2-25JFB-01 Project Manual 070826 Bid Doc.pdf

PDF 9 MB Posted

Attached to
Playground Improvements Contract No. 1 – Site Improvement Contract
Solicitation number
Not on record
Issued by
York County, Pennsylvania

About this file

This is a Project Manual and Bid Document for the Jefferson Borough Playground Improvements project, a site improvement contract issued by Jefferson Borough in York County, Pennsylvania, and prepared by landscape architect Yost Strodoski Mears. The project encompasses site preparation, erosion control measures, playground equipment furnishing and installation, playground area improvements, mulch safety surfacing, concrete curb edging and plaza construction, bituminous pavement installation, and lawn seeding and restoration. Bid items include mobilization/demobilization, site clearing and grading, topsoil stripping and replacement, bituminous trail pavement (62 square yards), concrete playground pavement (336 square feet), concrete curb edging (213 linear feet), playground equipment for tot lots and swings, underdrain installation (73 linear feet), safety surface mulch (2,445 square feet), acknowledgement signage (1 each), and lawn seeding. Two bid alternates are included: youth playground slide replacement and three benches. Sealed electronic proposals are due by 10:00 AM on Thursday, July 30, 2026, with a pre-bid conference scheduled for Wednesday, July 22, 2026, at 11:00 AM at the Jefferson Borough municipal building. The contract was awarded on August 3, 2026, with project classification as Highway under serial number 26-06440.

All bidders must submit a bid bond or certified check equal to 10 percent of the total base bid along with a non-collusion affidavit. Bids remain effective for 60 calendar days from the bid opening date and cannot be withdrawn during this period. Performance and payment bonds, each in the amount of 100 percent of the contract price, are required upon award. The contract is subject to the Pennsylvania Prevailing Wage Act, with detailed prevailing wage rates provided for both Building and Heavy/Highway classifications, including rates for laborers, operators, carpenters, cement finishers, and numerous other trade classifications with effective dates and hourly rates plus fringe benefits. All bidders must bid on all items listed on the Bid Form and submit unit costs for potential contract adjustments. Plans and contract documents are available at no cost on PennBid (www.pennbid.net). Inquiries must be submitted through the Questions feature in PennBid. Jefferson Borough reserves the right to accept or reject any or all bids and to waive any informality in bids received.

View the file

Other files

File Type Posted
1-25JFB-01 CDs- 070826 Bid Set.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ysm Landscape Architects

Project Manual for

Jefferson Borough — Playground Improvements

Jefferson Borough York County, PA

July 2026

PROJECT MANUAL

Jefferson Borough Playground Improvements

Jefferson Borough, York County, Pennsylvania

Prepared for:

48 Baltimore Street Codorus, PA 17311

(717) 229-0545

Prepared by:

