CONTRACT NO. 3 – ROADWAY AND STORMWATER INFASTRUCTURE CONSTRUCTION
Solicitation number
Not on record
Issued by
Luzerne County, Pennsylvania

About this file

This is a Project Manual and Instructions to Bidders for Contract No. 3 - Roadway and Stormwater Infrastructure Construction, issued by CAN DO, Inc. for the Crossroads East Business Park Phase 1 project located in Hazle Township, Luzerne County, Pennsylvania. The project involves constructing approximately 4,970 linear feet of new bituminous roadway and stormwater piping, with bids to be received online via the PennBid Program by September 26, 2025, at 2:00 p.m. A mandatory pre-bid conference is scheduled for September 17th at 11:00 a.m. at the project site, which is located on the northerly side of State Route 424 between Interstate 81 and State Route 309. The work will be awarded as a single prime contract with unit price bidding, and the successful bidder must provide performance and payment bonds.

The project requires 10% bid security and is subject to Pennsylvania Prevailing Wage Act requirements. Bidders must submit comprehensive documentation including qualifications statements, non-collusion affidavits, and other supporting materials. The project involves multiple infrastructure components, including asphalt paving, stormwater piping, and related site work, with specific quantities detailed in the bid form. Contractors will need to coordinate with other ongoing infrastructure projects in the area, including sanitary sewer, water main, gas, electric, and telecommunications infrastructure construction. The project anticipates road paving to commence on April 6, 2026, with a specified sequencing of road construction (Roads D, B, A, C, and E).

View the file

Other files

File Type Posted
1-CrossRoads East - Roadway and Storm Plans.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PROJECT MANUAL

FOR

CONTRACT NO. 3 – ROADWAY AND STORMWATER INFASTRUCTURE

CONSTRUCTION

CROSSROADS EAST BUSINESS PARK – PHASE 1

LOCATION

HAZLE TOWNSHIP, LUZERNE COUNTY

OWNER:

GREATER HAZLETON COMMUNITY AREA

NEW DEVELOPMENT ORGANIZATION INC.

ONE S. CHURCH STREET, SUITE 200

HAZLETON, PA 18201

SEPTEMBER 2025

ENGINEER:

REILLY ASSOCIATES

CONSULTING ENGINEERS

49 SOUTH MAIN STREET, SUITE 200

PITTSTON, PA. 18640

(570) 654-2473

JOB NUMBER: 19012.04

Table of Contents Page 00010-1 of 00010-2

TABLE OF CONTENTS

Section Number

Title

Page Number

INTRODUCTORY INFORMATION

00010 Table of Contents 00010-1 to 00010-2 00015 List of Drawings 00015-1 to 00015-1

BIDDING REQUIREMENTS

00111 Advertisement for Bids 00111-1 to 00111-1 00200 00410

Instructions to Bidders Bid Form (for reference only) Bid Pricing Section is available in PennBid

00200-1 to 00200-10 00410-1 to 00410-2 Online

00430 Bid Bond (Penal Sum Form) 00430-1 to 00430-2 00451 Qualifications Statement 00451-1 to 00451-12 00460 Affidavit RE Accepting Provisions of the

Workmen’s Compensation Act 00460-1 to 00460-1

00461 Nondiscrimination/Sexual Harassment Clause 00461-1 to 00461-2 00462 Employment Eligibility Verification Compliance

Form 00462-1 to 00462-1

00463 Public Works Employment Verification Form 00463-1 to 00463-1 00470 Instructions for Non-Collusion Affidavit 00470-1 to 00470-1 00471 Non-Collusion Affidavit 00471-1 to 00471-1 00472 Non-Collusion Affidavit of Subcontractor 00472-1 to 00472-1

CONTRACT DOCUMENTS

00510 Notice of Award 00510-1 to 00510-1 00520 Form of Agreement 00520-1 to 00520-7 00550 Notice to Proceed 00550-1 to 00550-1 00610 Performance Bond 00610-1 to 00610-3 00615 Payment Bond 00615-1 to 00615-3 00620 Contractor’s Application for Payment 00620-1 to 00620-4 00625 Certificate of Substantial Completion 00625-1 to 00625-1 00650 Consent of Surety to Final Payment Form 00650-1 to 00650-1 00700 Standard General Conditions of the Construction

Contract 00700-1 to 00700-65

00800 Supplementary Conditions 00800-1 to 00800-19 00820 Additional State, Federal or Funding Agency

Requirements 00820-1 to 00820-6

00830 Permits 00830-1 to 00830-1 00840 Wage Rate Requirements 00840-1 to 00840-8 00940 Work Change Directive 00940-1 to 00940-1 00941 Change Order 00941-1 to 00941-2 00942 Field Order 00942-1 to 00942-1

Table of Contents Page 00010-2 of 00010-2

SPECIFICATIONS

DIVISION 1 – GENERAL REQUIREMENTS

01000 Summary of Work 01000-1 to 01000-5 01020 01270

PennDOT Publication Coordination Unit Prices

01020-1 to 01020-2 01270-1 to 01020-2

01300 Submittals 01300-1 to 01300-4 01570 Maintenance and Protection of Traffic 01570-1 to 01570-4

DIVISION 2 – SITE WORK

02010 02025 02201

Subsurface Conditions Existing Utilities and Structures Clearing and Grubbing

02010-1 to 02010-2 02025-1 to 02025-2 02201-1 to 02201-2

02203 Excavation 02203-1 to 02203-6 02206 Embankment and Backfill 02206-1 to 02206-3 02230 Test Pits 02230-1 to 02230-2 02240 Dewatering 02240-1 to 02240-5 02413 Asphalt Paving 02413-1 to 02413-4 02495 Price Adjustment of Bituminous Materials 02495-1 to 02495-1 02601 Storm Drainage Pipe Culverts 02601-1 to 02601-4 02630 Sidewalk, Curb and Driveway 02630-1 to 02630-3 02801 Topsoil and Seeding 02801-1 to 02801-3 02845 Erosion Control 02845-1 to 02845-3 02930 Post Mounted Signs 02930-1 to 02930-4 02960 Pavement Markings 02960-1 to 02960-3

DIVISION 3-CONCRETE

03001 Cement Concrete Structures 03001-1 to 03001-2

ADDITIONAL SPECIFICATIONS

9000-0001 Fine Grading of Existing Subbase, 4” Depth

List of Drawings Page 00015- 1 of 00015-1

LIST OF DRAWINGS

CONTRACT NO. 3 – ROADWAY AND STORMWATER INFASTRUCTURE

CONSTRUCTION

DRAWINGS DESCRIPTION

C-000 COVER SHEET AND DRAWING INDEX

C-200 OVERALL ROADWAY GRADING AND STORM DRAINAGE PLAN

C-201 – C-206 ROADWAY AND STORMWATER PLAN AND PROFILE

C-207 – C-211 STORMWATER PROFILES

C-500 – C-505 CONSTRUCTION DETAILS

Advertisement for Bids Page 00111-1 of 00111-1

CAN DO, INC.

ONE S. CHURCH STREET, SUITE 200

HAZLETON, PA 18201

CONTRACT NO. 3 – ROADWAY AND STORMWATER INFRASTRUCTURE CONSTRUCTION

HAZLE TOWNSHIP, LUZERNE COUNTY

ADVERTISEMENT FOR BIDS

Sealed Bids for the following contract associated with the Crossroads East Business Park East Phase-1, Contract No. 3 – Roadway and Stormwater Infrastructure Construction, will be received online via the PennBid Program, by CAN DO, INC., until 2:00 p.m. local time on Friday, September 26, 2025, at which time the bids will be opened electronically and shortly after which, bid tabulation results will be publicly posted on PennBid’s website. The Project consists of construction of approximately 4,970 L.F. of new bituminous roadway and stormwater piping for roads.

Bids will be received for a single prime Contract. Bids shall be on a unit price basis as indicated in the Bid Form.

All bidding documents are available at no cost at https://pennbid.bonfirehub.com.

A pre-bid conference will be held on Wednesday, September 17th, 11:00 a.m. at the project site: the northerly side of State Route 424 between Interstate 81 and State Route 309 in Hazle Township, PA.

Attendance at the pre-bid conference is mandatory.

Bid security shall be furnished in accordance with the Instructions to Bidders. The successful bidder will be required to provide a Performance Bond and a Labor and Material Payment Bond, each in an amount at least equal to the Contract Price.

The following wage rate requirements are applicable to this contract: PA PREVAILING WAGES

A Certified Check or Bank Draft payable to the order of CAN DO, INC. or a satisfactory Bid Bond, executed by the Bidder and an acceptable surety, in an amount equal to ten percent (10%) of the total bid shall be submitted with each bid. Attention is called to the fact that the PA Prevailing Wage Act is applicable this contract; Contractor must file Stipulation Against Liens prior to the start of construction; Contractor shall provide acceptable liability, property damage, and Worker’s Compensation insurance and the Contractor must ensure that employees & applicants for employment are not discriminated against because of their race, age, color, religion, sex, national origin or handicap. CAN DO, INC. reserves the right to reject any or all bids and to waive any informalities in the bidding.

CAN DO, INC. does not discriminate on the basis of race, color, national origin, sex, religion, age, disability, or familial status in employment or the provision of services.

CAN DO, INC. is an Equal Opportunity/Affirmative Action Employer.

+ + END OF ADVERTISEMENT FOR BIDS + +

https://pennbid.bonfirehub.com/

Page 00200-i

INSTRUCTIONS TO BIDDERS

TABLE OF CONTENTS

Page ARTICLE 1 – Defined Terms

ARTICLE 2 – Copies of Bidding Documents

ARTICLE 3 – Qualifications of Bidders

ARTICLE 4 – Site and Other Areas; Existing Site Conditions; Examination of Site; Owner’s Safety Program;

Other Work at the Site

ARTICLE 5 – Bidder’s Representations

ARTICLE 6 – Pre-Bid Conference

ARTICLE 7 – Interpretations and Addenda

ARTICLE 8 – Bid Security

ARTICLE 9 – Contract Times

ARTICLE 10 – Liquidated Damages

ARTICLE 11 – Substitute and “Or-Equal” Items

ARTICLE 12 – Subcontractors, Suppliers, and Others

ARTICLE 13 – Preparation of Bid

ARTICLE 14 – Basis of Bid

ARTICLE 15 – Submittal of Bid

ARTICLE 16 – Modification and Withdrawal of Bid

ARTICLE 17 – Opening of Bids

ARTICLE 18 – Bids to Remain Subject to Acceptance

ARTICLE 19 – Evaluation of Bids and Award of Contract

ARTICLE 20 – Bonds and Insurance

ARTICLE 21 – Signing of Agreement

ARTICLE 22 – Wage Rate Requirements

ARTICLE 23 – Disadvantage Business Enterpirse (DBE) Solicitation Requirements

ARTICLE 24 – Other State, Federal & Funding Agency Requirements

ARTICLE 25 – rock clause

ARTICLE 26 – Other Contracts

ARTICLE 27 – subgrade elevations

ARTICLE 28 – INSPECTION FEES

Page 00200-1 of 00200-10

This document was generated from the EJCDC® C-200 (Rev. 1), Suggested Instructions to Bidders for Construction Contracts. Copyright © 2013 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved. The original form of this document has been modified herein for this specific project.

ARTICLE 1 – DEFINED TERMS

1.01 Terms used in these Instructions to Bidders have the meanings indicated in the General Conditions and Supplementary Conditions. Additional terms used in these Instructions to Bidders have the meanings indicated below:

A. Issuing Office – The office from which the Bidding Documents are to be issued.

ARTICLE 2 – COPIES OF BIDDING DOCUMENTS

Complete sets of the Bidding Documents may be obtained online at no cost via the PennBid Program (https://pennbid.bonfirehub.com.)

2.01 Complete sets of Bidding Documents shall be used in preparing Bids; neither Owner nor Engineer assumes any responsibility for errors or misinterpretations resulting from the use of incomplete sets of Bidding Documents.

2.02 Owner and Engineer, in making copies of Bidding Documents available on the above terms, do so only for the purpose of obtaining Bids for the Work and do not authorize or confer a license for any other use.

ARTICLE 3 – QUALIFICATIONS OF BIDDERS

3.01 To demonstrate Bidder’s qualifications to perform the Work, Bidder shall complete and submit with its Bid the Bidder Qualification Statement included with the Bidding Documents. In addition, within the times indicated in the General Conditions, as may be modified by the Supplementary Conditions, Bidder shall submit a listing of proposed Subcontractors to be utilized on the project along with similar qualifications and responsibility information on all Subcontractors.

3.02 A Bidder’s failure to submit required qualification information within the times indicated may disqualify Bidder from receiving an award of the Contract.

3.03 No requirement in this Article 3 to submit information will prejudice the right of Owner to seek additional pertinent information regarding Bidder’s qualifications.

3.04 Bidder is advised to carefully review those portions of the Bid Form requiring Bidder’s representations and certifications.

ARTICLE 4 – SITE AND OTHER AREAS; EXISTING SITE CONDITIONS; EXAMINATION OF SITE; OWNER’S

SAFETY PROGRAM; OTHER WORK AT THE SITE

4.01 Site and Other Areas

A. The Site is identified in the Bidding Documents. By definition, the Site includes rights-of-way, easements, and other lands furnished by Owner for the use of the Contractor. Any additional lands required for temporary construction facilities, construction equipment, or storage of materials and equipment, and any access needed for such additional lands, are to be obtained and paid for by Contractor.

Page 00200-2 of 00200-10

4.02 Existing Site Conditions

A. Subsurface and Physical Conditions; Hazardous Environmental Conditions

1. The Supplementary Conditions identify:

a. those reports known to Owner of explorations and tests of subsurface conditions at or adjacent to the Site.

b. those drawings known to Owner of physical conditions relating to existing surface or subsurface structures at the Site (except Underground Facilities).

c. reports and drawings known to Owner relating to Hazardous Environmental Conditions that have been identified at or adjacent to the Site.

d. Technical Data contained in such reports and drawings.

2. Owner will make copies of reports and drawings referenced above available to any Bidder on request. These reports and drawings are not part of the Contract Documents, but the Technical Data contained therein upon whose accuracy Bidder is entitled to rely, as provided in the General Conditions, has been identified and established in the Supplementary Conditions. Bidder is responsible for any interpretation or conclusion Bidder draws from any Technical Data or any other data, interpretations, opinions, or information contained in such reports or shown or indicated in such drawings. Bidder is responsible for all reproduction costs associated with requested reports and drawings.

3. If the Supplementary Conditions do not identify Technical Data, the default definition of Technical Data set forth in Article 1 of the General Conditions will apply.

B. Underground Facilities: Information and data shown or indicated in the Bidding Documents with respect to existing Underground Facilities at or adjacent to the Site are set forth in the Contract Documents and are based upon information and data furnished to Owner and Engineer by owners of such Underground Facilities, including Owner, or others.

C. Adequacy of Data: Provisions concerning responsibilities for the adequacy of data furnished to prospective Bidders with respect to subsurface conditions, other physical conditions, and Underground Facilities, and possible changes in the Bidding Documents due to differing or unanticipated subsurface or physical conditions appear in Paragraphs 5.03, 5.04, and 5.05 of the General Conditions. Provisions concerning responsibilities for the adequacy of data furnished to prospective Bidders with respect to a Hazardous Environmental Condition at the Site, if any, and possible changes in the Contract Documents due to any Hazardous Environmental Condition uncovered or revealed at the Site which was not shown or indicated in the Drawings or Specifications or identified in the Contract Documents to be within the scope of the Work, appear in Paragraph 5.06 of the General Conditions.

4.03 Site Visit and Testing by Bidders

A. Bidder shall conduct the required Site visit during normal working hours, and shall not disturb any ongoing operations at the Site. Bidders wishing to view the site must contact Jim Kean at jkean@mericle.com to arrange a date and time for access.

B. Bidder is responsible to obtain such additional or supplementary examinations, investigations, test borings, explorations, tests, studies and data concerning conditions (surface, subsurface and underground facilities) at or contiguous to the Site or otherwise, which may affect (1) the cost, progress, and performance of the Work; (2) the means, methods, techniques, sequences, and procedures of construction to be employed by Bidder, including applying any specific means, methods, techniques, sequences, and procedures of construction expressly required mailto:jkean@mericle.com

Page 00200-3 of 00200-10 by the Bidding Documents; and (3) Bidder’s safety precautions and programs or which the Bidder deems necessary to assume all risks in excavating for the Project and determine its bid for the Work.

C. On request, and to the extent Owner has control over the Site, and schedule permitting, the Owner will provide Bidder access to the Site to conduct such additional examinations, investigations, explorations, tests, and studies as Bidder deems necessary for preparing and submitting a successful Bid. Owner will not have any obligation to grant such access if doing so is not practical because of existing operations, security or safety concerns, or restraints on Owner’s authority regarding the Site.

D. Bidder shall comply with all applicable Laws and Regulations regarding excavation and location of utilities, obtain all permits, and comply with all terms and conditions established by Owner or by property owners or other entities controlling the Site with respect to schedule, access, existing operations, security, liability insurance, and applicable safety programs.

E. Bidder shall fill all holes and clean up and restore the Site to its former condition upon completion of such explorations, investigations, tests, and studies.

4.04 Owner’s Safety Program

A. Site visits and work at the Site may be governed by an Owner safety program. As the General Conditions indicate, if an Owner safety program exists, it will be noted in the Supplementary Conditions.

4.05 Other Work at the Site

A. Reference is made to Article 8 of the Supplementary Conditions for the identification of the general nature of other work of which Owner is aware (if any) that is to be performed at the Site by Owner or others (such as utilities and other prime contractors) and relates to the Work contemplated by these Bidding Documents. If Owner is party to a written contract for such other work, then on request, Owner will provide to each Bidder access to examine such contracts (other than portions thereof related to price and other confidential matters), if any.

ARTICLE 5 – BIDDER’S REPRESENTATIONS

5.01 It is the responsibility of each Bidder before submitting a Bid to:

A. examine and carefully study the Bidding Documents, and any data and reference items identified in the Bidding Documents;

B. visit the Site, conduct a thorough, alert visual examination of the Site and adjacent areas, and become familiar with and satisfy itself as to the general, local, and Site conditions that may affect cost, progress, and performance of the Work;

C. become familiar with and satisfy itself as to all Laws and Regulations that may affect cost, progress, and performance of the Work;

D. carefully study all: (1) reports of explorations and tests of subsurface conditions at or adjacent to the Site and all drawings of physical conditions relating to existing surface or subsurface structures, if any, at the Site that have been identified in the Supplementary Conditions, especially with respect to Technical Data in such reports and drawings, and (2) reports and drawings relating to Hazardous Environmental Conditions, if any, at or adjacent to the Site that have been identified in the Supplementary Conditions, especially with respect to Technical Data in such reports and drawings;

Page 00200-4 of 00200-10

E. consider the information known to Bidder itself; information commonly known to contractors doing business in the locality of the Site; information and observations obtained from visits to the Site; the Bidding Documents; and the Site-related reports and drawings, if any, identified in the Bidding Documents, with respect to the effect of such information, observations, and documents on (1) the cost, progress, and performance of the Work; (2) the means, methods, techniques, sequences, and procedures of construction to be employed by Bidder; and (3) Bidder’s safety precautions and programs;

F. obtain such additional or supplementary examinations, investigations, test borings, explorations, tests, studies and data concerning conditions (surface, subsurface and underground facilities) at or contiguous to the Site or otherwise, which may affect (1) the cost, progress, and performance of the Work; (2) the means, methods, techniques, sequences, and procedures of construction to be employed by Bidder, including applying any specific means, methods, techniques, sequences, and procedures of construction expressly required by the Bidding Documents; and (3) Bidder’s safety precautions and programs or which Bidder deems necessary to assume all risks in excavating for the Project and determine its bid for the Work;

G. agree, based on the information and observations referred to in the preceding paragraphs, that at the time of submitting its Bid no further examinations, investigations, explorations, tests, studies, or data are necessary for the determination of its Bid for performance of the Work at the price bid and within the times required, and in accordance with the other terms and conditions of the Bidding Documents;

H. become aware of the general nature of the work to be performed by Owner and others at the Site that relates to the Work as indicated in the Bidding Documents;

I. promptly give Engineer written notice of all conflicts, errors, ambiguities, or discrepancies that Bidder discovers in the Bidding Documents and confirm that the written resolution thereof by Engineer is acceptable to Bidder;

J. determine that the Bidding Documents are generally sufficient to indicate and convey understanding of all terms and conditions for the performance and furnishing of the Work;

and

K. agree that the submission of a Bid will constitute an incontrovertible representation by Bidder that Bidder has complied with every requirement of this Article, that without exception the Bid and all prices in the Bid are premised upon performing and furnishing the Work required by the Bidding Documents.

ARTICLE 6 – PRE-BID CONFERENCE

6.01 Pre-Bid conference requirements and details are stated in the invitation or advertisement to bid.

If a conference is planned and listed as mandatory in the invitation or advertisement to bid, Bids will not be accepted from any Bidder that did not attend the mandatory conference.

ARTICLE 7 – INTERPRETATIONS AND ADDENDA

7.01 All questions about the meaning or intent of the Bidding Documents are to be submitted to Engineer in writing via the “Messages/Vendor Discussions” feature in PennBid. Interpretations or clarifications considered necessary by Engineer in response to such questions will be issued by Addenda and posted within PennBid’s “Documents” tab. Notification via email will be made to all parties recorded as having downloaded the Bidding Documents. Questions received less than seven (7) days prior to the date for opening of Bids may not be answered. Only questions

Page 00200-5 of 00200-10 answered by Addenda will be binding. Oral and other interpretations or clarifications will be without legal effect.

7.02 Addenda may be issued to clarify, correct, supplement, or change the Bidding Documents.

ARTICLE 8 – BID SECURITY

8.01 A Bid must be accompanied by Bid security made payable to Owner in an amount of 10 percent of Bidder’s total of all Bid prices for each bid (not including bid alternates) and in the form of a certified check, bank money order, or a Bid bond (on the form included in the Bidding Documents) issued by a surety meeting the requirements of Paragraphs 6.01 and 6.02 of the General Conditions.

8.02 The Bid security of the apparent Successful Bidder will be retained until Owner awards the contract to such Bidder, and such Bidder has executed the Contract Documents, furnished the required contract security, and met the other conditions of the Notice of Award, whereupon the Bid security will be released. If the Successful Bidder fails to execute and deliver the Contract Documents and furnish the required contract security within 10 days after the Notice of Award, Owner may consider Bidder to be in default, annul the Notice of Award, and the Bid security of that Bidder will be forfeited. Such forfeiture shall be Owner’s exclusive remedy if Bidder defaults.

ARTICLE 9 – CONTRACT TIMES

9.01 The number of days within which, or the dates by which, Milestones are to be achieved and the Work is to be substantially completed, and completed and ready for final payment, are set forth in the Agreement.

ARTICLE 10 – LIQUIDATED DAMAGES

10.01 Provisions for liquidated damages, if any, for failure to timely attain a Milestone, Substantial Completion, or completion of the Work in readiness for final payment, are set forth in the Agreement.

ARTICLE 11 – SUBSTITUTE AND “OR-EQUAL” ITEMS

11.01 The Contract for the Work, as awarded, will be on the basis of materials and equipment specified or described in the Bidding Documents without consideration during the bidding and Contract award process of possible substitute or “or-equal” items. In cases in which the Contract allows the Contractor to request that Engineer authorize the use of a substitute or “or-equal” item of material or equipment, application for such acceptance may not be made to and will not be considered by Engineer until after the Effective Date of the Contract.

11.02 All prices that Bidder sets forth in its Bid shall be based on the presumption that the Contractor will furnish the materials and equipment specified or described in the Bidding Documents, as supplemented by Addenda. Any assumptions regarding the possibility of post-Bid approvals of “or-equal” or substitution requests are made at Bidder’s sole risk.

ARTICLE 12 – SUBCONTRACTORS, SUPPLIERS, AND OTHERS

12.01 A Bidder shall be prepared to retain specific Subcontractors, Suppliers, or other individuals or entities for the performance of the Work if required by the Bidding Documents (most commonly in the Specifications) to do so. If a prospective Bidder objects to retaining any such Subcontractor, Page 00200-6 of 00200-10

Supplier, or other individual or entity, and the concern is not relieved by an Addendum, then the prospective Bidder should refrain from submitting a Bid.

12.02 Subsequent to the submittal of the Bid, Owner may not require the Successful Bidder or Contractor to retain any Subcontractor, Supplier, or other individual or entity against which Contractor has reasonable objection.

12.03 The apparent Successful Bidder, and any other Bidder so requested, shall within five days after Bid opening, submit to Owner a list of the Subcontractors or Suppliers proposed for the various portions of the Work. If requested by Owner, such list shall be accompanied by an experience statement with pertinent information regarding similar projects and other evidence of qualification for each such Subcontractor, Supplier, or other individual or entity. If Owner or Engineer, after due investigation, has reasonable objection to any proposed Subcontractor, Supplier, individual, or entity, Owner may, before the Notice of Award is given, request apparent Successful Bidder to submit an acceptable substitute, without an increase in Bid price. No contract can be awarded to any contractor that is debarred by either the state or federal agency.

12.04 If apparent Successful Bidder declines to make any such substitution, Owner may award the Contract to the next lowest Bidder that proposes to use acceptable Subcontractors, Suppliers, or other individuals or entities. Declining to make requested substitutions will not constitute grounds for forfeiture of the Bid security of any Bidder. Any Subcontractor, Supplier, individual, or entity so listed and against which Owner or Engineer makes no written objection prior to the giving of the Notice of Award will be deemed acceptable to Owner and Engineer subject to subsequent revocation of such acceptance as provided in Paragraph 7.06 of the General Conditions.

ARTICLE 13 – PREPARATION OF BID

13.01 Bidders shall complete the electronic bid form within PennBid (“Prepare Your Submission” tab), inclusive of all pricing items and required supporting documents as identified.

13.02 A Bid by a corporation shall be executed in the corporate name by a corporate officer accompanied by evidence of authority to submit.

13.03 A Bid by a partnership shall be executed in the partnership name and submitted by a partner accompanied by evidence of authority to submit.

13.04 A Bid by a limited liability company shall be executed in the name of the firm by a member or other authorized person and accompanied by evidence of authority to submit.

13.05 A Bid by an individual shall show the Bidder’s name and address for receiving notices.

13.06 A Bid by a joint venture shall be executed and submitted by an authorized representative.

ARTICLE 14 – BASIS OF BID

14.01 Unit Price

A. Bidders shall submit a Bid on a unit price basis for each item of Work listed in the unit price section of the Bid Form.

B. The “Bid Price” (sometimes referred to as the extended price) for each unit price Bid item will be the product of the “Estimated Quantity” (which Owner or its representative has set forth in the Bid Form) for the item and the corresponding “Bid Unit Price” offered by the Bidder.

The total of all unit price Bid items will be the sum of these “Bid Prices”; such total will be used by Owner for Bid comparison purposes. The final quantities and Contract Price will be determined in accordance with Paragraph 13.03 of the General Conditions.

Page 00200-7 of 00200-10

ARTICLE 15 – SUBMITTAL OF BID

15.01 Bids shall be submitted online via the PennBid Program (https://pennbid.bonfirehub.com) no later than the date and time indicated in the Invitations or Advertisements for Bids, along with the Bid security and other required documents and the other documents required to be submitted as identified herein.

ARTICLE 16 – MODIFICATION AND WITHDRAWAL OF BID

16.01 A Bid may be withdrawn at any time prior to the date and time for the opening of Bids via the “Withdraw Bid” button in PennBid.

16.02 If within 24 hours after Bids are opened any Bidder files a duly signed written notice with Owner and promptly thereafter demonstrates to the reasonable satisfaction of Owner that there was a material and substantial mistake in the preparation of its Bid, that Bidder may withdraw its Bid, and the Bid security will be returned. Thereafter, if the Work is rebid, that Bidder will be disqualified from further bidding on the Work.

ARTICLE 17 – OPENING OF BIDS

17.01 Bids will be opened at the time and place indicated in the invitation or advertisement to bid, a public notice will be issued via PennBid containing any available bid results. It should be noted that bid results are subject to further review and should not be construed as issuance of award.

ARTICLE 18 – BIDS TO REMAIN SUBJECT TO ACCEPTANCE

18.01 All Bids will remain subject to acceptance for the period of time stated in the Bid Form, but Owner may, in its sole discretion, release any Bid and return the Bid security prior to the end of this period.

ARTICLE 19 – EVALUATION OF BIDS AND AWARD OF CONTRACT

19.01 Owner reserves the right to reject any or all Bids, including without limitation, nonconforming, nonresponsive, unbalanced, or conditional Bids. Owner will reject the Bid of any Bidder that Owner finds, after reasonable inquiry and evaluation, to not be responsible. If Bidder purports to add terms or conditions to its Bid, takes exception to any provision of the Bidding Documents, or attempts to alter the contents of the Contract Documents for purposes of the Bid, then the Owner will reject the Bid as nonresponsive; provided that Owner also reserves the right to waive all minor informalities not involving price, time, or changes in the Work.

19.02 If Owner awards the contract for the Work, such award shall be to the responsible Bidder submitting the lowest responsive Bid.

19.03 Evaluation of Bids

A. In evaluating Bids, Owner will consider whether or not the Bids comply with the prescribed requirements, and such alternates, unit prices, and other data, as may be requested in the Bid Form or prior to the Notice of Award.

B. For the determination of the apparent low Bidder when unit price bids are submitted, Bids will be compared on the basis of the total of the products of the estimated quantity of each item and unit price Bid for that item, together with any lump sum items.

C. In the comparison of Bids, alternates will be applied in an order of priority as established solely by Owner. After determination of the Successful Bidder based on this comparative process

Page 00200-8 of 00200-10 and on the responsiveness, responsibility, and other factors set forth in these Instructions, the award may be made to said Successful Bidder on its base Bid and the combination of its additive alternate Bids as established by Owner.

19.04 In evaluating whether a Bidder is responsible, Owner will consider the qualifications of the Bidder and may consider the qualifications and experience of Subcontractors and Suppliers proposed for those portions of the Work for which the identity of Subcontractors and Suppliers must be submitted as provided in the Bidding Documents.

19.05 Owner may conduct such investigations as Owner deems necessary to establish the responsibility, qualifications, and financial ability of Bidders and any proposed Subcontractors or Suppliers.

ARTICLE 20 – BONDS AND INSURANCE

20.01 Article 6 of the General Conditions, as may be modified by the Supplementary Conditions, sets forth Owner’s requirements as to performance and payment bonds and insurance. When the Successful Bidder delivers the Agreement (executed by Successful Bidder) to Owner, it shall be accompanied by required bonds and insurance documentation. Bonds issuers must be listed in OMB Circular 570 and be licensed in the Commonwealth of PA.

ARTICLE 21 – SIGNING OF AGREEMENT

21.01 When Owner issues a Notice of Award to the Successful Bidder, it shall be accompanied by the unexecuted counterparts of the Agreement along with the other Contract Documents as identified in the Agreement. Within 10 days thereafter, Successful Bidder shall execute and deliver the required number of counterparts of the Agreement (and any bonds and insurance documentation required to be delivered by the Contract Documents) to Owner. Within ten days thereafter, Owner shall deliver one fully executed counterpart of the Agreement to Successful Bidder, together with printed and electronic copies of the Contract Documents as stated in Paragraph 2.02 of the General Conditions.

ARTICLE 22 – WAGE RATE REQUIREMENTS

22.01 Refer to Section 00840 for any wage rate requirements applicable to this contract.

ARTICLE 23 – DISADVANTAGE BUSINESS ENTERPIRSE (DBE) SOLICITATION REQUIREMENTS

23.01 There are no additional DBE solicitation requirements.

ARTICLE 24 – OTHER STATE, FEDERAL & FUNDING AGENCY REQUIREMENTS

24.01 Refer to Section 00820 for any other State, Federal or Funding Agency requirements.

ARTICLE 25 – ROCK CLAUSE

25.01 Rock blasting has been completed on site by the Owner. Blasting did not occur within the state highway. The contractor is required to remove the blasted rock as part of the utility trench excavation required for this contract. No separate payment will be made for the removal of blasted rock and the work shall be included in the other items bid.

Rock has not been blasted in the state highway. The contractor shall remove rock in the state highway using mechanical means only. No blasting will be allowed in the state highway.

All work is expected to be accomplished using conventional equipment.

Page 00200-9 of 00200-10

For general excavation, a Caterpillar D9T tractor with a single shank ripper, or equivalent equipment, is considered conventional equipment if it can rip at a production rate of 300 bank cubic yards per hour.

For trench excavation, a Caterpillar 336 excavator with a medium stick and a rock ripping bucket, or equivalent equipment, is considered conventional equipment if it can excavate at a production rate of 30 bank cubic yards per hour.

If material is encountered which the contractor believes cannot be excavated by conventional method, the owner shall be immediately notified. No additional payment will be made if the owner is not notified prior to removal.

ARTICLE 26 – OTHER CONTRACTS

26.01 The Owner, adjacent land owners and others may award or may have awarded other Contracts for additional work, and the Contractor shall cooperate fully with such other Contracts, by scheduling their own work with that to be performed under other Contracts as may be directed by the Owner in order to meet the require completion time frames for all work at no additional cost to the owner. The Contractor shall not commit or permit any act, which will interfere with the performance of work by any other Contractor as scheduled.

The Contractor must coordinate their work, sequencing and work areas with other Contractors, Subcontractors, the Developer and the Project Owner. Regular coordination meetings will be required.

Separate contracts which are expected to be awarded for work in the same area for work at the same time as this contract include but are not limited to:

Sanitary Sewer Infrastructure Construction Water Main Infrastructure Construction Gas Infrastructure Construction Electric / Telecommunication and Site Lighting Construction Topsoil, Seeding and Landscape Construction Site grading, drainage, utilities and building construction on adjacent lands.

All Contractors must schedule their work to accommodate the following road paving sequence:

Road D, Road B, Road A, Road C, Road E. All Contractors must attend regular coordination meetings to ensure this sequence is achieved, prevent delays, and complete the infrastructure in the Road D work area first. For the purposes of bidding and scheduling, Contractors should assume Road D Paving will commence April 6, 2026.

The Contractor shall hold harmless the Owner, Reilly Associates, the property owner, and the owner of any other contracts and other contractors for any damages resulting from the delay of work caused by the contractor of any other contract awarded by the Owner or property owner, or any other contract owner performing work on the project site.

ARTICLE 27 – SUBGRADE ELEVATIONS

27.01 The utility elevations shown on the plans are based on final grade elevations in areas of proposed work, or existing ground. Where the profiles show utilities in areas of proposed grading, the Contractor shall stage his work to install such utilities after the completion of the grading by others. Work to prepare the area to within the specified tolerance for subgrade elevation will be performed by others and shall not be included in this contract. The typical roadway section detail indicates the subgrade elevation as-constructed by others prior to this contract, and the final

Page 00200-10 of 00200-10 subgrade elevation for this contract. All trench spoil material (excess excavated material) shall be stockpiled behind the curb area for fine grading unless directed otherwise by the owner. Common fill for fine grading shall be no stones or rocks larger than 6 inches.

ARTICLE 28 – INSPECTION FEES

28.01 The Hazleton City Authority (HCA) may have an inspector on site during the proposed work. HCA will take ownership of the utility infrastructure at the completion of construction and approval of the work. The owner will be responsible for any and all inspection fees incurred by HCA inspections.

BID FORM

ITEM

NUMBER

APPROXIMATE

QUANTITIES UNIT DESCRIPTION UNIT PRICE TOTALS

0608-0001 1 LS Mobilization $ $

0409-0481 19637 SY

Superpave Asphalt Mixture Design, WMA Wearing Course, PG 64S-22, 0.3 to < 3 Million ESALs, 9.5 MM Mix, 1 1/2" Depth, SRL-E

0413-0244 19637 SY

Superpave Asphalt Mixture Design, WMA Base Course, PG 64S-22, 0.3 to < 3.0 Million ESALs, 25 MM Mix, 4 1/2" Depth

0350-0108 19637 SY Subbase 8" Depth (No. 2A) $ $

0460-0001 19637 SY Asphalt Tack Coat $ $

4604-0353 143 LF 18" Perforated Thermoplastic Pipe, Group IIIP, 8' - 2' Fill, Complete in Place $ $

4601-0353 1291 LF 18" Thermoplastic Pipe, Group III, 8' - 2' Fill, Complete in Place $ $

4605-2854 25 EACH Standard Inlet Box, Height </= 10', Complete in Place $ $

4605-5721 27 Set Type C Concrete Top Unit, 8" Curb Height and Bicycle Safe Grate $ $

4605-5731 1 Set Type M Concrete Top Unit and Bicycle Safe Grate $ $

4610-7001 6239 LF 6" Pavement Base Drain, Complete in Place $ $

0501-0020 192 SY Plain Cement Concrete Pavement, 4" Depth $ $

0633-0200 639 LF Plain Concrete Mountable Curb, Type A $ $

0630-0001 7180 LF Plain Cement Concrete Curb, 8" Height $ $

0686-0020 1 LS Construction Surveying, Type B $ $

0962-1000 6260 LF 4" White Waterborne Pavement Markings $ $

0962-1001 658 LF 6" White Waterborne Pavement Markings $ $

0962-1005 6175 LF 4" Yellow Waterborne Pavement Markings $ $

0960-0222 5 EA White Hot Thermoplastic Legend, "Right Arrow," 12'-0" x 3'-0" $ $

0931-0002 56 SF Post Mounted Signes, Type B, Steel Channel Bar Post $ $

0620-1075 301 LF Type 31S Guide Rail $ $

CONTRACT NO. 3 - ROADWAY AND STORMWATER INFRASTRUCTURE CONSTRUCTION

BASE BID ITEMS

Bid Form – Revised 03-25-09 Section 0020 Page 4 of 10

CONTRACT NO. 3 - ROADWAY AND STORMWATER INFRASTRUCTURE CONSTRUCTION

0620-1250 4 EA Type 2 Strong Post End Treatment $ $

9000-0001 16766 SY Fine Grading Of Existing Subbase, 4" Depth $ $

0804-0036 728 LB Seeding and Soil Supplements - Formula B Residential Mix, Including Mulch $ $

0805-0021 10.4 TON Mulching - Hay $ $

0802-0001 1864 CY Topsoil Furnished and Placed $ $

ITEM

NUMBER

APPROXIMATE

QUANTITIES UNIT DESCRIPTION UNIT PRICE TOTAL

0409-0481 7365 SY

Superpave Asphalt Mixture Design, WMA Wearing Course, PG 64S-22, 0.3 to < 3 Million ESALs, 9.5 MM Mix, 1 1/2" Depth, SRL-E

0413-0244 7365 SY

Superpave Asphalt Mixture Design, WMA Base Course, PG 64S-22, 0.3 to < 3.0 Million ESALs, 25 MM Mix, 4 1/2" Depth

0350-0108 7365 SY Subbase 8" Depth (No. 2A) $ $

0460-0001 7365 SY Asphalt Tack Coat $ $

4604-0353 292 LF 18" Perforated Thermoplastic Pipe, Group IIIP, 8' - 2' Fill, Complete in Place

4601-0353 910 LF 18" Thermoplastic Pipe, Group III, 8' - 2' Fill, Complete in Place $ $

4605-2854 16 EACH Standard Inlet Box, Height </= 10', Complete in Place $ $

4605-5721 16 Set Type C Concrete Top Unit, 8" Curb Height and Bicycle Safe Grate $ $

4610-7001 2810 LF 6" Pavement Base Drain, Complete in Place $ $

0630-0001 3393 LF Plain Cement Concrete Curb, 8" Height $ $

0962-1000 2955 LF 4" White Waterborne Pavement Markings $ $

0962-1005 2885 LF 4" Yellow Waterborne Pavement Markings $ $

0960-0021 12 LF 24" White Hot Thermoplastic Pavement Markings $ $

0931-0002 17 SF Post Mounted Signes, Type B, Steel Channel Bar Post $ $

ADD ALTERNATE NO. 1 - ROAD E

TOTAL BASE BID

Bid Form – Revised 03-25-09 Section 0020 Page 5 of 10

CONTRACT NO. 3 - ROADWAY AND STORMWATER INFRASTRUCTURE CONSTRUCTION

0620-1600 513 LF Type 31S Guide Rail $ $

0619-0450 2 EA Permanent Impact Attenuator Device Type II, Test 0619-0450Level 3, Flared (MASH) $ $

9000-0001 8200 SY Fine Grading Of Existing Subbase, 4" Depth $ $

0804-0036 356 LB Seeding and Soil Supplements - Formula B Residential Mix, Including Mulch $ $

0805-0021 5.1 TON Mulching - Hay $ $

0802-0001 912 CY Topsoil Furnished and Placed $ $

$TOTAL ADD ALTERNATE NO. 1

Page 00410-3 of 00410-3

PENAL SUM FORM

EJCDC® C-430, Bid Bond (Penal Sum Form). Published 2013.

Prepared by the Engineers Joint Contract Documents Committee.

Page 00430-1 of 00430-2

BID BOND

Any singular reference to Bidder, Surety, Owner or other party shall be considered plural where applicable.

BIDDER (Name and Address):

SURETY (Name, and Address of Principal Place of Business):

OWNER (Name and Address):

BID

Bid Due Date:

Description (Project Name— Include Location):

BOND

Bond Number:

Date:

Penal sum $ (Words) (Figures) Surety and Bidder, intending to be legally bound hereby, subject to the terms set forth below, do each cause this Bid Bond to be duly executed by an authorized officer, agent, or representative.

BIDDER SURETY

(Seal) (Seal) Bidder’s Name and Corporate Seal Surety’s Name and Corporate Seal

By: By:

Signature Signature (Attach Power of Attorney)

Print Name Print Name

Title Title

Attest: Attest:

Signature Signature

Title Title Note: Addresses are to be used for giving any required notice.

Provide execution by any additional parties, such as joint venturers, if necessary.

PENAL SUM FORM

EJCDC® C-430, Bid Bond (Penal Sum Form). Published 2013.

Prepared by the Engineers Joint Contract Documents Committee.

Page 00430-2 of 00430-2

1. Bidder and Surety, jointly and severally, bind themselves, their heirs, executors, administrators, successors, and assigns to pay to Owner upon default of Bidder the penal sum set forth on the face of this Bond. Payment of the penal sum is the extent of Bidder’s and Surety’s liability. Recovery of such penal sum under the terms of this Bond shall be Owner’s sole and exclusive remedy upon default of Bidder.

2. Default of Bidder shall occur upon the failure of Bidder to deliver within the time required by the Bidding Documents (or any extension thereof agreed to in writing by Owner) the executed Agreement required by the Bidding Documents and any performance and payment bonds required by the Bidding Documents.

3. This obligation shall be null and void if:

3.1 Owner accepts Bidder’s Bid and Bidder delivers within the time required by the Bidding Documents (or any extension thereof agreed to in writing by Owner) the executed Agreement required by the Bidding Documents and any performance and payment bonds required by the Bidding Documents, or

3.2 All Bids are rejected by Owner, or

3.3 Owner fails to issue a Notice of Award to Bidder within the time specified in the Bidding Documents (or any extension thereof agreed to in writing by Bidder and, if applicable, consented to by Surety when required by Paragraph 5 hereof).

4. Payment under this Bond will be due and payable upon default of Bidder and within 30 calendar days after receipt by Bidder and Surety of written notice of default from Owner, which notice will be given with reasonable promptness, identifying this Bond and the Project and including a statement of the amount due.

5. Surety waives notice of any and all defenses based on or arising out of any time extension to issue Notice of Award agreed to in writing by Owner and Bidder, provided that the total time for issuing Notice of Award including extensions shall not in the aggregate exceed 120 days from the Bid due date without Surety’s written consent.

6. No suit or action shall be commenced under this Bond prior to 30 calendar days after the notice of default required in Paragraph 4 above is received by Bidder and Surety and in no case later than one year after the Bid due date.

7. Any suit or action under this Bond shall be commenced only in a court of competent jurisdiction located in the state in which the Project is located.

8. Notices required hereunder shall be in writing and sent to Bidder and Surety at their respective addresses shown on the face of this Bond. Such notices may be sent by personal delivery, commercial courier, or by United States Registered or Certified Mail, return receipt requested, postage pre-paid, and shall be deemed to be effective upon receipt by the party concerned.

9. Surety shall cause to be attached to this Bond a current and effective Power of Attorney evidencing the authority of the officer, agent, or representative who executed this Bond on behalf of Surety to execute, seal, and deliver such Bond and bind the Surety thereby.

10. This Bond is intended to conform to all applicable statutory requirements. Any applicable requirement of any applicable statute that has been omitted from this Bond shall be deemed to be included herein as if set forth at length. If any provision of this Bond conflicts with any applicable statute, then the provision of said statute shall govern and the remainder of this Bond that is not in conflict therewith shall continue in full force and effect.

11. The term “Bid” as used herein includes a Bid, offer, or proposal as applicable.

EJCDC® C-451, Qualifications Statement.

Copyright © 2013 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved.

Page 00451-1 of 00451-12

QUALIFICATIONS STATEMENT

THE INFORMATION SUPPLIED IN THIS DOCUMENT IS CONFIDENTIAL TO THE EXTENT

PERMITTED BY LAWS AND REGULATIONS

1. SUBMITTED BY:

Official Name of Firm:

Address:

2. SUBMITTED TO:

3. SUBMITTED FOR:

Owner:

Project Name:

TYPE OF WORK:

4. CONTRACTOR'S CONTACT INFORMATION

Contact Person:

Title:

Phone:

Email:

Copyright © 2013 National Society of Professional Engineers, American Council of Engineering Companies, Page 00451-2 of 00451-12

5. AFFILIATED COMPANIES:

Name:

6. TYPE OF ORGANIZATION:

Name of Owner:

SOLE PROPRIETORSHIP

Doing Business As:

Date of Organization:

PARTNERSHIP

Type of Partnership:

Name of General Partner(s):

State of Organization:

CORPORATION

Date of Organization:

Executive Officers:

- President:

- Vice President(s):

- Treasurer:

- Secretary:

Copyright © 2013 National Society of Professional Engineers, American Council of Engineering Companies, Page 00451-3 of 00451-12

State of Organization:

LIMITED LIABILITY COMPANY

Members:

Sate of Organization:

JOINT VENTURE

Date of Organization:

Form of Organization:

Joint Venture Managing Partner

- Name:

- Address:

Joint Venture Managing Partner

Joint Venture Managing Partner

Copyright © 2013 National Society of Professional Engineers, American Council of Engineering Companies, Page 00451-4 of 00451-12

7. LICENSING

Jurisdiction:

Type of License:

License Number:

Jurisdiction:

Type of License:

License Number:

8. CERTIFICATIONS CERTIFIED BY:

Disadvantage Business Enterprise:

Minority Business Enterprise:

Woman Owned Enterprise:

Small Business Enterprise:

Other ( ):

9. BONDING INFORMATION

Bonding Company:

Bonding Agent:

Contact Name:

Aggregate Bonding Capacity:

Available Bonding Capacity as of date of this submittal:

Copyright © 2013 National Society of Professional Engineers, American Council of Engineering Companies, Page 00451-5 of 00451-12

10. FINANCIAL INFORMATION

Financial Institution:

Account Manager:

INCLUDE AS AN ATTACHMENT AN AUDITED BALANCE SHEET FOR EACH OF THE

LAST 3 YEARS

11. CONSTRUCTION EXPERIENCE:

Current Experience:

List on Schedule A all uncompleted projects currently under contract (If Joint Venture list each participant's projects separately).

Previous Experience:

List on Schedule B all projects completed within the last 5 Years (If Joint Venture list each participant's projects separately).

Has firm listed in Section 1 ever defaulted on or failed to complete a construction contract awarded to it?

YES NO

If YES, attach as an Attachment details including Project Owner's contact information.

Has any Corporate Officer, Partner, Joint Venture participant or Proprietor ever defaulted on or failed to complete a construction contract awarded to them in their name or when acting as a principal of another entity?

YES NO

If YES, attach as an Attachment details including Project Owner's contact information.

Are there any judgments, claims, disputes or litigation pending or outstanding involving the firm listed in Section 1 or any of its officers (or any of its partners if a partnership or any of the individual entities if a joint venture)?

YES NO

Copyright © 2013 National Society of Professional Engineers, American Council of Engineering Companies, Page 00451-6 of 00451-12

If YES, attach as an Attachment details including Project Owner's contact information.

Has the firm listed in Section 1 or any of its officers (or any of its partners if a partnership or any of the individual entities if a joint venture) within the past seven (7) years, been involved in any judgments, claims, disputes or litigation?

YES NO

If YES, attach as an Attachment details including Project Owner's contact information.

Has the firm listed in Section 1 or any of its officers (or any of its partners if a partnership or any of the individual entities if a joint venture) within the past seven (7) years, made claims, made requests for extra compensation,…