2-2025-01-19.OTB.Drawings.25-081.pdf
PDF 3 MB Posted
- Attached to
- Bangor Area High School Roof Replacement
- Solicitation number
- Not on record
- Issued by
- Northampton County, Avoca Borough, Pennsylvania
About this file
This is a construction drawing set for a roof replacement project at Bangor Area High School, a facility of the Bangor Area School District located in Bangor, Pennsylvania. The project scope encompasses the complete removal and replacement of an existing 136,000 square foot roofing system, including removal of all ballast, roof edge metal, and existing roof coverings down to the structural deck. The contractor must furnish all labor, materials, and equipment necessary to install a complete, warrantable EPDM roof system with new edge metal assemblies at all perimeters, parapets, and transitions. The drawings include overall roof plans, detailed construction specifications for various roof penetrations (drains, exhaust fans, vents, heat stacks, pitch pockets), flashing details, and parapet coping specifications. Sealed bids will be received online via PennBid until 10:00 A.M. on Friday, February 20, 2026. A mandatory pre-bid conference is scheduled for 10:00 A.M. on Thursday, January 29, 2026 (virtual), and a mandatory site visit will occur on Friday, January 30, 2026 at 10:00 A.M. at the school's main office. Bidders must register by Wednesday, January 28, 2026 at 4:00 P.M. by emailing Christian Hoffer at choffer@alloy5.com with required company and contact information. Questions are accepted until 5:00 P.M. on Friday, February 13, 2026, submitted only through PennBid by registered prime bidders.
All bids must be accompanied by bid security equal to ten percent of the base bid. The apparent low bidder and the next two lowest bidders must submit original bidding documents to the architect within two business days of bid opening. The project includes bid alternates: Alternate #01 covers roof areas A1-A3, B8, B9, B13, B14, and C1-C7, while Alternate #02 covers roof areas B1-B7, B10-B12, and B15. The existing roof structure includes multiple deck types—lightweight insulated concrete in areas A1, A2, B3, B7-B9, B11, B13-14, and C1-C7, with Tectum decking in areas A3, B1, B2, B4-B6, B10, and B12. The contractor is responsible for verifying all existing conditions, locating below-grade utilities and storm water systems, repairing or replacing damaged decking as required, and disconnecting and reconnecting HVAC equipment. A pre-construction conference will be held with the contractor, owner, and architect prior to work commencement to confirm site access, schedule, and work sequence.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 1-2026-01-19.ProjManSpecs.OTB.25-081.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
MATERIALS SYMBOLS
GYPSUM WALLBOARD
WOOD BLOCKING
BATT INSULATION
BRICK
CONCRETE
FOAM INSULATION
CONCRETE UNIT MASONRY
FINISH WOOD
ROUGH WOOD
PLYWOOD/SHEATHING
MDO/MDF
EARTH
GRAVEL
CLAY
RIGID INSULATION
STEEL
ALUMINUM
STONE
TILE
LOOSE FILL INSULATION
GLASS
TERRAZZO
ORIENTED STRAND BOARD (0SB)
CORK
XX KEYED NOTE (DEMOLITION)
KEYED NOTE IDENTIFIERXX
XX CASEWORK/MILLWORK IDENTIFIER
XX REVISION IDENTIFIER
NO. COLUMN LINE OR
GRID IDENTIFIER
NO.
DWG
NO.
SIM
DETAIL INDICATOR
NO.
DWG
SIM
SECTION INDICATOR
NO.
DWG
SIM
EXTERIOR ELEVATION
INDICATOR
DWG
XX
XX XX
XX
INTERIOR ELEVATION
INDICATOR
ROOM NAME
NO.
150 SF
ROOM IDENTIFIER
DOOR NO.
DR NO.
1HR
DOOR & RATING IDENTIFIER
NO. WINDOW / GLAZING IDENTIFIER
NO. PARTITION TYPE IDENTIFIER
NO. ACCESSORIES IDENTIFIER
MATL
NO. CEILING HEIGHT &
MATERIAL IDENTIFIER
LEVEL NAME
ELEVATION
EL NO. SPOT ELEVATION
INDICATOR
WALL FINISH
BASE MATL
FLOOR FINISH
FLOOR FINISH PLAN -
FLOOR/WALL/BASE
FINISH IDENTIFIER
NORTH INDICATOR
LINE TYPES
LEVEL INDICATOR
SLOPE INDICATOR
NO.
NO.
EXISTING CONSTRUCTION
ITEM / WALL TO BE DEMOLISHED
NEW CONSTRUCTION
HIDDEN ITEM
ITEM ABOVE
CENTERLINE
GRID LINE
BREAK LINE
MATCH LINE
VIEW NO. / SHEET NO.
VIEW NO. / SHEET NO.
MOISTURE / VAPOR BARRIER
DAMPROOFING / WATER PROOFING
0" - 0" DIMENSION STRING
D O
O R
N O
EXISTING DOOR TO REMAIN
(SWING @ 45 DEGREES)
DOOR TO BE DEMOLISHED
NEW DOOR AS SCHEDULED
(SWING @ 90 DEGREES)
GL-NO. GLAZING PANEL
IDENTIFIER
NO. FURNITURE IDENTIFIER
GENERAL CONDITIONS
1. IN CASE OF CONFLICT BETWEEN NOTES, DETAILS, AND SPECIFICATIONS, THE MOST STRINGENT REQUIREMENTS SHALL
GOVERN.
2. PERFORM ALL WORK INCLUDING CONSTRUCTION PRACTICES, USE AND DISPOSAL OF MATERIALS, AND QUALITIES OF
WORKMANSHIP, IN STRICT ACCORDANCE WITH THE REQUIREMENTS OF THE GOVERNING LOCAL, STATE, AND NATIONAL CODES AND SPECIFICATIONS FOR THIS CONSTRUCTION PROJECT. PROVIDE APPROPRIATE SAFETY MEASURES
SATISFYING ALL OSHA REQUIREMENTS.
3. QUALITY OF MATERIALS AND WORKMANSHIP SHALL BE IN ACCORDANCE WITH THE BEST STANDARDS AND PRACTICES
OF THE TRADES INVOLVED.
4. THE CONTRACTOR SHALL FILE ALL REQUIRED INSURANCE CERTIFICATES AND OBTAIN ALL REQUIRED BUILDING PERMITS PRIOR TO COMMENCEMENT OF THE WORK. COSTS OF PERMITS TO BE PAID BY BUILDER, APPROVED PERMIT
TO BE POSTED.
5. A COMPLETE SET OF PROJECT DOCUMENTS, INCLUDING AN ORIGINAL STAMPED SET OF DRAWINGS AND ALL SUBSEQUENT CHANGES AND CLARIFICATIONS SHALL BE KEPT ON SITE AT ALL TIMES. ALL PROPOSED CHANGES TO ORIGINAL PROJECT DOCUMENT BID SET ARE TO BE SUBMITTED BY CONTRACTOR IN THE FORM OF CHANGE ORDERS, INCLUDING ALL BACKUP INFORMATION, FOR APPROVAL BY OWNER/ARCHITECT.
6. PRIOR TO COMMENCEMENT OF WORK, CONTRACTOR, OWNER, AND ARCHITECT SHALL HOLD A PRE-CONSTRUCTION
CONFERENCE TO CONFIRM SITE ACCESS ROUTE, SCHEDULE, AND SEQUENCE OF WORK.
7. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE SECURITY AND PROTECTION OF ALL CONDITIONS AND MATERIALS WITHIN THE PROPOSED CONSTRUCTION AREA. THE CONTRACTOR SHALL HAVE SOLE RESPONSIBILITY FOR ANY
DAMAGE OR INJURY CAUSED BY OR DURING THE EXECUTION OF WORK.
8. SECTIONS AND DETAILS SHOWN, WHILE DRAWN FOR SPECIFIC LOCATIONS, ARE INTENDED TO ESTABLISH THE GENERAL TYPES OF DETAILS TO BE USED THROUGHOUT. WORK NOT INDICATED ON A PART OF THE DRAWINGS BUT REASONABLY IMPLIED TO BE SIMILAR TO THAT SHOWN AT CORRESPONDING PLACES, SHALL BE REPEATED. MINOR DETAILS NOT USUALLY SHOWN OR SPECIFIED, BUT REQUIRED FOR PROPER CONSTRUCTION OF ANY PART OF THE
WORK SHALL BE INCLUDED AS IF THEY WERE INDICATED IN THE DRAWINGS.
9. CONTRACTOR TO VERIFY AND/OR ESTABLISH ALL EXISTING CONDITIONS AND DIMENSIONS AT THE SITE AND TO NOTIFY THE OWNER/ARCHITECT OF ANY DISCREPANCIES AND/OR DEVIATIONS FROM DRAWINGS. PROPOSED REMEDIES, IF REQUIRING ADDITIONAL WORK, ARE TO BE SUBMITTED FOR APPROVAL IN THE FORM OF WRITTEN CHANGE ORDERS TO THE OWNER IN ACCORDANCE WITH THE TERMS OF THE CONTRACT BEFORE ORDERING MATERIAL OR COMMENCING
WITH WORK.
10. CONTRACTOR TO VERIFY LOCATION OF ALL BELOW GRADE UTILITIES AND STORM WATER SYSTEMS PRIOR TO
EXCAVATION. NOTIFY ARCHITECT OF ANY CONFLICTS WITH PROPOSED CONSTRUCTION.
11. ARCHITECT/ENGINEER IS NOT RESPONSIBLE FOR WORK THAT THE ARCHITECT/ENGINEER'S DOES NOT REVIEW AND/OR WORK NOT COMPLETED IN ACCORDANCE WITH ARCHITECT/ENGINEER'S PLAN AND/OR INSTRUCTIONS. NO DEVIATION
FROM DESIGN DRAWINGS IS PERMITTED WITHOUT WRITTEN APPROVAL.
12. PROVIDE DAILY CLEAN-UP OF AREAS ADJACENT TO CONSTRUCTION AS WELL AS PERIODIC CLEAN-UP OF
CONSTRUCTION AREAS.
13. AT JOB COMPLETION, BESIDES FINAL GENERAL CLEANING, REMOVE ALL STAINS AND PAINT FROM ALL NEW GLASS, TILE, AND OTHER FINISHES AND WASH AND POLISH STONE.
1. WRITTEN DIMENSIONS HAVE PRECEDENCE OVER SCALED DIMENSIONS.
2. ITEMS NOT NOTED AS EXISTING ARE NEW. DOORS AND WINDOWS NOT NUMBERED ON THE FLOOR PLAN OR
ELEVATIONS ARE EXISTING TO REMAIN, UNLESS NOTED OTHERWISE.
3. ALL DIMENSIONS TO EXISTING SURFACES ARE TO FINISH, AND ALL DIMENSIONS TO NEW CONSTRUCTION ARE TO
ROUGH FRAMING, UNLESS NOTED OTHERWISE.
4. MECHANICAL, ELECTRICAL, PLUMBING & FIRE PROTECTION SYSTEMS INDICATED ON ARCHITECTURAL DRAWINGS ARE
FOR REFERENCE ONLY. COORDINATE WITH MEPF DRAWINGS
5. ENCLOSED ACCESSIBLE SPACE UNDER STAIRS SHALL HAVE WALLS AND SOFFITS PROTECTED BY 5/8" FIRE RATED GWB
UNLESS NOTED OTHERWISE.
