2-2026.11.09 - NCC LEARNING COMMONS - SPECS VOL 1 - BID.pdf
PDF 7 MB Posted
- Attached to
- Learning Commons - Renovations Project
- Solicitation number
- US.261667
- Issued by
- Northampton County, Pennsylvania
About this file
This is a Project Manual and Bidding Documents for an interior renovation project at Northampton Community College's Mack Library Learning Commons, 4th Floor, located at 3835 Green Pond Road, Bethlehem, Pennsylvania. The project encompasses general construction, HVAC, plumbing, and electrical work across four separate prime contracts. Sealed bids must be submitted electronically through the PennBid Program by 2:00 P.M. prevailing time on Tuesday, December 15, 2026, with public bid opening to follow. Contract documents are available electronically in PDF format at www.pennbid.net beginning Monday, November 9, 2026, at no cost. The last day for Requests for Information (RFIs) is Monday, November 30, 2026, by 4:00 P.M. A mandatory pre-bid meeting for all prime contract bidders will be held on Tuesday, November 17, 2026, at 9:00 A.M. at Northampton Community College, College Center, Room 220, with site walk-throughs available. The project architect is Alloy5 Architecture, LLC, located at 530 West Broad Street, Bethlehem, PA 18018, with phone number 610-419-4055. Contract awards will be made by the Owner at a later date, with the Owner reserving the right to accept or reject any portion of any bid and to withhold award for up to sixty days.
Bid security in the amount of ten percent (10%) of the total base bid and all possible add alternates must accompany each proposal, submitted as either a certified check, bank cashier's check, or bid bond from a surety authorized to do business in Pennsylvania with an AM Best rating of A- or higher and a financial rating of Class X or higher. The successful bidder must furnish Performance and Payment Bonds each in the amount of one hundred percent (100%) of the contract value within ten days of Notice of Intent to Award. This project is subject to the Pennsylvania Prevailing Wage Act, with prevailing wage rates established by the Secretary of Labor and Industry applying to all work. Bidders must be determined as responsible contractors under applicable law and must meet specific qualification requirements, including successful completion of a minimum of three previous public projects within the last five years of similar type or contract value of at least seventy percent (70%) of the bidder's base bid amount, and at least three public education projects within the last five years involving multiple trades coordination. The bidder must perform not less than ten percent (10%) of actual construction work with staff employed directly by the company, excluding project management. Additionally, contractors and subcontractors must comply with the Pennsylvania Public Works Employment Verification Act, utilizing the E-Verify system, and must provide state and federal criminal history reports and child abuse clearances for all employees and subcontractors prior to work commencement. All work must comply with Pennsylvania Prevailing Wage Act requirements, Pennsylvania Human Relations Act provisions, steel products procurement standards, and trade practices regulations regarding foreign-made aluminum and steel products.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
P R O J E C T M A N U A L
Interior Renovation to Northampton Community College, College Center
Mack Library Learning Commons, 4th Floor
3835 Green Pond Road
Bethlehem, PA 18020
Northampton Community College 3835 Green Pond Road
Bethlehem, Northampton County, PA 18020
November 9, 2026
ISSUED FOR BID
ALLOY5 ARCHITECTURE
530 West Broad Street Bethlehem, PA 18018
HB Engineers, Inc.
2900 Hamilton Blvd #200 Allentown, PA 18103
VOLUME 1
ALLOY5 ARCHITECTURE
25-101
NORTHAMPTION COMMUNITY COLLEGE
LEARNING COMMONS RENOVATION
TABLE OF CONTENTS 00.0110 - 1
TABLE OF CONTENTS
00.0101 Project Title Page
00.0110 Table of Contents
DIVISION 00 – PROCUREMENT AND CONTRACTING REQUIREMENTS
00.0115 List of Drawings
00.1113 Advertisements for Bids
00.1153 Qualifications Questionnaire
00.1154 Agreement of Surety
00.1155 Letter of Insurer
00.2113 Instructions to Bidders
00.2113A Public Works Verification Form
00.2625 Substitution Request Form
00.4116 General Construction Bid Form
00.4117 Mechanical Construction Bid Form
00.4118 Plumbing Construction Bid Form
00.4119 Electrical Construction Bid Form
00.4300 Bid Security, Payment Bond, Performance Bond
00.4519 Non-Collusion Affidavit
00.5216 Agreement Form
00.5216.01 A101-2017 Draft
00.5216.02 A101 Exhibit A-2017 Draft
00.6216 Sample Insurance Certificate
00.7216 General Conditions
007216.01 AIA A201-2017 General Conditions
07.3000 Supplementary Conditions
00.7343 Prevailing Wage Rate Requirements
00.7346.16 Certified Payroll Sample Form
DIVISION 01 – GENERAL REQUIREMENTS
01.1100 Summary
01.1200 Multiple Contract Summary
01.1400 Work Restrictions
01.2600 Contract Modification Procedures
01.2900 Payment Procedures
01.3100 Project Management and Coordination
01.3200 Construction Progress Documentation
01.3300 Submittal Procedures
01.4000 Quality Requirements
01.4200 References
01.5000 Temporary Facilities and Controls
01.6000 Product Requirements
01.7300 Execution
01.7329 Cutting and Patching
01.7419 Construction Waste Management
01.7700 Closeout Procedures
01.7823 Operation and Maintenance Data
01.7829 Project Record Documents
01.7900 Demonstration and Training
NORTHAMPTION COMMUNITY COLLEGE
LEARNING COMMONS RENOVATION
TABLE OF CONTENTS 00.0110 - 2
01.8109 Testing for Indoor Air Quality
01.8114 Low Emitting Materials
01.8119 Indoor Air Quality Management
01.9113 General Commissioning Requirements
