2-25TOS-01 Proj Manual03202026.pdf
PDF 10 MB Posted
- Solicitation number
- Not on record
- Issued by
- Berks County, South Pottstown CDP, Pennsylvania
About this file
This is a Project Manual and Bid Form for the West Wyomissing Park – Phase 1 site improvement contract issued by the Township of Spring, located in Berks County, Pennsylvania. The project involves the construction of one full and one half basketball court with color coating and lines, a plaza sitting area with site furnishings, chain link fencing, a shade sail, site grading, erosion and sediment control, planting, and lawn seeding/restoration. The bid form includes 24 line items with quantities specified in lump sum, square feet, square yards, linear feet, and each units, including items such as mobilization/demobilization, site preparation, topsoil stripping and replacement, concrete and bituminous pavement, basketball court equipment, fencing, benches, trash receptacles, bike racks, game tables, a mister pole, water line extension, planting, and lawn seeding. Sealed electronic proposals must be submitted to the Township of Spring by 10:00 AM on Friday, April 10, 2026. A pre-bid conference is scheduled for Tuesday, March 31, 2026, at 11:30 AM at the Township of Spring municipal building located at 2850 Windmill Road, Sinking Spring, Pennsylvania 19608, with attendance recommended for all bidders. The contract is anticipated to be awarded on April 27, 2026, with a serial number of 26-02738.
Bidders must provide a bid bond or certified check equal to 10 percent of the total base bid, submit a non-collusion affidavit, and include unit prices for potential adjustment of the contract amount. Bids remain effective for 60 calendar days from the bid opening date and may not be withdrawn during this period. A performance bond and payment bond, each equal to 100 percent of the contract price, are required upon award. The contract is subject to Pennsylvania's Prevailing Wage Act, with applicable wage rates provided for both Building and Heavy/Highway classifications, including rates for carpenters, laborers, operators, painters, and numerous other trades, effective through various dates in 2027. A deduct alternate is available for the shade sail item. The plans and contract documents are available at no cost through PennBid (www.pennbid.net), and bidders must address all inquiries using the Questions feature in PennBid. The Township reserves the right to accept or reject any or all bids and to award the contract in the manner deemed most favorable to its interests.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ysm Landscape Architects
Project Manual for
West Wyomissing Park— Phase 1
Township of Spring Berks County, PA
March, 2026 i
TABLE OF CONTENTS
Page
INVITATION TO BID 1
INSTRUCTIONS TO BIDDERS IB-1 TO IB-6
BID FORM – CONTRACT NO. 1 BF/1-1 TO BF/1-3
NON-COLLUSION AFFIDAVIT 1
BIDDER’S QUALIFICATION FORM QF-1 TO QF-3
BID BOND 1 TO 2
NON-DISCRIMINATION/SEXUAL HARASSMENT CLAUSE 2
NOTICE OF AWARD 1
AGREEMENT A-1 TO A-4
PERFORMANCE BOND 1 TO 2
PAYMENT BOND 1 TO 2
MAINTENANCE BOND 1 TO 2
NOTICE TO PROCEED 1
GENERAL CONDITIONS 1 TO 45
SUPPLEMENTAL CONDITIONS SC-1 TO SC-9
PENNSYLVANIA PREVAILING WAGE 1 TO 6
CHANGE ORDER 1 TO 2
APPLICATION FOR PAYMENT 1 TO 3
CERTIFICATE OF SUBSTANTIAL COMPLETION 1 TO 2
TECHNICAL SPECIFICATIONS
SECTION TITLE
DIVISION 01
01010 GENERAL PROVISIONS
01040 PROJECT MANAGEMENT AND COORDINATION
01300 SUBMITTALS
01400 QUALITY CONTROL
01500 TEMPORARY FACILITIES AND CONTROLS
01700 CONTRACT CLOSEOUT
DIVISION 02
02230 SITE CLEARING
02300 EARTHWORK
02700 BASES, BALLASTS, PAVEMENTS, AND APPURTANCES
02750 CONCRETE PAVEMET
02800 SITE IMPROVEMENTS AND AMENITIES
02920 FINE GRADING, SOIL PREPARTION, AND SEEDING
BF/1-1
BID FORM
Contract No. 1 - Site Improvement Contract
Project Identification: West Wyomissing Park – Phase 1
YSM Project No.: 25TOS-01
Name of Bidder:
Date:
This Bid is submitted to: Township of Spring 2850 Windmill Road Sinking Spring, PA 19608
1. The undersigned Bidder proposes and agrees, if this Bid is accepted, to enter into an Agreement with
Owner in the form included in the Contract Documents to perform and furnish all Work as specified or indicated in the Contract Documents for the Bid price and within the Bid Times indicated in this Bid and in accordance with the other terms and conditions of the Contract Documents.
2. Bidder accepts all of the terms and conditions of the Invitation to Bid and Instructions to Bidders, including without limitation those dealing with the disposition of Bid Security. This Bid will remain subject to acceptance for 90 days after the day of Bid opening. Bidder will sign and deliver the required number of counterparts of the Agreement with the Bonds and other documents required by the Bidding Requirements within 15 days after the date of Owner's Notice of Award.
3. In submitting this Bid, Bidder represents, as more fully set forth in the Agreement, that:
a. Bidder has examined and carefully studied the Bidding Documents and the following Addenda receipt of all which is hereby acknowledged:
b. Bidder has visited the site and become familiar with and is satisfied as to the general, local and site conditions that may affect cost, progress, performance and furnishing of the Work.
c. Bidder is familiar with and is satisfied as to all federal, state and local laws and regulations that may affect cost, progress, performance and furnishing of the Work.
d. Bidder is aware of the general nature of the Work to be performed by Owner and others at the site that relates to work for which this Bid is submitted as indicated in the Contract Documents.
e. Bidder has correlated the information known to Bidder, information and observations obtained from visits to the site, reports and drawings identified in the Contract Documents and all additional examinations, investigations, explorations, tests, studies and data with the Contract Documents.
f. Bidder has given Landscape Architect written notice of all conflicts, errors, ambiguities or discrepancies that Bidder has discovered in the Contract Documents and the written resolution thereof by Landscape Architect is acceptable to Bidder, and the Contract Documents are generally sufficient to indicate and convey understanding of all terms and conditions for performing and furnishing the Work for which this Bid is submitted.
g . This Bid is genuine and not made in the interest of or on the behalf of any undisclosed person, firm or corporation and is not submitted in conformity with any agreement or rules of any group, association, organization or corporation; Bidder has not directly or indirectly induced or solicited
BF/1-2
any other Bidder to submit a false or sham Bid; Bidder has not solicited or induced any person, firm or corporation to refrain from bidding; and Bidder has not sought by collusion to obtain for itself any advantage over any other Bidder or over Owner.
h. Bid is based on Pennsylvania Prevailing Wage rates as issued for this project.
i. Bidder understands that unit prices are included for adjustment of the contract amount in the event the Owner directs additional work not shown on the Drawings and no adjustment will be made for actual quantities completed in performing the work shown on the plans.
4. Bidder will complete the Work as described on Drawings, sheets S-1 through S-5 and Specifications contained herein for the following price(s):
Contract No. 1 - Site Improvement Contract
Item Quantity Unit Unit Price Total Price
1 Mobilization/Demobilization 1 LS
2 Bond and Insurance 1 LS
3 E & S Control Measures 1 LS
4 Site Preparation 1 LS
5 Topsoil Stripping and Replacement 1 LS
6 Site Grading 1 LS
7 Concrete Pavement 1,797 SF
8 Basketball Court Pavement 1,033 SY
9 Basketball Court Color Coat and Lines 1,033 SY
10 Basketball Court Posts, Backboards, Rims, Nets 3 EA
11 Bituminous Trail Pavement 141 SY
12 10’ Ht. Chain Link Fence at Basketball Courts 180 LF
13 4’ Ht. Chain Link Fence at West Lawn Avenue 100 LF
14 Benches 4 EA
15 Trash Receptacles 1 EA
16 Bike Rack 1 EA
17 Game Table – 4 seats 1 EA
18 Game Table – 3 seats 1 EA
19 Game Table – 2 seats 1 EA
20 Shade Sail 1 EA
21 Mister Pole 1 EA
22 Water Line Extension 170 LF
23 Planting 1 LS
24 Lawn Seeding and Restoration 1 LS
TOTAL BASE BID (Sum of Total Price, Items 1-24) __________________________________ (figures)
Dollars and Cents (written)
BF/1-3
The stated amount constitutes the Base Bid and includes all fees, insurances, and bonds required to execute the work.