GENERAL DRAWING NOTES
1 HR FIRE-RATED WALL
2 HR FIRE-RATED WALL
3 HR FIRE-RATED WALL
PATH OF EGRESS
NOT FOR
CONSTRUCTION
PROJ NO:
CHECKED BY:
DRAWN BY:
SCALE:
DATE:
SHEET TITLE:
REGISTRATION:
530 WEST BROAD ST BETHLEHEM, PA 18018
610.419.4055
A R C H I T E C T U R E
PROJECT:
OWNER:
PROJECT TEAM:
SUBMISSIONS:
KEY PLAN:
C
O P
Y R
IG
H
T A
LL
O
Y A
R C
H
IT
E C
T U
R E
CIVIL:
MEPF:
FOOD SERVICE:
ARCHITECT:
STRUCTURAL:
ACOUSTICS:
RESIDENT ENGINEER:
ALLOY5
ARCHITECTURE
DRAWINGS ARE NOT TO SCALE UNLESS PRINTED AT
30"X42".CONTRACTOR SHALL VERIFY ALL DIMENSIONS
AND EXISTING CONDITIONS PRIOR TO CONSTRUCTION.
As indicated
1/
/2
2:
:2
P M
G .0
01/19/26
Author
Checker
25-081
COVER SHEET
BANGOR AREA HIGH
SCHOOL ROOF
REPLACEMENT
187 FIVE POINTS RICHMOND ROAD,
BANGOR, PA 18013
BANGOR AREA
SCHOOL DISTRICT
187 FIVE POINTS RICHMOND
ROAD, BANGOR, PA 18013
N/A
N/A
N/AN/A
N/A
N/A
BANGOR AREA HIGH SCHOOL
ROOF REPLACEMENT
DRAWING INDEX
SCOPE OF WORK
NO. SHEET NAME
GENERAL
G0.00 COVER SHEET
G1.01 CODE DATA
ARCHITECTURE
A1.40 OVERALL ROOF PLAN
A1.41 ROOF PLAN - AREA A
A1.42 ROOF PLAN - AREA B
A4.40 ROOF DETAILS
A9.00 BID ALTERNATES
BANGOR AREA SCHOOL DISTRICT
187 FIVE POINTS RICHMOND RD, BANGOR, PA 18013
187 FIVE POINTS RICHMOND RD, BANGOR, PA 18013
PROJECT SITE
MAIN ENTRANCE
THE SCOPE OF WORK INCLUDES THE COMPLETE REMOVAL OF THE (±136,000 SF) EXISTING ROOFING SYSTEM DOWN TO THE STRUCTURAL DECK, INCLUDING ALL EXISTING ROOF BALLAST AND ALL ROOF EDGE METAL. THE CONTRACTOR SHALL FURNISH ALL LABOR, MATERIALS, AND EQUIPMENT NECESSARY TO REMOVE BALLAST, DISPOSE OF ROOFING DEBRIS, AND INSTALL A COMPLETE, WARRANTABLE EPDM ROOF SYSTEM. CONTRACTOR SHALL REMOVE ALL EXISTING ROOF EDGE METAL, INCLUDING BUT NOT LIMITED TO COPINGS, FASCIAS, GRAVEL STOPS, TRIM, AND ASSOCIATED FASTENERS. PROVIDE AND INSTALL NEW EDGE METAL ASSEMBLIES AT ALL PERIMETERS, PARAPETS, AND TRANSITIONS IN ACCORDANCE WITH THE ROOFING MANUFACTURER’S DETAILS AND WARRANTY REQUIREMENTS. INCLUDE ALL ACCESSORIES, SPLICE PLATES, CLEATS, FASTENERS, SEALANTS, AND UNDERLAYMENT COMPONENTS NECESSARY FOR A COMPLETE, WATERTIGHT INSTALLATION. CONTRACTOR SHALL REMOVE ALL EXISTING ROOF BALLAST, INCLUDING RIVER ROCK, GRAVEL, PAVERS, PEDESTALS, AND ANY LOOSE AGGREGATE LOCATED ON THE ROOF SURFACE. BALLAST SHALL BE VACUUMED OR MECHANICALLY REMOVED AS REQUIRED TO PROTECT THE ROOF SYSTEM AND STRUCTURE. CONTRACTOR SHALL DISPOSE OF ALL BALLAST OFF-SITE IN ACCORDANCE WITH LOCAL REGULATIONS AND SHALL COORDINATE ANY
TEMPORARY LOADING RESTRICTIONS.
SITE LOCATION MAP
NO. ISSUE DESCRIPTION DATE
BID DOCUMENTS 01/19/26
EXISTING BUILDING ALTERATION LEVEL (IEBC):
ALTERATIONS - LEVEL 1
ROOF REPLACEMENT IN KIND
CLIMATE ZONE: 5A NORTHAMPTON COUNTY, PA
INTERNATIONAL ENERGY CONSERVATION CODE:
ROOF (INSULATION ENTIRELY ABOVE DECK) = R-30ci MIN.
WALLS ABOVE GRADE (MASS) = R-11.4ci MIN.
WALLS ABOVE GRADE (METAL FRAMED) = R-13 + R-7.5ci MIN.
WALLS BELOW GRADE = R-7.5ci MIN.
FLOORS (JOIST/FRAMING) = R-30 MIN.
SLAB-ON-GRADE FLOOR (UNHEATED) = R-10 FOR 24" BELOW MIN.
NONSWINGING DOORS = R-4.75 MIN.
CHAPTER 4 - COMMERCIAL ENERGY EFFICIENCY
TABLE C402.1.3: OPAQUE THERMAL ENVELOPE INSULATION COMPONENT MINIMUM
REQUIREMENTS, R-VALUE METHOD
CHAPTER 3 - GENERAL REQUIREMENTS
TABLE C301.1 CLIMATE ZONES, MOISTURE REGIMES, AND WARM-HUMID DESIGNATIONS BY STATE, COUNTY AND TERRITORY
BUILDING CODE DATA SUMMARY
APPLICABLE BUILDING CODES & REGULATIONS:
TOWNSHIP OF UPPER MOUNT BETHEL ZONING CODE
2018 INTERNATIONAL BUILDING CODE
2018 INTERNATIONAL ENERGY CONSERVATION CODE
2018 INTERNATIONAL EXISTING BUILDING CODE
2018 INTERNATIONAL RESIDENTIAL CODE
2009 ICC A117.1 ACCESSIBLE AND USABLE BUILDINGS
AND FACILITIES
PROJECT DESCRIPTION:
MULTISTORY
ROOF REPLACEMENT IN KIND ±136,000 SF
IBC TABLE 601 FIRE-RESISTANCE RATING REQUIREMENTS FOR BUILDING ELEMENTS (HOURS)
BUILDING ELEMENT RATING REQUIRED RATING PROVIDED U.L. ASSEMBLY #
PRIMARY STRUCTURAL FRAME 0 NO CHANGE N/A
N/A
N/A
N/A
N/A
BEARING WALLS (EXTERIOR)
BEARING WALLS (INTERIOR)
NON-BEARING WALLS/PARTITIONS (EXT.)
NON-BEARING WALLS/PARTITIONS (INT.)
FLOOR CONSTR. & ASSOC. MEMBERS
ROOF CONSTR. & ASSOC. MEMBERS
N/A
0 0 N/A
IBC TABLE 1505.1 MIN ROOF COVERING CLASSIFICATION FOR TYPES OF CONSTRUCTION
2018 INTERNATIONAL MECHANICAL CODE
2018 INTERNATIONAL PLUMBING CODE
2018 INTERNATIONAL ELECTRICAL CODE
2018 INTERNATIONAL FIRE CODE
2018 INTERNATIONAL FUEL GAS CODE
EXISTING BUILDING
OCCUPANCY CLASSIFICATION:
ALLOWABLE AREA:
OCCUPANCY SEPARATION PROVIDED:
ACTUAL AREA:
AUTOMATIC SPRINKLERS PROVIDED:
ALTERNATIVE AUTOMATIC FIRE-EXTINGUISHING SYSTEMS:
STANDPIPE SYSTEMS:
PORTABLE FIRE EXTINGUISHERS:
IEBC ALTERATION LEVEL:
CORRIDOR FIRE-RESISTANCE RATING:
MAXIMUM EXIT ACCESS TRAVEL DISTANCE:
GROUP E NO CHANGE
RENOVATION1
NOTES: NOTE 1: TABLE 1020.1 CORRIDOR FIRE-RESISTANCE RATING - GROUP 'E' SPRINKLERED - OCCUPANT LOAD >30 = 0 HOUR RATING
CONSTRUCTION CLASSIFICATION:
# OF EXITS REQUIRED / # OF EXITS PROVIDED
THROUGH PENETRATION FIRE-STOP REQUIREMENTS
ASSEMBLY TYPE: F RATING T RATING REMARKS
1HR FIRE-RESISTANCE RATED WALL
2HR FIRE-RESISTANCE RATED WALL
1HR FIRE-RESISTANCE RATED HORIZ. ASSEMBLY
2HR FIRE-RESISTANCE RATED HORIZ. ASSEMBLY
1**
2**
**T RATING NOT REQUIRED WHERE PENETRATION IS CONTAINED AND LOCATED WITHIN THE CAVITY OF A WALL ABOVE THE FLOOR OR BELOW THE FLOOR
N/A NO CHANGE
N/A
N/A
N/A
N/A
TOTAL OCCUPANT LOAD:
NO CHANGE
NO CHANGE
NO CHANGE
NO CHANGE
NO CHANGE
NO CHANGE
NO CHANGE
NO CHANGE
NO CHANGE
NO CHANGE
NO CHANGE
EXISTING
EXISTING
N/A
N/A
N/A
N/A
IIB
NO CHANGE
NO CHANGE
NO CHANGE
NO CHANGE
NO CHANGE
NO CHANGE NO CHANGE
# OF OCCUPANTS:
ETR NO CHANGE
LAVATORIESWATER
CLOSETS
DRINKING
FOUNTAINS
SERVICE SINK
IBC TABLE 2902.1 MINIMUM NUMBER OF REQUIRED PLUMBING FIXTURES
NO CHANGE NO CHANGE
CONST. CLASSIFICATION CLASS TYPE
IIB C
EXISTING, NO CHANGE
EXISTING, NO CHANGE
EXISTING, NO CHANGE
EXISTING, NO CHANGE
NOT FOR
CONSTRUCTION
PROJ NO:
CHECKED BY:
DRAWN BY:
SCALE:
DATE:
SHEET TITLE:
REGISTRATION:
530 WEST BROAD ST BETHLEHEM, PA 18018
610.419.4055
A R C H I T E C T U R E
PROJECT:
OWNER:
PROJECT TEAM:
SUBMISSIONS:
KEY PLAN:
C
O P
Y R
IG
H
T A
LL
O
Y A
R C
H
IT
E C
T U
R E
CIVIL:
MEPF:
FOOD SERVICE:
ARCHITECT:
STRUCTURAL:
ACOUSTICS:
RESIDENT ENGINEER:
ALLOY5
ARCHITECTURE
DRAWINGS ARE NOT TO SCALE UNLESS PRINTED AT
30"X42".CONTRACTOR SHALL VERIFY ALL DIMENSIONS
AND EXISTING CONDITIONS PRIOR TO CONSTRUCTION.
1/4" = 1'-0"
1/
/2
2:
:2
P M
G .0
01/19/26
Author
Checker
25-081
CODE DATA
BANGOR AREA HIGH
SCHOOL ROOF
REPLACEMENT
187 FIVE POINTS RICHMOND ROAD,
BANGOR, PA 18013
BANGOR AREA
SCHOOL DISTRICT
187 FIVE POINTS RICHMOND
ROAD, BANGOR, PA 18013
N/A
N/A
N/AN/A
N/A
N/A
OPEN
COURTYARD
N
ROOF AREA - C7
ROOF AREA - C4
ROOF AREA - B9
ROOF AREA - C2
ROOF AREA - C1
ROOF AREA - B13
ROOF AREA - B15
ROOF AREA - B11
ROOF AREA - C3
ROOF AREA - C5
ROOF AREA - B1
ROOF AREA - B5 ROOF AREA - B4
ROOF AREA - B3
ROOF AREA - B8
ROOF AREA - A3
ROOF AREA - C6
ROOF AREA - B10
ROOF AREA - B14
ROOF AREA - A2ROOF AREA - A1
ROOF AREA - B7
/1 A1.41
/1 A1.42
EJ
EJ
AD
ROOF AREA - B6
MTL ROOF
NIC
ROOF AREA - B2
EJ
ROOF AREA - B2
ROOF AREA - B10
EJ
ROOF AREA - B12
MTL ROOF
NIC
AD
PP
RV
RV
RV
HS
AD
RV
PP
PP
PP
PPRV RV EJ PP
RV
HS
RV
HS
A D
RV
RV
HSHS
PP PP
RV
PP
PP
HS
HS
HS HS
AD
HS
RV
HS
HS
RV
RV RV
RV
RV
PP
EJ
EJ
HS
PP
PP
RV
ROOF CHIMNEY
RV
RV
RV
RV
RV RV
RV
RV RV
RV
RV
RV
PP
PP
RTU
RTU
RTU
EF
EF
EF
EF
EF
PV
PV
RTU
RTU
EF
EF
RTU
RTU
RTU
RTU
EF
EF
HS
RTU
EF
PV
PP
RTU
EF
EF
EF
EF
RTU
EF RD
EF
EF
EF
EF
EF RTU
RTU RTU
PV
RTU
RTU
EF
EF EF
EF
EF
EF
EF
EF
EF
PV
RTUEF
EF
RTU
RTU
RTU
RTU
RTU
EF
EF
EFEF
EF
EF
EF
EF EF
EF
EF EF
EF
EFEF
PV
EF
/1 A1.41
/1 A1.42
PV
PV
PV
PV
S
S S
EJ
HP
HP
HP
LP
HP
ROOF ACCESS
LP
LP
LP
HP
LP
HP
ACCESS LADDER
ACCESS LADDER
EXISTING TO
REMAIN
GENERAL ROOF NOTES
1. GC TO VERIFY ALL EXISTING CONDITIONS; LOCATIONS, SIZES AND DIMENSIONS OF ROOF FEATURES AND PENETRATIONS
SHOWN ARE APPROXIMATE. GC TO REVIEW AND VERIFY ALL PROJECT CONDITIONS AND BUILDING COMPONENTS. EXISTING
ROOF STRUCTURE APPEARS TO BE SLOPED; GC TO VIF.
2. ALL TAPERED INSULATION SHALL BE 1/4" PER FT. UNLESS NOTED OTHERWISE, PROVIDE TAPERED INSULATION CRICKETS AT
ALL MECHANICAL UNITS. VERIFY QUANTITIES AND LOCATIONS IN THE FIELD.
3. FLASHING SHALL BE INSTALLED AT WALL AND ROOF INTERSECTIONS, GUTTERS, WHEREVER THERE IS A CHANGE IN ROOF SLOPE OR DIRECTION AND AROUND ROOF OPENINGS. WHERE FLASHING IS OF METAL, THE METAL SHALL BE CORROSION
RESISTANT WITH A THICKNESS AS NOTED IN THE SPECIFICATIONS.
4. PARAPET WALLS SHALL BE PROPERLY COPED WITH NONCOMBUSTIBLE, WEATHERPROOF MATERIALS OF A WIDTH NOT LESS
THAN THE THICKNESS OF THE PARAPET WALL.
5. FOR ROOF REPAIRS, THE GC IS RESPONSIBLE FOR PROVIDING ALL STRUCTURAL FRAMING AND INFILL MATERIAL TO MATCH
ADJACENT.
6. ROOF DRAINS ON SLOPING STRUCTURE TO BE LOCATED 12" OFF CENTERLINE OF STEEL.
7. GC SHALL VERIFY THAT ALL NEW WORK ON EXISTING ROOF DOES NOT VOID WARRANTY ON ADJACENT EXISTING ROOF
SYSTEMS.
8. GC TO COORD REPAIR/REPLACEMENT OF EXTG CURBS INSTALLED IN CRICKETS/SUMPS WITH MANUFACTURER.
9. ALL CURBS SHALL BE SUPPORTED ON ROOF DECK.
10. GC TO CONFIRM HEIGHT OF EQUIPMENT WITH MANUFACTURER TO PROVIDE PROPER FLASHING HEIGHTS FOR ROOF SYSTEMS
11. GC TO COORDINATE EQUIPMENT ON EXISTING ROOFS WITH MANUFACTURERS HOLDING THE WARRANTY.
12. DO NOT SCALE THIS DRAWING. GC MUST VERIFY ALL ROOF DIMENSIONS PRIOR TO PURCHASE OF MATERIALS.
13. PARAPETS TO RECEIVE NEW COPING PER SPECIFICATIONS.
14. SEE SHEET A4.40 FOR ROOF DETAILS; ALL DETAILS SHALL BE IN ACCORDANCE ROOF MANUFACTURER.
15. COLOR OF ALL NEW METAL TO BE SELECTED BY ARCHITECT FROM MANUFACTURERS FULL SELECTION OF COLORS.
16. INSTALL A CRICKET ON THE HIGH SIDE OF THE CHIMNEY TO PREVENT WATER PONDING. THE CRICKET SHALL SLOPE TO
DIRECT WATER AROUND THE CHIMNEY AND BE COVERED AND FLASHED WITH THE SAME ROOFING MEMBRANE AS THE FLAT
ROOF
17. SQUARE TAPERED SUMPS, SLOPED PER MANUFACTURERS RECOMMENDATION; MIN. 5" OF RIGID INSULATION TO BE
PROVIDED AT ROOF DRAIN, SEE TYPICAL ROOF DETAILS
18. ANY DISCONNECTING, RAISING AND RECONNECTING OF HVAC UNITS IS TO BE INCLUDED IN GC SCOPE OF WORK.
19. GC IS RESPONSIBLE TO LOCATE ANY ELECTRICAL CONDUIT OR GAS PIPE LOCATED BELOW THE ROOF SURFACE, DAMAGE TO
ELECTRICAL OR GAS LINES CAUSED BY THE GC DUE TO NEGLIGENT FAILURE TO TRY AND LOCATE SUCH LINES WILL BE PAID
FOR BY THE GC.
20. GC IS RESPONSIBLE FOR ANY DISCONNECTION/CONNECTION OF ELECTRIC OR GAS SUPPLY TO PROVIDE PROPER
INSTALLATION OF NEW ROOF SYSTEM.
21. GC TO VERIFY QUANTITY AND LOCATION OF ALL EXTG ROOF ITEMS. ANY ITEMS NOT INCLUDED ON DRAWINGS ARE TO BE
INCLUDED IN THIS SCOPE OF WORK.
22. GC TO VERIFY IN FIELD ALL EX ROOF DECK CONDITIONS. REPAIR, REPLACE AND/OR INFILL AS REQUIRED TO ACCEPT NEW CONSTRUCTION. GC IS RESPONSIBLE FOR ALL AREAS WITHIN THE SCOPE OF THIS PROJECT; EXISTING DECK MATERIAL
KEY IS FOR REFERENCE ONLY; GC TO VERIFY IN FIELD. LIGHT WEIGHT INSULATED CONCRETE: A1, A2, B3, B7-B9, B11, B13-14 C1-C7. TECTUM: A3, B1, B2, B4-B6, B10, B12, B1
23. GC TO PROVIDE THE ALLOWANCE THAT IS INCLUDED FOR LOCALIZED REPAIR AND REPLACEMENT OF EXISTING TECTUM ROOF DECK AND LIGHTWEIGHT INSULATING CONCRETE DUE TO CONCEALED CONDITIONS. QUANTITIES ARE UNKNOWN AND
WILL BE VERIFIED DURING CONSTRUCTION.
ROOF LEGEND
DIRECTION OF SLOPE
CHANGE IN LEVEL
RD
ROOF DRAIN
ROOF IDENTIFIERROOF AREA - A
HP +00"
LP -00"
HIGH POINT INDICATOR
LOW POINT INDICATOR
AD AREA DIVIDER SEE DETAIL
ON SHEET A4.40
SYMBOL DESCRIPTION SYMBOL DESCRIPTION
8'x8' TAPERED SUMP
16'x16' TAPERED SUMP
PASSIVE VENT/AIR INTAKE
EXHAUST FAN
ROOF VENT
RV
EF
PV
EJ EXPANSION JOINT SEE
DETAIL ON SHEET A4.40
RV
PP
HS
ROOF VENT
PITCH POCKET
ROOF HEAT STACK
S
EXISTING SCUPPER
NOT FOR
CONSTRUCTION
PROJ NO:
CHECKED BY:
DRAWN BY:
SCALE:
DATE:
SHEET TITLE:
REGISTRATION:
530 WEST BROAD ST BETHLEHEM, PA 18018
610.419.4055
A R C H I T E C T U R E
PROJECT:
OWNER:
PROJECT TEAM:
SUBMISSIONS:
KEY PLAN:
C
O P
Y R
IG
H
T A
LL
O
Y A
R C
H
IT
E C
T U
R E
CIVIL:
MEPF:
FOOD SERVICE:
ARCHITECT:
STRUCTURAL:
ACOUSTICS:
RESIDENT ENGINEER:
ALLOY5
ARCHITECTURE
DRAWINGS ARE NOT TO SCALE UNLESS PRINTED AT
30"X42".CONTRACTOR SHALL VERIFY ALL DIMENSIONS
AND EXISTING CONDITIONS PRIOR TO CONSTRUCTION.
As indicated
1/
/2
2:
:2
P M
A .4
01/19/26
Author
Checker
25-081
OVERALL ROOF PLAN
BANGOR AREA HIGH
SCHOOL ROOF
REPLACEMENT
187 FIVE POINTS RICHMOND ROAD,
BANGOR, PA 18013
BANGOR AREA
SCHOOL DISTRICT
187 FIVE POINTS RICHMOND
ROAD, BANGOR, PA 18013
N/A
N/A
N/AN/A
N/A
N/A
1" = 20'-0"
ROOF PLAN - OVERALL
KEYED CONSTRUCTION NOTES
NO. NOTE
1 REMOVE EXISTING BALLAST AND ALL LAYERS OF ROOF COVERINGS DOWN TO THE ROOF DECK. REPAIR AND REPLACE
DAMAGED EXTG ROOF DECK AS REQUIRED AND PREPARE SURFACES FOR NEW CONSTRUCTION.
2 ALL EXISTING ROOF DRAIN COMPONENTS TO REMAIN. GC TO INSPECT, REPAIR AND REPLACE DRAINS, DRAIN LEADERS, AND ALL ASSOCIATED COMPONENTS AS REQUIRED. REPLACE BOLTS AND DRAIN RINGS, PNT OR REPLACE DOMES.
3 ALL EXISTING ROOF PENETRATIONS NOT REQUIRED IN NEW CONSTRUCTION TO BE INFILLED TO MATCH ADJACENT
DECK AND FRAMING AS REQUIRED.
4 VERIFY EXISTING ROOF PITCH REQUIRED FOR NEW CONSTRUCTION TO ACHIEVE PROPER SLOPE TO EXISTING DRAINS.
REFER TO SPECIFICATION
5 REMOVE EXISTING COUNTER FLASHING AND REPLACE WITH NEW. REFER TO SPECIFICATION
6 REMOVE EXISTING METAL EDGE FROM ALL AREAS RECEIVING NEW ROOFING; INCLUDING PARAPET WALLS. PROVIDE ADDITIONAL PRESSURE TREATED EDGE AND CURB BLOCKING AND NEW METAL FASCIA AS REQUIRED FOR COMPLETE
SYSTEM.
7 REMOVE ALL EXISTING FLASHING COMPONENTS FROM PIPE VENT, HEAT STACKS, AND ALL ROOF PENETRATIONS TO ALLOW THE INSTALLATION OF NEW ROOF SYSTEM, FLASHING COMPONENTS, PIPE SLEEVES FOR A COMPLETE SYSTEM.
8 NEW EPDM ROOF SYSTEM, METAL EDGE, EDGE SCUPPERS AND ALL ASSOCIATED COMPONENTS
9 NEW FORMED METAL CAP. INSTALL PER MANUFACTURER’S RECOMMENDATIONS AND ENSURE CONTINUOUS WEATHER-TIGHT SEAL. COLOR TO BE SELECTED BY ARCHITECT FROM MFR. FULL SELECTION OF COLORS.
10 GC TO ENSURE ALL EQUIPMENT CURBS ARE A MINIMUM OF 12 INCHES ABOVE THE FINISHED ROOF; EXISTING CURBS
NOT MEETING THIS REQUIREMENT SHALL BE MODIFIED.
11 PROVIDE TAPERED CRICKET SLOPED ON HIGH SIDE OF ROOF TOP EQUIPMENT.
12 PARAPETS TO RECEIVE NEW WATERPROOFING AND COPING SYSTEM. SEE DETAIL ON SHEET A4.40.
13 REMOVE EXTG PITCH POCKETS AND ALL ASSOCIATED COMPONENTS AND PREPARE FOR INSTALLATION OF NEW PITCH
POCKETS.
14 REMOVE AND REPLACE ALL EXISTING WOOD SLEEPERS WITH NEW PRESSURE TREATED WOOD.
15 NEW WALKWAY PADS AT ALL ROOF ACCESS POINTS INCLUDING BUT NOT LIMITED TO ROOF HATCHES AND LADDERS.
AREAS AROUND ALL RTUS ON CONTROL SIDE SHALL ALSO RECEIVE WALKPADS.
OPEN COURTYARD
ROOF AREA - C7
ROOF AREA - C4
ROOF AREA - B9
ROOF AREA - C2ROOF AREA - C1
ROOF AREA - B13
ROOF AREA - B15
ROOF AREA - B11
ROOF AREA - C3
ROOF AREA - C5
ROOF AREA - B8
ROOF AREA - C6
ROOF AREA - B10
HP __"
LP __"
HP __"
LP
HP
ROOF AREA - B14
/1 A1.42
AD AD
RD RD
RDRD
RD RD
RDRD
RD RD
RD RD
RD RD
RD RD
RD
RD
RD
RD
RD
RD
RD
RD
RD
RD
RD
RD
RD RD RD
RD RD RD
RD
RD
RD
RD
RD
RD
RD
RD
RD
RD
RD
RD
RD
RD
RD
RD
RD
RD
RD
RD
RD
E.J
EJ
AD
RV
HS
AD
PP
PP
PP
PP
RV RV
EJ PP
RV
HS
RV
HS
A .D
RV
RV
HSHS
PP PP
RV
PP
PP
HS
HS
HS HS
A.D
HS
RV
HS
HS
RV
RV RV
RV
RV
PP
E.J
E.J
HS
PP
PP
RV
ROOF CHIMNEY
RV
RV
RV
RV
RV RV
RVRV RV
RTU
RTU
RTU
PP
PP
EF
EF
EF
EF
EF
PV
PV
RTU
RTU
EF
EF
RTU
RTU
EF
EF
EF
EF
EFEF
EF
EF
EF
EF
EF
EF
EFEF
EF
EFEF
PV
PV
EF
EF
PV
PV
PV
PV
RTU
RTU
RTU
RTU
EF EF
EF
EF
EF
EF
EF
RTU
EF
EF
EF
RTU
S S
S S
S S
E.J
/1 A1.42 EJ
ROOF ACCESS
ACCESS LADDER
TYP.
HP
EXTG ANTENNA
TYP.
TYP.
TYP.
TYP.
TYP.
TYP.
TYP.
TYP.
TYP.
TYP.
TYP.
TYP.
8 1413
2 3 4 6
TYP.
TYP.
TYP.
TYP.
TYP.
TYP.
TYP.
TYP.
TYP.
TYP.
TYP.
TYP.
TYP.
TYP.
TYP.
TYP.
TYP.
TYP.
108 1413
2 3 4 6
108 1413
2 3 4 6
108 1413
2 3 4 6
108 1413
2 3 4 6
108 1413
2 3 4 6
108 1413
2 3 4 6
108 1413
2 3 4 6
108 1413
2 3 4 6
108 1413
2 3 4 6
108 1413
2 3 4 6
108 1413
2 3 4 6
108 1413
2 3 4 6
108 1413
2 3 4 6
ACCESS LADDER
RTU
EXTG ANTENNA
MTL ROOF
NIC
ACCESS LADDER
TYP.
TYP.
TYP.
TYP.
TYP.
TYP.
TYP.
TYP.
108 1413
2 3 4 6
7 11
GENERAL ROOF NOTES
1. GC TO VERIFY ALL EXISTING CONDITIONS; LOCATIONS, SIZES AND DIMENSIONS OF ROOF FEATURES AND PENETRATIONS
SHOWN ARE APPROXIMATE. GC TO REVIEW AND VERIFY ALL PROJECT CONDITIONS AND BUILDING COMPONENTS. EXISTING
ROOF STRUCTURE APPEARS TO BE SLOPED; GC TO VIF.
2. ALL TAPERED INSULATION SHALL BE 1/4" PER FT. UNLESS NOTED OTHERWISE, PROVIDE TAPERED INSULATION CRICKETS AT
ALL MECHANICAL UNITS. VERIFY QUANTITIES AND LOCATIONS IN THE FIELD.
3. FLASHING SHALL BE INSTALLED AT WALL AND ROOF INTERSECTIONS, GUTTERS, WHEREVER THERE IS A CHANGE IN ROOF SLOPE OR DIRECTION AND AROUND ROOF OPENINGS. WHERE FLASHING IS OF METAL, THE METAL SHALL BE CORROSION
RESISTANT WITH A THICKNESS AS NOTED IN THE SPECIFICATIONS.
4. PARAPET WALLS SHALL BE PROPERLY COPED WITH NONCOMBUSTIBLE, WEATHERPROOF MATERIALS OF A WIDTH NOT LESS
THAN THE THICKNESS OF THE PARAPET WALL.
5. FOR ROOF REPAIRS, THE GC IS RESPONSIBLE FOR PROVIDING ALL STRUCTURAL FRAMING AND INFILL MATERIAL TO MATCH
ADJACENT.
6. ROOF DRAINS ON SLOPING STRUCTURE TO BE LOCATED 12" OFF CENTERLINE OF STEEL.
7. GC SHALL VERIFY THAT ALL NEW WORK ON EXISTING ROOF DOES NOT VOID WARRANTY ON ADJACENT EXISTING ROOF
SYSTEMS.
8. GC TO COORD REPAIR/REPLACEMENT OF EXTG CURBS INSTALLED IN CRICKETS/SUMPS WITH MANUFACTURER.
9. ALL CURBS SHALL BE SUPPORTED ON ROOF DECK.
10. GC TO CONFIRM HEIGHT OF EQUIPMENT WITH MANUFACTURER TO PROVIDE PROPER FLASHING HEIGHTS FOR ROOF SYSTEMS
11. GC TO COORDINATE EQUIPMENT ON EXISTING ROOFS WITH MANUFACTURERS HOLDING THE WARRANTY.
12. DO NOT SCALE THIS DRAWING. GC MUST VERIFY ALL ROOF DIMENSIONS PRIOR TO PURCHASE OF MATERIALS.
13. PARAPETS TO RECEIVE NEW COPING PER SPECIFICATIONS.
14. SEE SHEET A4.40 FOR ROOF DETAILS; ALL DETAILS SHALL BE IN ACCORDANCE ROOF MANUFACTURER.
15. COLOR OF ALL NEW METAL TO BE SELECTED BY ARCHITECT FROM MANUFACTURERS FULL SELECTION OF COLORS.
16. INSTALL A CRICKET ON THE HIGH SIDE OF THE CHIMNEY TO PREVENT WATER PONDING. THE CRICKET SHALL SLOPE TO
DIRECT WATER AROUND THE CHIMNEY AND BE COVERED AND FLASHED WITH THE SAME ROOFING MEMBRANE AS THE FLAT
ROOF
17. SQUARE TAPERED SUMPS, SLOPED PER MANUFACTURERS RECOMMENDATION; MIN. 5" OF RIGID INSULATION TO BE
PROVIDED AT ROOF DRAIN, SEE TYPICAL ROOF DETAILS
18. ANY DISCONNECTING, RAISING AND RECONNECTING OF HVAC UNITS IS TO BE INCLUDED IN GC SCOPE OF WORK.
19. GC IS RESPONSIBLE TO LOCATE ANY ELECTRICAL CONDUIT OR GAS PIPE LOCATED BELOW THE ROOF SURFACE, DAMAGE TO
ELECTRICAL OR GAS LINES CAUSED BY THE GC DUE TO NEGLIGENT FAILURE TO TRY AND LOCATE SUCH LINES WILL BE PAID
FOR BY THE GC.
20. GC IS RESPONSIBLE FOR ANY DISCONNECTION/CONNECTION OF ELECTRIC OR GAS SUPPLY TO PROVIDE PROPER
INSTALLATION OF NEW ROOF SYSTEM.
21. GC TO VERIFY QUANTITY AND LOCATION OF ALL EXTG ROOF ITEMS. ANY ITEMS NOT INCLUDED ON DRAWINGS ARE TO BE
INCLUDED IN THIS SCOPE OF WORK.
22. GC TO VERIFY IN FIELD ALL EX ROOF DECK CONDITIONS. REPAIR, REPLACE AND/OR INFILL AS REQUIRED TO ACCEPT NEW CONSTRUCTION. GC IS RESPONSIBLE FOR ALL AREAS WITHIN THE SCOPE OF THIS PROJECT; EXISTING DECK MATERIAL
KEY IS FOR REFERENCE ONLY; GC TO VERIFY IN FIELD. LIGHT WEIGHT INSULATED CONCRETE: A1, A2, B3, B7-B9, B11, B13-14 C1-C7. TECTUM: A3, B1, B2, B4-B6, B10, B12, B1
23. GC TO PROVIDE THE ALLOWANCE THAT IS INCLUDED FOR LOCALIZED REPAIR AND REPLACEMENT OF EXISTING TECTUM ROOF DECK AND LIGHTWEIGHT INSULATING CONCRETE DUE TO CONCEALED CONDITIONS. QUANTITIES ARE UNKNOWN AND
WILL BE VERIFIED DURING CONSTRUCTION.
ROOF LEGEND
DIRECTION OF SLOPE
CHANGE IN LEVEL
RD
ROOF DRAIN
ROOF IDENTIFIERROOF AREA - A
HP +00"
LP -00"
HIGH POINT INDICATOR
LOW POINT INDICATOR
AD AREA DIVIDER SEE DETAIL
ON SHEET A4.40
SYMBOL DESCRIPTION SYMBOL DESCRIPTION
8'x8' TAPERED SUMP
16'x16' TAPERED SUMP
PASSIVE VENT/AIR INTAKE
EXHAUST FAN
ROOF VENT
RV
EF
PV
EJ EXPANSION JOINT SEE
DETAIL ON SHEET A4.40
RV
PP
HS
ROOF VENT
PITCH POCKET
ROOF HEAT STACK
S
EXISTING SCUPPER
NOT FOR
CONSTRUCTION
PROJ NO:
CHECKED BY:
DRAWN BY:
SCALE:
DATE:
SHEET TITLE:
REGISTRATION:
530 WEST BROAD ST BETHLEHEM, PA 18018
610.419.4055
A R C H I T E C T U R E
PROJECT:
OWNER:
PROJECT TEAM:
SUBMISSIONS:
KEY PLAN:
C
O P
Y R
IG
H
T A
LL
O
Y A
R C
H
IT
E C
T U
R E
CIVIL:
MEPF:
FOOD SERVICE:
ARCHITECT:
STRUCTURAL:
ACOUSTICS:
RESIDENT ENGINEER:
ALLOY5
ARCHITECTURE
DRAWINGS ARE NOT TO SCALE UNLESS PRINTED AT
30"X42".CONTRACTOR SHALL VERIFY ALL DIMENSIONS
AND EXISTING CONDITIONS PRIOR TO CONSTRUCTION.
As indicated
1/
/2
2:
:2
P M
A .4
01/19/26
Author
Checker
25-081
ROOF PLAN - AREA A
BANGOR AREA HIGH
SCHOOL ROOF
REPLACEMENT
187 FIVE POINTS RICHMOND ROAD,
BANGOR, PA 18013
BANGOR AREA
SCHOOL DISTRICT
187 FIVE POINTS RICHMOND
ROAD, BANGOR, PA 18013
N/A
N/A
N/AN/A
N/A
N/A
1/16" = 1'-0"
ROOF PLAN - AREA A
1" = 80'-0"
ROOF KEYPLAN
KEYED CONSTRUCTION NOTES
NO. NOTE
1 REMOVE EXISTING BALLAST AND ALL LAYERS OF ROOF COVERINGS DOWN TO THE ROOF DECK. REPAIR AND REPLACE
DAMAGED EXTG ROOF DECK AS REQUIRED AND PREPARE SURFACES FOR NEW CONSTRUCTION.
2 ALL EXISTING ROOF DRAIN COMPONENTS TO REMAIN. GC TO INSPECT, REPAIR AND REPLACE DRAINS, DRAIN LEADERS, AND ALL ASSOCIATED COMPONENTS AS REQUIRED. REPLACE BOLTS AND DRAIN RINGS, PNT OR REPLACE DOMES.
3 ALL EXISTING ROOF PENETRATIONS NOT REQUIRED IN NEW CONSTRUCTION TO BE INFILLED TO MATCH ADJACENT
DECK AND FRAMING AS REQUIRED.
4 VERIFY EXISTING ROOF PITCH REQUIRED FOR NEW CONSTRUCTION TO ACHIEVE PROPER SLOPE TO EXISTING DRAINS.
REFER TO SPECIFICATION
5 REMOVE EXISTING COUNTER FLASHING AND REPLACE WITH NEW. REFER TO SPECIFICATION
6 REMOVE EXISTING METAL EDGE FROM ALL AREAS RECEIVING NEW ROOFING; INCLUDING PARAPET WALLS. PROVIDE ADDITIONAL PRESSURE TREATED EDGE AND CURB BLOCKING AND NEW METAL FASCIA AS REQUIRED FOR COMPLETE
SYSTEM.
7 REMOVE ALL EXISTING FLASHING COMPONENTS FROM PIPE VENT, HEAT STACKS, AND ALL ROOF PENETRATIONS TO ALLOW THE INSTALLATION OF NEW ROOF SYSTEM, FLASHING COMPONENTS, PIPE SLEEVES FOR A COMPLETE SYSTEM.
8 NEW EPDM ROOF SYSTEM, METAL EDGE, EDGE SCUPPERS AND ALL ASSOCIATED COMPONENTS
9 NEW FORMED METAL CAP. INSTALL PER MANUFACTURER’S RECOMMENDATIONS AND ENSURE CONTINUOUS WEATHER-TIGHT SEAL. COLOR TO BE SELECTED BY ARCHITECT FROM MFR. FULL SELECTION OF COLORS.
10 GC TO ENSURE ALL EQUIPMENT CURBS ARE A MINIMUM OF 12 INCHES ABOVE THE FINISHED ROOF; EXISTING CURBS
NOT MEETING THIS REQUIREMENT SHALL BE MODIFIED.
11 PROVIDE TAPERED CRICKET SLOPED ON HIGH SIDE OF ROOF TOP EQUIPMENT.
12 PARAPETS TO RECEIVE NEW WATERPROOFING AND COPING SYSTEM. SEE DETAIL ON SHEET A4.40.
13 REMOVE EXTG PITCH POCKETS AND ALL ASSOCIATED COMPONENTS AND PREPARE FOR INSTALLATION OF NEW PITCH
POCKETS.
14 REMOVE AND REPLACE ALL EXISTING WOOD SLEEPERS WITH NEW PRESSURE TREATED WOOD.
15 NEW WALKWAY PADS AT ALL ROOF ACCESS POINTS INCLUDING BUT NOT LIMITED TO ROOF HATCHES AND LADDERS.
AREAS AROUND ALL RTUS ON CONTROL SIDE SHALL ALSO RECEIVE WALKPADS.
ROOF AREA - B1
ROOF AREA - B5
ROOF AREA - B4
ROOF AREA - B3
ROOF AREA - B8
ROOF AREA - A3
ROOF AREA - A2
ROOF AREA - A1
/1 A1.41
AD
RD
RD
RD
RD
RD
RD
RD
RD
RD
RD
RD RD
RD
RD
RD
RD
RD
RD
RD
RD
RD
RD
RD
RD
RD
RD
RD
RD
RD
AD
AD EJ
AD
PP
RV
RV
AD
RV
RV RV
EJ PP
RV
HS
RV
RV
RV
ACCESS LADDER
RTU
RTU
RTU RTU
EF
EF
RTU
EF
EF
EF
EF
EF
PV
PV
RTU
RTU
WALL
MOUNT FAN
RTU
RTU
RTU
EF
EF
EF
EF
RTU
RTU
EF
EF
HS
RTU
EF
PV
PP
RTU
EF
/1 A1.41
EJ
MTL ROOF
NIC
TYP.
TYP.
TYP.
108 1413
2 3 4 6
7 11
108 1413
2 3 4 6
7 11
108 1413
2 3 4 6
7 11
108 1413
2 3 4 6
7 11
108 1413
2 3 4 6
7 11
108 1413
2 3 4 6
7 11
108 1413
2 3 4 6
7 11
108 1413
2 3 4 6
7 11
108 1413
2 3 4 6
7 11
TYP.
TYP.
TYP.
TYP.
TYP.
TYP.
TYP.
GENERAL ROOF NOTES
1. GC TO VERIFY ALL EXISTING CONDITIONS; LOCATIONS, SIZES AND DIMENSIONS OF ROOF FEATURES AND PENETRATIONS
SHOWN ARE APPROXIMATE. GC TO REVIEW AND VERIFY ALL PROJECT CONDITIONS AND BUILDING COMPONENTS. EXISTING
ROOF STRUCTURE APPEARS TO BE SLOPED; GC TO VIF.
2. ALL TAPERED INSULATION SHALL BE 1/4" PER FT. UNLESS NOTED OTHERWISE, PROVIDE TAPERED INSULATION CRICKETS AT
ALL MECHANICAL UNITS. VERIFY QUANTITIES AND LOCATIONS IN THE FIELD.
3. FLASHING SHALL BE INSTALLED AT WALL AND ROOF INTERSECTIONS, GUTTERS, WHEREVER THERE IS A CHANGE IN ROOF SLOPE OR DIRECTION AND AROUND ROOF OPENINGS. WHERE FLASHING IS OF METAL, THE METAL SHALL BE CORROSION
RESISTANT WITH A THICKNESS AS NOTED IN THE SPECIFICATIONS.
4. PARAPET WALLS SHALL BE PROPERLY COPED WITH NONCOMBUSTIBLE, WEATHERPROOF MATERIALS OF A WIDTH NOT LESS
THAN THE THICKNESS OF THE PARAPET WALL.
5. FOR ROOF REPAIRS, THE GC IS RESPONSIBLE FOR PROVIDING ALL STRUCTURAL FRAMING AND INFILL MATERIAL TO MATCH
ADJACENT.
6. ROOF DRAINS ON SLOPING STRUCTURE TO BE LOCATED 12" OFF CENTERLINE OF STEEL.
7. GC SHALL VERIFY THAT ALL NEW WORK ON EXISTING ROOF DOES NOT VOID WARRANTY ON ADJACENT EXISTING ROOF
SYSTEMS.
8. GC TO COORD REPAIR/REPLACEMENT OF EXTG CURBS INSTALLED IN CRICKETS/SUMPS WITH MANUFACTURER.
9. ALL CURBS SHALL BE SUPPORTED ON ROOF DECK.
10. GC TO CONFIRM HEIGHT OF EQUIPMENT WITH MANUFACTURER TO PROVIDE PROPER FLASHING HEIGHTS FOR ROOF SYSTEMS
11. GC TO COORDINATE EQUIPMENT ON EXISTING ROOFS WITH MANUFACTURERS HOLDING THE WARRANTY.
12. DO NOT SCALE THIS DRAWING. GC MUST VERIFY ALL ROOF DIMENSIONS PRIOR TO PURCHASE OF MATERIALS.
13. PARAPETS TO RECEIVE NEW COPING PER SPECIFICATIONS.
14. SEE SHEET A4.40 FOR ROOF DETAILS; ALL DETAILS SHALL BE IN ACCORDANCE ROOF MANUFACTURER.
15. COLOR OF ALL NEW METAL TO BE SELECTED BY ARCHITECT FROM MANUFACTURERS FULL SELECTION OF COLORS.
16. INSTALL A CRICKET ON THE HIGH SIDE OF THE CHIMNEY TO PREVENT WATER PONDING. THE CRICKET SHALL SLOPE TO
DIRECT WATER AROUND THE CHIMNEY AND BE COVERED AND FLASHED WITH THE SAME ROOFING MEMBRANE AS THE FLAT
ROOF
17. SQUARE TAPERED SUMPS, SLOPED PER MANUFACTURERS RECOMMENDATION; MIN. 5" OF RIGID INSULATION TO BE
PROVIDED AT ROOF DRAIN, SEE TYPICAL ROOF DETAILS
18. ANY DISCONNECTING, RAISING AND RECONNECTING OF HVAC UNITS IS TO BE INCLUDED IN GC SCOPE OF WORK.
19. GC IS RESPONSIBLE TO LOCATE ANY ELECTRICAL CONDUIT OR GAS PIPE LOCATED BELOW THE ROOF SURFACE, DAMAGE TO
ELECTRICAL OR GAS LINES CAUSED BY THE GC DUE TO NEGLIGENT FAILURE TO TRY AND LOCATE SUCH LINES WILL BE PAID
FOR BY THE GC.
20. GC IS RESPONSIBLE FOR ANY DISCONNECTION/CONNECTION OF ELECTRIC OR GAS SUPPLY TO PROVIDE PROPER
INSTALLATION OF NEW ROOF SYSTEM.
21. GC TO VERIFY QUANTITY AND LOCATION OF ALL EXTG ROOF ITEMS. ANY ITEMS NOT INCLUDED ON DRAWINGS ARE TO BE
INCLUDED IN THIS SCOPE OF WORK.
22. GC TO VERIFY IN FIELD ALL EX ROOF DECK CONDITIONS. REPAIR, REPLACE AND/OR INFILL AS REQUIRED TO ACCEPT NEW CONSTRUCTION. GC IS RESPONSIBLE FOR ALL AREAS WITHIN THE SCOPE OF THIS PROJECT; EXISTING DECK MATERIAL
KEY IS FOR REFERENCE ONLY; GC TO VERIFY IN FIELD. LIGHT WEIGHT INSULATED CONCRETE: A1, A2, B3, B7-B9, B11, B13-14 C1-C7. TECTUM: A3, B1, B2, B4-B6, B10, B12, B1
23. GC TO PROVIDE THE ALLOWANCE THAT IS INCLUDED FOR LOCALIZED REPAIR AND REPLACEMENT OF EXISTING TECTUM ROOF DECK AND LIGHTWEIGHT INSULATING CONCRETE DUE TO CONCEALED CONDITIONS. QUANTITIES ARE UNKNOWN AND
WILL BE VERIFIED DURING CONSTRUCTION.
ROOF LEGEND
DIRECTION OF SLOPE
CHANGE IN LEVEL
RD
ROOF DRAIN
ROOF IDENTIFIERROOF AREA - A
HP +00"
LP -00"
HIGH POINT INDICATOR
LOW POINT INDICATOR
AD AREA DIVIDER SEE DETAIL
ON SHEET A4.40
SYMBOL DESCRIPTION SYMBOL DESCRIPTION
8'x8' TAPERED SUMP
16'x16' TAPERED SUMP
PASSIVE VENT/AIR INTAKE
EXHAUST FAN
ROOF VENT
RV
EF
PV
EJ EXPANSION JOINT SEE
DETAIL ON SHEET A4.40
RV
PP
HS
ROOF VENT
PITCH POCKET
ROOF HEAT STACK
S
EXISTING SCUPPER
NOT FOR
CONSTRUCTION
PROJ NO:
CHECKED BY:
DRAWN BY:
SCALE:
DATE:
SHEET TITLE:
REGISTRATION:
530 WEST BROAD ST BETHLEHEM, PA 18018
610.419.4055
A R C H I T E C T U R E
PROJECT:
OWNER:
PROJECT TEAM:
SUBMISSIONS:
KEY PLAN:
C
O P
Y R
IG
H
T A
LL
O
Y A
R C
H
IT
E C
T U
R E
CIVIL:
MEPF:
FOOD SERVICE:
ARCHITECT:
STRUCTURAL:
ACOUSTICS:
RESIDENT ENGINEER:
ALLOY5
ARCHITECTURE
DRAWINGS ARE NOT TO SCALE UNLESS PRINTED AT
30"X42".CONTRACTOR SHALL VERIFY ALL DIMENSIONS
AND EXISTING CONDITIONS PRIOR TO CONSTRUCTION.
As indicated
1/
/2
2:
:2
P M
A .4
01/19/26
Author
Checker
25-081
ROOF PLAN - AREA B
BANGOR AREA HIGH
SCHOOL ROOF
REPLACEMENT
187 FIVE POINTS RICHMOND ROAD,
BANGOR, PA 18013
BANGOR AREA
SCHOOL DISTRICT
187 FIVE POINTS RICHMOND
ROAD, BANGOR, PA 18013
N/A
N/A
N/AN/A
N/A
N/A
1/16" = 1'-0"
ROOF PLAN - AREA B
1" = 80'-0"
ROOF KEYPLAN
N
KEYED CONSTRUCTION NOTES
NO. NOTE
1 REMOVE EXISTING BALLAST AND ALL LAYERS OF ROOF COVERINGS DOWN TO THE ROOF DECK. REPAIR AND REPLACE
DAMAGED EXTG ROOF DECK AS REQUIRED AND PREPARE SURFACES FOR NEW CONSTRUCTION.
2 ALL EXISTING ROOF DRAIN COMPONENTS TO REMAIN. GC TO INSPECT, REPAIR AND REPLACE DRAINS, DRAIN LEADERS, AND ALL ASSOCIATED COMPONENTS AS REQUIRED. REPLACE BOLTS AND DRAIN RINGS, PNT OR REPLACE DOMES.
3 ALL EXISTING ROOF PENETRATIONS NOT REQUIRED IN NEW CONSTRUCTION TO BE INFILLED TO MATCH ADJACENT
DECK AND FRAMING AS REQUIRED.
4 VERIFY EXISTING ROOF PITCH REQUIRED FOR NEW CONSTRUCTION TO ACHIEVE PROPER SLOPE TO EXISTING DRAINS.
REFER TO SPECIFICATION
5 REMOVE EXISTING COUNTER FLASHING AND REPLACE WITH NEW. REFER TO SPECIFICATION
6 REMOVE EXISTING METAL EDGE FROM ALL AREAS RECEIVING NEW ROOFING; INCLUDING PARAPET WALLS. PROVIDE ADDITIONAL PRESSURE TREATED EDGE AND CURB BLOCKING AND NEW METAL FASCIA AS REQUIRED FOR COMPLETE
SYSTEM.
7 REMOVE ALL EXISTING FLASHING COMPONENTS FROM PIPE VENT, HEAT STACKS, AND ALL ROOF PENETRATIONS TO ALLOW THE INSTALLATION OF NEW ROOF SYSTEM, FLASHING COMPONENTS, PIPE SLEEVES FOR A COMPLETE SYSTEM.
8 NEW EPDM ROOF SYSTEM, METAL EDGE, EDGE SCUPPERS AND ALL ASSOCIATED COMPONENTS
9 NEW FORMED METAL CAP. INSTALL PER MANUFACTURER’S RECOMMENDATIONS AND ENSURE CONTINUOUS WEATHER-TIGHT SEAL. COLOR TO BE SELECTED BY ARCHITECT FROM MFR. FULL SELECTION OF COLORS.
10 GC TO ENSURE ALL EQUIPMENT CURBS ARE A MINIMUM OF 12 INCHES ABOVE THE FINISHED ROOF; EXISTING CURBS
NOT MEETING THIS REQUIREMENT SHALL BE MODIFIED.
11 PROVIDE TAPERED CRICKET SLOPED ON HIGH SIDE OF ROOF TOP EQUIPMENT.
12 PARAPETS TO RECEIVE NEW WATERPROOFING AND COPING SYSTEM. SEE DETAIL ON SHEET A4.40.
13 REMOVE EXTG PITCH POCKETS AND ALL ASSOCIATED COMPONENTS AND PREPARE FOR INSTALLATION OF NEW PITCH
POCKETS.
14 REMOVE AND REPLACE ALL EXISTING WOOD SLEEPERS WITH NEW PRESSURE TREATED WOOD.
15 NEW WALKWAY PADS AT ALL ROOF ACCESS POINTS INCLUDING BUT NOT LIMITED TO ROOF HATCHES AND LADDERS.
AREAS AROUND ALL RTUS ON CONTROL SIDE SHALL ALSO RECEIVE WALKPADS.
FLASHING CLAMP RING
DOME STRAINER
EPDM MEMBRANE ROOFING
SYSTEM
WATER RESISTANT HIGH
DENSITY COMPOSITE
BOARD, SEE SPECS
EX STRUCTURAL FRAMING /
DECK, V.I.F
TAPER INSULATION, STAGGER ALL
JOINTS, INSTALL PER ROOF MANUF.'S
INSTRUCTIONS & SPEC.'S
FASTENER AND SEAM PLATE
SPACING PER MFR SPECS
ADJUSTABLE SLEEVE
WATER CUT-OFF MASTIC
STORMWATER DRAIN PIPING
NEOPRENE FLAT GASKET
DECK PLATE/DRAIN RECEIVER
DRAIN BOTTOM/BODY
REVERSIBLE COLLAR
METAL EXHAUST FAN COVER
FLASHING SYSTEM FASTENER., PER MANUF.
INSTRUCTIONS & SPEC.'S
5" MIN. ROOF INSULATION, STAGGER
ALL JOINTS, FASTEN PER ROOFING
MANUF.'S INSTRUCTIONS & SPEC.'S
IF THE FLASHING SYSTEM IS NOT TERMINATED ON
TOP OF THE CURB, INSTALL ALUMINUM SLIP
FLASHING OVER ROOF FLASHING SYSTEM AND
UNDER FAN COVER, SECURE COVER W/ NEOPRENE
GASKETED SCREW
CURB BY MC
P.T. WOOD BLOCKING AS REQUIRED TO MEET
INSULATION DEPTH, TYPICAL
EX STRUCTURAL FRAMING / DECK, V.I.F
WATER RESISTANT HIGH
DENSITY COVER BOARD
EPDM MEMBRANE ROOFING
SYSTEM
FASTENER AND SEAM PLATE
PRESSURE SENSITIVE CURB FLASHING
FASTENERS
COUNTERFLASHING
PRESSURE SENSITIVE CURB FLASHING. SEE MFR.
5" MIN ROOF INSULATION, STAGGER ALL JOINTS,
FASTEN PER MANUF.'S INSTRUCTIONS & SPEC.'S
P.T. WOOD BLOCKING AS REQUIRED TO MEET INSULATION
DEPTH, TYPICAL
BASE OF UNIT EXTENDS 1/2" MIN. BEYOND
AND DOWN OVER TOP OF CURB
SEALING MATERIAL, MUST BE
CONTINUOUS ON THE PERIMETER
UNIT MOUNTING CURB
EXISTING ROOF STRUCTURAL FRAMING / DECK, V.I.F
WATER RESISTANT HIGH
DENSITY COVER BOARD
EPDM MEMBRANE ROOFING
SYSTEM PER MFR SPEC.
5" MIN ROOF INSULATION,
STAGGER ALL JOINTS, FASTEN PER
MANUF.'S INSTRUCTIONS & SPEC.'S
EXISTING ROOF STRUCTURAL FRAMING / DECK, V.I.F
FASTENER AND SEAM PLATE
PRESSURE SENSITIVE CURB FLASHING
ALUMINUM COUNTER FLASHING
PASSIVE VENT / AIR INTAKE
P.T. WOOD BLOCKING AS REQUIRED TO MEET
INSULATION DEPTH, TYPICAL
WATER RESISTANT HIGH
DENSITY COVER BOARD
EPDM MEMBRANE ROOFING
SYSTEM
5" MIN ROOF INSULATION, STAGGER ALL JOINTS,
FASTEN PER MANUF.'S INSTRUCTIONS & SPEC.'S
TEMPERATURE APPROPRIATE
ELASTOMERIC SEALANT
EX STRUCTURAL FRAMING / DECK, V.I.F
PRESSURE SENSITIVE ELASTOFORM FLASHING AND
EPDM PRIMER
SEALANT
STORM COLLAR SET IN MASTIC/SEALER, PRIME FLANGE
DRAWBAND OR WELD UMBRELLA TO STACK
UMBRELLA
HEAT STACK
PRESSURE SENSITIVE CURED COVER
STRIP AND EPDM PRIMER W/ SEAM
PLATE & FASTENERS
P.T. WOOD BLOCKING AS REQUIRED TO MEET
INSULATION DEPTH, TYPICAL
WATER RESISTANT HIGH
DENSITY COVER BOARD
EPDM MEMBRANE ROOFING
SYSTEM
SEE MFR.'S REQUIREMENT
SEAM PLATE DIA.
NOTES:
1. NAILER SHALL BE SECURELY ANCHORED TO THE DECK
TO RESIST A FORCE OF 300 POUNDS PER LINEAL FOOT IN
ANY DIRECTION.
2. VAPOR BARRIER SHALL BE SEALED AT EDGES.
5" MIN ROOF INSULATION,
STAGGER ALL JOINTS,
FASTEN PER MANUF.'S
INSTRUCTIONS & SPEC.'S
EX ROOF SUBSTRUCTURE SUPPORT, V.I.F
FASTENER AND SEAM PLATE
EXPANSION JOINT SUPPORT
CURED MEMBRANE
FLASHING
FLEXIBLE VAPOR RETARDER TO
SERVE AS INSULATION RETAINER
ATTACH TO TOP OF CURB
WATER RESISTANT HIGH DENSITY
COVER BOARD
EPDM MEMBRANE ROOFING
SYSTEM
P.T. WOOD BLOCKING AS
REQUIRED TO MEET
INSULATION DEPTH, TYPICAL
5" MIN. ROOF INSULATION, STAGGER
ALL JOINTS, INSTALL PER MANUF.'S
INSTRUCTIONS & SPEC.'S
PLUMBING VENT STACK
BASE FLASHING PLY 6" MIN. ON FIELD
1' -0
M
IN
EX STRUCTURAL FRAMING / DECK, V.I.F
EPDM MEMBRANE ROOFING
SYSTEM
WATER RESISTANT HIGH
DENSITY COVER BOARD
WOOD BLOCKING AS REQUIRED TO
MEET INSULATION DEPTH, TYPICAL
5" ROOF MIN. INSULATION, STAGGER ALL
JOINTS, FASTEN PER SPECS
PRESSURE SENSITIVE ELASTOFORM
FLASHING AND EPDM PRIMER
SHEET METAL PITCH PAN SOLDERED/WELDED
WATERTIGHT, SEE MFR. SPEC FOR HEIGHT
POLYURETHANE SEALANT
DRAWBAND
POURABLE SEALANT, 2 PART
NON-SHRINK GROUT
SEALANT
STRUCTURAL FRAMING / DECK, SEE
STRUC. DWG.'S
WATER RESISTANT HIGH
DENSITY COVER BOARD
EPDM MEMBRANE ROOFING
SYSTEM
SEE MANUF.'S REQUIREMENT
SEAM PLATE DIA.
PRESSURE SENSITIVE CURED
COVER STRIP AND EPDM
PRIMER W/ SEAM PLATE &
FASTENERS
PRESSURE SENSITIVE POURABLE
SEALER POCKET
9" WIDE PRESSURE SENSITIVE
ELASTOFORM FLASHING
CONT. MTL ROOF EDGE
SEALANT
EPDM ROOF MEMBRANE, SEE SPECS
SEALANT
EX STRUCTURAL FRAMING / DECK, V.I.FEX WALL
CONSTRUCTION
5" MIN ROOF INSULATION, STAGGER ALL
JOINTS, FASTEN PER MANUF.'S
INSTRUCTIONS & SPEC.'S
WATER RESISTANT HIGH DENSITY COVER BOARD
2"
P.T. WOOD BLOCKING ANCHORED TO EX
STRUCTURE. COUNTERSINK BOT ROW OR
BLOCKING
EX WALL
CONSTRUCTION, V.I.F
EX STRUCTURAL FRAMING /
DECK, V.I.F
EXPANSION JOINT SUPPORT
EPDM ROOF MEMBRANE, MECHANIICAL
TERMINATION WITH COUNTER FLASHING PER
MANUF REQUIREMENTS; MIN. 12" ABOVE DECK.
6" SEALING STRIP,
CAULK BOTH SIDE OF
THE EDGES
EXPANSION JOINT FILLER
FORMED ALUMINUM METAL CAP, ATTACHED TO P.T. WD
BLOCKING WITH WATERTIGHT FASTENERS & NEOPRENE
WASHERS AND AT LAPPED JOINTS
EX STRUCTURAL FRAMING / DECK, V.I.F
5" MIN ROOF INSULATION, STAGGER
ALL JOINTS, FASTEN PER MANUF.'S
INSTRUCTIONS & SPEC.'S
WATER RESISTANT HIGH
DENSITY COVER BOARD (BOTH
SIDES OF ROOF)
ROOF MEMBRANE, WRAP UP OVER WOOD
BLOCKING AS SHOWN, EA SIDE
LAP SEAMS OF CAPPING w/ SEALANT, MIN. 3" LAP
EX WALL CONSTRUCTION, V.I.F
H O
LD
M
IN
V A
R
IE
S
FASTENER AND SEAM PLATE
(BOTH SIDES OF ROOF)
PRESSURE SENSITIVE CURED FLASHING
(BOTH SIDES OF ROOF)
EPDM ROOF MEMBRANE, SEE
SPECS
EPDM ROOF MEMBRANE, SEE
SPECS ROOFING SYSTEM
EX STRUCTURE, V.I.F
2"
FORMED ALUMN. METAL CAP,
ATTACHED TO P.T. WD BLOCKING w/
WATERTIGHT FASTENERS &
NEOPRENE WASHERS & AT ALL
LAPPED JOINTS
EX WALL CONSTRUCTION, V.I.F
PRESSURE SENSITIVE CURED
FLASHING
WATER RESISTANT HIGH
DENSITY COVER BOARD
5" MIN. ROOF INSULATION, STAGGER
ALL JOINTS & FASTEN PER MFR.'S
REQUIREMENT
SEE DETAIL
FOR EXPANSION JOINT
INFORMATION NOT
REPEATED HERE
/8 A4.40
6" WIDE MIN. SECURETAPE AND
EPDM PRIMER
PRESSURE SENSITIVE ELASTOFORM
FLASHING, LAP SEALANT APPLIED
ALONG EDGES
FASTENER & SEAM
FASTENING PLATE
BONDING ADHESIVE
EPDM MEMBRANE ROOFING
SYSTEM
MTL. COUNTER FLASHING
THROUGH WALL FLASHING, DRIP EDGE, &
WEEPS, SEE WALL SECTIONS & DETAILS
TERMINATION BAR, SET IN WATER CUT-
OFF MASTIC
5" MIN ROOF INSULATION, STAGGER
ALL JOINTS, FASTEN PER MANUF.'S
INSTRUCTIONS & SPEC.'S
WATER RESISTANT HIGH DENSITY
COVER BOARD
EX METAL DECK, V.I.F
5" MIN ROOF INSULATION, STAGGER
ALL JOINTS, FASTEN PER MANUF.'S
INSTRUCTIONS & SPEC.'S
EPDM ROOF MEMBRANE, SEE SPECS
2" H O
LD
M
IN
V A
R
IE
S
ROOF MEMBRANE, WRAP UP OVER PT
WOOD BLOCKING AS SHOWN, EA SIDE
EX WALL CONSTRUCTION, V.I.F
SEE COPING DETAIL FOR
INFORMATION NOT REPEATED
HERE
NOT FOR
CONSTRUCTION
PROJ NO:
CHECKED BY:
DRAWN BY:
SCALE:
DATE:
SHEET TITLE:
REGISTRATION:
530 WEST BROAD ST BETHLEHEM, PA 18018
610.419.4055
A R C H I T E C T U R E
PROJECT:
OWNER:
PROJECT TEAM:
SUBMISSIONS:
KEY PLAN:
C
O P
Y R
IG
H
T A
LL
O
Y A
R C
H
IT
E C
T U
R E
CIVIL:
MEPF:
FOOD SERVICE:
ARCHITECT:
STRUCTURAL:
ACOUSTICS:
RESIDENT ENGINEER:
ALLOY5
ARCHITECTURE
DRAWINGS ARE NOT TO SCALE UNLESS PRINTED AT
30"X42".CONTRACTOR SHALL VERIFY ALL DIMENSIONS
AND EXISTING CONDITIONS PRIOR TO CONSTRUCTION.
1 1/2" = 1'-0"
1/
/2
2:
:2
P M
A .4
01/19/26
Author
Checker
25-081
ROOF DETAILS
BANGOR AREA HIGH
SCHOOL ROOF
REPLACEMENT
187 FIVE POINTS RICHMOND ROAD,
BANGOR, PA 18013
BANGOR AREA
SCHOOL DISTRICT
187 FIVE POINTS RICHMOND
ROAD, BANGOR, PA 18013
N/A
N/A
N/AN/A
N/A
N/A
1 1/2" = 1'-0"
TYP. ROOF DETAIL - TOP-SET ROOF DRAIN
1 1/2" = 1'-0"
TYP. ROOF DETAIL - EXHAUST FAN
1 1/2" = 1'-0"
TYP. ROOF DETAIL - CURB DETAIL/HANDLING STATION
1 1/2" = 1'-0"
TYP. ROOF DETAIL - PASSIVE VENT/AIR INTAKE
1 1/2" = 1'-0"
TYP. ROOF DETAIL - HEAT STACK
1 1/2" = 1'-0"
TYP. ROOF DETAIL - EXPANSION JOINT
1 1/2" = 1'-0"
TYP. ROOF DETAIL - VENT STACK
1 1/2" = 1'-0"
TYP. ROOF DETAIL - PITCH POCKET WITH UMBRELLA
1 1/2" = 1'-0"
ROOF EDGE DETAIL
1 1/2" = 1'-0"
EXPANSION JOINT - ROOF TO WALL DETAIL
1 1/2" = 1'-0"
TYP. ROOF DETAIL - AREA DIVIDER @ LOW TO HIGH ROOF
1 1/2" = 1'-0"
PARAPET COPING DETAIL
1 1/2" = 1'-0"
COUNTERFLASHING DETAIL
OPEN
COURTYARD
N
ROOF AREA - C7
ROOF AREA - C4
ROOF AREA - B9
ROOF AREA - C2
ROOF AREA - C1
ROOF AREA - B13
ROOF AREA - B15
ROOF AREA - B11
ROOF AREA - C3
ROOF AREA - C5
ROOF AREA - B1
ROOF AREA - B5 ROOF AREA - B4
ROOF AREA - B3
ROOF AREA - B8
ROOF AREA - A3
ROOF AREA - C6
ROOF AREA - B10
ROOF AREA - B14
ROOF AREA - A2ROOF AREA - A1
ROOF AREA - B7
/1 A1.41
/1 A1.42
EJ
EJ
AD
ROOF AREA - B6
MTL ROOF
NIC
ROOF AREA - B2
EJ
ROOF AREA - B2
ROOF AREA - B10
EJ
ROOF AREA - B12
MTL ROOF
NIC
AD
PP
RV
RV
RV
HS
AD
RV
PP
PP
PP
PPRV RV EJ PP
RV
HS
RV
HS
A D
RV
RV
HSHS
PP PP
RV
PP
PP
HS
HS
HS HS
AD
HS
RV
HS
HS
RV
RV RV
RV
RV
PP
EJ
EJ
HS
PP
PP
RV
ROOF CHIMNEY
RV
RV
RV
RV
RV RV
RV
RV RV
RV
RV
RV
PP
PP
RTU
RTU
RTU
EF
EF
EF
EF
EF
PV
PV
RTU
RTU
EF
EF
RTU
RTU
RTU
RTU
EF
EF
HS
RTU
EF
PV
PP
RTU
EF
EF
EF
EF
RTU
EF RD
EF
EF
EF
EF
EF RTU
RTU RTU
PV
RTU
RTU
EF
EF EF
EF
EF
EF
EF
EF
EF
PV
RTUEF
EF
RTU
RTU
RTU
RTU
RTU
EF
EF
EFEF
EF
EF
EF
EF EF
EF
EF EF
EF
EFEF
PV
EF
/1 A1.41
/1 A1.42
PV
PV
PV
PV
S
S S
EJ
HP
HP
HP
LP
HP
ROOF ACCESS
LP
LP
LP
HP
LP
HP
ACCESS LADDER
ACCESS LADDER
ALTERNATE #01
ALTERNATE #02
GENERAL ROOF NOTES
1. GC TO VERIFY ALL EXISTING CONDITIONS; LOCATIONS, SIZES AND DIMENSIONS OF ROOF FEATURES AND PENETRATIONS
SHOWN ARE APPROXIMATE. GC TO REVIEW AND VERIFY ALL PROJECT CONDITIONS AND BUILDING COMPONENTS. EXISTING
ROOF STRUCTURE APPEARS TO BE SLOPED; GC TO VIF.
2. ALL TAPERED INSULATION SHALL BE 1/4" PER FT. UNLESS NOTED OTHERWISE, PROVIDE TAPERED INSULATION CRICKETS AT
ALL MECHANICAL UNITS. VERIFY QUANTITIES AND LOCATIONS IN THE FIELD.
3. FLASHING SHALL BE INSTALLED AT WALL AND ROOF INTERSECTIONS, GUTTERS, WHEREVER THERE IS A CHANGE IN ROOF SLOPE OR DIRECTION AND AROUND ROOF OPENINGS. WHERE FLASHING IS OF METAL, THE METAL SHALL BE CORROSION
RESISTANT WITH A THICKNESS AS NOTED IN THE SPECIFICATIONS.
4. PARAPET WALLS SHALL BE PROPERLY COPED WITH NONCOMBUSTIBLE, WEATHERPROOF MATERIALS OF A WIDTH NOT LESS
THAN THE THICKNESS OF THE PARAPET WALL.
5. FOR ROOF REPAIRS, THE GC IS RESPONSIBLE FOR PROVIDING ALL STRUCTURAL FRAMING AND INFILL MATERIAL TO MATCH
ADJACENT.
6. ROOF DRAINS ON SLOPING STRUCTURE TO BE LOCATED 12" OFF CENTERLINE OF STEEL.
7. GC SHALL VERIFY THAT ALL NEW WORK ON EXISTING ROOF DOES NOT VOID WARRANTY ON ADJACENT EXISTING ROOF
SYSTEMS.
8. GC TO COORD REPAIR/REPLACEMENT OF EXTG CURBS INSTALLED IN CRICKETS/SUMPS WITH MANUFACTURER.
9. ALL CURBS SHALL BE SUPPORTED ON ROOF DECK.
10. GC TO CONFIRM HEIGHT OF EQUIPMENT WITH MANUFACTURER TO PROVIDE PROPER FLASHING HEIGHTS FOR ROOF SYSTEMS
11. GC TO COORDINATE EQUIPMENT ON EXISTING ROOFS WITH MANUFACTURERS HOLDING THE WARRANTY.
12. DO NOT SCALE THIS DRAWING. GC MUST VERIFY ALL ROOF DIMENSIONS PRIOR TO PURCHASE OF MATERIALS.
13. PARAPETS TO RECEIVE NEW COPING PER SPECIFICATIONS.
14. SEE SHEET A4.40 FOR ROOF DETAILS; ALL DETAILS SHALL BE IN ACCORDANCE ROOF MANUFACTURER.
15. COLOR OF ALL NEW METAL TO BE SELECTED BY ARCHITECT FROM MANUFACTURERS FULL SELECTION OF COLORS.
16. INSTALL A CRICKET ON THE HIGH SIDE OF THE CHIMNEY TO PREVENT WATER PONDING. THE CRICKET SHALL SLOPE TO
DIRECT WATER AROUND THE CHIMNEY AND BE COVERED AND FLASHED WITH THE SAME ROOFING MEMBRANE AS THE FLAT
ROOF
17. SQUARE TAPERED SUMPS, SLOPED PER MANUFACTURERS RECOMMENDATION; MIN. 5" OF RIGID INSULATION TO BE
PROVIDED AT ROOF DRAIN, SEE TYPICAL ROOF DETAILS
18. ANY DISCONNECTING, RAISING AND RECONNECTING OF HVAC UNITS IS TO BE INCLUDED IN GC SCOPE OF WORK.
19. GC IS RESPONSIBLE TO LOCATE ANY ELECTRICAL CONDUIT OR GAS PIPE LOCATED BELOW THE ROOF SURFACE, DAMAGE TO
ELECTRICAL OR GAS LINES CAUSED BY THE GC DUE TO NEGLIGENT FAILURE TO TRY AND LOCATE SUCH LINES WILL BE PAID
FOR BY THE GC.
20. GC IS RESPONSIBLE FOR ANY DISCONNECTION/CONNECTION OF ELECTRIC OR GAS SUPPLY TO PROVIDE PROPER
INSTALLATION OF NEW ROOF SYSTEM.
21. GC TO VERIFY QUANTITY AND LOCATION OF ALL EXTG ROOF ITEMS. ANY ITEMS NOT INCLUDED ON DRAWINGS ARE TO BE
INCLUDED IN THIS SCOPE OF WORK.
22. GC TO VERIFY IN FIELD ALL EX ROOF DECK CONDITIONS. REPAIR, REPLACE AND/OR INFILL AS REQUIRED TO ACCEPT NEW CONSTRUCTION. GC IS RESPONSIBLE FOR ALL AREAS WITHIN THE SCOPE OF THIS PROJECT; EXISTING DECK MATERIAL KEY IS FOR REFERENCE ONLY. INSULATED CONCRETE: A1, A2, B3-B9, B14, C1-C7. TECTUM: A3, B1, B2, B10, B15
23. GC TO PROVIDE THE ALLOWANCE THAT IS INCLUDED FOR LOCALIZED REPAIR AND REPLACEMENT OF EXISTING TECTUM ROOF DECK AND LIGHTWEIGHT INSULATING CONCRETE DUE TO CONCEALED CONDITIONS. QUANTITIES ARE UNKNOWN AND
WILL BE VERIFIED DURING CONSTRUCTION.
ROOF LEGEND
DIRECTION OF SLOPE
CHANGE IN LEVEL
RD
ROOF DRAIN
ROOF IDENTIFIERROOF AREA - A
HP +00"
LP -00"
HIGH POINT INDICATOR
LOW POINT INDICATOR
AD AREA DIVIDER SEE DETAIL
ON SHEET A4.40
SYMBOL DESCRIPTION SYMBOL DESCRIPTION
8'x8' TAPERED SUMP
16'x16' TAPERED SUMP
PASSIVE VENT/AIR INTAKE
EXHAUST FAN
ROOF VENT
RV
EF
PV
EJ EXPANSION JOINT SEE
DETAIL ON SHEET A4.40
RV
PP
HS
ROOF VENT
PITCH POCKET
ROOF HEAT STACK
S
EXISTING SCUPPER
BID ALTERNATES
BASE BID: SCOPE OF WORK INCLUDES ALL ROOF AREAS.
ALTERNATE #01: SCOPE OF WORK INCLUDES THE FOLLOWING
ROOF AREAS ONLY (A1-A3, B8, B9, B13, B14, C1-C7).
ALTERNATE #02: SCOPE OF WORK INCLUDES THE FOLLOWING
ROOF AREAS ONLY (B1-B7, B10-B12, B15).
NOT FOR
CONSTRUCTION
PROJ NO:
CHECKED BY:
DRAWN BY:
SCALE:
DATE:
SHEET TITLE:
REGISTRATION:
530 WEST BROAD ST BETHLEHEM, PA 18018
610.419.4055
A R C H I T E C T U R E
PROJECT:
OWNER:
PROJECT TEAM:
SUBMISSIONS:
KEY PLAN:
C
O P
Y R
IG
H
T A
LL
O
Y A
R C
H
IT
E C
T U
R E
CIVIL:
MEPF:
FOOD SERVICE:
ARCHITECT:
STRUCTURAL:
ACOUSTICS:
RESIDENT ENGINEER:
ALLOY5
ARCHITECTURE
DRAWINGS ARE NOT TO SCALE UNLESS PRINTED AT
30"X42".CONTRACTOR SHALL VERIFY ALL DIMENSIONS
AND EXISTING CONDITIONS PRIOR TO CONSTRUCTION.
As indicated
1/
/2
2:
:2
P M
A .0
01/19/26
Author
Checker
25-081
BID ALTERNATES
BANGOR AREA HIGH
SCHOOL ROOF
REPLACEMENT
187 FIVE POINTS RICHMOND ROAD,
BANGOR, PA 18013
BANGOR AREA
SCHOOL DISTRICT
187 FIVE POINTS RICHMOND
ROAD, BANGOR, PA 18013
N/A
N/A
N/AN/A
N/A
N/A
1" = 20'-0"
ROOF PLAN - OVERALL - ALTERNATES
| Sheets |
| G0.00 - COVER SHEET |
| G1.01 - CODE DATA |
| A1.40 - OVERALL ROOF PLAN |
| A1.41 - ROOF PLAN - AREA A |
| A1.42 - ROOF PLAN - AREA B |
| A4.40 - ROOF DETAILS |
| A9.00 - BID ALTERNATES |
File details come from the government source that posted it. Updated .