2-20260915 - Zarfoss Fire Door Operators IFB.pdf

PDF 594 KB Posted

Attached to
20260915 - Zarfoss Fire Door Operators
Solicitation number
US.264282
Issued by
York County, Harveys Lake Borough, Pennsylvania

About this file

This Invitation for Bids (IFB) is issued by the Susquehanna Regional Transportation Authority (SRTA), dba rabbittransit, a Pennsylvania transit authority serving eleven counties and Harrisburg. SRTA seeks qualified contractors to supply, deliver, and install eight electric NFPA 80 fire door operators at its Zarfoss facility in York County to correct fire-door compliance deficiencies. The existing Cornell rolling fire doors consist of four doors measuring 6 feet by 3 feet, one door measuring 4 feet by 3 feet, two doors measuring 8 feet by 10 feet, and one door measuring 8 feet by 3 feet. The contractor must furnish all labor, materials, electrical work, controls, testing, and documentation. A pre-bid meeting is scheduled for December 10, 2026 at 11:00 AM. Written questions are due by 2:00 PM prevailing time on December 15, 2026. Bids are due by 2:00 PM prevailing time on January 5, 2026, with contract work commencing on February 1, 2027 (with an inconsistency noting June 1, 2027 elsewhere in the document). The contract award is subject to Board approval on October 29, with the Notice to Proceed issued within two weeks of receipt of required documentation.

The contract is structured as a firm fixed-price agreement with milestone-based pricing and payment. The first milestone (Kickoff) cannot exceed 5 percent of the total price, the second milestone (Mobilization) cannot exceed 10 percent, and the final milestone (Final Acceptance) must be at least 12 percent of the total price. Invoices are paid within 45 days of receipt and must reference the SRTA-issued purchase order. No prepayment is permitted, and all materials must be delivered to the Zarfoss facility before payment is issued. The contractor must provide General Liability insurance with a $2,000,000 General Aggregate Limit and $2,000,000 Each Occurrence Limit, plus Automobile Insurance with a $2,000,000 Combined Single Limit, naming SRTA as additional insured. The project is federally funded through the Federal Transit Administration (FTA) and Pennsylvania Department of Transportation (PennDOT), making all bids and contracts subject to applicable Commonwealth and Federal laws. The contractor must comply with NFPA 80 standards, obtain all necessary permits and approvals from West Manchester Township or other authorities having jurisdiction, and provide a one-year workmanship warranty from final acceptance. All work must maintain fire door listings and ratings, integrate with the existing Fire-Lite fire alarm system, and include comprehensive closeout documentation including as-built drawings, test records, warranty registration, and operating manuals.

View the file

Other files

File Type Posted
1-20260915 - Zarfoss Fire Door Operators Pricing Form.xlsx XLSX spreadsheet

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Invitation for Bids for Fire Door Opening and Closing Devices

Solicitation:

20260915 - Zarfoss Fire Door Operators IFB

Issue Date: November 23, 2026

Pre-Bid Meeting: December 10, 2026

Questions Due: 2:00 PM Prevailing Time, December 15, 2026

Bids Due: 2:00 PM Prevailing Time, January 5, 2026

Contract Start Date: February 1, 2027

Susquehanna Regional Transportation Authority dba rabbittransit

20260915 - Zarfoss Fire Door Operators

Invitation for Bids 20260915 - Zarfoss Fire Door Operators IFB

The Susquehanna Regional Transportation Authority (SRTA), dba rabbittransit is issuing an Invitation for Bids (IFB) for the services described as follows. The Authority will receive Bids from qualified firms for the supply, delivery, and proper installation electric NFPA 80 fire door operators. The resulting Contract shall include the furnishing of all necessary parts, labor, supervision, and labor as set forth in the Specifications section of this Invitation for Bids (IFB). Please review the complete Solicitation to determine if your products and services are suitable.

SRTA/rabbittransit provides transit service and maintains facilities throughout Adams, Columbia, Cumberland, Dauphin, Franklin, Montour, Northumberland, Perry, Snyder, Union, and York Counties, as well as the City of Harrisburg. This solicitation and the resulting Contract will cover work in York County.

All Bids and contracts are subject to all applicable Commonwealth and Federal laws and to a financial assistance contract between the Federal Transit Administration (FTA) and the Pennsylvania Department of Transportation (PennDOT).

All costs incurred by Bidders in the development of their responses to this IFB are the sole responsibility of the Bidding firms. No such costs will be reimbursed by SRTA. Furthermore, Bidding firms must not include such costs as part of their cost proposals to perform any work described in this IFB.

Please obtain the full specification by visiting PennBid.net. All materials, questions, addenda, and submissions will be addressed via the PennBid.net platform.

Due:

2:00 PM Prevailing Time, January 5, 2026

SRTA hereby notifies all Bidding Firms that in regard to any contract entered into pursuant to this IFB advertisement or solicitation, disadvantaged business enterprises (DBE’s) will be afforded full opportunity to submit Bids in response and will not be subjected to discrimination on the basis of race, color, sex or national origin in consideration for an award. The Authority reserves the right to postpone, accept or reject any and all Bids and to waive any informality in the IFB process as the Authority may deem in its own best interest. Bids received after the specified closing time will be considered late Bids and will not be evaluated for award. Misdirected submittals will not be accepted.