DEDUCT ALTERNATE NO. 1 – Shade Sail: State the total amount to be deducted from the Contract if the Shade Sail is deducted from the Contract.
DEDUCT ALTERNATE NO. 1 – Shade Sail: (figures)
Dollars and Cents (written)
The Owner may, in its sole discretion, increase or decrease the Site Improvement Contract, through application of the unit price and alternates.
5. Bidder agrees that the Work will be substantially complete and ready for Final Payment in accordance with Paragraph 14.13 of the General Conditions, on or before the dates or within the number of calendar days indicated in the Agreement.
6. The following documents are attached to and made a condition of this Bid:
a. Required Bid Security in the form of .
b. A tabulation of subcontractors, suppliers and other persons and organizations required to be identified in this Bid.
7. Phone Number and Address for Receipt of Official Communications
Contact Name:
Address:
Phone Number: Email:
8. The terms used in this Bid which are defined in the General Conditions or Instructions will have the meanings assigned to them in the General Conditions or Instructions.
SUBMITTED on , 2026.
Project Name: West Wyomissing Park
General Description: Construction of one full and one half basketball courts, court color coat, plaza sitting area, site furnishings, chain link fence, shade sail, grading, erosion control, planting, seeding/lawn restoration.
Project Locality Township of Spring
Awarding Agency: Township of Spring
Contract Award Date: 4/27/2026
Serial Number: 26-02738
Project Classification: Highway
Determination Date: 3/19/2026
Assigned Field Office: Scranton
Field Office Phone Number: (570)963-4577
Toll Free Phone Number: (877)214-3962
Project County: Berks County
BUREAU OF LABOR LAW COMPLIANCE
PREVAILING WAGES PROJECT RATES
Commonwealth of Pennsylvania Department of Labor & Industry Report Date: 3/19/2026 Page 1 of 6
Project: 26-02738 - Building Effective Date
Expiration Date
Hourly Rate Fringe Benefits
Total
Asbestos & Insulation Workers 6/30/2025 $41.50 $29.86 $71.36
Boilermaker (Commercial, Institutional, and Minor Repair Work)
3/1/2024 $36.71 $19.13 $55.84
Boilermakers 1/1/2024 $52.10 $35.72 $87.82
Bricklayers, Stone Masons, Pointers, Caulkers, Cleaners
5/4/2025 $41.68 $19.17 $60.85
Bricklayers, Stone Masons, Pointers, Caulkers, Cleaners
5/3/2026 $43.53 $19.17 $62.70
Carpenters, Drywall Hangers, Framers, Instrument Men, Lathers, Soft Floor Layers
6/1/2025 $36.84 $20.44 $57.28
Carpenters, Drywall Hangers, Framers, Instrument Men, Lathers, Soft Floor Layers
6/1/2026 $36.84 $22.69 $59.53
Carpenters, Drywall Hangers, Framers, Instrument Men, Lathers, Soft Floor Layers
6/1/2027 $36.84 $24.94 $61.78
Cement Finishers & Plasterers 5/4/2025 $32.23 $22.27 $54.50
Cement Finishers & Plasterers 5/3/2026 $34.23 $22.27 $56.50
Cement Finishers & Plasterers 5/3/2027 $33.49 $25.01 $58.50
Cement Masons 5/1/2024 $34.85 $20.90 $55.75
Cement Masons 5/1/2025 $35.85 $20.90 $56.75
Dockbuilder, Pile Drivers 5/1/2025 $55.23 $37.99 $93.22
Dockbuilder, Pile Drivers 5/1/2026 $56.98 $37.99 $94.97
Dockbuilder/Pile Driver Diver 5/1/2025 $64.35 $41.74 $106.09
Dockbuilder/Pile Driver Diver 5/1/2026 $66.54 $41.74 $108.28
Dockbuilder/pile driver tender 5/1/2025 $55.23 $37.99 $93.22
Dockbuilder/pile driver tender 5/1/2026 $56.98 $37.99 $94.97
Drywall Finisher 5/1/2025 $31.83 $23.26 $55.09
Electricians 9/2/2024 $44.52 $26.83 $71.35
Electricians 9/1/2025 $46.02 $28.39 $74.41
Elevator Constructor 1/1/2025 $61.41 $44.95 $106.36
Elevator Constructor 1/1/2026 $64.06 $46.01 $110.07
Floor Coverer 5/1/2025 $37.78 $19.80 $57.58
Floor Coverer 5/1/2026 $38.59 $20.61 $59.20
Glazier 5/1/2024 $39.48 $23.81 $63.29
Iron Workers (Bridge, Structural Steel, Ornamental, Precast, Reinforcing)
7/1/2025 $38.76 $33.38 $72.14
Laborers (Class 01 - See notes) 5/1/2025 $29.27 $17.84 $47.11
Laborers (Class 01 - See notes) 5/1/2026 $30.12 $18.49 $48.61
Laborers (Class 02 - See notes) 5/1/2026 $32.12 $18.49 $50.61
Laborers (Class 02 - see notes) 5/1/2025 $31.27 $17.84 $49.11
Laborers (Class 03 - See notes) 4/27/2025 $31.82 $18.09 $49.91
Laborers (Class 03 - See notes) 5/1/2026 $32.82 $18.74 $51.56
Laborers (Class 04 - See notes) 4/27/2025 $33.82 $18.09 $51.91
Laborers (Class 04 - See notes) 5/1/2026 $34.32 $18.74 $53.06
Laborers (Class 05 - See notes) 5/1/2025 $31.27 $17.84 $49.11
Laborers (Class 05 - See notes) 5/1/2026 $32.12 $18.49 $50.61
Laborers (Class 06 - See notes) 5/1/2025 $30.62 $17.84 $48.46
Laborers (Class 06 - See notes) 5/1/2026 $31.47 $18.49 $49.96
BUREAU OF LABOR LAW COMPLIANCE
PREVAILING WAGES PROJECT RATES
Report Date: 3/19/2026 Page 2 of 6
Expiration Date
Hourly Rate Fringe Benefits
Total
Marble Mason 5/1/2025 $37.71 $18.73 $56.44
Marble Mason 5/1/2026 $39.66 $18.73 $58.39
Millwright 6/1/2025 $43.00 $22.95 $65.95
Millwright 6/1/2026 $44.97 $22.95 $67.92
Operators (Building, Class 01 - See Notes) 5/1/2025 $44.89 $30.92 $75.81
Operators (Building, Class 01 - See Notes) 5/1/2026 $46.05 $31.76 $77.81
Operators (Building, Class 01A - See Notes) 5/1/2025 $47.14 $31.58 $78.72
Operators (Building, Class 01A - See Notes) 5/1/2026 $48.30 $32.42 $80.72
Operators (Building, Class 02 - See Notes) 5/1/2025 $44.61 $30.83 $75.44
Operators (Building, Class 02 - See Notes) 5/1/2026 $45.77 $31.67 $77.44
Operators (Building, Class 02A - See Notes) 5/1/2025 $46.86 $31.50 $78.36
Operators (Building, Class 02A - See Notes) 5/1/2026 $48.02 $32.34 $80.36
Operators (Building, Class 03 - See Notes) 5/1/2025 $41.88 $30.03 $71.91
Operators (Building, Class 03 - See Notes) 5/1/2026 $43.04 $30.87 $73.91
Operators (Building, Class 04 - See Notes) 5/1/2025 $40.74 $29.70 $70.44
Operators (Building, Class 04 - See Notes) 5/1/2026 $41.90 $30.54 $72.44
Operators (Building, Class 05 - See Notes) 5/1/2025 $40.30 $29.56 $69.86
Operators (Building, Class 05 - See Notes) 5/1/2026 $41.45 $30.41 $71.86
Operators (Building, Class 06 - See Notes) 5/1/2025 $39.42 $29.30 $68.72
