These are construction documents for the Allen Hall Structural Retaining Wall project at Commonwealth University of Pennsylvania's Mansfield Campus, located in Tioga County, Pennsylvania. The project is commissioned under Contract No. S.S.H.E. 82 - CWU - 48-M, with construction documents dated September 25, 2025. The documents, prepared by Greenman-Pedersen, Inc., detail a comprehensive structural retaining wall project for Wilson Avenue, including existing conditions, layout plans, grading, erosion and sediment control, and various construction details.
The documents include multiple alternative design scenarios, with detailed technical specifications for Magnumstone retaining wall systems, including standard units, half-height units, corner/end units, and block extenders. The plans show intricate wall profiles, embankment configurations, and technical construction details such as drainage systems, soil stabilization, and railing connections. The project appears to involve significant site grading, utility management, and landscape modifications, with careful consideration given to erosion control, soil retention, and integrated infrastructure solutions. The design demonstrates a sophisticated approach to managing topographical challenges while providing a robust structural solution for the campus environment.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DBA
COVER SHEET
CS
REVISIONS
NO. REVISION DATE
DRAWN/DESIGN BY CHECKED BY
PREPARED FOR
SCALE:
MJC
SCR-2402090
C W
U -4
8- M
: A
LL
EN
H
A
LL
S
TR
U C
TU
R
A L
R
ET
A
IN
IN
G
W A
LL
W
IL
SO
N A
VE
N
U E
M A
N
SF
IE
LD
TI
O
G A
C O
U N
TY
, P
A
SEPTEMBER 25, 2025
COMMONWEALTH UNIVERSITY
OF PENNSYLVANIA
400 EAST SECOND STREET
BLOOMSBURG, PA 17815
Construction Management
Engineering Design Planning
52 Glenmaura National Blvd.
Suite 302, P.O. Box 5777 Scranton, PA 18505
Greenman-Pedersen, Inc.
GPINET.COM570.342.3700
AS NOTED
C O
N
ST
R U
C
TI
O N
D O
C U
M
EN
TS
LOCATION MAP
N
STATE SYSTEM OF HIGHER EDUCATION
COMMONWEALTH OF PENNSYLVANIA
MANSFIELD CAMPUS
TIOGA COUNTY, PENNSYLVANIA
PROJECT/CONTRACT NO.: S.S.H.E. 82 - CWU - 48- M
ALLEN HALL STRUCTURAL RETAINING WALL
CONSTRUCTION DOCUMENTS - SEPTEMBER 25, 2025
SHEET # SHEET NAME
SHEET INDEX
COVER SHEETCS
PRE-FINAL
DOCUMENTS
JOSHUA SHAPIRO, GOVERNOR
DR. CHRISTOPHER FIORENTINO, CHANCELLOR
DR. JEFFERY OSGOOD, PRESIDENT
L&I
SUBMISSION
CONSTRUCTION
SUBMISSION
PROJECT
LOCATION
AS-BUILT
SUBMISSION
PROJECT SITE
GENERAL NOTESC-001
EXISTING CONDITIONS AND DEMOLITION PLANC-101
LAYOUT PLANC-201
GRADING, EROSION AND SEDIMENT CONTROL PLANC-301
EROSION AND SEDIMENT CONTROL NOTESC-501
EROSION AND SEDIMENT CONTROL NOTES AND DETAILSC-502
CONSTRUCTION DETAILSC-601
EMBANKMENT PROFILESC-701
C-702
ALTERNATE EXISTING CONDITIONS AND DEMOLITION PLANC-801
ALTERNATE LAYOUT PLANC-802
ALTERNATE GRADING, EROSION AND SEDIMENT CONTROL PLANC-803
ALTERNATE WALL PROFILESC-901
C-902 C-903 C-904
EMBANKMENT PROFILES
ALTERNATE CONSTRUCTION DETAILS
MAINTENANCE AND PROTECTION OF TRAFFIC PLAN, NOTES & DETAILSC-202
ALTERNATE CONSTRUCTION DETAILS
ALTERNATE CONSTRUCTION DETAILS
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text C
AutoCAD SHX Text W
AutoCAD SHX Text O
AutoCAD SHX Text N
AutoCAD SHX Text M
AutoCAD SHX Text M
AutoCAD SHX Text L
AutoCAD SHX Text A
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text N
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text N
AutoCAD SHX Text Y
AutoCAD SHX Text L
AutoCAD SHX Text A
AutoCAD SHX Text V
AutoCAD SHX Text F
AutoCAD SHX Text H
AutoCAD SHX Text O
AutoCAD SHX Text A
AutoCAD SHX Text I
AutoCAD SHX Text N
AutoCAD SHX Text
REGISTERED
AutoCAD SHX Text
PROFESSIONAL
AutoCAD SHX Text
ENGINEER
AutoCAD SHX Text
PE078670
AutoCAD SHX Text
MATTHEW JOHN CHORBA
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
SCALE IN FEET
AutoCAD SHX Text
PROJECT LOCATION
AutoCAD SHX Text
PORTION OF MANSFIELD U.S.G.S. TOPO. QUAD SCALE: 1" = 2,000'
AutoCAD SHX Text N
DBA
COVER SHEET
C-001
REVISIONS
NO. REVISION DATE
DRAWN/DESIGN BY CHECKED BY
PREPARED FOR
SCALE:
MJC
SCR-2402090
C W
U -4
8- M
: A
LL
EN
H
A
LL
S
TR
U C
TU
R
A L
R
ET
A
IN
IN
G
W A
LL
W
IL
SO
N A
VE
N
U E
M A
N
SF
IE
LD
TI
O
G A
C O
U N
TY
, P
A
SEPTEMBER 25, 2025
COMMONWEALTH UNIVERSITY
OF PENNSYLVANIA
400 EAST SECOND STREET
BLOOMSBURG, PA 17815
Construction Management
Engineering Design Planning
52 Glenmaura National Blvd.
Suite 302, P.O. Box 5777 Scranton, PA 18505
Greenman-Pedersen, Inc.
GPINET.COM570.342.3700
AS NOTED
C O
N
ST
R U
C
TI
O N
D O
C U
M
EN
TS
1-800-242-1776
SYSTEM, INC.
POCS SERIAL NUMBER
CALL BEFORE YOU DIG!
PENNSYLVANIA LAW REQUIRES
3 WORKING DAYS NOTICE FOR
CONSTRUCTION PHASE AND 10 WORKING
DAYS IN DESIGN STAGE - STOP CALL
20242400925
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text C
AutoCAD SHX Text W
AutoCAD SHX Text O
AutoCAD SHX Text N
AutoCAD SHX Text M
AutoCAD SHX Text M
AutoCAD SHX Text L
AutoCAD SHX Text A
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text N
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text N
AutoCAD SHX Text Y
AutoCAD SHX Text L
AutoCAD SHX Text A
AutoCAD SHX Text V
AutoCAD SHX Text F
AutoCAD SHX Text H
AutoCAD SHX Text O
AutoCAD SHX Text A
AutoCAD SHX Text I
AutoCAD SHX Text N
AutoCAD SHX Text
REGISTERED
AutoCAD SHX Text
PROFESSIONAL
AutoCAD SHX Text
ENGINEER
AutoCAD SHX Text
PE078670
AutoCAD SHX Text
MATTHEW JOHN CHORBA
AutoCAD SHX Text
4. EXISTING TOPSOIL SHALL NOT BE REMOVED FROM THE PROJECT SITE. EXISTING TOPSOIL SHALL NOT BE REMOVED FROM THE PROJECT SITE. 5. SOILS DATA AND SOIL BOUNDARIES SHOWN HEREON WERE TAKEN FROM THE NCRS WEB SOIL SOILS DATA AND SOIL BOUNDARIES SHOWN HEREON WERE TAKEN FROM THE NCRS WEB SOIL DATA AND SOIL BOUNDARIES SHOWN HEREON WERE TAKEN FROM THE NCRS WEB SOIL DATA AND SOIL BOUNDARIES SHOWN HEREON WERE TAKEN FROM THE NCRS WEB SOIL AND SOIL BOUNDARIES SHOWN HEREON WERE TAKEN FROM THE NCRS WEB SOIL AND SOIL BOUNDARIES SHOWN HEREON WERE TAKEN FROM THE NCRS WEB SOIL SOIL BOUNDARIES SHOWN HEREON WERE TAKEN FROM THE NCRS WEB SOIL SOIL BOUNDARIES SHOWN HEREON WERE TAKEN FROM THE NCRS WEB SOIL BOUNDARIES SHOWN HEREON WERE TAKEN FROM THE NCRS WEB SOIL BOUNDARIES SHOWN HEREON WERE TAKEN FROM THE NCRS WEB SOIL SHOWN HEREON WERE TAKEN FROM THE NCRS WEB SOIL SHOWN HEREON WERE TAKEN FROM THE NCRS WEB SOIL HEREON WERE TAKEN FROM THE NCRS WEB SOIL HEREON WERE TAKEN FROM THE NCRS WEB SOIL WERE TAKEN FROM THE NCRS WEB SOIL WERE TAKEN FROM THE NCRS WEB SOIL TAKEN FROM THE NCRS WEB SOIL TAKEN FROM THE NCRS WEB SOIL FROM THE NCRS WEB SOIL FROM THE NCRS WEB SOIL THE NCRS WEB SOIL THE NCRS WEB SOIL NCRS WEB SOIL NCRS WEB SOIL WEB SOIL WEB SOIL SOIL SOIL SURVEY. 6. EXISTING SITE FEATURES, BOUNDARY, AND TOPOGRAPHIC INFORMATION SHOWN HEREON ARE EXISTING SITE FEATURES, BOUNDARY, AND TOPOGRAPHIC INFORMATION SHOWN HEREON ARE SITE FEATURES, BOUNDARY, AND TOPOGRAPHIC INFORMATION SHOWN HEREON ARE SITE FEATURES, BOUNDARY, AND TOPOGRAPHIC INFORMATION SHOWN HEREON ARE FEATURES, BOUNDARY, AND TOPOGRAPHIC INFORMATION SHOWN HEREON ARE FEATURES, BOUNDARY, AND TOPOGRAPHIC INFORMATION SHOWN HEREON ARE BOUNDARY, AND TOPOGRAPHIC INFORMATION SHOWN HEREON ARE BOUNDARY, AND TOPOGRAPHIC INFORMATION SHOWN HEREON ARE AND TOPOGRAPHIC INFORMATION SHOWN HEREON ARE AND TOPOGRAPHIC INFORMATION SHOWN HEREON ARE TOPOGRAPHIC INFORMATION SHOWN HEREON ARE TOPOGRAPHIC INFORMATION SHOWN HEREON ARE INFORMATION SHOWN HEREON ARE INFORMATION SHOWN HEREON ARE SHOWN HEREON ARE SHOWN HEREON ARE HEREON ARE HEREON ARE ARE ARE BASED ON FIELD SURVEY PERFORMED ON AUGUST 2, 2024, BY GREENMAN-PEDERSEN, INC. 2, 2024, BY GREENMAN-PEDERSEN, INC. 2, 2024, BY GREENMAN-PEDERSEN, INC. 7. THERE ARE NO EXISTING WETLANDS WITHIN THE PROJECT AREA BASED ON FIELD INVESTIGATION THERE ARE NO EXISTING WETLANDS WITHIN THE PROJECT AREA BASED ON FIELD INVESTIGATION ARE NO EXISTING WETLANDS WITHIN THE PROJECT AREA BASED ON FIELD INVESTIGATION ARE NO EXISTING WETLANDS WITHIN THE PROJECT AREA BASED ON FIELD INVESTIGATION NO EXISTING WETLANDS WITHIN THE PROJECT AREA BASED ON FIELD INVESTIGATION NO EXISTING WETLANDS WITHIN THE PROJECT AREA BASED ON FIELD INVESTIGATION EXISTING WETLANDS WITHIN THE PROJECT AREA BASED ON FIELD INVESTIGATION EXISTING WETLANDS WITHIN THE PROJECT AREA BASED ON FIELD INVESTIGATION WETLANDS WITHIN THE PROJECT AREA BASED ON FIELD INVESTIGATION WETLANDS WITHIN THE PROJECT AREA BASED ON FIELD INVESTIGATION WITHIN THE PROJECT AREA BASED ON FIELD INVESTIGATION WITHIN THE PROJECT AREA BASED ON FIELD INVESTIGATION THE PROJECT AREA BASED ON FIELD INVESTIGATION THE PROJECT AREA BASED ON FIELD INVESTIGATION PROJECT AREA BASED ON FIELD INVESTIGATION PROJECT AREA BASED ON FIELD INVESTIGATION AREA BASED ON FIELD INVESTIGATION AREA BASED ON FIELD INVESTIGATION BASED ON FIELD INVESTIGATION BASED ON FIELD INVESTIGATION ON FIELD INVESTIGATION ON FIELD INVESTIGATION FIELD INVESTIGATION FIELD INVESTIGATION INVESTIGATION INVESTIGATION AND REVIEW OF NWI MAPPING. 8. THE LOCATION OF ALL EXISTING UNDERGROUND UTILITIES SHOWN HEREON ARE APPROXIMATE THE LOCATION OF ALL EXISTING UNDERGROUND UTILITIES SHOWN HEREON ARE APPROXIMATE LOCATION OF ALL EXISTING UNDERGROUND UTILITIES SHOWN HEREON ARE APPROXIMATE LOCATION OF ALL EXISTING UNDERGROUND UTILITIES SHOWN HEREON ARE APPROXIMATE OF ALL EXISTING UNDERGROUND UTILITIES SHOWN HEREON ARE APPROXIMATE OF ALL EXISTING UNDERGROUND UTILITIES SHOWN HEREON ARE APPROXIMATE ALL EXISTING UNDERGROUND UTILITIES SHOWN HEREON ARE APPROXIMATE ALL EXISTING UNDERGROUND UTILITIES SHOWN HEREON ARE APPROXIMATE EXISTING UNDERGROUND UTILITIES SHOWN HEREON ARE APPROXIMATE EXISTING UNDERGROUND UTILITIES SHOWN HEREON ARE APPROXIMATE UNDERGROUND UTILITIES SHOWN HEREON ARE APPROXIMATE UNDERGROUND UTILITIES SHOWN HEREON ARE APPROXIMATE UTILITIES SHOWN HEREON ARE APPROXIMATE UTILITIES SHOWN HEREON ARE APPROXIMATE SHOWN HEREON ARE APPROXIMATE SHOWN HEREON ARE APPROXIMATE HEREON ARE APPROXIMATE HEREON ARE APPROXIMATE ARE APPROXIMATE ARE APPROXIMATE APPROXIMATE APPROXIMATE AND ARE BASED ON FIELD LOCATIONS OF OBSERVABLE SURFACE STRUCTURES AND RECORDS ARE BASED ON FIELD LOCATIONS OF OBSERVABLE SURFACE STRUCTURES AND RECORDS ARE BASED ON FIELD LOCATIONS OF OBSERVABLE SURFACE STRUCTURES AND RECORDS BASED ON FIELD LOCATIONS OF OBSERVABLE SURFACE STRUCTURES AND RECORDS BASED ON FIELD LOCATIONS OF OBSERVABLE SURFACE STRUCTURES AND RECORDS ON FIELD LOCATIONS OF OBSERVABLE SURFACE STRUCTURES AND RECORDS ON FIELD LOCATIONS OF OBSERVABLE SURFACE STRUCTURES AND RECORDS FIELD LOCATIONS OF OBSERVABLE SURFACE STRUCTURES AND RECORDS FIELD LOCATIONS OF OBSERVABLE SURFACE STRUCTURES AND RECORDS LOCATIONS OF OBSERVABLE SURFACE STRUCTURES AND RECORDS LOCATIONS OF OBSERVABLE SURFACE STRUCTURES AND RECORDS OF OBSERVABLE SURFACE STRUCTURES AND RECORDS OF OBSERVABLE SURFACE STRUCTURES AND RECORDS OBSERVABLE SURFACE STRUCTURES AND RECORDS OBSERVABLE SURFACE STRUCTURES AND RECORDS SURFACE STRUCTURES AND RECORDS SURFACE STRUCTURES AND RECORDS STRUCTURES AND RECORDS STRUCTURES AND RECORDS AND RECORDS AND RECORDS RECORDS RECORDS BY UTILITY USERS FOLLOWING A CALL TO PENNSYLVANIA ONE CALL SYSTEM. LOCATIONS AND UTILITY USERS FOLLOWING A CALL TO PENNSYLVANIA ONE CALL SYSTEM. LOCATIONS AND UTILITY USERS FOLLOWING A CALL TO PENNSYLVANIA ONE CALL SYSTEM. LOCATIONS AND USERS FOLLOWING A CALL TO PENNSYLVANIA ONE CALL SYSTEM. LOCATIONS AND USERS FOLLOWING A CALL TO PENNSYLVANIA ONE CALL SYSTEM. LOCATIONS AND FOLLOWING A CALL TO PENNSYLVANIA ONE CALL SYSTEM. LOCATIONS AND FOLLOWING A CALL TO PENNSYLVANIA ONE CALL SYSTEM. LOCATIONS AND A CALL TO PENNSYLVANIA ONE CALL SYSTEM. LOCATIONS AND A CALL TO PENNSYLVANIA ONE CALL SYSTEM. LOCATIONS AND CALL TO PENNSYLVANIA ONE CALL SYSTEM. LOCATIONS AND CALL TO PENNSYLVANIA ONE CALL SYSTEM. LOCATIONS AND TO PENNSYLVANIA ONE CALL SYSTEM. LOCATIONS AND TO PENNSYLVANIA ONE CALL SYSTEM. LOCATIONS AND PENNSYLVANIA ONE CALL SYSTEM. LOCATIONS AND PENNSYLVANIA ONE CALL SYSTEM. LOCATIONS AND ONE CALL SYSTEM. LOCATIONS AND ONE CALL SYSTEM. LOCATIONS AND CALL SYSTEM. LOCATIONS AND CALL SYSTEM. LOCATIONS AND SYSTEM. LOCATIONS AND SYSTEM. LOCATIONS AND LOCATIONS AND LOCATIONS AND AND AND DEPTHS ARE APPROXIMATE. GREENMAN-PEDERSEN DOES NOT GUARANTEE THAT ALL ARE APPROXIMATE. GREENMAN-PEDERSEN DOES NOT GUARANTEE THAT ALL ARE APPROXIMATE. GREENMAN-PEDERSEN DOES NOT GUARANTEE THAT ALL APPROXIMATE. GREENMAN-PEDERSEN DOES NOT GUARANTEE THAT ALL APPROXIMATE. GREENMAN-PEDERSEN DOES NOT GUARANTEE THAT ALL GREENMAN-PEDERSEN DOES NOT GUARANTEE THAT ALL GREENMAN-PEDERSEN DOES NOT GUARANTEE THAT ALL DOES NOT GUARANTEE THAT ALL DOES NOT GUARANTEE THAT ALL NOT GUARANTEE THAT ALL NOT GUARANTEE THAT ALL GUARANTEE THAT ALL GUARANTEE THAT ALL THAT ALL THAT ALL ALL ALL UNDERGROUND UTILITIES ARE SHOWN. CONTRACTORS ARE REQUIRED TO CONTACT UTILITY UTILITIES ARE SHOWN. CONTRACTORS ARE REQUIRED TO CONTACT UTILITY UTILITIES ARE SHOWN. CONTRACTORS ARE REQUIRED TO CONTACT UTILITY ARE SHOWN. CONTRACTORS ARE REQUIRED TO CONTACT UTILITY ARE SHOWN. CONTRACTORS ARE REQUIRED TO CONTACT UTILITY SHOWN. CONTRACTORS ARE REQUIRED TO CONTACT UTILITY SHOWN. CONTRACTORS ARE REQUIRED TO CONTACT UTILITY CONTRACTORS ARE REQUIRED TO CONTACT UTILITY CONTRACTORS ARE REQUIRED TO CONTACT UTILITY ARE REQUIRED TO CONTACT UTILITY ARE REQUIRED TO CONTACT UTILITY REQUIRED TO CONTACT UTILITY REQUIRED TO CONTACT UTILITY TO CONTACT UTILITY TO CONTACT UTILITY CONTACT UTILITY CONTACT UTILITY UTILITY UTILITY PROVIDERS NOT LESS THAN 3 DAYS NOR MORE THAN 10 DAYS PRIOR TO BEGINNING ANY NOT LESS THAN 3 DAYS NOR MORE THAN 10 DAYS PRIOR TO BEGINNING ANY NOT LESS THAN 3 DAYS NOR MORE THAN 10 DAYS PRIOR TO BEGINNING ANY LESS THAN 3 DAYS NOR MORE THAN 10 DAYS PRIOR TO BEGINNING ANY LESS THAN 3 DAYS NOR MORE THAN 10 DAYS PRIOR TO BEGINNING ANY THAN 3 DAYS NOR MORE THAN 10 DAYS PRIOR TO BEGINNING ANY THAN 3 DAYS NOR MORE THAN 10 DAYS PRIOR TO BEGINNING ANY 3 DAYS NOR MORE THAN 10 DAYS PRIOR TO BEGINNING ANY 3 DAYS NOR MORE THAN 10 DAYS PRIOR TO BEGINNING ANY DAYS NOR MORE THAN 10 DAYS PRIOR TO BEGINNING ANY DAYS NOR MORE THAN 10 DAYS PRIOR TO BEGINNING ANY NOR MORE THAN 10 DAYS PRIOR TO BEGINNING ANY NOR MORE THAN 10 DAYS PRIOR TO BEGINNING ANY MORE THAN 10 DAYS PRIOR TO BEGINNING ANY MORE THAN 10 DAYS PRIOR TO BEGINNING ANY THAN 10 DAYS PRIOR TO BEGINNING ANY THAN 10 DAYS PRIOR TO BEGINNING ANY 10 DAYS PRIOR TO BEGINNING ANY 10 DAYS PRIOR TO BEGINNING ANY DAYS PRIOR TO BEGINNING ANY DAYS PRIOR TO BEGINNING ANY PRIOR TO BEGINNING ANY PRIOR TO BEGINNING ANY TO BEGINNING ANY TO BEGINNING ANY BEGINNING ANY BEGINNING ANY ANY ANY EXCAVATION OR DEMOLITION WORK. THEY ARE REQUIRED TO COMPLY WITH ALL OTHER OR DEMOLITION WORK. THEY ARE REQUIRED TO COMPLY WITH ALL OTHER OR DEMOLITION WORK. THEY ARE REQUIRED TO COMPLY WITH ALL OTHER DEMOLITION WORK. THEY ARE REQUIRED TO COMPLY WITH ALL OTHER DEMOLITION WORK. THEY ARE REQUIRED TO COMPLY WITH ALL OTHER WORK. THEY ARE REQUIRED TO COMPLY WITH ALL OTHER WORK. THEY ARE REQUIRED TO COMPLY WITH ALL OTHER THEY ARE REQUIRED TO COMPLY WITH ALL OTHER THEY ARE REQUIRED TO COMPLY WITH ALL OTHER ARE REQUIRED TO COMPLY WITH ALL OTHER ARE REQUIRED TO COMPLY WITH ALL OTHER REQUIRED TO COMPLY WITH ALL OTHER REQUIRED TO COMPLY WITH ALL OTHER TO COMPLY WITH ALL OTHER TO COMPLY WITH ALL OTHER COMPLY WITH ALL OTHER COMPLY WITH ALL OTHER WITH ALL OTHER WITH ALL OTHER ALL OTHER ALL OTHER OTHER OTHER PROCEDURES OF PENNSYLVANIA ACT 30, AS MOST CURRENTLY AMENDED. INFORMATION OF PENNSYLVANIA ACT 30, AS MOST CURRENTLY AMENDED. INFORMATION OF PENNSYLVANIA ACT 30, AS MOST CURRENTLY AMENDED. INFORMATION PENNSYLVANIA ACT 30, AS MOST CURRENTLY AMENDED. INFORMATION PENNSYLVANIA ACT 30, AS MOST CURRENTLY AMENDED. INFORMATION ACT 30, AS MOST CURRENTLY AMENDED. INFORMATION ACT 30, AS MOST CURRENTLY AMENDED. INFORMATION 30, AS MOST CURRENTLY AMENDED. INFORMATION 30, AS MOST CURRENTLY AMENDED. INFORMATION AS MOST CURRENTLY AMENDED. INFORMATION AS MOST CURRENTLY AMENDED. INFORMATION MOST CURRENTLY AMENDED. INFORMATION MOST CURRENTLY AMENDED. INFORMATION CURRENTLY AMENDED. INFORMATION CURRENTLY AMENDED. INFORMATION AMENDED. INFORMATION AMENDED. INFORMATION INFORMATION INFORMATION CONCERNING UTILITIES IS NOT INTENDED FOR CONSTRUCTION PURPOSES. 9. THE CONTRACTOR SHALL VERIFY ALL EXISTING FIELD CONDITIONS (ELEVATIONS, LOCATIONS, THE CONTRACTOR SHALL VERIFY ALL EXISTING FIELD CONDITIONS (ELEVATIONS, LOCATIONS, CONTRACTOR SHALL VERIFY ALL EXISTING FIELD CONDITIONS (ELEVATIONS, LOCATIONS, CONTRACTOR SHALL VERIFY ALL EXISTING FIELD CONDITIONS (ELEVATIONS, LOCATIONS, SHALL VERIFY ALL EXISTING FIELD CONDITIONS (ELEVATIONS, LOCATIONS, SHALL VERIFY ALL EXISTING FIELD CONDITIONS (ELEVATIONS, LOCATIONS, VERIFY ALL EXISTING FIELD CONDITIONS (ELEVATIONS, LOCATIONS, VERIFY ALL EXISTING FIELD CONDITIONS (ELEVATIONS, LOCATIONS, ALL EXISTING FIELD CONDITIONS (ELEVATIONS, LOCATIONS, ALL EXISTING FIELD CONDITIONS (ELEVATIONS, LOCATIONS, EXISTING FIELD CONDITIONS (ELEVATIONS, LOCATIONS, EXISTING FIELD CONDITIONS (ELEVATIONS, LOCATIONS, FIELD CONDITIONS (ELEVATIONS, LOCATIONS, FIELD CONDITIONS (ELEVATIONS, LOCATIONS, CONDITIONS (ELEVATIONS, LOCATIONS, CONDITIONS (ELEVATIONS, LOCATIONS, (ELEVATIONS, LOCATIONS, (ELEVATIONS, LOCATIONS, LOCATIONS, LOCATIONS, ETC.) BEFORE COMMENCING WORK. GREENMAN-PEDERSEN, INC. SHALL BE NOTIFIED IMMEDIATELY BEFORE COMMENCING WORK. GREENMAN-PEDERSEN, INC. SHALL BE NOTIFIED IMMEDIATELY BEFORE COMMENCING WORK. GREENMAN-PEDERSEN, INC. SHALL BE NOTIFIED IMMEDIATELY COMMENCING WORK. GREENMAN-PEDERSEN, INC. SHALL BE NOTIFIED IMMEDIATELY COMMENCING WORK. GREENMAN-PEDERSEN, INC. SHALL BE NOTIFIED IMMEDIATELY WORK. GREENMAN-PEDERSEN, INC. SHALL BE NOTIFIED IMMEDIATELY WORK. GREENMAN-PEDERSEN, INC. SHALL BE NOTIFIED IMMEDIATELY GREENMAN-PEDERSEN, INC. SHALL BE NOTIFIED IMMEDIATELY GREENMAN-PEDERSEN, INC. SHALL BE NOTIFIED IMMEDIATELY INC. SHALL BE NOTIFIED IMMEDIATELY INC. SHALL BE NOTIFIED IMMEDIATELY SHALL BE NOTIFIED IMMEDIATELY SHALL BE NOTIFIED IMMEDIATELY BE NOTIFIED IMMEDIATELY BE NOTIFIED IMMEDIATELY NOTIFIED IMMEDIATELY NOTIFIED IMMEDIATELY IMMEDIATELY IMMEDIATELY IF A CONFLICT EXISTS. 10. CONTRACTOR SHALL MAKE EXPLORATION EXCAVATIONS AND LOCATE EXISTING UNDERGROUND CONTRACTOR SHALL MAKE EXPLORATION EXCAVATIONS AND LOCATE EXISTING UNDERGROUND SHALL MAKE EXPLORATION EXCAVATIONS AND LOCATE EXISTING UNDERGROUND SHALL MAKE EXPLORATION EXCAVATIONS AND LOCATE EXISTING UNDERGROUND MAKE EXPLORATION EXCAVATIONS AND LOCATE EXISTING UNDERGROUND MAKE EXPLORATION EXCAVATIONS AND LOCATE EXISTING UNDERGROUND EXPLORATION EXCAVATIONS AND LOCATE EXISTING UNDERGROUND EXPLORATION EXCAVATIONS AND LOCATE EXISTING UNDERGROUND EXCAVATIONS AND LOCATE EXISTING UNDERGROUND EXCAVATIONS AND LOCATE EXISTING UNDERGROUND AND LOCATE EXISTING UNDERGROUND AND LOCATE EXISTING UNDERGROUND LOCATE EXISTING UNDERGROUND LOCATE EXISTING UNDERGROUND EXISTING UNDERGROUND EXISTING UNDERGROUND UNDERGROUND UNDERGROUND FACILITIES SUFFICIENTLY AHEAD OF CONSTRUCTION TO PERMIT REVISIONS TO PLANS IF SUFFICIENTLY AHEAD OF CONSTRUCTION TO PERMIT REVISIONS TO PLANS IF SUFFICIENTLY AHEAD OF CONSTRUCTION TO PERMIT REVISIONS TO PLANS IF AHEAD OF CONSTRUCTION TO PERMIT REVISIONS TO PLANS IF AHEAD OF CONSTRUCTION TO PERMIT REVISIONS TO PLANS IF OF CONSTRUCTION TO PERMIT REVISIONS TO PLANS IF OF CONSTRUCTION TO PERMIT REVISIONS TO PLANS IF CONSTRUCTION TO PERMIT REVISIONS TO PLANS IF CONSTRUCTION TO PERMIT REVISIONS TO PLANS IF TO PERMIT REVISIONS TO PLANS IF TO PERMIT REVISIONS TO PLANS IF PERMIT REVISIONS TO PLANS IF PERMIT REVISIONS TO PLANS IF REVISIONS TO PLANS IF REVISIONS TO PLANS IF TO PLANS IF TO PLANS IF PLANS IF PLANS IF IF IF REVISIONS ARE NECESSARY. CONTRACTOR SHALL NOTIFY ENGINEER IMMEDIATELY IF ANY ARE NECESSARY. CONTRACTOR SHALL NOTIFY ENGINEER IMMEDIATELY IF ANY ARE NECESSARY. CONTRACTOR SHALL NOTIFY ENGINEER IMMEDIATELY IF ANY NECESSARY. CONTRACTOR SHALL NOTIFY ENGINEER IMMEDIATELY IF ANY NECESSARY. CONTRACTOR SHALL NOTIFY ENGINEER IMMEDIATELY IF ANY CONTRACTOR SHALL NOTIFY ENGINEER IMMEDIATELY IF ANY CONTRACTOR SHALL NOTIFY ENGINEER IMMEDIATELY IF ANY CONTRACTOR SHALL NOTIFY ENGINEER IMMEDIATELY IF ANY SHALL NOTIFY ENGINEER IMMEDIATELY IF ANY SHALL NOTIFY ENGINEER IMMEDIATELY IF ANY NOTIFY ENGINEER IMMEDIATELY IF ANY NOTIFY ENGINEER IMMEDIATELY IF ANY ENGINEER IMMEDIATELY IF ANY ENGINEER IMMEDIATELY IF ANY IMMEDIATELY IF ANY IMMEDIATELY IF ANY IF ANY IF ANY ANY ANY DISCREPANCIES IN UTILITY LINE LOCATIONS ARE FOUND. 11. THE CONTRACTOR SHALL CONTACT THE PENNSYLVANIA ONE-CALL NUMBER AT THE CONTRACTOR SHALL CONTACT THE PENNSYLVANIA ONE-CALL NUMBER AT CONTRACTOR SHALL CONTACT THE PENNSYLVANIA ONE-CALL NUMBER AT CONTRACTOR SHALL CONTACT THE PENNSYLVANIA ONE-CALL NUMBER AT SHALL CONTACT THE PENNSYLVANIA ONE-CALL NUMBER AT SHALL CONTACT THE PENNSYLVANIA ONE-CALL NUMBER AT CONTACT THE PENNSYLVANIA ONE-CALL NUMBER AT CONTACT THE PENNSYLVANIA ONE-CALL NUMBER AT THE PENNSYLVANIA ONE-CALL NUMBER AT THE PENNSYLVANIA ONE-CALL NUMBER AT PENNSYLVANIA ONE-CALL NUMBER AT PENNSYLVANIA ONE-CALL NUMBER AT ONE-CALL NUMBER AT ONE-CALL NUMBER AT NUMBER AT NUMBER AT AT AT 1-800-242-1776, THREE WORKING DAYS PRIOR TO THE START OF WORK TO HAVE ALL THREE WORKING DAYS PRIOR TO THE START OF WORK TO HAVE ALL THREE WORKING DAYS PRIOR TO THE START OF WORK TO HAVE ALL WORKING DAYS PRIOR TO THE START OF WORK TO HAVE ALL WORKING DAYS PRIOR TO THE START OF WORK TO HAVE ALL DAYS PRIOR TO THE START OF WORK TO HAVE ALL DAYS PRIOR TO THE START OF WORK TO HAVE ALL PRIOR TO THE START OF WORK TO HAVE ALL PRIOR TO THE START OF WORK TO HAVE ALL TO THE START OF WORK TO HAVE ALL TO THE START OF WORK TO HAVE ALL THE START OF WORK TO HAVE ALL THE START OF WORK TO HAVE ALL START OF WORK TO HAVE ALL START OF WORK TO HAVE ALL OF WORK TO HAVE ALL OF WORK TO HAVE ALL WORK TO HAVE ALL WORK TO HAVE ALL TO HAVE ALL TO HAVE ALL HAVE ALL HAVE ALL ALL ALL UTILITIES MARKED IN THE WORK AREA. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO MARKED IN THE WORK AREA. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO MARKED IN THE WORK AREA. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO IN THE WORK AREA. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO IN THE WORK AREA. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO THE WORK AREA. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO THE WORK AREA. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO WORK AREA. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO WORK AREA. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO AREA. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO AREA. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO IS THE RESPONSIBILITY OF THE CONTRACTOR TO IS THE RESPONSIBILITY OF THE CONTRACTOR TO THE RESPONSIBILITY OF THE CONTRACTOR TO THE RESPONSIBILITY OF THE CONTRACTOR TO RESPONSIBILITY OF THE CONTRACTOR TO RESPONSIBILITY OF THE CONTRACTOR TO OF THE CONTRACTOR TO OF THE CONTRACTOR TO THE CONTRACTOR TO THE CONTRACTOR TO CONTRACTOR TO CONTRACTOR TO TO TO MAINTAIN ALL UTILITY MARKINGS WITHIN THE PROJECT LIMITS FOR THE DURATION OF PROJECT. ALL UTILITY MARKINGS WITHIN THE PROJECT LIMITS FOR THE DURATION OF PROJECT. ALL UTILITY MARKINGS WITHIN THE PROJECT LIMITS FOR THE DURATION OF PROJECT. UTILITY MARKINGS WITHIN THE PROJECT LIMITS FOR THE DURATION OF PROJECT. UTILITY MARKINGS WITHIN THE PROJECT LIMITS FOR THE DURATION OF PROJECT. MARKINGS WITHIN THE PROJECT LIMITS FOR THE DURATION OF PROJECT. MARKINGS WITHIN THE PROJECT LIMITS FOR THE DURATION OF PROJECT. WITHIN THE PROJECT LIMITS FOR THE DURATION OF PROJECT. WITHIN THE PROJECT LIMITS FOR THE DURATION OF PROJECT. THE PROJECT LIMITS FOR THE DURATION OF PROJECT. THE PROJECT LIMITS FOR THE DURATION OF PROJECT. PROJECT LIMITS FOR THE DURATION OF PROJECT. PROJECT LIMITS FOR THE DURATION OF PROJECT. LIMITS FOR THE DURATION OF PROJECT. LIMITS FOR THE DURATION OF PROJECT. FOR THE DURATION OF PROJECT. FOR THE DURATION OF PROJECT. THE DURATION OF PROJECT. THE DURATION OF PROJECT. DURATION OF PROJECT. DURATION OF PROJECT. OF PROJECT. OF PROJECT. PROJECT. PROJECT. IF UTILITY MARKINGS ARE DESTROYED, THE CONTRACTOR IS RESPONSIBLE FOR CONTACTING UTILITY MARKINGS ARE DESTROYED, THE CONTRACTOR IS RESPONSIBLE FOR CONTACTING UTILITY MARKINGS ARE DESTROYED, THE CONTRACTOR IS RESPONSIBLE FOR CONTACTING MARKINGS ARE DESTROYED, THE CONTRACTOR IS RESPONSIBLE FOR CONTACTING MARKINGS ARE DESTROYED, THE CONTRACTOR IS RESPONSIBLE FOR CONTACTING ARE DESTROYED, THE CONTRACTOR IS RESPONSIBLE FOR CONTACTING ARE DESTROYED, THE CONTRACTOR IS RESPONSIBLE FOR CONTACTING DESTROYED, THE CONTRACTOR IS RESPONSIBLE FOR CONTACTING DESTROYED, THE CONTRACTOR IS RESPONSIBLE FOR CONTACTING THE CONTRACTOR IS RESPONSIBLE FOR CONTACTING THE CONTRACTOR IS RESPONSIBLE FOR CONTACTING CONTRACTOR IS RESPONSIBLE FOR CONTACTING CONTRACTOR IS RESPONSIBLE FOR CONTACTING IS RESPONSIBLE FOR CONTACTING IS RESPONSIBLE FOR CONTACTING RESPONSIBLE FOR CONTACTING RESPONSIBLE FOR CONTACTING FOR CONTACTING FOR CONTACTING CONTACTING CONTACTING PA-ONE CALL FOR MARKOUT. 12. THE CONTRACTOR SHALL NOTIFY ALL APPROPRIATE UTILITIES OF HIS WORK SCHEDULE PRIOR TO THE CONTRACTOR SHALL NOTIFY ALL APPROPRIATE UTILITIES OF HIS WORK SCHEDULE PRIOR TO CONTRACTOR SHALL NOTIFY ALL APPROPRIATE UTILITIES OF HIS WORK SCHEDULE PRIOR TO CONTRACTOR SHALL NOTIFY ALL APPROPRIATE UTILITIES OF HIS WORK SCHEDULE PRIOR TO SHALL NOTIFY ALL APPROPRIATE UTILITIES OF HIS WORK SCHEDULE PRIOR TO SHALL NOTIFY ALL APPROPRIATE UTILITIES OF HIS WORK SCHEDULE PRIOR TO NOTIFY ALL APPROPRIATE UTILITIES OF HIS WORK SCHEDULE PRIOR TO NOTIFY ALL APPROPRIATE UTILITIES OF HIS WORK SCHEDULE PRIOR TO ALL APPROPRIATE UTILITIES OF HIS WORK SCHEDULE PRIOR TO ALL APPROPRIATE UTILITIES OF HIS WORK SCHEDULE PRIOR TO APPROPRIATE UTILITIES OF HIS WORK SCHEDULE PRIOR TO APPROPRIATE UTILITIES OF HIS WORK SCHEDULE PRIOR TO UTILITIES OF HIS WORK SCHEDULE PRIOR TO UTILITIES OF HIS WORK SCHEDULE PRIOR TO OF HIS WORK SCHEDULE PRIOR TO OF HIS WORK SCHEDULE PRIOR TO HIS WORK SCHEDULE PRIOR TO HIS WORK SCHEDULE PRIOR TO WORK SCHEDULE PRIOR TO WORK SCHEDULE PRIOR TO SCHEDULE PRIOR TO SCHEDULE PRIOR TO PRIOR TO PRIOR TO TO TO THE START OF CONSTRUCTION. THE CONTRACTOR SHALL HAVE EACH UTILITY OWNER VERIFY START OF CONSTRUCTION. THE CONTRACTOR SHALL HAVE EACH UTILITY OWNER VERIFY START OF CONSTRUCTION. THE CONTRACTOR SHALL HAVE EACH UTILITY OWNER VERIFY OF CONSTRUCTION. THE CONTRACTOR SHALL HAVE EACH UTILITY OWNER VERIFY OF CONSTRUCTION. THE CONTRACTOR SHALL HAVE EACH UTILITY OWNER VERIFY CONSTRUCTION. THE CONTRACTOR SHALL HAVE EACH UTILITY OWNER VERIFY CONSTRUCTION. THE CONTRACTOR SHALL HAVE EACH UTILITY OWNER VERIFY THE CONTRACTOR SHALL HAVE EACH UTILITY OWNER VERIFY THE CONTRACTOR SHALL HAVE EACH UTILITY OWNER VERIFY CONTRACTOR SHALL HAVE EACH UTILITY OWNER VERIFY CONTRACTOR SHALL HAVE EACH UTILITY OWNER VERIFY SHALL HAVE EACH UTILITY OWNER VERIFY SHALL HAVE EACH UTILITY OWNER VERIFY HAVE EACH UTILITY OWNER VERIFY HAVE EACH UTILITY OWNER VERIFY EACH UTILITY OWNER VERIFY EACH UTILITY OWNER VERIFY UTILITY OWNER VERIFY UTILITY OWNER VERIFY OWNER VERIFY OWNER VERIFY VERIFY VERIFY AND MARK THE LOCATIONS OF THEIR RESPECTIVE MAIN AND SERVICE LINES IN THE FIELD MARK THE LOCATIONS OF THEIR RESPECTIVE MAIN AND SERVICE LINES IN THE FIELD MARK THE LOCATIONS OF THEIR RESPECTIVE MAIN AND SERVICE LINES IN THE FIELD THE LOCATIONS OF THEIR RESPECTIVE MAIN AND SERVICE LINES IN THE FIELD THE LOCATIONS OF THEIR RESPECTIVE MAIN AND SERVICE LINES IN THE FIELD LOCATIONS OF THEIR RESPECTIVE MAIN AND SERVICE LINES IN THE FIELD LOCATIONS OF THEIR RESPECTIVE MAIN AND SERVICE LINES IN THE FIELD OF THEIR RESPECTIVE MAIN AND SERVICE LINES IN THE FIELD OF THEIR RESPECTIVE MAIN AND SERVICE LINES IN THE FIELD THEIR RESPECTIVE MAIN AND SERVICE LINES IN THE FIELD THEIR RESPECTIVE MAIN AND SERVICE LINES IN THE FIELD RESPECTIVE MAIN AND SERVICE LINES IN THE FIELD RESPECTIVE MAIN AND SERVICE LINES IN THE FIELD MAIN AND SERVICE LINES IN THE FIELD MAIN AND SERVICE LINES IN THE FIELD AND SERVICE LINES IN THE FIELD AND SERVICE LINES IN THE FIELD SERVICE LINES IN THE FIELD SERVICE LINES IN THE FIELD LINES IN THE FIELD LINES IN THE FIELD IN THE FIELD IN THE FIELD THE FIELD THE FIELD FIELD FIELD BEFORE THE START OF WORK. 13. THE CONTRACTOR SHALL TAKE NECESSARY PRECAUTIONS TO MAINTAIN EXISTING UTILITY THE CONTRACTOR SHALL TAKE NECESSARY PRECAUTIONS TO MAINTAIN EXISTING UTILITY CONTRACTOR SHALL TAKE NECESSARY PRECAUTIONS TO MAINTAIN EXISTING UTILITY CONTRACTOR SHALL TAKE NECESSARY PRECAUTIONS TO MAINTAIN EXISTING UTILITY SHALL TAKE NECESSARY PRECAUTIONS TO MAINTAIN EXISTING UTILITY SHALL TAKE NECESSARY PRECAUTIONS TO MAINTAIN EXISTING UTILITY TAKE NECESSARY PRECAUTIONS TO MAINTAIN EXISTING UTILITY TAKE NECESSARY PRECAUTIONS TO MAINTAIN EXISTING UTILITY NECESSARY PRECAUTIONS TO MAINTAIN EXISTING UTILITY NECESSARY PRECAUTIONS TO MAINTAIN EXISTING UTILITY PRECAUTIONS TO MAINTAIN EXISTING UTILITY PRECAUTIONS TO MAINTAIN EXISTING UTILITY TO MAINTAIN EXISTING UTILITY TO MAINTAIN EXISTING UTILITY MAINTAIN EXISTING UTILITY MAINTAIN EXISTING UTILITY EXISTING UTILITY EXISTING UTILITY UTILITY UTILITY SERVICE. IN THE EVENT THAT THE CONTRACTOR DAMAGES AN EXISTING UTILITY LINE OR IN THE EVENT THAT THE CONTRACTOR DAMAGES AN EXISTING UTILITY LINE OR IN THE EVENT THAT THE CONTRACTOR DAMAGES AN EXISTING UTILITY LINE OR THE EVENT THAT THE CONTRACTOR DAMAGES AN EXISTING UTILITY LINE OR THE EVENT THAT THE CONTRACTOR DAMAGES AN EXISTING UTILITY LINE OR EVENT THAT THE CONTRACTOR DAMAGES AN EXISTING UTILITY LINE OR EVENT THAT THE CONTRACTOR DAMAGES AN EXISTING UTILITY LINE OR THAT THE CONTRACTOR DAMAGES AN EXISTING UTILITY LINE OR THAT THE CONTRACTOR DAMAGES AN EXISTING UTILITY LINE OR THE CONTRACTOR DAMAGES AN EXISTING UTILITY LINE OR THE CONTRACTOR DAMAGES AN EXISTING UTILITY LINE OR CONTRACTOR DAMAGES AN EXISTING UTILITY LINE OR CONTRACTOR DAMAGES AN EXISTING UTILITY LINE OR DAMAGES AN EXISTING UTILITY LINE OR DAMAGES AN EXISTING UTILITY LINE OR AN EXISTING UTILITY LINE OR AN EXISTING UTILITY LINE OR EXISTING UTILITY LINE OR EXISTING UTILITY LINE OR UTILITY LINE OR UTILITY LINE OR LINE OR LINE OR OR OR LATERAL, HE SHALL NOTIFY THE UTILITY OWNER IMMEDIATELY. ALL REPAIRS SHALL BE DIRECTED HE SHALL NOTIFY THE UTILITY OWNER IMMEDIATELY. ALL REPAIRS SHALL BE DIRECTED HE SHALL NOTIFY THE UTILITY OWNER IMMEDIATELY. ALL REPAIRS SHALL BE DIRECTED SHALL NOTIFY THE UTILITY OWNER IMMEDIATELY. ALL REPAIRS SHALL BE DIRECTED SHALL NOTIFY THE UTILITY OWNER IMMEDIATELY. ALL REPAIRS SHALL BE DIRECTED NOTIFY THE UTILITY OWNER IMMEDIATELY. ALL REPAIRS SHALL BE DIRECTED NOTIFY THE UTILITY OWNER IMMEDIATELY. ALL REPAIRS SHALL BE DIRECTED THE UTILITY OWNER IMMEDIATELY. ALL REPAIRS SHALL BE DIRECTED THE UTILITY OWNER IMMEDIATELY. ALL REPAIRS SHALL BE DIRECTED UTILITY OWNER IMMEDIATELY. ALL REPAIRS SHALL BE DIRECTED UTILITY OWNER IMMEDIATELY. ALL REPAIRS SHALL BE DIRECTED OWNER IMMEDIATELY. ALL REPAIRS SHALL BE DIRECTED OWNER IMMEDIATELY. ALL REPAIRS SHALL BE DIRECTED IMMEDIATELY. ALL REPAIRS SHALL BE DIRECTED IMMEDIATELY. ALL REPAIRS SHALL BE DIRECTED ALL REPAIRS SHALL BE DIRECTED ALL REPAIRS SHALL BE DIRECTED REPAIRS SHALL BE DIRECTED REPAIRS SHALL BE DIRECTED SHALL BE DIRECTED SHALL BE DIRECTED BE DIRECTED BE DIRECTED DIRECTED DIRECTED BY THE UTILITY OWNER AND SHALL BE MADE AT NO ADDITIONAL COST TO MANSFIELD THE UTILITY OWNER AND SHALL BE MADE AT NO ADDITIONAL COST TO MANSFIELD THE UTILITY OWNER AND SHALL BE MADE AT NO ADDITIONAL COST TO MANSFIELD UTILITY OWNER AND SHALL BE MADE AT NO ADDITIONAL COST TO MANSFIELD UTILITY OWNER AND SHALL BE MADE AT NO ADDITIONAL COST TO MANSFIELD OWNER AND SHALL BE MADE AT NO ADDITIONAL COST TO MANSFIELD OWNER AND SHALL BE MADE AT NO ADDITIONAL COST TO MANSFIELD AND SHALL BE MADE AT NO ADDITIONAL COST TO MANSFIELD AND SHALL BE MADE AT NO ADDITIONAL COST TO MANSFIELD SHALL BE MADE AT NO ADDITIONAL COST TO MANSFIELD SHALL BE MADE AT NO ADDITIONAL COST TO MANSFIELD BE MADE AT NO ADDITIONAL COST TO MANSFIELD BE MADE AT NO ADDITIONAL COST TO MANSFIELD MADE AT NO ADDITIONAL COST TO MANSFIELD MADE AT NO ADDITIONAL COST TO MANSFIELD AT NO ADDITIONAL COST TO MANSFIELD AT NO ADDITIONAL COST TO MANSFIELD NO ADDITIONAL COST TO MANSFIELD NO ADDITIONAL COST TO MANSFIELD ADDITIONAL COST TO MANSFIELD ADDITIONAL COST TO MANSFIELD COST TO MANSFIELD COST TO MANSFIELD TO MANSFIELD TO MANSFIELD MANSFIELD MANSFIELD UNIVERSITY. 14. ALL CONTRACTORS SHALL COMPLY WITH ALL LOCAL BUILDING CODE REGULATIONS. THE ALL CONTRACTORS SHALL COMPLY WITH ALL LOCAL BUILDING CODE REGULATIONS. THE CONTRACTORS SHALL COMPLY WITH ALL LOCAL BUILDING CODE REGULATIONS. THE CONTRACTORS SHALL COMPLY WITH ALL LOCAL BUILDING CODE REGULATIONS. THE SHALL COMPLY WITH ALL LOCAL BUILDING CODE REGULATIONS. THE SHALL COMPLY WITH ALL LOCAL BUILDING CODE REGULATIONS. THE COMPLY WITH ALL LOCAL BUILDING CODE REGULATIONS. THE COMPLY WITH ALL LOCAL BUILDING CODE REGULATIONS. THE WITH ALL LOCAL BUILDING CODE REGULATIONS. THE WITH ALL LOCAL BUILDING CODE REGULATIONS. THE ALL LOCAL BUILDING CODE REGULATIONS. THE ALL LOCAL BUILDING CODE REGULATIONS. THE LOCAL BUILDING CODE REGULATIONS. THE LOCAL BUILDING CODE REGULATIONS. THE BUILDING CODE REGULATIONS. THE BUILDING CODE REGULATIONS. THE CODE REGULATIONS. THE CODE REGULATIONS. THE REGULATIONS. THE REGULATIONS. THE THE THE CONTRACTOR SHALL ALSO COMPLY WITH ALL SAFETY REQUIREMENTS OF ALL GOVERNING SHALL ALSO COMPLY WITH ALL SAFETY REQUIREMENTS OF ALL GOVERNING SHALL ALSO COMPLY WITH ALL SAFETY REQUIREMENTS OF ALL GOVERNING ALSO COMPLY WITH ALL SAFETY REQUIREMENTS OF ALL GOVERNING ALSO COMPLY WITH ALL SAFETY REQUIREMENTS OF ALL GOVERNING COMPLY WITH ALL SAFETY REQUIREMENTS OF ALL GOVERNING COMPLY WITH ALL SAFETY REQUIREMENTS OF ALL GOVERNING WITH ALL SAFETY REQUIREMENTS OF ALL GOVERNING WITH ALL SAFETY REQUIREMENTS OF ALL GOVERNING ALL SAFETY REQUIREMENTS OF ALL GOVERNING ALL SAFETY REQUIREMENTS OF ALL GOVERNING SAFETY REQUIREMENTS OF ALL GOVERNING SAFETY REQUIREMENTS OF ALL GOVERNING REQUIREMENTS OF ALL GOVERNING REQUIREMENTS OF ALL GOVERNING OF ALL GOVERNING OF ALL GOVERNING ALL GOVERNING ALL GOVERNING GOVERNING GOVERNING AUTHORITIES. 15. WHEN THE DEPTH OF TRENCH EXCEEDS 5 FEET, A TRENCH BOX OR SHORING SHALL BE WHEN THE DEPTH OF TRENCH EXCEEDS 5 FEET, A TRENCH BOX OR SHORING SHALL BE THE DEPTH OF TRENCH EXCEEDS 5 FEET, A TRENCH BOX OR SHORING SHALL BE THE DEPTH OF TRENCH EXCEEDS 5 FEET, A TRENCH BOX OR SHORING SHALL BE DEPTH OF TRENCH EXCEEDS 5 FEET, A TRENCH BOX OR SHORING SHALL BE DEPTH OF TRENCH EXCEEDS 5 FEET, A TRENCH BOX OR SHORING SHALL BE OF TRENCH EXCEEDS 5 FEET, A TRENCH BOX OR SHORING SHALL BE OF TRENCH EXCEEDS 5 FEET, A TRENCH BOX OR SHORING SHALL BE TRENCH EXCEEDS 5 FEET, A TRENCH BOX OR SHORING SHALL BE TRENCH EXCEEDS 5 FEET, A TRENCH BOX OR SHORING SHALL BE EXCEEDS 5 FEET, A TRENCH BOX OR SHORING SHALL BE EXCEEDS 5 FEET, A TRENCH BOX OR SHORING SHALL BE 5 FEET, A TRENCH BOX OR SHORING SHALL BE 5 FEET, A TRENCH BOX OR SHORING SHALL BE FEET, A TRENCH BOX OR SHORING SHALL BE FEET, A TRENCH BOX OR SHORING SHALL BE A TRENCH BOX OR SHORING SHALL BE A TRENCH BOX OR SHORING SHALL BE TRENCH BOX OR SHORING SHALL BE TRENCH BOX OR SHORING SHALL BE BOX OR SHORING SHALL BE BOX OR SHORING SHALL BE OR SHORING SHALL BE OR SHORING SHALL BE SHORING SHALL BE SHORING SHALL BE SHALL BE SHALL BE BE BE REQUIRED. IF THE MAXIMUM TRENCH DEPTH EXCEEDS 20 FEET, A SHORING DESIGN PER IF THE MAXIMUM TRENCH DEPTH EXCEEDS 20 FEET, A SHORING DESIGN PER IF THE MAXIMUM TRENCH DEPTH EXCEEDS 20 FEET, A SHORING DESIGN PER IF THE MAXIMUM TRENCH DEPTH EXCEEDS 20 FEET, A SHORING DESIGN PER THE MAXIMUM TRENCH DEPTH EXCEEDS 20 FEET, A SHORING DESIGN PER THE MAXIMUM TRENCH DEPTH EXCEEDS 20 FEET, A SHORING DESIGN PER MAXIMUM TRENCH DEPTH EXCEEDS 20 FEET, A SHORING DESIGN PER MAXIMUM TRENCH DEPTH EXCEEDS 20 FEET, A SHORING DESIGN PER TRENCH DEPTH EXCEEDS 20 FEET, A SHORING DESIGN PER TRENCH DEPTH EXCEEDS 20 FEET, A SHORING DESIGN PER DEPTH EXCEEDS 20 FEET, A SHORING DESIGN PER DEPTH EXCEEDS 20 FEET, A SHORING DESIGN PER EXCEEDS 20 FEET, A SHORING DESIGN PER EXCEEDS 20 FEET, A SHORING DESIGN PER 20 FEET, A SHORING DESIGN PER 20 FEET, A SHORING DESIGN PER FEET, A SHORING DESIGN PER FEET, A SHORING DESIGN PER A SHORING DESIGN PER A SHORING DESIGN PER SHORING DESIGN PER SHORING DESIGN PER DESIGN PER DESIGN PER PER PER O.S.H.A. REGULATIONS SHALL BE USED. 16. THE CONTRACTOR SHALL MAINTAIN THE STRUCTURAL INTEGRITY OF TRENCH EXCAVATIONS AT THE CONTRACTOR SHALL MAINTAIN THE STRUCTURAL INTEGRITY OF TRENCH EXCAVATIONS AT CONTRACTOR SHALL MAINTAIN THE STRUCTURAL INTEGRITY OF TRENCH EXCAVATIONS AT CONTRACTOR SHALL MAINTAIN THE STRUCTURAL INTEGRITY OF TRENCH EXCAVATIONS AT SHALL MAINTAIN THE STRUCTURAL INTEGRITY OF TRENCH EXCAVATIONS AT SHALL MAINTAIN THE STRUCTURAL INTEGRITY OF TRENCH EXCAVATIONS AT MAINTAIN THE STRUCTURAL INTEGRITY OF TRENCH EXCAVATIONS AT MAINTAIN THE STRUCTURAL INTEGRITY OF TRENCH EXCAVATIONS AT THE STRUCTURAL INTEGRITY OF TRENCH EXCAVATIONS AT THE STRUCTURAL INTEGRITY OF TRENCH EXCAVATIONS AT STRUCTURAL INTEGRITY OF TRENCH EXCAVATIONS AT STRUCTURAL INTEGRITY OF TRENCH EXCAVATIONS AT INTEGRITY OF TRENCH EXCAVATIONS AT INTEGRITY OF TRENCH EXCAVATIONS AT OF TRENCH EXCAVATIONS AT OF TRENCH EXCAVATIONS AT TRENCH EXCAVATIONS AT TRENCH EXCAVATIONS AT EXCAVATIONS AT EXCAVATIONS AT AT AT ALL TIMES. 17. THE CONTRACTOR SHALL SAFEGUARD THE OWNER'S PROPERTY AND ADJACENT PROPERTIES THE CONTRACTOR SHALL SAFEGUARD THE OWNER'S PROPERTY AND ADJACENT PROPERTIES CONTRACTOR SHALL SAFEGUARD THE OWNER'S PROPERTY AND ADJACENT PROPERTIES CONTRACTOR SHALL SAFEGUARD THE OWNER'S PROPERTY AND ADJACENT PROPERTIES SHALL SAFEGUARD THE OWNER'S PROPERTY AND ADJACENT PROPERTIES SHALL SAFEGUARD THE OWNER'S PROPERTY AND ADJACENT PROPERTIES SAFEGUARD THE OWNER'S PROPERTY AND ADJACENT PROPERTIES SAFEGUARD THE OWNER'S PROPERTY AND ADJACENT PROPERTIES THE OWNER'S PROPERTY AND ADJACENT PROPERTIES THE OWNER'S PROPERTY AND ADJACENT PROPERTIES OWNER'S PROPERTY AND ADJACENT PROPERTIES OWNER'S PROPERTY AND ADJACENT PROPERTIES PROPERTY AND ADJACENT PROPERTIES PROPERTY AND ADJACENT PROPERTIES AND ADJACENT PROPERTIES AND ADJACENT PROPERTIES ADJACENT PROPERTIES ADJACENT PROPERTIES PROPERTIES PROPERTIES DURING CONSTRUCTION AND SHALL REPLACE ANY DAMAGED PROPERTY OF THE OWNER'S CONSTRUCTION AND SHALL REPLACE ANY DAMAGED PROPERTY OF THE OWNER'S CONSTRUCTION AND SHALL REPLACE ANY DAMAGED PROPERTY OF THE OWNER'S AND SHALL REPLACE ANY DAMAGED PROPERTY OF THE OWNER'S AND SHALL REPLACE ANY DAMAGED PROPERTY OF THE OWNER'S SHALL REPLACE ANY DAMAGED PROPERTY OF THE OWNER'S SHALL REPLACE ANY DAMAGED PROPERTY OF THE OWNER'S REPLACE ANY DAMAGED PROPERTY OF THE OWNER'S REPLACE ANY DAMAGED PROPERTY OF THE OWNER'S ANY DAMAGED PROPERTY OF THE OWNER'S ANY DAMAGED PROPERTY OF THE OWNER'S DAMAGED PROPERTY OF THE OWNER'S DAMAGED PROPERTY OF THE OWNER'S PROPERTY OF THE OWNER'S PROPERTY OF THE OWNER'S OF THE OWNER'S OF THE OWNER'S THE OWNER'S THE OWNER'S OWNER'S OWNER'S PROPERTY AND ADJACENT PROPERTIES TO THE ORIGINAL CONDITION. 18. UNSUITABLE MATERIAL IS NOT TO BE USED FOR EMBANKMENT CONSTRUCTION. REMOVE ANY UNSUITABLE MATERIAL IS NOT TO BE USED FOR EMBANKMENT CONSTRUCTION. REMOVE ANY MATERIAL IS NOT TO BE USED FOR EMBANKMENT CONSTRUCTION. REMOVE ANY MATERIAL IS NOT TO BE USED FOR EMBANKMENT CONSTRUCTION. REMOVE ANY IS NOT TO BE USED FOR EMBANKMENT CONSTRUCTION. REMOVE ANY IS NOT TO BE USED FOR EMBANKMENT CONSTRUCTION. REMOVE ANY NOT TO BE USED FOR EMBANKMENT CONSTRUCTION. REMOVE ANY NOT TO BE USED FOR EMBANKMENT CONSTRUCTION. REMOVE ANY TO BE USED FOR EMBANKMENT CONSTRUCTION. REMOVE ANY TO BE USED FOR EMBANKMENT CONSTRUCTION. REMOVE ANY BE USED FOR EMBANKMENT CONSTRUCTION. REMOVE ANY BE USED FOR EMBANKMENT CONSTRUCTION. REMOVE ANY USED FOR EMBANKMENT CONSTRUCTION. REMOVE ANY USED FOR EMBANKMENT CONSTRUCTION. REMOVE ANY FOR EMBANKMENT CONSTRUCTION. REMOVE ANY FOR EMBANKMENT CONSTRUCTION. REMOVE ANY EMBANKMENT CONSTRUCTION. REMOVE ANY EMBANKMENT CONSTRUCTION. REMOVE ANY CONSTRUCTION. REMOVE ANY CONSTRUCTION. REMOVE ANY REMOVE ANY REMOVE ANY ANY ANY SUBGRADE THAT CANNOT BE PROPERLY COMPACTED AS DETERMINED BY A GEOTECHNICAL THAT CANNOT BE PROPERLY COMPACTED AS DETERMINED BY A GEOTECHNICAL THAT CANNOT BE PROPERLY COMPACTED AS DETERMINED BY A GEOTECHNICAL CANNOT BE PROPERLY COMPACTED AS DETERMINED BY A GEOTECHNICAL CANNOT BE PROPERLY COMPACTED AS DETERMINED BY A GEOTECHNICAL BE PROPERLY COMPACTED AS DETERMINED BY A GEOTECHNICAL BE PROPERLY COMPACTED AS DETERMINED BY A GEOTECHNICAL PROPERLY COMPACTED AS DETERMINED BY A GEOTECHNICAL PROPERLY COMPACTED AS DETERMINED BY A GEOTECHNICAL COMPACTED AS DETERMINED BY A GEOTECHNICAL COMPACTED AS DETERMINED BY A GEOTECHNICAL AS DETERMINED BY A GEOTECHNICAL AS DETERMINED BY A GEOTECHNICAL DETERMINED BY A GEOTECHNICAL DETERMINED BY A GEOTECHNICAL BY A GEOTECHNICAL BY A GEOTECHNICAL A GEOTECHNICAL A GEOTECHNICAL GEOTECHNICAL GEOTECHNICAL ENGINEER. UNDERCUTTING AND/OR SUBGRADE STABILIZATION MAY BE REQUIRED. 19. THE CONTRACTOR SHALL REMOVE ANY DEBRIS AND FLUSH OUT ALL EXISTING AND PROPOSED THE CONTRACTOR SHALL REMOVE ANY DEBRIS AND FLUSH OUT ALL EXISTING AND PROPOSED CONTRACTOR SHALL REMOVE ANY DEBRIS AND FLUSH OUT ALL EXISTING AND PROPOSED CONTRACTOR SHALL REMOVE ANY DEBRIS AND FLUSH OUT ALL EXISTING AND PROPOSED SHALL REMOVE ANY DEBRIS AND FLUSH OUT ALL EXISTING AND PROPOSED SHALL REMOVE ANY DEBRIS AND FLUSH OUT ALL EXISTING AND PROPOSED REMOVE ANY DEBRIS AND FLUSH OUT ALL EXISTING AND PROPOSED REMOVE ANY DEBRIS AND FLUSH OUT ALL EXISTING AND PROPOSED ANY DEBRIS AND FLUSH OUT ALL EXISTING AND PROPOSED ANY DEBRIS AND FLUSH OUT ALL EXISTING AND PROPOSED DEBRIS AND FLUSH OUT ALL EXISTING AND PROPOSED DEBRIS AND FLUSH OUT ALL EXISTING AND PROPOSED AND FLUSH OUT ALL EXISTING AND PROPOSED AND FLUSH OUT ALL EXISTING AND PROPOSED FLUSH OUT ALL EXISTING AND PROPOSED FLUSH OUT ALL EXISTING AND PROPOSED OUT ALL EXISTING AND PROPOSED OUT ALL EXISTING AND PROPOSED ALL EXISTING AND PROPOSED ALL EXISTING AND PROPOSED EXISTING AND PROPOSED EXISTING AND PROPOSED AND PROPOSED AND PROPOSED PROPOSED PROPOSED STORM DRAINAGE FACILITIES WITHIN THE PROJECT LIMITS AT THE COMPLETION OF DRAINAGE FACILITIES WITHIN THE PROJECT LIMITS AT THE COMPLETION OF DRAINAGE FACILITIES WITHIN THE PROJECT LIMITS AT THE COMPLETION OF FACILITIES WITHIN THE PROJECT LIMITS AT THE COMPLETION OF FACILITIES WITHIN THE PROJECT LIMITS AT THE COMPLETION OF WITHIN THE PROJECT LIMITS AT THE COMPLETION OF WITHIN THE PROJECT LIMITS AT THE COMPLETION OF THE PROJECT LIMITS AT THE COMPLETION OF THE PROJECT LIMITS AT THE COMPLETION OF PROJECT LIMITS AT THE COMPLETION OF PROJECT LIMITS AT THE COMPLETION OF LIMITS AT THE COMPLETION OF LIMITS AT THE COMPLETION OF AT THE COMPLETION OF AT THE COMPLETION OF THE COMPLETION OF THE COMPLETION OF COMPLETION OF COMPLETION OF OF OF CONSTRUCTION. 20. ALL UTILITY INSTALLATION SHALL BE IN ACCORDANCE WITH PENNSYLVANIA ACT 121. ALL UTILITY INSTALLATION SHALL BE IN ACCORDANCE WITH PENNSYLVANIA ACT 121. 21. THE CONTRACTOR SHALL NOTIFY (IN WRITING) THE MUNICIPALITY, AT LEAST 3 WORKING DAYS THE CONTRACTOR SHALL NOTIFY (IN WRITING) THE MUNICIPALITY, AT LEAST 3 WORKING DAYS CONTRACTOR SHALL NOTIFY (IN WRITING) THE MUNICIPALITY, AT LEAST 3 WORKING DAYS CONTRACTOR SHALL NOTIFY (IN WRITING) THE MUNICIPALITY, AT LEAST 3 WORKING DAYS SHALL NOTIFY (IN WRITING) THE MUNICIPALITY, AT LEAST 3 WORKING DAYS SHALL NOTIFY (IN WRITING) THE MUNICIPALITY, AT LEAST 3 WORKING DAYS NOTIFY (IN WRITING) THE MUNICIPALITY, AT LEAST 3 WORKING DAYS NOTIFY (IN WRITING) THE MUNICIPALITY, AT LEAST 3 WORKING DAYS (IN WRITING) THE MUNICIPALITY, AT LEAST 3 WORKING DAYS (IN WRITING) THE MUNICIPALITY, AT LEAST 3 WORKING DAYS WRITING) THE MUNICIPALITY, AT LEAST 3 WORKING DAYS WRITING) THE MUNICIPALITY, AT LEAST 3 WORKING DAYS THE MUNICIPALITY, AT LEAST 3 WORKING DAYS THE MUNICIPALITY, AT LEAST 3 WORKING DAYS MUNICIPALITY, AT LEAST 3 WORKING DAYS MUNICIPALITY, AT LEAST 3 WORKING DAYS , AT LEAST 3 WORKING DAYS AT LEAST 3 WORKING DAYS AT LEAST 3 WORKING DAYS LEAST 3 WORKING DAYS LEAST 3 WORKING DAYS 3 WORKING DAYS 3 WORKING DAYS WORKING DAYS WORKING DAYS DAYS DAYS PRIOR TO THE START OF ANY (INCLUDING ON-SITE) CONSTRUCTION. 22. DRAWING REFERENCES ARE FOR CONVENIENCE ONLY AND DO NOT LIMIT THE APPLICATION OF DRAWING REFERENCES ARE FOR CONVENIENCE ONLY AND DO NOT LIMIT THE APPLICATION OF REFERENCES ARE FOR CONVENIENCE ONLY AND DO NOT LIMIT THE APPLICATION OF REFERENCES ARE FOR CONVENIENCE ONLY AND DO NOT LIMIT THE APPLICATION OF ARE FOR CONVENIENCE ONLY AND DO NOT LIMIT THE APPLICATION OF ARE FOR CONVENIENCE ONLY AND DO NOT LIMIT THE APPLICATION OF FOR CONVENIENCE ONLY AND DO NOT LIMIT THE APPLICATION OF FOR CONVENIENCE ONLY AND DO NOT LIMIT THE APPLICATION OF CONVENIENCE ONLY AND DO NOT LIMIT THE APPLICATION OF CONVENIENCE ONLY AND DO NOT LIMIT THE APPLICATION OF ONLY AND DO NOT LIMIT THE APPLICATION OF ONLY AND DO NOT LIMIT THE APPLICATION OF AND DO NOT LIMIT THE APPLICATION OF AND DO NOT LIMIT THE APPLICATION OF DO NOT LIMIT THE APPLICATION OF DO NOT LIMIT THE APPLICATION OF NOT LIMIT THE APPLICATION OF NOT LIMIT THE APPLICATION OF LIMIT THE APPLICATION OF LIMIT THE APPLICATION OF THE APPLICATION OF THE APPLICATION OF APPLICATION OF APPLICATION OF OF OF THE DRAWING OR DETAIL. 23. CONTRACTOR SHALL PREPARE A PREPAREDNESS, PREVENTION, AND CONTINGENCY (PPC) PLAN CONTRACTOR SHALL PREPARE A PREPAREDNESS, PREVENTION, AND CONTINGENCY (PPC) PLAN SHALL PREPARE A PREPAREDNESS, PREVENTION, AND CONTINGENCY (PPC) PLAN SHALL PREPARE A PREPAREDNESS, PREVENTION, AND CONTINGENCY (PPC) PLAN PREPARE A PREPAREDNESS, PREVENTION, AND CONTINGENCY (PPC) PLAN PREPARE A PREPAREDNESS, PREVENTION, AND CONTINGENCY (PPC) PLAN A PREPAREDNESS, PREVENTION, AND CONTINGENCY (PPC) PLAN A PREPAREDNESS, PREVENTION, AND CONTINGENCY (PPC) PLAN PREPAREDNESS, PREVENTION, AND CONTINGENCY (PPC) PLAN PREPAREDNESS, PREVENTION, AND CONTINGENCY (PPC) PLAN PREVENTION, AND CONTINGENCY (PPC) PLAN PREVENTION, AND CONTINGENCY (PPC) PLAN AND CONTINGENCY (PPC) PLAN AND CONTINGENCY (PPC) PLAN CONTINGENCY (PPC) PLAN CONTINGENCY (PPC) PLAN (PPC) PLAN (PPC) PLAN PLAN PLAN IN ACCORDANCE WITH PA DEPARTMENT OF ENVIRONMENTAL PROTECTION REGULATIONS (IF ACCORDANCE WITH PA DEPARTMENT OF ENVIRONMENTAL PROTECTION REGULATIONS (IF ACCORDANCE WITH PA DEPARTMENT OF ENVIRONMENTAL PROTECTION REGULATIONS (IF WITH PA DEPARTMENT OF ENVIRONMENTAL PROTECTION REGULATIONS (IF WITH PA DEPARTMENT OF ENVIRONMENTAL PROTECTION REGULATIONS (IF PA DEPARTMENT OF ENVIRONMENTAL PROTECTION REGULATIONS (IF PA DEPARTMENT OF ENVIRONMENTAL PROTECTION REGULATIONS (IF DEPARTMENT OF ENVIRONMENTAL PROTECTION REGULATIONS (IF DEPARTMENT OF ENVIRONMENTAL PROTECTION REGULATIONS (IF OF ENVIRONMENTAL PROTECTION REGULATIONS (IF OF ENVIRONMENTAL PROTECTION REGULATIONS (IF ENVIRONMENTAL PROTECTION REGULATIONS (IF ENVIRONMENTAL PROTECTION REGULATIONS (IF PROTECTION REGULATIONS (IF PROTECTION REGULATIONS (IF REGULATIONS (IF REGULATIONS (IF (IF (IF REQUIRED). 24. PROPERTY MARKERS CURRENTLY EXIST IN THE FIELD. ANY MARKERS DISTURBED DURING PROPERTY MARKERS CURRENTLY EXIST IN THE FIELD. ANY MARKERS DISTURBED DURING MARKERS CURRENTLY EXIST IN THE FIELD. ANY MARKERS DISTURBED DURING MARKERS CURRENTLY EXIST IN THE FIELD. ANY MARKERS DISTURBED DURING CURRENTLY EXIST IN THE FIELD. ANY MARKERS DISTURBED DURING CURRENTLY EXIST IN THE FIELD. ANY MARKERS DISTURBED DURING EXIST IN THE FIELD. ANY MARKERS DISTURBED DURING EXIST IN THE FIELD. ANY MARKERS DISTURBED DURING IN THE FIELD. ANY MARKERS DISTURBED DURING IN THE FIELD. ANY MARKERS DISTURBED DURING THE FIELD. ANY MARKERS DISTURBED DURING THE FIELD. ANY MARKERS DISTURBED DURING FIELD. ANY MARKERS DISTURBED DURING FIELD. ANY MARKERS DISTURBED DURING ANY MARKERS DISTURBED DURING ANY MARKERS DISTURBED DURING MARKERS DISTURBED DURING MARKERS DISTURBED DURING DISTURBED DURING DISTURBED DURING DURING DURING CONSTRUCTION SHALL BE RE-SET IN THE FIELD WHEN CONSTRUCTION IS COMPLETE. 25. ENGINEER OF RECORD IS NOT RESPONSIBLE FOR JOB SITE SAFETY OR SUPERVISION. ENGINEER OF RECORD IS NOT RESPONSIBLE FOR JOB SITE SAFETY OR SUPERVISION. OF RECORD IS NOT RESPONSIBLE FOR JOB SITE SAFETY OR SUPERVISION. OF RECORD IS NOT RESPONSIBLE FOR JOB SITE SAFETY OR SUPERVISION. RECORD IS NOT RESPONSIBLE FOR JOB SITE SAFETY OR SUPERVISION. RECORD IS NOT RESPONSIBLE FOR JOB SITE SAFETY OR SUPERVISION. IS NOT RESPONSIBLE FOR JOB SITE SAFETY OR SUPERVISION. IS NOT RESPONSIBLE FOR JOB SITE SAFETY OR SUPERVISION. NOT RESPONSIBLE FOR JOB SITE SAFETY OR SUPERVISION. NOT RESPONSIBLE FOR JOB SITE SAFETY OR SUPERVISION. RESPONSIBLE FOR JOB SITE SAFETY OR SUPERVISION. RESPONSIBLE FOR JOB SITE SAFETY OR SUPERVISION. FOR JOB SITE SAFETY OR SUPERVISION. FOR JOB SITE SAFETY OR SUPERVISION. JOB SITE SAFETY OR SUPERVISION. JOB SITE SAFETY OR SUPERVISION. SITE SAFETY OR SUPERVISION. SITE SAFETY OR SUPERVISION. SAFETY OR SUPERVISION. SAFETY OR SUPERVISION. OR SUPERVISION. OR SUPERVISION. SUPERVISION. SUPERVISION. CONTRACTOR IS RESPONSIBLE FOR KEEPING ALL CONSTRUCTION AREAS IN A CONDITION THAT IS RESPONSIBLE FOR KEEPING ALL CONSTRUCTION AREAS IN A CONDITION THAT IS RESPONSIBLE FOR KEEPING ALL CONSTRUCTION AREAS IN A CONDITION THAT RESPONSIBLE FOR KEEPING ALL CONSTRUCTION AREAS IN A CONDITION THAT RESPONSIBLE FOR KEEPING ALL CONSTRUCTION AREAS IN A CONDITION THAT FOR KEEPING ALL CONSTRUCTION AREAS IN A CONDITION THAT FOR KEEPING ALL CONSTRUCTION AREAS IN A CONDITION THAT KEEPING ALL CONSTRUCTION AREAS IN A CONDITION THAT KEEPING ALL CONSTRUCTION AREAS IN A CONDITION THAT ALL CONSTRUCTION AREAS IN A CONDITION THAT ALL CONSTRUCTION AREAS IN A CONDITION THAT CONSTRUCTION AREAS IN A CONDITION THAT CONSTRUCTION AREAS IN A CONDITION THAT AREAS IN A CONDITION THAT AREAS IN A CONDITION THAT IN A CONDITION THAT IN A CONDITION THAT A CONDITION THAT A CONDITION THAT CONDITION THAT CONDITION THAT THAT THAT ALLOWS FOR SAFE MOVEMENT OF BOTH VEHICULAR AND PEDESTRIAN TRAFFIC. 26. NEITHER THE PROFESSIONAL ACTIVITIES OF GREENMAN-PEDERSEN, INC., LLC NOR THE NEITHER THE PROFESSIONAL ACTIVITIES OF GREENMAN-PEDERSEN, INC., LLC NOR THE THE PROFESSIONAL ACTIVITIES OF GREENMAN-PEDERSEN, INC., LLC NOR THE THE PROFESSIONAL ACTIVITIES OF GREENMAN-PEDERSEN, INC., LLC NOR THE PROFESSIONAL ACTIVITIES OF GREENMAN-PEDERSEN, INC., LLC NOR THE PROFESSIONAL ACTIVITIES OF GREENMAN-PEDERSEN, INC., LLC NOR THE ACTIVITIES OF GREENMAN-PEDERSEN, INC., LLC NOR THE ACTIVITIES OF GREENMAN-PEDERSEN, INC., LLC NOR THE OF GREENMAN-PEDERSEN, INC., LLC NOR THE OF GREENMAN-PEDERSEN, INC., LLC NOR THE GREENMAN-PEDERSEN, INC., LLC NOR THE GREENMAN-PEDERSEN, INC., LLC NOR THE INC., LLC NOR THE INC., LLC NOR THE LLC NOR THE LLC NOR THE NOR THE NOR THE THE THE PRESENCE OF GREENMAN-PEDERSEN, INC. OR ITS EMPLOYEES AND SUB-CONSULTANTS AT A OF GREENMAN-PEDERSEN, INC. OR ITS EMPLOYEES AND SUB-CONSULTANTS AT A OF GREENMAN-PEDERSEN, INC. OR ITS EMPLOYEES AND SUB-CONSULTANTS AT A GREENMAN-PEDERSEN, INC. OR ITS EMPLOYEES AND SUB-CONSULTANTS AT A GREENMAN-PEDERSEN, INC. OR ITS EMPLOYEES AND SUB-CONSULTANTS AT A INC. OR ITS EMPLOYEES AND SUB-CONSULTANTS AT A INC.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .