STATEMENT OF WORK

1. SCOPE

1.1. To provide temporary AC units during availability.

2. REFERENCES

2.1. Issues of Publications - The following documents of the issue date in effect on the date of request for proposal form a part of this specification to the extent applicable, or as specified herein. Within the specification, they shall be referred to by their basic designation only.

2.1.1. Government

2.1.1.1. N/A

2.1.2. Nongovernment

2.1.2.1. N/A

2.2. Order of precedence - In the event of conflict between the text of this specification and that of the references cited above, the text of this specification shall take precedence.

Nothing in this specification, however, shall supersede applicable laws or regulations unless a specific exemption has been obtained.

3. REQUIREMENTS

3.1. 25 Ton AC Unit

3.1.1. Must have lifting pads for movement via overhead crane

3.1.2. 10,000 CFM Capacity

3.1.3. Dual Thermostat Control

3.1.4. 480V

3.1.5. 60A

3.1.6. Cam Lock Connections

3.1.7. 2 – 20” Discharge Ports

3.1.8. 2 – 20” Return Ports

3.1.9. Filtration rating of “MERV 8”

3.1.10. 400ft of 20” ducting

3.1.11. 600ft of cabling

3.2. Delivery - The machinery shall be in a fully-charged, fully-assembled, ready-to-use, and in a first-class-operating condition. Machines shall be functionally tested to include performance of _____N/A_________ prior to its delivery. The machinery with its support equipment shall be delivered to the site on or prior to the request date. It is incumbent and the responsibility of the Contractor to either confirm or coordinate the date and time of delivery prior to each shipment via the Point-of-Contact (POC) as

Rev: Page 2 of 3 designated on the Contract and/or the Contracting Officer's Representative (COR). The Government can provide forklift services for removing machinery from Vendor’s transport during work hours. Documentation with Shipyard copies shall accompany each delivery.

3.3. Responsibilities

3.3.1. Except for daily surveillance checks i.e. liquid levels, the Contractor is responsible for and shall perform all maintenance (e.g. refrigerant charge, oil changes, replace / clean filters, lubrication, coolant refills, liquid top-offs, etc.) for the duration of the lease. Coordinate maintenance with Shipyard POC.

3.3.2. The equipment will be operating around-the-clock under a rigorous deployment performance schedule. Within twelve (12) hours of initial notification of the need for repair, the Contractor shall have a knowledgeable and equipped technician on the job-site fully prepared to repair the rental equipment. The defective unit(s) shall be repaired within twenty-four (24) hours (one day) of initial notification or, if the original defective unit(s) cannot be made operational, replaced within forty-eight

(48) hours (two days) of initial notification. If the equipment failure is not the fault of the Government, the Contractor shall bear all costs associated with its repair and/or replacement.

3.4. Inspection Criteria

3.4.1. Shipyard personnel shall inspect the units on delivery for compliance with requirements of the units (padeyes, unit cleanliness, supplies filled, unit uniquely numbered, and maintenance service decals inside unit.)

3.5. Final Acceptance - Upon satisfactory completion of inspection and test of the equipment, the authorized Government Representative (Portsmouth Naval Shipyard, Code 990 Equipment Manager) will sign and forward the acceptance document(s) to Code 270.3 Production Control for completion. Unloading of equipment from Vendor’s transport does not signify acceptance.

3.6. Return - The Government will dismantle the equipment and provide a temporary storage location convenient for Contractor pick-up. The Government will notify the Contractor as well as the Contracting Office as to when the rental Item has been released and is available for pick-up. The last day of the rental period shall be the next normal workday after the Contractor has been so notified. The Contractor shall be responsible for shipping. The Government can provide forklift services during work hours for placing the equipment onto the vendor’s transport.

4. NOTES

4.1. Operator / Maintenance Manuals - Documentation will be located within a water proof case affixed to each machine. Minimally, the documentation shall consist of:

4.1.1. Lifting & Handling the equipment with its padeye(s) Certification

4.1.2. Points of contact with telephone numbers for requesting emergency repair regardless of the time or type of day

4.2. Approved Models

Rev: Page 3 of 3

4.2.1. Trane TC*300E4

File details come from the government source that posted it. Updated .