Operators (Building, Class 06 - See Notes) 5/1/2026 $40.58 $30.14 $70.72
Operators (Building, Class 07A- See Notes) 5/1/2025 $54.56 $35.21 $89.77
Operators (Building, Class 07A- See Notes) 5/1/2026 $56.03 $36.14 $92.17
Operators (Building, Class 07B- See Notes) 5/1/2025 $54.22 $35.10 $89.32
Operators (Building, Class 07B- See Notes) 5/1/2026 $55.69 $36.03 $91.72
Painters Class 1 (see notes) 5/1/2024 $31.81 $23.77 $55.58
Painters Class 1 (see notes) 5/1/2025 $32.71 $24.17 $56.88
Painters - Line Stripping 12/1/2024 $44.12 $27.91 $72.03
Painters - Line Stripping 12/1/2025 $45.12 $29.41 $74.53
Painters Class 2 (see notes) 5/1/2023 $30.09 $23.19 $53.28
Painters Class 2 (see notes) 5/1/2025 $35.61 $24.18 $59.79
Painters Class 3 (see notes) 5/1/2025 $41.71 $24.18 $65.89
Piledrivers 5/1/2021 $43.73 $37.99 $81.72
Plasterers 5/1/2024 $32.93 $21.08 $54.01
Plasterers 5/1/2025 $34.68 $21.23 $55.91 plumber 5/1/2024 $54.28 $35.26 $89.54 plumber 5/1/2025 $56.28 $36.01 $92.29
Roofers (Composition) 5/1/2024 $44.13 $34.77 $78.90
Roofers (Composition) 5/1/2025 $46.03 $34.77 $80.80
Roofers (Shingle) 5/1/2024 $34.35 $22.20 $56.55
Roofers (Slate & Tile) 5/1/2024 $37.35 $22.20 $59.55
Sheet Metal Workers 6/1/2024 $43.09 $43.14 $86.23
Sheet Metal Workers 6/1/2025 $45.02 $44.71 $89.73
Sign Makers and Hangars 7/15/2024 $32.32 $25.82 $58.14
Sign Makers and Hangars 7/15/2025 $33.48 $26.41 $59.89
BUREAU OF LABOR LAW COMPLIANCE
PREVAILING WAGES PROJECT RATES
Report Date: 3/19/2026 Page 3 of 6
Expiration Date
Hourly Rate Fringe Benefits
Total
Sprinklerfitters 4/1/2024 $46.45 $28.62 $75.07
Sprinklerfitters 4/1/2025 $49.75 $29.21 $78.96
Steamfitters 5/1/2024 $59.65 $43.09 $102.74
Steamfitters 5/1/2025 $61.47 $44.89 $106.36
Terrazzo Finisher 5/1/2024 $35.66 $20.76 $56.42
Terrazzo Finisher 5/1/2025 $36.32 $21.68 $58.00
Terrazzo Grinder 5/1/2024 $36.42 $20.76 $57.18
Terrazzo Grinder 5/1/2025 $37.10 $21.68 $58.78
Terrazzo Mechanics 5/1/2024 $36.44 $22.51 $58.95
Terrazzo Mechanics 5/1/2025 $37.17 $23.43 $60.60
Tile & Marble Finisher 5/1/2025 $35.31 $16.99 $52.30
Tile & Marble Finisher 5/1/2026 $37.26 $16.99 $54.25
Tile Setter 5/1/2025 $37.71 $18.73 $56.44
Tile Setter 5/1/2026 $39.66 $18.73 $58.39
Truckdriver class 1(see notes) 5/1/2025 $41.87 $0.00 $41.87
Truckdriver class 2 (see notes) 5/1/2025 $41.94 $0.00 $41.94
Truckdriver class 3 (see notes) 5/1/2025 $42.43 $0.00 $42.43
Window Film / Tint Installer 6/1/2024 $26.37 $14.83 $41.20
Window Film / Tint Installer 6/1/2025 $27.42 $15.13 $42.55
BUREAU OF LABOR LAW COMPLIANCE
PREVAILING WAGES PROJECT RATES
Report Date: 3/19/2026 Page 4 of 6
Project: 26-02738 - Heavy/Highway Effective
Expiration Date
Hourly Rate Fringe Benefits
Total
Carpenter - Chief of Party (Surveying & Layout) 5/1/2021 $41.42 $15.49 $56.91
Carpenter - Instrument Person (Surveying & Layout) 5/1/2021 $36.02 $15.49 $51.51
Carpenter - Rodman I (Survey & Layout) 5/1/2021 $28.82 $12.39 $41.21
Carpenter 5/1/2025 $36.87 $20.49 $57.36