Yost Strodoski Mears 19 South Newberry Street

York PA 17401

(717) 812-9959

Contact: Ann E. Yost, RLA

July 2026

Project No. 25JFB-01 i

TABLE OF CONTENTS

Page

INVITATION TO BID 1

INSTRUCTIONS TO BIDDERS IB-1 TO IB-6

BID FORM BF/1-1 TO BF/1-3

NON-COLLUSION AFFIDAVIT 1

BIDDER’S QUALIFICATION FORM QF-1 TO QF-3

BID BOND 1 TO 2

NON-DISCRIMINATION & EQUAL OPPORTUNITY POLICY 1 TO 2

NOTICE OF AWARD 1

AGREEMENT A-1 TO A-4

PERFORMANCE BOND 1 TO 2

PAYMENT BOND 1 TO 2

MAINTENANCE BOND 1 TO 2

NOTICE TO PROCEED 1

GENERAL CONDITIONS 1 TO 44

SUPPLEMENTAL CONDITIONS SC-1 TO SC-9

PENNSYLVANIA PREVAILING WAGE 1 TO 6

CHANGE ORDER 1 TO 2

APPLICATION FOR PAYMENT 1 TO 3

CERTIFICATE OF SUBSTANTIAL COMPLETION 1 TO 2

TECHNICAL SPECIFICATIONS

DIVISION 01

SECTION TITLE

01010 GENERAL PROVISIONS

01040 PROJECT MANAGEMENT AND COORDINATION

01300 SUBMITTALS

01400 QUALITY CONTROL

01500 TEMPORARY FACILITIES AND CONTROLS

01700 CONTRACT CLOSEOUT

DIVISION 02

SECTION TITLE

02230 SITE CLEARING

02300 EARTHWORK

02700 BASES, BALLASTS, PAVEMENTS, AND APPURTANCES

02750 CONCRETE PAVEMENT

02800 SITE IMPROVEMENTS AND AMENITIES

02900 PLANTING

02920 FINE GRADING, SOIL PREPARTION, AND SEEDING

INVITATION TO BID

OWNER: Jefferson Borough 48 Baltimore Street

Codorus, PA 17311

(717) 229-0545

LANDSCAPE

ARCHITECT: Yost Strodoski Mears (YSM) 19 South Newberry Street York, PA 17401

(717) 812-9959

Sealed proposals will be received electronically by Jefferson Borough until 10:00 AM prevailing time on Thursday, July 30, 2026, for the following project:

Jefferson Borough – Playground Improvements, contains one (1) contract:

Contract No. 1 – Site Improvement Contract

Plans and contract documents are available at no cost on PennBid (www.pennbid.net).

A pre-bid conference will be held on Wednesday, July 22, 2026, at 11:00 AM at the Jefferson Borough municipal building, 48 Baltimore Street, Codorus, PA 17311. Attendance is recommended for all bidders.

A bid bond or certified check shall accompany each proposal to the Owner in the amount of 10 percent of the total base bid. A non-collusion affidavit shall accompany each proposal. Bids will be effective for 60 calendar days from the bid opening date and may not be withdrawn during this period. All bidders must bid on all items listed on the Bid Form and on the unit costs and alternatives. A performance bond and a payment bond, each in the amount of 100 percent of the contract price, shall be required.

Inquiries shall be submitted using the “Questions” feature in PennBid.

This contract is subject to the Pennsylvania Prevailing Wage Act.

Jefferson Borough reserves the right to accept or reject any or all bids, to re-advertise and award the contract in the regular manner or to waive any informality in the bid received and to accept any bid deemed to be most favorable in the interest of Jefferson Borough.

Daniel Kauffman, Council

BF/1-1

BID FORM

Contract No. 1 - Site Improvement Contract

Project Identification: Jefferson Borough – Playground Improvements

YSM Project No.: 25JFB-01

Name of Bidder:

Date:

This Bid is submitted to: Jefferson Borough 48 Baltimore Street Codorus, PA 17311

1. The undersigned Bidder proposes and agrees, if this Bid is accepted, to enter into an Agreement with

Owner in the form included in the Contract Documents to perform and furnish all Work as specified or indicated in the Contract Documents for the Bid price and within the Bid Times indicated in this Bid and in accordance with the other terms and conditions of the Contract Documents.

2. Bidder accepts all of the terms and conditions of the Invitation to Bid and Instructions to Bidders, including without limitation those dealing with the disposition of Bid Security. This Bid will remain subject to acceptance for 90 days after the day of Bid opening. Bidder will sign and deliver the required number of counterparts of the Agreement with the Bonds and other documents required by the Bidding Requirements within 15 days after the date of Owner's Notice of Award.

3. In submitting this Bid, Bidder represents, as more fully set forth in the Agreement, that:

a. Bidder has examined and carefully studied the Bidding Documents and the following Addenda receipt of all which is hereby acknowledged:

b. Bidder has visited the site and become familiar with and is satisfied as to the general, local and site conditions that may affect cost, progress, performance and furnishing of the Work.

c. Bidder is familiar with and is satisfied as to all federal, state and local laws and regulations that may affect cost, progress, performance and furnishing of the Work.

d. Bidder is aware of the general nature of the Work to be performed by Owner and others at the site that relates to work for which this Bid is submitted as indicated in the Contract Documents.

e. Bidder has correlated the information known to Bidder, information and observations obtained from visits to the site, reports and drawings identified in the Contract Documents and all additional examinations, investigations, explorations, tests, studies and data with the Contract Documents.

f. Bidder has given Landscape Architect written notice of all conflicts, errors, ambiguities or discrepancies that Bidder has discovered in the Contract Documents and the written resolution thereof by Landscape Architect is acceptable to Bidder, and the Contract Documents are generally sufficient to indicate and convey understanding of all terms and conditions for performing and furnishing the Work for which this Bid is submitted.

g . This Bid is genuine and not made in the interest of or on the behalf of any undisclosed person, firm or corporation and is not submitted in conformity with any agreement or rules of any group, association, organization or corporation; Bidder has not directly or indirectly induced or solicited

BF/1-2

any other Bidder to submit a false or sham Bid; Bidder has not solicited or induced any person, firm or corporation to refrain from bidding; and Bidder has not sought by collusion to obtain for itself any advantage over any other Bidder or over Owner.

h. Bid is based on Pennsylvania Prevailing Wage rates as issued for this project.

i. Bidder understands that unit prices are included for adjustment of the contract amount in the event the Owner directs additional work not shown on the Drawings and no adjustment will be made for actual quantities completed in performing the work shown on the plans.

4. Bidder will complete the Work as described on Drawings, sheets S-1 through S-6 and Specifications contained herein for the following price(s):

Contract No. 1 - Site Improvement Contract

Item Quant ity Unit Labor

Price Material Price Total Price

1 Mobilization/Demobilization 1 LS

2 Bond and Insurance 1 LS

3 E & S Control Measures 1 LS

4 Site Preparation 1 LS

5 Topsoil Stripping and Replacement 1 LS

6 Site Grading 1 LS

7 Bituminous Trail Pavement 62 SY

8 Concrete Pavement at Playground 336 SF

9 Playground Concrete Curb Edge at Tot Lot/Swings 213 LF

10 Playground Equipment Tot Lot/Swings 1 LS

11 Tot Lot/Swings Playground Area Drainage Aggregate 1 LS

12 Tot Lot/Swings Playground Area Geotextile Fabrics 1 LS

13 Underdrain at Tot Lot/Swings Playground 73 LF

14 Safety Surface Mulch at Tot Lot/Swings 2,445 SF

15 Acknowledgement Sign 1 EA

16 Lawn Seeding and Restoration 1 LS

TOTAL BASE BID (Sum of Total Price, Items 1-16) __________________________________ (figures)

Dollars and Cents (written)

The stated amount constitutes the Base Bid and includes all fees, insurances, and bonds required to execute the work.

BF/1-3

ADD ALTERNATE NO. 1 – Youth Playground Slide Replacement: State the total amount to be added to the Contract if the existing youth playground corkscrew slide is removed and a new slide and appurtenances are furnished and installed on the existing youth playground equipment.

ADD ALTERNATE NO. 1 – Youth Playground Slide Replacement: (figures)

ADD ALTERNATE NO. 2 – Benches: State the total amount to be added to the Contract to furnish and install three (3) benches.

ADD ALTERNATE NO. 2 – Benches: (figures)

The Owner may, in its sole discretion, increase or decrease the Site Improvement Contract, through application of the unit price and alternates.

5. Bidder agrees that the Work will be substantially complete and ready for Final Payment in accordance with Paragraph 14.13 of the General Conditions, on or before the dates or within the number of calendar days indicated in the Agreement.

6. The following documents are attached to and made a condition of this Bid:

a. Required Bid Security in the form of .

b. A tabulation of subcontractors, suppliers and other persons and organizations required to be identified in this Bid.

7. Phone Number and Address for Receipt of Official Communications

Contact Name:

Address:

Phone Number: Email:

8. The terms used in this Bid which are defined in the General Conditions or Instructions will have the meanings assigned to them in the General Conditions or Instructions.

SUBMITTED on , 2026.

Project Name: Jefferson Borough - Playground Improvements

General Description: site preparation, erosion control measures, furnish and install playground equipment, playground area improvements and mulch safety surfacing, concrete curb edging and plaza, bituminous pavement, lawn seeding/restoration.

Project Locality Jefferson Borough

Awarding Agency: Jefferson Borough

Contract Award Date: 8/3/2026

Serial Number: 26-06440

Project Classification: Highway

Determination Date: 7/8/2026

Assigned Field Office: Harrisburg

Field Office Phone Number: (717)787-4763

Toll Free Phone Number: (800)932-0665

Project County: York County

BUREAU OF LABOR LAW COMPLIANCE

PREVAILING WAGES PROJECT RATES

Commonwealth of Pennsylvania Department of Labor & Industry Report Date: 7/8/2026 Page 1 of 6

Project: 26-06440 - Building Effective Date

Expiration Date

Hourly Rate Fringe Benefits

Total

Asbestos & Insulation Workers 6/30/2025 $41.50 $29.86 $71.36

Asbestos & Insulation Workers 6/29/2026 $43.50 $31.11 $74.61

Boilermaker (Commercial, Institutional, and Minor Repair Work)

3/1/2024 $36.71 $19.13 $55.84

Boilermaker (Commercial, Institutional, and Minor Repair Work)

3/1/2026 $41.34 $19.23 $60.57

Boilermakers 1/1/2024 $52.10 $35.72 $87.82

Boilermakers 1/1/2026 $58.00 $36.57 $94.57

Bricklayers, Stone Masons, Pointers, Caulkers, Cleaners

5/4/2025 $40.47 $19.68 $60.15

Bricklayers, Stone Masons, Pointers, Caulkers, Cleaners

5/3/2026 $40.49 $21.51 $62.00

Carpenters - Piledriver/Welder 1/1/2025 $43.38 $22.72 $66.10

Carpenters - Piledriver/Welder 1/1/2026 $44.63 $23.47 $68.10

Carpenters, Drywall Hangers, Framers, Instrument Men, Lathers, Soft Floor Layers

6/1/2025 $36.84 $20.44 $57.28

Carpenters, Drywall Hangers, Framers, Instrument Men, Lathers, Soft Floor Layers

6/1/2026 $36.84 $22.69 $59.53

Carpenters, Drywall Hangers, Framers, Instrument Men, Lathers, Soft Floor Layers

6/1/2027 $36.84 $24.94 $61.78

Cement Finishers & Plasterers 5/4/2025 $32.23 $22.27 $54.50

Cement Finishers & Plasterers 5/3/2026 $34.23 $22.27 $56.50

Cement Finishers & Plasterers 5/3/2027 $33.49 $25.01 $58.50

Cement Masons 5/1/2025 $36.00 $21.30 $57.30

Drywall Finisher 5/1/2025 $31.83 $23.26 $55.09

Drywall Finisher 5/1/2026 $33.02 $24.00 $57.02

Electricians 6/1/2025 $40.00 $27.78 $67.78

Electricians 6/1/2026 $41.40 $28.33 $69.73

Elevator Constructor 1/1/2025 $63.40 $40.03 $103.43

Elevator Constructor 1/1/2026 $61.26 $45.78 $107.04

Glazier 5/1/2024 $32.46 $20.93 $53.39

Iron Workers (Bridge, Structural Steel, Ornamental, Precast, Reinforcing)

7/1/2025 $38.76 $33.38 $72.14

Iron Workers (Bridge, Structural Steel, Ornamental, Precast, Reinforcing)

7/1/2026 $40.51 $33.88 $74.39

Laborers (Class 01 - See notes) 5/1/2023 $23.26 $18.03 $41.29

Laborers (Class 01 - See notes) 5/1/2026 $28.06 $19.08 $47.14

Laborers (Class 02 - See notes) 5/1/2023 $25.26 $18.03 $43.29

Laborers (Class 02 - See notes) 5/1/2026 $30.06 $19.08 $49.14

Laborers (Class 03 - See notes) 4/30/2023 $26.47 $18.22 $44.69

Laborers (Class 03 - See notes) 5/1/2026 $32.06 $19.08 $51.14

Laborers (Class 04 - See notes) 4/30/2023 $27.97 $18.22 $46.19

Laborers (Class 04 - See notes) 5/1/2026 $33.56 $19.08 $52.64

Laborers (Class 05 - See notes) 4/30/2023 $28.47 $18.22 $46.69

Laborers (Class 05 - See notes) 5/1/2026 $34.06 $19.08 $53.14

Laborers (Class 06 - See notes) 5/1/2023 $25.26 $18.03 $43.29

Laborers (Class 06 - See notes) 5/1/2026 $30.06 $19.08 $49.14

BUREAU OF LABOR LAW COMPLIANCE

PREVAILING WAGES PROJECT RATES

Report Date: 7/8/2026 Page 2 of 6

Expiration Date

Hourly Rate Fringe Benefits

Total

Marble Mason 5/1/2025 $37.20 $19.24 $56.44

Marble Mason 5/1/2026 $39.15 $19.24 $58.39

Millwright 6/1/2025 $43.00 $22.95 $65.95

Millwright 6/1/2026 $44.97 $22.95 $67.92

Operators (Building, Class 01 - See Notes) 5/1/2025 $44.89 $30.92 $75.81

Operators (Building, Class 01 - See Notes) 5/1/2026 $46.05 $31.76 $77.81

Operators (Building, Class 01A - See Notes) 5/1/2025 $47.14 $31.58 $78.72

Operators (Building, Class 01A - See Notes) 5/1/2026 $48.30 $32.42 $80.72

Operators (Building, Class 02 - See Notes) 5/1/2025 $44.61 $30.83 $75.44

Operators (Building, Class 02 - See Notes) 5/1/2026 $45.77 $31.67 $77.44

Operators (Building, Class 02A - See Notes) 5/1/2025 $46.86 $31.50 $78.36

Operators (Building, Class 02A - See Notes) 5/1/2026 $48.02 $32.34 $80.36

Operators (Building, Class 03 - See Notes) 5/1/2025 $41.88 $30.03 $71.91

Operators (Building, Class 03 - See Notes) 5/1/2026 $43.04 $30.87 $73.91

Operators (Building, Class 04 - See Notes) 5/1/2025 $40.74 $29.70 $70.44

Operators (Building, Class 04 - See Notes) 5/1/2026 $41.90 $30.54 $72.44

Operators (Building, Class 05 - See Notes) 5/1/2025 $40.30 $29.56 $69.86

Operators (Building, Class 05 - See Notes) 5/1/2026 $41.45 $30.41 $71.86

Operators (Building, Class 06 - See Notes) 5/1/2025 $39.42 $29.30 $68.72

Operators (Building, Class 06 - See Notes) 5/1/2026 $40.58 $30.14 $70.72

Operators (Building, Class 07A- See Notes) 5/1/2025 $54.56 $35.21 $89.77

Operators (Building, Class 07A- See Notes) 5/1/2026 $56.03 $36.14 $92.17

Operators (Building, Class 07B- See Notes) 5/1/2025 $54.22 $35.10 $89.32

Operators (Building, Class 07B- See Notes) 5/1/2026 $55.69 $36.03 $91.72

Painters Class 1 (see notes) 5/1/2025 $28.42 $18.36 $46.78

Painters Class 1 (see notes) 5/1/2026 $29.70 $18.78 $48.48

Painters - Line Stripping 12/1/2024 $44.12 $27.91 $72.03

Painters - Line Stripping 12/1/2025 $45.12 $29.41 $74.53

Painters Class 2 (see notes) 5/1/2020 $27.43 $15.99 $43.42

Painters Class 3 (see notes) 5/1/2020 $33.18 $15.99 $49.17

Pile Driver Divers (Building, Heavy, Highway) 1/1/2025 $62.82 $22.72 $85.54

Pile Driver Divers (Building, Heavy, Highway) 1/1/2026 $64.70 $23.47 $88.17

Piledrivers 1/1/2025 $41.88 $22.72 $64.60

Piledrivers 1/1/2026 $43.13 $23.47 $66.60

Plasterers 5/1/2024 $32.93 $21.08 $54.01

Plasterers 5/1/2025 $34.68 $21.23 $55.91

Plumber/Pipefitter 5/1/2025 $45.30 $29.91 $75.21

Plumber/Pipefitter 5/1/2026 $48.30 $30.66 $78.96

Roofers (Composition) 5/1/2025 $46.03 $34.77 $80.80

Roofers (Composition) 5/1/2026 $47.53 $35.22 $82.75

Roofers (Shingle) 5/1/2024 $34.35 $22.20 $56.55

Roofers (Slate & Tile) 5/1/2024 $37.35 $22.20 $59.55

Sheet Metal Workers 6/1/2025 $45.02 $44.71 $89.73

Sheet Metal Workers 6/1/2026 $46.62 $46.36 $92.98

BUREAU OF LABOR LAW COMPLIANCE

PREVAILING WAGES PROJECT RATES

Report Date: 7/8/2026 Page 3 of 6

Expiration Date

Hourly Rate Fringe Benefits

Total

Sign Makers and Hangars 7/15/2024 $32.32 $25.82 $58.14

Sign Makers and Hangars 7/15/2025 $33.48 $26.41 $59.89

Sign Makers and Hangars 7/15/2026 $36.38 $25.01 $61.39

Sprinklerfitters 4/1/2025 $49.75 $29.21 $78.96

Sprinklerfitters 4/1/2026 $52.82 $30.56 $83.38

Terrazzo Finisher 5/1/2025 $36.32 $21.68 $58.00

Terrazzo Finisher 5/1/2026 $37.12 $22.76 $59.88

Terrazzo Grinder 5/1/2025 $37.10 $21.68 $58.78

Terrazzo Grinder 5/1/2026 $37.93 $22.76 $60.69

Terrazzo Mechanics 5/1/2025 $37.17 $23.43 $60.60

Terrazzo Mechanics 5/1/2026 $38.06 $24.51 $62.57

Tile & Marble Finisher 5/1/2025 $35.31 $16.99 $52.30

Tile & Marble Finisher 5/1/2026 $37.26 $16.99 $54.25

Tile Setter 5/1/2025 $39.15 $19.24 $58.39

Tile Setter 5/1/2026 $39.15 $19.24 $58.39

Truckdriver class 1(see notes) 5/1/2025 $41.87 $0.00 $41.87

Truckdriver class 2 (see notes) 5/1/2025 $41.94 $0.00 $41.94

Truckdriver class 3 (see notes) 5/1/2025 $42.43 $0.00 $42.43

Window Film / Tint Installer 6/1/2025 $27.42 $15.13 $42.55

Window Film / Tint Installer 6/1/2026 $28.35 $15.60 $43.95

BUREAU OF LABOR LAW COMPLIANCE

PREVAILING WAGES PROJECT RATES

Report Date: 7/8/2026 Page 4 of 6

Project: 26-06440 - Heavy/Highway Effective

Expiration Date

Hourly Rate Fringe Benefits

Total

Carpenter 5/1/2025 $36.87 $20.49 $57.36

Carpenter 5/1/2026 $37.63 $21.18 $58.81

Carpenter Welder 5/1/2025 $37.62 $20.49 $58.11

Carpenter Welder 5/1/2026 $38.38 $21.18 $59.56

Carpenters - Piledriver/Welder 1/1/2025 $37.62 $20.49 $58.11

Carpenters - Piledriver/Welder 1/1/2026 $38.38 $21.18 $59.56

Cement Finishers 6/1/2016 $27.60 $20.85 $48.45

Electric Lineman 6/3/2024 $52.80 $30.61 $83.41

Electric Lineman 6/2/2025 $55.42 $31.04 $86.46

Iron Workers (Bridge, Structural Steel, Ornamental, Precast, Reinforcing)

7/1/2024 $37.26 $32.63 $69.89

Laborers (Class 01 - See notes) 5/1/2025 $26.61 $19.99 $46.60

Laborers (Class 01 - See notes) 5/1/2026 $27.61 $20.44 $48.05

Laborers (Class 02 - See notes) 5/1/2025 $33.23 $19.99 $53.22

Laborers (Class 02 - See notes) 5/1/2026 $34.23 $20.44 $54.67

Laborers (Class 03 - See notes) 5/1/2025 $30.22 $19.99 $50.21

Laborers (Class 03 - See notes) 5/1/2026 $31.22 $20.44 $51.66

Laborers (Class 04 - See notes) 5/1/2025 $30.57 $19.99 $50.56

Laborers (Class 04 - See notes) 5/1/2026 $31.57 $20.44 $52.01

Laborers (Class 05 - See notes) 5/1/2025 $31.24 $19.99 $51.23

Laborers (Class 05 - See notes) 5/1/2026 $32.24 $20.44 $52.68

Laborers (Class 06 - See notes) 5/1/2025 $30.66 $19.99 $50.65

Laborers (Class 06 - See notes) 5/1/2026 $31.66 $20.44 $52.10

Laborers (Class 07 - See notes) 5/1/2025 $30.95 $19.99 $50.94

Laborers (Class 07 - See notes) 5/1/2026 $31.95 $20.44 $52.39

Laborers (Class 08 - See notes) 5/1/2025 $31.43 $19.99 $51.42

Laborers (Class 08 - See notes) 5/1/2026 $32.43 $20.44 $52.87

Millwright 6/1/2025 $45.46 $23.33 $68.79

Millwright 6/1/2026 $47.52 $23.33 $70.85

Operators (Heavy, Class 01 - See Notes) 5/1/2025 $43.46 $30.50 $73.96

Operators (Heavy, Class 01 - See Notes) 5/1/2026 $44.61 $31.35 $75.96

Operators (Heavy, Class 01A - See Notes) 5/1/2025 $45.71 $31.16 $76.87

Operators (Heavy, Class 01A - See Notes) 5/1/2026 $46.86 $32.01 $78.87

Operators (Heavy, Class 02 - See Notes) 5/1/2025 $43.18 $30.41 $73.59

Operators (Heavy, Class 02 - See Notes) 5/1/2026 $44.34 $31.25 $75.59

Operators (Heavy, Class 02A - See Notes) 5/1/2025 $45.43 $31.08 $76.51

Operators (Heavy, Class 02A - See Notes) 5/1/2026 $46.59 $31.92 $78.51

Operators (Heavy, Class 03 - See Notes) 5/1/2025 $40.26 $29.55 $69.81

Operators (Heavy, Class 03 - See Notes) 5/1/2026 $41.43 $30.38 $71.81

Operators (Heavy, Class 04 - See Notes) 5/1/2025 $39.12 $29.22 $68.34

Operators (Heavy, Class 04 - See Notes) 5/1/2026 $40.28 $30.06 $70.34

Operators (Heavy, Class 05 - See Notes) 5/1/2025 $38.67 $29.09 $67.76

Operators (Heavy, Class 05 - See Notes) 5/1/2026 $39.83 $29.93 $69.76

Operators (Heavy, Class 06 - See Notes) 5/1/2025 $37.80 $28.82 $66.62

Operators (Heavy, Class 06 - See Notes) 5/1/2026 $38.96 $29.66 $68.62

BUREAU OF LABOR LAW COMPLIANCE

PREVAILING WAGES PROJECT RATES

Report Date: 7/8/2026 Page 5 of 6

Project: 26-06440 - Heavy/Highway Effective

Expiration Date

Hourly Rate Fringe Benefits

Total

Operators (Heavy, Class 07A - See Notes) 5/1/2025 $52.85 $34.71 $87.56

Operators (Heavy, Class 07A - See Notes) 5/1/2026 $54.32 $35.64 $89.96

Operators (Heavy, Class 07B - See Notes) 5/1/2025 $52.51 $34.60 $87.11

Operators (Heavy, Class 07B - See Notes) 5/1/2026 $53.97 $35.54 $89.51

Operators (Highway, Class 01 - See Notes) 5/1/2025 $42.56 $30.24 $72.80

Operators (Highway, Class 01 - See Notes) 5/1/2026 $43.72 $31.08 $74.80

Operators (Highway, Class 01a - See Notes) 5/1/2025 $44.81 $30.92 $75.73

Operators (Highway, Class 01a - See Notes) 5/1/2026 $45.97 $31.76 $77.73

Operators (Highway, Class 02 - See Notes) 5/1/2025 $41.39 $29.89 $71.28

Operators (Highway, Class 02 - See Notes) 5/1/2026 $42.55 $30.73 $73.28

Operators (Highway, Class 03 - See Notes) 5/1/2025 $40.70 $29.68 $70.38

Operators (Highway, Class 03 - See Notes) 5/1/2026 $41.87 $30.51 $72.38

Operators (Highway, Class 04 - See Notes) 5/1/2025 $40.26 $29.54 $69.80

Operators (Highway, Class 04 - See Notes) 5/1/2026 $41.41 $30.39 $71.80

Operators (Highway, Class 05 - See Notes) 5/1/2025 $39.73 $29.41 $69.14

Operators (Highway, Class 05 - See Notes) 5/1/2026 $40.89 $30.25 $71.14

Operators (Highway, Class 06 - See Notes) 5/1/2025 $42.80 $30.30 $73.10

Operators (Highway, Class 06 - See Notes) 5/1/2026 $43.95 $31.15 $75.10

Operators (Highway, Class 06/A - See Notes) 5/1/2025 $45.05 $30.96 $76.01

Operators (Highway, Class 06/A - See Notes) 5/1/2026 $46.21 $31.80 $78.01

Operators (Highway, Class 07/A - See Notes) 5/1/2025 $51.79 $34.38 $86.17

Operators (Highway, Class 07/A - See Notes) 5/1/2026 $53.25 $35.32 $88.57

Operators (Highway, Class 07/B - See Notes) 5/1/2025 $50.37 $33.97 $84.34

Operators (Highway, Class 07/B - See Notes) 5/1/2026 $51.84 $34.90 $86.74

Painters - Line Stripping 12/1/2024 $44.12 $27.91 $72.03

Painters - Line Stripping 12/1/2025 $45.12 $29.41 $74.53

Painters Class 2 (see notes) 5/1/2025 $30.55 $18.36 $48.91

Painters Class 2 (see notes) 5/1/2026 $33.13 $18.78 $51.91

Painters Class 3 (see notes) 5/1/2025 $36.30 $18.36 $54.66

Painters Class 3 (see notes) 5/1/2026 $38.88 $18.78 $57.66

Pile Driver Divers (Building, Heavy, Highway) 1/1/2022 $56.40 $20.50 $76.90

Piledrivers 5/1/2025 $36.87 $20.49 $57.36

Piledrivers 5/1/2026 $37.63 $21.18 $58.81

Steamfitters (Heavy and Highway - Gas Distribution) 5/1/2022 $48.43 $40.28 $88.71

Truckdriver class 1(see notes) 5/1/2025 $41.87 $0.00 $41.87

Truckdriver class 2 (see notes) 5/1/2025 $41.94 $0.00 $41.94

Truckdriver class 3 (see notes) 5/1/2025 $42.43 $0.00 $42.43

BUREAU OF LABOR LAW COMPLIANCE

PREVAILING WAGES PROJECT RATES

Report Date: 7/8/2026 Page 6 of 6

INVTBID1 for PennBid.pdf
LANDSCAPE
titlesht.pdf
PROJECT MANUAL
INVTBID1 for PennBid.pdf
LANDSCAPE
BIDFORM - Cntrct 1.pdf
ADD ALTERNATE NO. 1 – Youth Playground Slide Replacement: State the total amount to be added to the Contract if the existing youth playground corkscrew slide is removed and a new slide and appurtenances are furnished and installed on the existing yout...
ADD ALTERNATE NO. 2 – Benches: State the total amount to be added to the Contract to furnish and install three (3) benches.