About this file
This is a permit plan file for the S. Flowers Mill Road Bridge Clearance Improvements project in Pennsylvania, prepared by PennDOT. The project involves the installation of advanced low clearance signage, lane separator curbs, and two Flashing Warning Devices with associated mast arms, signal indications, signage, conduit, and pavement markings to address clearance issues at the bridge location. The plan document indicates revisions made as of June 23, 2026, including the addition of W12-2 components to the mast arm shaft. The work requires furnishing all materials, equipment, labor, and supervision necessary to complete the improvements shown on the contract drawings, along with maintenance and protection of traffic measures and all appurtenant work materials.
Successful contractors must comply with the Pennsylvania Department of Labor and Industry Prevailing Minimum Wage Determination and maintain pre-qualification status with PennDOT in accordance with section 102.01 of PennDOT Publication 408. The permit plan file does not specify pricing terms, set-asides, funding amounts, response dates, or award information; these details would be contained in separate contract documents and bid solicitations associated with this project.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
P
P 9'-9" LOW CLEARENCE36"X36"W12-2
ADDED W12-2 TO MAST ARM SHAFT PAI 6/23/26
ADDED W12-2 TO MAST ARM SHAFT PAI 6/23/26