Project Summary
These bid documents detail a sanitary sewer replacement project undertaken by Upper Allen Township in Cumberland County, Pennsylvania. The project involves the replacement of approximately 135 linear feet of sanitary sewer with new 6- and 8-inch PVC piping along Gettysburg Pike and West Lisburn Road (State Route 2004) within Upper Allen Township's rights-of-way and paved areas. Work scope includes installation of two new precast concrete manholes with owner-furnished frames and covers, service lateral connections with cleanouts, and all appurtenances as specified in the technical drawings. The bid documents package (Document No. 12691159) includes a general coversheet, site plan with legend and general notes, profile drawings, detailed connection specifications, and comprehensive erosion and sedimentation control plans with implementation details. The project site is located at the intersection of Gettysburg Pike and Lisburn Road in Mechanicsburg, Pennsylvania, within an area of karst geology requiring special sinkhole management provisions. Construction must comply with Pennsylvania Department of Transportation (PenDOT) traffic control standards and the Pennsylvania Underground Utility Line Protection Act.
The technical specifications require contractors to perform field testing and verification of existing utility locations prior to construction, maintain continuous trench access and driveway maintenance, and implement comprehensive erosion and sedimentation control measures throughout all construction phases. Work includes pipe bedding requirements using AASHTO No. 8 or No. 57 coarse aggregate, trench backfill procedures with specific compaction standards, pavement restoration in accordance with PenDOT Publication 408, and permanent stabilization of all disturbed areas with minimum 70 percent vegetative cover. The contractor is responsible for all bypass pumping of sewage during replacement and connection of existing systems, test pitting to verify existing utility clearances, environmental due diligence for imported clean fill materials, and inspection and maintenance of erosion control best management practices on a weekly basis and after each runoff event. All building materials and wastes must be recycled or disposed of in accordance with Pennsylvania Department of Environmental Protection regulations, and the project site is subject to Preparedness, Prevention, and Contingency plan requirements.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 1-UAT Gettysburg Pike SS Replacement - Bid Specifications.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
16 November 2026 - 10:08 PM C:\ADSK\ACCDocs\GHD Services Pty Ltd\12691159-UAT Gettysburg\Project Files\01 WIP\Gen\12691159-GHD-00-DRG-00-GN-001.dwgBrad Anderson
No. Checked Date
Project No. Scale
Title Size Bar is 1" on original size sheet
Sheet No.
Project
Client
Plot Date: Plotted By:
Issue Approved Drafting Check
Designer Design Check
Project Manager
Project Director
Date
Path and Filename:
1"
Author
This document and the ideas and designs incorporated herein, as an instrument of professional service, is the property of GHD. This document may only be used by GHD’s client (and any other person who GHD has agreed can use this document) for the purpose for which it was prepared and must not be used by any other person or for any other purpose.
www.ghd.com
Conditions of Use
GHD
T
Inc.
225 Grandview Avenue, Suite 403 Camp Hill, Pennsylvania 17011, USA
717.541.0622
ARCH D
0 BID DOCUMENTS RC JK 11-17-2026
R. CECCHETTI
UPPER ALLEN TOWNSHIP
J. KOSTELAC
GETTYSBURG PIKE
SANITARY SEWER REPLACEMENT
12691159 NOV. 2026
B. ANDERSON
R. CECCHETTI
S. MATTHEWS
T. PARTHEMORE AS NOTED
GENERAL
COVERSHEET
GN-001
LOCATION MAP
UPPER ALLEN TOWNSHIP
GETTYSBURG PIKE AND
WEST LISBURN ROAD (S.R. 2004)
SANITARY SEWER
REPLACEMENT PROJECT
BID DOCUMENTS
UPPER ALLEN TOWNSHIP, CUMBERLAND COUNTY, PA
NOVEMBER 2026
SITE ADDRESS
GETTYSBURG PIKE AND LISBURN ROAD
UPPER ALLEN TOWNSHIP
CUMBERLAND COUNTY, PA
PENNSYLVANIA LAW REQUIRES 3 WORKING DAYS NOTICE
FOR CONSTRUCTION PHASE AND 10 WORKING
DAYS IN DESIGN STAGE - STOP CALL
PENNSYLVANIA ONE CALL SYSTEM, INC.
1-800-242-1776 OR 811
SERIAL #ER - 20263143243
CALL BEFORE YOU DIG
THE CONTRACTOR SHALL COMPLY WITH THE PROVISIONS OF THE PENNSYLVANIA GENERAL ASSEMBLY UNDERGROUND UTILITY LINE PROTECTION ACT, PA ACT 287 OF 1974, AS AMENDED BY ACT 121 OF 2008, 73 P.S. § 176 ET SEQ., FOR NOTIFICATION OF UTILITIES BEFORE EXCAVATION IN THE CONTRACT AREA. THE ONE UNDERGROUND UTILITIES CALL NUMBER IS 800-242-1776 OR 811.
INDIVIDUAL LOCAL UTILITIES ARE AS FOLLOWS:
UNDERGROUND UTILITIES ACT:
COMPANY: CABLE PROTECTION SERVICES INC
ADDRESS: PO BOX 4816
MIDLOTHIAN, VA. 23112
CONTACT: DEBBIE KING
EMAIL: DEBBIE_KING@CABLEPS.COM
PHONE: 804-562-3409
COMPANY: VERIZON PENNSYLVANIA LLC
ADDRESS:
CONTACT: OFFICE PERSONNEL
EMAIL: 1CALL-VERIZON-PADE@VERIZON.COM
COMPANY: VEOLIA WATER PENNSYLVANIA INC
ADDRESS: 6310 ALLENTOWN BOULEVARD
HARRISBURG, PA. 17112
CONTACT: CHRISTOPHER BRIDE
EMAIL: CHRISTOPHER.BRIDE@VEOLIA.COM
PHONE: 717-901-6317
COMPANY: PENNSYLVANIA ELECTRIC CO
ADDRESS: 341 WHITE POND DRIVE
AKRON, OH. 44320
CONTACT: MELLYSSA ADAMS
EMAIL: MADAMS@FIRSTENERGYCORP.COM
PHONE: 330-252-4013
COMPANY: PPL ELECTRIC UTILITIES CORPORATION
ADDRESS: 437 BLUE CHURCH RD
PAXINOS, PA. 17860
CONTACT: DOUG HAUPT
EMAIL: DLHAUPT@PPLWEB.COM
PHONE: 570-490-5684
COMPANY: UPPER ALLEN TOWNSHIP PUBLIC WORKS DEPT
ADDRESS: 100 GETTYSBURG PIKE
MECHANICSBURG, PA. 17055
CONTACT: COLLIN BARGE
EMAIL: CBARGE@UATWP.ORG
PHONE: 717-766-0756
COMPANY: UPPER ALLEN TOWNSHIP SEWER
ADDRESS: 400 CREEKSIDE DR
MECHANICSBURG, PA. 17055
CONTACT: KODI HOCKENBERRY
EMAIL: KHOCKENBERRY@UATWP.ORG
PHONE: 717-697-9548
COMPANY: UGI UTILITIES INC
ADDRESS: 1301 AIP DR
MIDDLETOWN, PA. 17057
CONTACT: GEOFFREY FERGUSON
EMAIL: GFERGUSON@UGI.COM
PHONE: 610-807-3118
PROJECT
LOCATION
PROJECT SITE
NOT TO SCALE
VICINITY MAP
HARRISBURG
YORK
LANCASTER
PHILADELPHIA
PITTSBURGH
ERIE
STATE COLLEGE
WILLIAMSPORT
SCRANTON
CHAMBERSBURG
SHEET INDEX
SEQUENCE
NUMBER
SHEET
NUMBER SHEET TITLE
GENERAL
1 GN-001 COVERSHEET
CIVIL
2 CI-101 SITE PLAN, LEGEND AND GENERAL NOTES
3 CI-201 PROFILE
4 CI-501 DETAILS
5 CI-502 DETAILS
6 CI-701 EROSION AND SEDIMENTATION CONTROL - NOTES
7 CI-702 EROSION AND SEDIMENTATION CONTROL - DETAILS
8 CI-801 PENNDOT HOP - ENCROACHMENT CHART, GENERAL NOTES AND DETAILS
9 CI-802 PENNDOT HOP - DETAILS
http://www.ghd.com
OH
W
OH
W
OH
W
OH
W
OH
W
OH
W
OH
W
OH
W
OH
W
OH
W
OH
W
OH
W
OH
W
OH
W
OH
W
OH
W
OH
W
OH
W
OH
W
OH
W
OHW
OHW
OHW
OHW
OHW
OHW
OHW
OHW
OHW
OHW
OHW
OHW
OHW
OHW
OHW
OHW
OHW
SA
N
SA
N
SA
N
SA
N
SA
N
SA
N
SA
N
SA
N
SA
N
SA
N
SA
N
SA
N
SA
N
SA
N
SA
N
SA
N
SA
N
SAN
W
W
SAN
SAN
SAN
OHW
O H W
O H W
O H W
O H W
O H W
S
S
S
S
S
S
S
S
S
S
S S
S
SSSSSSSSSSS
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
SSSSS
OHW OHW OHW OHW OHW OHW
S S
S
S
S
S
S
S
S
S
S
S
S
S
W
W
W
W
W W
W
W
W
W
W
W
W
W W
W
W
W
W
W
W
W
W W
W W W W W W W W W W W W W W W W W
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
OHW
OHW
OHW
OHW
OHW
OHW
OHW
OHW
OHW
OHW
OHW
OHW
OHW
OHW
OHW
OHW
OHW
OHW
OHW
OHW
OHW
OHW
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
STORM
W W W W W W
SAN
SAN
SAN
SAN
SAN
OH
W
OH
W
OH
W
OH
W
OH
W
OH
W
OH
W
OH
W
OH
W
OH
W
OH
W
OH
W
OH
W
OH
W
OH
W
OH
W
OH
W
OH
W
OH
W
OH
W
OHW
OHW
OHW
OHW
OHW
OHW
OHW
OHW
OHW
OHW
OHW
OHW
OHW
OHW
OHW
OHW
OHW
SA
N
SA
N
SA
N
SA
N
SA
N
SA
N
SA
N
SA
N
SA
N
SA
N
SA
N
SA
N
SA
N
SA
N
SA
N
SA
N
SA
N
SAN
W
W
SAN
SAN
SAN
OHW
O H W
O H W
O H W
O H W
O H W
S
S
S
S
S
S
S
S
S
S
S S
S
SSSSSSSSSSS
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
SSSSS
OHW OHW OHW OHW OHW OHW
S S
S
S
S
S
S
S
S
S
S
S
S
S
W
W
W
W
W W
W
W
W
W
W
W
W
W W
W
W
W
W
W
W
W
W W
W W W W W W W W W W W W W W W W W
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
OHW
OHW
OHW
OHW
OHW
OHW
OHW
OHW
OHW
OHW
OHW
OHW
OHW
OHW
OHW
OHW
OHW
OHW
OHW
OHW
OHW
OHW
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
STORM
W W W W W W
SAN
SAN
SAN
SAN
SAN
3+69
0+00
1+
2+00
3+00
1+81.63
2+39.11
LOD
LOD
LOD
LODLOD
LO
D
LO
D
LOD
LOD
LOD
LOD
LOD
LO
D
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LODLODLODLODLOD
LOD
LOD
LOD LOD
LOD
LOD
LO
D
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LOD
LOD
LOD
LOD
LOD
LO
D
LO
D
LOD
LOD
LOD
LOD
LOD
LO
D
LO
D
LOD
LOD
LOD
LOD
LO
D
LO
D
LOD
LOD
LOD
LOD
LO
D
LO
D
LOD
LODLOD
LO
D
LOD LOD
LOD
LOD
LOD
LO
D
LOD
LOD
LOD
LODLOD
LO
D
LOD LOD
CF
S
16 November 2026 - 10:35 PM C:\ADSK\ACCDocs\GHD Services Pty Ltd\12691159-UAT Gettysburg\Project Files\01 WIP\Civil\Sheets\12691159-GHD-00-DRG-00-CI-101.dwgBrad Anderson
No. Checked Date
Project No. Scale
Title Size Bar is 1" on original size sheet
Sheet No.
Project
Client
Plot Date: Plotted By:
Issue Approved Drafting Check
Designer Design Check
Project Manager
Project Director
Date
Path and Filename:
1"
Author
This document and the ideas and designs incorporated herein, as an instrument of professional service, is the property of GHD. This document may only be used by GHD’s client (and any other person who GHD has agreed can use this document) for the purpose for which it was prepared and must not be used by any other person or for any other purpose.
www.ghd.com
Conditions of Use
GHD
T
Inc.
225 Grandview Avenue, Suite 403 Camp Hill, Pennsylvania 17011, USA
717.541.0622
ARCH D
0 BID DOCUMENTS RC JK 11-17-2026
R. CECCHETTI
UPPER ALLEN TOWNSHIP
J. KOSTELAC
GETTYSBURG PIKE
SANITARY SEWER REPLACEMENT
12691159 NOV. 2026
B. ANDERSON
R. CECCHETTI
S. MATTHEWS
T. PARTHEMORE AS NOTED
CIVIL
SITE PLAN
CI-101
0 40'20'10'
1 PLAN
SCALE: 1"=20' 0 40'20'10'
CFSCFS
LOD LOD LOD
NEW MH G07-10
EX. MH G07-10
(TO BE FILLED
AND ABANDONED)
CONNECT TO
EXISTING (TYP.)
CONNECT
TO EXISTING
NEW 8" PVC
SANITARY SEWER
EX. SANITARY SEWER
(TO BE CAPPED, FILLED
AND ABANDONED)
REPLACE LATERAL TO R-O-W LINE WITH 6"
PVC SDR 35 AND INSTALL A NEW CLEANOUT.
CONNECT LATERAL TO NEW MH.
N
INLET
PROTECTION
(TYP.)
LIMIT OF
DISTURBANCE
12" COMPOST
FILTER SOCK
SHEET GENERAL NOTES
1. THIS SURVEY WAS NOT PERFORMED AND MAPPING PREPARED WITH THE BENEFIT OF A
TITLE SEARCH.
2. BOUNDARY AND TOPOGRAPHIC INFORMATION SHOWN ARE BASED ON A FIELD SURVEY
PERFORMED BY A TO Z LAND CONSULTING SERVICES LLC., COMPLETED IN JUNE, 2026.
3. CONTOURS AND ELEVATIONS ARE BASED ON NATIONAL AMERICAN VERTICAL DATUM OF 1988
(NAVD 88).
4. BEARINGS ARE BASED ON PENNSYLVANIA STATE PLANE COORDINATES, SOUTH ZONE,
NORTH AMERICAN DATUM OF 1983 (NAD 83).
5. CONTRACTOR SHALL COMPLY WITH THE PROVISIONS OF ACT 181 WITH PROVISIONS FOR
NOTIFICATION OF UTILITIES AND PROTECTION OF EXISTING UNDERGROUND UTILITIES IN THE
VICINITY OF THE PROJECT. THE ONE CALL UNDERGROUND UTILITIES LOCATION CALL
NUMBER IS (800) 242-1776.
6. IMPLEMENT SOIL CONSERVATION MEASURES BEFORE STARTING CONSTRUCTION.
7. THE LOCATION, DEPTH, SIZE, AND TYPE OF EXISTING UTILITIES (ELECTRIC, GAS,
TELEPHONE, TV CABLE, WATER, SANITARY SEWERS, STORM SEWERS, SIGNALING CABLE
ETC.) SHOWN ON THE DRAWINGS MAY NOT BE ACCURATE. IN MANY CASES, THE ACTUAL
LOCATION AND INVERT OF THESE UTILITIES ARE NOT KNOWN. INDIVIDUAL UTILITY SERVICES
FOR HOUSES AND BUILDINGS ARE NOT KNOWN OR SHOWN. EXACT LOCATIONS AND DEPTHS
ARE TO BE VERIFIED IN THE FIELD BY THE CONTRACTOR. THE CONTRACTOR SHALL TEST PIT, AS REQUIRED, TO ESTABLISH THE LOCATION OF THESE FACILITIES SO APPROPRIATE
ADJUSTMENT TO THE PROPOSED SANITARY SEWER DESIGN MAY BE MADE, IF NECESSARY.
8. CONTRACTOR SHALL MAINTAIN ACCESS TO ALL DRIVEWAYS AND MAILBOXES DURING THE
COURSE OF THE WORK.
9. LENGTHS AND SLOPE(GRADE) OF PIPE SHOWN ARE CALCULATED FROM MANHOLE INSIDE
WALL TO MANHOLE INSIDE WALL USING THE INVERTS FROM INSIDE OF MANHOLE.
CONTRACTOR TO ADJUST ACTUAL GRADES ACCORDINGLY TO ALLOW FOR DISTANCE FROM
MH CENTERS TO INSIDE OF MH WALLS.
10. MANHOLES ARE TO BE SET AT GRADE IN IMPROVED AREAS AND PRIVATE YARDS, UNLESS
OTHERWISE NOTED.
11. AT THE END OF EACH WORK DAY, THE EXCAVATED TRENCHES SHALL BE COMPLETELY
BACKFILLED AND/OR STEEL PLATES SHALL BE PLACED OVER THE EXCAVATION.
12. CONTRACTOR WILL BE RESPONSIBLE FOR BYPASS PUMPING OF SEWAGE WHEN REPLACING
AND/OR CONNECTING EXISTING SANITARY SEWER SYSTEMS.
13. CONTRACTOR SHALL TEST PIT ALL KNOWN EXISTING UTILITY CROSSINGS WITHOUT
ADDITIONAL COMPENSATION FROM OWNER OTHER THAN THE CONTRACT UNIT PRICES
PRIOR TO INSTALLING ANY SANITARY SEWER PIPE TO VERIFY EXISTING HORIZONTAL AND
VERTICAL ELEVATIONS TO ASSURE NO CONFLICT.
14. LOCATION OF SERVICE LATERALS ENTERING THE SEWER MAIN WAS OBTAINED BY
TELEVISING THE SEWER MAIN. THE EXACT DIRECTION AND DEPTH OF THE SERVICE
LATERALS LEAVING THE SEWER MAIN TOWARDS THE PROPERTY ARE UNKNOWN. ACTUAL
LOCATIONS OF THE SERVICE LATERALS SHALL BE DETERMINED IN THE FIELD. LATERAL
CLEANOUTS SHALL BE INSTALLED ON THE RIGHT-OF-WAY LINE.
15. EXISTING SANITARY SEWER PIPING TO BE RECONNECTED TO NEW MANHOLES IN
ACCORDANCE WITH DETAIL DRAWINGS.
16. MAINTENANCE AND PROTECTION OF TRAFFIC DURING CONSTRUCTION SHALL BE IN ACCORDANCE WITH PENNDOT PUBLICATION 213 "WORK ZONE TRAFFIC CONTROL," JUNE 2014, OR MOST CURRENT.
LEGEND:
SHEET KEYNOTES
1. EXISTING MANHOLE FRAME, COVER AND RISER RINGS/DONUTS TO BE REMOVED AND
MANHOLE TO BE ABANDONED.
2. CONTRACTOR TO FIELD LOCATE LATERAL AND DETERMINE DEPTH PRIOR TO THE START
OF CONSTRUCTION.
SOIL TYPE (TYP.)
(APPROXIMATE)
SOIL TYPE BOUNDARY
EX. WATER
EX. PROPERTY LINE
EX. STORM SEWER
EX. SANITARY SEWER
EX. RIGHT-OF-WAY
NEW SANITARY SEWER
(ACTUAL WIDTH)
EX. INDEX CONTOUR
EX. INTERMEDIATE CONTOUR
EX. EDGE OF ROAD
EX. OVERHEAD WIRE
EX. BUILDINGS AND STRUCTURES
MILL/OVERLAY AREA
COMPOST FILTER SOCK
LIMIT OF DISTURBANCE
EX. TRAFFIC LOOP/COMM. LINE
EX. MH G07-11
W/ POURED IN
PLACE BASE
(TO BE REPLACED)
S.R. 2004
SEGMENT - 140
OFFSET - 3693
S.R. 2004
SEGMENT - 150
OFFSET - 0000
EX. SANITARY SEWER
(TO BE FILLED AND ABANDONED)
S.R. 2004
SEGMENT - 140
OFFSET - 3588
LIMIT OF WORK
S.R. 2004
SEGMENT - 140
OFFSET - 3693
LIMIT OF WORK
CAP EXISTING
CAP EXISTING
CONNECT
TO EXISTING
0+00 1+00 2+00 3+00 4+00 4+50
53.49LF of NEW 8" PVC @ 1.59%
NEW G07-10
EX. MH G07-11
W/ POURED IN PLACE BASE
(TO BE REPLACED)
459.63(NW)
459.78(SE)
459.53(SW)
1+81.63 470.0
460.93(N) 460.71(W)
460.48(SE)
2+39.11 469.6
6" LAT.
8"
6" LATERAL
CONNECTION
8" PVC SDR 35
CONNECTION
SEE PIPE
CONNECTION
DETAIL
SEE PIPE
CONNECTION
DETAIL
INV IN
INV IN
INV OUT
STATION
RIM
8'
NEW FLOWABLE FILL
NEW 8" PVC
SANITARY SEWER
(5 FT)
5'
NEW 8" PVC
SANITARY SEWER
(16 FT)
16 November 2026 - 10:32 PM C:\ADSK\ACCDocs\GHD Services Pty Ltd\12691159-UAT Gettysburg\Project Files\01 WIP\Civil\Sheets\12691159-GHD-00-DRG-00-CI-201.dwgBrad Anderson
No. Checked Date
Project No. Scale
Title Size Bar is 1" on original size sheet
Sheet No.
