GETTYSBURG PIKE SANITARY SEWER REPLACEMENT PROJECT
Solicitation number
US.259188
Issued by
Cumberland County, Pennsylvania

About this file

Project Summary

These bid documents detail a sanitary sewer replacement project undertaken by Upper Allen Township in Cumberland County, Pennsylvania. The project involves the replacement of approximately 135 linear feet of sanitary sewer with new 6- and 8-inch PVC piping along Gettysburg Pike and West Lisburn Road (State Route 2004) within Upper Allen Township's rights-of-way and paved areas. Work scope includes installation of two new precast concrete manholes with owner-furnished frames and covers, service lateral connections with cleanouts, and all appurtenances as specified in the technical drawings. The bid documents package (Document No. 12691159) includes a general coversheet, site plan with legend and general notes, profile drawings, detailed connection specifications, and comprehensive erosion and sedimentation control plans with implementation details. The project site is located at the intersection of Gettysburg Pike and Lisburn Road in Mechanicsburg, Pennsylvania, within an area of karst geology requiring special sinkhole management provisions. Construction must comply with Pennsylvania Department of Transportation (PenDOT) traffic control standards and the Pennsylvania Underground Utility Line Protection Act.

The technical specifications require contractors to perform field testing and verification of existing utility locations prior to construction, maintain continuous trench access and driveway maintenance, and implement comprehensive erosion and sedimentation control measures throughout all construction phases. Work includes pipe bedding requirements using AASHTO No. 8 or No. 57 coarse aggregate, trench backfill procedures with specific compaction standards, pavement restoration in accordance with PenDOT Publication 408, and permanent stabilization of all disturbed areas with minimum 70 percent vegetative cover. The contractor is responsible for all bypass pumping of sewage during replacement and connection of existing systems, test pitting to verify existing utility clearances, environmental due diligence for imported clean fill materials, and inspection and maintenance of erosion control best management practices on a weekly basis and after each runoff event. All building materials and wastes must be recycled or disposed of in accordance with Pennsylvania Department of Environmental Protection regulations, and the project site is subject to Preparedness, Prevention, and Contingency plan requirements.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

16 November 2026 - 10:08 PM C:\ADSK\ACCDocs\GHD Services Pty Ltd\12691159-UAT Gettysburg\Project Files\01 WIP\Gen\12691159-GHD-00-DRG-00-GN-001.dwgBrad Anderson

No. Checked Date

Project No. Scale

Title Size Bar is 1" on original size sheet

Sheet No.

Project

Client

Plot Date: Plotted By:

Issue Approved Drafting Check

Designer Design Check

Project Manager

Project Director

Date

Path and Filename:

1"

Author

This document and the ideas and designs incorporated herein, as an instrument of professional service, is the property of GHD. This document may only be used by GHD’s client (and any other person who GHD has agreed can use this document) for the purpose for which it was prepared and must not be used by any other person or for any other purpose.

www.ghd.com

Conditions of Use

GHD

T

Inc.

225 Grandview Avenue, Suite 403 Camp Hill, Pennsylvania 17011, USA

717.541.0622

ARCH D

0 BID DOCUMENTS RC JK 11-17-2026

R. CECCHETTI

UPPER ALLEN TOWNSHIP

J. KOSTELAC

GETTYSBURG PIKE

SANITARY SEWER REPLACEMENT

12691159 NOV. 2026

B. ANDERSON

R. CECCHETTI

S. MATTHEWS

T. PARTHEMORE AS NOTED

GENERAL

COVERSHEET

GN-001

LOCATION MAP

UPPER ALLEN TOWNSHIP

GETTYSBURG PIKE AND

WEST LISBURN ROAD (S.R. 2004)

SANITARY SEWER

REPLACEMENT PROJECT

BID DOCUMENTS

UPPER ALLEN TOWNSHIP, CUMBERLAND COUNTY, PA

NOVEMBER 2026

SITE ADDRESS

GETTYSBURG PIKE AND LISBURN ROAD

UPPER ALLEN TOWNSHIP

CUMBERLAND COUNTY, PA

PENNSYLVANIA LAW REQUIRES 3 WORKING DAYS NOTICE

FOR CONSTRUCTION PHASE AND 10 WORKING

DAYS IN DESIGN STAGE - STOP CALL

PENNSYLVANIA ONE CALL SYSTEM, INC.

1-800-242-1776 OR 811

SERIAL #ER - 20263143243

CALL BEFORE YOU DIG

THE CONTRACTOR SHALL COMPLY WITH THE PROVISIONS OF THE PENNSYLVANIA GENERAL ASSEMBLY UNDERGROUND UTILITY LINE PROTECTION ACT, PA ACT 287 OF 1974, AS AMENDED BY ACT 121 OF 2008, 73 P.S. § 176 ET SEQ., FOR NOTIFICATION OF UTILITIES BEFORE EXCAVATION IN THE CONTRACT AREA. THE ONE UNDERGROUND UTILITIES CALL NUMBER IS 800-242-1776 OR 811.

INDIVIDUAL LOCAL UTILITIES ARE AS FOLLOWS:

UNDERGROUND UTILITIES ACT:

COMPANY: CABLE PROTECTION SERVICES INC

ADDRESS: PO BOX 4816

MIDLOTHIAN, VA. 23112

CONTACT: DEBBIE KING

EMAIL: DEBBIE_KING@CABLEPS.COM

PHONE: 804-562-3409

COMPANY: VERIZON PENNSYLVANIA LLC

ADDRESS:

CONTACT: OFFICE PERSONNEL

EMAIL: 1CALL-VERIZON-PADE@VERIZON.COM

COMPANY: VEOLIA WATER PENNSYLVANIA INC

ADDRESS: 6310 ALLENTOWN BOULEVARD

HARRISBURG, PA. 17112

CONTACT: CHRISTOPHER BRIDE

EMAIL: CHRISTOPHER.BRIDE@VEOLIA.COM

PHONE: 717-901-6317

COMPANY: PENNSYLVANIA ELECTRIC CO

ADDRESS: 341 WHITE POND DRIVE

AKRON, OH. 44320

CONTACT: MELLYSSA ADAMS

EMAIL: MADAMS@FIRSTENERGYCORP.COM

PHONE: 330-252-4013

COMPANY: PPL ELECTRIC UTILITIES CORPORATION

ADDRESS: 437 BLUE CHURCH RD

PAXINOS, PA. 17860

CONTACT: DOUG HAUPT

EMAIL: DLHAUPT@PPLWEB.COM

PHONE: 570-490-5684

COMPANY: UPPER ALLEN TOWNSHIP PUBLIC WORKS DEPT

ADDRESS: 100 GETTYSBURG PIKE

MECHANICSBURG, PA. 17055

CONTACT: COLLIN BARGE

EMAIL: CBARGE@UATWP.ORG

PHONE: 717-766-0756

COMPANY: UPPER ALLEN TOWNSHIP SEWER

ADDRESS: 400 CREEKSIDE DR

MECHANICSBURG, PA. 17055

CONTACT: KODI HOCKENBERRY

EMAIL: KHOCKENBERRY@UATWP.ORG

PHONE: 717-697-9548

COMPANY: UGI UTILITIES INC

ADDRESS: 1301 AIP DR

MIDDLETOWN, PA. 17057

CONTACT: GEOFFREY FERGUSON

EMAIL: GFERGUSON@UGI.COM

PHONE: 610-807-3118

PROJECT

LOCATION

PROJECT SITE

NOT TO SCALE

VICINITY MAP

HARRISBURG

YORK

LANCASTER

PHILADELPHIA

PITTSBURGH

ERIE

STATE COLLEGE

WILLIAMSPORT

SCRANTON

CHAMBERSBURG

SHEET INDEX

SEQUENCE

NUMBER

SHEET

NUMBER SHEET TITLE

GENERAL

1 GN-001 COVERSHEET

CIVIL

2 CI-101 SITE PLAN, LEGEND AND GENERAL NOTES

3 CI-201 PROFILE

4 CI-501 DETAILS

5 CI-502 DETAILS

6 CI-701 EROSION AND SEDIMENTATION CONTROL - NOTES

7 CI-702 EROSION AND SEDIMENTATION CONTROL - DETAILS

8 CI-801 PENNDOT HOP - ENCROACHMENT CHART, GENERAL NOTES AND DETAILS

9 CI-802 PENNDOT HOP - DETAILS

http://www.ghd.com

OH

W

OH

W

OH

W

OH

W

OH

W

OH

W

OH

W

OH

W

OH

W

OH

W

OH

W

OH

W

OH

W

OH

W

OH

W

OH

W

OH

W

OH

W

OH

W

OH

W

OHW

OHW

OHW

OHW

OHW

OHW

OHW

OHW

OHW

OHW

OHW

OHW

OHW

OHW

OHW

OHW

OHW

SA

N

SA

N

SA

N

SA

N

SA

N

SA

N

SA

N

SA

N

SA

N

SA

N

SA

N

SA

N

SA

N

SA

N

SA

N

SA

N

SA

N

SAN

W

W

SAN

SAN

SAN

OHW

O H W

O H W

O H W

O H W

O H W

S

S

S

S

S

S

S

S

S

S

S S

S

SSSSSSSSSSS

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

SSSSS

OHW OHW OHW OHW OHW OHW

S S

S

S

S

S

S

S

S

S

S

S

S

S

W

W

W

W

W W

W

W

W

W

W

W

W

W W

W

W

W

W

W

W

W

W W

W W W W W W W W W W W W W W W W W

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

OHW

OHW

OHW

OHW

OHW

OHW

OHW

OHW

OHW

OHW

OHW

OHW

OHW

OHW

OHW

OHW

OHW

OHW

OHW

OHW

OHW

OHW

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

STORM

W W W W W W

SAN

SAN

SAN

SAN

SAN

OH

W

OH

W

OH

W

OH

W

OH

W

OH

W

OH

W

OH

W

OH

W

OH

W

OH

W

OH

W

OH

W

OH

W

OH

W

OH

W

OH

W

OH

W

OH

W

OH

W

OHW

OHW

OHW

OHW

OHW

OHW

OHW

OHW

OHW

OHW

OHW

OHW

OHW

OHW

OHW

OHW

OHW

SA

N

SA

N

SA

N

SA

N

SA

N

SA

N

SA

N

SA

N

SA

N

SA

N

SA

N

SA

N

SA

N

SA

N

SA

N

SA

N

SA

N

SAN

W

W

SAN

SAN

SAN

OHW

O H W

O H W

O H W

O H W

O H W

S

S

S

S

S

S

S

S

S

S

S S

S

SSSSSSSSSSS

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

SSSSS

OHW OHW OHW OHW OHW OHW

S S

S

S

S

S

S

S

S

S

S

S

S

S

W

W

W

W

W W

W

W

W

W

W

W

W

W W

W

W

W

W

W

W

W

W W

W W W W W W W W W W W W W W W W W

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

OHW

OHW

OHW

OHW

OHW

OHW

OHW

OHW

OHW

OHW

OHW

OHW

OHW

OHW

OHW

OHW

OHW

OHW

OHW

OHW

OHW

OHW

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

STORM

W W W W W W

SAN

SAN

SAN

SAN

SAN

3+69

0+00

1+

2+00

3+00

1+81.63

2+39.11

LOD

LOD

LOD

LODLOD

LO

D

LO

D

LOD

LOD

LOD

LOD

LOD

LO

D

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LODLODLODLODLOD

LOD

LOD

LOD LOD

LOD

LOD

LO

D

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LOD

LOD

LOD

LOD

LOD

LO

D

LO

D

LOD

LOD

LOD

LOD

LOD

LO

D

LO

D

LOD

LOD

LOD

LOD

LO

D

LO

D

LOD

LOD

LOD

LOD

LO

D

LO

D

LOD

LODLOD

LO

D

LOD LOD

LOD

LOD

LOD

LO

D

LOD

LOD

LOD

LODLOD

LO

D

LOD LOD

CF

S

16 November 2026 - 10:35 PM C:\ADSK\ACCDocs\GHD Services Pty Ltd\12691159-UAT Gettysburg\Project Files\01 WIP\Civil\Sheets\12691159-GHD-00-DRG-00-CI-101.dwgBrad Anderson

No. Checked Date

Project No. Scale

Title Size Bar is 1" on original size sheet

Sheet No.

Project

Client

Plot Date: Plotted By:

Issue Approved Drafting Check

Designer Design Check

Project Manager

Project Director

Date

Path and Filename:

1"

Author

This document and the ideas and designs incorporated herein, as an instrument of professional service, is the property of GHD. This document may only be used by GHD’s client (and any other person who GHD has agreed can use this document) for the purpose for which it was prepared and must not be used by any other person or for any other purpose.

www.ghd.com

Conditions of Use

GHD

T

Inc.

225 Grandview Avenue, Suite 403 Camp Hill, Pennsylvania 17011, USA

717.541.0622

ARCH D

0 BID DOCUMENTS RC JK 11-17-2026

R. CECCHETTI

UPPER ALLEN TOWNSHIP

J. KOSTELAC

GETTYSBURG PIKE

SANITARY SEWER REPLACEMENT

12691159 NOV. 2026

B. ANDERSON

R. CECCHETTI

S. MATTHEWS

T. PARTHEMORE AS NOTED

CIVIL

SITE PLAN

CI-101

0 40'20'10'

1 PLAN

SCALE: 1"=20' 0 40'20'10'

CFSCFS

LOD LOD LOD

NEW MH G07-10

EX. MH G07-10

(TO BE FILLED

AND ABANDONED)

CONNECT TO

EXISTING (TYP.)

CONNECT

TO EXISTING

NEW 8" PVC

SANITARY SEWER

EX. SANITARY SEWER

(TO BE CAPPED, FILLED

AND ABANDONED)

REPLACE LATERAL TO R-O-W LINE WITH 6"

PVC SDR 35 AND INSTALL A NEW CLEANOUT.

CONNECT LATERAL TO NEW MH.

N

INLET

PROTECTION

(TYP.)

LIMIT OF

DISTURBANCE

12" COMPOST

FILTER SOCK

SHEET GENERAL NOTES

1. THIS SURVEY WAS NOT PERFORMED AND MAPPING PREPARED WITH THE BENEFIT OF A

TITLE SEARCH.

2. BOUNDARY AND TOPOGRAPHIC INFORMATION SHOWN ARE BASED ON A FIELD SURVEY

PERFORMED BY A TO Z LAND CONSULTING SERVICES LLC., COMPLETED IN JUNE, 2026.

3. CONTOURS AND ELEVATIONS ARE BASED ON NATIONAL AMERICAN VERTICAL DATUM OF 1988

(NAVD 88).

4. BEARINGS ARE BASED ON PENNSYLVANIA STATE PLANE COORDINATES, SOUTH ZONE,

NORTH AMERICAN DATUM OF 1983 (NAD 83).

5. CONTRACTOR SHALL COMPLY WITH THE PROVISIONS OF ACT 181 WITH PROVISIONS FOR

NOTIFICATION OF UTILITIES AND PROTECTION OF EXISTING UNDERGROUND UTILITIES IN THE

VICINITY OF THE PROJECT. THE ONE CALL UNDERGROUND UTILITIES LOCATION CALL

NUMBER IS (800) 242-1776.

6. IMPLEMENT SOIL CONSERVATION MEASURES BEFORE STARTING CONSTRUCTION.

7. THE LOCATION, DEPTH, SIZE, AND TYPE OF EXISTING UTILITIES (ELECTRIC, GAS,

TELEPHONE, TV CABLE, WATER, SANITARY SEWERS, STORM SEWERS, SIGNALING CABLE

ETC.) SHOWN ON THE DRAWINGS MAY NOT BE ACCURATE. IN MANY CASES, THE ACTUAL

LOCATION AND INVERT OF THESE UTILITIES ARE NOT KNOWN. INDIVIDUAL UTILITY SERVICES

FOR HOUSES AND BUILDINGS ARE NOT KNOWN OR SHOWN. EXACT LOCATIONS AND DEPTHS

ARE TO BE VERIFIED IN THE FIELD BY THE CONTRACTOR. THE CONTRACTOR SHALL TEST PIT, AS REQUIRED, TO ESTABLISH THE LOCATION OF THESE FACILITIES SO APPROPRIATE

ADJUSTMENT TO THE PROPOSED SANITARY SEWER DESIGN MAY BE MADE, IF NECESSARY.

8. CONTRACTOR SHALL MAINTAIN ACCESS TO ALL DRIVEWAYS AND MAILBOXES DURING THE

COURSE OF THE WORK.

9. LENGTHS AND SLOPE(GRADE) OF PIPE SHOWN ARE CALCULATED FROM MANHOLE INSIDE

WALL TO MANHOLE INSIDE WALL USING THE INVERTS FROM INSIDE OF MANHOLE.

CONTRACTOR TO ADJUST ACTUAL GRADES ACCORDINGLY TO ALLOW FOR DISTANCE FROM

MH CENTERS TO INSIDE OF MH WALLS.

10. MANHOLES ARE TO BE SET AT GRADE IN IMPROVED AREAS AND PRIVATE YARDS, UNLESS

OTHERWISE NOTED.

11. AT THE END OF EACH WORK DAY, THE EXCAVATED TRENCHES SHALL BE COMPLETELY

BACKFILLED AND/OR STEEL PLATES SHALL BE PLACED OVER THE EXCAVATION.

12. CONTRACTOR WILL BE RESPONSIBLE FOR BYPASS PUMPING OF SEWAGE WHEN REPLACING

AND/OR CONNECTING EXISTING SANITARY SEWER SYSTEMS.

13. CONTRACTOR SHALL TEST PIT ALL KNOWN EXISTING UTILITY CROSSINGS WITHOUT

ADDITIONAL COMPENSATION FROM OWNER OTHER THAN THE CONTRACT UNIT PRICES

PRIOR TO INSTALLING ANY SANITARY SEWER PIPE TO VERIFY EXISTING HORIZONTAL AND

VERTICAL ELEVATIONS TO ASSURE NO CONFLICT.

14. LOCATION OF SERVICE LATERALS ENTERING THE SEWER MAIN WAS OBTAINED BY

TELEVISING THE SEWER MAIN. THE EXACT DIRECTION AND DEPTH OF THE SERVICE

LATERALS LEAVING THE SEWER MAIN TOWARDS THE PROPERTY ARE UNKNOWN. ACTUAL

LOCATIONS OF THE SERVICE LATERALS SHALL BE DETERMINED IN THE FIELD. LATERAL

CLEANOUTS SHALL BE INSTALLED ON THE RIGHT-OF-WAY LINE.

15. EXISTING SANITARY SEWER PIPING TO BE RECONNECTED TO NEW MANHOLES IN

ACCORDANCE WITH DETAIL DRAWINGS.

16. MAINTENANCE AND PROTECTION OF TRAFFIC DURING CONSTRUCTION SHALL BE IN ACCORDANCE WITH PENNDOT PUBLICATION 213 "WORK ZONE TRAFFIC CONTROL," JUNE 2014, OR MOST CURRENT.

LEGEND:

SHEET KEYNOTES

1. EXISTING MANHOLE FRAME, COVER AND RISER RINGS/DONUTS TO BE REMOVED AND

MANHOLE TO BE ABANDONED.

2. CONTRACTOR TO FIELD LOCATE LATERAL AND DETERMINE DEPTH PRIOR TO THE START

OF CONSTRUCTION.

SOIL TYPE (TYP.)

(APPROXIMATE)

SOIL TYPE BOUNDARY

EX. WATER

EX. PROPERTY LINE

EX. STORM SEWER

EX. SANITARY SEWER

EX. RIGHT-OF-WAY

NEW SANITARY SEWER

(ACTUAL WIDTH)

EX. INDEX CONTOUR

EX. INTERMEDIATE CONTOUR

EX. EDGE OF ROAD

EX. OVERHEAD WIRE

EX. BUILDINGS AND STRUCTURES

MILL/OVERLAY AREA

COMPOST FILTER SOCK

LIMIT OF DISTURBANCE

EX. TRAFFIC LOOP/COMM. LINE

EX. MH G07-11

W/ POURED IN

PLACE BASE

(TO BE REPLACED)

S.R. 2004

SEGMENT - 140

OFFSET - 3693

S.R. 2004

SEGMENT - 150

OFFSET - 0000

EX. SANITARY SEWER

(TO BE FILLED AND ABANDONED)

S.R. 2004

SEGMENT - 140

OFFSET - 3588

LIMIT OF WORK

S.R. 2004

SEGMENT - 140

OFFSET - 3693

LIMIT OF WORK

CAP EXISTING

CAP EXISTING

CONNECT

TO EXISTING

0+00 1+00 2+00 3+00 4+00 4+50

53.49LF of NEW 8" PVC @ 1.59%

NEW G07-10

EX. MH G07-11

W/ POURED IN PLACE BASE

(TO BE REPLACED)

459.63(NW)

459.78(SE)

459.53(SW)

1+81.63 470.0

460.93(N) 460.71(W)

460.48(SE)

2+39.11 469.6

6" LAT.

8"

6" LATERAL

CONNECTION

8" PVC SDR 35

CONNECTION

SEE PIPE

CONNECTION

DETAIL

SEE PIPE

CONNECTION

DETAIL

INV IN

INV IN

INV OUT

STATION

RIM

8'

NEW FLOWABLE FILL

NEW 8" PVC

SANITARY SEWER

(5 FT)

5'

NEW 8" PVC

SANITARY SEWER

(16 FT)

16 November 2026 - 10:32 PM C:\ADSK\ACCDocs\GHD Services Pty Ltd\12691159-UAT Gettysburg\Project Files\01 WIP\Civil\Sheets\12691159-GHD-00-DRG-00-CI-201.dwgBrad Anderson

No. Checked Date

Project No. Scale

Title Size Bar is 1" on original size sheet

Sheet No.

Project

Client

Plot Date: Plotted By:

Issue Approved Drafting Check

Designer Design Check

Project Manager

Project Director

Date

Path and Filename:

1"

Author

This document and the ideas and designs incorporated herein, as an instrument of professional service, is the property of GHD. This document may only be used by GHD’s client (and any other person who GHD has agreed can use this document) for the purpose for which it was prepared and must not be used by any other person or for any other purpose.

www.ghd.com

Conditions of Use

GHD

T

Inc.

225 Grandview Avenue, Suite 403 Camp Hill, Pennsylvania 17011, USA

717.541.0622

ARCH D

0 BID DOCUMENTS RC JK 11-17-2026

R. CECCHETTI

UPPER ALLEN TOWNSHIP

J. KOSTELAC

GETTYSBURG PIKE

SANITARY SEWER REPLACEMENT

12691159 NOV. 2026

B. ANDERSON

R. CECCHETTI

S. MATTHEWS

T. PARTHEMORE AS NOTED

CIVIL

PROFILE

CI-201

1 PROFILE

SCALE: H 1"=20', V 1"=10' 0 40'20'10'

0 20'10'

NEW 8" PVC

SANITARY SEWER

PLAN

MI

N.

1"

1"

1/2"

(TYPICAL)

REINFORCED PLASTIC

SECTIONAL ELEVATION

INSIDE FACE

OF MANHOLE

STEEL BAR

#3 DEFORMED

10"

6 3/4"

1 3 /4"

1"

GROOVE

JOINT SEALANT

FLEXIBLE PLASTIC

PREFORMED TONGUE

SECTION

HEAVY DUTY

MANHOLE FRAME (H-25)

NO SCALE

STANDARD PRECAST CONCRETE MANHOLE

WITH PRECAST CONCRETE BASE

NO SCALE

STANDARD PRECAST CONCRETE MANHOLE

WITH PRECAST CONCRETE BASE

NO SCALE

MANHOLE STEPS

NO SCALE

MANHOLE PIPE GASKETS

NO SCALE

MANHOLE SECTION JOINT SEAL

NO SCALE

TYPICAL PLAN OF MANHOLE CHANNELS

NO SCALE

TYPE 1

RUBBER GASKET CAST INTO

PRECAST PIPE OPENINGS

TYPE 2

RUBBER GASKET COMPRESSION RING

INSERT FOR PRECAST OR CORED PIPE OPENINGS (KOR-N-SEAL)

END VIEW

END VIEW

GASKET

PLAN

PIPE

PLAN SECTION

MANHOLE

SECTION

MANHOLE

A-LOK GASKET

OR APPROVED EQUAL

PIPE

(TYP.)

NOTE:

AFTER PIPE-TO- MANHOLE INSTALLATION,

SEAL ANNULAR SPACE AROUND PIPE,

INSIDE AND OUTSIDE OF MANHOLE WITH

POLYURETHANE SEALING COMPOUND OR

NON-SHRINK CEMENT GROUT.

(TYP.OF ALL CONNECTIONS).

6" MIN.

VA

RI

ES

VA

RI

ES

R=1'-0"

3/4

1/2"/FT.

12" CENTERS

4'-0", 5'-0", 6'-0"

(TYP.)

SPACED ON

NO. 57 COARSE AGGREGATE

O.

D.

HAND TAMPED UNDER PIPE

BASE WITH RISER SECTION AND

PRECAST REINFORCED CONCRETE

(SEE MANHOLE GASKET DETAIL)

JOINTS SEALED WATERTIGHT

SECTION

CAST INTO TOP

THREADED INSERT

3'- 0"

M

IN

MATCH PAVEMENT/GRADE

AND SLOPE AS DIRECTED

BOLTED FRAME DETAIL)

(SEE LEVELING RINGS AND

3-1/2" MIN. TO 4" MAX.

MANHOLE STEPS

SEALED WATERTIGHT

FRAME AND LEVELING RINGS

2'-0"

18" MAX. TO TOP STEP

CONCRETE

PLAN

SECTION

EMBEDMENT

CHANNEL

NOTES:

1. BOLTING OF MANHOLE FRAME AND COVER REQUIRED FOR ALL

MANHOLES.

2. 3/4" DIA. STAINLESS STEEL EXPANSION ANCHOR BOLTS MAY BE USED IN

PLACE OF THREADED STUDS AND INSERTS.

3. MANHOLE THREADED INSERT SPACING TO MATCH HOLE CENTER

SPACING ON SPECIFIED FRAME AND COVER FOR EACH MANHOLE.

4. MANHOLE FRAMES SHALL BE SET WITH DOUBLE APPLICATION OF

PREFORMED PLASTIC GASKET SEALANT MATERIAL.

5. PIPES SHALL PROTRUDE 2" INSIDE MANHOLE WALL.

6. ANNULAR SPACE AROUND PIPES TO BE FILLED WITH NON-SHRINK

CEMENT GROUT FLUSH WITH MANHOLE WALL.

7. FOR LENGTH OF PIPE CONNECTIONS TO MANHOLES, REFERENCE

SPECIFICATION SECTION 02601.

8. REFERENCE SPECIFICATION SECTION 02601

FOR ANTI-FLOATATION REQUIREMENTS.

9. ALL STONE GRADATIONS ARE AASHTO CLASSIFICATION.

MIN. TWO 3/4" DIA.

STAINLESS STEEL STUDS,

WASHERS, AND NUTS.

COATING (TYP.)

EXTERIOR BITUMASTIC

CONE SECTION

(MIN. 5' EA. WAY-TYP.)

5" (4' DIA.)

6" (5' DIA.)

7" (6 'DIA.)

6" (4' DIA.)

8" (5' OR 6' DIA.)

VA

RI

ES

GASKETS DETAIL)

WITH RUBBER GASKET.

(SEE MANHOLE PIPE

PIPE CONNECTION MADE

VA

RI

ES

SECTION

6" MIN.

BASE WITH RISER SECTION AND

PRECAST REINFORCED CONCRETE

JOINTS SEALED WATERTIGHT

(SEE MANHOLE GASKET DETAIL)

(TYP.)

MAX.

5'-0"

12" CENTERS

SPACED ON

4'-0", 5'-0", 6'-0"

3-5/8"

INTO TOP SECTION

THREADED INSERT CAST

3'- 0"

M

IN

MATCH PAVEMENT/GRADE

AND SLOPE AS DIRECTED

(SEE LEVELING RINGS AND

BOLTED FRAME DETAIL)

3-1/2" MIN. TO 4" MAX. EMBEDMENT

SEALED WATERTIGHT

MANHOLE STEPS

FRAME AND LEVELING RINGS

2'-0"

PLAN

MIN. TWO 3/4" DIA.

STAINLESS STEEL STUDS,

WASHERS, AND NUTS.

COATING (TYP.)

EXTERIOR BITUMASTIC

CONE SECTION

NO. 57 COARSE AGGREGATE

HAND TAMPED UNDER PIPE

(MIN. 5' EA. WAY-TYP.)

5" (4' DIA.)

6" (5' DIA.)

7" (6' DIA.)

6" (4' DIA.)

8" (5' OR 6' DIA.)

ANTI-FLOTATION

COLLAR ON MANHOLES

(TYP.) ANTI-FLOTATION

COLLAR ON MANHOLES

(TYP.)

PICKHOLE DETAIL

Ö DESIGNATES MACHINED SURFACE

BOTTOM VIEW

COVER SECTION

GROOVE DETAIL

EM A D I N U S A

S E A

ODO R

T J

A RIN

K

N W RO

S

(2) CLOSED

PICKHOLES

1-1/2" (38mm) LETTERS

(RECESSED FLUSH)

PLAN VIEW

1-1/2" (38mm) LETTERS

(RECESSED FLUSH)

STYLE: Bookman Old Style

STYLE: Bookman Old Style

.UP

PE

R ALLEN TW

P

S A

N

I TARY S EW

E

R

CUSTOM LOGO

1-1/2" [38mm]

1" [25mm]

1/4" [6mm]

1-3/8" [35mm]

2-1/4" [57mm]

26" DIA

[660mm]

1/4" (6mm) DIA

NEOPRENE GASKET

21-1/2" DIA

[546mm]

Ö

2-1/2" [64mm]

.180" [5mm]

.240" [6mm]

25" DIA

[635mm]

(O.D. OF GASKET GROOVE)

1-1/2" [38mm]

NOTES:

1. SPECIAL LETTERED COVER PRODUCT NO.

00103664

2. REF. LOGO DWG. 00103665

3. EST. COVER WT. 150 LBS. (68 kg)

4. SPECIFIED MATERIAL: GRAY IRON

5. FURNISH FOUR (4) 1" DIA. HOLES

IN COVER EVENLY SPACED ON 15" DIA. BOLT

CIRCLE WHEN SPECIFIED

6.

HEAVY DUTY MANHOLE

FRAME AND COVER

NO SCALE

*FRAMES AND COVERS TO BE

SUPPLIED BY OWNER

INTO TOP SECTION

THREADED INSERT CAST

JOINT SEALANT

FLEXIBLE PLASTIC

OF PREFORMED

DOUBLE APPLICATION

VARIED THICKNESS

LEVELING RING;

WHOLE PRECAST CONCRETE

(MIN. TWO BOLTS REQ'D)

NUT AND WASHER

STAINLESS STEEL STUD,

3/4" DIA.

SECTION

LEVELING RINGS AND BOLTED

FRAME DETAILS

NOTES:

1. NO CEMENT GROUTING BETWEEN MANHOLE, LEVELING RINGS AND FRAME, OR ON

INSIDE OR OUTSIDE OF MANHOLE PERMITTED. SEALING WITH APPLICATION OF

HIGH BUILD EPOXY COATING PERMITTED (SIKA GUARD 62 OR APPROVED EQUAL).

2. RUBBER ADJUSTMENT RISERS PERMITTED FOR PAVED AREAS AND MAY BE

TAPERED FOR STREET GRADE ADJUSTMENT.

3. 3/4" DIA. STAINLESS STEEL EXPANSION ANCHOR BOLTS MAY BE USED IN PLACE OF

THREADED STUDS AND INSERTS.

18" MAXIMUM

ALLOWABLE DISTANCE

NO SCALE

3/4

1/2"/FT.

VARIES

O.

D.

CONCRETE

SECTION

CHANNEL

CONCRETE SLIDE DETAIL

NO SCALE

GASKETS DETAIL)

WITH RUBBER GASKET.

(SEE MANHOLE PIPE

PIPE CONNECTION MADE

5" MIN.

2'

MA

X.

CONCRETE

SLIDE

SECTION

6" MIN.

CONCRETE

SLIDE

VARIES 5" MIN.

2'

MA

X.

SECTION

00104616

EAST JORDAN IRON WORKS

MAD

E

IN

U

SA

1045Z2

MO/DAY/YR X

(4) 2" (51mm) X 1" (25mm)

SLOTTED HOLES ON 31-3/4"

(806mm) DIA BOLT CIRCLE.

PLAN

EAST JORDAN IRON WORKS, INC.

PRODUCT NO. 00104516

CATALOG NO. 1045Z2 REF.

PRODUCT DRAWING 00104516

EST. WT.

FRAME: 156 LBS 71kg

FRAME - GRAY IRON ASTM

A48 CL35B

27-1/2" [698mm]

34" [864mm]

24" [610mm]

28-7/16" [722mm]

26-1/4" [667mm]

7" [178mm]

1-1/2" [38mm]

5/8" [16mm]

2" [51mm]

(SEE NOTE 3)

16 November 2026 - 10:27 PM C:\ADSK\ACCDocs\GHD Services Pty Ltd\12691159-UAT Gettysburg\Project Files\01 WIP\Civil\Sheets\12691159-GHD-00-DRG-00-CI-501.dwgBrad Anderson

No. Checked Date

Project No. Scale

Title Size Bar is 1" on original size sheet

Sheet No.

Project

Client

Plot Date: Plotted By:

Issue Approved Drafting Check

Designer Design Check

Project Manager

Project Director

Date

Path and Filename:

1"

Author

This document and the ideas and designs incorporated herein, as an instrument of professional service, is the property of GHD. This document may only be used by GHD’s client (and any other person who GHD has agreed can use this document) for the purpose for which it was prepared and must not be used by any other person or for any other purpose.

www.ghd.com

Conditions of Use

GHD

T

Inc.

225 Grandview Avenue, Suite 403 Camp Hill, Pennsylvania 17011, USA

717.541.0622

ARCH D

0 BID DOCUMENTS RC JK 11-17-2026

R. CECCHETTI

UPPER ALLEN TOWNSHIP

J. KOSTELAC

GETTYSBURG PIKE

SANITARY SEWER REPLACEMENT

12691159 NOV. 2026

B. ANDERSON

R. CECCHETTI

S. MATTHEWS

T. PARTHEMORE AS NOTED

CIVIL

DETAILS

CI-501

PIPE RECONNECTION DETAIL

NO SCALE

TRENCH BACKFILL DETAIL

IN PAVED, SHOULDER, GRAVEL AND CONCRETE AREAS

NO SCALE

TRENCH BACKFILL DETAIL

IN UNPAVED AREAS

NO SCALE

UNSUITABLE MATERIAL EXCAVATION

NO SCALE

6" (MIN.)

DE

PT

H

VA

RI

ES

5'

MI

NI

MU

M

" M

IN

O.

D.

MIN. MIN.

O.D.6" 6"

BE

DD

IN

G

LIM

IT

O F

PI

PE

DETECTION TAPE

12"TRENCH

WIDTH

ALL TEMPORARY AND PERMANENT PAVEMENT REQUIREMENTS

MIN.

(TYP.)

PER TOWNSHIP OR PENNDOT REQUIREMENTS

NOTE:

1. BACKFILL AND COMPACTION REQUIREMENT APPLIES TO PAVED ROADWAYS AND

SHOULDERS OF PROPOSED AND EXISTING STREETS (OTHER THAN STATE

HIGHWAYS), PAVED DRIVEWAYS, AND SIDEWALKS.

UNDISTURBED OR WELL

TAMPED EARTH OR

ROCK SUBGRADE

PA NO. 2A COARSE AGG. TRENCH BACKFILL COMPACTED IN 6"

LAYERS WITH WACKER OR ROLLER, OR 18" LAYERS WITH HOE

MOUNTED PLATE TAMPER, OR CONFORMING TO PA DOT

PUBLICATION 408 WITHIN LIMITS OF STATE HIGHWAY

RIGHTS-OF-WAY.

AASHTO NO. 8 OR NO. 57 COARSE

AGGREGATE BEDDING (HAND TAMPED NO.

57 COARSE AGGREGATE REQUIRED WITHIN

5' OF MANHOLES)

5'

MI

NI

MU

M

OF

C

OV

ER

6" (MIN.)

O.

D.

" M

IN

FINISH GRADE

6"6"

DETECTION TAPE

LIM

IT

O F

PI

PE

BE

DD

IN

G

MIN.

O.D.

MIN.

1'

MA

X.

6" TOPSOIL (MIN.) OR 6" PA NO. 2A

AG

GR

EG

AT

E

OR FORCE MAIN

GRAVITY SEWER

TO

DE

TE

CT

IO

N

TA

PE

1. UNPAVED AREAS OUTSIDE ROADWAYS - SUITABLE ON-SITE BACKFILL COMPACTED AS INDICATED ABOVE TO

BOTTOM OF TOPSOIL. REPLACE TOPSOIL T0 APPROXIMATE DEPTH OF EXISTING OR MIN. 4".

2. UNPAVED AREAS WITHIN R/W LIMITS OF STATE HIGHWAYS - CONFORMING TO REQUIREMENTS OF PA DOT

PUBLICATION 408.

3. UNPAVED SHOULDERS OF PROPOSED AND EXISTING STREETS OTHER THAN STATE HIGHWAYS - AGGREGATE

BACKFILL COMPACTED AS INDICATED ABOVE.

4. STONE DRIVEWAYS AND PARKING AREAS - SUITABLE ON-SITE BACKFILL COMPACTED AS INDICATED ABOVE.

5. UNIMPROVED STREETS - AGGREGATE BACKFILL COMPACTED AS INDICATED ABOVE.

BACKFILLING REQUIREMENTS:

UNDISTURBED OR WELL TAMPED

EARTH OR ROCK SUBGRADE

TRENCH BACKFILL MATERIAL COMPACTED IN 6" LAYERS WITH

WACKER OR ROLLER, OR

18" LAYERS WITH HOE MOUNTED PLATE TAMPER, OR

CONFORMING TO PA DOT PUBLICATION 408 WITHIN LIMITS OF

STATE HIGHWAY RIGHTS-OF-WAY.

COARSE AGGREGATE (AS REQUIRED)

ASHTO NO. 8 OR NO. 57 COARSE

AGGREGATE BEDDING (HAND TAMPED NO.

57 COARSE AGGREGATE REQUIRED

WITHIN 5' OF MANHOLES) 6" (MIN.)

O.

D.

" M

IN

6"6"

LIM

IT

O F

PI

PE

BE

DD

IN

G

MIN.

O.D.

MIN.

1'

MA

X.

AG

GR

EG

AT

E

DEPTH AS REQUIRED

R-3 BEDDING (COMPACTED)

EARTH OR ROCK

STABLE UNDISTRUBED

TA

PETO

DE

TE

CT

IO

N

GRAVITY SEWER

REFERENCE APPROPRIATE

TRENCH DETAIL

NOTES:

1. IF STABLE UNDISTURBED EARTH OR ROCK UNATTAINABLE, STABILIZATION METHOD TO BE

DETERMINED BY ENGINEER.

2. DETECTION TAPE REQUIRED; REFERENCE APPROPRIATE TRENCH DETAIL.

ASHTO NO. 8 OR NO. 57 COARSE

AGGREGATE BEDDING (HAND TAMPED NO.

57 COARSE AGGREGATE REQUIRED

WITHIN 5' OF MANHOLES)

6"(MIN.)

FOR BACKFILL REQUIREMENTS

SEE APPROPRIATE TRENCH DETAIL

LIFTS.

MATERIAL, COMPACTED IN 4"

NO. 8 OR PA NO. 2A. COARSE

AGGREGATE PIPE BEDDING

PVC TO ACP CONNECTION USE MECHANICAL JOINT COUPLING

PVC TO CAST IRON CONNECTION USE MECHANICAL JOINT COUPLING

UNDISTURBED

SUBGRADE

PVC TO PVC CONNECTION USE PVC REPAIR SLEEVE

PVC TO TCP/VCP CONNECTION USE S.S. ANTI-SHEAR COLLAR RUBBER ADAPTER

DIP/CIP TO DIP/CIP CONNECTION USE MECHANICAL JOINT COUPLING

NOTES:

1. RECONNECTIONS TO BE AIR TESTED IN ACCORDANCE WITH SPECIFICATIONS.

2. MECHANICAL JOINT COUPLINGS TO BE SMITH-BLAIR OR APPROVED EQUAL

NEW PVC

SANITARY SEWER

PIPE50 LB. BAG OF

CONCRETE CENTERED

BENEATH JOINT (NOT

REQUIRED IN ROCK

EXCAVATION)

SECTION

RUBBER RISER RING ADJUSTMENT

STREET

(TAPERED)

RUBBER RISER RINGS

USE SIKA-FLEX 1A SEALING

COMPOUND BETWEEN RISER RINGS

ELEVATION

12" 10-1/2"

16"

11-1/4"

9"

2"

8"

RISER PIPE

SAME SIZE AND TYPE AS

LATERAL/BUILDING SEWER

20" SQUARE x 3" THICK

CONCRETE PAD

CLEANOUT

CAP/FITTING

CLEANOUT CAP

PROTECTION CASTING 2" MIN.

FINAL GRADE

CONCRETE OR

PAVEMENT DEPTH

CAP

NOTE:

1. CASTING FRAME AND COVER SHALL BE HEAVY DUTY WITH "S" MARKING ON COVER

(EAST JORDAN IRONWORKS CATALOG No.1565, OR APPROVED EQUAL.)

NO SCALE

2x4 PLANK

2x4 PLANK

SECTION

PLAN

SEWER MAIN

SANITARY

SEWER MAIN

TRENCH

REFER TO

DETAIL

REFER TO

TRENCH

DETAIL

WYE W/ 45°

BEND OR

5'- 0"

2-WAY CLEANOUT NOT TO BE LOCATED IN SIDEWALK OR BENEATH OTHER CURB LINE UTILITIES.

NOTES:

1.

(M

IN

THERE SHALL BE A 10 FOOT HORIZONTAL SEPARATION BETWEEN THE WATER SERVICE

AND THE SERVICE LATERAL/BUILDING SEWER.

2.

2-WAY CLEANOUT TO BE LOCATED ON TOWNSHIP R/W LINE AND LOCATION TO BE SITE SPECIFIC WITH3.

SANITARY TEE

SANITARY

WYE W/ 45°

BEND OR

SANITARY TEE

ROADWAY OR SEWER

RIGHTS-OF-WAY LINE

6" SDR 35 PVC

(1% MIN. SLOPE)

SERVICE LATERAL

6" SDR 35 PVC

(1% MIN. SLOPE)

WHERE 2-WAY CLEANOUT IS NOT REQUIRED, SERVICE CONNECTION SHALL BE EXTENDED TO THE 4.

RIGHTS-OF-WAY LINE AND PLUGGED.

PLUG

PLUG

2-WAY CLEANOUT

WITH PLUGS INSTALLED

PLUG

2-WAY CLEANOUT

WITH PLUGS INSTALLED

RESPECT TO CURB AND SIDEWALK.

DETECTION TAPE REQUIRED IN PIPE TRENCH AT A DEPTH OF NO MORE THAN 12-INCHES BELOW5.

FINAL SURFACE GRADE OR PAVEMENT SUBGRADE.

2-WAY CLEANOUTS MAY ALSO BE USED FOR TESTING AND OBSERVATION.6.

SERVICE LATERAL - SHALLOW SEWER

NO SCALE

ELEVATION

(M

AX

6" SDR 35 PVC @ 1% SERVICE CONNECTION

45° BEND

PLUG

6" SERVICE

CONNECTION

2x4 PLANK

DETAIL

REFER TO

TRENCH

5'- 0"

(M

IN

SERVICE LATERAL - DEEP SEWER

2-WAY CLEANOUT

W/ PLUGS INSTALLED

PLUG

ROADWAY OR SEWER

RIGHTS-OF-WAY LINE

SEWER

MAIN

2-WAY CLEANOUT NOT TO BE LOCATED IN SIDEWALK OR BENEATH OTHER CURB LINE UTILITIES.

NOTES:

1.

THERE SHALL BE A 10 FOOT HORIZONTAL SEPARATION BETWEEN THE WATER SERVICE

AND THE SERVICE LATERAL/BUILDING SEWER.

2.

2-WAY CLEANOUT TO BE LOCATED ON TOWNSHIP R/W AND LOCATION TO BE SITE SPECIFIC WITH3.

WHERE 2-WAY CLEANOUT IS NOT REQUIRED, SERVICE CONNECTION SHALL BE EXTENDED TO THE 4.

RIGHTS-OF-WAY LINE AND PLUGGED.

RESPECT TO CURB AND SIDEWALK.

SERVICE LATERAL

(1% MIN. SLOPE)

DETECTION TAPE REQUIRED IN PIPE TRENCH AT A DEPTH OF NO MORE THAN 12-INCHES BELOW5.

FINAL SURFACE GRADE OR PAVEMENT SUBGRADE.

2-WAY CLEANOUTS MAY ALSO BE USED FOR TESTING AND OBSERVATION.6.

STRUCTURE

S.S. PIPE CLAMPS

SEWER PIPE

PROPOSED ADAPTER

CONCRETE MANHOLE

EXISTING PRECAST

2" MIN.

NEW CONNECTION TO EXISTING MANHOLE

POURED CONCRETE

EXISTING

BASE

KOR-N-SEAL

CORE DRILL OPENING

EXTENDED THROUGH

EXISTING BASE TO FORM NEW

CHANNELNOTES:

1. NEW PIPE CHANNEL RECONSTRUCTION IN ACCORDANCE WITH

TOWNSHIP REQUIREMENTS.

2. NON-SHRINK CEMENT GROUT MUST CONTAIN TYPE II PORTLAND

CEMENT FOR SULFATE RESISTANCE.

NON-SHRINK GROUT

FILL (AS REQUIRED)

NO SCALE

NO SCALE

SANITARY WYE W/ 45° BEND

OR SANITARY TEE

NO SCALE

FRAME, COVER

REMOVE EXISTING

EXISTING SANITARY SEWER

MANHOLE TO BE ABANDONED

SECTION

NO SCALE

SEE PAVING DETAIL

BACKFILL WITH 2A STONE IN PAVED AREAS

CAP PROTECTION CASTING FOR CLEANOUT

COVER IN VEHICULAR TRAFFIC AREAS

ELEVATION

SEE PIPE

RECONNECTION

DETAIL (TYP.)

EXCAVATION TO

CONDUCT AIR TEST

INSTALL TEE AND

NOTES:

1. TWO-WAY CLEANOUT (OBSERVATION TEE) SHALL BE THE SAME SIZE AS BUILDING SEWER.

2. REFER TO PIPE REPAIR/RECONNECTION DETAIL FOR PROPER FITTINGS/COUPLINGS/ADAPTERS.

3. FITTINGS/COUPLINGS/ADAPTERS FOR CONNECTIONS TO EXISTING SEWERS MUST BE IN ACCORDANCE

WITH TOWNSHIP SPECIFICATIONS AND ARE SUBJECT TO TOWNSHIP REVIEW AND APPROVAL.

4. TWO-WAY CLEANOUT (OBSERVATION TEE) TO BE LOCATED AT OR NEAR TOWNSHIP R/W LINE; LOCATION TO

BE SITE SPECIFIC WITH RESPECT TO CURB AND SIDEWALK.

6"x6"x6"

SDR-35 PVC

2-WAY CLEANOUT

(SEE NOTE 3)

0-15 PSI GAUGE

TEST

PLUG

1/2 lb. INCREMENTS

12"

MIN.

12"

MIN.

EXISTING

CURB

EXISTING

PAVEMENT

SEE NOTE 4

BLDG. SEWER

EXIST. 4" OR 6"

MIN. 6" NO. 8 OR NO. 57 COARSE AGGREGATE ALL AROUND

(BEDDING MATERIAL HAND TAMPED IN 4" LAYERS)

THREADED PVC CAP INSIDE AND CAST IRON CAP

PROTECTION CASTING WHERE REQUIRED (INSTALLED

FLUSH W/ FIN. GRADE - SEE DETAIL)

BACKFILL W/ CONCRETE FILL

OR FLOWABLE FILL

EXISTING

SANITARY SEWER

MANHOLE

TWO-WAY CLEANOUT (AT R/W LINE)

NO SCALE

6" SDR-35 PVC

OBSERVATION

TEE RISER PIPE

AND RISER RINGS/DONUTS

16 November 2026 - 10:28 PM C:\ADSK\ACCDocs\GHD Services Pty Ltd\12691159-UAT Gettysburg\Project Files\01 WIP\Civil\Sheets\12691159-GHD-00-DRG-00-CI-501.dwgBrad Anderson

No. Checked Date

Project No. Scale

Title Size Bar is 1" on original size sheet

Sheet No.

Project

Client

Plot Date: Plotted By:

Issue Approved Drafting Check

Designer Design Check

Project Manager

Project Director

Date

Path and Filename:

1"

Author

This document and the ideas and designs incorporated herein, as an instrument of professional service, is the property of GHD. This document may only be used by GHD’s client (and any other person who GHD has agreed can use this document) for the purpose for which it was prepared and must not be used by any other person or for any other purpose.

www.ghd.com

Conditions of Use

GHD

T

Inc.

225 Grandview Avenue, Suite 403 Camp Hill, Pennsylvania 17011, USA

717.541.0622

ARCH D

0 BID DOCUMENTS RC JK 11-17-2026

R. CECCHETTI

UPPER ALLEN TOWNSHIP

J. KOSTELAC

GETTYSBURG PIKE

SANITARY SEWER REPLACEMENT

12691159 NOV. 2026

B. ANDERSON

R. CECCHETTI

S. MATTHEWS

T. PARTHEMORE AS NOTED

CIVIL

DETAILS

CI-502

16 November 2026 - 10:24 PM C:\ADSK\ACCDocs\GHD Services Pty Ltd\12691159-UAT Gettysburg\Project Files\01 WIP\Civil\Sheets\12691159-GHD-00-DRG-00-CI-701.dwgBrad Anderson

Project No. Scale

Title Size Bar is 1" on original size sheet

Sheet No.

Project

Client

Plot Date: Plotted By:

Issue Approved Drafting Check

Designer Design Check

Project Manager

Project Director

Date

Path and Filename:

1"

Author

This document and the ideas and designs incorporated herein, as an instrument of professional service, is the property of GHD. This document may only be used by GHD’s client (and any other person who GHD has agreed can use this document) for the purpose for which it was prepared and must not be used by any other person or for any other purpose.

www.ghd.com

Conditions of Use

GHD

T

Inc.

225 Grandview Avenue, Suite 403 Camp Hill, Pennsylvania 17011, USA

717.541.0622

ARCH D

0 BID DOCUMENTS RC JK 11-17-2026

R. CECCHETTI

UPPER ALLEN TOWNSHIP

J. KOSTELAC

GETTYSBURG PIKE

SANITARY SEWER REPLACEMENT

12691159 NOV. 2026

B. ANDERSON

R. CECCHETTI

S. MATTHEWS

T. PARTHEMORE AS NOTED

CIVIL

EROSION AND SEDIMENTATION

CONTROL PLAN - NOTES

CI-701

SOIL DESCRIPTION:

THERE ARE NO KNOWN NATURALLY OCCURRING GEOLOGIC FORMATIONS THAT MAY HAVE THE POTENTIAL TO CAUSE POLLUTION DURING EARTH DISTURBANCE ACTIVITIES.

APPROXIMATE BOUNDARIES OF THE SOIL-MAPPING UNITS ARE SHOWN ON THE ATTACHED DRAWINGS. THIS INFORMATION WAS OBTAINED FROM THE USDA NRCS ONLINE WEB SOIL SURVEY

(HTTP://WEBSOILSURVEY.NRCS.USDA.GOV/APP/).

SOILS FOUND WITHIN THE PROJECT AREA ARE CLASSIFIED AS FOLLOWS:

SOIL LIMITATION RESOLUTIONS:

· DEPTH TO HARD BEDROCK WILL BE ADDRESSED BY USE OF ROCK BREAKER, IF NECESSARY, AND ONLY PERFORMED WHEN APPROVED BY OWNER.

· DEPTH TO SATURATED ZONE AND FLOODING LIMITATIONS WILL BE ADDRESSED BY USE OF A PUMPED WATER FILTER BAG IF NECESSARY. PUMPED WATER FILTER BAGS MUST BE

PLACED AT LEAST 50 FEET FROM ANY STREAM BANKS IN WELL VEGETATED, FLAT AREAS.

· CONTRACTOR IS REQUIRED BY LAW TO FOLLOW OSHA REQUIREMENTS; THIS WILL ADDRESS ANY LIMITATIONS ASSOCIATED WITH UNSTABLE EXCAVATION WALLS.

· DUSTY LIMITATIONS FOR LANDSCAPING WILL BE ADDRESSED BY SUPPLEMENTAL WATERING IF NECESSARY.

STANDARD EROSION AND SEDIMENT CONTROL PLAN NOTES:

1. ALL EARTH DISTURBANCES, INCLUDING CLEARING AND GRUBBING AS WELL AS CUTS AND FILLS SHALL BE DONE IN ACCORDANCE WITH THE E&S PLAN. A COPY OF THE E&S PLAN

DRAWINGS MUST BE AVAILABLE AT THE PROJECT SITE AT ALL TIMES.

2. AT LEAST 3 DAYS BEFORE STARTING ANY EARTH DISTURBANCE ACTIVITIES, ALL CONTRACTORS INVOLVED IN THOSE ACTIVITIES SHALL NOTIFY THE PENNSYLVANIA ONE CALL SYSTEM

INCORPORATED AT 1-800-242-1776 OR 811 FOR BURIED UTILITIES LOCATIONS.

3. ALL EARTH DISTURBANCE ACTIVITIES SHALL PROCEED IN ACCORDANCE WITH THE SEQUENCE PROVIDED ON THE PLAN DRAWINGS.

4. THE CONTRACTOR IS RESPONSIBLE FOR INSTALLATION AND MAINTENANCE OF ALL EROSION AND SEDIMENT BMPS AND SHALL ASSURE THAT THE E&S PLAN IS PROPERLY AND

COMPLETELY IMPLEMENTED.

5. AREAS TO BE FILLED ARE TO BE CLEARED, GRUBBED, AND STRIPPED OF TOPSOIL TO REMOVE TREES, VEGETATION, ROOTS AND OTHER OBJECTIONABLE MATERIAL.

6. CLEARING, GRUBBING, AND TOPSOIL STRIPPING SHALL BE LIMITED TO THOSE AREAS DESCRIBED IN EACH STAGE OF THE CONSTRUCTION SEQUENCE. GENERAL SITE CLEARING, GRUBBING AND TOPSOIL STRIPPING MAY NOT COMMENCE IN ANY STAGE OR PHASE OF THE PROJECT UNTIL THE E&S BMPS SPECIFIED BY THE BMP SEQUENCE FOR THAT STAGE OR

PHASE HAVE BEEN INSTALLED AND ARE FUNCTIONING AS DESCRIBED IN THIS E&S PLAN.

7. AT NO TIME SHALL CONSTRUCTION VEHICLES BE ALLOWED TO ENTER AREAS OUTSIDE THE LIMIT OF DISTURBANCE BOUNDARIES SHOWN ON THE PLAN DRAWINGS. THESE AREAS MUST

BE CLEARLY MARKED AND FENCED OFF BEFORE CLEARING AND GRUBBING OPERATIONS BEGIN.

8. SOIL STOCKPILE HEIGHTS SHALL NOT EXCEED 35 FEET. STOCKPILE SLOPES SHALL BE 2H:1V OR FLATTER. EXCESS EXCAVATED MATERIAL MUST BE HAULED AWAY IMMEDIATELY TO A

SITE WITH AN APPROVED E&S CONTROL PLAN.

9. IMMEDIATELY UPON DISCOVERING UNFORESEEN CIRCUMSTANCES POSING THE POTENTIAL FOR ACCELERATED EROSION AND/OR SEDIMENT POLLUTION, THE OPERATOR SHALL IMPLEMENT APPROPRIATE BEST MANAGEMENT PRACTICES TO MINIMIZE THE POTENTIAL FOR EROSION AND SEDIMENT POLLUTION AND NOTIFY THE CONSERVATION DISTRICT.

10. ALL BUILDING MATERIALS AND WASTES SHALL BE REMOVED FROM THE SITE AND RECYCLED OR DISPOSED OF IN ACCORDANCE WITH THE DEPARTMENT'S SOLID WASTE MANAGEMENT REGULATIONS AT 25 PA. CODE 260.1 ET SEQ., 271.1, AND 287.1 ET. SEQ. NO BUILDING MATERIALS OR WASTES OR UNUSED BUILDING MATERIALS SHALL BE BURNED, BURIED, DUMPED, OR DISCHARGED AT THE SITE.

11. ALL OFF-SITE WASTE AND BORROW AREAS MUST HAVE AN E&S PLAN APPROVED BY THE CONSERVATION DISTRICT FULLY IMPLEMENTED PRIOR TO BEING ACTIVATED.

12. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ANY MATERIAL BROUGHT ON SITE IS CLEAN FILL OR IS OTHERWISE AUTHORIZED FOR USE ON THE PROJECT SITE. FORM

FP-001, CERTIFICATION OF CLEAN FILL, MUST BE COMPLETED AND SUBMITTED TO DEP (ELECTRONICALLY ON THE DEP WEBSITE) PRIOR TO MOVEMENT OF CLEAN FILL TO THE RECEIVING SITE. FORM FP-001 MUST BE COMPLETED AND SUBMITTED REGARDLESS OF WHETHER SAMPLING AND ANALYSIS ARE PERFORMED AS PART OF ENVIRONMENTAL DUE

DILIGENCE.

13. ALL PUMPING OF WATER FROM ANY WORK AREA SHALL BE THROUGH A SEDIMENT CONTROL BMP SUCH AS A PUMPED WATER FILTER BAG OR EQUIVALENT SEDIMENT REMOVAL

FACILITY, DISCHARGING OVER UNDISTURBED VEGETATED AREAS.

14. EROSION CONTROL BLANKETING SHALL BE INSTALLED ON ALL SLOPES 3H:1V OR STEEPER, WITHIN 100 FEET OF A SURFACE WATER, AND ON ALL OTHER DISTURBED AREAS SPECIFIED

ON THE PLAN DRAWINGS AND/OR DETAIL SHEETS.

15. UNTIL THE SITE IS STABILIZED, ALL EROSION AND SEDIMENT BMPS SHALL BE MAINTAINED PROPERLY. MAINTENANCE SHALL INCLUDE INSPECTIONS OF ALL EROSION AND SEDIMENT BMPS AFTER EACH RUNOFF EVENT AND ON A WEEKLY BASIS. ALL PREVENTATIVE AND REMEDIAL MAINTENANCE WORK, INCLUDING CLEAN OUT, REPAIR, REPLACEMENT, REGRADING, RESEEDING, RE-MULCHING, AND RE-NETTING MUST BE PERFORMED IMMEDIATELY. IF THE E&S BMPS FAIL TO PERFORM AS EXPECTED, REPLACEMENT BMPS, OR MODIFICATIONS OF

THOSE INSTALLED WILL BE REQUIRED.

16. SEDIMENT TRACKED ONTO ANY PUBLIC ROADWAY OR SIDEWALK SHALL BE RETURNED TO THE CONSTRUCTION SITE BY THE END OF EACH WORKDAY AND DISPOSED IN THE MANNER DESCRIBED IN THIS PLAN. IN NO CASE SHALL THE SEDIMENT BE WASHED, SHOVELED, OR SWEPT INTO ANY ROADSIDE DITCH, STORM SEWER, OR SURFACE WATER.

17. ALL SEDIMENT REMOVED FROM BMPS SHALL BE DISPOSED OF IN THE MANNER DESCRIBED ON THE PLAN DRAWINGS.

18. AREAS WHICH ARE TO BE TOPSOILED SHALL BE SCARIFIED TO A MINIMUM DEPTH OF 3 TO 5 INCHES; 6 - 12 INCHES ON COMPACTED SOILS - PRIOR TO PLACEMENT OF TOPSOIL. AREAS

TO BE VEGETATED SHALL HAVE A MINIMUM 6 INCHES OF TOPSOIL IN PLACE PRIOR TO SEEDING AND MULCHING. FILL OUTSLOPES SHALL HAVE A MINIMUM OF 2 INCHES OF TOPSOIL.

19. ALL FILLS SHALL BE COMPACTED AS REQUIRED TO REDUCE EROSION, SLIPPAGE, SETTLEMENT, SUBSIDENCE, OR OTHER RELATED PROBLEMS. FILL INTENDED TO SUPPORT BUILDINGS, STRUCTURES AND CONDUITS, ETC. SHALL BE COMPACTED IN ACCORDANCE WITH LOCAL REQUIREMENTS OR CODES.

20. ALL EARTHEN FILLS SHALL BE PLACED IN COMPACTED LAYERS NOT TO EXCEED 9 INCHES IN THICKNESS.

21. FILL MATERIALS SHALL BE FREE OF FROZEN PARTICLES, BRUSH, ROOTS, SOD, OR OTHER FOREIGN OR OBJECTIONABLE MATERIALS THAT WOULD INTERFERE WITH OR PREVENT

CONSTRUCTION OF SATISFACTORY FILLS.

22. FROZEN MATERIALS OR SOFT, MUCKY, OR HIGHLY COMPRESSIBLE MATERIALS SHALL NOT BE INCORPORATED INTO FILLS.

23. FILL SHALL NOT BE PLACED ON SATURATED OR FROZEN SURFACES.

24. SEEPS OR SPRINGS ENCOUNTERED DURING CONSTRUCTION SHALL BE HANDLED IN ACCORDANCE WITH THE STANDARD AND SPECIFICATION FOR SUBSURFACE DRAIN OR OTHER

APPROVED METHOD.

25. ALL GRADED AREAS SHALL BE PERMANENTLY STABILIZED IMMEDIATELY UPON REACHING FINISHED GRADE. CUT SLOPES IN COMPETENT BEDROCK AND ROCK FILLS NEED NOT BE

VEGETATED. SEEDED AREAS WITHIN 100 FEET OF A SURFACE WATER, OR AS OTHERWISE SHOWN ON THE PLAN DRAWINGS, SHALL BE BLANKETED ACCORDING TO THE STANDARDS OF

THIS PLAN.

26. IMMEDIATELY AFTER EARTH DISTURBANCE ACTIVITIES CEASE IN ANY AREA OR SUBAREA OF THE PROJECT, THE OPERATOR SHALL STABILIZE ALL DISTURBED AREAS. DURING NON-GERMINATING MONTHS, MULCH OR PROTECTIVE BLANKETING SHALL BE APPLIED AS DESCRIBED IN THE PLAN. AREAS NOT AT FINISHED GRADE, WHICH WILL BE REACTIVATED WITHIN 1 YEAR, MAY BE STABILIZED IN ACCORDANCE WITH THE TEMPORARY STABILIZATION SPECIFICATIONS. THOSE AREAS WHICH WILL NOT BE REACTIVATED WITHIN 1 YEAR SHALL

BE STABILIZED IN ACCORDANCE WITH THE PERMANENT STABILIZATION SPECIFICATIONS.

27. PERMANENT STABILIZATION IS DEFINED AS A MINIMUM UNIFORM, PERENNIAL 70% VEGETATIVE COVER OR OTHER PERMANENT NON-VEGETATIVE COVER WITH A DENSITY SUFFICIENT TO RESIST ACCELERATED EROSION. CUT AND FILL SLOPES SHALL BE CAPABLE OF RESISTING FAILURE DUE TO SLUMPING, SLIDING, OR OTHER MOVEMENTS.

28. E&S BMPS SHALL REMAIN FUNCTIONAL AS SUCH UNTIL ALL AREAS TRIBUTARY TO THEM ARE PERMANENTLY STABILIZED OR UNTIL THEY ARE REPLACED BY ANOTHER BMP APPROVED

BY THE CONSERVATION DISTRICT.

29. AFTER FINAL SITE STABILIZATION HAS BEEN ACHIEVED, TEMPORARY EROSION AND SEDIMENT BMPS MUST BE REMOVED. AREAS DISTURBED DURING REMOVAL OF THE BMPS SHALL BE STABILIZED IMMEDIATELY. IN ORDER TO ENSURE RAPID REVEGETATION OF DISTURBED AREAS, SUCH REMOVAL IS TO BE DONE ONLY DURING THE GERMINATING SEASON.

30. FAILURE TO CORRECTLY INSTALL E&S BMPS, FAILURE TO PREVENT SEDIMENT-LADEN RUNOFF FROM LEAVING THE CONSTRUCTION SITE, OR FAILURE TO TAKE IMMEDIATE CORRECTIVE ACTION TO RESOLVE FAILURE OF E&S BMPS MAY RESULT IN ADMINISTRATIVE, CIVIL, AND/OR CRIMINAL PENALTIES BEING INSTITUTED BY THE DEPARTMENT AS DEFINED IN SECTION 602 OF THE PENNSYLVANIA CLEAN STREAMS LAW. THE CLEAN STREAMS LAW PROVIDES FOR UP TO $10,000 PER DAY IN CIVIL PENALTIES, UP TO $10,000 IN SUMMARY CRIMINAL PENALTIES, AND UP TO $25,000 IN MISDEMEANOR CRIMINAL PENALTIES FOR EACH VIOLATION.

31. CONTRACTOR IS REQUIRED TO HAVE A PREPAREDNESS, PREVENTION AND CONTINGENCY (PPC) PLAN FOR THE PROJECT SITE. PPC PLAN IS TO BE DEVELOPED AND IMPLEMENTED IN ACCORDANCE WITH PA DEP REQUIREMENTS AND IS TO BE IN PLACE BEFORE CONSTRUCTION IS STARTED.

32. THE PROJECT IS LOCATED IN AN AREA OF KARST GEOLOGY. IF A SINKHOLE DEVELOPS DURING CONSTRUCTION, STORMWATER SHALL BE DIRECTED AWAY FROM THE SINKHOLE.

SINKHOLES SHALL BE REPAIRED IN ACCORDANCE WITH THE DETAILS SHOWN ON THE PLAN DRAWINGS AND SHALL BE REPAIRED UNDER THE DIRECT OBSERVATION AND SUPERVISION

OF A GEOLOGIST OR LICENSED GEOTECHNICAL ENGINEER.

GENERAL STAGING OF CONSTRUCTION ACTIVITIES:

ALL EARTH DISTURBANCE ACTIVITIES SHALL PROCEED IN ACCORDANCE WITH THE FOLLOWING SEQUENCE. EACH STAGE SHALL BE COMPLETED AND IMMEDIATELY STABILIZED BEFORE

ANY FOLLOWING STAGE IS INITIATED.

AT LEAST 3 DAYS BEFORE STARTING ANY EARTH DISTURBANCE ACTIVITIES, ALL CONTRACTORS INVOLVED IN THOSE ACTIVITIES SHALL NOTIFY THE PENNSYLVANIA ONE CALL SYSTEM

INCORPORATED AT 1-800-242-1776 OR 811 FOR BURIED UTILITIES LOCATIONS.

EROSION AND SEDIMENT BMPS MUST BE CONSTRUCTED, STABILIZED, AND FUNCTIONAL BEFORE SITE DISTURBANCE BEGINS WITHIN THE TRIBUTARY AREAS OF THOSE BMPS.

THE GENERAL CONSTRUCTION SEQUENCE WILL BE AS FOLLOWS:

1. CLEARLY FIELD MARK THE LIMITS OF DISTURBANCE SHOWN ON PLAN DRAWINGS PRIOR TO THE START OF ANY EARTH MOVING ACTIVITIES.

2. PRIOR TO BEGINNING ANY EARTH DISTURBANCE ACTIVITIES, INSTALL EROSION AND SEDIMENTATION CONTROLS AS SHOWN ON THE PLAN DRAWINGS. PROJECT ACTIVITIES SHALL BE

LIMITED TO THE EXISTING PAVED ROADWAYS AND ROAD SHOULDERS.

3. SET UP FIELD OFFICES AND STAGING AREA AS NEEDED.

4. TRENCH EXCAVATION IS LIMITED TO THE LENGTH OF PIPE PLACEMENT AND BACKFILLING THAT CAN BE COMPLETED IN THE SAME DAY. EXCAVATED MATERIAL TO BE PLACED ON

UPSLOPE SIDE OF TRENCH UNTIL OPENING IS BACKFILLED, OR IMMEDIATELY PLACED ONTO A TRUCK FOR DISPOSAL OFF-SITE. EXCAVATED TRENCHES SHALL BE THE MINIMUM WIDTH NECESSARY TO INSTALL WATER LINE AND IN COMPLIANCE WITH ALL OSHA REQUIREMENTS. EXCAVATED MATERIAL IS TO BE REMOVED IN ACCORDANCE WITH THE CONTRACT DOCUMENTS. NO MORE THAN 50 LINEAR FEET OF OPEN TRENCH IS TO EXIST WHEN UTILITY LINE INSTALLATION CEASES AT THE END OF THE WORKDAY.

5. TRENCH TO BE EXCAVATED TO THE SUBGRADE ELEVATION AS REQUIRED AND SHOWN ON THE DRAWINGS. EXCAVATED MATERIALS IS TO BE THE MINIMUM WIDTH NECESSARY TO INSTALL THE UTILITY LINE. EXCAVATED MATERIAL IS TO BE REMOVED IN ACCORDANCE WITH THE CONTRACT DOCUMENTS. ANY TRENCH DEWATERING, IF NECESSARY, SHALL BE PUMPED TO A SEDIMENTATION FILTER BAG. FILTER BAGS TO BE PLACED AT LEAST 100 FEET FROM ANY STREAMBANKS IN WELL VEGETATED FLAT AREAS.

6. EXCESSIVE MATERIAL IN PAVED AREAS SHALL BE PLACED IN A TRUCK OR HAULED AWAY IMMEDIATELY TO A DESIGNATED AREA HAVING AN APPROVED EROSION AND SEDIMENTATION

CONTROL PLAN.

7. CONSTRUCTION MATERIAL MAY NOT BE STORED IN THE FLOODWAY; HOWEVER, EXCAVATED MATERIALS TO BE USED AS BACKFILL MAY BE TEMPORARILY STORED ADJACENT TO TRENCH, BUT FOR NO MORE THAN 72 HOURS.

8. REPLACE SEWER AND BACKFILL ACCORDINGLY.

9. RESTORE PAVING AND/OR CURBING WHERE APPLICABLE.

10. FINAL PLACEMENT OF TOPSOIL, SEEDING, AND MULCHING OF ALL CONSTRUCTION AREAS THAT ARE NOT PAVED. (NOTE: SEE SPECIFIC REQUIREMENTS IN SEEDING AND FERTILIZING

SECTION). OPEN CUT TRENCH THROUGH BAREFOOT CREEK CROSSING IS TO BE MADE IN DRY CONDITIONS BY INSTALLING SANDBAG DIVISION DAM AND/OR BYPASSING PUMPING TO

DIVERT WATER AROUND THE WATER AREA.

11. UPON FINAL COMPLETION OF AN EARTH DISTURBANCE ACTIVITY OR ANY STAGE OR PHASE OF AN ACTIVITY, ALL AREAS DISTURBED DURING CONSTRUCTION AND NOT PAVED SHALL IMMEDIATELY HAVE TOPSOIL RESTORED, REPLACED, OR AMENDED, SEEDED FERTILIZED, MULCHED OR OTHERWISE PERMANENTLY STABILIZED AND PROTECTED FROM ACCELERATED EROSION AND SEDIMENTATION ACCORDING TO THE SEEDING AND FERTILIZING SECTION OF THE PLAN.

12. AFTER FINAL STABILIZATION HAS BEEN ACHIEVED, TEMPORARY E&S BMP'S MUST BE REMOVED. AREAS DISTURBED DURING THE REMOVAL PROCESS MUST BE STABILIZED IMMEDIATELY.

TO ENSURE RAPID REVEGETATION OF DISTURBED AREAS, SUCH REMOVAL SHOULD BE DONE DURING THE GERMINATION SEASON.

STABILIZATION SPECIFICATIONS:

1. E&S BMPS MUST REMAIN FUNCTIONAL AS SUCH UNTIL ALL AREAS TRIBUTARY TO THEM ARE PERMANENTLY STABILIZED OR UNTIL THEY ARE REPLACED BY ANOTHER BMP.

2. UPON COMPLETION OR TEMPORARY CESSATION OF AN EARTH DISTURBANCE ACTIVITY OR ANY STAGE OR PHASE OF AN ACTIVITY, THE SITE SHALL BE IMMEDIATELY STABILIZED.

3. IN NO CASE SHOULD AN AREA EXCEEDING 15,000 SQUARE FEET, WHICH IS TO BE STABILIZED BY VEGETATION, REACH FINAL GRADE WITHOUT BEING SEEDED AND MULCHED.

4. FOR AN EARTH DISTURBANCE ACTIVITY OR ANY STAGE OR PHASE OF AN ACTIVITY TO BE CONSIDERED PERMANENTLY STABILIZED, THE DISTURBED AREAS SHALL BE COVERED WITH ONE

A MINIMUM UNIFORM 70% PERENNIAL VEGETATIVE COVER, WITH A DENSITY CAPABLE OF RESISTING ACCELERATED EROSION AND SEDIMENTATION OR OTHER ACCEPTABLE BMP WHICH

PERMANENTLY MINIMIZES ACCELERATED EROSION AND SEDIMENTATION.

5. E&S BMPS SHALL BE IMPLEMENTED AND MAINTAINED UNTIL THE PERMANENT STABILIZATION IS COMPLETED. ONCE PERMANENT STABILIZATION HAS BEEN ESTABLISHED, THE TEMPORARY E&S BMPS SHALL BE REMOVED. ANY AREAS DISTURBED IN THE ACT OF REMOVING TEMPORARY E&S BMPS SHALL BE PERMANENTLY STABILIZED UPON COMPLETION OF THE

TEMPORARY E&S BMP REMOVAL ACTIVITY.

6. UPON FINAL COMPLETION OF AN EARTH DISTURBANCE ACTIVITY OR ANY STAGE OR PHASE OF AN ACTIVITY, ALL AREAS DISTURBED DURING CONSTRUCTION AND NOT PAVED SHALL IMMEDIATELY HAVE TOPSOIL RESTORED, REPLACED, OR AMENDED, SEEDED, FERTILIZED, MULCHED OR OTHERWISE PERMANENTLY STABILIZED AND PROTECTED FROM ACCELERATED

EROSION AND SEDIMENTATION ACCORDING TO THE SEEDING AND FERTILIZING SECTION.

7. IMMEDIATELY AFTER EARTH DISTURBANCE ACTIVITIES CEASE, THE OPERATOR SHALL STABILIZE THE DISTURBED AREAS. DURING NON-GERMINATING PERIODS, MULCH MUST BE APPLIED AS DESCRIBED IN THIS PLAN. DISTURBED AREAS WHICH ARE NOT AT FINISHED GRADE AND WHICH WILL BE RE-DISTURBED WITHIN 1 YEAR MUST BE STABILIZED IN ACCORDANCE WITH THE TEMPORARY VEGETATIVE STABILIZATION SPECIFICATIONS. DISTURBED AREAS WHICH ARE AT FINAL GRADE OR WHICH WILL NOT BE RE-DISTURBED WITHIN 1 YEAR MUST BE STABILIZED IN ACCORDANCE WITH THE PERMANENT VEGETATIVE STABILIZATION SPECIFICATIONS.

8. EROSION CONTROL BLANKETING SHALL BE INSTALLED ON ALL SLOPES 3H:1V OR STEEPER, SEEDED AREAS WITHIN 100 FEET OF A SURFACE WATER REGARDLESS OF SLOPE, ON ALL AREAS OF CONCENTRATED FLOWS, AND ON ALL OTHER DISTURBED AREAS SPECIFIED ON THE PLAN MAPS AND/OR DETAIL SHEETS.

STAGING, LAYDOWN, AND EQUIPMENT STORAGE AREAS:

STAGING, LAYDOWN AND EQUIPMENT STORAGE AREAS WILL BE CONFIRMED BY THE CONTRACTOR IN CONSULTATION WITH UAT. THE CONTRACTOR IS REQUIRED TO PROVIDE ADEQUATE EROSION AND SEDIMENTATION CONTROL FOR THESE AREAS AND IS REQUIRED TO PROVIDE THE CUMBERLAND COUNTY CONSERVATION DISTRICT WITH AN EROSION AND SEDIMENTATION CONTROL PLAN FOR ALL STAGING, LAY-DOWN AND DEVELOPMENT STORAGE AREAS.

STORAGE AND DISPOSAL AREAS FOR EXCESS EXCAVATED MATERIAL:

AREAS USED FOR STORAGE AND DISPOSAL OF EXCESS EXCAVATED MATERIAL WILL BE DETERMINED BY THE CONTRACTOR IN CONSULTATION WITH THE OWNER. THE CONTRACTOR WILL BE RESPONSIBLE FOR THE REMOVAL OF ANY EXCESS MATERIAL AND MUST ENSURE THAT THE SITE RECEIVING THE EXCESS MATERIAL HAS AN APPROVED EROSION AND SEDIMENTATION CONTROL PLAN THAT MEETS THE CONDITIONS OF CHAPTER 102 AND/OR OTHER STATE AND FEDERAL REGULATIONS AND, IF REQUIRED BY THE SIZE OF THE AREA, AN

NPDES PERMIT FOR STORMWATER DISCHARGES ASSOCIATED WITH CONSTRUCTION ACTIVITIES.

RECYCLING:

WHEREVER POSSIBLE, RECYCLING OF WASTE MATERIALS IS PREFERRED RATHER THAN DISPOSAL. THE CONTRACTOR SHALL ENSURE THAT MECHANISMS ARE IN PLACE TO CONTROL WASTE MATERIALS. CONSTRUCTION WASTES INCLUDE, BUT ARE NOT LIMITED TO, EXCESS SOIL MATERIALS, BUILDING MATERIALS, CONCRETE WASH WATER, SANITARY WASTES, ETC.

THAT COULD ADVERSELY IMPACT WATER QUALITY. THE CONTRACTOR SHALL REMOVE FROM SITE, RECYCLE OR DISPOSE OF ALL BUILDING MATERIALS AND WASTES IN ACCORDANCE WITH PA DEP'S SOLID WASTE MANAGEMENT REGULATIONS AT 25 PA CODE 260.1 ET SEQ., 271.1 ET. SEQ., AND 287.1 ET. SEQ. THE CONTRACTOR SHALL NOT ILLEGALLY BURY, DUMP, OR

DISCHARGE ANY BUILDING MATERIAL OR WASTE AT THE SITE.

MAINTENANCE OF EROSION AND SEDIMENTATION CONTROL BMPS:

1. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE ONGOING MAINTENANCE OF ALL EROSION AND SEDIMENT CONTROL FACILITIES THROUGHOUT THE PERIOD OF CONSTRUCTION AND

UNTIL SUCH TIME THAT THE SITE IS DEEMED PERMANENTLY STABILIZED.

2. UNTIL THE SITE IS STABILIZED, ALL E&S BMPS MUST BE MAINTAINED PROPERLY. MAINTENANCE MUST INCLUDE INSPECTIONS OF ALL E&S BMPS AFTER EACH RUNOFF EVENT AND ON A

WEEKLY BASIS. ALL PREVENTATIVE AND REMEDIAL MAINTENANCE WORK, INCLUDING CLEAN OUT, REPAIR, REPLACEMENT, REGRADING, RESEEDING, REMULCHING AND RENETTING MUST BE PERFORMED IMMEDIATELY. IF E&S BMPS FAIL TO PERFORM AS EXPECTED, REPLACEMENT BMPS, OR MODIFICATIONS OF THOSE INSTALLED WILL BE REQUIRED.

3. A LOG SHOWING DATES THAT E&S BMPS WERE INSPECTED AS WELL AS ANY DEFICIENCIES FOUND AND THE DATE THEY WERE CORRECTED SHALL BE MAINTAINED ON THE SITE AND BE

MADE AVAILABLE TO REGULATORY AGENCY OFFICIALS AT THE TIME OF INSPECTION.

4. ANY SEDIMENT REMOVED FROM BMPS DURING CONSTRUCTION WILL BE RETURNED TO UPLAND AREAS ON SITE AND INCORPORATED INTO THE SITE GRADING.

5. OTHER CONTROL MEASURES INDICATED IN THE EROSION AND SEDIMENTATION CONTROL NOTES SHALL BE MAINTAINED.

CLEAN FILL REQUIREMENTS:

1. WITH THE EXCEPTION OF SITES ENROLLED IN DEP'S LAND RECYCLING AND ENVIRONMENTAL REMEDIATION STANDARDS (ACT 2) PROGRAM, ALL FILL MATERIAL EXCAVATED AND USED

ON-SITE, IMPORTED TO THE SITE, AND EXPORTED FROM THE SITE, SHOULD MEET THE DEFINITION OF CLEAN FILL CONTAINED IN DEP'S MANAGEMENT OF FILL POLICY (DOCUMENT ID NO.

258-2182-773). REGULATED FILL MAY ONLY BE USED ON ACT 2 SITES, IN ACCORDANCE WITH STANDARDS ESTABLISHED BY DEP'S LAND RECYCLING AND ENVIRONMENTAL REMEDIATION

STANDARDS PROGRAM.

2. CLEAN FILL IS DEFINED AS: UNCONTAMINATED, NONWATER-SOLUBLE, NONDECOMPOSABLE, INERT SOLID MATERIAL USED TO LEVEL AN AREA OR BRING AN AREA TO GRADE. THE TERM DOES NOT INCLUDE MATERIALS PLACED IN OR ON THE WATERS OF THE COMMONWEALTH. ALTHOUGH THE PLACEMENT OF CLEAN FILL IN OR ON WATERS OF THE COMMONWEALTH CANNOT BE MANAGED UNDER THIS POLICY, PLACEMENT OF CLEAN FILL IN OR ON WATERS OF THE COMMONWEALTH MAY BE APPROVED UNDER A SEPARATE DEP AUTHORIZATION. THE TERM INCLUDES ONLY THOSE MATERIALS THAT ARE IDENTIFIED AS “FILL,” AS THE TERM IS DEFINED IN THIS POLICY. THE TERM DOES NOT INCLUDE FILL THAT HAS BEEN BLENDED, MIXED OR TREATED WITH THE PURPOSE OF MEETING THE DEFINITION OF “CLEAN FILL” AND THAT WITHOUT BEING BLENDED, MIXED OR TREATED WOULD FAIL TO MEET THE NUMERIC LIMITS IDENTIFIED IN THE DEFINITION OF “UNCONTAMINATED MATERIAL” CONTAINED IN THIS POLICY.

3. ENVIRONMENTAL DUE DILIGENCE MUST BE PERFORMED TO DETERMINE IF THE FILL MATERIALS ASSOCIATED WITH THE PROJECT QUALIFY AS CLEAN FILL. ENVIRONMENTAL DUE DILIGENCE IS DEFINED AS: INVESTIGATIVE TECHNIQUES USED TO DETERMINE WHETHER FILL FROM A DONOR SITE HAS BEEN AFFECTED BY A RELEASE OF A REGULATED SUBSTANCE.

INVESTIGATIVE TECHNIQUES INCLUDING, BUT NOT LIMITED TO, VISUAL PROPERTY INSPECTIONS, ELECTRONIC DATA BASE SEARCHES, REVIEW OF OWNERSHIP AND HISTORICAL USE OF A PROPERTY, SANBORN MAPS, ENVIRONMENTAL QUESTIONNAIRES, TRANSACTION SCREENS, ANALYTICAL TESTING, ENVIRONMENTAL ASSESSMENTS, AUDITS, OR PROCEDURES OUTLINED IN ASTM STANDARD E1527-13. A SINGLE INVESTIGATIVE TECHNIQUE MAY NOT BE USED AS THE BASIS FOR ENVIRONMENTAL DUE DILIGENCE. ENVIRONMENTAL DUE DILIGENCE INCLUDES VISUAL PROPERTY INSPECTION AND A REVIEW OF OWNERSHIP AND HISTORICAL PROPERTY USE, AT A MINIMUM, UNLESS ANALYTICAL SAMPLING IS PERFORMED IN LIEU OF A REVIEW OF OWNERSHIP AND HISTORICAL PROPERTY USE. ANALYTICAL TESTING IS NOT A REQUIRED PART UNLESS ENVIRONMENTAL DUE DILIGENCE INDICATES THAT THE FILL MAY HAVE BEEN AFFECTED BY A RELEASE OF A REGULATED SUBSTANCE. IF DUE DILIGENCE SHOWS EVIDENCE THAT THE FILL MAY HAVE BEEN AFFECTED BY A RELEASE OF A REGULATED SUBSTANCE, THE FILL MUST BE TESTED TO DETERMINE IF IT IS CLEAN FILL OR REGULATED FILL. TESTING SHOULD BE PERFORMED IN ACCORDANCE WITH APPENDIX A OF THE

DEPARTMENT'S POLICY “MANAGEMENT OF CLEAN FILL.”

4. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ANY MATERIAL BROUGHT ON SITE IS CLEAN FILL OR IS OTHERWISE AUTHORIZED FOR USE ON THE PROJECT SITE. FORM FP-001, CERTIFICATION OF CLEAN FILL MUST BE COMPLETED AND SUBMITTED TO DEP (ELECTRONICALLY ON THE DEP WEBSITE) PRIOR TO MOVEMENT OF CLEAN FILL TO THE RECEIVING SITE.

FORM FP-001 MUST BE COMPLETED AND SUBMITTED REGARDLESS OF WHETHER SAMPLING AND ANALYSIS ARE PERFORMED AS PART OF ENVIRONMENTAL DUE DILIGENCE. BOTH THE DONOR SITE AND THE RECEIVING SITE MUST RETAIN COPIES OF THE COMPLETED FORM FP-001 FOR A PERIOD OF FIVE (5) YEARS AND MUST BE MADE AVAILABLE UPON REQUEST BY DEP

OR CCD.

5. NO REGULATED FILL REQUIRING A PERMIT FROM DEP'S WASTE MANAGEMENT PROGRAM WILL BE IMPORTED TO, EXPORTED FROM, OR OTHERWISE UTILIZED ON THE PROJECT SITE.

16 November 2026 - 10:25 PM C:\ADSK\ACCDocs\GHD Services Pty Ltd\12691159-UAT Gettysburg\Project Files\01 WIP\Civil\Sheets\12691159-GHD-00-DRG-00-CI-701.dwgBrad Anderson

Project No. Scale

Title Size Bar is 1" on original size sheet

Sheet No.

Project

Client

Plot Date: Plotted By:

Issue Approved Drafting Check

Designer Design Check

Project Manager

Project Director

Date

Path and Filename:

1"

Author

This document and the ideas and…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .