRIOR TO COMMENCEMENT OF THE WORK, SUBMIT A SITE
UTILIZATION PLAN FOR REVIEW AND APPROVAL BY ENGINEER AND
OWNER. PLAN TO SHOW, AS APPLICABLE: TEMPORARY EGRESS,
TEMPORARY FACILITIES, TEMPORARY UTILITY LINES AND
CONNECTIONS, STAGING AREAS, CONSTRUCTION SITE ENTRANCES,
VEHICLE CIRCULATION, AND PARKING AREAS FOR CONSTRUCTION
PERSONNEL.
39. MAINTAIN ACCESS TO DRIVEWAYS, BUILDING ENTRANCES, AND
UTILITY ACCESS POINTS AT ALL TIMES FOR EMERGENCY AND FOR
TOWNSHIP'S CONTINUED OPERATION OF THE FACILITY.
40. MAINTAIN ALL SYSTEMS, SERVICES, AND UTILITIES IN WORKING
ORDER. IF IT BECOMES NECESSARY TO SHUT OFF A SYSTEM,
SERVICE, OR UTILITY AT ANY POINT DURING EXECUTION OF THE
WORK, THE CONTRACTOR WILL GIVE OWNER AT LEAST 72 HOURS
NOTICE AND WILL COORDINATE TO A REASONABLE EXTENT TO
MINIMIZE INTERRUPTION OF OWNER'S WORK/FACILITIES.
41. PROVIDE PROJECT SIGNS AS INDICATED AND WHERE REQUIRED BY
AUTHORITIES HAVING JURISDICTION. UNAUTHORIZED SIGNS ARE NOT
PERMITTED.
42. MAINTAIN AND TOUCH-UP SIGNS SO THEY ARE LEGIBLE AT ALL TIMES.
43. PROVIDE TEMPORARY BARRICADES AND OTHER PROTECTION
REQUIRED TO PREVENT INJURY TO PEOPLE AND DAMAGE TO
FACILITIES TO REMAIN.
44. CONTRACTOR SHALL PROTECT EXISTING SURFACES ADJACENT TO
CONTRACT AREAS. CONTRACTOR SHALL BE RESPONSIBLE FOR ALL
REPAIR / REPLACEMENT OF ANY DAMAGE.
45. PROTECT EXISTING VEGETATION AND TREES, EQUIPMENT,
STRUCTURES, CURBS, PAVEMENT, UTILITIES, AND OTHER
IMPROVEMENTS AT PROJECT SITE AND ON ADJACENT PROPERTIES,
EXCEPT THOSE INDICATED TO BE REMOVED OR ALTERED. REPAIR
ANY DAMAGE CAUSED BY THE WORK TO EXISTING FACILITIES.
46. PATCH, REPAIR, OR REPLACE EXISTING CONSTRUCTION AND
MATERIALS DISTURBED DURING REPAIR WORK OR OTHER
CONSTRUCTION ACTIVITIES. ALL REPAIR OR REPLACEMENT SHALL
MATCH ADJACENT EXISTING QUALITY, FINISHES, AND MATERIALS.
47. PROVIDE PROTECTION, OPERATE TEMPORARY FACILITIES, AND
CONDUCT CONSTRUCTION AS REQUIRED TO COMPLY WITH
ENVIRONMENTAL REGULATIONS AND THAT MINIMIZE POSSIBLE AIR,
WATERWAY, AND SUBSOIL CONTAMINATION OR POLLUTION OR
OTHER UNDESIRABLE EFFECTS.
48. MAINTAIN A CLEAN WORK AREA, FREE OF DEBRIS ON THE GROUND,
ELIMINATING ANY POSSIBLE CONTACT BY OR WITH THE PUBLIC ON
THE SITE. CLEANUP SHALL BE CONTINUOUS, ON A DAILY BASIS.
49. PROVIDE WASTE-COLLECTION CONTAINERS IN SIZES ADEQUATE TO
HANDLE WASTE FROM CONSTRUCTION OPERATIONS. COMPLY WITH
REQUIREMENTS OF AUTHORITIES HAVING JURISDICTION. LOCATIONS
TO BE AGREED WITH OWNER. CONTAINERS TO BE EMPTIED AS SOON
AS FULL.
50. CONDUCT FINAL CLEANING PRIOR TO SUBSTANTIAL COMPLETION.
USE CLEANING MATERIALS AND METHODS AS DESCRIBED BELOW
AND ELSEWHERE IN THE CONTRACT DOCUMENTS.
50.1. USE CLEANING MATERIALS AND AGENTS RECOMMENDED BY
MANUFACTURER OR FABRICATOR OF THE SURFACE TO BE
CLEANED. DO NOT USE CLEANING AGENTS THAT ARE
POTENTIALLY HAZARDOUS TO HEALTH OR PROPERTY OR THAT
MIGHT DAMAGE FINISHED SURFACES.
50.2. CLEAN PROJECT SITE, YARD, AND GROUNDS, IN AREAS
DISTURBED BY CONSTRUCTION ACTIVITIES, INCLUDING
LANDSCAPE DEVELOPMENT AREAS, OF RUBBISH, WASTE
MATERIAL, LITTER, AND OTHER FOREIGN SUBSTANCES.
50.3. SWEEP PAVED AREAS BROOM CLEAN. REMOVE PETROCHEMICAL
SPILLS, STAINS, AND OTHER FOREIGN DEPOSITS.
50.4. REMOVE TOOLS, CONSTRUCTION EQUIPMENT, MACHINERY, AND
SURPLUS MATERIAL FROM PROJECT SITE.
50.5. CLEAN EXPOSED HARD-SURFACED FINISHES TO A DIRT-FREE
CONDITION, FREE OF STAINS, FILMS, AND SIMILAR FOREIGN
SUBSTANCES. AVOID DISTURBING NATURAL WEATHERING OF
EXTERIOR SURFACES. RESTORE REFLECTIVE SURFACES TO
THEIR ORIGINAL CONDITION.
51. REMOVE LABELS THAT ARE NOT PERMANENT.
52. UPON COMPLETION OF THE PROJECT AND ACCEPTANCE BY OWNER,
CONTRACTOR SHALL SUPPLY TO OWNER BOUND COPIES OF
OPERATION AND MAINTENANCE MANUALS, INCLUDING ALL
WARRANTIES. CONTRACTOR SHALL INSTRUCT OWNER'S PERSONNEL
WITH REGARD TO THE PROPER OPERATION AND MAINTENANCE OF
ALL SYSTEMS TO THE SATISFACTION OF OWNER, AND AT NO
ADDITIONAL COST TO OWNER.
SELECTIVE DEMOLITION
1. DEFINITIONS
1.1. 'DEMO', 'DEMOLISH', OR 'REMOVE' MEANS DETACH ITEMS FROM
EXISTING CONSTRUCTION AND DISPOSE OF THEM OFF-SITE
UNLESS INDICATED TO BE SALVAGED OR REINSTALLED.
1.2. 'REMOVE AND REINSTALL' MEANS DETACH ITEMS FROM EXISTING
CONSTRUCTION, IN A MANNER TO PREVENT DAMAGE, PREPARE
FOR REUSE, AND REINSTALL WHERE INDICATED.
1.3. 'EXISTING TO REMAIN' MEANS LEAVE EXISTING ITEMS THAT ARE
NOT TO BE REMOVED AND THAT ARE NOT OTHERWISE INDICATED
TO BE SALVAGED OR REINSTALLED.
1.4. 'SALVAGE' MEANS CAREFULLY DETACH ITEMS FROM EXISTING
CONSTRUCTION. CLEAN SALVAGED ITEMS AND STORE IN SECURE
AREA, PROTECTED FROM ANY DAMAGE, UNTIL DELIVERY TO
OWNER.
2. UNLESS OTHERWISE INDICATED, DEMOLITION WASTE BECOMES
PROPERTY OF CONTRACTOR.
3. AT LEAST FIVE (5) WORKING DAYS PRIOR TO ANTICIPATED START OF
DEMOLITION, SUBMIT SCHEDULE OF SELECTIVE DEMOLITION
ACTIVITIES, INDICATING THE FOLLOWING:
3.1. DETAILED SEQUENCE OF SELECTIVE DEMOLITION AND REMOVAL
WORK, WITH STARTING AND ENDING DATES FOR EACH ACTIVITY.
ENSURE OWNER'S ON-SITE OPERATIONS ARE UNINTERRUPTED.
3.2. BUILDING AND SITE ACCESS, DUMPSTER AND STAGING
LOCATIONS.
3.3. COORDINATION OF OWNER'S CONTINUING OCCUPANCY OF
PORTIONS OF EXISTING SITE.
3.4. SUBMIT REPORT, INCLUDING DRAWINGS, THAT INDICATES THE
MEASURES PROPOSED FOR PROTECTING INDIVIDUALS AND
PROPERTY, FOR ENVIRONMENTAL PROTECTION, FOR DUST
CONTROL, AND FOR NOISE CONTROL. INDICATE PROPOSED
LOCATIONS AND CONSTRUCTION OF BARRIERS.
4. PREDEMOLITION PHOTOGRAPHS OR VIDEO: SHOW EXISTING
CONDITIONS OF ADJOINING CONSTRUCTION, INCLUDING FINISHED
SURFACES, THAT MIGHT BE MISCONSTRUED AS DAMAGE CAUSED BY
DEMOLITION OPERATIONS.
5. OWNER WILL OCCUPY PORTIONS OF SITE IMMEDIATELY ADJACENT TO
SELECTIVE DEMOLITION AREA. CONDUCT SELECTIVE DEMOLITION SO
OWNER'S OPERATIONS WILL NOT BE DISRUPTED.
6. COMPLY WITH GOVERNING EPA NOTIFICATION REGULATIONS BEFORE
BEGINNING SELECTIVE DEMOLITION. COMPLY WITH HAULING AND
DISPOSAL REGULATIONS OF AUTHORITIES HAVING JURISDICTION.
7. DEMOLISH AND REMOVE EXISTING CONSTRUCTION ONLY TO THE
EXTENT REQUIRED BY NEW CONSTRUCTION AND AS INDICATED. USE
METHODS REQUIRED TO COMPLETE THE WORK WITHIN LIMITATIONS
OF GOVERNING REGULATIONS AND AS FOLLOWS:
7.1. NEATLY CUT OPENINGS AND HOLES PLUMB, SQUARE, AND TRUE
TO DIMENSIONS REQUIRED. USE CUTTING METHODS LEAST LIKELY
TO DAMAGE CONSTRUCTION TO REMAIN OR ADJOINING
CONSTRUCTION. USE HAND TOOLS OR SMALL POWER TOOLS
DESIGNED FOR SAWING OR GRINDING, NOT HAMMERING AND
CHOPPING. TEMPORARILY COVER OPENINGS TO REMAIN.
7.2. LOCATE SELECTIVE DEMOLITION EQUIPMENT AND REMOVE
DEBRIS AND MATERIALS SO AS NOT TO IMPOSE EXCESSIVE LOADS
ON ANY OTHER AREA OF THE SITE.
7.3. DISPOSE OF DEMOLISHED ITEMS AND MATERIALS PROMPTLY.
COMPLY WITH ALL FEDERAL, STATE, AND LOCAL REQUIREMENTS
REGARDING RECYCLING AND DISPOSAL OF MATERIALS FOR EACH
DEMOLISHED MATERIAL.
7.4. DO NOT ALLOW DEMOLISHED MATERIALS TO ACCUMULATE
ON-SITE.
7.5. REMOVE AND TRANSPORT DEBRIS IN A MANNER THAT WILL
PREVENT SPILLAGE ON ADJACENT SURFACES AND AREAS.
7.6. DO NOT BURY OR BURN WASTE MATERIALS ON-SITE. DO NOT
WASH WASTE MATERIALS DOWN SEWERS OR INTO WATERWAYS.
7.7. ON-SITE SALE OF REMOVED ITEMS OR MATERIALS IS NOT
PERMITTED.
8. EXISTING ITEMS TO REMAIN: PROTECT CONSTRUCTION INDICATED TO
REMAIN AGAINST DAMAGE AND SOILING DURING SELECTIVE
DEMOLITION. WHEN PERMITTED BY ENGINEER, ITEMS MAY BE
REMOVED TO A SUITABLE, PROTECTED STORAGE LOCATION DURING
SELECTIVE DEMOLITION AND CLEANED AND REINSTALLED IN THEIR
ORIGINAL LOCATIONS AFTER SELECTIVE DEMOLITION OPERATIONS
ARE COMPLETE.
PRODUCTS AND SPECIFICATIONS
REFERENCE PROJECT MANUAL SECTION 013300 SUBMITTAL PROCEDURES
FOR ADDITIONAL INFORMATION.
FOR EACH TYPE OF PRODUCT USED, SUBMIT PHYSICAL SAMPLES,
PRODUCT DATA SHEETS, AND SHOP DRAWINGS AS APPROPRIATE FOR
REVIEW BY ENGINEER AND OWNER PRIOR TO ORDERING OR INSTALLING
EACH ITEM. INCLUDE CONSTRUCTION DETAILS, MATERIAL DESCRIPTIONS,
DIMENSIONS OF INDIVIDUAL COMPONENTS AND PROFILES, PART NUMBERS,
AND FINISHES, AND ANY OTHER PERTINENT INFORMATION.
REVIEW PERIOD SHALL BE A MINIMUM OF TWO (2) WEEKS.
DISPOSITION: MAINTAIN SETS OF APPROVED SAMPLES AT PROJECT SITE,
AVAILABLE FOR QUALITY-CONTROL COMPARISONS THROUGHOUT THE
COURSE OF CONSTRUCTION ACTIVITY. SAMPLE SETS MAY BE USED TO
DETERMINE FINAL ACCEPTANCE OF CONSTRUCTION ASSOCIATED WITH
EACH SET.
SAMPLES THAT MAY BE INCORPORATED INTO THE WORK ARE INDICATED IN
INDIVIDUAL SPECIFICATION SECTIONS AND ON THESE DRAWINGS. SUCH
SAMPLES MUST BE IN AN UNDAMAGED CONDITION AT TIME OF USE.
SAMPLES NOT INCORPORATED INTO THE WORK OR NOT OTHERWISE
DESIGNATED AS OWNER'S PROPERTY, ARE THE PROPERTY OF
CONTRACTOR.
REPRODUCTION OF ANY PORTION OF THE CONTRACT DRAWINGS FOR
RESUBMITTAL AS SHOP DRAWINGS IS PROHIBITED. SHOP DRAWINGS
PRODUCED IN THIS MANNER WILL BE REJECTED AND RETURNED.
SHOP DRAWINGS SHALL BEAR THE CONTRACTOR'S STAMP OF APPROVAL,
WHICH SHALL CONSTITUTE CERTIFICATION THAT THE CONTRACTOR HAS
VERIFIED ALL CONSTRUCTION CRITERIA, MATERIALS, AND SIMILAR DATA
AND HAS CHECKED EACH DRAWING FOR COMPLETENESS, COORDINATION,
AND COMPLIANCE WITH THE CONTRACT DOCUMENTS.
1. JOINT SEALANTS:
1.1. PROVIDE ELASTOMERIC JOINT SEALANTS THAT ESTABLISH AND
MAINTAIN WATERTIGHT AND AIRTIGHT CONTINUOUS JOINT SEALS
WITHOUT STAINING OR DETERIORATING JOINT SUBSTRATES.
1.2. PROVIDE JOINT SEALANTS, PRIMERS, BACKINGS, AND OTHER
RELATED MATERIALS AS REQUIRED AND AS RECOMMENDED BY
MANUFACTURER THAT ARE COMPATIBLE WITH ONE ANOTHER AND
WITH JOINT SUBSTRATES UNDER CONDITIONS OF SERVICE AND
APPLICATION, AS DEMONSTRATED BY SEALANT MANUFACTURER
BASED ON TESTING AND FIELD EXPERIENCE.
1.3. JOINT SEALANTS TO BE SIKASIL-728 NS OR APPROVED EQUAL, OF
TYPE INDICATED BY APPLICATION LOCATION. COLOR TO BE
SELECTED BY OWNER FROM MFGR'S FULL RANGE OF STANDARD
COLORS.
1.3.1. ELASTOMERIC SEALANTS ARE TO BE NON-STAINING TO
POROUS SUBSTRATES. PROVIDE PRODUCTS THAT HAVE
UNDERGONE TESTING ACCORDING TO ASTM C 1248 AND HAVE
NOT STAINED POROUS JOINT SUBSTRATES INDICATED FOR
PROJECT.
1.4. PROVIDE SEALANT BACKINGS OF MATERIAL AND TYPE THAT ARE
NON-STAINING; ARE COMPATIBLE WITH JOINT SUBSTRATES,
SEALANTS, PRIMERS, AND OTHER JOINT FILLERS; AND ARE
APPROVED FOR APPLICATIONS INDICATED BY SEALANT
MANUFACTURER BASED ON FIELD EXPERIENCE AND LABORATORY
TESTING.
1.5. PROVIDE CYLINDRICAL SEALANT BACKINGS: ASTM C 1330, OF
TYPE INDICATED BELOW AND OF SIZE AND DENSITY TO CONTROL
SEALANT DEPTH AND OTHERWISE CONTRIBUTE TO PRODUCING
OPTIMUM SEALANT PERFORMANCE: TYPE C: CLOSED-CELL
MATERIAL WITH A SURFACE SKIN.
