2-2026 West Abbott Street Contract Documents - 5.22.26.pdf

PDF 19 MB Posted

Attached to
2026 West Abbott Street Water System Improvements Project
Solicitation number
Not on record
Issued by
Carbon County, Pennsylvania

About this file

Contract Documents Summary

This is a comprehensive bid package and contract document for the Lansford-Coaldale Joint Water Authority located in Carbon and Schuylkill Counties, Pennsylvania for the 2026 West Abbott Street Water System Improvements Project in Lansford Borough. The project involves replacing approximately 570 linear feet of existing four-inch water main with new twelve-inch DIP pipe, including installation of new valves, fittings, fire hydrants, service connections, and pavement restoration. The existing water main and 28 service laterals will be abandoned in place, with new three-quarter inch copper tubing connections to be installed at each of the 28 service locations. Sealed bids are due online via PennBid Bonfire by 12:00 p.m. prevailing time on June 22, 2026, with bids opening immediately and public results displayed on PennBid. The Lansford-Coaldale Joint Water Authority will review bids at their regularly scheduled meeting on June 24, 2026 at 3:45 p.m. Bidders may arrange site visits by contacting the Authority's Superintendent, Tobias Krajcirik at (570) 751-2456 during normal working hours. No pre-bid conference has been scheduled. The contract award is anticipated within sixty days of bid opening, with Notice to Proceed expected in July 2026. Substantial completion is required per the Agreement, with liquidated damages provisions applying for failure to meet deadlines.

All bidders must submit bid security equal to ten percent of their total bid amount in the form of a certified check or bid bond. The successful bidder must execute the Agreement and provide Performance and Payment Bonds each in the amount of one hundred percent of the contract price within ten days of receiving the Notice of Intent to Award. The project is funded in part by a Federal Grant from the United States Environmental Protection Agency Community Grant Program sponsored by U.S. Congresswoman Susan Wild, requiring compliance with all EPA grant conditions including Davis-Bacon prevailing wage requirements, the Copeland Anti-Kickback Act, Build America Buy America (BABA) regulations, and nondiscrimination/sexual harassment clauses. All contractors and subcontractors must be prequalified and demonstrate five to ten years of experience with similar water system projects, maintain a permanent place of business, possess adequate equipment, and comply with the Pennsylvania Public Works Employment Verification Act by utilizing the E-Verify system. Contractors must submit proof of authority to do business in Pennsylvania and applicable contractor license numbers. The Owner reserves the right to reject any or all bids, delete project items based on budget constraints, and award the contract to the lowest responsible bidder. All contract documents, including technical specifications, general conditions, and supplementary conditions, are available at no cost on PennBid Bonfire.

View the file

Other files

File Type Posted
1-West Abbott Street Drawings - 5.22.26.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

LANSFORD-COALDALE JOINT WATER AUTHORITY

CARBON AND SCHUYKILL COUNTY, PENNSYLVANIA

SPECIFICATIONS

FOR

WEST ABBOTT STREET WATER SYSTEM

IMPROVEMENTS PROJECT

MAY 2026

Prepared by:

25-1095-0223

— - SYSTEMS DESIGN

CDE ENGINEERING, INC

OLL 1032 James Drive, Leesport, PA 19533

CARBON AND SCHUYLKILL COUNTY, PENNSYLVANIA

2026 WEST ABBOTT STREET WATER SYSTEM IMPROVEMENTS PROJECT

LANSFORD BOROUGH, CARBON COUNTY

INDEX

SECTION DESCRIPTION PAGES

• INDEX……………………………………………………………………………………………………………….. 1 thru 4

• ADVERTISEMENT FOR BIDS…………………………….................................................... 1 and 2

• INSTRUCTIONS TO BIDDERS (EJCDC C-200)……………………………………………………… 1 thru 13

• QUALIFICATIONS OF BIDDER QUESTIONNAIRE

1 thru 6

• BID FORM (EJCDC C-410)………………………………………………………………………………….. 1 thru 14

• BID BOND (EJCDC C-430)………………………………………………………………………………….. 1 and 2

• NOTICE OF INTENT TO AWARD………………………………………………………………………… 1

• PUBLIC WORKS EMPLOYMENT VERIFICATION FORM………………………………

• CONTRACTOR’S STATEMENT OF COMPLIANCE WITH CDL TESTING PROGRAM

REQUIREMENTS…………………………………………………………

• PERFORMANCE BOND (EJCDC C-610)…………………………………………………………....... 1 thru 3

• PAYMENT BOND (EJCDC C-615)……………………………………………………………………….. 1 thru 3

• AGREEMENT (EJCDC C-525)……………………………………………………………………………… 1 thru 9

• NOTICE OF AWARD (EJCDC C-510)…………………………………………………………………… 1

• NOTICE TO PROCEED (EJCDC C-550)…………………………………………………………………. 1

• GENERAL CONDITIONS (EJCDC C-710)……………………………………………………………… 1 thru 57

• SUPPLEMENTARY CONDITIONS………………………………………………………………………. 1 thru 20

• SPECIAL CONDITIONS………………………………………………………………………………………. 1 thru 3

• WORK CHANGE DIRECTIVE (EJCDC C-940)……………………………………………………….. 1

• CONTRACT CHANGE ORDER (EJCDC C-941)……………………………………………………… 1 thru 2

• FIELD ORDER (EJCDC C-942)……………………………………………………………………………… 1

• APPLICATION FOR PAYMENT…………………………………………………………………………… 1 thru 2

• CERTIFICATE OF SUBSTANTIAL COMPLETION (EJCDC C-625)…………………………… 1 thru 2

SECTION DESCRIPTION

• TECHNICAL SPECIFICATIONS

DIVISION 1 – GENERAL REQUIREMENTS

01010 Summary of Work 01011 General Technical Specifications 01040 Work on Existing Structures 01045 Cutting and Patching 01300 Submittals 01310 Construction Schedule 01340 Shop Drawings, Product Data and Samples 01370 Schedule of Values and Applications for Payment 01400 Quality Control 01410 Testing Laboratory Services 01500 Construction Facilities and Temporary Controls 01600 Material and Equipment 01650 Starting of Systems 01700 Contract Closeout 01710 Cleaning and Adjusting 01720 Project Record Documents 01740 Warranties and Bonds

DIVISION 2 – SITE WORK

02050 Demolition 02141 Dewatering and Drainage of Excavation 02161 Trench Safety Systems 02202 Rock Removal 02211 Rough Grading 02221 Excavation, Trenching and Backfilling for Utilities 02222 Excavation 02223 Backfilling 02224 Shoring 02225 Trenching 02228 Waste Material Disposal 02230 Aggregate Subbase

• TECHNICAL SPECIFICATIONS (Cont’d.)