Project
Client
Plot Date: Plotted By:
Issue Approved Drafting Check
Designer Design Check
Project Manager
Project Director
Date
Path and Filename:
1"
Author
This document and the ideas and designs incorporated herein, as an instrument of professional service, is the property of GHD. This document may only be used by GHD’s client (and any other person who GHD has agreed can use this document) for the purpose for which it was prepared and must not be used by any other person or for any other purpose.
www.ghd.com
Conditions of Use
GHD
T
Inc.
225 Grandview Avenue, Suite 403 Camp Hill, Pennsylvania 17011, USA
717.541.0622
ARCH D
0 BID DOCUMENTS RC JK 11-17-2026
R. CECCHETTI
UPPER ALLEN TOWNSHIP
J. KOSTELAC
GETTYSBURG PIKE
SANITARY SEWER REPLACEMENT
12691159 NOV. 2026
B. ANDERSON
R. CECCHETTI
S. MATTHEWS
T. PARTHEMORE AS NOTED
CIVIL
PROFILE
CI-201
1 PROFILE
SCALE: H 1"=20', V 1"=10' 0 40'20'10'
0 20'10'
NEW 8" PVC
SANITARY SEWER
PLAN
MI
N.
1"
1"
1/2"
(TYPICAL)
REINFORCED PLASTIC
SECTIONAL ELEVATION
INSIDE FACE
OF MANHOLE
STEEL BAR
#3 DEFORMED
10"
6 3/4"
1 3 /4"
1"
GROOVE
JOINT SEALANT
FLEXIBLE PLASTIC
PREFORMED TONGUE
SECTION
HEAVY DUTY
MANHOLE FRAME (H-25)
NO SCALE
STANDARD PRECAST CONCRETE MANHOLE
WITH PRECAST CONCRETE BASE
NO SCALE
STANDARD PRECAST CONCRETE MANHOLE
WITH PRECAST CONCRETE BASE
NO SCALE
MANHOLE STEPS
NO SCALE
MANHOLE PIPE GASKETS
NO SCALE
MANHOLE SECTION JOINT SEAL
NO SCALE
TYPICAL PLAN OF MANHOLE CHANNELS
NO SCALE
TYPE 1
RUBBER GASKET CAST INTO
PRECAST PIPE OPENINGS
TYPE 2
RUBBER GASKET COMPRESSION RING
INSERT FOR PRECAST OR CORED PIPE OPENINGS (KOR-N-SEAL)
END VIEW
END VIEW
GASKET
PLAN
PIPE
PLAN SECTION
MANHOLE
SECTION
MANHOLE
A-LOK GASKET
OR APPROVED EQUAL
PIPE
(TYP.)
NOTE:
AFTER PIPE-TO- MANHOLE INSTALLATION,
SEAL ANNULAR SPACE AROUND PIPE,
INSIDE AND OUTSIDE OF MANHOLE WITH
POLYURETHANE SEALING COMPOUND OR
NON-SHRINK CEMENT GROUT.
(TYP.OF ALL CONNECTIONS).
6" MIN.
VA
RI
ES
VA
RI
ES
R=1'-0"
3/4
1/2"/FT.
12" CENTERS
4'-0", 5'-0", 6'-0"
(TYP.)
SPACED ON
NO. 57 COARSE AGGREGATE
O.
D.
HAND TAMPED UNDER PIPE
BASE WITH RISER SECTION AND
PRECAST REINFORCED CONCRETE
(SEE MANHOLE GASKET DETAIL)
JOINTS SEALED WATERTIGHT
SECTION
CAST INTO TOP
THREADED INSERT
3'- 0"
M
IN
MATCH PAVEMENT/GRADE
AND SLOPE AS DIRECTED
BOLTED FRAME DETAIL)
(SEE LEVELING RINGS AND
3-1/2" MIN. TO 4" MAX.
MANHOLE STEPS
SEALED WATERTIGHT
FRAME AND LEVELING RINGS
2'-0"
18" MAX. TO TOP STEP
CONCRETE
PLAN
SECTION
EMBEDMENT
CHANNEL
NOTES:
1. BOLTING OF MANHOLE FRAME AND COVER REQUIRED FOR ALL
MANHOLES.
2. 3/4" DIA. STAINLESS STEEL EXPANSION ANCHOR BOLTS MAY BE USED IN
PLACE OF THREADED STUDS AND INSERTS.
3. MANHOLE THREADED INSERT SPACING TO MATCH HOLE CENTER
SPACING ON SPECIFIED FRAME AND COVER FOR EACH MANHOLE.
4. MANHOLE FRAMES SHALL BE SET WITH DOUBLE APPLICATION OF
PREFORMED PLASTIC GASKET SEALANT MATERIAL.
5. PIPES SHALL PROTRUDE 2" INSIDE MANHOLE WALL.
6. ANNULAR SPACE AROUND PIPES TO BE FILLED WITH NON-SHRINK
CEMENT GROUT FLUSH WITH MANHOLE WALL.
7. FOR LENGTH OF PIPE CONNECTIONS TO MANHOLES, REFERENCE
SPECIFICATION SECTION 02601.
8. REFERENCE SPECIFICATION SECTION 02601
FOR ANTI-FLOATATION REQUIREMENTS.
9. ALL STONE GRADATIONS ARE AASHTO CLASSIFICATION.
MIN. TWO 3/4" DIA.
STAINLESS STEEL STUDS,
WASHERS, AND NUTS.
COATING (TYP.)
EXTERIOR BITUMASTIC
CONE SECTION
(MIN. 5' EA. WAY-TYP.)
5" (4' DIA.)
6" (5' DIA.)
7" (6 'DIA.)
6" (4' DIA.)
8" (5' OR 6' DIA.)
VA
RI
ES
GASKETS DETAIL)
WITH RUBBER GASKET.
(SEE MANHOLE PIPE
PIPE CONNECTION MADE
VA
RI
ES
SECTION
6" MIN.
BASE WITH RISER SECTION AND
PRECAST REINFORCED CONCRETE
JOINTS SEALED WATERTIGHT
(SEE MANHOLE GASKET DETAIL)
(TYP.)
MAX.
5'-0"
12" CENTERS
SPACED ON
4'-0", 5'-0", 6'-0"
3-5/8"
INTO TOP SECTION
THREADED INSERT CAST
3'- 0"
M
IN
MATCH PAVEMENT/GRADE
AND SLOPE AS DIRECTED
(SEE LEVELING RINGS AND
BOLTED FRAME DETAIL)
3-1/2" MIN. TO 4" MAX. EMBEDMENT
SEALED WATERTIGHT
MANHOLE STEPS
FRAME AND LEVELING RINGS
2'-0"
PLAN
MIN. TWO 3/4" DIA.
STAINLESS STEEL STUDS,
WASHERS, AND NUTS.
COATING (TYP.)
EXTERIOR BITUMASTIC
CONE SECTION
NO. 57 COARSE AGGREGATE
HAND TAMPED UNDER PIPE
(MIN. 5' EA. WAY-TYP.)
5" (4' DIA.)
6" (5' DIA.)
7" (6' DIA.)
6" (4' DIA.)
8" (5' OR 6' DIA.)
ANTI-FLOTATION
COLLAR ON MANHOLES
(TYP.) ANTI-FLOTATION
COLLAR ON MANHOLES
(TYP.)
PICKHOLE DETAIL
Ö DESIGNATES MACHINED SURFACE
BOTTOM VIEW
COVER SECTION
GROOVE DETAIL
EM A D I N U S A
S E A
ODO R
T J
A RIN
K
N W RO
S
(2) CLOSED
PICKHOLES
1-1/2" (38mm) LETTERS
(RECESSED FLUSH)
PLAN VIEW
1-1/2" (38mm) LETTERS
(RECESSED FLUSH)
STYLE: Bookman Old Style
STYLE: Bookman Old Style
.UP
PE
R ALLEN TW
P
S A
N
I TARY S EW
E
R
CUSTOM LOGO
1-1/2" [38mm]
1" [25mm]
1/4" [6mm]
1-3/8" [35mm]
2-1/4" [57mm]
26" DIA
[660mm]
1/4" (6mm) DIA
NEOPRENE GASKET
21-1/2" DIA
[546mm]
Ö
2-1/2" [64mm]
.180" [5mm]
.240" [6mm]
25" DIA
[635mm]
(O.D. OF GASKET GROOVE)
1-1/2" [38mm]
NOTES:
1. SPECIAL LETTERED COVER PRODUCT NO.
00103664
2. REF. LOGO DWG. 00103665
3. EST. COVER WT. 150 LBS. (68 kg)
4. SPECIFIED MATERIAL: GRAY IRON
5. FURNISH FOUR (4) 1" DIA. HOLES
IN COVER EVENLY SPACED ON 15" DIA. BOLT
CIRCLE WHEN SPECIFIED
6.
HEAVY DUTY MANHOLE
FRAME AND COVER
NO SCALE
*FRAMES AND COVERS TO BE
SUPPLIED BY OWNER
INTO TOP SECTION
THREADED INSERT CAST
JOINT SEALANT
FLEXIBLE PLASTIC
OF PREFORMED
DOUBLE APPLICATION
VARIED THICKNESS
LEVELING RING;
WHOLE PRECAST CONCRETE
(MIN. TWO BOLTS REQ'D)
NUT AND WASHER
STAINLESS STEEL STUD,
3/4" DIA.
SECTION
LEVELING RINGS AND BOLTED
FRAME DETAILS
NOTES:
1. NO CEMENT GROUTING BETWEEN MANHOLE, LEVELING RINGS AND FRAME, OR ON
INSIDE OR OUTSIDE OF MANHOLE PERMITTED. SEALING WITH APPLICATION OF
HIGH BUILD EPOXY COATING PERMITTED (SIKA GUARD 62 OR APPROVED EQUAL).
2. RUBBER ADJUSTMENT RISERS PERMITTED FOR PAVED AREAS AND MAY BE
TAPERED FOR STREET GRADE ADJUSTMENT.
3. 3/4" DIA. STAINLESS STEEL EXPANSION ANCHOR BOLTS MAY BE USED IN PLACE OF
THREADED STUDS AND INSERTS.
18" MAXIMUM
ALLOWABLE DISTANCE
NO SCALE
3/4
1/2"/FT.
VARIES
O.
D.
CONCRETE
SECTION
CHANNEL
CONCRETE SLIDE DETAIL
NO SCALE
GASKETS DETAIL)
WITH RUBBER GASKET.
(SEE MANHOLE PIPE
PIPE CONNECTION MADE
5" MIN.
2'
MA
X.
CONCRETE
SLIDE
SECTION
6" MIN.
CONCRETE
SLIDE
VARIES 5" MIN.
2'
MA
X.
SECTION
00104616
EAST JORDAN IRON WORKS
MAD
E
IN
U
SA
1045Z2
MO/DAY/YR X
(4) 2" (51mm) X 1" (25mm)
SLOTTED HOLES ON 31-3/4"
(806mm) DIA BOLT CIRCLE.
PLAN
EAST JORDAN IRON WORKS, INC.
PRODUCT NO. 00104516
CATALOG NO. 1045Z2 REF.
PRODUCT DRAWING 00104516
EST. WT.
FRAME: 156 LBS 71kg
FRAME - GRAY IRON ASTM
A48 CL35B
27-1/2" [698mm]
34" [864mm]
24" [610mm]
28-7/16" [722mm]
26-1/4" [667mm]
7" [178mm]
1-1/2" [38mm]
5/8" [16mm]
2" [51mm]
(SEE NOTE 3)
16 November 2026 - 10:27 PM C:\ADSK\ACCDocs\GHD Services Pty Ltd\12691159-UAT Gettysburg\Project Files\01 WIP\Civil\Sheets\12691159-GHD-00-DRG-00-CI-501.dwgBrad Anderson
No. Checked Date
Project No. Scale
Title Size Bar is 1" on original size sheet
Sheet No.
Project
Client
Plot Date: Plotted By:
Issue Approved Drafting Check
Designer Design Check
Project Manager
Project Director
Date
Path and Filename:
1"
Author
This document and the ideas and designs incorporated herein, as an instrument of professional service, is the property of GHD. This document may only be used by GHD’s client (and any other person who GHD has agreed can use this document) for the purpose for which it was prepared and must not be used by any other person or for any other purpose.
www.ghd.com
Conditions of Use
GHD
T
Inc.
225 Grandview Avenue, Suite 403 Camp Hill, Pennsylvania 17011, USA
717.541.0622
ARCH D
0 BID DOCUMENTS RC JK 11-17-2026
R. CECCHETTI
UPPER ALLEN TOWNSHIP
J. KOSTELAC
GETTYSBURG PIKE
SANITARY SEWER REPLACEMENT
12691159 NOV. 2026
B. ANDERSON
R. CECCHETTI
S. MATTHEWS
T. PARTHEMORE AS NOTED
CIVIL
DETAILS
CI-501
PIPE RECONNECTION DETAIL
NO SCALE
TRENCH BACKFILL DETAIL
IN PAVED, SHOULDER, GRAVEL AND CONCRETE AREAS
NO SCALE
TRENCH BACKFILL DETAIL
IN UNPAVED AREAS
NO SCALE
UNSUITABLE MATERIAL EXCAVATION
NO SCALE
6" (MIN.)
DE
PT
H
VA
RI
ES
5'
MI
NI
MU
M
" M
IN
O.
D.
MIN. MIN.
O.D.6" 6"
BE
DD
IN
G
LIM
IT
O F
PI
PE
DETECTION TAPE
12"TRENCH
WIDTH
ALL TEMPORARY AND PERMANENT PAVEMENT REQUIREMENTS
MIN.
(TYP.)
PER TOWNSHIP OR PENNDOT REQUIREMENTS
NOTE:
1. BACKFILL AND COMPACTION REQUIREMENT APPLIES TO PAVED ROADWAYS AND
SHOULDERS OF PROPOSED AND EXISTING STREETS (OTHER THAN STATE
HIGHWAYS), PAVED DRIVEWAYS, AND SIDEWALKS.
UNDISTURBED OR WELL
TAMPED EARTH OR
ROCK SUBGRADE
PA NO. 2A COARSE AGG. TRENCH BACKFILL COMPACTED IN 6"
LAYERS WITH WACKER OR ROLLER, OR 18" LAYERS WITH HOE
MOUNTED PLATE TAMPER, OR CONFORMING TO PA DOT
PUBLICATION 408 WITHIN LIMITS OF STATE HIGHWAY
RIGHTS-OF-WAY.
AASHTO NO. 8 OR NO. 57 COARSE
AGGREGATE BEDDING (HAND TAMPED NO.
57 COARSE AGGREGATE REQUIRED WITHIN
5' OF MANHOLES)
5'
MI
NI
MU
M
OF
C
OV
ER
6" (MIN.)
O.
D.
" M
IN
FINISH GRADE
6"6"
DETECTION TAPE
LIM
IT
O F
PI
PE
BE
DD
IN
G
MIN.
O.D.
MIN.
1'
MA
X.
6" TOPSOIL (MIN.) OR 6" PA NO. 2A
AG
GR
EG
AT
E
OR FORCE MAIN
GRAVITY SEWER
TO
DE
TE
CT
IO
N
TA
PE
1. UNPAVED AREAS OUTSIDE ROADWAYS - SUITABLE ON-SITE BACKFILL COMPACTED AS INDICATED ABOVE TO
BOTTOM OF TOPSOIL. REPLACE TOPSOIL T0 APPROXIMATE DEPTH OF EXISTING OR MIN. 4".
2. UNPAVED AREAS WITHIN R/W LIMITS OF STATE HIGHWAYS - CONFORMING TO REQUIREMENTS OF PA DOT
PUBLICATION 408.
3. UNPAVED SHOULDERS OF PROPOSED AND EXISTING STREETS OTHER THAN STATE HIGHWAYS - AGGREGATE
BACKFILL COMPACTED AS INDICATED ABOVE.
4. STONE DRIVEWAYS AND PARKING AREAS - SUITABLE ON-SITE BACKFILL COMPACTED AS INDICATED ABOVE.
5. UNIMPROVED STREETS - AGGREGATE BACKFILL COMPACTED AS INDICATED ABOVE.
BACKFILLING REQUIREMENTS:
UNDISTURBED OR WELL TAMPED
EARTH OR ROCK SUBGRADE
TRENCH BACKFILL MATERIAL COMPACTED IN 6" LAYERS WITH
WACKER OR ROLLER, OR
18" LAYERS WITH HOE MOUNTED PLATE TAMPER, OR
CONFORMING TO PA DOT PUBLICATION 408 WITHIN LIMITS OF
STATE HIGHWAY RIGHTS-OF-WAY.
COARSE AGGREGATE (AS REQUIRED)
ASHTO NO. 8 OR NO. 57 COARSE
AGGREGATE BEDDING (HAND TAMPED NO.
57 COARSE AGGREGATE REQUIRED
WITHIN 5' OF MANHOLES) 6" (MIN.)
O.
D.
" M
IN
6"6"
LIM
IT
O F
PI
PE
BE
DD
IN
G
MIN.
O.D.
MIN.
1'
MA
X.
AG
GR
EG
AT
E
DEPTH AS REQUIRED
R-3 BEDDING (COMPACTED)
EARTH OR ROCK
STABLE UNDISTRUBED
TA
PETO
DE
TE
CT
IO
N
GRAVITY SEWER
REFERENCE APPROPRIATE
TRENCH DETAIL
NOTES:
1. IF STABLE UNDISTURBED EARTH OR ROCK UNATTAINABLE, STABILIZATION METHOD TO BE
DETERMINED BY ENGINEER.
2. DETECTION TAPE REQUIRED; REFERENCE APPROPRIATE TRENCH DETAIL.
ASHTO NO. 8 OR NO. 57 COARSE
AGGREGATE BEDDING (HAND TAMPED NO.
57 COARSE AGGREGATE REQUIRED
WITHIN 5' OF MANHOLES)
6"(MIN.)
FOR BACKFILL REQUIREMENTS
SEE APPROPRIATE TRENCH DETAIL
LIFTS.
MATERIAL, COMPACTED IN 4"
NO. 8 OR PA NO. 2A. COARSE
AGGREGATE PIPE BEDDING
PVC TO ACP CONNECTION USE MECHANICAL JOINT COUPLING
PVC TO CAST IRON CONNECTION USE MECHANICAL JOINT COUPLING
UNDISTURBED
SUBGRADE
PVC TO PVC CONNECTION USE PVC REPAIR SLEEVE
PVC TO TCP/VCP CONNECTION USE S.S. ANTI-SHEAR COLLAR RUBBER ADAPTER
DIP/CIP TO DIP/CIP CONNECTION USE MECHANICAL JOINT COUPLING
NOTES:
1. RECONNECTIONS TO BE AIR TESTED IN ACCORDANCE WITH SPECIFICATIONS.
2. MECHANICAL JOINT COUPLINGS TO BE SMITH-BLAIR OR APPROVED EQUAL
NEW PVC
SANITARY SEWER
PIPE50 LB. BAG OF
CONCRETE CENTERED
BENEATH JOINT (NOT
REQUIRED IN ROCK
EXCAVATION)
SECTION
RUBBER RISER RING ADJUSTMENT
STREET
(TAPERED)
RUBBER RISER RINGS
USE SIKA-FLEX 1A SEALING
COMPOUND BETWEEN RISER RINGS
ELEVATION
12" 10-1/2"
16"
11-1/4"
9"
2"
8"
RISER PIPE
SAME SIZE AND TYPE AS
LATERAL/BUILDING SEWER
20" SQUARE x 3" THICK
CONCRETE PAD
CLEANOUT
CAP/FITTING
CLEANOUT CAP
PROTECTION CASTING 2" MIN.
FINAL GRADE
CONCRETE OR
PAVEMENT DEPTH
CAP
NOTE:
1. CASTING FRAME AND COVER SHALL BE HEAVY DUTY WITH "S" MARKING ON COVER
(EAST JORDAN IRONWORKS CATALOG No.1565, OR APPROVED EQUAL.)
NO SCALE
2x4 PLANK
2x4 PLANK
SECTION
PLAN
SEWER MAIN
SANITARY
SEWER MAIN
TRENCH
REFER TO
DETAIL
REFER TO
TRENCH
DETAIL
WYE W/ 45°
BEND OR
5'- 0"
2-WAY CLEANOUT NOT TO BE LOCATED IN SIDEWALK OR BENEATH OTHER CURB LINE UTILITIES.
NOTES:
1.
(M
IN
THERE SHALL BE A 10 FOOT HORIZONTAL SEPARATION BETWEEN THE WATER SERVICE
AND THE SERVICE LATERAL/BUILDING SEWER.
2.
2-WAY CLEANOUT TO BE LOCATED ON TOWNSHIP R/W LINE AND LOCATION TO BE SITE SPECIFIC WITH3.
SANITARY TEE
SANITARY
WYE W/ 45°
BEND OR
SANITARY TEE
ROADWAY OR SEWER
RIGHTS-OF-WAY LINE
6" SDR 35 PVC
(1% MIN. SLOPE)
SERVICE LATERAL
6" SDR 35 PVC
(1% MIN. SLOPE)
WHERE 2-WAY CLEANOUT IS NOT REQUIRED, SERVICE CONNECTION SHALL BE EXTENDED TO THE 4.
RIGHTS-OF-WAY LINE AND PLUGGED.
PLUG
PLUG
2-WAY CLEANOUT
WITH PLUGS INSTALLED
PLUG
2-WAY CLEANOUT
WITH PLUGS INSTALLED
RESPECT TO CURB AND SIDEWALK.
DETECTION TAPE REQUIRED IN PIPE TRENCH AT A DEPTH OF NO MORE THAN 12-INCHES BELOW5.
FINAL SURFACE GRADE OR PAVEMENT SUBGRADE.
2-WAY CLEANOUTS MAY ALSO BE USED FOR TESTING AND OBSERVATION.6.
SERVICE LATERAL - SHALLOW SEWER
NO SCALE
ELEVATION
(M
AX
6" SDR 35 PVC @ 1% SERVICE CONNECTION
45° BEND
PLUG
6" SERVICE
CONNECTION
2x4 PLANK
DETAIL
REFER TO
TRENCH
5'- 0"
(M
IN
SERVICE LATERAL - DEEP SEWER
2-WAY CLEANOUT
W/ PLUGS INSTALLED
PLUG
ROADWAY OR SEWER
RIGHTS-OF-WAY LINE
SEWER
MAIN
2-WAY CLEANOUT NOT TO BE LOCATED IN SIDEWALK OR BENEATH OTHER CURB LINE UTILITIES.
NOTES:
1.
THERE SHALL BE A 10 FOOT HORIZONTAL SEPARATION BETWEEN THE WATER SERVICE
AND THE SERVICE LATERAL/BUILDING SEWER.
2.
2-WAY CLEANOUT TO BE LOCATED ON TOWNSHIP R/W AND LOCATION TO BE SITE SPECIFIC WITH3.
WHERE 2-WAY CLEANOUT IS NOT REQUIRED, SERVICE CONNECTION SHALL BE EXTENDED TO THE 4.
RIGHTS-OF-WAY LINE AND PLUGGED.
RESPECT TO CURB AND SIDEWALK.
SERVICE LATERAL
(1% MIN. SLOPE)
DETECTION TAPE REQUIRED IN PIPE TRENCH AT A DEPTH OF NO MORE THAN 12-INCHES BELOW5.
FINAL SURFACE GRADE OR PAVEMENT SUBGRADE.
2-WAY CLEANOUTS MAY ALSO BE USED FOR TESTING AND OBSERVATION.6.
STRUCTURE
S.S. PIPE CLAMPS
SEWER PIPE
PROPOSED ADAPTER
CONCRETE MANHOLE
EXISTING PRECAST
2" MIN.
NEW CONNECTION TO EXISTING MANHOLE
POURED CONCRETE
EXISTING
BASE
KOR-N-SEAL
CORE DRILL OPENING
EXTENDED THROUGH
EXISTING BASE TO FORM NEW
CHANNELNOTES:
1. NEW PIPE CHANNEL RECONSTRUCTION IN ACCORDANCE WITH
TOWNSHIP REQUIREMENTS.
2. NON-SHRINK CEMENT GROUT MUST CONTAIN TYPE II PORTLAND
CEMENT FOR SULFATE RESISTANCE.
NON-SHRINK GROUT
FILL (AS REQUIRED)
NO SCALE
NO SCALE
SANITARY WYE W/ 45° BEND
OR SANITARY TEE
NO SCALE
FRAME, COVER
REMOVE EXISTING
EXISTING SANITARY SEWER
MANHOLE TO BE ABANDONED
SECTION
NO SCALE
SEE PAVING DETAIL
BACKFILL WITH 2A STONE IN PAVED AREAS
CAP PROTECTION CASTING FOR CLEANOUT
COVER IN VEHICULAR TRAFFIC AREAS
ELEVATION
SEE PIPE
RECONNECTION
DETAIL (TYP.)
EXCAVATION TO
CONDUCT AIR TEST
INSTALL TEE AND
NOTES:
1. TWO-WAY CLEANOUT (OBSERVATION TEE) SHALL BE THE SAME SIZE AS BUILDING SEWER.
2. REFER TO PIPE REPAIR/RECONNECTION DETAIL FOR PROPER FITTINGS/COUPLINGS/ADAPTERS.
3. FITTINGS/COUPLINGS/ADAPTERS FOR CONNECTIONS TO EXISTING SEWERS MUST BE IN ACCORDANCE
WITH TOWNSHIP SPECIFICATIONS AND ARE SUBJECT TO TOWNSHIP REVIEW AND APPROVAL.
4. TWO-WAY CLEANOUT (OBSERVATION TEE) TO BE LOCATED AT OR NEAR TOWNSHIP R/W LINE; LOCATION TO
BE SITE SPECIFIC WITH RESPECT TO CURB AND SIDEWALK.
6"x6"x6"
SDR-35 PVC
2-WAY CLEANOUT
(SEE NOTE 3)
0-15 PSI GAUGE
TEST
PLUG
1/2 lb. INCREMENTS
12"
MIN.
12"
MIN.
EXISTING
CURB
EXISTING
PAVEMENT
SEE NOTE 4
BLDG. SEWER
EXIST. 4" OR 6"
MIN. 6" NO. 8 OR NO. 57 COARSE AGGREGATE ALL AROUND
(BEDDING MATERIAL HAND TAMPED IN 4" LAYERS)
THREADED PVC CAP INSIDE AND CAST IRON CAP
PROTECTION CASTING WHERE REQUIRED (INSTALLED
FLUSH W/ FIN. GRADE - SEE DETAIL)
BACKFILL W/ CONCRETE FILL
OR FLOWABLE FILL
EXISTING
SANITARY SEWER
MANHOLE
TWO-WAY CLEANOUT (AT R/W LINE)
NO SCALE
6" SDR-35 PVC
OBSERVATION
TEE RISER PIPE
AND RISER RINGS/DONUTS
16 November 2026 - 10:28 PM C:\ADSK\ACCDocs\GHD Services Pty Ltd\12691159-UAT Gettysburg\Project Files\01 WIP\Civil\Sheets\12691159-GHD-00-DRG-00-CI-501.dwgBrad Anderson
No. Checked Date
Project No. Scale
Title Size Bar is 1" on original size sheet
Sheet No.
Project
Client
Plot Date: Plotted By:
Issue Approved Drafting Check
Designer Design Check
Project Manager
Project Director
Date
Path and Filename:
1"
Author
This document and the ideas and designs incorporated herein, as an instrument of professional service, is the property of GHD. This document may only be used by GHD’s client (and any other person who GHD has agreed can use this document) for the purpose for which it was prepared and must not be used by any other person or for any other purpose.
www.ghd.com
Conditions of Use
GHD
T
Inc.
225 Grandview Avenue, Suite 403 Camp Hill, Pennsylvania 17011, USA
717.541.0622
ARCH D
0 BID DOCUMENTS RC JK 11-17-2026
R. CECCHETTI
UPPER ALLEN TOWNSHIP
J. KOSTELAC
GETTYSBURG PIKE
SANITARY SEWER REPLACEMENT
12691159 NOV. 2026
B. ANDERSON
R. CECCHETTI
S. MATTHEWS
T. PARTHEMORE AS NOTED
CIVIL
DETAILS
CI-502
16 November 2026 - 10:24 PM C:\ADSK\ACCDocs\GHD Services Pty Ltd\12691159-UAT Gettysburg\Project Files\01 WIP\Civil\Sheets\12691159-GHD-00-DRG-00-CI-701.dwgBrad Anderson
Project No. Scale
Title Size Bar is 1" on original size sheet
Sheet No.
Project
Client
Plot Date: Plotted By:
Issue Approved Drafting Check
Designer Design Check
Project Manager
Project Director
Date
Path and Filename:
1"
Author
This document and the ideas and designs incorporated herein, as an instrument of professional service, is the property of GHD. This document may only be used by GHD’s client (and any other person who GHD has agreed can use this document) for the purpose for which it was prepared and must not be used by any other person or for any other purpose.
www.ghd.com
Conditions of Use
GHD
T
Inc.
225 Grandview Avenue, Suite 403 Camp Hill, Pennsylvania 17011, USA
717.541.0622
ARCH D
0 BID DOCUMENTS RC JK 11-17-2026
R. CECCHETTI
UPPER ALLEN TOWNSHIP
J. KOSTELAC
GETTYSBURG PIKE
SANITARY SEWER REPLACEMENT
12691159 NOV. 2026
B. ANDERSON
R. CECCHETTI
S. MATTHEWS
T. PARTHEMORE AS NOTED
CIVIL
EROSION AND SEDIMENTATION
CONTROL PLAN - NOTES
CI-701
SOIL DESCRIPTION:
THERE ARE NO KNOWN NATURALLY OCCURRING GEOLOGIC FORMATIONS THAT MAY HAVE THE POTENTIAL TO CAUSE POLLUTION DURING EARTH DISTURBANCE ACTIVITIES.
APPROXIMATE BOUNDARIES OF THE SOIL-MAPPING UNITS ARE SHOWN ON THE ATTACHED DRAWINGS. THIS INFORMATION WAS OBTAINED FROM THE USDA NRCS ONLINE WEB SOIL SURVEY
(HTTP://WEBSOILSURVEY.NRCS.USDA.GOV/APP/).
SOILS FOUND WITHIN THE PROJECT AREA ARE CLASSIFIED AS FOLLOWS:
SOIL LIMITATION RESOLUTIONS:
· DEPTH TO HARD BEDROCK WILL BE ADDRESSED BY USE OF ROCK BREAKER, IF NECESSARY, AND ONLY PERFORMED WHEN APPROVED BY OWNER.
· DEPTH TO SATURATED ZONE AND FLOODING LIMITATIONS WILL BE ADDRESSED BY USE OF A PUMPED WATER FILTER BAG IF NECESSARY. PUMPED WATER FILTER BAGS MUST BE
PLACED AT LEAST 50 FEET FROM ANY STREAM BANKS IN WELL VEGETATED, FLAT AREAS.
· CONTRACTOR IS REQUIRED BY LAW TO FOLLOW OSHA REQUIREMENTS; THIS WILL ADDRESS ANY LIMITATIONS ASSOCIATED WITH UNSTABLE EXCAVATION WALLS.
· DUSTY LIMITATIONS FOR LANDSCAPING WILL BE ADDRESSED BY SUPPLEMENTAL WATERING IF NECESSARY.
STANDARD EROSION AND SEDIMENT CONTROL PLAN NOTES:
1. ALL EARTH DISTURBANCES, INCLUDING CLEARING AND GRUBBING AS WELL AS CUTS AND FILLS SHALL BE DONE IN ACCORDANCE WITH THE E&S PLAN. A COPY OF THE E&S PLAN
DRAWINGS MUST BE AVAILABLE AT THE PROJECT SITE AT ALL TIMES.
2. AT LEAST 3 DAYS BEFORE STARTING ANY EARTH DISTURBANCE ACTIVITIES, ALL CONTRACTORS INVOLVED IN THOSE ACTIVITIES SHALL NOTIFY THE PENNSYLVANIA ONE CALL SYSTEM
INCORPORATED AT 1-800-242-1776 OR 811 FOR BURIED UTILITIES LOCATIONS.
3. ALL EARTH DISTURBANCE ACTIVITIES SHALL PROCEED IN ACCORDANCE WITH THE SEQUENCE PROVIDED ON THE PLAN DRAWINGS.
4. THE CONTRACTOR IS RESPONSIBLE FOR INSTALLATION AND MAINTENANCE OF ALL EROSION AND SEDIMENT BMPS AND SHALL ASSURE THAT THE E&S PLAN IS PROPERLY AND
COMPLETELY IMPLEMENTED.
5. AREAS TO BE FILLED ARE TO BE CLEARED, GRUBBED, AND STRIPPED OF TOPSOIL TO REMOVE TREES, VEGETATION, ROOTS AND OTHER OBJECTIONABLE MATERIAL.
6. CLEARING, GRUBBING, AND TOPSOIL STRIPPING SHALL BE LIMITED TO THOSE AREAS DESCRIBED IN EACH STAGE OF THE CONSTRUCTION SEQUENCE. GENERAL SITE CLEARING, GRUBBING AND TOPSOIL STRIPPING MAY NOT COMMENCE IN ANY STAGE OR PHASE OF THE PROJECT UNTIL THE E&S BMPS SPECIFIED BY THE BMP SEQUENCE FOR THAT STAGE OR
PHASE HAVE BEEN INSTALLED AND ARE FUNCTIONING AS DESCRIBED IN THIS E&S PLAN.
7. AT NO TIME SHALL CONSTRUCTION VEHICLES BE ALLOWED TO ENTER AREAS OUTSIDE THE LIMIT OF DISTURBANCE BOUNDARIES SHOWN ON THE PLAN DRAWINGS. THESE AREAS MUST
BE CLEARLY MARKED AND FENCED OFF BEFORE CLEARING AND GRUBBING OPERATIONS BEGIN.
8. SOIL STOCKPILE HEIGHTS SHALL NOT EXCEED 35 FEET. STOCKPILE SLOPES SHALL BE 2H:1V OR FLATTER. EXCESS EXCAVATED MATERIAL MUST BE HAULED AWAY IMMEDIATELY TO A
SITE WITH AN APPROVED E&S CONTROL PLAN.
9. IMMEDIATELY UPON DISCOVERING UNFORESEEN CIRCUMSTANCES POSING THE POTENTIAL FOR ACCELERATED EROSION AND/OR SEDIMENT POLLUTION, THE OPERATOR SHALL IMPLEMENT APPROPRIATE BEST MANAGEMENT PRACTICES TO MINIMIZE THE POTENTIAL FOR EROSION AND SEDIMENT POLLUTION AND NOTIFY THE CONSERVATION DISTRICT.
10. ALL BUILDING MATERIALS AND WASTES SHALL BE REMOVED FROM THE SITE AND RECYCLED OR DISPOSED OF IN ACCORDANCE WITH THE DEPARTMENT'S SOLID WASTE MANAGEMENT REGULATIONS AT 25 PA. CODE 260.1 ET SEQ., 271.1, AND 287.1 ET. SEQ. NO BUILDING MATERIALS OR WASTES OR UNUSED BUILDING MATERIALS SHALL BE BURNED, BURIED, DUMPED, OR DISCHARGED AT THE SITE.
11. ALL OFF-SITE WASTE AND BORROW AREAS MUST HAVE AN E&S PLAN APPROVED BY THE CONSERVATION DISTRICT FULLY IMPLEMENTED PRIOR TO BEING ACTIVATED.
12. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ANY MATERIAL BROUGHT ON SITE IS CLEAN FILL OR IS OTHERWISE AUTHORIZED FOR USE ON THE PROJECT SITE. FORM
FP-001, CERTIFICATION OF CLEAN FILL, MUST BE COMPLETED AND SUBMITTED TO DEP (ELECTRONICALLY ON THE DEP WEBSITE) PRIOR TO MOVEMENT OF CLEAN FILL TO THE RECEIVING SITE. FORM FP-001 MUST BE COMPLETED AND SUBMITTED REGARDLESS OF WHETHER SAMPLING AND ANALYSIS ARE PERFORMED AS PART OF ENVIRONMENTAL DUE
DILIGENCE.
13. ALL PUMPING OF WATER FROM ANY WORK AREA SHALL BE THROUGH A SEDIMENT CONTROL BMP SUCH AS A PUMPED WATER FILTER BAG OR EQUIVALENT SEDIMENT REMOVAL
FACILITY, DISCHARGING OVER UNDISTURBED VEGETATED AREAS.
14. EROSION CONTROL BLANKETING SHALL BE INSTALLED ON ALL SLOPES 3H:1V OR STEEPER, WITHIN 100 FEET OF A SURFACE WATER, AND ON ALL OTHER DISTURBED AREAS SPECIFIED
ON THE PLAN DRAWINGS AND/OR DETAIL SHEETS.
15. UNTIL THE SITE IS STABILIZED, ALL EROSION AND SEDIMENT BMPS SHALL BE MAINTAINED PROPERLY. MAINTENANCE SHALL INCLUDE INSPECTIONS OF ALL EROSION AND SEDIMENT BMPS AFTER EACH RUNOFF EVENT AND ON A WEEKLY BASIS. ALL PREVENTATIVE AND REMEDIAL MAINTENANCE WORK, INCLUDING CLEAN OUT, REPAIR, REPLACEMENT, REGRADING, RESEEDING, RE-MULCHING, AND RE-NETTING MUST BE PERFORMED IMMEDIATELY. IF THE E&S BMPS FAIL TO PERFORM AS EXPECTED, REPLACEMENT BMPS, OR MODIFICATIONS OF
THOSE INSTALLED WILL BE REQUIRED.
16. SEDIMENT TRACKED ONTO ANY PUBLIC ROADWAY OR SIDEWALK SHALL BE RETURNED TO THE CONSTRUCTION SITE BY THE END OF EACH WORKDAY AND DISPOSED IN THE MANNER DESCRIBED IN THIS PLAN. IN NO CASE SHALL THE SEDIMENT BE WASHED, SHOVELED, OR SWEPT INTO ANY ROADSIDE DITCH, STORM SEWER, OR SURFACE WATER.
17. ALL SEDIMENT REMOVED FROM BMPS SHALL BE DISPOSED OF IN THE MANNER DESCRIBED ON THE PLAN DRAWINGS.
18. AREAS WHICH ARE TO BE TOPSOILED SHALL BE SCARIFIED TO A MINIMUM DEPTH OF 3 TO 5 INCHES; 6 - 12 INCHES ON COMPACTED SOILS - PRIOR TO PLACEMENT OF TOPSOIL. AREAS
TO BE VEGETATED SHALL HAVE A MINIMUM 6 INCHES OF TOPSOIL IN PLACE PRIOR TO SEEDING AND MULCHING. FILL OUTSLOPES SHALL HAVE A MINIMUM OF 2 INCHES OF TOPSOIL.
19. ALL FILLS SHALL BE COMPACTED AS REQUIRED TO REDUCE EROSION, SLIPPAGE, SETTLEMENT, SUBSIDENCE, OR OTHER RELATED PROBLEMS. FILL INTENDED TO SUPPORT BUILDINGS, STRUCTURES AND CONDUITS, ETC. SHALL BE COMPACTED IN ACCORDANCE WITH LOCAL REQUIREMENTS OR CODES.
20. ALL EARTHEN FILLS SHALL BE PLACED IN COMPACTED LAYERS NOT TO EXCEED 9 INCHES IN THICKNESS.
21. FILL MATERIALS SHALL BE FREE OF FROZEN PARTICLES, BRUSH, ROOTS, SOD, OR OTHER FOREIGN OR OBJECTIONABLE MATERIALS THAT WOULD INTERFERE WITH OR PREVENT
CONSTRUCTION OF SATISFACTORY FILLS.
22. FROZEN MATERIALS OR SOFT, MUCKY, OR HIGHLY COMPRESSIBLE MATERIALS SHALL NOT BE INCORPORATED INTO FILLS.
23. FILL SHALL NOT BE PLACED ON SATURATED OR FROZEN SURFACES.
24. SEEPS OR SPRINGS ENCOUNTERED DURING CONSTRUCTION SHALL BE HANDLED IN ACCORDANCE WITH THE STANDARD AND SPECIFICATION FOR SUBSURFACE DRAIN OR OTHER
APPROVED METHOD.
25. ALL GRADED AREAS SHALL BE PERMANENTLY STABILIZED IMMEDIATELY UPON REACHING FINISHED GRADE. CUT SLOPES IN COMPETENT BEDROCK AND ROCK FILLS NEED NOT BE
VEGETATED. SEEDED AREAS WITHIN 100 FEET OF A SURFACE WATER, OR AS OTHERWISE SHOWN ON THE PLAN DRAWINGS, SHALL BE BLANKETED ACCORDING TO THE STANDARDS OF
THIS PLAN.
26. IMMEDIATELY AFTER EARTH DISTURBANCE ACTIVITIES CEASE IN ANY AREA OR SUBAREA OF THE PROJECT, THE OPERATOR SHALL STABILIZE ALL DISTURBED AREAS. DURING NON-GERMINATING MONTHS, MULCH OR PROTECTIVE BLANKETING SHALL BE APPLIED AS DESCRIBED IN THE PLAN. AREAS NOT AT FINISHED GRADE, WHICH WILL BE REACTIVATED WITHIN 1 YEAR, MAY BE STABILIZED IN ACCORDANCE WITH THE TEMPORARY STABILIZATION SPECIFICATIONS. THOSE AREAS WHICH WILL NOT BE REACTIVATED WITHIN 1 YEAR SHALL
BE STABILIZED IN ACCORDANCE WITH THE PERMANENT STABILIZATION SPECIFICATIONS.
27. PERMANENT STABILIZATION IS DEFINED AS A MINIMUM UNIFORM, PERENNIAL 70% VEGETATIVE COVER OR OTHER PERMANENT NON-VEGETATIVE COVER WITH A DENSITY SUFFICIENT TO RESIST ACCELERATED EROSION. CUT AND FILL SLOPES SHALL BE CAPABLE OF RESISTING FAILURE DUE TO SLUMPING, SLIDING, OR OTHER MOVEMENTS.
28. E&S BMPS SHALL REMAIN FUNCTIONAL AS SUCH UNTIL ALL AREAS TRIBUTARY TO THEM ARE PERMANENTLY STABILIZED OR UNTIL THEY ARE REPLACED BY ANOTHER BMP APPROVED
BY THE CONSERVATION DISTRICT.
29. AFTER FINAL SITE STABILIZATION HAS BEEN ACHIEVED, TEMPORARY EROSION AND SEDIMENT BMPS MUST BE REMOVED. AREAS DISTURBED DURING REMOVAL OF THE BMPS SHALL BE STABILIZED IMMEDIATELY. IN ORDER TO ENSURE RAPID REVEGETATION OF DISTURBED AREAS, SUCH REMOVAL IS TO BE DONE ONLY DURING THE GERMINATING SEASON.
30. FAILURE TO CORRECTLY INSTALL E&S BMPS, FAILURE TO PREVENT SEDIMENT-LADEN RUNOFF FROM LEAVING THE CONSTRUCTION SITE, OR FAILURE TO TAKE IMMEDIATE CORRECTIVE ACTION TO RESOLVE FAILURE OF E&S BMPS MAY RESULT IN ADMINISTRATIVE, CIVIL, AND/OR CRIMINAL PENALTIES BEING INSTITUTED BY THE DEPARTMENT AS DEFINED IN SECTION 602 OF THE PENNSYLVANIA CLEAN STREAMS LAW. THE CLEAN STREAMS LAW PROVIDES FOR UP TO $10,000 PER DAY IN CIVIL PENALTIES, UP TO $10,000 IN SUMMARY CRIMINAL PENALTIES, AND UP TO $25,000 IN MISDEMEANOR CRIMINAL PENALTIES FOR EACH VIOLATION.
31. CONTRACTOR IS REQUIRED TO HAVE A PREPAREDNESS, PREVENTION AND CONTINGENCY (PPC) PLAN FOR THE PROJECT SITE. PPC PLAN IS TO BE DEVELOPED AND IMPLEMENTED IN ACCORDANCE WITH PA DEP REQUIREMENTS AND IS TO BE IN PLACE BEFORE CONSTRUCTION IS STARTED.
32. THE PROJECT IS LOCATED IN AN AREA OF KARST GEOLOGY. IF A SINKHOLE DEVELOPS DURING CONSTRUCTION, STORMWATER SHALL BE DIRECTED AWAY FROM THE SINKHOLE.
SINKHOLES SHALL BE REPAIRED IN ACCORDANCE WITH THE DETAILS SHOWN ON THE PLAN DRAWINGS AND SHALL BE REPAIRED UNDER THE DIRECT OBSERVATION AND SUPERVISION
OF A GEOLOGIST OR LICENSED GEOTECHNICAL ENGINEER.
GENERAL STAGING OF CONSTRUCTION ACTIVITIES:
ALL EARTH DISTURBANCE ACTIVITIES SHALL PROCEED IN ACCORDANCE WITH THE FOLLOWING SEQUENCE. EACH STAGE SHALL BE COMPLETED AND IMMEDIATELY STABILIZED BEFORE
ANY FOLLOWING STAGE IS INITIATED.
AT LEAST 3 DAYS BEFORE STARTING ANY EARTH DISTURBANCE ACTIVITIES, ALL CONTRACTORS INVOLVED IN THOSE ACTIVITIES SHALL NOTIFY THE PENNSYLVANIA ONE CALL SYSTEM
INCORPORATED AT 1-800-242-1776 OR 811 FOR BURIED UTILITIES LOCATIONS.
EROSION AND SEDIMENT BMPS MUST BE CONSTRUCTED, STABILIZED, AND FUNCTIONAL BEFORE SITE DISTURBANCE BEGINS WITHIN THE TRIBUTARY AREAS OF THOSE BMPS.
THE GENERAL CONSTRUCTION SEQUENCE WILL BE AS FOLLOWS:
1. CLEARLY FIELD MARK THE LIMITS OF DISTURBANCE SHOWN ON PLAN DRAWINGS PRIOR TO THE START OF ANY EARTH MOVING ACTIVITIES.
2. PRIOR TO BEGINNING ANY EARTH DISTURBANCE ACTIVITIES, INSTALL EROSION AND SEDIMENTATION CONTROLS AS SHOWN ON THE PLAN DRAWINGS. PROJECT ACTIVITIES SHALL BE
LIMITED TO THE EXISTING PAVED ROADWAYS AND ROAD SHOULDERS.
3. SET UP FIELD OFFICES AND STAGING AREA AS NEEDED.
4. TRENCH EXCAVATION IS LIMITED TO THE LENGTH OF PIPE PLACEMENT AND BACKFILLING THAT CAN BE COMPLETED IN THE SAME DAY. EXCAVATED MATERIAL TO BE PLACED ON
UPSLOPE SIDE OF TRENCH UNTIL OPENING IS BACKFILLED, OR IMMEDIATELY PLACED ONTO A TRUCK FOR DISPOSAL OFF-SITE. EXCAVATED TRENCHES SHALL BE THE MINIMUM WIDTH NECESSARY TO INSTALL WATER LINE AND IN COMPLIANCE WITH ALL OSHA REQUIREMENTS. EXCAVATED MATERIAL IS TO BE REMOVED IN ACCORDANCE WITH THE CONTRACT DOCUMENTS. NO MORE THAN 50 LINEAR FEET OF OPEN TRENCH IS TO EXIST WHEN UTILITY LINE INSTALLATION CEASES AT THE END OF THE WORKDAY.
5. TRENCH TO BE EXCAVATED TO THE SUBGRADE ELEVATION AS REQUIRED AND SHOWN ON THE DRAWINGS. EXCAVATED MATERIALS IS TO BE THE MINIMUM WIDTH NECESSARY TO INSTALL THE UTILITY LINE. EXCAVATED MATERIAL IS TO BE REMOVED IN ACCORDANCE WITH THE CONTRACT DOCUMENTS. ANY TRENCH DEWATERING, IF NECESSARY, SHALL BE PUMPED TO A SEDIMENTATION FILTER BAG. FILTER BAGS TO BE PLACED AT LEAST 100 FEET FROM ANY STREAMBANKS IN WELL VEGETATED FLAT AREAS.
6. EXCESSIVE MATERIAL IN PAVED AREAS SHALL BE PLACED IN A TRUCK OR HAULED AWAY IMMEDIATELY TO A DESIGNATED AREA HAVING AN APPROVED EROSION AND SEDIMENTATION
CONTROL PLAN.
7. CONSTRUCTION MATERIAL MAY NOT BE STORED IN THE FLOODWAY; HOWEVER, EXCAVATED MATERIALS TO BE USED AS BACKFILL MAY BE TEMPORARILY STORED ADJACENT TO TRENCH, BUT FOR NO MORE THAN 72 HOURS.
8. REPLACE SEWER AND BACKFILL ACCORDINGLY.
9. RESTORE PAVING AND/OR CURBING WHERE APPLICABLE.
10. FINAL PLACEMENT OF TOPSOIL, SEEDING, AND MULCHING OF ALL CONSTRUCTION AREAS THAT ARE NOT PAVED. (NOTE: SEE SPECIFIC REQUIREMENTS IN SEEDING AND FERTILIZING
SECTION). OPEN CUT TRENCH THROUGH BAREFOOT CREEK CROSSING IS TO BE MADE IN DRY CONDITIONS BY INSTALLING SANDBAG DIVISION DAM AND/OR BYPASSING PUMPING TO
DIVERT WATER AROUND THE WATER AREA.
11. UPON FINAL COMPLETION OF AN EARTH DISTURBANCE ACTIVITY OR ANY STAGE OR PHASE OF AN ACTIVITY, ALL AREAS DISTURBED DURING CONSTRUCTION AND NOT PAVED SHALL IMMEDIATELY HAVE TOPSOIL RESTORED, REPLACED, OR AMENDED, SEEDED FERTILIZED, MULCHED OR OTHERWISE PERMANENTLY STABILIZED AND PROTECTED FROM ACCELERATED EROSION AND SEDIMENTATION ACCORDING TO THE SEEDING AND FERTILIZING SECTION OF THE PLAN.
12. AFTER FINAL STABILIZATION HAS BEEN ACHIEVED, TEMPORARY E&S BMP'S MUST BE REMOVED. AREAS DISTURBED DURING THE REMOVAL PROCESS MUST BE STABILIZED IMMEDIATELY.
TO ENSURE RAPID REVEGETATION OF DISTURBED AREAS, SUCH REMOVAL SHOULD BE DONE DURING THE GERMINATION SEASON.
STABILIZATION SPECIFICATIONS:
1. E&S BMPS MUST REMAIN FUNCTIONAL AS SUCH UNTIL ALL AREAS TRIBUTARY TO THEM ARE PERMANENTLY STABILIZED OR UNTIL THEY ARE REPLACED BY ANOTHER BMP.
2. UPON COMPLETION OR TEMPORARY CESSATION OF AN EARTH DISTURBANCE ACTIVITY OR ANY STAGE OR PHASE OF AN ACTIVITY, THE SITE SHALL BE IMMEDIATELY STABILIZED.
3. IN NO CASE SHOULD AN AREA EXCEEDING 15,000 SQUARE FEET, WHICH IS TO BE STABILIZED BY VEGETATION, REACH FINAL GRADE WITHOUT BEING SEEDED AND MULCHED.
4. FOR AN EARTH DISTURBANCE ACTIVITY OR ANY STAGE OR PHASE OF AN ACTIVITY TO BE CONSIDERED PERMANENTLY STABILIZED, THE DISTURBED AREAS SHALL BE COVERED WITH ONE
A MINIMUM UNIFORM 70% PERENNIAL VEGETATIVE COVER, WITH A DENSITY CAPABLE OF RESISTING ACCELERATED EROSION AND SEDIMENTATION OR OTHER ACCEPTABLE BMP WHICH
PERMANENTLY MINIMIZES ACCELERATED EROSION AND SEDIMENTATION.
5. E&S BMPS SHALL BE IMPLEMENTED AND MAINTAINED UNTIL THE PERMANENT STABILIZATION IS COMPLETED. ONCE PERMANENT STABILIZATION HAS BEEN ESTABLISHED, THE TEMPORARY E&S BMPS SHALL BE REMOVED. ANY AREAS DISTURBED IN THE ACT OF REMOVING TEMPORARY E&S BMPS SHALL BE PERMANENTLY STABILIZED UPON COMPLETION OF THE
TEMPORARY E&S BMP REMOVAL ACTIVITY.
6. UPON FINAL COMPLETION OF AN EARTH DISTURBANCE ACTIVITY OR ANY STAGE OR PHASE OF AN ACTIVITY, ALL AREAS DISTURBED DURING CONSTRUCTION AND NOT PAVED SHALL IMMEDIATELY HAVE TOPSOIL RESTORED, REPLACED, OR AMENDED, SEEDED, FERTILIZED, MULCHED OR OTHERWISE PERMANENTLY STABILIZED AND PROTECTED FROM ACCELERATED
EROSION AND SEDIMENTATION ACCORDING TO THE SEEDING AND FERTILIZING SECTION.
7. IMMEDIATELY AFTER EARTH DISTURBANCE ACTIVITIES CEASE, THE OPERATOR SHALL STABILIZE THE DISTURBED AREAS. DURING NON-GERMINATING PERIODS, MULCH MUST BE APPLIED AS DESCRIBED IN THIS PLAN. DISTURBED AREAS WHICH ARE NOT AT FINISHED GRADE AND WHICH WILL BE RE-DISTURBED WITHIN 1 YEAR MUST BE STABILIZED IN ACCORDANCE WITH THE TEMPORARY VEGETATIVE STABILIZATION SPECIFICATIONS. DISTURBED AREAS WHICH ARE AT FINAL GRADE OR WHICH WILL NOT BE RE-DISTURBED WITHIN 1 YEAR MUST BE STABILIZED IN ACCORDANCE WITH THE PERMANENT VEGETATIVE STABILIZATION SPECIFICATIONS.
8. EROSION CONTROL BLANKETING SHALL BE INSTALLED ON ALL SLOPES 3H:1V OR STEEPER, SEEDED AREAS WITHIN 100 FEET OF A SURFACE WATER REGARDLESS OF SLOPE, ON ALL AREAS OF CONCENTRATED FLOWS, AND ON ALL OTHER DISTURBED AREAS SPECIFIED ON THE PLAN MAPS AND/OR DETAIL SHEETS.
STAGING, LAYDOWN, AND EQUIPMENT STORAGE AREAS:
STAGING, LAYDOWN AND EQUIPMENT STORAGE AREAS WILL BE CONFIRMED BY THE CONTRACTOR IN CONSULTATION WITH UAT. THE CONTRACTOR IS REQUIRED TO PROVIDE ADEQUATE EROSION AND SEDIMENTATION CONTROL FOR THESE AREAS AND IS REQUIRED TO PROVIDE THE CUMBERLAND COUNTY CONSERVATION DISTRICT WITH AN EROSION AND SEDIMENTATION CONTROL PLAN FOR ALL STAGING, LAY-DOWN AND DEVELOPMENT STORAGE AREAS.
STORAGE AND DISPOSAL AREAS FOR EXCESS EXCAVATED MATERIAL:
AREAS USED FOR STORAGE AND DISPOSAL OF EXCESS EXCAVATED MATERIAL WILL BE DETERMINED BY THE CONTRACTOR IN CONSULTATION WITH THE OWNER. THE CONTRACTOR WILL BE RESPONSIBLE FOR THE REMOVAL OF ANY EXCESS MATERIAL AND MUST ENSURE THAT THE SITE RECEIVING THE EXCESS MATERIAL HAS AN APPROVED EROSION AND SEDIMENTATION CONTROL PLAN THAT MEETS THE CONDITIONS OF CHAPTER 102 AND/OR OTHER STATE AND FEDERAL REGULATIONS AND, IF REQUIRED BY THE SIZE OF THE AREA, AN
NPDES PERMIT FOR STORMWATER DISCHARGES ASSOCIATED WITH CONSTRUCTION ACTIVITIES.
RECYCLING:
WHEREVER POSSIBLE, RECYCLING OF WASTE MATERIALS IS PREFERRED RATHER THAN DISPOSAL. THE CONTRACTOR SHALL ENSURE THAT MECHANISMS ARE IN PLACE TO CONTROL WASTE MATERIALS. CONSTRUCTION WASTES INCLUDE, BUT ARE NOT LIMITED TO, EXCESS SOIL MATERIALS, BUILDING MATERIALS, CONCRETE WASH WATER, SANITARY WASTES, ETC.
THAT COULD ADVERSELY IMPACT WATER QUALITY. THE CONTRACTOR SHALL REMOVE FROM SITE, RECYCLE OR DISPOSE OF ALL BUILDING MATERIALS AND WASTES IN ACCORDANCE WITH PA DEP'S SOLID WASTE MANAGEMENT REGULATIONS AT 25 PA CODE 260.1 ET SEQ., 271.1 ET. SEQ., AND 287.1 ET. SEQ. THE CONTRACTOR SHALL NOT ILLEGALLY BURY, DUMP, OR
DISCHARGE ANY BUILDING MATERIAL OR WASTE AT THE SITE.
MAINTENANCE OF EROSION AND SEDIMENTATION CONTROL BMPS:
1. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE ONGOING MAINTENANCE OF ALL EROSION AND SEDIMENT CONTROL FACILITIES THROUGHOUT THE PERIOD OF CONSTRUCTION AND
UNTIL SUCH TIME THAT THE SITE IS DEEMED PERMANENTLY STABILIZED.
2. UNTIL THE SITE IS STABILIZED, ALL E&S BMPS MUST BE MAINTAINED PROPERLY. MAINTENANCE MUST INCLUDE INSPECTIONS OF ALL E&S BMPS AFTER EACH RUNOFF EVENT AND ON A
WEEKLY BASIS. ALL PREVENTATIVE AND REMEDIAL MAINTENANCE WORK, INCLUDING CLEAN OUT, REPAIR, REPLACEMENT, REGRADING, RESEEDING, REMULCHING AND RENETTING MUST BE PERFORMED IMMEDIATELY. IF E&S BMPS FAIL TO PERFORM AS EXPECTED, REPLACEMENT BMPS, OR MODIFICATIONS OF THOSE INSTALLED WILL BE REQUIRED.
3. A LOG SHOWING DATES THAT E&S BMPS WERE INSPECTED AS WELL AS ANY DEFICIENCIES FOUND AND THE DATE THEY WERE CORRECTED SHALL BE MAINTAINED ON THE SITE AND BE
MADE AVAILABLE TO REGULATORY AGENCY OFFICIALS AT THE TIME OF INSPECTION.
4. ANY SEDIMENT REMOVED FROM BMPS DURING CONSTRUCTION WILL BE RETURNED TO UPLAND AREAS ON SITE AND INCORPORATED INTO THE SITE GRADING.
5. OTHER CONTROL MEASURES INDICATED IN THE EROSION AND SEDIMENTATION CONTROL NOTES SHALL BE MAINTAINED.
CLEAN FILL REQUIREMENTS:
1. WITH THE EXCEPTION OF SITES ENROLLED IN DEP'S LAND RECYCLING AND ENVIRONMENTAL REMEDIATION STANDARDS (ACT 2) PROGRAM, ALL FILL MATERIAL EXCAVATED AND USED
ON-SITE, IMPORTED TO THE SITE, AND EXPORTED FROM THE SITE, SHOULD MEET THE DEFINITION OF CLEAN FILL CONTAINED IN DEP'S MANAGEMENT OF FILL POLICY (DOCUMENT ID NO.
258-2182-773). REGULATED FILL MAY ONLY BE USED ON ACT 2 SITES, IN ACCORDANCE WITH STANDARDS ESTABLISHED BY DEP'S LAND RECYCLING AND ENVIRONMENTAL REMEDIATION
STANDARDS PROGRAM.
2. CLEAN FILL IS DEFINED AS: UNCONTAMINATED, NONWATER-SOLUBLE, NONDECOMPOSABLE, INERT SOLID MATERIAL USED TO LEVEL AN AREA OR BRING AN AREA TO GRADE. THE TERM DOES NOT INCLUDE MATERIALS PLACED IN OR ON THE WATERS OF THE COMMONWEALTH. ALTHOUGH THE PLACEMENT OF CLEAN FILL IN OR ON WATERS OF THE COMMONWEALTH CANNOT BE MANAGED UNDER THIS POLICY, PLACEMENT OF CLEAN FILL IN OR ON WATERS OF THE COMMONWEALTH MAY BE APPROVED UNDER A SEPARATE DEP AUTHORIZATION. THE TERM INCLUDES ONLY THOSE MATERIALS THAT ARE IDENTIFIED AS “FILL,” AS THE TERM IS DEFINED IN THIS POLICY. THE TERM DOES NOT INCLUDE FILL THAT HAS BEEN BLENDED, MIXED OR TREATED WITH THE PURPOSE OF MEETING THE DEFINITION OF “CLEAN FILL” AND THAT WITHOUT BEING BLENDED, MIXED OR TREATED WOULD FAIL TO MEET THE NUMERIC LIMITS IDENTIFIED IN THE DEFINITION OF “UNCONTAMINATED MATERIAL” CONTAINED IN THIS POLICY.
3. ENVIRONMENTAL DUE DILIGENCE MUST BE PERFORMED TO DETERMINE IF THE FILL MATERIALS ASSOCIATED WITH THE PROJECT QUALIFY AS CLEAN FILL. ENVIRONMENTAL DUE DILIGENCE IS DEFINED AS: INVESTIGATIVE TECHNIQUES USED TO DETERMINE WHETHER FILL FROM A DONOR SITE HAS BEEN AFFECTED BY A RELEASE OF A REGULATED SUBSTANCE.
INVESTIGATIVE TECHNIQUES INCLUDING, BUT NOT LIMITED TO, VISUAL PROPERTY INSPECTIONS, ELECTRONIC DATA BASE SEARCHES, REVIEW OF OWNERSHIP AND HISTORICAL USE OF A PROPERTY, SANBORN MAPS, ENVIRONMENTAL QUESTIONNAIRES, TRANSACTION SCREENS, ANALYTICAL TESTING, ENVIRONMENTAL ASSESSMENTS, AUDITS, OR PROCEDURES OUTLINED IN ASTM STANDARD E1527-13. A SINGLE INVESTIGATIVE TECHNIQUE MAY NOT BE USED AS THE BASIS FOR ENVIRONMENTAL DUE DILIGENCE. ENVIRONMENTAL DUE DILIGENCE INCLUDES VISUAL PROPERTY INSPECTION AND A REVIEW OF OWNERSHIP AND HISTORICAL PROPERTY USE, AT A MINIMUM, UNLESS ANALYTICAL SAMPLING IS PERFORMED IN LIEU OF A REVIEW OF OWNERSHIP AND HISTORICAL PROPERTY USE. ANALYTICAL TESTING IS NOT A REQUIRED PART UNLESS ENVIRONMENTAL DUE DILIGENCE INDICATES THAT THE FILL MAY HAVE BEEN AFFECTED BY A RELEASE OF A REGULATED SUBSTANCE. IF DUE DILIGENCE SHOWS EVIDENCE THAT THE FILL MAY HAVE BEEN AFFECTED BY A RELEASE OF A REGULATED SUBSTANCE, THE FILL MUST BE TESTED TO DETERMINE IF IT IS CLEAN FILL OR REGULATED FILL. TESTING SHOULD BE PERFORMED IN ACCORDANCE WITH APPENDIX A OF THE
DEPARTMENT'S POLICY “MANAGEMENT OF CLEAN FILL.”
4. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ANY MATERIAL BROUGHT ON SITE IS CLEAN FILL OR IS OTHERWISE AUTHORIZED FOR USE ON THE PROJECT SITE. FORM FP-001, CERTIFICATION OF CLEAN FILL MUST BE COMPLETED AND SUBMITTED TO DEP (ELECTRONICALLY ON THE DEP WEBSITE) PRIOR TO MOVEMENT OF CLEAN FILL TO THE RECEIVING SITE.
FORM FP-001 MUST BE COMPLETED AND SUBMITTED REGARDLESS OF WHETHER SAMPLING AND ANALYSIS ARE PERFORMED AS PART OF ENVIRONMENTAL DUE DILIGENCE. BOTH THE DONOR SITE AND THE RECEIVING SITE MUST RETAIN COPIES OF THE COMPLETED FORM FP-001 FOR A PERIOD OF FIVE (5) YEARS AND MUST BE MADE AVAILABLE UPON REQUEST BY DEP
OR CCD.
5. NO REGULATED FILL REQUIRING A PERMIT FROM DEP'S WASTE MANAGEMENT PROGRAM WILL BE IMPORTED TO, EXPORTED FROM, OR OTHERWISE UTILIZED ON THE PROJECT SITE.
16 November 2026 - 10:25 PM C:\ADSK\ACCDocs\GHD Services Pty Ltd\12691159-UAT Gettysburg\Project Files\01 WIP\Civil\Sheets\12691159-GHD-00-DRG-00-CI-701.dwgBrad Anderson
Project No. Scale
Title Size Bar is 1" on original size sheet
Sheet No.
Project
Client
Plot Date: Plotted By:
Issue Approved Drafting Check
Designer Design Check
Project Manager
Project Director
Date
Path and Filename:
1"
Author
This document and the ideas and…