1.6. PROVIDE PRIMER: MATERIAL RECOMMENDED BY JOINT SEALANT
MANUFACTURER WHERE REQUIRED FOR ADHESION OF SEALANT
TO JOINT SUBSTRATES INDICATED, AS DETERMINED FROM
PRECONSTRUCTION JOINT-SEALANT-SUBSTRATE TESTS AND
FIELD TESTS AND THROUGH MOCKUPS.
1.7. PROVIDE BOND-BREAKER TAPE AS NEEDED: POLYETHYLENE
TAPE OR OTHER PLASTIC TAPE RECOMMENDED BY SEALANT
MANUFACTURER FOR PREVENTING SEALANT FROM ADHERING TO
RIGID, INFLEXIBLE JOINT-FILLER MATERIALS OR JOINT SURFACES
AT BACK OF JOINT WHERE SUCH ADHESION WOULD RESULT IN
SEALANT FAILURE. PROVIDE SELF-ADHESIVE TAPE WHERE
APPLICABLE.
1.8. PROVIDE MASKING TAPE AS NEEDED: NON-STAINING,
NONABSORBENT MATERIAL COMPATIBLE WITH JOINT SEALANTS
AND SURFACES ADJACENT TO JOINTS.
1.9. COMPLY WITH ASTM C 920 AND OTHER REQUIREMENTS INDICATED
FOR EACH LIQUID-APPLIED CHEMICALLY CURING SEALANT.
1.10. CLEAN OUT JOINTS IMMEDIATELY BEFORE INSTALLING JOINT
SEALANTS TO COMPLY WITH JOINT SEALANT MANUFACTURER'S
WRITTEN INSTRUCTIONS.
1.10.1. REMOVE ALL FOREIGN MATERIAL FROM JOINT SUBSTRATES
THAT COULD INTERFERE WITH ADHESION OF JOINT SEALANT,
INCLUDING DUST, PAINTS (EXCEPT FOR PERMANENT,
PROTECTIVE COATINGS TESTED AND APPROVED FOR
SEALANT ADHESION AND COMPATIBILITY BY SEALANT
MANUFACTURER), OLD JOINT SEALANTS, OIL, GREASE,
WATERPROOFING, WATER REPELLENTS, WATER, SURFACE
DIRT, AND FROST.
1.10.2. REMOVE LAITANCE AND FORM-RELEASE AGENTS FROM
CONCRETE.
1.10.3. CLEAN NONPOROUS SURFACES WITH CHEMICAL CLEANERS
OR OTHER MEANS THAT DO NOT STAIN, HARM SUBSTRATES,
OR LEAVE RESIDUES CAPABLE OF INTERFERING WITH
ADHESION OF JOINT SEALANTS.
1.8.4. USE ONLY CHEMICAL CLEANERS ACCEPTABLE TO
MANUFACTURERS OF SEALANTS AND SEALANT BACKING
MATERIALS AND FORMULATED TO PROMOTE OPTIMUM
ADHESION OF SEALANTS WITH JOINT SUBSTRATES.
1.9. DO NOT PROCEED WITH INSTALLATION OF JOINT SEALANTS
UNDER THE FOLLOWING CONDITIONS:
1.9.1. WHEN AMBIENT AND SUBSTRATE TEMPERATURE CONDITIONS
ARE OUTSIDE LIMITS PERMITTED BY JOINT-SEALANT
MANUFACTURER OR ARE BELOW 40 DEG F (5 DEG C).
1.9.2. WHEN JOINT SUBSTRATES ARE WET.
1.9.3. WHERE CONTAMINANTS CAPABLE OF INTERFERING WITH
ADHESION HAVE NOT YET BEEN REMOVED FROM JOINT
SUBSTRATES.
1.9.4. WHERE JOINT WIDTHS ARE GREATER THAN OR LESS THAN
THOSE ALLOWED BY JOINT SEALANT MANUFACTURER FOR
APPLICATIONS INDICATED.
1.10. JOINT PRIMING: PRIME JOINT SUBSTRATES WHERE
RECOMMENDED IN WRITING BY JOINT SEALANT MANUFACTURER,
BASED ON PRECONSTRUCTION JOINT-SEALANT-SUBSTRATE
TESTS OR PRIOR EXPERIENCE. APPLY PRIMER TO COMPLY WITH
JOINT SEALANT MANUFACTURER'S WRITTEN INSTRUCTIONS.
CONFINE PRIMERS TO AREAS OF JOINT-SEALANT BOND; DO NOT
ALLOW SPILLAGE OR MIGRATION ONTO ADJOINING SURFACES.
1.11. MASKING TAPE: USE MASKING TAPE WHERE REQUIRED TO
PREVENT CONTACT OF SEALANT WITH ADJOINING SURFACES
THAT OTHERWISE WOULD BE PERMANENTLY STAINED OR
DAMAGED BY SUCH CONTACT OR BY CLEANING METHODS
REQUIRED TO REMOVE SEALANT SMEARS. REMOVE TAPE
IMMEDIATELY AFTER TOOLING WITHOUT DISTURBING JOINT SEAL.
1.12. INSTALL SEALANT BACKINGS OF TYPE INDICATED TO SUPPORT
SEALANTS DURING APPLICATION AND AT POSITION REQUIRED TO
PRODUCE CROSS-SECTIONAL SHAPES AND DEPTHS OF INSTALLED
SEALANTS RELATIVE TO JOINT WIDTHS THAT ALLOW OPTIMUM
SEALANT MOVEMENT CAPABILITY. DO NOT LEAVE GAPS BETWEEN
ENDS OF SEALANT BACKINGS. DO NOT STRETCH, TWIST,
PUNCTURE, OR TEAR SEALANT BACKINGS.
1.13. REMOVE ABSORBENT SEALANT BACKINGS THAT HAVE BECOME
WET BEFORE SEALANT APPLICATION AND REPLACE THEM WITH
DRY MATERIALS.
1.14. INSTALL BOND-BREAKER TAPE BEHIND SEALANTS WHERE
SEALANT BACKINGS ARE NOT USED BETWEEN SEALANTS AND
BACK OF JOINTS.
1.15. INSTALL SEALANTS BY PROVEN TECHNIQUES. COMPLY WITH
RECOMMENDATIONS OF ASTM C 1193 FOR USE OF JOINT
SEALANTS AS APPLICABLE TO MATERIALS, APPLICATIONS, AND
CONDITIONS INDICATED, AT THE SAME TIME BACKINGS ARE
INSTALLED, AND TO COMPLY WITH THE FOLLOWING:
1.15.1. PLACE SEALANTS SO THEY DIRECTLY CONTACT AND FULLY
WET JOINT SUBSTRATES.
1.15.2. COMPLETELY FILL RECESSES PROVIDED FOR EACH JOINT
CONFIGURATION.
1.15.3. PRODUCE UNIFORM, CROSS-SECTIONAL SHAPES AND DEPTHS
RELATIVE TO JOINT WIDTHS THAT ALLOW OPTIMUM SEALANT
MOVEMENT CAPABILITY.
1.16. IMMEDIATELY AFTER SEALANT APPLICATION AND BEFORE
SKINNING OR CURING BEGINS, TOOL SEALANTS TO FORM
SMOOTH, UNIFORM BEADS OF CONFIGURATION INDICATED; TO
ELIMINATE AIR POCKETS; AND TO ENSURE CONTACT AND
ADHESION OF SEALANT WITH SIDES OF JOINT.
1.17. PROVIDE CONCAVE JOINT CONFIGURATION PER FIGURE 8A IN
ASTM C 1193, UNLESS OTHERWISE INDICATED.
1.18. CLEAN OFF EXCESS SEALANTS OR SEALANT SMEARS ADJACENT
TO JOINTS AS THE WORK PROGRESSES BY METHODS AND WITH
CLEANING MATERIALS APPROVED IN WRITING BY
MANUFACTURERS OF JOINT SEALANTS AND OF PRODUCTS IN
WHICH JOINTS OCCUR.
1.19. PROTECT JOINT SEALANTS DURING AND AFTER CURING PERIOD
FROM CONTACT WITH CONTAMINATING SUBSTANCES AND FROM
DAMAGE RESULTING FROM CONSTRUCTION OPERATIONS OR
OTHER CAUSES SO SEALANTS ARE WITHOUT DETERIORATION OR
DAMAGE AT TIME OF SUBSTANTIAL COMPLETION. IF, DESPITE
SUCH PROTECTION, DAMAGE OR DETERIORATION OCCURS, CUT
OUT AND REMOVE DAMAGED OR DETERIORATED JOINT SEALANTS
IMMEDIATELY. REINSTALL JOINT SEALANTS SO INSTALLATIONS
WITH REPAIRED AREAS ARE INDISTINGUISHABLE FROM THE
ORIGINAL WORK.
CONSTRUCTION SEQUENCE
1. NOTIFY ENGINEER, TOWNSHIP, AND FIRE COMPANY AT LEAST 7
CALENDAR DAYS IN ADVANCE OF START OF ONSITE ACTIVITIES FOR
EACH WORK STAGE.
1.1. IT IS ANTICIPATED THAT THE WORK WILL TAKE PLACE IN EARLY
FALL 2026.
2. DURING REPAIRS, ONE OR MORE APPARATUS WILL BE TEMPORARY
RELOCATED. DUE TO WATER CONTENT AND SENSITIVE ELECTRONICS
/ EQUIPMENT, APPARATUS CAN BE PARKED OUTSIDE FOR EACH
RESPECTIVE CONSTRUCTION PERIOD DURING MILD WEATHER,
IDEALLY BETWEEN 50 DEG F AND 80 DEG F.
3. CONTRACTOR'S SCHEDULE GUIDE FOR ENGINE ROOM REPAIRS
3.1. DURING ENGINE ROOM REPAIRS, THE APPARATUS FOR ENGINE
BAY 1 TO 3 WILL BE TEMPORARY RELOCATED ONTO APRON.
3.2. MONDAY - DEMOLITION
3.3. TUESDAY - SUBGRADE PREP AND DOWEL INSTALLATION
3.4. WEDNESDAY - DOWEL INSTALLATION AND SET TRENCH DRAIN
SYSTEM, INCLUDING TIE-IN TO EXISTING DRAIN
3.5. THURSDAY - PLACE PREFORMED EXPANSION JOINTS, POUR
CONCRETE, AND TOOL CONTROL JOINTS
3.6. FRIDAY - JOINT SEALANTS
3.7. FRIDAY TO SUNDAY - CONCRETE CURE
3.8. MONDAY - REMOVE TEMPORARY MEASURES AND CLEAN UP;
RETURN ENGINE ROOM FLOOR TO FIRE COMPANY AT END OF
WORK DAY
4. CONTRACTOR'S SCHEDULE GUIDE FOR APRON REPAIRS
4.1. MAY BE PERFORMED EITHER BEFORE OR AFTER ENGINE ROOM
REPAIRS
4.2. DURING APRON REPAIRS, APPARATUS FOR ENGINE BAY 2 WILL BE
TEMPORARILY RELOCATED TO AVOID USING THE RESPECTIVE
APRON AREA WHILE WORK IS UNDERWAY,
4.3. MONDAY - SETUP TEMPORARY CONES, ETC; PERFORM
DEMOLITION AND PREP EACH LOCATION
4.4. TUESDAY - PLACE CONCRETE REPAIR MATERIAL. NOTE, HOT
WEATHER AND SUN EXPOSURE WILL ACCELERATE REPAIR SET
TIME. PERFORM WORK DURING COOLER WEATHER AND PROVIDE
TEMPORARY SHADE, IF NEEDED. MIX THE REPAIR BATCH AT TIME
OF PLACEMENT FOR EACH LOCATION.
4.5. TUESDAY TO THURSDAY - IF ADD ALTERNATE #1 IS SELECTED,
THEN PERFORM JOINT REPLACEMENT
4.6. WEDNESDAY TO FRIDAY - REPAIR AREAS CURE
4.7. FRIDAY - REMOVE TEMPORARY MEASURES AND CLEAN UP;
RETURN APRON TO FIRE COMPANY AT END OF WORK DAY
SPECIAL FIRE COMPANY EVENTS
IF WORK IS UNDERWAY AND OVERLAPS WITH THE FOLLOWING EVENTS,
THEN PROVIDE TEMPORARY MEASURES AND CLEAN-UP WORK AREA FOR
EVENT FOOT TRAFFIC:
* SEPTEMBER 24, 2026 EVENING EVENT
NO WORK ALLOWED DURING THE FOLLOWING EVENTS:
* OCTOBER 4 TO 10, 2026 FOR NATIONAL FIRE PREVENTION WEEK
ABOVE SUBJECT TO CHANGE, INCLUDING OTHER EVENTS, WHICH WILL BE
REVIEWED DURING THE PRECONSTRUCTION MEETING.
SCALE:
LOCATION PLAN
NOT TO SCALE
WORK
AREA
GENERAL NOTES
SYMBOLS & ABBREVIATIONS LIST
(NOT ALL USED)
WORK IN THIS AREA, SEE KEYNOTE
ALIGN FACES OF ELEMENTS IN PLANE AS INDICATED
CENTER LINE
DETAIL OR DRAWING NUMBER
SHEET NUMBER
ELEVATION NUMBER
SHEET NUMBER
ELEVATION DATUM
ADA AMERICANS WITH DISABILITIES ACT
AFF ABOVE FINISHED FLOOR
BLDG BUILDING
CJ CONTROL JOINT
CLR CLEAR
CMU CONCRETE MASONRY UNIT
CTR CENTER
DIA/Ø DIAMETER
DTLS DETAILS
DWGS DRAWINGS
EQ. EQUAL
HM HOLLOW METAL
IBC INTERNATIONAL BUILDING CODE
IEBC INTERNATIONAL EXISTING BUILDING CODE
INT. INTERIOR
MAX. MAXIMUM
MIN. MINIMUM
MEP MECHANICAL/ELECTRICAL/PLUMBING
MFGR. MANUFACTURER
MISC. MISCELLANEOUS
N/A NOT APPLICABLE
NIC NOT IN CONTRACT
OC ON CENTER
P.T. PRESSURE TREATED
PTD. PAINTED
RD ROOF DRAIN
REQ'D REQUIRED
RM ROOM
SF SQUARE FEET
SIM. SIMILAR
SS STAINLESS STEEL
T.O.M. TOP OF MASONRY
TYP. TYPICAL
U.O.N. UNLESS OTHERWISE NOTED
VIF VERIFY IN FIELD
W/ WITH
ALIGN
CL
U :\A cc ou nt s\
LO
W
M M
\L O
W M
G la dw yn e
FC
E ng in e
R m
R ep ai rs
APPROVED BY:
DRAWN BY:
DATE:
SCALE:
1044 BLACK ROCK ROAD
GLADWYNE, PENNSYLVANIA 19035
GLADWYNE FIRE COMPANY
APRON & ENGINE ROOM FLOOR REPAIRS
SHEET:
DRAWING NO.:
ZAP
AS NOTED
JM
TOWNSHIP OF LOWER MERION
OFFICE OF THE TOWNSHIP ENGINEER
75 EAST LANCASTER AVENUE
ARDMORE, MONTGOMERY COUNTY, PENNSYLVANIA 19003
2026-05-11
C-1
05/11/2026
C-2
C-2
TYP BETWEEN DEPRESSED
CURB AND APRON
TYP AROUND FRAMES
TYP BETWEEN BUILDING /
THRESHOLDS AND APRON
TYP BETWEEN SIDEWALK
AND APRON
CONSTRUCTION KEY NOTES
APRON: PERFORM TOPSIDE REPAIR OF CONCRETE. REFER
TO DETAIL 4/C-2 & 5/C-2.
APRON (ADD ALTERNATE): RAKE OUT ALL JOINTS. CLEAN,
PREPARE, AND INSTALL NEW BACKER ROD WITH SEALANT.
ENGINE ROOM FLOOR: SAWCUT AND DEMOLISH CONCRETE
AND TRENCH DRAIN IN ITS ENTIRETY.
ENGINE ROOM FLOOR: PREPARE AND INSTALL NEW TRENCH
DRAIN SYSTEM WITH CONCRETE SLAB PER DETAIL 8/C-3.
ENGINE ROOM FLOOR: RAKE OUT JOINT. CLEAN, PREPARE,
AND INSTALL NEW BACKER ROD WITH SEALANT.
ENGINE ROOM FLOOR (CONTINGENCY): IF AND WHERE
INDICATED, ROUTE CRACK, CLEAN, THEN INSTALL BACKER
ROD WITH SEALANT.
3/ 4"
M
IN
EXISTING
CONCRETE TO
REMAIN
UP TO 6" MAX
SAWCUT PERIMETER OF
EXISTING THRESHOLD
PATCH. SAWCUT TO
PROVIDE RIGHT ANGLE
EDGES
TOOLED JOINT AND SEALANT
MATCH EXISTING CONC.
FINISH WITH TOP OF
ADJACENT SLAB
NOTES:
1. REFER TO PLANS FOR REPAIR LAYOUT AND EXTENT OF SLAB REPAIR. FINAL EXTENT AND LAYOUT OF REPAIR TO BE VERIFIED IN FIELD.
2. SAWCUT AND MAINTAIN RIGHT ANGLE OF CUT TO CONCRETE SURFACE. MAINTAIN A MINIMUM REPAIR DEPTH OF 3/4" AT THE PERIMETER OF THE REPAIR. REPAIR
AREA SHOULD NOT BE LESS THAN 2" IN DEPTH.
3. REMOVE ALL LOOSE OR DELAMINATED CONCRETE.CHIP CONCRETE BACK TO SOUND CONCRETE SUBSTRATE. ROUGHEN SURFACE OF EXPOSED CONCRETE
PER MANUFACTURER INSTRUCTION
4. CLEAN CONCRETE SURFACE. REMOVE ALL DELETERIOUS MATERIAL SUCH AS LAITANCE, DUST, DIRT, AND OIL.
5. AFTER REMOVAL AND CLEANING OF THE CONCRETE SURFACE, CONTACT THE ENGINEER AND EUCLID REPRESENTATIVE FOR REVIEW OF THE CONCRETE
SUBSTRATE.
6. PREPARE THE CONCRETE SUBSTRATE AS REQUIRED. BONDING AGENT/ANTI-CORRODING COATING TO BE EUCOWELD 2.0 BY EUCLID CHEMICAL OR APPROVED
EQUAL. APPLY IN ACCORDANCE WITH THE MANUFACTURER'S RECOMMENDATIONS.
7. APPLY AND CURE REPAIR MORTAR IN ACCORDANCE WITH MANUFACTURER'S RECOMMENDATIONS AND PROJECT SPECIFICATIONS FOR WET CURE. REPAIR
MORTAR TO BE VERSASPEED 100 BY EUCLID CHEMICAL OR APPROVED EQUAL
8. PROVIDE TOOLED SEALANT JOINT AT PERIMETER OF ALL SLAB REPAIRS AND WHERE INDICATED.
REMOVE DELAMINATED/
DETERIORATED CONC
NOTES:
1. REPAIR LAYOUT CONFIGURATIONS SHALL BE SIMPLIFIED AS MUCH AS POSSIBLE. MAINTAIN SQUARE CORNERS OF REPAIR AREA.
2. MAINTAIN MINIMUM EDGE DISTANCE BETWEEN ADJACENT CONCRETE REPAIR AREAS OF 1'-0". WHERE EDGE DISTANCE IS LESS THAN 1'-0", COMBINE REPAIR
AREAS.
1' -0
M
IN
BOUNDARY OF LOOSE
& DELAMINATED OR
SPALLED CONCRETE
RECOMMENDED LAYOUT
OF CONC REPAIR AREA
RECOMMENDED LAYOUT
OF CONCRETE REPAIR
AREA TO BE DETERMINED
IN FIELD BY ENGINEER OF
RECORD
C-2
C-2
C-2
1'-0"
MIN
8" M N
18" MIN
10TYP11
36" MIN
6" M
IN
10TYP11
U :\A cc ou nt s\
LO
W
M M
\L O
W M
G la dw yn e
FC
E ng in e
R m
R ep ai rs
APPROVED BY:
DRAWN BY:
DATE:
SCALE:
1044 BLACK ROCK ROAD
GLADWYNE, PENNSYLVANIA 19035
GLADWYNE FIRE COMPANY
APRON & ENGINE ROOM FLOOR REPAIRS
SHEET:
DRAWING NO.:
ZAP
AS NOTED
JM
TOWNSHIP OF LOWER MERION
OFFICE OF THE TOWNSHIP ENGINEER
75 EAST LANCASTER AVENUE
ARDMORE, MONTGOMERY COUNTY, PENNSYLVANIA 19003
2026-05-11
NORTH
APRON REPAIRS
C-2
NOT TO SCALEC-2
APRON PLAN1
NOT TO SCALEC-2
APRON REPAIR AREA #12
NOT TO SCALEC-2
APRON REPAIR AREA #23
NOT TO SCALEC-2
PARTIAL DEPTH TOPSIDE CONCRETE SLAB ON GRADE REPAIR DETAIL4
NOT TO SCALEC-2
CONCRETE SLAB SELECTIVE REMOVAL DETAIL5
ENGINE BAY 1 ENGINE BAY 2 ENGINE BAY 3 ENGINE BAY 1 ENGINE BAY 2 ENGINE BAY 3
CONSTRUCTION KEY NOTES
APRON: PERFORM TOPSIDE REPAIR OF CONCRETE. REFER
TO DETAIL 4/C-2 & 5/C-2.
APRON (ADD ALTERNATE): RAKE OUT ALL JOINTS. CLEAN,
PREPARE, AND INSTALL NEW BACKER ROD WITH SEALANT.
ENGINE ROOM FLOOR: SAWCUT AND DEMOLISH CONCRETE
AND TRENCH DRAIN IN ITS ENTIRETY.
ENGINE ROOM FLOOR: PREPARE AND INSTALL NEW TRENCH
DRAIN SYSTEM WITH CONCRETE SLAB PER DETAIL 8/C-3.
ENGINE ROOM FLOOR: RAKE OUT JOINT. CLEAN, PREPARE,
AND INSTALL NEW BACKER ROD WITH SEALANT.
ENGINE ROOM FLOOR (CONTINGENCY): IF AND WHERE
INDICATED, ROUTE CRACK, CLEAN, THEN INSTALL BACKER
ROD WITH SEALANT.
9"
OVERHEAD DOOR
VERTICAL TRACK
OVERHEAD DOOR
EXISTING
SEALANT
JOINT
EXTERIOR INTERIOR
1' -0
AV
ER
AG
E
SAWCUT & DEMOLISH TRENCH &
CONCRETE IN AREA INDICATED
CAREFULLY CUT REINFORCING,
WHERE OCCURS
3'-0"
EXTERIOR INTERIOR
TRENCH DRAIN; REFER TO 7/C-3
FOR PROFILE
1'-0"
6" MIN
CONCRETE
4"
1'-6" 1'-6"
DRILL AND INSTALL 3/4" MIN
DIAMETER X 18" LONG EPOXY
COATED DOWELS AT 30" OC INTO
EXISTING SLAB (9" EMBED) WITH
HILTI HY 150 ADHESIVE OR
APPROVED EQUAL
EXISTING CONCRETE SLAB ON
GRADE TO REMAIN. DO NOT
UNDERMINE DURING DEMO OR
NEW CONSTRUCTION (TYP)
DOWELS SHALL BE
CENTERED ON EXISTING
SLAB (TYP)
NOTES:
1. COMPACTED SUBGRADE AND STONE BASE TO BE
INSPECTED BY OFFICE OF TOWNSHIP ENGINEER
PREMOLDED EXPANSION JOINT
WITH SEALANT (TYP ALONG
PERIMETER)
INVERT VARIES
UP TO 12.25"
6" MIN 2A CRUSHED
STONE BASE
8206N82068205 8206N8206 8205
8'-0" 8'-0" 8'-0" 8'-0" 8'-0" 4'-0"
BOTTOM OUTLET
1 4"
93 4"
1' -0
1 4"
ENGINE BAY 1 ENGINE BAY 2 ENGINE BAY 3
U :\A cc ou nt s\
LO
W
M M
\L O
W M
G la dw yn e
FC
E ng in e
R m
R ep ai rs
APPROVED BY:
DRAWN BY:
DATE:
SCALE:
1044 BLACK ROCK ROAD
GLADWYNE, PENNSYLVANIA 19035
GLADWYNE FIRE COMPANY
APRON & ENGINE ROOM FLOOR REPAIRS
SHEET:
DRAWING NO.:
ZAP
AS NOTED
JM
TOWNSHIP OF LOWER MERION
OFFICE OF THE TOWNSHIP ENGINEER
75 EAST LANCASTER AVENUE
ARDMORE, MONTGOMERY COUNTY, PENNSYLVANIA 19003
2026-05-11
STANDPIPE SAW CUT LINE CONCRETE TO REMAINGEAR RACK TO REMAIN; CONTENTS NEAR WORK
AREA WILL BE TEMPORARY REMOVED (TYP)
EXISTING CLEANOUT
ENGINE ROOM REPAIRS
C-3
SCALE: 1/4"=1'-0"C-3
EXISTING FLOOR PLAN1
SCALE: 1/4"=1'-0"C-3
PROPOSED PLAN3
NOT TO SCALEC-3
ENGINE FLOOR DETAIL5
NOT TO SCALEC-3
ENGINE BAY 3 DETAIL6
NOT TO SCALEC-3
ENGINE BAY 1 DETAIL7
EXISTING GARAGE DOOR TO
REMAIN. PROTECT WHILE
PERFORMING THE WORK.
7"
NOT TO SCALEC-3
TRENCH DETAIL8
EXISTING PROPOSED
SCALE: 1/4"=1'-0"C-3
PROPOSED TRENCH DRAIN SYSTEM PROFILE4
NOTES:
1. PROVIDE ASSEMBLY WITH APPURTENANCES NEEDED FOR A COMPLETE TRENCH DRAIN SYSTEM
FOR INSTALLATION AND POSITIVE DRAINAGE, INCLUDING BUT NOT LIMITED TO:
1.1. TRENCH DRAIN SHALL BE ZURN Z882 PERMA-TRENCH HDPE 12” DRAIN SYSTEM OR APPROVED
EQUAL.
1.2. ENTIRE TRENCH ASSEMBLY, INCLUDING GRATES, SHALL BE H-20 RATED.
1.3. REFER TO PROFILE FOR TRENCH NUMBER.
1.4. CLOSED END CAP AT EACH END OF SYSTEM.
1.5. BOTTOM OUTLET.
1.6. GRATE SHALL BE:
1.6.1. BASE BID: ZURN P12-GDE-USA GALVANIZED DUCTILE IRON 12" WIDE SLOTTED GRATE
1.6.2. ALTERNATE: ZURN P12-BDE-USA BLACK ACID RESISTANT EPOXY COATED DUCTILE IRON 12"
WIDE DOMESTIC SLOTTED GRATE
2. COMPLY WITH MANUFACTURERS INSTRUCTIONS, INCLUDING BUT NOT LIMITED TO:
2.1. COORDINATE BOTTOM OUTLET WITH THE EXISTING DRAINAGE PIPE. MODIFY DRAINAGE PIPE AS
REQUIRED FOR WATERTIGHT CONNECTION.
2.2. BEGIN INSTALLATION AT THE OUTLET TO SET THE FIRST CHANNEL (DEEPEST SECTION), THEN
WORK UPSTREAM TO EACH SHALLOWER END.
2.3. SET THE TOP EDGE OF THE DRAIN 1/16” BELOW THE FINISHED FLOOR ELEVATION.
2.4. FIELD VERIFY THE TRENCH DRAIN IS AT THE CORRECTION LOCATION AND ELEVATION PRIOR TO
CONCRETE PLACEMENT.
2.5. INSTALL DOWELS ALONG PERIMETER AGAINST EXISTING CONCRETE. THEN, PLACE PREMOLDED
EXPANSION JOINTS ALONG PERIMETER AGAINST EXISTING CONCRETE WITH CUTOUT FOR
DOWELS.
2.6. PLACE CONCRETE. CONCRETE SHALL BE HIGH-EARLY STRENGTH (PENNDOT CONCRETE HES), AIR-ENTRAINED WITH COMPRESSIVE STRENGTH OF 3,000 PSI (MIN) IN 3 DAYS. THE OBJECTIVE IS TO MINIMIZE THE DOWNTIME OF THE TRAFFIC AREA TO RESUME NORMAL OPERATIONS WITHIN 3
TO 4 CALENDAR DAYS WHEN CONCRETE HAS REACHED AT LEAST 3,500 PSI. TOOL CONTROL
JOINTS.
2.7. INSTALL GRATES. PROTECT AREA DURING CURING.
2.8. INSTALL SEALANT.
2.9. REMOVE TEMPORARY MEASURES AND CLEAN AREA.
NOTE:
CHANNEL INVERT SHOWN; EXTERIOR
HOUSING NOT SHOWN FOR CLARITY
PROTECT EXISTING CLEANOUT
AND CLEAN FOR REUSE.
SCALE: 1/4"=1'-0"C-3
SELECTIVE DEMOLITION PLAN2
30 20
31 31
| Sheets and Views |
| 1 GENERAL NOTES |
| 2 APRON REPAIRS |
| 3 ENGINE ROOM REPAIRS |