02320 Horizontal Directional Drilling 02510 Bituminous Concrete Paving 02522 Concrete Sidewalks 02560 Soil and Erosion and Sedimentation Control 02580 Pavement Markings 02640 Valves and Fire Hydrants 02660 Water Mains 02661 Water Service Connections 02675 Testing and Disinfecting Water Mains 02900 Landscaping

DIVISION 3 – CONCRETE

03301 Concrete for Utility Construction

DIVISION 4 – MASONRY

NOT USED

DIVISION 5 – METALS

NOT USED

DIVISION 6 – WOOD AND PLASTICS

NOT USED

DIVISION 7 –THERMAL AND MOISTURE PROTECTION

NOT USED

DIVISION 8 – WOOD AND PLASTICS

NOT USED

DIVISION 9 – FINISHES

NOT USED

DIVISION 10 – SPECIALTIES

• TECHNICAL SPECIFICATIONS (Cont’d.)

DIVISION 11 – EQUIPMENT

DIVISION 12 – FURNISHINGS

NOT USED

DIVISION 13 – SPECIAL CONSTRUCTION

NOT USED

DIVISION 14 – CONVEYING SYSTEMS

NOT USED

DIVISION 15 – MECHANICAL

NOT USED

DIVISION 16 – ELECTRICAL

• DRAWINGS (Attached Separately)

• ADDENDA

• APPENDICES

APPENDIX “A” Affidavit of Release of Liens and Final Waiver of Liens (Forms and Sample Forms)

APPENDIX “B” Consent of Surety to Final Payment APPENDIX “C” Davis – Bacon Prevailing Wage Determination APPENDIX “D” Nondiscrimination/Sexual Harassment Clause APPENDIX “E” Compliance with the State Contractor Responsibility Program APPENDIX “F” Grant Specific Programmatic Terms and Conditions for EPA Community

Grants APPENDIX “G” EPA Region 3 Contract Language APPENDIX “H” DBRA Requirements for Contractors and Subcontractors under EPA

Grants APPENDIX “I” DBRA Requirements for Contracts in excess of $100,000 under EPA

Grants

ADVERTISEMENT FOR BIDS

I

SPECIFICATIONS FOR THE

ADVERTISEMENT FOR BIDS

Separate sealed bids will be received, by the Lansford-Coaldale Joint Water Authority online via PennBid for the 2026 West Abbott Street Water System Improvement Project, located in Lansford Borough, Carbon County, until 12:00 P.M. prevailing time, on June 22, 2026, after which time, Bids will be opened with results displayed publicly on PennBid. Bids will be reviewed at the Public Meeting of the Lansford-Coaldale Joint Water Authority at their regularly scheduled meeting to be held at 3:45 P.M. prevailing time on June 24, 2026.

All documents and solicitation details are available at no cost on PennBid Bonfire – www.pennbid.bonfirehub.com.

The project generally consists of replacing the existing four-inch (4”) water main located within West Abbott Street, with approximately 570 linear feet of a new twelve-inch (12”) DIP pipe along with new valves, fittings, fire hydrants, service connections, and associated pavement restoration. The existing water main is to be abandoned in place. The project includes 28 existing water service laterals that are to be replaced with new three-quarter inch (3/4”) copper tubing and connected to the new twelve-inch (12”) DIP pipe.

The Project is being funded in part by a Federal Grant sponsored by U.S. Congresswoman Susan Wild under the United States Environmental Protection Agency (EPA) Community Grant Program, and the Successful Bidder shall comply with all conditions of the grant as set forth in the Contract Documents and under the EPA Grant Program.

All bidders must submit bid security in the amount of ten percent [10%].

The successful Bidder will be required to execute the Agreement and to furnish a “Performance Bond” and a “Payment Bond” all on the respective forms provided in the Contract Documents.

The Contractor also will be required to furnish evidence of insurance coverage as required by the Contract Documents.

All Contracts exceeding $10,000.00 shall be performed in compliance with Executive Order 11246, entitled, “Equal Employment Opportunity,” as amended by Executive Order 11375 and as supplemented in Department of Labor regulations (41 CFR Part 60). In addition, all Contractors shall comply with the Nondiscrimination/Sexual Harassment Clause as required by the Contract Documents and the United States Environmental Protection Agency.

http://www.pennbid.bonfirehub.com/

By accepting this Contract, the Contractor acknowledges and agrees to the terms provided in the DBRA Requirements for Contractors and Subcontractors Under EPA Grants:

(https://www.epa.gov/grants/contract-provisions-davis-bacon-and-related-acts).