Solicitation Contents

1. General Information

1.1 Obtaining IFB Documents 8

1.2 Pre-Bid Meeting 8

1.3 Questions, Clarifications, and Interpretation 8

1.4 Bid Submissions 8

1.5 Proprietary Information 9

1.6 Bid Forms 9

1.7 Authorized Signature 9

1.8 Bid Withdrawal 9

1.9 Conditional Bids 10

1.10 Opening, Requirements, and Evaluation of Bids 10

1.11 Contract 10

1.12 Invoices and Payment 11

1.13 Force Majeure 11

1.14 Contract Breaches and Dispute Resolution 12

1.15 Subcontracts 12

1.16 Liability 12

1.17 Postponement and Cancellation 12

1.18 Changes and Addendum 12

1.19 Insurance 12

1.20 Jurisdiction and Venue 13

1.21 Reservation of Governmental Immunity 13

1.22 Confidentiality, Data Ownership, and Use of Materials 13

1.23 Indemnification 13

1.24 Contract Execution Requirement 14

1.25 Group Purchasing Organization Restrictions 14

2. Bid Protests

2.1 Bid Protest Procedures 16

2.2 Definitions Related to Protests 16

2.3 Types of Protests and Time Limits 16

2.4 Content of Protest 16

2.5 Action by the Authority 16

2.6 Confidentiality of Protest 16

2.7 Federal Transit Administration (FTA) Involvement 17

3. Specifications

3.1 Purpose 19

3.2 Scope of Work 19

3.3 Equipment Compatibility and Listing 19

3.4 Fire Alarm Integration 19

3.5 Codes and Standards 20

3.6 Contractor Qualifications 20

3.7 Installation and Coordination 20

3.8 Testing and Acceptance 21

3.9 Closeout Documentation 21

3.10 Warranty 22

3.11 Kickoff Meeting 22

3.12 Turnover Requirements 23

3.13 Pricing and Milestone Schedule 23

3.14 Milestone Achievement 24

4. Third Party Contract Requirements

4.1 Access to Records and Reports 26

4.2 Americans with Disabilities Act (ADA) 26

4.3 Reserved 26

4.4 Restrictions on Lobbying 26

4.5 Civil Rights Laws and Regulations 28

4.6 Civil Rights and Equal Opportunity 28

4.7 Clean Air Act and Federal Water Pollution Control Act 29

4.8 Reserved 30

4.9 Debarment and Suspension 30

4.10 Disadvantaged Business Enterprise (DBE) 30

4.11 Energy Conservation 31

4.12 Equal Employment Opportunity 31

4.13 Notice to Third Party Participants 32

4.14 Incorporation of Federal Transit Administration (FTA) Terms 32

4.15 No Government Obligation to Third Parties 32

4.16 Notification to FTA Regarding Legal Matters 32

4.17 Reserved 33

4.18 Solid Wastes 33

4.19 Program Fraud and False or Fraudulent Statements and Related Acts 33

4.20 Prohibition on Certain Telecommunications and Video Surveillance Services or Equipment 33

4.21 Prompt Payment 34

4.22 Safe Operation of Motor Vehicles 34

4.23 Termination 34

4.24 Violation and Breach of Contract 37

4.25 Trafficking In Persons 37

4.26 Federal Tax Liability and Recent Felony Convictions 37

4.27 Severability 38

4.28 Assignability 38

5. Required Forms and Certifications

5.1 Acknowledgement of Receipt of Addenda 40

5.2 Certification Regarding Debarment, Suspension, and Other Responsibility Matters 41

5.3 Certification of Lower-Tier Participants Regarding Debarment, Suspension, and Other Ineligibility and Voluntary Exclusion

5.4 Non-Collusion Affidavit 43

5.5 Commonwealth Non-Discrimination Clause 44

5.6 Disadvantaged Business Participation 46

5.7 Disadvantaged Business Enterprise (DBE) Certification 47

5.8 Subcontractor Good Faith Checklist 48

5.9 Prohibited Telecommunications Equipment 49

5.10 Notice of Federal Requirements 50

5.11 Certification of Restrictions on Lobbying 53

5.12 Federal Tax Liability and Recent Felony Convictions 54

6. Appendix

6.1 20260915 - Zarfoss Fire Door Operators IFB Instructions 56

6.2 20260915 - Zarfoss Fire Door Operators IFB Quote Form 57

6.3 20260915 - Zarfoss Fire Door Operators IFB References 58

End of Solicitation

Intentionally Blank

1. General Information

1.1 Obtaining IFB Documents

Interested parties may obtain the Invitation for Bids (IFB) documents by visiting PennBid.net. All addenda, communication, and submissions will be communicated via PennBid.net. Please note: Any interested Bidder is expected to thoroughly read and understand the information contained within this IFB.

1.2 Pre-Bid Meeting

An optional Pre-Bid meeting will be held on Thursday December 10, 2026 beginning at 11:00 AM prevailing time.

Potential Bidders are encouraged to view the site, measure the work area, and confirm existing door information.

Please register by sending a message to ahollenbach@rabbittransit.org 4:00PM, December 7, 2026. Any potential Bidder who wishes to attend shall supply their own reflective vest and closed-toe shoes.

1.3 Questions, Clarifications, and Interpretation

Bid questions will be accepted in writing on the PennBid.net platform until 2:00 PM Prevailing Time on December 15, 2026. No telephone calls will be accepted for questions or clarifications. Interested Bidders shall not make any effort to contact any Authority employees, other than the Procurement Analyst, or attempt to make contact with any persons engaged in maintenance, repair, or service of any Authority property. Any such attempts may result in the disqualification of such Bidder. If any person contemplating submitting a Bid is in doubt as to the true meaning of any provision or part of this Solicitation, or finds discrepancies in, or omissions from such documents, questions may be submitted via PennBid.net. Any interpretation or correction of the Solicitation will be made only by addendum and will be posted publicly via the PennBid.net platform. All inquiries regarding the contents and requirements of this IFB should be in writing and directed to Allen Hollenbach until 2:00 PM Prevailing Time on December 15, 2026 via the PennBid.net platform.

1.4 Bid Submissions

Bidding Firms shall submit their Bid via the PennBid.net platform by the date and time due. The Excel file, “20260915 - Zarfoss Fire Door Operators Pricing Form,” must be fully completed and uploaded as part of the Bid submission. All required forms shall be uploaded as PDF files with printed and signed originals. In addition to the PDF documents, Bidders shall also upload the Excel file with all information completed. The Bids shall be submitted no later than 2:00 PM Prevailing Time on January 5, 2026.