Carpenter 5/1/2026 $37.63 $21.18 $58.81
Carpenter Welder 5/1/2025 $37.62 $20.49 $58.11
Carpenter Welder 5/1/2026 $38.38 $21.18 $59.56
Carpenters - Piledriver/Welder 1/1/2025 $37.62 $20.49 $58.11
Carpenters - Piledriver/Welder 1/1/2026 $38.38 $21.18 $59.56
Cement Finishers 1/1/2017 $27.70 $20.20 $47.90
Dockbuilder, Pile Drivers 5/1/2025 $55.23 $37.99 $93.22
Dockbuilder, Pile Drivers 5/1/2026 $56.98 $37.99 $94.97
Dockbuilder/Pile Driver Diver 5/1/2025 $60.31 $44.97 $105.28
Dockbuilder/Pile Driver Diver 5/1/2026 $61.88 $45.47 $107.35
Dockbuilder/pile driver tender 5/1/2025 $55.23 $37.99 $93.22
Dockbuilder/pile driver tender 5/1/2026 $56.98 $37.99 $94.97
Electric Lineman 6/3/2024 $52.80 $30.61 $83.41
Electric Lineman 6/2/2025 $55.42 $31.04 $86.46
Iron Workers (Bridge, Structural Steel, Ornamental, Precast, Reinforcing)
7/1/2024 $37.26 $32.63 $69.89
Laborers (Class 01 - See notes) 5/1/2025 $26.61 $19.99 $46.60
Laborers (Class 01 - See notes) 5/1/2026 $27.61 $20.44 $48.05
Laborers (Class 02 - See notes) 5/1/2025 $33.23 $19.99 $53.22
Laborers (Class 02 - See notes) 5/1/2026 $34.23 $20.44 $54.67
Laborers (Class 03 - See notes) 5/1/2025 $30.22 $19.99 $50.21
Laborers (Class 03 - See notes) 5/1/2026 $31.22 $20.44 $51.66
Laborers (Class 04 - See notes) 5/1/2025 $30.57 $19.99 $50.56
Laborers (Class 04 - See notes) 5/1/2026 $31.57 $20.44 $52.01
Laborers (Class 05 - See notes) 5/1/2025 $31.24 $19.99 $51.23
Laborers (Class 05 - See notes) 5/1/2026 $32.24 $20.44 $52.68
Laborers (Class 06 - See notes) 5/1/2025 $30.66 $19.99 $50.65
Laborers (Class 06 - See notes) 5/1/2026 $31.66 $20.44 $52.10
Laborers (Class 07 - See notes) 5/1/2025 $30.95 $19.99 $50.94
Laborers (Class 07 - See notes) 5/1/2026 $31.95 $20.44 $52.39
Laborers (Class 08 - See notes) 5/1/2025 $31.43 $19.99 $51.42
Laborers (Class 08 - See notes) 5/1/2026 $32.43 $20.44 $52.87
Millwright 6/1/2025 $45.46 $23.33 $68.79
Millwright 6/1/2026 $47.52 $23.33 $70.85
Operators (Heavy, Class 01 - See Notes) 5/1/2025 $43.46 $30.50 $73.96
Operators (Heavy, Class 01 - See Notes) 5/1/2026 $44.61 $31.35 $75.96
Operators (Heavy, Class 01A - See Notes) 5/1/2025 $45.71 $31.16 $76.87
Operators (Heavy, Class 01A - See Notes) 5/1/2026 $46.86 $32.01 $78.87
Operators (Heavy, Class 02 - See Notes) 5/1/2025 $43.18 $30.41 $73.59
Operators (Heavy, Class 02 - See Notes) 5/1/2026 $44.34 $31.25 $75.59
Operators (Heavy, Class 02A - See Notes) 5/1/2025 $45.43 $31.08 $76.51
BUREAU OF LABOR LAW COMPLIANCE
PREVAILING WAGES PROJECT RATES
Report Date: 3/19/2026 Page 5 of 6
Project: 26-02738 - Heavy/Highway Effective
Expiration Date
Hourly Rate Fringe Benefits
Total
Operators (Heavy, Class 02A - See Notes) 5/1/2026 $46.59 $31.92 $78.51
Operators (Heavy, Class 03 - See Notes) 5/1/2025 $40.26 $29.55 $69.81
Operators (Heavy, Class 03 - See Notes) 5/1/2026 $41.43 $30.38 $71.81
Operators (Heavy, Class 04 - See Notes) 5/1/2025 $39.12 $29.22 $68.34
Operators (Heavy, Class 04 - See Notes) 5/1/2026 $40.28 $30.06 $70.34
Operators (Heavy, Class 05 - See Notes) 5/1/2025 $38.67 $29.09 $67.76
Operators (Heavy, Class 05 - See Notes) 5/1/2026 $39.83 $29.93 $69.76
Operators (Heavy, Class 06 - See Notes) 5/1/2025 $37.80 $28.82 $66.62
Operators (Heavy, Class 06 - See Notes) 5/1/2026 $38.96 $29.66 $68.62
Operators (Heavy, Class 07A - See Notes) 5/1/2025 $52.85 $34.71 $87.56
Operators (Heavy, Class 07A - See Notes) 5/1/2026 $54.32 $35.64 $89.96
Operators (Heavy, Class 07B - See Notes) 5/1/2025 $52.51 $34.60 $87.11
Operators (Heavy, Class 07B - See Notes) 5/1/2026 $53.97 $35.54 $89.51
Operators (Highway, Class 01 - See Notes) 5/1/2025 $42.56 $30.24 $72.80
Operators (Highway, Class 01 - See Notes) 5/1/2026 $43.72 $31.08 $74.80
Operators (Highway, Class 01a - See Notes) 5/1/2025 $44.81 $30.92 $75.73
Operators (Highway, Class 01a - See Notes) 5/1/2026 $45.97 $31.76 $77.73
Operators (Highway, Class 02 - See Notes) 5/1/2025 $41.39 $29.89 $71.28
Operators (Highway, Class 02 - See Notes) 5/1/2026 $42.55 $30.73 $73.28
Operators (Highway, Class 03 - See Notes) 5/1/2025 $40.70 $29.68 $70.38
Operators (Highway, Class 03 - See Notes) 5/1/2026 $41.87 $30.51 $72.38
Operators (Highway, Class 04 - See Notes) 5/1/2025 $40.26 $29.54 $69.80
Operators (Highway, Class 04 - See Notes) 5/1/2026 $41.41 $30.39 $71.80
Operators (Highway, Class 05 - See Notes) 5/1/2025 $39.73 $29.41 $69.14
Operators (Highway, Class 05 - See Notes) 5/1/2026 $40.89 $30.25 $71.14
Operators (Highway, Class 06 - See Notes) 5/1/2025 $42.80 $30.30 $73.10
Operators (Highway, Class 06 - See Notes) 5/1/2026 $43.95 $31.15 $75.10
Operators (Highway, Class 06/A - See Notes) 5/1/2025 $45.05 $30.96 $76.01
Operators (Highway, Class 06/A - See Notes) 5/1/2026 $46.21 $31.80 $78.01
Operators (Highway, Class 07/A - See Notes) 5/1/2025 $51.79 $34.38 $86.17
Operators (Highway, Class 07/A - See Notes) 5/1/2026 $53.25 $35.32 $88.57
Operators (Highway, Class 07/B - See Notes) 5/1/2025 $50.37 $33.97 $84.34
Operators (Highway, Class 07/B - See Notes) 5/1/2026 $51.84 $34.90 $86.74
Painters - Line Stripping 12/1/2024 $44.12 $27.91 $72.03
Painters - Line Stripping 12/1/2025 $45.12 $29.41 $74.53
Painters Class 2 (see notes) 5/1/2025 $35.61 $24.18 $59.79
Painters Class 3 (see notes) 5/1/2024 $40.81 $23.78 $64.59
Painters Class 3 (see notes) 5/1/2025 $41.71 $24.18 $65.89
Piledrivers 5/1/2025 $36.87 $20.49 $57.36
Piledrivers 5/1/2026 $37.63 $21.18 $58.81
Steamfitters (Heavy and Highway - Gas Distribution) 5/1/2025 $54.39 $44.73 $99.12
Truckdriver class 1(see notes) 5/1/2025 $41.87 $0.00 $41.87
Truckdriver class 2 (see notes) 5/1/2025 $41.94 $0.00 $41.94
Truckdriver class 3 (see notes) 5/1/2025 $42.43 $0.00 $42.43
BUREAU OF LABOR LAW COMPLIANCE
PREVAILING WAGES PROJECT RATES
Report Date: 3/19/2026 Page 6 of 6
| BIDFORM - Cntrct 1.pdf |
| DEDUCT ALTERNATE NO. 1 – Shade Sail: State the total amount to be deducted from the Contract if the Shade Sail is deducted from the Contract. |
File details come from the government source that posted it. Updated .