Davis-Bacon Act, as amended (40 U.S.C. 3141-3148). When required by Federal program legislation, all prime construction contracts in excess of $2,000 awarded by non-Federal entities must include a provision for compliance with the Davis-Bacon Act (40 U.S.C. 3141-3144, and 3146-3148) as supplemented by Department of Labor regulations (29 C.F.R. Part 5, “Labor Standards Provisions Applicable to Contracts Covering Federally Financed and Assisted Construction”). In accordance with the statute, contractors must be required to pay wages to laborers and mechanics at a rate not less than the prevailing wages specified in a wage determination made by the Secretary of Labor. In addition, contractors must be required to pay wages not less than once a week. The non-Federal entity must place a copy of the current prevailing wage determination issued by the Department of Labor in each solicitation. The decision to award a contract or subcontract must be conditioned upon the acceptance of the wage determination. The non-Federal entity must report all suspected or reported violations to the Federal awarding agency. The contracts must also include a provision for compliance with the Copeland “Anti-Kickback” Act (40 U.S.C. 3145), as supplemented by Department of Labor regulations (29 C.F.R. Part 3, “Contractors and Subcontractors on Public Building or Public Work Financed in Whole or in Part by Loans or Grants from the United States”). The Act provides that each Contractor or Subcontractors must be prohibited from inducing, by any means, any person employed in the construction, completion, or repair of public work, to give up any part of the compensation to which he or she is otherwise entitled. The non-Federal entity must report all suspected or reported violations to the Federal awarding agency. Attention is called to the fact that not less than the minimum salaries and wages as set forth in the Contract Documents must be paid on this Project, and that employees and applicants for employment shall not be discriminated against because of their race, age, color, religion, sex, national origin, or handicap.

The Bidder and all Subcontractors must be qualified for the type of project work specified in order to bid the project, and prequalification’s must be submitted by the Bidder and all Subcontractors. The qualification documentation listed in Article 3 in the Instructions to Bidders must be submitted with the Bid.

Bidders should refer to provisions of federal and state statutes, rules, and regulations dealing with the prevention of environment pollution and the preservation of public, natural resources that affect the Project.

Any Bid received after the time and date specified will not be considered. No bid may be withdrawn for a period of sixty (60) days after the above specified date for receiving, opening, and reading of Bids, except as specifically provided by law.

The Lansford-Coaldale Joint Water Authority reserves the right to waive any informality in or to reject any or all Bids, and to delete any item or portion of an item without affecting the Bids on the remaining items or portion of items. The above invitation to Bidders is made for the benefit of the Lansford-Coaldale Joint Water Authority and no rights shall be deemed to accrue to any person making a Bid by reason of the submission of any Bid hereunder or by waiver or non-enforcement of any provision of requirement of this invitation.

Any Bid may be withdrawn prior to the above scheduled time for the opening of Bids or authorized postponement thereof. The award of the Contract and the issuance of Notice to Proceed shall be contingent upon the approval of the Performance Bond, Payment Bond, Agreement and the Certificates of Insurance.

Lansford-Coaldale Joint Water Authority Daniel Weiksner, Chairman

INSTRUCTIONS TO BIDDERS

(EJCDC C-200)

EJCDC® C-200, Instructions to Bidders for Construction Contracts.

Copyright © 2013 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved.

I:\Projects\Lansford-Coaldale JWA\25-1095-0223 2025 Water System Imp. Project\02 - Bid Phase\Front End\4 - C-200 Instructions to Bidders -

PennBid- NV 2024.docx

INSTRUCTIONS TO BIDDERS

TABLE OF CONTENTS

Page

Article 1 – Defined Terms

Article 2 – Copies of Bidding Documents

Article 3 – Qualifications of Bidders

Article 4 – Site and Other Areas; Existing Site Conditions; Examination of Site; Owner’s Safety Program;

Other Work at the Site

Article 5 – Bidder’s Representations

Article 6 – Pre-Bid Conference

Article 7 – Interpretations and Addenda

Article 8 – Bid Security

Article 9 – Contract Times

Article 10 – Liquidated Damages

Article 11 – Substitute and “Or-Equal” Items

Article 12 – Subcontractors, Suppliers, and Others

Article 13 – Preparation of Bid

Article 14 – Basis of Bid

Article 15 – Submittal of Bid

Article 16 – Modification and Withdrawal of Bid

Article 17 – Opening of Bids

Article 18 – Bids to Remain Subject to Acceptance

Article 19 – Evaluation of Bids and Award of Contract

Article 20 – Bonds and Insurance

Article 21 – Signing of Agreement

Article 22 – Sales and Use Taxes

Article 23 – Retainage …………………………………………………………..……………………….……………………………….…… 12

Article 24 – Performance Bond, Payment Bond, Agreement, Insurance, Schedule of Values, PENNDOT Highway Restoration and Maintenance Bond ……….………..…………..………………… 12

Article 25 – Pennsylvania Public Works Employment Verification Act ………………………..……..………………... 13

Article 26 – Availability of Appropriated Funds ………………………..……………………………………….………………... 13

Article 27 – Steel Products Procurement Act ………………………..……………………………………..……………………... 13

Article 28 - CDL Program Contractor's Statement of Compliance …..…………….……………………………………... 13

Copyright © 2013 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved.

I:\Projects\Lansford-Coaldale JWA\25-1095-0223 2025 Water System Imp. Project\02 - Bid Phase\Front End\4 - C-200 Instructions to Bidders - PennBid- NV 2024.docx

ARTICLE 1 – DEFINED TERMS

1.01 Terms used in these Instructions to Bidders have the meanings indicated in the General Conditions and Supplementary Conditions. Additional terms used in these Instructions to Bidders have the meanings indicated below:

A. Issuing Office – The office from which the Bidding Documents are to be issued. The issuing office for this Project is Systems Design Engineering, Inc., 1032 James Drive, Leesport, PA 19533.

B. Owner/Municipality – Lansford-Coaldale Joint Water Authority 1 E. Ridge Street Lansford, Pennsylvania 18232-1417

ARTICLE 2 – COPIES OF BIDDING DOCUMENTS

2.01 Plans and Specifications and other documents constituting the Contract Documents are available at no cost on PennBid Bonfire – www.pennbid.bonfirehub.com.

2.02 Complete sets of Bidding Documents shall be used in preparing Bids; neither Owner nor Engineer assumes any responsibility for errors or misinterpretations resulting from the use of incomplete sets of Bidding Documents.

2.03 Owner and Engineer, in making copies of Bidding Documents available on the above terms, do so only for the purpose of obtaining Bids for the Work and do not authorize or confer a license for any other use.

ARTICLE 3 – QUALIFICATIONS OF BIDDERS

3.01 To demonstrate Bidder’s qualifications to perform the Work, Bidder shall submit with the Bid (a) the Qualifications of Bidder Questionnaire (included within the Bid Documents) establishing its qualifications such as financial data, previous experience, and present commitments, and (b) the following additional information:

A. Evidence of Bidder’s authority to do business in the Commonwealth of Pennsylvania.

B. Bidder’s state or other contractor license number, if applicable.

C. Subcontractor and Supplier qualification information; coordinate with provisions of Article 12 of these Instructions, “Subcontractors, Suppliers, and Others.”

D. Maintains a permanent place of business with at least five (5) years and preferably ten (10) years’ experience with similar work;

E. Has adequate equipment to do the Work properly and expeditiously.

F. Has successfully completed projects of similar character and magnitude of the Work (provide a list of projects completed within the past 5 years, including the Contract date and a description of the work items, quantities, county where Project is located and the total bid price).

3.02 A Bidder’s failure to submit required qualification information within the times indicated may disqualify Bidder from receiving an award of the Contract.

Copyright © 2013 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved.

I:\Projects\Lansford-Coaldale JWA\25-1095-0223 2025 Water System Imp. Project\02 - Bid Phase\Front End\4 - C-200 Instructions to Bidders -

3.03 No requirement in this Article 3 to submit information shall prejudice the right of the Owner to seek additional pertinent information regarding Bidder’s qualifications. In particular, Bidders shall be prepared to submit a copy of their latest financial statement within 24 hours of bid opening if requested by the Owner/Engineer.

3.04 Bidder is advised to carefully review those portions of the Bid Form requiring Bidder’s representations and certifications.

ARTICLE 4 – SITE AND OTHER AREAS; EXISTING SITE CONDITIONS; EXAMINATION OF SITE; OWNER’S

SAFETY PROGRAM; OTHER WORK AT THE SITE

4.01 Site and Other Areas

A. The Site is identified in the Bidding Documents. By definition, the Site includes rights-of-way, easements, and other lands furnished by Owner for the use of the Contractor. Any additional lands required for temporary construction facilities, construction equipment, or storage of materials and equipment, and any access needed for such additional lands, are to be obtained and paid for by Contractor.

4.02 Existing Site Conditions There are No Reports or Drawings of the type referred to in this representation available for this Project.

A. Subsurface and Physical Conditions; Hazardous Environmental Conditions

1. The Supplementary Conditions identify:

a. Those reports known to Owner of explorations and tests of subsurface conditions at or adjacent to the Site.

b. Those drawings known to Owner of physical conditions relating to existing surface or subsurface structures at the Site (except Underground Facilities).

c. Reports and drawings known to Owner relating to Hazardous Environmental Conditions that have been identified at or adjacent to the Site.

d. Technical Data contained in such reports and drawings.

2. Owner shall make copies of reports and drawings referenced above available to any Bidder on request. These reports and drawings are not part of the Contract Documents, but the Technical Data contained therein upon whose accuracy Bidder is entitled to rely, as provided in the General Conditions, has been identified and established in the Supplementary Conditions. Bidder is responsible for any interpretation or conclusion Bidder draws from any Technical Data or any other data, interpretations, opinions, or information contained in such reports or shown or indicated in such drawings.

3. If the Supplementary Conditions do not identify Technical Data, the default definition of Technical Data set forth in Article 1 of the General Conditions shall apply.

4. Geotechnical Baseline Report: The Bidding Documents contain a Geotechnical Baseline Report (GBR). The GBR describes certain select subsurface conditions that are anticipated to be encountered by Contractor during construction in specified locations (“Baseline Conditions”). The GBR is a Contract Document.

Copyright © 2013 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved.

I:\Projects\Lansford-Coaldale JWA\25-1095-0223 2025 Water System Imp. Project\02 - Bid Phase\Front End\4 - C-200 Instructions to Bidders -

The Baseline Conditions in the GBR are intended to reduce uncertainty and the degree of contingency in submitted Bids. However, Bidders cannot rely solely on the Baseline Conditions. Bids should be based on a comprehensive approach that includes an independent review and analysis of the GBR, all other Contract Documents, Technical Data, other available information, and observable surface conditions. Not all potential subsurface conditions are baselined.

Nothing in the GBR is intended to relieve Bidders of the responsibility to make their own determinations regarding construction costs, bidding strategies, and Bid prices, nor of the responsibility to select and be responsible for the means, methods, techniques, sequences, and procedures of construction, and for safety precautions and programs incident thereto.

B. Underground Facilities: Information and data shown or indicated in the Bidding Documents with respect to existing Underground Facilities at or contiguous to the Site are set forth in the Contract Documents and are based upon information and data furnished to Owner and Engineer by Owners of such Underground Facilities, including Owner, or others.

C. Adequacy of Data: Provisions concerning responsibilities for the adequacy of data furnished to prospective Bidders with respect to subsurface conditions, other physical conditions, and Underground Facilities, and possible changes in the Bidding Documents due to differing or unanticipated subsurface or physical conditions appear in Paragraphs 4.03, 4.04, and 5.06 of the General Conditions. Provisions concerning responsibilities for the adequacy of data furnished to prospective Bidders with respect to a Hazardous Environmental Condition at the Site, if any, and possible changes in the Contract Documents due to any Hazardous Environmental Condition uncovered or revealed at the Site which was not shown or indicated in the Drawings or Specifications or identified in the Contract Documents to be within the scope of the Work, appear in Paragraph 4.06 of the General Conditions.

4.03 Site Visit and Testing by Bidders

A. Bidder shall conduct the required Site visit during normal working hours, and shall not disturb any ongoing operations at the Site.

B. Bidder may conduct any subsurface testing, or investigations of Site conditions as Bidder may find necessary to prepare their bid in addition to the information supplied by Owner.

C. On request, and to the extent Owner has control over the Site, and schedule permitting, the Owner shall provide Bidder access to the Site to conduct such additional examinations, investigations, explorations, tests, and studies as Bidder deems necessary for preparing and submitting a successful Bid. Owner shall not have any obligation to grant such access if doing so is not practical because of existing operations, security or safety concerns, or restraints on Owner’s authority regarding the Site.

D. Bidder shall comply with all applicable Laws and Regulations regarding excavation and location of utilities, obtain all permits, and comply with all terms and conditions established by Owner or by property owners or other entities controlling the Site with respect to schedule, access, existing operations, security, liability insurance, and applicable safety programs.

E. Bidder shall fill all holes and clean up and restore the Site to its former condition upon completion of such explorations, investigations, tests, and studies.

Copyright © 2013 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved.

I:\Projects\Lansford-Coaldale JWA\25-1095-0223 2025 Water System Imp. Project\02 - Bid Phase\Front End\4 - C-200 Instructions to Bidders -

4.04 Owner’s Safety Program

A. Site visits and performance of all Work at the Site are undertaken by the Contractor and Subcontractors at their own risk. The Contractor and Subcontractors are responsible for implementing their own safety program, and agree to hold harmless the Owner and Engineer against any injuries or damages that may occur during site visits or the performance of all Work.

4.05 Other Work at the Site

A. Reference is made to Article 8 of the Supplementary Conditions for the identification of the general nature of other work of which Owner is aware (if any) that is to be performed at the Site by Owner or others (such as utilities and other prime contractors) and relates to the Work contemplated by these Bidding Documents. If Owner is party to a written contract for such other Work, then on request, Owner shall provide to each Bidder access to examine such contracts (other than portions thereof related to price and other confidential matters), if any.

ARTICLE 5 – BIDDER’S REPRESENTATIONS

5.01 It is the responsibility of each Bidder before submitting a Bid to:

A. examine and carefully study the Bidding Documents, and any data and reference items identified in the Bidding Documents;

1. Bidders are to specifically note EPA guidelines and stipulations of this contract as outlined in Appendices F, G, H, and I. The stipulations and guidelines located in these appendices supersede all other language included in these Bid Documents.

B. visit the Site, conduct a thorough, alert visual examination of the Site and adjacent areas, and become familiar with and satisfy itself as to the general, local, and Site conditions that may affect cost, progress, and performance of the Work;

C. become familiar with and satisfy itself as to all Laws and Regulations that may affect cost, progress, and performance of the Work;

D. carefully study all: (1) reports of explorations and tests of subsurface conditions at or adjacent to the Site and all drawings of physical conditions relating to existing surface or subsurface structures at the Site that have been identified in the Supplementary Conditions, especially with respect to Technical Data in such reports and drawings, and (2) reports and drawings relating to Hazardous Environmental Conditions, if any, at or adjacent to the Site that have been identified in the Supplementary Conditions, especially with respect to Technical Data in such reports and drawings;

E. consider the information known to Bidder itself; information commonly known to contractors doing business in the locality of the Site; information and observations obtained from visits to the Site; the Bidding Documents; and the Site-related reports and drawings identified in the Bidding Documents, with respect to the effect of such information, observations, and documents on (1) the cost, progress, and performance of the Work; (2) the means, methods, techniques, sequences, and procedures of construction to be employed by Bidder; and (3) Bidder’s safety precautions and programs;

Copyright © 2013 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved.

I:\Projects\Lansford-Coaldale JWA\25-1095-0223 2025 Water System Imp. Project\02 - Bid Phase\Front End\4 - C-200 Instructions to Bidders -

F. agree, based on the information and observations referred to in the preceding paragraph, that at the time of submitting its Bid no further examinations, investigations, explorations, tests, studies, or data are necessary for the determination of its Bid for performance of the Work at the price bid and within the times required, and in accordance with the other terms and conditions of the Bidding Documents.

G. become aware of the general nature of the Work to be performed by Owner and others at the Site that relates to the Work as indicated in the Bidding Documents;

H. promptly give Engineer written notice of all conflicts, errors, ambiguities, or discrepancies that Bidder discovers in the Bidding Documents and confirm that the written resolution thereof by Engineer is acceptable to Bidder;

I. determine that the Bidding Documents are generally sufficient to indicate and convey understanding of all terms and conditions for the performance and furnishing of the Work;

and

J. agree that the submission of a Bid shall constitute an incontrovertible representation by Bidder that Bidder has complied with every requirement of this Article, that without exception the Bid and all prices in the Bid are premised upon performing and furnishing the Work required by the Bidding Documents.

ARTICLE 6 – PRE-BID CONFERENCE

6.01 Bidders shall note that no pre-bid conference/on-site meeting has been scheduled. Any Bidder interested in viewing the proposed work area site shall make arrangements with the Authority’s Superintendent, Tobias Krajcirik and he can be reached by phone at (570) 751-2456 to coordinate a site visit.

ARTICLE 7 – INTERPRETATIONS AND ADDENDA

7.01 All questions about the meaning or intent of the Bidding Documents are to be submitted no less than ten (10) days prior to the date for opening Bids via the “Public Q&A” feature in PennBid Bonfire.

Interpretations or clarifications considered necessary by Engineer in response to such questions shall be issued by Addenda delivered to all parties recorded as having received the Bidding Documents. Questions received less than ten (10) days or as stated elsewhere prior to the date for opening of Bids may not be answered. Only questions answered by Addenda shall be binding.

Oral and other interpretations or clarifications shall be without legal effect.

7.02 Addenda may be issued to clarify, correct, supplement, or change the Bidding Documents.

7.03 Any questions answered outside of the parameters described above are neither valid, nor binding upon the Owner.

ARTICLE 8 – BID SECURITY

8.01 A Bid must be accompanied by Bid security made payable to Owner in an amount of ten (10) percent of Bidder’s maximum Bid price (determined by adding the Base Bid, all alternate, and all

Copyright © 2013 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved.

I:\Projects\Lansford-Coaldale JWA\25-1095-0223 2025 Water System Imp. Project\02 - Bid Phase\Front End\4 - C-200 Instructions to Bidders -supplemental bid items) and in the form of a certified check, bank money order, or a Bid bond (on the form included in the Bidding Documents) issued by a surety meeting the requirements of Paragraphs 6.01 and 6.02 of the General Conditions. If by Certified Check, Bidder shall upload scan of check in lieu of Bid Bond, with the condition that the apparent low bidder shall provide the original of same check to the Owner no later than 30 days after bid opening.

8.02 If the Project contains more than one (1) Contract, and the Bidder is bidding on more than one (1) Contract, a single Bid bond equaling the combined amounts for the Contracts being bid may be submitted in lieu of separate Bid bonds for each Contract.

8.03 The Bid security of the apparent Successful Bidder shall be retained until Owner awards the Contract to such Bidder, and such Bidder has executed the Contract Documents, furnished the required contract security, and met the other conditions of the Notice of Intent to Award, whereupon the Bid security shall be released. If the Successful Bidder fails to execute and deliver the Contract Documents and furnish the required contract security within ten (10) days after the Notice of Intent to Award, Owner may consider Bidder to be in default, annul the Notice of Intent to Award, and the Bid security of that Bidder shall be forfeited. Such forfeiture shall be Owner’s exclusive remedy if Bidder defaults.

8.04 The Bid security of other Bidders that Owner believes to have a reasonable chance of receiving the award may be retained by Owner until the earlier of seven days after the Effective Date of the Contract or sixty-one (61) days after the Bid opening, whereupon Bid security furnished by such Bidders shall be released.

8.05 Bid security of other Bidders that Owner believes do not have a reasonable chance of receiving the award shall be released within seven (7) days after the Bid opening.

ARTICLE 9 – CONTRACT TIMES

9.01 The number of days within which, or the dates by which, the Work is to be substantially completed and ready for final payment are set forth in Article 4 of the Agreement. For the purpose of scheduling the Work, it is anticipated, but not guaranteed, that the Notice to Proceed will be issued in July 2026.

ARTICLE 10 – LIQUIDATED DAMAGES

10.01 Provisions for liquidated damages, if any, for failure to timely attain a Milestone, Substantial Completion, or completion of the Work in readiness for final payment, are set forth in Article 4 of the Agreement.

ARTICLE 11 – SUBSTITUTE AND “OR-EQUAL” ITEMS

11.01 The Contract for the Work, as awarded, shall be on the basis of materials and equipment specified or described in the Bidding Documents, and those “or-equal” or substitute or materials and equipment subsequently approved by Engineer prior to the submittal of Bids and identified by Addendum. No item of material or equipment shall be considered by Engineer as an “or-equal” or substitute unless written request for approval has been submitted by Bidder and has been received by Engineer at least ten (10) days prior to the date for receipt of Bids. Each such request shall comply with the requirements of Paragraphs 7.04 and 7.05 of the General Conditions. The

Copyright © 2013 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved.

I:\Projects\Lansford-Coaldale JWA\25-1095-0223 2025 Water System Imp. Project\02 - Bid Phase\Front End\4 - C-200 Instructions to Bidders -burden of proof of the merit of the proposed item is upon Bidder. Engineer’s decision of approval or disapproval of a proposed item shall be final. If Engineer approves any such proposed item, such approval shall be set forth in an Addendum issued to all prospective Bidders. Bidders shall not rely upon approvals made in any other manner.

11.02 All prices that Bidder sets forth in its Bid shall be based on the presumption that the Contractor shall furnish the materials and equipment specified or described in the Bidding Documents, as supplemented by Addenda. Any assumptions regarding the possibility of post-Bid approvals of “or-equal” or substitution requests are made at Bidder’s sole risk.

ARTICLE 12 – SUBCONTRACTORS, SUPPLIERS, AND OTHERS

12.01 A Bidder shall be prepared to retain specific Subcontractors, Suppliers, or other individuals or entities for the performance of the Work if required by the Bidding Documents (most commonly in the Specifications) to do so. If a prospective Bidder objects to retaining any such Subcontractor, Supplier, or other individual or entity, and the concern is not relieved by an Addendum, then the prospective Bidder should refrain from submitting a Bid.

12.02 Subsequent to the submittal of the Bid, Owner may not require the Successful Bidder or Contractor to retain any Subcontractor, Supplier, or other individual or entity against which Contractor has reasonable objection.

12.03 The apparent Successful Bidder, and any other Bidder so requested, shall submit with the bid the list of Subcontractors or Suppliers proposed unless permitted otherwise, then within five (5) days after Bid opening, submit to Owner a list of the Subcontractors or Suppliers proposed.

12.04 If requested by Owner, such list shall be accompanied by an experience statement with pertinent information regarding similar projects and other evidence of qualification for each such Subcontractor, Supplier, or other individual or entity. If Owner or Engineer, after due investigation, has reasonable objection to any proposed Subcontractor, Supplier, individual, or entity, Owner may, before the Notice of Award is given, request apparent Successful Bidder to submit an acceptable substitute, in which case apparent Successful Bidder shall submit a substitute, Bidder’s Bid price shall be increased (or decreased) by the difference in cost occasioned by such substitution, and Owner may consider such price adjustment in evaluating Bids and making the Contract award.

12.05 If apparent Successful Bidder declines to make any such substitution, Owner may award the Contract to the next lowest Bidder that proposes to use acceptable Subcontractors, Suppliers, or other individuals or entities. Declining to make requested substitutions shall constitute grounds for forfeiture of the Bid security of any Bidder. Any Subcontractor, Supplier, individual, or entity so listed and against which Owner or Engineer makes no written objection prior to the giving of the Notice of Award shall be deemed acceptable to Owner and Engineer subject to subsequent revocation of such acceptance as provided in Paragraph 7.06 of the General Conditions.

ARTICLE 13 – PREPARATION OF BID

13.01 The Bid Form is included with the Bidding Documents for reference.

A. Bidders shall complete the electronic Bid Form in PennBid Bonfire, inclusive of all required supporting documents as identified herein. A Bid price shall be indicated for each section, Copyright © 2013 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved.

I:\Projects\Lansford-Coaldale JWA\25-1095-0223 2025 Water System Imp. Project\02 - Bid Phase\Front End\4 - C-200 Instructions to Bidders -

Base Bid item, Alternate and Supplemental Bid item, adjustment unit price item, and unit price item listed therein. A Bid price shall be indicated for each section, Base Bid item, Alternate and Supplemental Bid item, adjustment unit price item, and unit price item listed therein.

B. If the Bid Form expressly indicates that submitting pricing on a specific Alternate or Supplemental item is optional, and Bidder elects to not furnish pricing for such optional Alternate or Supplemental item, then Bidder may select the “No Bid” checkbox next to that line.

13.02 A Bid by a corporation shall be executed in the corporate name by a corporate officer (whose title must appear under the signature), accompanied by evidence of authority to sign. The corporate address and state of incorporation shall be shown.

13.03 A Bid by a limited liability company shall be executed in the name of the firm by a member or other authorized person and accompanied by evidence of authority to sign. The state of formation of the firm and the official address of the firm shall be shown.

13.04 A Bid by an individual shall show the Bidder’s name and official address.

13.05 A Bid by a joint venture shall be executed by an authorized representative of each joint venturer in the manner indicated on the Bid Form. The official address of the joint venture shall be shown.

13.06 All names shall be printed in ink below the signatures.

13.07 The Bid shall contain an acknowledgment of receipt of all Addenda, the numbers of which shall be filled in on the Bid Form.

13.08 Postal and e-mail addresses and telephone number for communications regarding the Bid shall be shown.

13.09 The Bid shall contain evidence of Bidder’s authority and qualification to do business in the Commonwealth of Pennsylvania, or Bidder shall covenant in writing to obtain such authority and qualification prior to award of the Contract and attach such covenant to the Bid. Bidder’s state contractor license number, if any, shall also be shown on the Bid Form.

ARTICLE 14 – BASIS OF BID

14.01 Lump Sum

A. Bids shall be submitted online via the PennBid Program (www.pennbid.bonfirehub.com) by the date and time indicated in the Invitation for Bids along with the Bid security and the other documents required to be submitted as identified herein.

14.02 Unit Price

A. Bidders shall submit a Bid on a unit price basis for each unit price item of Work listed in the Bid Form.

B. The “Bid Price” (sometimes referred to as the extended price) for each unit price Bid item shall be the product of the “Estimated Quantity” (which Owner or its representative has set forth in the Bid Form) for the item and the corresponding “Bid Unit Price” offered by the Bidder. The total of all unit price Bid items shall be the sum of these “Bid Prices”; such total

Copyright © 2013 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved.

I:\Projects\Lansford-Coaldale JWA\25-1095-0223 2025 Water System Imp. Project\02 - Bid Phase\Front End\4 - C-200 Instructions to Bidders -shall be used by Owner for Bid comparison purposes. The final quantities and Contract Price shall be determined in accordance with Paragraph 13.03 of the General Conditions.

C. Discrepancies between the multiplication of units of Work and unit prices shall be resolved in favor of the unit prices. Discrepancies between the indicated sum of any column of figures and the correct sum thereof shall be resolved in favor of the correct sum.

14.03 Allowances

A. For cash allowances the Bid price shall include such amounts as the Bidder deems proper for Contractor's overhead, costs, profit, and other expenses on account of cash allowances, if any, named in the Contract Documents, in accordance with Paragraph 13.02.B of the General Conditions.

14.04 Submission of a Complete Bid

A. The Bidder shall submit a cost for all items listed on the Bid Form, unless specifically noted otherwise.

ARTICLE 15 – SUBMITTAL OF BID

15.01 A Bid may be withdrawn or modified at any time within PennBid Bonfire prior to the due date and time identified in the Invitation for Bids.

ARTICLE 16 – MODIFICATION AND WITHDRAWAL OF BID

16.01 A Bid may be withdrawn prior to the date and time for the opening of Bids.

16.02 If a Bidder wishes to modify its Bid prior to Bid opening, Bidder must “withdraw and edit” its initial Bid within PennBid Bonfire and submit a new Bid prior to the date and time for the opening of Bids. More than one Bid for the same Work from an individual or entity under the same or different names will not be considered.

16.03 If within 48 hours after Bids are opened any Bidder files a duly signed written notice with Owner and promptly thereafter demonstrates to the reasonable satisfaction of Owner that there was a material and substantial mistake in the preparation of its Bid, that Bidder may withdraw its Bid, and the Bid security shall be returned. Thereafter, if the Work is rebid, that Bidder shall be disqualified from further bidding on the Work.

ARTICLE 17 – OPENING OF BIDS

17.01 A summary of bids received will be displayed on PennBid Bonfire immediately after bid opening, the time of which is listed in the Invitation to Bid. It should be noted that bid results are subject to further review and should not be construed as issuance of an award. The consideration of the apparent low bidder will be at the regularly scheduled Authority meeting on June 24, at 3:45 P.M.

An abstract of the amounts of the Base Bids and major alternate and supplemental bid items, if any, shall be made available to Bidders after the opening of Bids.

Copyright © 2013 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved.

I:\Projects\Lansford-Coaldale JWA\25-1095-0223 2025 Water System Imp. Project\02 - Bid Phase\Front End\4 - C-200 Instructions to Bidders -

ARTICLE 18 – BIDS TO REMAIN SUBJECT TO ACCEPTANCE

18.01 All Bids shall remain subject to acceptance for the period of time stated in the Bid Form, but Owner may, in its sole discretion, release any Bid and return the Bid security prior to the end of this period.

ARTICLE 19 – EVALUATION OF BIDS AND AWARD OF CONTRACT

19.01 Owner reserves the right to reject any or all Bids, including without limitation, nonconforming, nonresponsive, unbalanced, or conditional Bids. Owner shall reject the Bid of any Bidder that Owner finds, after reasonable inquiry and evaluation, to not be responsible. If Bidder purports to add terms or conditions to its Bid, takes exception to any provision of the Bidding Documents, or attempts to alter the contents of the Contract Documents for purposes of the Bid, then the Owner shall reject the Bid as nonresponsive; provided that Owner also reserves the right to waive all minor informalities not involving price, time, or changes in the Work.

19.02 Bidder accepts all of the terms and conditions of the Instructions to Bidders, including without limitation those dealing with the disposition of Bid security. This Bid shall be awarded by the Owner to the lowest responsible Bidder within sixty (60) days of the date of bid opening, or all bids shall be rejected except as otherwise provided. If the award is delayed by a required approval of another government agency, the sale of bonds, or the award of a grant or grants, the Owner shall reject all bids or award the Contract to the lowest responsible Bidder within one-hundred twenty (120) days of the date of bid opening. Thirty (30) day extensions of the date for the award may be made by the mutual written consent of the Owner and the lowest responsible Bidder.

19.03 Evaluation of Bids

A. In evaluating Bids, Owner shall consider whether or not the Bids comply with the prescribed requirements, and such alternates, unit prices, and other data, as may be requested in the Bid Form or prior to the Notice of Award.

B. For the determination of the apparent low Bidder when unit price bids are submitted, Bids shall be compared on the basis of the total of the products of the estimated quantity of each item and unit price Bid for that item, together with any lump sum items.

19.04 In evaluating whether a Bidder is responsible, Owner shall consider the qualifications of the Bidder and may consider the qualifications and experience of Subcontractors and Suppliers proposed for those portions of the Work for which the identity of Subcontractors and Suppliers must be submitted as provided in the Bidding Documents.

19.05 In evaluating whether a Bidder is qualified, Owner may consider any Bidder who has demonstrated poor performance during either a present or previous contract with the Owner to be unqualified and reject their bid accordingly. The Owner reserves the right to exercise this option as is deemed proper and/or necessary.

19.06 Owner may conduct such investigations as Owner deems necessary to establish the responsibility, qualifications, and financial ability of Bidders and any proposed Subcontractors or Suppliers. By submitting a Bid, Bidders consent to the release to the Owner of any and all information deemed necessary by the Owner to allow for such investigation.

Copyright © 2013 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved.

I:\Projects\Lansford-Coaldale JWA\25-1095-0223 2025 Water System Imp. Project\02 - Bid Phase\Front End\4 - C-200 Instructions to Bidders -

19.07 If the Contract is to be awarded, Owner shall award the Contract to the responsible Bidder whose Bid is in the best interests of the Project, conforming with all material terms and conditions of the Instructions to Bidders, is the lowest price and other factors considered.

19.08 Bidders shall note that the Owner reserves the right to award the Contract(s) to the lowest responsible Bidder respectively as follows (as applicable): Base Bid only, Base Bid with Alternate Bid items only, Base Bid with Supplemental Bid items only, Base Bid with Supplemental Bid items and Alternate Bid items, Base Bid all Contracts combined, or Base Bid Contracts individually, as may be applicable and as noted on the Bid Form. The Owner reserves the right to delete portions of the Project listed under the Base Bid Items, Alternate Bid Items, or Supplemental Bid Items for Work under the Contract(s) based upon budget constraints. Each Bidder shall bid accordingly.

19.09 The lowest responsible Bidder must comply with the Public Works Employment Verification Act by submitting a Public Works Employment Verification Form to the Municipality prior to award of each Contract. The Form and relevant information can be found on the Department of General Services’ web site at www.dgs.state.pa.us. A copy of the Public Works Employment Verification Form has also been included in the Contract Documents.

ARTICLE 20 – BONDS AND INSURANCE

20.01 Article 6 of the General Conditions, as may be modified by the Supplementary Conditions, sets forth Owner’s requirements as to Performance and Payment bonds and insurance. When the Successful Bidder delivers the Agreement (executed by Successful Bidder) to Owner, it shall be accompanied by the required bonds and insurance documentation.

ARTICLE 21 – SIGNING OF AGREEMENT

21.01 When Owner issues the Notice of Intent to Award to the Successful Bidder, it shall be accompanied by the unexecuted counterparts of the Agreement along with the other Contract Documents as identified in the Agreement. Within ten (10) days thereafter, Successful Bidder shall execute and deliver the required number of counterparts of the Agreement (and any bonds.

insurance documentation, and other documentation required to be delivered by the Contract Documents) to Owner.

ARTICLE 22 – SALES AND USE TAXES

22.01 Owner may be exempt from Federal Excise and Pennsylvania sales and use taxes on certain materials and equipment to be incorporated in the Work. Said taxes shall not be included in the Bid. Refer to Paragraph SC-6.10 of the Supplementary Conditions for additional information.

ARTICLE 23 – RETAINAGE

23.01 Provisions concerning Contractor’s rights to deposit securities in lieu of retainage are set forth in the Agreement.

http://www.dgs.state.pa.us/

Copyright © 2013 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved.

I:\Projects\Lansford-Coaldale JWA\25-1095-0223 2025 Water System Imp. Project\02 - Bid Phase\Front End\4 - C-200 Instructions to Bidders -

ARTICLE 24 – PERFORMANCE BOND, PAYMENT BOND, AGREEMENT, INSURANCE, SCHEDULE OF

VALUES, AND PENNDOT HIGHWAY RESTORATION AND MAINTENANCE BOND (AS

APPLICABLE)

24.01 The Successful Bidder shall, within ten (10) calendar days from the date of receipt of the “Notice of Intent to Award” the Contract to such Bidder, furnish to the Owner an executed Performance Bond, in the form set forth in the Contract Documents, with corporate surety guaranteeing that the Work shall be done according to the Contract Documents. The Performance Bond shall be in the amount of ONE-HUNDRED PERCENT (100%) of the Contract Price.

24.02 In addition to the Performance Bond the successful Bidder shall, within ten (10) calendar days from the date of receipt of the “Notice of Intent to Award” the Contract to such Bidder, furnish to the Owner an executed Payment Bond, in the form set forth in the Contract Documents, with corporate surety conditioned for the prompt payment for all material furnished and labor supplied or performed in the prosecution of the Work, whether or not the said material or labor…