1.4.1 Bidding Firm Compliance: Bids must be submitted on the provided forms contained within this Solicitation. Bids submitted in any other form or on any other document may not receive consideration. All documents contained within the Bid packet must be completed, signed and returned to SRTA by the designated date and time and shall include: all items within Section 5, titled “Required Forms and Certifications.”

1.4.2 Any Bid received after the noted date and time will be deemed non-responsive and rejected. Except for unforeseen circumstances that would warrant a change in the deadline by the Authority for all respondents, requests for extensions of the closing time and date will not be granted. Bids received after the time and date specified will not be considered and shall be returned to the Bidder unopened.

1.4.3 No Obligation on the Part of Any Authority or Agents: IF BIDS ARE SUBMITTED BY ANY MEANS, THE RESPONSIBILITY FOR THEIR ON-TIME DELIVERY TO SRTA VIA THE PENNBID.NET PLATFORM IS WHOLLY

UPON THE BIDDER.

1.4.4 Understanding: By submitting a Bid, each Bidding Firm will be deemed to have certified to SRTA that the firm has fully investigated and become completely familiar with the Solicitation requirements, conditions throughout SRTA’s Solicitation, and applicable local, state, federal laws, and regulations relating to this procurement. The Authority will not consider claims for additional compensation based upon the firm’s lack of knowledge of such documents, statutes, regulations, resolutions, or conditions. Bidding Firms shall rely only on written addenda provided by SRTA when submitting or revising Bids. In no event should a prospective firm submit a Bid based upon an oral interpretation of the Solicitation. Vendors are required to state exactly what they intend to furnish to SRTA via this Solicitation and must indicate any variances to the terms, conditions, and specifications of this Solicitation, no matter how slight. If variations are not stated in the vendor’s offer, it shall be inferred that the offer fully complies with all conditions identified in this Solicitation.

mailto:ahollenbach@rabbittransit.org

1.4.5 Specifications Section: Bidders do not need to submit the specifications book. Please submit only the bid form as instructed and the required forms and certifications found in Section 5.

1.4.5 Schedule:

Issue Date: June 8, 2026

Pre-Bid Meeting: December 10, 2026

Questions Due: 2:00 PM Prevailing Time, December 15, 2026

Bids Due: 2:00 PM Prevailing Time, January 5, 2026

Contract Start Date: June 1, 2027

1.5 Proprietary Information

Any information contained in the Bid that the Bidding Firm considers proprietary must be clearly identified as such.

The Authority will respect requests for non-disclosure of proprietary information to the extent that information so restricted conforms to the Freedom of Information Act (FOIA) and Pennsylvania Sunshine Laws.

1.6 Bid Forms

All pricing must be submitted on the forms provided, contained within this document, and must contain all specified items in section 5. Incomplete Bids submitted in any other form will be considered non-responsive and will be rejected.

Item Number

Description

5.1 Acknowledgement of Receipt of Addenda

5.2 Certification Regarding Debarment, Suspension, and Other Responsibility Matters

5.3 Certification of Lower-Tier Participants Regarding Debarment, Suspension, and Other Ineligibility and Voluntary Exclusion

5.4 Non-Collusion Affidavit

5.5 Commonwealth Non-Discrimination Clause

5.6 Disadvantaged Business Participation

5.7 Disadvantaged Business Enterprise (DBE) Certification

5.8 Subcontractor Good Faith Checklist

5.9 Prohibited Telecommunications Equipment

5.10 Notice of Federal Requirements

5.11 Certification of Restrictions on Lobbying

5.12 Federal Tax Liability and Recent Felony Convictions

1.7 Authorized Signature

The Bid shall be signed by an official authorized to bind the offer, and it shall contain a statement to the effect that the Bid is firm for a period of at least One-hundred, Twenty (120) days from the closing date for the submission of Bids. This individual will be named on the resulting Contract.

1.8 Bid Withdrawal

All Bids shall be valid for One-hundred, Twenty (120) days from the closing date for the submission of Bids. Prior to the date and time Bids are due, the Bid may be modified or withdrawn by the Bidder’s authorized representative via the PennBid.net platform or by written notice. Written notices shall be addressed to: Allen Hollenbach, Procurement Analyst, SRTA, 415 Zarfoss Drive, York, Pennsylvania 17404, no later than the exact due date and time.

1.9 Conditional Bids

Conditional Bids, or those which take exception to the specifications, will be considered non-responsive and will be rejected.

1.10 Opening, Requirements, and Evaluation of Bids

Bids will be evaluated by SRTA to determine which Bid, if any, should be accepted in the best interest of the organization. The Authority at its sole discretion will reserve the right to accept or reject Bids submitted and to waive any informalities and minor irregularities and to request additional information required to fully evaluate a Bid. The Bid shall be clear and meet the terms as specified herein, leaving no ambiguity in terms of provided materials.

1.10.1 Opening of Bids: Received Bids will be publicly opened via remote meeting. If interested in observing the Bid opening, please request the meeting link from Allen Hollenbach at ahollenbach@rabbittransit.org.

1.10.2 Evaluation: Bids will be reviewed for completeness and solicitation compliance. The complete Bid will include all documents in Section 5. The lowest cost, responsible and responsive Bid which meets specified criteria will be selected as the apparent Contractor.

1.10.3 Reserved.

1.10.4 Disadvantaged Business Enterprise: Though not a requirement and will not disqualify a firm or earn a contract, please identify any DBE participation in the Bid.

1.10.5 Single Bid: Firms or individuals wishing to submit Bids may not submit more than one Bid. If multiple

Bids are received from the same individual or firm, both Bids will be rejected.

1.10.6 Sole Bid: In the event a single bid is received, SRTA may conduct a cost analysis of the bid; to be limited to non-proprietary cost data only. A cost analysis is the process of examining the quote and evaluating the separate cost elements. It should be recognized that a cost analysis through comparison to other similar procurements must be based on an established or competitive price of the elements used in the comparison. The comparison must be made to a purchase of similar quantity and involving similar provisions. Where a difference exists, a detailed analysis must be made of this difference and costs attached thereto. Where it is not possible to obtain a valid price analysis, it may be necessary for the Authority to conduct a cost analysis of the proposed price.

1.11 Contract

The Contract will set a firm, fixed price for the supply, delivery, and proper installation of the fire door electric operators as specified. The completed project will result in operable and compliant electric door operators.

1.11.1 Contract: The Authority will issue a firm, fixed price Contract to the selected firm. The successful Bidding Firm will receive a Notice of Intent to Award. Bidding firms which will not receive a contract will receive a Notice of Intent informing them of the decision to award the Contract to a different firm.

1.11.2 Award of Contract: The Authority has a Board of Directors meeting October 29 during which the contract process will be approved for the successful Bidder. After Board Approval, the apparent Contractor will then need to provide any necessary documentation to Allen Hollenbach, and the Notice to Proceed will be sent within two (2) weeks of the receipt of all required documents. The necessary documents will include any insurance certificates, the signed Contract, and the organization’s W9.

1.11.3 Notice to Proceed: After all required documents have been received, reviewed, and approved, SRTA will issue a Notice to Proceed. The Authority will not be responsible for any costs incurred by the Apparent Contractor prior to the issuance of the Notice to Proceed.

1.11.4 Solicitation: This Solicitation and any addenda will be incorporated in whole, by reference, within the Contract.

1.11.5 Bid: The successful Bid will be incorporated in whole, by reference, in the resulting Contract.

1.11.6 Contract Term: The Contract term shall commence shall commence upon execution and shall continue until all work is completed in accord with this Solicitation and in agreement with commensurate Contract Milestones. Should Contractor need to extend period of performance, Contractor may request a no-cost Change Order from the SRTA Project Manager. Such Change Orders shall follow the described Change Order process and shall be at the sole discretion of SRTA.

1.11.7 Change Orders: Should it become necessary to change the terms of the resulting Contract, the SRTA Project Manager may direct a Change Order Quote be developed by the Contractor in accord with the Contract documents. Any Change Order Quote shall provide detail such SRTA can sufficiently evaluate costs and necessary changes. Contractor shall provide any and all back up, information, or data to support change evaluations.

1.12 Invoices and Payment

Invoices shall be sent upon delivery and Acceptance of materials and shall reference this solicitation number and the purchase order issued by SRTA. The Authority shall make payment within Forty-five (45) days of receipt of an acceptable invoice. Disputed invoices shall not be subject to this limit. SRTA may withhold payment of an entire inaccurate, incomplete, unsupported, or disputed invoice. A corrected invoice shall be paid within ten (10) days after the disputed charges are adequately documented and accepted by SRTA. Contractor shall continue performance during any invoice dispute unless SRTA directs otherwise. Additionally invoices shall list the corresponding Milestone and cost.

1.12.1 Invoice Detail: Each invoice shall reference this solicitation number and the purchase order issued by SRTA.

1.12.2 Prepayment: SRTA will not prepay for any materials or delivery. No exceptions.

1.12.3 Delivery: To receive payment, all invoices shall be sent to tmanahan@rabbittransit.org, pmathis@rabbittransit.org, omartinez@rabbittransit.org, and accountspayable@rabbittransit.org.

1.12.4 Purchase Order: Each and every invoice must reference the SRTA-issued Purchase Order.

1.12.5 Misdirected Invoices: SRTA shall not pay late fees, penalties, or other costs associated with lost or misdirected invoices.

1.12.6 Additional Invoice Terms: Contractor shall not add terms to invoices, delivery tickets, portals, or other documents contrary to the Contract. SRTA's payment, receipt of materials, or use of a Contractor system shall not constitute acceptance of additional terms. SRTA shall not pay late fees associated with disputed, unsupported, or misdirected invoices.

1.12.7 Invoiced Amounts: Contractor invoices shall match Milestones and Bid costs. Invoices shall not be issued until the SRTA Project Manager Formerly accepts an achieved Milestone.

1.13 Force Majeure

Contractor will be considered in default in the performance of its obligations under this Contract to the extent that performance is prevented or delayed by events beyond the reasonable control and without the fault or negligence of the Contractor (“Force Majeure”). Such events may include acts of God, natural disasters, fires, floods, declaration of war, civil disturbances, governmental actions, or other similar causes beyond the reasonable control of the Contractor which result in a declaration of emergency.

1.13.1 Should Contractor claim Force Majeure it shall promptly notify SRTA in writing of the nature of the event, the anticipated duration of the delay, and the actions being taken to mitigate the impact on performance. The Contractor shall use all reasonable efforts to resume full performance of its obligations as soon as practicable.

1.13.2 Force Majeure shall not include labor disputes, strikes, work stoppages, supply chain interruptions, or the unavailability of materials, equipment, or products required for performance under this Contract. The Contractor remains responsible for ensuring that sufficient labor, materials, products, and equipment are available to meet the requirements of this Contract.

1.13.3 Any determination that a Force Majeure event has occurred and that performance delays are excusable under this provision shall be subject to written review and approval by the SRTA Executive Director.

1.13.4 Should Force Majeure be granted, it shall operate only to excuse performance for the duration of the event and shall not relieve the Contractor of its obligation to resume full performance as soon as the Force Majeure condition ceases.

1.13.5 Time of the Essence: Time is of the Essence for deliveries.

1.14 Contract Breaches and Dispute Resolution

Disputes arising from the performance of the contract, which are not resolved between SRTA and the contract holder, shall be decided and resolved by the Executive Director of SRTA. In connection with any such appeal, the Contractor shall be afforded an opportunity to be heard and to offer evidence in support of its position. The decision of the Executive Director shall be binding upon the Contractor.

1.14.1 Performance During Dispute: Unless otherwise directed by the Authority, Contractor shall continue performance under the Contract while matters in dispute are being resolved.

1.14.2 Claims for Damages: Should either party to the Contract suffer injury or damage to person or property because of any act or omission of the other party or of any of his employees, agents or others for whose act he is legally liable, a claim for damages therefor shall be made in writing to such other party within a reasonable time after the first observance of such injury or damage.

1.15 Subcontracts

The requirement for single-point responsibility does not prohibit subcontracts or joint ventures provided that the single successful proposer assumes the position of Prime Contractor and performs Twenty Percent (20%) of the service specified. Additionally, the Authority will be held harmless, individually and collectively, with regard to any disputes between the Contractor and any subcontractors.

1.16 Liability

The Authority shall not be liable to any contractor or to any third party for any claims or damages occasioned by the solicitation, rejection, negotiation, or selection of Bids regarding this requirement. Each contractor or other respondent agrees to bear all costs of its response and participation in the process described in this IFB; there shall be no reimbursement for any costs incurred in the preparation of responses or Bids in connection with this process.

1.17 Postponement and Cancellation

SRTA reserves the right to postpone the bid opening for its own convenience and to reject any or all bids.

1.18 Changes and Addendum

Changes to the specifications will be made by addendum. Answers to written questions will be included as an addendum. At no point shall any correspondence, conversation, or assumption be deemed to take precedence above this document or any addenda released by the SRTA Procurement Analyst.

1.19 Insurance

SRTA shall be supplied with certificates of such insurance prior to the commencement of any work under this Agreement. All coverages below are to be “occurrence” type policies.

1.19.1 Worker’s Compensation Insurance: The Contractor shall be responsible for taking out and maintaining Workers’ Compensation insurance in accordance with the laws of the Commonwealth of Pennsylvania as necessary. Evidence of having this insurance shall be given to SRTA.

1.19.2 Liability Insurance: The Contractor shall take out and maintain on its owned and leased vehicles used in service under this Agreement such general liability, vehicle liability and property damage liability insurance as shall protect SRTA, and others performing work covered in this Agreement, from all claims for damages, personal injury, including accidental death, as well as from claims for property damages which may arise from operations under this Agreement, by naming SRTA and all others performing work as additional insured with respect to the project, and the amount of such insurance shall be as follows:

a. General Liability – insurance in an amount not less than:

$2,000,000 General Aggregate Limit

$2,000,000 Products – Completed Operations Aggregate Limit $2,000,000 Personal and Advertising Injury Limit $2,000,000 Each Occurrence Limit

b. Automobile Insurance in an amount not less than:

$2,000,000 Combined Single Limit for Bodily Injury and Property Damage Liability per Accident

1.19.3 The insurance specified in sections 1.19.1 and 1.19.2 shall be with an acceptable insurance company authorized to do business in the Commonwealth of Pennsylvania and shall be taken out before work is commenced and kept in effect until claims which may arise from work performed under the terms of this Agreement are satisfactorily completed. SRTA shall be given a minimum of thirty (30) days’ notice prior to any change or cancellation. SRTA shall be named as “additional insured” on all policies.

Failure to comply with any of the terms set forth in this paragraph shall constitute an immediate and automatic termination of contract.

1.19.4 The Contractor shall indemnify, defend and hold harmless the Susquehanna Regional Transportation Authority (SRTA), its officials and employees from and against any and all actual or alleged demands, claims, damages, losses and expenses, whether caused in whole or in part by a party indemnified hereunder, excepting only SRTA’s sole negligence.

1.19.5 Certificate of Insurance: Bidder shall have the ability to provide a certificate of insurance as specified, naming the Susquehanna Regional Transportation Authority as an additional insured. This must be obtained and in force prior to the apparent Contractor receiving the necessary Notice to Proceed.

1.20 Jurisdiction and Venue

Any and all disputes between the parties relating in any way to this Contract, and all exhibits and/or attachments hereto, shall be adjudicated in the Court of Common Pleas of York County, Pennsylvania. The parties hereto agree that jurisdiction and venue are appropriate as to each of them and said court.

1.21 Reservation of Governmental Immunity

The Susquehanna Regional Transportation Authority (“SRTA”) does not waive, relinquish, or otherwise limit any governmental or sovereign immunity by issuing this Solicitation, entering into any resulting Contract, or by any action taken pursuant thereto. SRTA expressly retains and preserves all immunities and defenses available under applicable law, including but not limited to those provided by the Pennsylvania Political Subdivision Tort Claims Act, 42 Pa.C.S. §§ 8541–8564.

1.22 Confidentiality, Data Ownership, and Use of Materials

Contractor shall not release, publish, distribute, or display any materials, communications, reports, data, photographs, drawings, or other resources related to this Contract without the prior written consent of SRTA.

SRTA shall retain all ownership rights, title, and interest in and to all SRTA data, including but not limited to operational records, reports, forms, logos, and any other materials generated or collected in the performance of services under this Contract. Any materials produced specifically for SRTA under this Contract shall remain the property of SRTA.

1.23 Indemnification

The Contractor agrees to defend, indemnify and hold harmless SRTA, the Authority, its Board of Directors, officers, agents, servants and employees from and against any and all claims, judgments and awards, including court costs and reasonable counsel fees, arising out of any claim, suit or action at law, in equity or otherwise, of any kind or nature whatsoever, which may be brought against the Authority arising out of any actions referenced in the resulting Contract on account of any actual or alleged loss to property or injury to any person or persons (including death), arising directly or indirectly out of or related to the performance or nonperformance under the resulting Contract by the Contractor, and/or subcontractor(s), and/or their officers, agents, servants or employees, even if caused in part by any party indemnified hereunder, excepting only the sole negligence of the Authority. This indemnification shall survive the expiration or termination of the resulting Contract.

1.24 Contract Execution Requirement

The successful Offeror shall execute the Contract and return all required documents, including insurance certificates and other submittals, within ten (10) calendar days from the date of the Notice of Award, unless otherwise authorized in writing by the Authority. Submission of a Bid shall constitute acknowledgment of and agreement to this requirement.

1.24.1 Acceptance of Contract Terms: By submission of a Bid, the Offeror acknowledges review of and agreement to all terms and conditions of the Contract included in this solicitation. Exceptions, clarifications, or modifications to Contract terms after issuance of the Notice of Award shall not be permitted unless expressly approved in writing by the Authority.

1.24.2 Failure to Execute Contract: If the successful Offeror fails to execute the Contract within the time required, the Authority may, at its sole discretion: rescind the Notice of Award; retain any bid security, if applicable; proceed with award to the next lowest responsive and responsible Offeror;

and/or pursue any other remedies available under applicable law.

1.24.3 Recovery of Re-procurement Costs: If the Authority awards the Contract to another Offeror at a higher price due to the failure of the original Offeror to execute the Contract, the original Offeror shall be liable to the Authority for the difference in price, together with any additional administrative and re-procurement costs incurred.

1.25 Group Purchasing Organization Restrictions

The Proposer shall not require SRTA to join, participate in, or maintain membership in any group purchasing organization, cooperative purchasing program, procurement consortium, purchasing alliance, buying cooperative, or similar organization as a condition of receiving the pricing, discounts, products, services, warranties, support, or any other benefits offered in its Proposal. All pricing submitted shall be made available directly to SRTA under the resulting Agreement without requiring SRTA to execute any separate membership, participation, subscription, or other agreement with a third party.

1.25.1 Prohibited Requirement: The Proposer shall not condition any proposed pricing, discounts, rebates, incentives, warranties, maintenance, support, or other contractual benefits upon SRTA joining or participating in any cooperative purchasing organization or similar entity.

1.25.2 Direct Contracting: All pricing proposed shall be available directly to SRTA through the resulting Agreement. The Proposer shall not require SRTA to execute any separate agreement with a third-party purchasing organization in order to obtain the proposed pricing or services.

1.25.3 Permissible Cooperative Pricing: Nothing herein shall prohibit the Proposer from voluntarily extending pricing derived from an existing cooperative purchasing contract, provided such pricing is made available directly to SRTA without requiring SRTA to become a member of, or otherwise participate in, the applicable cooperative purchasing organization.

1.25.4 Non-Responsive Proposal: Any Proposal that requires SRTA to join or participate in a group purchasing organization, cooperative purchasing program, procurement consortium, purchasing alliance, buying cooperative, or similar organization as a condition of award or receipt of the proposed pricing may be determined non-responsive and rejected by SRTA.

1.25.5 Separate Purchase Orders: The Vendor shall not require SRTA to issue a Purchase Order to any entity or organization other than the Vendor or a joint venture member expressly identified in the submitted bid.

2. Bid Protests

2.1 Bid Protest Procedures

The policies and procedures governing the receipt and resolution of protests in connection with an Invitation for Bids (IFB) are outlined below. This procedure is applicable to all IFBs.

2.2 Definitions Related to Protests

“Interested Party” means any Bidder. “Days” means business days. “Filed” means the date of receipt by The Office of the Executive Director or his/her designee. “Federal/State Law or Regulation” means any valid requirement imposed by Federal, State, or other Statute or regulation. “Presumptive Contractor” means the Bidder that is in line for award of the contract in the event that the protest is denied. “Protestant” is an Interested Party who is aggrieved in connection with the solicitation or award of a contract and who files a protest.

2.3 Types of Protests and Time Limits

For this solicitation, SRTA and the SRTA Executive Director will review and respond to all protests. A Pre-Bid Protest is based upon alleged restrictive specifications or alleged improprieties in the procurement process. A Protestant must file a pre-bid protest no later than Five (5) days prior to bid opening date by 4:30 PM York, Pennsylvania prevailing time. A Pre-Award Protest is based upon alleged improprieties of a Bid. A Protestant must file a pre-award protest no later than Five (5) days after the Protestant knows or should have known of the facts giving rise thereto. A Post-Award Protest is based upon the award of a contract and must be filed no later than Five (5) days after notification to unsuccessful firms of the Authority’s intent to award.

2.4 Content of Protest

Protests must be in writing, and filed directly with the Office of the Executive Director of the Susquehanna Regional Transportation Authority (SRTA) at:

Executive Director Susquehanna Regional Transportation Authority (SRTA)

415 N. Zarfoss Drive York, PA 17404 Any and all protests must contain the following information:

a. The name, address and telephone number of the Protestant

b. Identity of the IFB (by name) “20260915 - Zarfoss Fire Door Operators IFB”

c. A detailed factual statement of the grounds for protest

d. The desired relief, action, or ruling.

2.5 Action by the Authority

Upon timely receipt of a protest, SRTA will delay the opening of bids until after a resolution of the protest or protests filed prior to the bid opening, or withhold award until after resolution of the protest or protests filed after bid opening. However, SRTA may open bids or award a contract whenever the Authority, at its sole discretion, determines that: a. The items or work to be procured are urgently required; b. Delivery will be unduly delayed by failure to make the award promptly; or c. Failure to make prompt award will otherwise cause undue harm to either SRTA or funding sources.

2.5.1 Response to the Protest: SRTA’s Executive Director will respond in detail to each substantive issue raised in the protest within a reasonable time after the protest is filed. When on its face a protest does not state a valid basis for protest or is untimely, the Executive Director may summarily dismiss the protest without requiring a detailed response.

2.5.2 Rebuttal to the Authority’s Response: The Protestant may submit a written rebuttal to SRTA’s response, addressed to the Executive Director of SRTA, but must do so within five (5) days after receipt of the original Executive Director’s response. The Executive Director will review the protest and notify the Protestant of his/her final decision.

2.5.3 Request for Reconsideration: If data becomes available that was not previously known, or there has been an error of law, a Protestant may submit a request for reconsideration of the protest.

The Executive Director’s determination will be considered final.

2.6 Confidentiality of Protest

Material submitted by a Protestant will not be withheld from any Interested Party, except to the extent that the withholding of information is permitted or required by law or regulation. If the Protestant considers that the protest contains proprietary material which should be withheld, a statement advising of this fact must be affixed to the front page of the protest submission and the allegedly protected information must be so identified whenever it appears.

2.7 Federal Transit Administration (FTA) Involvement

Where procurements are funded by the FTA, SRTA will notify the Regional Office of any known or pending protests. SRTA will notify the FTA again within five (5) business days from receipt of final decision made by the Executive Director of SRTA. The Protestant may file a protest with the FTA only where the protest alleges that SRTA failed to have, or failed to adhere to its protest procedures or there was a violation of Federal Law or Regulation. Any protest to the FTA must be filed in accordance with FTA Circular 4220.1G.

3. Scope Of Work and Technical Requirements

3.1 Purpose

SRTA seeks a qualified Contractor to furnish and install a complete retrofit solution for eight (8) existing rolling fire doors at the Zarfoss facility to correct an identified fire-door compliance deficiency under applicable NFPA 80 requirements. The work shall restore compliant automatic-closing operation while preserving the fire-rated and listed status of each existing door assembly. Closing speed shall be compliant with current NFPA 80 requirements.

3.2 Scope of Work

The Contractor shall furnish all labor, equipment, materials, controls, interfaces, supervision, coordination, testing, and documentation necessary to deliver eight (8) fully functional and compliant fire-door operator retrofits.

3.2.1 Contractor Verification: The Contractor shall field-verify each existing door assembly, operator configuration, mounting arrangement, electrical supply, control interface, and available installation clearances before ordering equipment.

3.2.2 Existing Conditions: The Contractor shall identify any existing condition that prevents a compliant installation and shall notify the SRTA Project Manager in writing before proceeding with affected work.

3.2.3 Protection of Facilities: The Contractor shall protect existing facilities and restore surfaces or equipment damaged by its operations.

3.2.4 Existing Door Dimensions: The existing rolling fire doors are identified as Cornell doors. The following quantities and nominal dimensions were supplied by Eastern Lift Truck: four (4) doors measuring 6 feet wide by 3 feet tall; one (1) door measuring 4 feet wide by 3 feet tall; two (2) doors measuring 8 feet wide by 10 feet tall; and one (1) door measuring 8 feet wide by 3 feet tall.

These quantities total eight (8) doors.

3.2.5 Door Serial Numbers: The following existing door serial numbers have been provided:

S026068528-002, S026068528-001, S026069468-002, S026069468-001, and S026051977-001.

The Contractor shall field-verify the dimensions, manufacturer information, serial numbers, and identification of each of the eight (8) door assemblies before ordering equipment. The five (5) supplied serial numbers have not been assigned to specific door sizes or locations; the Contractor shall document the association of each verified serial number with its corresponding door and identify any remaining door serial numbers.

3.3 Equipment Compatibility and Listing

All proposed equipment shall be suitable for the existing fire-rated rolling door assemblies and shall maintain the assemblies’ required listing and fire-protection functions.

3.3.1 Manufacturer Compatibility: The Contractor shall provide manufacturer documentation demonstrating that each proposed operator and associated release or control device is listed, approved, or otherwise authorized by the applicable door manufacturer and listing requirements for use with the specific existing assembly.

3.3.2 Preservation of Fire Rating: The Contractor shall not modify a listed door assembly in a manner that voids its fire rating, labeling, or listing.

3.3.3 Proposed Modifications: Any proposed substitution or modification affecting the fire-rated assembly shall be submitted to SRTA for written approval before installation; SRTA approval shall not relieve the Contractor of code or listing compliance.

3.4 Fire Alarm Integration

Each retrofitted door shall automatically close in response to the required activation signal from the existing Fire- Lite fire alarm system.

3.4.1 Fire Alarm Interfaces: The Contractor shall furnish the operator controls, interfaces, relays, and related components required for compatibility with the existing Fire-Lite system.

3.4.2 Coordination of Connections: The Contractor shall coordinate signal requirements, wiring boundaries, programming, and testing with the fire alarm contractor as necessary.

3.4.3 Work by Others: The Contractor shall clearly identify in its bid any work proposed to be performed by others. Unless expressly excluded in the solicitation, the Contractor shall remain responsible for coordinating a complete functional installation.

3.4.4 Protection of Life-Safety Systems: The Contractor shall not impair existing fire alarm operation or other life-safety systems during installation or testing.

3.5 Codes and Standards

The completed work shall comply with applicable codes, the manufacturer’s installation requirements, and NFPA 80 provisions applicable to the existing rolling fire doors.

3.5.1 Operational Compliance: The Contractor shall preserve required automatic-closing, release, resetting, and manual operation functions applicable to each assembly.

3.5.2 Code and Listing Clarification: Where a field condition creates uncertainty concerning listing or code compliance, the Contractor shall obtain and submit appropriate manufacturer or authority guidance before proceeding.

3.6 Contractor Qualifications

The Contractor shall employ personnel qualified to service, modify, install, and test fire-rated rolling door assemblies.

3.6.1 Installation Supervisor: The Contractor shall identify its proposed installation supervisor and provide relevant experience with rolling fire doors and fire alarm interface work.

3.6.2 Qualified Trade Personnel: Electrical or fire alarm work requiring a separate trade qualification or license shall be performed by appropriately qualified personnel.

3.6.3 Contractor Ability: By submitting a Bid, Bidding Firms aver and affirm that they have authorization and ability to properly install electric door operators, perform warranty registration, and formerly perform warranty work. No action by the Contractor shall void manufacturer warranties or void fire door ratings or certifications. Bidding firms shall be factory authorized service representatives for the items and materials which will be installed.

3.7 Installation and Coordination

The Contractor shall coordinate the sequence and timing of work with Paul Mathis, SRTA Project Manager, to minimize disruption and maintain site safety.

3.7.1 Installation Schedule: The Contractor shall submit an installation schedule and identify anticipated door outages, access requirements, and any required impairment of fire-protection systems.

3.7.2 Fire-Protection Impairments: No fire-protection system impairment shall occur without advance approval by SRTA and implementation of any required impairment controls.

3.7.3 Work Area Housekeeping: The Contractor shall maintain a clean work area and remove debris and unused materials upon completion.

3.7.4 Permit Determination: The Contractor shall determine whether West Manchester Township or any other authority having jurisdiction requires permits, approvals, inspections, or other authorizations for the work, including associated electrical and fire alarm modifications.

3.7.5 Permit Procurement and Inspections: The Contractor shall be responsible for obtaining and paying for all permits, approvals, inspections, and authorizations required for its work. The Contractor shall coordinate with the applicable authority having jurisdiction and shall not commence work requiring authorization until such authorization has been obtained.

3.7.6 Permit Closeout: Before Final Acceptance, the Contractor shall provide the SRTA Project Manager with copies of all applicable permits, inspection approvals, and final sign-offs. If no permits are required, the Contractor shall provide written confirmation of that determination and identify the authority consulted.

3.7.7 Electrical Supply: The Contractor shall furnish and install electrical power from the existing electrical room to each of the eight (8) door operators, including all necessary branch-circuit components, conductors, raceways, supports, fittings, terminations, and connections for a complete operating installation.

3.7.8 Square D Breakers: The Contractor shall furnish and install appropriately sized Square D circuit breaker(s) compatible with the existing electrical panel, including its listing, voltage, available fault current, and other applicable ratings. The Contractor shall verify panel capacity and available circuit positions before installation and notify the SRTA Project Manager of any deficiency before proceeding.

3.7.9 EMT Conduit: Electrical distribution shall use electrical metallic tubing (EMT) conduit of substantially similar design, style, and appearance to the existing conduit installations. Conduit shall be securely supported and installed using normal and regular standards of workmanship, with bends, fittings, and terminations appropriate for the installation.

3.7.10 Conduit Routing: Conduit routing shall be coordinated with the SRTA Project Manager and shall not obstruct access to, interfere with the operation or maintenance of, or otherwise adversely affect existing building systems, equipment, controls, utilities, or life-safety components.

3.7.11 Conductor Sizing: Conductors and overcurrent protection shall be sized for the installed operator motor load, manufacturer requirements, circuit conditions, and applicable electrical codes. The Contractor shall verify motor electrical characteristics, circuit lengths, and existing supply conditions before selecting equipment and conductor sizes.

3.7.12 Panel and Circuit Labeling: The Contractor shall label all new circuit conductors within the electrical panel and label each new breaker and corresponding panel directory entry in a manner substantially consistent with the existing panel identification and labeling conventions.

Labels shall be durable, legible, and identify the door operator or circuit served.

3.7.13 Electrical Workmanship: All electrical work shall be performed by qualified personnel in accordance with applicable electrical codes, manufacturer instructions, permitting requirements, and accepted standards of workmanship. The Contractor shall restore disturbed surfaces and leave installations neat, secure, and serviceable.

3.8 Testing and Acceptance

The Contractor shall demonstrate the correct operation of all eight (8) fire-door assemblies before SRTA acceptance.

3.8.1 Operational and Drop Testing: The Contractor shall perform operational and fire-door drop testing on each assembly in accordance with applicable NFPA 80 and manufacturer requirements.

3.8.2 Fire Alarm Activation Testing: Testing shall demonstrate automatic closure initiated by an actual activation signal from the existing Fire-Lite fire alarm system, coordinated with authorized SRTA and fire alarm personnel.

3.8.3 Reset Verification: The Contractor shall verify proper reset and return to normal operation following each test.

3.8.4 Correction and Retesting: Any deficiency identified during testing shall be corrected and the affected assembly retested at no additional cost to SRTA.

3.8.5 Proof of Testing: Prior to Final Acceptance and testing demonstration for SRTA Project Manager, Contractor shall provide an affidavit written on company letterhead and signed by an official of the Contractor company with authority to bind the Contractor Company certifying satisfactory testing. This affidavit shall be provided to the SRTA Project Manger not less than five (5) business days prior to the scheduled Final Acceptance test.

3.8.6 Final Acceptance: Final Acceptance shall require satisfactory testing, with the SRTA Project Manager present, of all eight assemblies and receipt of the required closeout documentation.

3.9 Closeout Documentation

Before Final Acceptance, the Contractor shall submit a complete record of the installed equipment and tests.

3.9.1 Installed Equipment Records: Documentation shall identify each door location, installed operator and control components, manufacturer, model, and applicable listing or approval information.

3.9.2 Door Test Records: The Contractor shall provide completed individual door test records showing test date, method, results, deficiencies, corrective actions, and retest results.

3.9.3 Operating Documentation: The Contractor shall provide operation, maintenance, inspection, reset, and troubleshooting instructions and any manufacturer warranties. This shall be supplied on a USB drive and as hard copies in heavy-duty protective plastic sleeves for insertion in a three-ring binder.

3.9…

This is the start of the file's text. The full file is on GovTribe.