DIVISION 02 – EXISTING CONDITIONS
02.4119 Selective Demolition
DIVISION 03 – CONCRETE
DIVISION 04 – MASONRY
DIVISION 05 – METALS
05.5000 Metal Fabrications
DIVISION 06 – WOOD, PLASTICS, AND COMPOSITES
06.0513 Decorative Plastic Laminate
06.1000 Rough Carpentry
06.4023 Interior Architectural Woodwork
06.4025 High Pressure Laminates
DIVISION 07 – THERMAL AND MOISTURE PROTECTION
07.2100 Thermal Insulation
07.8413 Penetration Firestopping
07.9200 Joint Sealants
DIVISION 08 – OPENINGS
08.1113 Hollow Metal Doors and Frames
08.1416 Flush Wood Doors
08.3100 Access Doors
08.4110 Aluminum-Framed Entrances and Storefronts
08.7100 Door Hardware & Schedule
08.8000 Glazing
08.8700 Interior Window Film
DIVISION 09 – FINISHES
09.2116 Gypsum Board Assemblies
09.2216 Non-Structural Metal Framing
09.3000 Tiling
09.5000 Acoustic Ceilings
09.5421 Metal Ceilings
09.6500 Resilient Wall Base
09.6519 Resilient Tile Flooring
09.6813 Tile Carpeting
09.8319 Sound Absorbing Wall Units
09.9100 Painting & Finishing
09.9300 Transparent Finishing
DIVISION 10 – SPECIALTIES
NORTHAMPTION COMMUNITY COLLEGE
LEARNING COMMONS RENOVATION
TABLE OF CONTENTS 00.0110 - 3
10.1416 Interior Tactile Signage
10.2113 Toilet Compartments
10.2813 Toilet Accessories
DIVISION 12 – FURNISHINGS
12.2400 Window Blinds
12.3619 Wood Countertops
12.3661 Solid Surface Countertops
DIVISION 22 – PLUMBING
22.0500 Common Work Results for Plumbing
22.0517 Sleeves and Sleeve Seals for Plumbing Piping
22.0523 General-Duty Valves for Plumbing Piping
22.0529 Hangers and Supports for Plumbing Piping and Equipment
22.0553 Identification for Plumbing Piping and Equipment
22.1116 Domestic Water Piping
22.1119 Domestic Water Piping Specialties
22.1316 Sanitary Waste and Vent Piping
22.1319 Sanitary Waste Piping Specialties
22.4000 Plumbing Fixtures
22.4700 Drinking Fountain and Water Coolers
DIVISION 23 – HVAC
23.0500 Common Work Results for HVAC
23.0553 Identification for HVAC Ductwork
23.0593 Testing, Adjusting, and Balancing for HVAC
23.0700 HVAC Insulation
23.0900 Automatic Temperature Controls
23.2113 Hydronic Piping
23.3113 Metal Ducts
23.3300 Air Duct Accessories
23.3713 Diffusers, Registers, and Grilles
DIVISION 26 – ELECTRICAL SYSTEMS
26.0510 Common Work Results for Electrical
26.0519 Conductors and Cables
26.0529 Hangers and Supports for Electrical Systems
26.0533 Raceways and Boxes
26.0550 Electrical System Testing
26.0551 Arc Flash
26.0553 Electrical Identification
26.0610 Electrical Demolition for Renovations
26.0923 Lighting Control Devices
26.2416 Panelboards
26.2526 Grounding and Bonding
26.2726 Wiring Devices
26.2816 Enclosed Switches and Circuit Breakers
26.4400 Disconnect Switches
26.5100 Interior Lighting
NORTHAMPTION COMMUNITY COLLEGE
LEARNING COMMONS RENOVATION
TABLE OF CONTENTS 00.0110 - 4
DIVISION 27 – COMMUNICATIONS
27.0790 General Requirements for Telecommunications Work
27.1500 Communications Horizontal Cabling
DIVISION 28 – ELECTRONIC SAFETY AND SECURITY
28.3111 Fire Alarm and Smoke Detection Systems
DIVISION 31 – EARTHWORK
DIVISION 32 – EXTERIOR IMPROVEMENTS
DIVISION 33 – SITE UTILITIES
NORTHAMPTION COMMUNITY COLLEGE
LEARNING COMMONS RENOVATION
LIST OF DRAWINGS 00.0115 - 1
SECTION 00.0115 - LIST OF DRAWINGS
The List of Drawings indicated on the Drawing Cover Sheet G0.00, form a part of this Contract, as set forth in the accompanying Conditions of the Contract for Construction.
ADDITIONAL DIGITAL DATA FILES
Non-editable version of the Building Information Model (BIM) for visualization use only. NOT TO BE USED FOR BIDDING PURPOSES. This model is being provided as an example of the final Coordination BIM digital data files the Architect will furnish to Contractor for use in preparing the coordination BIM as specified in SECTION 013117 –
COORDINATION DRAWINGS.
END OF SECTION 00.0115
NORTHAMPTION COMMUNITY COLLEGE
LEARNING COMMONS RENOVATION
ADVERTISEMENT FOR BIDS 00.1113- 1
SECTION 00.1113 - ADVERTISEMENT FOR BIDS
NORTHAMPTION COMMUNITY COLLEGE will receive sealed bids for the renovation construction of the LEARNING COMMONS - RENOVATION project located at THE MACK LIBRARY, COLLEGE CENTER, 3858 GREEN POND RD., BETHLEHEM, PA 18020. Sealed bids for all Prime Contracts shall be submitted electronically through the PennBid Program until 2:00 P.M. prevailing time on Tuesday, December 15, 2026 at which time bids will be publicly opened and bid results will be available through the PennBid website following the opening. Contract awards will be made by the Owner at a later date.
All Contract Documents will be available electronically in PDF format through PennBid at www.pennbid.net beginning at 9:00 A.M., Monday, November 9, 2026, at no cost. Questions regarding this advertisement can be submitted through PennBid ‘Questions.’ Last day for RFI’s is
Monday, November 30, 2026 by 4:00 pm.
Prospective bidders shall register with PennBid and provide the required company contact information (company name, contact person, complete address, phone numbers, and email address) and identify the Prime Contract(s) for which they intend to bid.
Construction will be bid for the following Prime Contracts:
Contract No. 1: General Construction Contract No. 3: Electrical Construction Contract No. 2: HVAC Construction Contract No. 4: Plumbing Construction
A MANDATORY pre-bid meeting for ALL contracts will be held on Tuesday, November 17, 2026 at
9:00 A.M. prevailing time, at Northampton Community College, College Center – meeting place at College Center, Room 220. The Project site THE MACK LIBRARY, COLLEGE CENTER, 3858 GREEN POND RD., BETHLEHEM, PA 18020 will be available for Bidders, Subcontractors, and Vendor walk-through. Attendance of all Prime Contract Bidders is mandatory.
The Project Architect is Alloy5 Architecture, LLC, 530 West Broad Street, Bethlehem, PA, 18018, Phone: 610-419-4055.
This Project is subject to the Pennsylvania Prevailing Wage Act, Act of August 15, 1961, P.L. 987, No.
442, as amended. Prevailing wage rates established by the Secretary of Labor and Industry shall apply.
All bids shall conform to the requirements of the Contract Documents.
Each bid shall be accompanied by bid security with a corporate surety authorized to do business in Pennsylvania, in accordance with the project specifications in the amount equal to ten percent (10%) of the total bid amount.
NORTHAMPTION COMMUNITY COLLEGE
LEARNING COMMONS RENOVATION
ADVERTISEMENT FOR BIDS 00.1113- 2
A Performance Bond and Payment Bond both in the amount of one hundred percent (100%) of the contract value shall be furnished by the successful bidders as detailed in Contract Documents.
Interested Firms are requested to respond by sealed bid submission satisfying the requirements of this Invitation. Bids shall only be submitted electronically via the Penn Bid Program.
NORTHAMPTON COMMUNITY COLLEGE reserves the right to accept or reject any portion of any bid and waive any informalities or technicalities when deemed to be in the best interest of the College, and to withhold award for a period of up to sixty (60) days.
Mr. William Smith Northampton Community College
Run Days:
Friday, 11/06 Monday, 11/09
NORTHAMPTION COMMUNITY COLLEGE
LEARNING COMMONS RENOVATION
QUALIFICATIONS QUESTIONNAIRE 00.1153 - 1
QUALIFCATIONS QUESTIONNAIRE – 00.1153
Submitted To: NORTHAMPTION COMMUNITY COLLEGE
For consideration with regard to: RENOVATION TO LEARNING COMMONS, 4TH FLOOR
Date: ___________, ________
1. Companies that wish to bid on this Project must submit this Qualification Statement with their bids.
2. Only Companies which are determined to be responsible contractors under applicable law will be designated as qualified bidders.
3. The Instructions to Bidders govern the Owner’s consideration of this completed Qualification Statement and any other requirements that will be considered in making an award.
4. All prospective bidders must complete this form by answering all questions, and supplying all requested documents, using the spaces indicated (with additional pages if necessary) and attaching documents as required and submit the completed form with their bid by the deadline established in the Invitation to Bid.
I. Capability
1. Form of organization (sole proprietorship, partnership, corporation, etc.)
2. Years the organization has been in business as a contractor under its present name.
3. List of all affiliated or subsidiary organizations and companies.
NORTHAMPTION COMMUNITY COLLEGE
LEARNING COMMONS RENOVATION
QUALIFICATIONS QUESTIONNAIRE 00.1153 - 2
4. List of all organizations and individuals who have a financial interest in or a specified percentage in the company.
5. Any other organization or individual who controls bidding or operation of the organization.
6. Identification of all offices.
Main Office: ________________________________________________________________
Additional Locations:
7. The numbers, categories and locations of all employees and officers.
NORTHAMPTION COMMUNITY COLLEGE
LEARNING COMMONS RENOVATION
QUALIFICATIONS QUESTIONNAIRE 00.1153 - 3
8. The officers, administrators, managers and superintendents who will be assigned to the project -identification of qualifications, with specific attention to years in present position, years of construction experience, and magnitude and type of work.
9. Any work the organization has performed for NORTHAMPTION COMMUNITY COLLEGE.
10. Other public work, including specifically similar education projects, that the organization has performed
(up to ten most recent projects). For each, identify the name and address of owner, location of project, nature of contract (prime, sub, etc.), contract amount, change orders, final contract amount, if completed on-time, kind of work, and nature of project.
NORTHAMPTION COMMUNITY COLLEGE
LEARNING COMMONS RENOVATION
QUALIFICATIONS QUESTIONNAIRE 00.1153 - 4
11. Other projects, including specifically similar education projects, involving multiple-prime contracts (up to ten most recent projects). For each, identify the name and address of owner, location of project, nature of contract (prime, sub, etc.), contract amount, change orders, final contract amount, if completed on time, kind of work, and nature of project.
12. Other projects, including specifically similar education projects, for the type of construction that is to be undertaken, performed by the organization at any time. For each, identify the name and address of owner, location of project, nature of contract (prime, sub, etc.), contract amount, kind of work, and nature of project.
13. Projects constructed with Critical Path Method (CPM) or some other form of computerized project scheduling and capabilities that otherwise can be provided. For each, identify the name and address of owner, location of project, nature of contract (prime, sub, etc.), contract amount, kind of work, and nature of project.
NORTHAMPTION COMMUNITY COLLEGE
LEARNING COMMONS RENOVATION
QUALIFICATIONS QUESTIONNAIRE 00.1153 - 5
14. Projects awarded but which the organization failed to complete. Identify dates, name and address of owner, name and location of project and kind of work, and the reasons the project was not completed.
15. Equipment owned that will be utilized on the project by type, size or capacity, years of service, and condition.
16. Leased equipment that will be utilized on the project by type, size or capacity, years of service, and condition.
NORTHAMPTION COMMUNITY COLLEGE
LEARNING COMMONS RENOVATION
QUALIFICATIONS QUESTIONNAIRE 00.1153 - 6
17. Portion of the contract to the nearest ten percent (10%) that the bidder expects to perform using its own labor and equipment.
II. Financial Integrity
1. Attach the most recent audited and CPA certified financial statement, with certification, date of preparation, name and address of preparer (financial information can be treated as confidential in accordance to PennBid procedures).
2. Net working capital (current assets over current liabilities) and date of determination.
3. Identification of credit lines, with information on the total lines, amounts drawn down and amounts remaining.
NORTHAMPTION COMMUNITY COLLEGE
LEARNING COMMONS RENOVATION
QUALIFICATIONS QUESTIONNAIRE 00.1153 - 7
4. Identification of the contractor’s surety for the required performance bond, total bonding capacity and available bonding capacity. Also list bonding company A.M. Best Rating and Financial Rating for compliance with project requirement. The qualifications of the bonding company should be a surety company designated as acceptable surety in Circular 570, as amended by the Audit Staff of the Bureau of Government Financial Operations U.S. Treasury Department.
III. Conduct
1. All felony convictions, all bidding related offenses, and all misdemeanor convictions involving moral turpitude of the organization, its affiliates, its owners holding more than a specified percentage interest (25%), its officers, and its administrators, managers, and superintendents that will be assigned to the project.
2. Debarments, suspensions, and denials of pre-qualification of the organization for any federal, state, local or governmental contracting.
NORTHAMPTION COMMUNITY COLLEGE
LEARNING COMMONS RENOVATION
QUALIFICATIONS QUESTIONNAIRE 00.1153 - 8
3. Construction-related disputes of any kind including lawsuits, arbitrations, mechanics liens, and other claims that the organization has been involved in. Provide a summary of each item.
4. Proceedings of an administrative enforcement nature of whatever kind, including environmental, wage and hour, prevailing wage, employment discrimination, or other kind of proceeding. Provide a summary of each item.
5. List any prevailing wage disputes, investigations or complaints filed against the firm or any officers.
5. Unpaid obligations to local, state, or federal taxing authorities, including but not limited to income, withholding and unemployment taxes.
NORTHAMPTION COMMUNITY COLLEGE
LEARNING COMMONS RENOVATION
QUALIFICATIONS QUESTIONNAIRE 00.1153 - 9
7. Cancellation, termination or rescission of contracts of insurance or suretyship.
8. Provide all other information requested in accordance with Instructions to Bidders or any other information requested by Owner as part of its investigation.
IV. Safety and Training
1. Provide a copy of your Workmen’s Compensation Experience Modification Factor for the past three (3) years.
2. Identify any safety violations, accidents or injuries on any projects over the last five (5) years.
3. Provide a summary and proof of any training or other programs that are available, endorsed or paid by your company and made available to employees.
NORTHAMPTION COMMUNITY COLLEGE
LEARNING COMMONS RENOVATION
QUALIFICATIONS QUESTIONNAIRE 00.1153 - 10
4. Provide a summary of your safety training and compliance programs.
V. Ethics Act
1. The owners of the Firm and their immediate family members, namely, parents, spouse, child, brother or sister are not related by blood or marriage to and have no business relationships with Members of the Board of Directors, President, or Business Administrator of the NORTHAMPTION COMMUNITY COLLEGE except as follows:
If familial or business relationship(s) exist, please identify.
When the Bidder is an individual proprietor:
WITNESS:
__________________________________ _________________________________(SEAL)
Signature of Witness Signature of Proprietor
Print Name of Proprietor
NORTHAMPTION COMMUNITY COLLEGE
LEARNING COMMONS RENOVATION
QUALIFICATIONS QUESTIONNAIRE 00.1153 - 11
When the Bidder is a partnership:
Print Name of Partnership
Address
City, State, Zip Code
Phone Number with Area Code
WITNESS:
__________________________________ _________________________________(SEAL)
Signature of Witness General Partner
When the Bidder is a corporation:
Print Name of Corporation
Address
City, State, Zip Code
NORTHAMPTION COMMUNITY COLLEGE
LEARNING COMMONS RENOVATION
QUALIFICATIONS QUESTIONNAIRE 00.1153 - 12
Phone Number with Area Code
ATTEST:
__________________________________ BY:_______________________________(SEAL)
Secretary/Assistant Secretary/ President/Vice President or Treasurer/Assistant Treasurer or other authorized representative other authorized representative
Print Name of Corporate Representative
(CORPORATE SEAL)
END OF SECTION 00.1153
NORTHAMPTION COMMUNITY COLLEGE
LEARNING COMMONS RENOVATION
AGREEMENT OF SURETY 00.1154 - 1
AGREEMENT OF SURETY
KNOW ALL MEN BY THESE PRESENTS, that we, _____________________________________________ as Surety, a corporation existing under the laws of the State of , and authorized to transact business in the
Commonwealth of Pennsylvania hereby agree intending to be legally bound hereby, to execute and deliver to the
NORTHAMPTION COMMUNITY COLLEGE, within the time limit specified in the Contract Documents, the
Performance Bond and Labor and Material Payment Bond in the forms included in the Contract Documents each in an amount of 100% of the contract amount, in favor of the NORTHAMPTION COMMUNITY COLLEGE, as required for the faithful performance and proper fulfillment of the contract for the Renovation to the Learning Commons, 4th
Floor project for the NORTHAMPTION COMMUNITY COLLEGE as set forth in the Contract Documents on behalf of
_____________________ __________________________________ (hereinafter called the Bidder) provided that the above contract be awarded to the bidder within sixty (60) days after the date of opening of the bids or otherwise as set forth in the Instructions to Bidders.
DATED: _______________, ___________ _______________________________
(CORPORATE SURETY)
ATTEST: ______________________________ BY: ________________________
Secretary President
(CORPORATE SEAL)
END OF SECTION 00.1154
NORTHAMPTION COMMUNITY COLLEGE
LEARNING COMMONS RENOVATION
LETTER OF INSURER 00.1155- 1
LETTER OF INSURER
DATE: _______________________________
TO: Mr. William Smith, Executive Director of Facilities
Northampton Community College 3835 Green Pond Rd.
Bethlehem, PA 18020
Dear Bill Smith:
The undersigned insurance agent, licensed to do business in the Commonwealth of Pennsylvania and authorized to issue this letter on behalf of the following insurance company or companies:
hereby represent that if
(insert name of Bidder) is awarded the contract for the construction of the project, as is described in the Contract for Construction, then the above-named insurance company or companies will issue insurance, naming the NORTHAMPTION COMMUNITY COLLEGE and its Architect as additional insured, for the coverages in the amounts required by the Contract Documents, as set forth in Article 11 of the General Conditions.
(Name of Agent)
By: ____________________________________ (Authorized Representative)
END OF SECTION 00.1155
NORTHAMPTION COMMUNITY COLLEGE
LEARNING COMMONS RENOVATION
INSTRUCTIONS TO BIDDERS 00.2113 - 1
SECTION 00.2113 – INSTRUCTIONS TO BIDDERS
1. DEFINED TERMS
Terms used in these Instructions to Bidders, which are defined in the Standard General Conditions of the Construction Contract, have the meanings assigned to them in the General Conditions. The term "Bidder" means one who submits a Bid directly to Owner, as distinct from a sub-bidder, who submits a bid to a Bidder. The term "Successful Bidder" means the lowest, qualified, responsible and responsive Bidder to whom Owner (on the basis of Owner's evaluation as hereinafter provided) makes an award. The term "Bidding Document" includes the Advertisement or Invitation to Bid, Instructions to Bidders, the Bid Form, and the Contract Documents (including all Addenda issued prior to receipt of Bids). The numbering system refers to Articles.
2. COPIES OF BIDDING DOCUMENTS
2.1 Complete sets of .pdf documents will be made available on PennBid for free.
2.2 Complete sets of Bidding Documents must be used in preparing Bids; neither Owner nor Architect assumes any responsibility for errors or misinterpretations resulting from the use of incomplete sets of Bidding Documents. Bid Documents consist of Contract Documents (and all reference standards), specifications, addenda and drawings. Bidder is responsible to make sure that the set of Bidding Documents is complete and that any printed contract document is legible and represents properly all the information as represented in the PDF file.
2.3 Owner and Architect, in making copies of the Bidding Documents available on the above terms, do so only for the purpose of obtaining Bids on the Work and do not confer a license or grant for any other use.
3. QUALIFICATIONS OF BIDDERS
3.1 The following information must be completed and submitted with the appropriate bid form.
3.1.1 The qualification questionnaire found in Section 00.1153. Use additional pages to complete any of the sections if more space is needed.
3.1.2 The Agreement of Surety found in Section 00.1154.
3.1.3 The Letter of Insurer found in Section 00.1155.
3.1.4 Executed Non-Collusion Affidavit found in Section 00.4519.
3.1.5 Executed Bid Bond found in Section 00.4300.
3.2 To demonstrate qualifications to perform the Work, each Bidder must be prepared to submit qualifications submitted with bid to include evidence such as financial data, insurance
NORTHAMPTION COMMUNITY COLLEGE
LEARNING COMMONS RENOVATION
INSTRUCTIONS TO BIDDERS 00.2113 - 2
certificates, previous experience of the Bidder and its assigned personnel, present commitments and any other information that may be requested by the Owner. Each Bid must contain evidence of Bidder's qualification to do business in the state where the Project is located, or covenant to obtain such qualification prior to award of the Contract. Owner reserves the right to reject Bidder if he cannot satisfy all of the Qualification Requirements, including those listed in the Technical Specifications.
3.3 In determining the lowest responsible Bidder, the Owner will consider the Bidder’s integrity, efficiency, experience of the Bidder and its assigned personnel, promptness, current work load, financial capability, performance on recent projects, references from Owners, Architects and Engineers, potential list of sub-contractors, schedule of values, and ability to successfully and timely complete the Project. The Owner will scrutinize the apparent low Bidder’s information for full disclosure before intent to award is issued. The apparent low Bidder must demonstrate competency and provide any or all of the above information requested within five (5) days of request. Owner reserves the right to reject Bid if all the information is not received on time and/or does not satisfy the Owner’s evaluation process.
3.4 In addition to all the requirements specified in Articles 3.1, 3.2 and 3.3 regarding qualifications of Bidders, the Owner will evaluate bidders using the following additional criteria:
3.4.1 The Bidder and its assigned personnel, must have successfully performed a minimum of 3 previous public projects within the last 5 years of similar type or a contract value of at least seventy percent (70%) of the amount of the bidder’s base bid. Provide references including telephone number and contact person.
3.4.2 The Bidder shall perform not less than ten percent (10%) of the actual construction Work with staff employed directly by the company. Project management shall NOT be included in this percentage.
3.4.3 The Bidder, or its assigned personnel, must have successfully performed at least 3 public education projects within the last 5 years where they have managed multiple trades and coordinated and scheduled all the activities for projects as per 3.4.1. Provide references including telephone number and contact person.
3.4.4 An agreement of Surety certifying that the Surety Company is committed to provide the bidder with a Performance Bond and Payment Bond each in the amount of one hundred percent (100%) of the contract amount. The Surety Company must have an AM Best rating of A- or better and a financial rating of Class X or higher.
3.4.5 The Bidder’s performance on previous projects including claims, litigation, coordination of work, staffing and timely completion. If it is determined that the bidder does not have a good track record on previous projects, the Owner reserves the right to reject the bid.
NORTHAMPTION COMMUNITY COLLEGE
LEARNING COMMONS RENOVATION
INSTRUCTIONS TO BIDDERS 00.2113 - 3
3.4.6 The Bidder shall also refer to Articles 11 and 16.
4. EXAMINATION OF CONTRACT DOCUMENTS AND SITE
4.1 It is the responsibility of each Bidder, before submitting a Bid, to:
(1) Examine the Contract Documents thoroughly.
(2) Visit the site to become familiar with local conditions that may affect the cost, progress, performance, or furnishing the Work.
(3) Consider federal, state, and local laws and regulations that may affect cost, progress, performance, or furnishing of the Work.
(4) Study and carefully correlate Bidder's observations with the Contract Documents.
(5) Notify Architect of any conflicts, errors, or discrepancies discovered in the Contract
Documents.
4.1.1 REVIEW OF DRAWINGS AND SPECIFICATIONS
A. Bidders shall thoroughly examine and be familiar with the Specifications and Drawings.
The failure or omission of any Bidder to receive or examine any form, instrument, document, or visit the site and acquaint himself with conditions there existing, shall in no way relieve any Bidder from obligation with respect to his Bid. By submitting a Bid, the Bidder agrees and warrants that he has examined the site and the Specifications and Drawings and, where Specifications and/or Drawings require in any part of the Work a given result to be produced, that the Specifications and Drawings are adequate and the required result can be produced under the Specifications and Drawings. No claim for any extra will be allowed because of alleged impossibilities in the production of the results specified or because of inadequate or improper plans and specifications and whenever a result is required, the successful Bidder shall furnish any and all extras and make any changes needed to produce the required result for the sum stated in the form of proposal.
B. Should any Bidder find discrepancies, duplications or omissions in the documents or have doubt as to the meaning expressed by the Contract Documents, he shall make inquiry at once in writing to the Architect. Where changes, corrections or clarifications to Contract Documents are deemed necessary by the Architect, he will issue written Addenda accordingly. Addenda shall be a part of the Contract Documents. No oral, telephone or letter instructions will be considered as having effect upon the Contract Documents; Addenda only shall constitute change to them. Bidders and Sub-bidders are urged to make early examination of Contract Documents and make inquiries about them if necessary, even though prices may not be determined until late in the bidding period.
4.2 The site will be available for visits at the pre-bid conference and at the other specific designated dates and times determined at the pre-bid.
NORTHAMPTION COMMUNITY COLLEGE
LEARNING COMMONS RENOVATION
INSTRUCTIONS TO BIDDERS 00.2113 - 4
4.3 Information and data reflected in the Contract Documents with respect to Underground Facilities at or contiguous to the site is based upon information and data furnished to Owner and Architect by owners of such Underground Facilities or others, and Owner and Architect do not assume responsibility for the accuracy or completeness thereof. Contractor shall verify the location of all underground utilities prior to any excavation.
4.4 General Contractor is responsible, on behalf of the Owner, for providing the physical markings of all existing utilities including those on site as indicated on the drawings or that may be identified in the field. The locations shown on the drawings are approximate. The Bidder must include in his proposal the cost for hand-dug test holes, or other means, to ascertain the precise position of such underground facilities on the site owned by the Owner. This verification should be performed for any utilities to be relocated, removed, modified or that may otherwise interfere with planned work. The utilities in the public right of way will be identified and marked by the appropriate facility owner as per the requirements of the PA One Call Act as amended. Physical layout is to be performed in full compliance with the PA One Call PA Act 287 of 1974 as amended by Act 18 of 1996.
4.5 The Owner and Architect will not be responsible for the adequacy of data furnished to prospective Bidders on subsurface conditions, Underground Facilities and other physical conditions. This information is provided based on information available. Bidder assumes responsibility for verifications, adjustments and modifications that may be required since this is generally recognized as inherent to the work of the Contract Documents.
4.6 Before submitting a Bid, each Bidder will, at Bidder's expense, make or obtain any additional examinations, investigations, explorations, tests and studies and obtain any additional information and data which pertain to the physical conditions (surface, subsurface and Underground Facilities) at or contiguous to the site or otherwise which may affect cost, progress, performance or furnishing the Work and which Bidder deems necessary to determine its Bid for performing and furnishing the Work in accordance with the time, price and other terms and conditions of the Contract Documents.
4.7 On request in advance, Owner will provide each Bidder access to the site to conduct such explorations and tests, as each Bidder deems necessary for submission of a Bid. Bidder shall fill all holes, clean up and restore the site to its former condition upon completion of such explorations.
4.8 The lands upon which the Work is to be performed, rights-of-way and easements for access thereto and other lands designated for use by the Bidder in performing the Work are identified in the Contract Documents. All additional lands and access thereto required for temporary construction facilities or storage of materials and equipment are to be provided by Bidder.
Easements for permanent structures or permanent changes in existing structures are to be obtained and paid for by Owner unless otherwise provided in the Contract Documents.
4.9 The submission of a Bid will constitute an incontrovertible representation by Bidder that Bidder has complied with every requirement of the bid documents and, that without exception, the Bid is premised upon performing and furnishing the Work required by the Contract Documents and
NORTHAMPTION COMMUNITY COLLEGE
LEARNING COMMONS RENOVATION
INSTRUCTIONS TO BIDDERS 00.2113 - 5
such means, methods, techniques, sequences or procedures of construction as may be indicated in or required by the Contract Documents, and that the Contract Documents are sufficient in scope and detail to indicate and convey understanding of all terms and conditions for performance and furnishing of the Work.
5. INTERPRETATIONS AND ADDENDA
5.1 All questions about the meaning or intent of the Contract Documents are to be directed as listed below. Interpretations or clarifications considered necessary by the Architect in response to such questions will be issued through PennBid. PennBid will provide notifications of the presence of new addenda to any registered potential bidders. Questions received after RFI cut-off date (to be specified in addendum) may not be answered.
5.2 Only questions answered by formal written Addenda will be binding. Oral or other interpretations or clarifications will be without legal effect.
Addenda may also be issued to modify the Bidding Documents as deemed advisable by Owner or Architect.
5.3 All questions must be submitted in writing through PennBid. Phone calls are not permitted.
6. BID SECURITY
6.1 A proposal shall be rejected unless accompanied by a Bid Security in the amount of ten percent (10%) of the total of the Base Bid and all possible add alternates. Bid Security shall be in the form of a certified check or bank cashier’s check payable to Owner or a Bid Bond in the form set forth herein, naming as obligee, the Owner.
6.2 The Owner may declare the Bid Security forfeited to the Owner if, following such issuance of a Notice of Intent to Award to the apparent lowest responsible Bidder, such Bidder fails to deliver the items required for complete evaluation and for contract execution required by the Bid Documents and within the time required by the Bid Documents.
6.3 If Bid Security is submitted in the form of a Bid Bond, the Bid Bond shall be submitted on the form referenced in the Bidding Documents, and the Attorney-in-Fact who executes the bond on behalf of the surety shall affix to the bond a certified and current copy of its Power of Attorney, authorizing said Attorney-in-Fact to act on behalf of the surety. The Power of Attorney must be dated the same date as the Bid Bond and both the Bid Bond and Power of Attorney shall have affixed the raised corporate seal of the surety. The Bid Bond form must be executed by a surety licensed and authorized to conduct business as a surety within the Commonwealth of Pennsylvania, have an AM Best rating of ‘A-’ or higher and a financial rating of Class X or higher and shall be named in the current list of companies holding Certificates of Authority as acceptable sureties on federal bonds and/or as acceptable reinsuring companies as published in Circular 570 (as amended) by the Audit Staff, Bureau of Government Financial Operations, U.S. Treasury Department, and the amount of the bond shall not exceed the underwriting risk of
NORTHAMPTION COMMUNITY COLLEGE
LEARNING COMMONS RENOVATION
INSTRUCTIONS TO BIDDERS 00.2113 - 6
such surety set forth in said circular of revisions thereof. Any bond must be acceptable to Owner.
6.4 The Bid Security of Bidders will be returned (unless forfeited as stated above) at the Bidder’s request, upon (1) the execution of the Agreement Between Owner and Contractor by Owner, or
(2) the rejection of all bids by Owner, or (3) the expiration of the firm bid period set forth in Section 12 of these Instructions to Bidder. The Owner shall not be liable for any interest on bid security which is held in accordance with these Bidding Instructions.
7. NON-COLLUSION AFFIDAVIT
More than one proposal for the contract from an individual, partnership, corporation, or an association under the same or different name will be grounds for the rejection of all proposals in which such Bidder is interested. Any or all proposals will be rejected if there is reason for believing that collusion exists among any of the Bidders. Participants in such collusion will not be considered in future proposals. A Non- Collusion Affidavit shall be executed and submitted with the Bidder’s proposal using the form set forth herein.
8. CONTRACT TIME
The Bidder acknowledges that a condition of the Contract is that time is of the essence of the Contract and the number of calendar days within which, or the dates by which, the Work is to be substantially completed and completed and ready for final payment (the Contract Time) are set forth in the Contract Documents and are accepted by the Bidder without exception or conditions.
9. LIQUIDATED DAMAGES
Provisions for liquidated damages are set forth in the Contract Documents.
10. SUBSTITUTE OR “OR-EQUAL” ITEMS
The various materials and products specified in the specifications by name or description are given to establish a minimum acceptable standard of quality and of cost for bid purposes. When proprietary names are used, and there does not follow a “listing” of acceptable approved manufacturers and/or products, then the proprietary named item must be included in the bid proposal without substitution.
When proprietary names are used, and there follows a “listing” of acceptable “approved” manufacturers and/or products, then the bidder may base the bid on either the proprietary product or any from the “listing”. Bidders may request approval prior to bid opening of non-listed items in accordance with the specifications. When proprietary names are used, and there are alternates on the bid form, then the bidder shall base his bid on the proprietary product or any from the “listing” of approved manufacturers and/or products. The bidder must furnish the specified or listed item regardless of whether or not they were included in his bid. The bidder shall be required to coordinate and pay for any conditions which are required to accommodate the listed or alternate item, including the reimbursement of other affected prime contractors.
NORTHAMPTION COMMUNITY COLLEGE
LEARNING COMMONS RENOVATION
INSTRUCTIONS TO BIDDERS 00.2113 - 7
No substitutions (alternatives) will be considered prior to receipt of Bids unless written request for approval has been received by the Architect only from prime Contract Bidders at least ten days prior to the date for receipt of Bids. Such requests shall be in accordance with substitution request procedure, and any other requirements at the Architect or Owner’s discretion.
In order to prequalify, all alternative Manufacturers’ information should be submitted by a prime contract bidder and should include:
• Technical, warranty, and Manufacturer's data specified. A line-by-line comparison of all specified items in the Specification must be made. Submission must be made ten (10) days prior to Bid opening.
• Architect will review submission and any acceptable substitutions will be listed in an addendum.
All manufacturers not specifically approved by addendum shall not be considered.
• Only manufacturers that are qualified prior to the Bid Opening will be considered acceptable Manufacturers.
10.1 The approval of a substitution shall be at the sole determination of the Architect and upon approval of the Owner, if a proposed substitution (alternative) is approved prior to receipt of Bids, such approval will be set forth in an addendum. Bidders shall not rely upon approvals in any other manner. If a proposed substitution is not specifically approved by addendum they are rejected.
10.2 No substitutions (alternatives) will otherwise be considered after the Contract award.
10.3 No substitutions (alternatives) will be considered for pre-bid approval later than ten (10) days before bids are due.
11. SUBCONTRACTORS, SUPPPLIERS, AND OTHERS
11.1 All subcontractors proposed for the project shall have been in business for a minimum of five (5) years and must have a successful record of completing, at a minimum, five (5) projects of similar size and cost. Subcontractors must also have business insurance, workmen’s compensation, adequate resources of man power, tools and equipment and must be defined as an independent contractor by the IRS.
11.2 At the Owner’s request the identity of certain Subcontractors, Suppliers and other persons or organizations (including those who are to furnish the principal items of material and equipment) is to be submitted to Owner in advance by the apparent Successful Bidder, and any other Bidder so requested. Within five (5) days after the Bid Opening, submit to Owner a list of all such Subcontractors, Suppliers and other such persons or organizations proposed for those portions of the Work for which such identification is required. An experience statement shall accompany such list with pertinent information regarding similar projects and other evidence of qualification for each such Subcontractor, Supplier, person or organization if requested by Owner. If Owner
NORTHAMPTION COMMUNITY COLLEGE
LEARNING COMMONS RENOVATION
INSTRUCTIONS TO BIDDERS 00.2113 - 8
and Construction Manager, after due investigation, have reasonable objections to any proposed Subcontractor, Supplier, and other person or organization, then Owner may, before the Notice of Award is given, request the apparent Successful Bidder to submit an acceptable substitute without an increase in Bid Price.
11.3 If apparent Successful Bidder declines to make any such substitution, Owner may award the Contract to the next lowest Bidder that proposed to use acceptable Subcontractors, Suppliers, and other persons and organizations. Declining to make requested substitutions will not constitute grounds for sacrificing the Bid Security of any Bidder.
12. BID FORM
12.1 THE BID FORM SHALL NOT BE ALTERED. ALTERED BID FORMS MAY BE CONSIDERED NON-
RESPONSIVE AND MAY BE REJECTED.
12.2 The Bid Form is included with the Bidding Documents; NO additional copies will be provided.
12.3 All the blanks of the Bid Form must be completed in ink or by type.
12.4 Bids by corporations must be executed in the corporate name by the president or a vice-president (or other corporate officer accompanied by the evidence of authority to sign) and the corporate seal must be affixed and attested by the secretary or an assistant secretary. The corporate address and state of incorporation must be shown below the signature.
12.5 Bids by partnership must be executed in the partnership name and signed by a partner, whose title must appear under the signature, and the official address of the partnership must be shown below the signature.
12.6 All names must be typed or printed below the signature.
12.7 The Bid shall contain an acknowledgement of receipt of all Addenda (the numbers of which must be filled in on the Bid Form). Properly issued Addenda shall be binding upon all Bidders, regardless of whether a Bidder fails to acknowledge receipt.
12.8 The address and telephone number for communications regarding the Bid must be shown.
12.9 If there is a discrepancy between the written words and numerical figures written on the bid form, the written words shall prevail.
NORTHAMPTION COMMUNITY COLLEGE
LEARNING COMMONS RENOVATION
INSTRUCTIONS TO BIDDERS 00.2113 - 9
13. SUBMISSION OF BIDS
Bids shall be submitted at the time and place indicated in the Advertisement or Invitation to Bid via PennBid and shall be in accordance with the requirements of PennBid. If the Bid is delivered in any hard copy format to the owner, the bid will be invalid.
14. MODIFICATIONS AND WITHDRAWAL OF BIDS
14.1 Bids shall be irrevocable for sixty (60) days after the actual day of opening thereofunless delayed by the required approval of another governmental agency, the sale of bonds or the award of a grant, in which case, Bids shall be irrevocable for 120 days after Bid opening. Extensions of the date for the award of contract may be made by the mutual written consent of Owner and the lowest responsible and responsive Bidder.
14.2 Neither the designation of the apparent lowest responsible Bidder, nor the issuance of a Notice of Intent to Award to the Bidder so designated shall operate to release any other Bidder from its Bid. Each such other Bidder, unless earlier released from its Bid by specific action of the Owner, shall remain bound by its Bid until the earlier of (1) the date of actual execution by Owner of the Agreement Between Owner and Contractor with the Bidder whom the Award of Contract has been made, or (2) the expiration of the firm Bid period stipulated above.
14.3 Negligence by the Bidder in preparing his proposal confers no right of withdrawal or modification of his proposal after such proposal has been opened. No claims on account of mistakes or omissions of any proposal will be considered. Notwithstanding the above, a Bidder may withdraw his proposal within two (2) business days after the Bid opening time in accordance with the Public Contracts – Withdrawal of Bids Law, Act of January 23, 1974, P.L. 9, No. 4, 73 P.S. §1601 et seq., as amended. A Bid which has been opened may be withdrawn only in accordance with the causes set forth in said Act and for no other reasons. Strict compliance with said Act is required to withdraw a Bid after opening.
15. OPENING OF BIDS
Bids will be opened and (unless obviously non-responsive) read aloud publicly. An abstract of the amounts of the Base Bids and major alternate(s) (if any) will be made available to Bidders after the opening of the Bids.
16. AWARD OF CONTRACT
16.1 The Owner’s intent is to enter into Contracts with the lowest responsible and qualified Bidders.
Bid forms shall NOT BE ALTERED IN ANY MANNER. Owner reserves the right to reject any and all bids, to waive all informalities or technicalities and to negotiate contract terms with the Successful Bidder, and the right to disregard all nonconforming, non-responsive, unbalanced or conditional bids. Also, Owner reserves the right to reject the Bid of any Bidder if Owner believes that it would not be in the best interest of the Project to make an award to that Bidder, whether
NORTHAMPTION COMMUNITY COLLEGE
LEARNING COMMONS RENOVATION
INSTRUCTIONS TO BIDDERS 00.2113 - 10
because the Bid is not responsive or the Bidder is unqualified or of doubtful financial ability or fails to meet any other pertinent standard or criteria established by Owner. Discrepancies in the multiplication of units of Work and unit prices will be resolved in favor of the correct sum.
16.2 In evaluating Bids, Owner will consider the qualifications of such Bidders (see Article 3), whether or not the Bids comply with the prescribed requirements, and such alternates, unit prices and other data, as may be requested in the Bid Form or prior to the Notice of Award.
16.3 Owner may consider the qualifications and experience of Subcontractors, Suppliers, and other persons or organizations proposed for any portions of the Work requested by Owner. Owner also may consider the operating costs, maintenance requirements, performance data and guarantees of major items of materials and equipment proposed for incorporation in the Work when such data is required to be submitted prior to the Notice of Award.
16.4 Owner may conduct such investigations as Owner deems necessary to assist in the evaluation of any Bid and to establish the responsibility, qualification and financial ability of Bidders, Subcontractors, Suppliers, and other persons or organizations to perform and furnish the Work in accordance with the Contract Documents to Owner's satisfaction within the prescribed time.
16.5 If the Contract is to be awarded, Owner will give the Successful Bidder a Notice of Intent to Award within sixty (60) days after the day of Bid Opening unless delayed by the required approval of another governmental agency.
16.6 The Owner reserves the right to waive non-material defects in any bid if it determines that it is in its best interest to do so. The Owner reserves the right to reject all bids.
17. CONTRACT SECURITY & INSURANCE
The General Conditions and the Supplementary Conditions set forth Owner's requirements as to Performance, Payment Bonds and Insurance requirements.
17.1 The apparent low bidder must provide Payment and Performance Bonds in the form included in the Contract Documents within 10 days of the issuance of Notice of Intent to Award. Other bond forms will not be accepted. Failure of the apparent low bidder to provide original executed Payment and Performance Bonds in the required form within the required time will result in forfeiture of the Bid Security.
18. SIGNING OF AGREEMENT
When Owner issues Intent to Award to the Successful Bidder, the Bidder shall within ten (10)days thereafter, deliver to the Owner, four (4) original copies of the required Bonds and Insurance Certificates.
Within ten (10) days thereafter, the Architect will deliver four (4) agreements to Bidder. The Bidder shall sign the agreements and return all original documents to the Architect .The Architect will forward the agreements to the Owner for signature. The Owner will return one (1) signed agreement to the Bidder and Architect.
NORTHAMPTION COMMUNITY COLLEGE
LEARNING COMMONS RENOVATION
INSTRUCTIONS TO BIDDERS 00.2113 - 11
19. RETAINAGE
Retainage will be in accordance with the Contract Documents.
20. PREVAILING WAGES
Pennsylvania Prevailing Wage Predetermination rates will apply to this Project. The Bidder shall keep an accurate record showing the name, craft and actual hourly rate of wage paid to each workman employed by him and such record shall be preserved for two years from date of payment.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .