This is a Project Manual for a water main replacement project issued by Washington Township Municipal Authority (WTMA) in Franklin County, Pennsylvania, prepared by engineering firm GHD. The project involves the installation of approximately 1,125 linear feet of 8-inch PVC water main, replacement of 18 water service connections, and associated lawn and pavement restoration work located on Route 16 in Washington Township. Sealed bids were submitted online via PennBid with a deadline of 10:00 AM on May 28, 2026. The contract documents indicate that the Notice to Proceed will be issued on or before June 16, 2026, with substantial completion required by September 2, 2026, and final completion by October 15, 2026. No pre-bid conference was held for this project. Bidders were required to conduct site visits during normal working hours and submit qualifications documentation including evidence of contractor licensing, subcontractor and supplier information, and financial data.
The contract utilizes unit price work as the basis for payment, with bidders required to submit pricing for each identified pay item including water main installation with tracer wire and fittings, gate valves and line stops, water service connections, hydrant assemblies, locate boxes, facility abandonment, testing and chlorination, and various restoration and ancillary work. A bid bond equal to 10 percent of the maximum bid price was required at submission. The successful bidder must furnish performance and payment bonds equal to the contract price and maintain comprehensive insurance including workers' compensation, commercial general liability with minimum limits of $1,000,000 per occurrence and $2,000,000 general aggregate, automobile liability, umbrella coverage of $3,000,000, and builder's risk property insurance. Liquidated damages are assessed at $1,000 per day for failure to achieve substantial completion and $1,000 per day for failure to complete remaining work after substantial completion. The contractor is responsible for all permits, utility coordination, traffic control in accordance with PennDOT standards, prevailing wage compliance, steel products procurement requirements, and environmental regulatory compliance including erosion and sedimentation controls and clean fill management procedures.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 1-12678282-WTMA Rt 16 WM Replacement Bid Drawings.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PROJECT MANUAL
FOR
ROUTE 16 WATER MAIN REPLACEMENT PROJECT
WASHINGTON TOWNSHIP MUNICIPAL AUTHORITY
FRANKLIN COUNTY, PENNSYLVANIA
Engineering Project Number: 12678282
APRIL 2026
GHD
225 GRANDVIEW AVE., SUITE 403
CAMP HILL, PA 17011
(717) 541-0622
PROJECT MANUAL
FOR
ROUTE 16 WATER MAIN REPLACEMENT PROJECT
WASHINGTON TOWNSHIP MUNICIPAL AUTHORITY
FRANKLIN COUNTY, PENNSYLVANIA
Engineering Project Number: 12678282
APRIL 2026
GHD
225 GRANDVIEW AVE., SUITE 403
CAMP HILL, PA 17011
(717) 541-0622
Copyright ©2026 by GHD All rights reserved.
WTMA – ROUTE 16 WATER MAIN REPLACEMENT PROJECT
12678282 TOC – 1 TABLE OF CONTENTS
PROJECT MANUAL
TABLE OF CONTENTS
ADVERTISEMENT
DIVISION 00 CONTRACT REQUIREMENTS
Document 00100 Instructions to Bidders
Document 00320 Non-Collusion Affidavit
Document 00330 Affidavit of Compliance with PA Steel Products Procurement Act
Document 00340 Public Works Employment Verification Form
Document 00410 Bid Form
Document 00435 Bid Bond (Damages Form)
Document 00451 Statement of Bidder’s Qualifications
Document 00520 Standard Form of Agreement between Owner and Contractor for Construction Contract (Stipulated Price)
Document 00610 Performance Bond
Document 00615 Payment Bond
Document 00700 Standard General Conditions of the Construction Contract
Document 00800 Supplementary Conditions:
Article 1 – Modifications to General Conditions
Article 2 – Pennsylvania Prevailing Wage Act
Article 3 – Regulations of the Pennsylvania Human Relations Commission
Article 4 – Compliance with Steel Products Procurement Act
Article 5 – Permits
Article 6 – Pennsylvania Department of Environmental Protection Clean Fill Information
Article 7 – Pennsylvania Right-To-Know Requirements
Article 8 – Requirements of Act 141 of 2022 – Public Works Employment Verification Act
DIVISION 01 GENERAL REQUIREMENTS
Section 01010 Summary of Work Section 01027 Applications for Payment Section 01035 Modification Procedures Section 01040 Project Coordination Section 01050 Field Engineering Section 01095 Reference Standards and Definitions Section 01200 Project Meetings Section 01300 Submittals Section 01381 Color Audio Video Documentation Section 01400 Quality Control Services Section 01516 Temporary Sanitary Facilities Section 01560 Temporary Controls Section 01600 Materials and Equipment Section 01631 Product Substitutions Section 01700 Project Closeout
12678282 TOC – 2 TABLE OF CONTENTS
DIVISION 02 SITE WORK
Section 02110 Site Clearing Section 02211 Rock Removal Section 02221 Trenching Section 02500 Paving and Surfacing Section 02710 Piped Utilities – Waterline
(Advertisement)
WASHINGTON TOWNSHIP MUNICIPAL AUTHORITY
FRANKLIN COUNTY, PENNSYLVANIA
ROUTE 16 WATER MAIN REPLACEMENT PROJECT
WASHINGTON TOWNSHIP MUNICIPAL AUTHORITY will receive sealed proposals online via PennBid for the Route 16 Water Main Replacement Project, in accordance with the Contract Documents. Sealed bids may be submitted and updated online via the PennBid Program until 10:00 AM on MAY 28, 2026. Bids will be opened virtually and posted to PennBid shortly thereafter.
The work includes all material, labor, and equipment necessary for the installation of approximately 1,125 feet of 8” PVC water line, replacement of 18 water services, lawn and pavement restoration as shown on the drawings and as specified. The project is located in Washington Township, Franklin County.
Contract documents have been prepared at the office of GHD, 225 Grandview Avenue, Suite 403, Camp Hill, PA 17011. Please refer all questions concerning the project on PennBid. Documents are available via PennBid, printed documents are not available for purchase.
All documents and solicitation details are available at no cost at the PennBid website as of Tuesday, April 28th, 2026. To access this solicitation, go to https://pennbid.bonfirehub.com/portal/ Opportunities and click on “Bids” on the left-hand side of the website. Search the “number” column for “Washington Township Municipal Authority - GHD”. The “title” of the project is “ROUTE 16 WATER MAIN REPLACEMENT PROJECT”. A PennBid Representative can be reached at 610-693-4769.
Bidders can utilize the PennBid Program without any initial or recurring costs. A fee of 0.33% of the bid total, capped at $6,000, is assessed only to the bidder who is awarded the project.
Andy Zeigler Managing Director Washington Township Municipal Authority https://pennbid.bonfirehub.com/portal/?tab=openOpportunities
12678282 00100-1 INSTRUCTIONS TO BIDDERS
DOCUMENT 00100 – INSTRUCTIONS TO BIDDERS
ARTICLE 1 – DEFINED TERMS
1.01 Terms used in these Instructions to Bidders have the meanings indicated in the General Conditions and Supplementary Conditions. Additional terms used in these Instructions to Bidders have the meanings indicated below, which are applicable to both the singular and plural thereof:
A. Issuing Office – The office from which the Bidding Documents are to be issued.
B. PennBid – A web-based electronic procurement program (https://pennbid.bonfirehub.com/portal/Opportunities).
ARTICLE 2 – COPIES OF BIDDING DOCUMENTS
2.01 Complete sets of the Bidding Documents may be obtained online at https://pennbid.bonfirehub.com at no fee. The project is titled “ROUTE 16 WATER MAIN REPLACEMENT PROJECT” under the solicitations list. All documents may be downloaded directly to the Bidder’s computer. Paper copies of the Bidding Documents may be obtained through PennBid for a fee. No paper copies will be available through the Owner or Engineer.
2.02 Complete sets of Bidding Documents shall be used in preparing Bids; neither Owner nor Engineer assumes any responsibility for errors or misinterpretations resulting from the use of incomplete sets of Bidding Documents.
2.03 Owner and Engineer, and PennBid in making copies of Bidding Documents available on the above terms, do so only for the purpose of obtaining Bids for the Work and do not authorize or confer a license for any other use.
2.04 All Contractors who submit a Bid for this project must obtain the Contract Documents online from PennBid. A Contractor is automatically added to the list of bidders after they download any document from PennBid.
ARTICLE 3 – QUALIFICATIONS OF BIDDERS
3.01 To demonstrate Bidder’s qualifications to perform the Work, Bidder shall submit with its Bid (a) written evidence establishing its qualifications such as financial data, previous experience, and present commitments, and (b) the following additional information:
A. [Evidence of Bidder’s authority to do business in the state where the Project is located.]
B. [Bidder’s state or other contractor license number, if applicable.]
C. [Subcontractor and Supplier qualification information; coordinate with provisions of Article 12 of these Instructions, “Subcontractors, Suppliers, and Others.”]
D. [Other required information regarding qualifications.]
3.02 A Bidder’s failure to submit required qualification information within the times indicated may disqualify Bidder from receiving an award of the Contract.
3.03 No requirement in this Article 3 to submit information will prejudice the right of Owner to seek additional pertinent information regarding Bidder’s qualifications.
https://pennbid.bonfirehub.com/
12678282 00100-2 INSTRUCTIONS TO BIDDERS
3.04 Bidder is advised to carefully review those portions of the Bid Form requiring Bidder’s representations and certifications.
3.05 Owner reserves the right to reject any Bid if the evidence submitted by, or the investigation of, such bidder fails to satisfy Owner that such Bidder is properly qualified to carry out the obligations of the Contract Documents and to complete the Work contemplated therein.
ARTICLE 4 – SITE AND OTHER AREAS; EXISTING SITE CONDITIONS; EXAMINATION OF SITE;
OWNER’S SAFETY PROGRAM; OTHER WORK AT THE SITE
4.01 Site and Other Areas
A. The Site is identified in the Bidding Documents. By definition, the Site includes rights-of-way, easements, and other lands furnished by Owner for the use of the Contractor. Any additional lands required for temporary construction facilities, construction equipment, or storage of materials and equipment, and any access needed for such additional lands, are to be obtained and paid for by Contractor.
4.02 Existing Site Conditions
A. Subsurface and Physical Conditions; Hazardous Environmental Conditions:
1. The Supplementary Conditions identify:
a. those reports known to Owner of explorations and tests of subsurface conditions at or adjacent to the Site.
b. those drawings known to Owner of physical conditions relating to existing surface or subsurface structures at the Site (except Underground Facilities).
c. reports and drawings known to Owner relating to Hazardous Environmental Conditions that have been identified at or adjacent to the Site.
d. Technical Data contained in such reports and drawings.
2. Owner will make copies of reports and drawings referenced above available to any Bidder on request. These reports and drawings are not part of the Contract Documents, but the Technical Data contained therein upon whose accuracy Bidder is entitled to rely, as provided in the General Conditions, has been identified and established in the Supplementary Conditions. Bidder is responsible for any interpretation or conclusion Bidder draws from any Technical Data or any other data, interpretations, opinions, or information contained in such reports or shown or indicated in such drawings.
3. If the Supplementary Conditions do not identify Technical Data, the default definition of Technical Data set forth in Article 1 of the General Conditions will apply.
B. Underground Facilities: Information and data shown or indicated in the Bidding Documents with respect to existing Underground Facilities at or contiguous to the Site are set forth in the Contract Documents and are based upon information and data furnished to Owner and Engineer by owners of such Underground Facilities, including Owner, or others.
12678282 00100-3 INSTRUCTIONS TO BIDDERS
C. Adequacy of Data: Provisions concerning responsibilities for the adequacy of data furnished to prospective Bidders with respect to subsurface conditions, other physical conditions, and Underground Facilities, and possible changes in the Bidding Documents due to differing or unanticipated subsurface or physical conditions appear in Paragraphs 5.03, 5.04, and 5.05 of the General Conditions. Provisions concerning responsibilities for the adequacy of data furnished to prospective Bidders with respect to a Hazardous Environmental Condition at the Site, if any, and possible changes in the Contract Documents due to any Hazardous Environmental Condition uncovered or revealed at the Site which was not shown or indicated in the Drawings or Specifications or identified in the Contract Documents to be within the scope of the Work, appear in Paragraph 5.06 of the General Conditions.
4.03 Site Visit and Testing by Bidders
A. Bidder shall conduct the required Site visit during normal working hours, and shall not disturb any ongoing operations at the Site.
B. Bidder is not required to conduct any subsurface testing, or exhaustive investigations of Site conditions.
C. On request, and to the extent Owner has control over the Site, and schedule permitting, the Owner will provide Bidder access to the Site to conduct such additional examinations, investigations, explorations, tests, and studies as Bidder deems necessary for preparing and submitting a successful Bid. Owner will not have any obligation to grant such access if doing so is not practical because of existing operations, security or safety concerns, or restraints on Owner’s authority regarding the Site.
D. Bidder shall comply with all applicable Laws and Regulations regarding excavation and location of utilities, obtain all permits, and comply with all terms and conditions established by Owner or by property owners or other entities controlling the Site with respect to schedule, access, existing operations, security, liability insurance, and applicable safety programs.
E. Bidder shall fill all holes and clean up and restore the Site to its former condition upon completion of such explorations, investigations, tests, and studies.
4.04 Owner’s Safety Program
A. Site visits and work at the Site may be governed by an Owner safety program. As the General Conditions indicate, if an Owner safety program exists, it will be noted in the Supplementary Conditions.
4.05 Other Work at the Site
A. Reference is made to Article 8 of the Supplementary Conditions for the identification of the general nature of other work of which Owner is aware (if any) that is to be performed at the Site by Owner or others (such as utilities and other prime contractors) and relates to the Work contemplated by these Bidding Documents. If Owner is party to a written contract for such other work, then on request, Owner will provide to each Bidder access to examine such contracts (other than portions thereof related to price and other confidential matters), if any.
4.06 The submission of a Bid will constitute an incontrovertible representation by Bidder that Bidder has complied with every requirement of this Article 4, that without exception the Bid is premised upon performing and furnishing the Work required by the Bidding Documents and applying any
12678282 00100-4 INSTRUCTIONS TO BIDDERS
specific means, methods, techniques, sequences, and procedures of construction that may be shown or indicated or expressly required by the Bidding Documents, that Bidder has given Engineer written notice of all conflicts, errors, ambiguities, and discrepancies that Bidder has discovered in the Bidding Documents and the written resolutions thereof by Engineer are acceptable to Bidder, and that the Bidding Documents are generally sufficient to indicate and convey understanding of all terms and conditions for performing and furnishing the Work.
ARTICLE 5 – BIDDER’S REPRESENTATIONS
5.01 It is the responsibility of each Bidder before submitting a Bid to:
A. examine and carefully study the Bidding Documents, and any data and reference items identified in the Bidding Documents;
B. visit the Site, conduct a thorough, alert visual examination of the Site and adjacent areas, and become familiar with and satisfy itself as to the general, local, and Site conditions that may affect cost, progress, and performance of the Work;
C. become familiar with and satisfy itself as to all Laws and Regulations that may affect cost, progress, and performance of the Work;
D. carefully study all: (1) reports of explorations and tests of subsurface conditions at or adjacent to the Site and all drawings of physical conditions relating to existing surface or subsurface structures at the Site that have been identified in the Supplementary Conditions, especially with respect to Technical Data in such reports and drawings, and
(2) reports and drawings relating to Hazardous Environmental Conditions, if any, at or adjacent to the Site that have been identified in the Supplementary Conditions, especially with respect to Technical Data in such reports and drawings;
E. consider the information known to Bidder itself; information commonly known to contractors doing business in the locality of the Site; information and observations obtained from visits to the Site; the Bidding Documents; and the Site-related reports and drawings identified in the Bidding Documents, with respect to the effect of such information, observations, and documents on (1) the cost, progress, and performance of the Work; (2) the means, methods, techniques, sequences, and procedures of construction to be employed by Bidder; and (3) Bidder’s safety precautions and programs;
F. agree, based on the information and observations referred to in the preceding paragraph, that at the time of submitting its Bid no further examinations, investigations, explorations, tests, studies, or data are necessary for the determination of its Bid for performance of the Work at the price bid and within the times required, and in accordance with the other terms and conditions of the Bidding Documents;
G. become aware of the general nature of the work to be performed by Owner and others at the Site that relates to the Work as indicated in the Bidding Documents;
H. promptly give Engineer written notice of all conflicts, errors, ambiguities, or discrepancies that Bidder discovers in the Bidding Documents and confirm that the written resolution thereof by Engineer is acceptable to Bidder;
I. determine that the Bidding Documents are generally sufficient to indicate and convey understanding of all terms and conditions for the performance and furnishing of the Work;
and
12678282 00100-5 INSTRUCTIONS TO BIDDERS
J. agree that the submission of a Bid will constitute an incontrovertible representation by Bidder that Bidder has complied with every requirement of this Article, that without exception the Bid and all prices in the Bid are premised upon performing and furnishing the Work required by the Bidding Documents.
ARTICLE 6 – PRE-BID CONFERENCE
6.01 No pre-bid conference will be held for this project.
ARTICLE 7 – INTERPRETATIONS AND ADDENDA
7.01 All questions about the meaning or intent of the Bidding Documents are to be submitted to Engineer in writing through PennBid by clicking on the “Questions” tab. Interpretations or clarifications considered necessary by Engineer in response to such questions will be issued by Addenda delivered to all parties recorded as having received the Bidding Documents. Questions received less than seven days prior to the date for opening of Bids may not be answered. Only questions answered by Addenda will be binding. Oral and other interpretations or clarifications will be without legal effect.
7.02 All questions that have been asked and answered through PennBid are available on the “Questions” tab. The identity of the Bidder asking the question is not disclosed to other bidders.
7.03 Addenda may be issued to clarify, correct, supplement, or change the Bidding Documents.
ARTICLE 8 – BID SECURITY
8.01 A Bid must be accompanied by Bid security made payable to Owner in an amount of [_ten (10)_] percent of Bidder’s maximum Bid price (determined by adding the base bid and all alternates) and in the form of a certified check, bank money order, or a Bid bond (on the form included in the Bidding Documents) issued by a surety meeting the requirements of Paragraphs 6.01 and 6.02 of the General Conditions.
8.02 The Bid security of the apparent Successful Bidder will be retained until Owner awards the contract to such Bidder, and such Bidder has executed the Contract Documents, furnished the required contract security, and met the other conditions of the Notice of Award, whereupon the Bid security will be released. If the Successful Bidder fails to execute and deliver the Contract Documents and furnish the required contract security within 15 days after the Notice of Award, Owner may consider Bidder to be in default, annul the Notice of Award, and the Bid security of that Bidder will be forfeited. Such forfeiture shall be Owner’s exclusive remedy if Bidder defaults.
8.03 The Bid security of other Bidders that Owner believes to have a reasonable chance of receiving the award may be retained by Owner until the earlier of seven days after the Effective Date of the Contract or 61 days after the Bid opening, whereupon Bid security furnished by such Bidders will be released.
8.04 Bid security of other Bidders that Owner believes do not have a reasonable chance of receiving the award will be released within seven days after the Bid opening.
ARTICLE 9 – CONTRACT TIMES
9.01 The number of days within which, or the dates by which the Work is to be substantially completed and ready for final payment are set forth in the Agreement.
12678282 00100-6 INSTRUCTIONS TO BIDDERS
ARTICLE 10 – LIQUIDATED DAMAGES
10.01 Provisions for liquidated damages, if any, for failure to timely attain a Milestone, Substantial Completion, or completion of the Work in readiness for final payment, are set forth in the Agreement.
ARTICLE 11 – SUBSTITUTE AND “OR-EQUAL” ITEMS
11.01 The Contract for the Work, as awarded, will be on the basis of materials and equipment specified or described in the Bidding Documents without consideration during the bidding and Contract award process of possible substitute or “or-equal” items. In cases in which the Contract allows the Contractor to request that Engineer authorize the use of a substitute or “or-equal” item of material or equipment, application for such acceptance may not be made to and will not be considered by Engineer until after the Effective Date of the Contract.
11.02 All prices that Bidder sets forth in its Bid shall be based on the presumption that the Contractor will furnish the materials and equipment specified or described in the Bidding Documents, as supplemented by Addenda. Any assumptions regarding the possibility of post-Bid approvals of “or-equal” or substitution requests are made at Bidder’s sole risk.
ARTICLE 12 – SUBCONTRACTORS, SUPPLIERS, AND OTHERS
12.01 A Bidder shall be prepared to retain specific Subcontractors, Suppliers, or other individuals or entities for the performance of the Work if required by the Bidding Documents (most commonly in the Specifications) to do so. If a prospective Bidder objects to retaining any such Subcontractor, Supplier, or other individual or entity, and the concern is not relieved by an Addendum, then the prospective Bidder should refrain from submitting a Bid.
12.02 Subsequent to the submittal of the Bid, Owner may not require the Successful Bidder or Contractor to retain any Subcontractor, Supplier, or other individual or entity against which Contractor has reasonable objection.
12.03 The apparent Successful Bidder, and any other Bidder so requested, shall within five days after Bid opening, submit to Owner a list of the Subcontractors or Suppliers proposed for the following portions of the Work: [Piping Materials, Paving, Traffic Control, Flagging.].
If requested by Owner, such list shall be accompanied by an experience statement with pertinent information regarding similar projects and other evidence of qualification for each such Subcontractor, Supplier, or other individual or entity. If Owner or Engineer, after due investigation, has reasonable objection to any proposed Subcontractor, Supplier, individual, or entity, Owner may, before the Notice of Award is given, request apparent Successful Bidder to submit an acceptable substitute, in which case apparent Successful Bidder shall submit a substitute, Bidder’s Bid price will be increased (or decreased) by the difference in cost occasioned by such substitution, and Owner may consider such price adjustment in evaluating Bids and making the Contract award.
12.04 If apparent Successful Bidder declines to make any such substitution, Owner may award the Contract to the next lowest Bidder that proposes to use acceptable Subcontractors, Suppliers, or other individuals or entities. Declining to make requested substitutions will constitute grounds for forfeiture of the Bid security of any Bidder. Any Subcontractor, Supplier, individual, or entity so listed and against which Owner or Engineer makes no written objection prior to the giving of the Notice of Award will be deemed acceptable to Owner and Engineer subject to subsequent revocation of such acceptance as provided in Paragraph 7.06 of the General Conditions.
12678282 00100-7 INSTRUCTIONS TO BIDDERS
ARTICLE 13 – PREPARATION OF BID
13.01 The Bid Form is included with the Bidding Documents.
A. All blanks on the Bid Form shall be completed in ink and the Bid Form signed in ink.
Erasures or alterations shall be initialed in ink by the person signing the Bid Form. A Bid price shall be indicated for each section, Bid item, alternate, adjustment unit price item, and unit price item listed therein. The individual submitting the electronic Bid must have the power and authority to enter the Bid on behalf of their company. In Pennsylvania, electronic signatures are legally binding. (PA Statute, Title 73, Chapter 41).
B. If the Bid Form expressly indicates that submitting pricing on a specific alternate item is optional, and Bidder elects to not furnish pricing for such optional alternate item, then Bidder may enter the words “No Bid” or “Not Applicable.”
13.02 A Bid by a corporation shall be executed in the corporate name by a corporate officer (whose title must appear under the signature), accompanied by evidence of authority to sign. The corporate address and state of incorporation shall be shown. The corporate seal shall be affixed and attested by the corporate secretary or an assistant corporate secretary. A Bid by a partnership shall be executed in the partnership name and signed by a partner (whose title must appear under the signature), accompanied by evidence of authority to sign. The official address of the partnership shall be shown. A Bid by a limited liability company shall be executed in the name of the firm by a member or other authorized person and accompanied by evidence of authority to sign. The state of formation of the firm and the official address of the firm shall be shown. A Bid by a joint venture shall be executed by an authorized representative of each joint venturer in the manner indicated on the Bid Form. The official address of the joint venture shall be shown.
13.03 The Bid shall contain evidence of Bidder’s authority and qualification to do business in the state where the Project is located, or Bidder shall covenant in writing to obtain such authority and qualification prior to award of the Contract and attach such covenant to the Bid. Bidder’s state contractor license number, if any, shall also be shown on the Bid Form.
ARTICLE 14 – BASIS OF BID
14.01 Unit Price
A. Bidders shall submit a Bid on a unit price basis for each item of Work listed in the unit price section of the Bid Form.
B. The “Bid Price” (sometimes referred to as the extended price) for each unit price Bid item will be the product of the “Estimated Quantity” (which Owner or its representative has set forth in the Bid Form) for the item and the corresponding “Bid Unit Price” offered by the Bidder. The total of all unit price Bid items will be the sum of these “Bid Prices”; such total will be used by Owner for Bid comparison purposes. The final quantities and Contract Price will be determined in accordance with Paragraph 13.03 of the General Conditions.
C. Discrepancies between the multiplication of units of Work and unit prices will be resolved in favor of the unit prices. Discrepancies between the indicated sum of any column of figures and the correct sum thereof will be resolved in favor of the correct sum.
ARTICLE 15 – SUBMITTAL OF BID
15.01 The “Bid” tab on PennBid contains the electronic Bid form. A Bid price must be indicated for each section, Bid item, alternative, adjustment unit price item, and unit price item listed therein. The PennBid Program will automatically calculate the extended price.
12678282 00100-8 INSTRUCTIONS TO BIDDERS
15.02 A Bid shall be received no later than the date and time prescribed and in the manner indicated in the advertisement or invitation to bid and shall be accompanied by the Bid security and other required documents.
15.03 Bids received after the date and time prescribed for the opening of bids, or not submitted at the correct location or in the designated manner, will not be accepted and will be returned to the Bidder unopened.
15.04 Contractors submitting online sealed Bids shall compete and submit the following documents electronically:
A. Bid (via PennBid).
B. Non-Collusion Affidavit, Document 00320.
C. Steel Products Procurement Affidavit, Document 00330.
D. Public Works Employment Verification Form, Document 00340.
E. Attach an electronic file containing their required Bid Security, Document 00435. (See Instructions to Bidders, Document 00100, Article 8-Bid Security).
F. Statement of Bidder’s Qualifications, Document 00451 (excluding financial statement for the most recent fiscal year).
G. Evidence of authority to do business in the state of the Project. (See Instructions to Bidders, Document 00100, Section 13.03.)
H. Answer questions in the Bidder’s Acknowledgements (via Pennbid).
When uploading a Bid Security or other document, the maximum individual file size is 20 MB.
15.05 Upon request by the Owner, the Bidder(s) will submit the below listed documents in original form and signature to the Owner within three (3) business days:
A. Original Bid Security (showing original seal and signature).
B. Non-Collusion Affidavit, Document 00320.
C. Steel Products Procurement Affidavit, Document 00330.
D. Public Works Employment Verification Form, Document 00340.
E. Statement of Bidder’s Qualifications, Document 00451 (excluding financial statement for the most recent fiscal year).
F. Finacial statement for the most recent fiscal year.
15.06 Bidders are to submit their Bid by the date and time provided in PennBid and the Advertisement.
15.07 To submit a Bid, Bidders must fill out the Bid Form, check the Verification Statement and click the Submit Bid button at the bottom of the Bid form page. When submitted properly, the Bidder will receive an acknowledgment appearing in the middle of the screen saying “Your Bid has been submitted”. The completed Bid form can be printed or saved to ExcelTM by clicking the icons in the middle of the Bid form page.
12678282 00100-9 INSTRUCTIONS TO BIDDERS
15.08 At no time before Bid Opening can anyone other than the preparer see an electronic Bid.
ARTICLE 16 – MODIFICATION AND WITHDRAWAL OF BID
16.01 The Bid can be withdrawn anytime up to Bid opening by clicking “Withdraw Bid”.
16.02 The Bid can be modified anytime up to Bid opening.
16.03 No Bid may be withdrawn for a period of sixty (60) calendar days with an additional sixty (60) calendar days if the project award is delayed by the required approval of another government agency, the sale of bonds, or award of a grant, after the actual date of the opening of Bids as provided for in 62 Pa.C.S. § 3911.
ARTICLE 17 – OPENING OF BIDS
17.01 Bids will be opened at the time and place indicated in the advertisement or invitation to bid and, unless obviously non-responsive, read aloud publicly. An abstract of the amounts of the base Bids and major alternates, if any, will be made available to Bidders after the opening of Bids.
ARTICLE 18 – BIDS TO REMAIN SUBJECT TO ACCEPTANCE
18.01 All Bids will remain subject to acceptance for the period of time stated in the Bid Form, but Owner may, in its sole discretion, release any Bid and return the Bid security prior to the end of this period.
ARTICLE 19 – EVALUATION OF BIDS AND AWARD OF CONTRACT
19.01 Owner reserves the right to reject any or all Bids, including without limitation, nonconforming, nonresponsive, unbalanced, or conditional Bids. Owner will reject the Bid of any Bidder that Owner finds, after reasonable inquiry and evaluation, to not be responsible. If Bidder purports to add terms or conditions to its Bid, takes exception to any provision of the Bidding Documents, or attempts to alter the contents of the Contract Documents for purposes of the Bid, then the Owner will reject the Bid as nonresponsive; provided that Owner also reserves the right to waive all defects, errors, omissions, irregularities, or informalities in a Bid or the Bid procedure.
19.02 If Owner awards the contract for the Work, such award shall be to the lowest responsible Bidder.
19.03 Evaluation of Bids
A. In evaluating Bids, Owner will consider whether or not the Bids comply with the prescribed requirements, and such alternates, unit prices, and other data, as may be requested in the Bid Form or prior to the Notice of Award.
B. For the determination of the apparent low Bidder when unit price bids are submitted, Bids will be compared on the basis of the total of the products of the estimated quantity of each item and unit price Bid for that item, together with any lump sum items.
19.04 In evaluating whether a Bidder is responsible, Owner will consider the qualifications of the Bidder and may consider the qualifications and experience of Subcontractors and Suppliers proposed for those portions of the Work for which the identity of Subcontractors and Suppliers must be submitted as provided in the Bidding Documents. The term “lowest responsible Bidder” as used herein shall mean the Bidder whose Bid is the lowest of those Bidders who possesses the skill, ability and integrity necessary to the faithful performance of the Work.
12678282 00100-10 INSTRUCTIONS TO BIDDERS
19.05 Owner may conduct such investigations as Owner deems necessary to establish the responsibility, qualifications, and financial ability of Bidders and any proposed Subcontractors or Suppliers.
ARTICLE 20 – BONDS AND INSURANCE
20.01 Article 6 of the General Conditions, as may be modified by the Supplementary Conditions, sets forth Owner’s requirements as to performance and payment bonds and insurance. When the Successful Bidder delivers the Agreement (executed by Successful Bidder) to Owner, it shall be accompanied by required bonds and insurance documentation.
ARTICLE 21 – SIGNING OF AGREEMENT
21.01 When Owner issues a Notice of Award to the Successful Bidder, it shall be accompanied by the unexecuted counterparts of the Agreement along with the other Contract Documents as identified in the Agreement. Within 15 days thereafter, Successful Bidder shall execute and deliver the required number of counterparts of the Agreement (and any bonds and insurance documentation required to be delivered by the Contract Documents) to Owner. Within ten days thereafter, Owner shall deliver one fully executed counterpart of the Agreement to Successful Bidder, together with printed and electronic copies of the Contract Documents as stated in Paragraph 2.02 of the General Conditions.
ARTICLE 22 – SALES AND USE TAXES
22.01 Owner is exempt from [PA] state sales and use taxes on materials and equipment to be incorporated in the Work. Said taxes shall not be included in the Bid. Refer to Paragraph SC-7.09 of the Supplementary Conditions for additional information.
ARTICLE 23 – WAGE RATES
23.01 Minimum wage rates as determined by the Commonwealth of Pennsylvania, Department of Labor and Industry, Prevailing Wage Division shall apply to this project. It is the responsibility of the Bidder, before the bid opening, to request, if necessary, any additional information on Minimum Wage Rates for those trades people who may be employed for the proposed work under this contract.
ARTICLE 24 – STEEL PRODUCTS PROCUREMENT
24.01 The successful Bidder agrees to comply with the provision of the Steel Products Procurement Act of March 3, 1978, as amended (73 P.S. § 1881 et seq.). Information regarding the Act’s requirements, including a list of exempt products, is available on the website of the Department of General Services at http://www.dgs.pa.gov/Business/Design-and-Construction/Steel-Products- Act-ExecmptionsPages/default.aspx.
▪ This document is a MODIFIED version of EJCDC® c-200, Copyright © 2013 by the National Society of Professional Engineers, American Society of Civil Engineers, and American Council of Engineering Companies, or is based in part on excerpts from EJCDC documents. Those portions of the text that originated in published EJCDC documents remain subject to the copyright.
12678282 00320-1 NON-COLLUSION AFFIDAVIT
DOCUMENT 00320 - NON-COLLUSION AFFIDAVIT
County of
I state that I am of (Title) (Name of Firm) and that I am authorized to make this affidavit on behalf of my firm and its owners, directors and officers. I am the person responsible in my firm for the price(s) and the amount(s) of this Bid.
I state that:
(1) The price(s) and amount(s) of this Bid have been arrived at independently and without consultation, communication or agreement with any other Contractor, Bidder or Potential Bidder.
(2) Neither the price(s) nor the amount(s) of this Bid, and neither the approximate price(s) nor approximate amount(s) of this Bid, have been disclosed to any other firm or person who is a Bidder or Potential Bidder, and they will not be disclosed before Bid Opening.
(3) No attempt has been made or will be made to induce any firm or person to refrain from
Bidding on this Contract, or to submit a Bid higher than this Bid, or to submit an intentionally high or noncompetitive bid or other form of complementary Bid.
(4) The Bid of my firm is made in good faith and not pursuant to any agreement or inducement from any firm or person to submit a complementary or other noncompetitive Bid.
(5) , its affiliates, subsidiaries, officers, directors and employees
(Name of Firm) are not currently under investigation by any governmental agency and have not in the last four (4) years been convicted or found liable for any act prohibited by State or Federal Law in any jurisdiction, involving conspiracy or collusion with respect to bidding on any public contract, except as follows (if applicable):
12678282 00320-2 NON-COLLUSION AFFIDAVIT
I state that understands and acknowledges that the (Name of Firm) above representations are material and important, and will be relied upon by the
Washington Township Municipal Authority in awarding the Contract(s) for which this
Bid is submitted. I understand and my firm understands that any misstatement in this affidavit shall be treated as fraudulent concealment from the Washington Township
Municipal Authority of the true facts relating to the submission of Bids for this
Contract.
Dated this day of , .
(Name of Firm)
By:
Title:
State of
County of being duly sworn, disposes and says that he/she is the of and that the answers to the foregoing questions and all statements therein contained are true and correct. Subscribed and sworn before me this day of .
(Notary Public)
My commission expires .
12678282 00330 - 1 PA STEEL PRODUCTS
DOCUMENT 00330 – AFFIDAVIT OF COMPLIANCE WITH PENNSYLVANIA STEEL PRODUCTS
PROCUREMENT ACT
State of ____________________________
County of ___________________________
I state that I am __________________ of ________________________________________ (Title) (Name of Firm)
_________________________________and that I am authorized to make this affidavit on behalf of my firm and its owners, directors and officers. I am the person responsible in my firm for the conditions of this Bid.
I state that:
(1) My firm shall comply with the provisions of the Act of March 3, 1978 (P.L. 6, No. 3) as amended, known as the “Steel Products Procurement Act” in response to the conditions set forth in the Contract Documents, for which this Bid is submitted.
(2) _______________________________________________ understands and acknowledges (Name of my Firm) above representations are material and important, and will be relied upon by the
Washington Township Municipal Authority in awarding the Contract(s) for which this Bid is submitted. I understand and my firm understands that any misstatement in this affidavit shall be treated as fraudulent concealment from the Washington Township Municipal Authority of the true facts relating to the submission of Bids for this Contract. I further understand, and my firm understands and agrees to indemnify and defend the Washington Township Municipal Authority and GHD against any and all claims, including paying in full, all costs, including attorney’s fees and engineering fees to defend any claim as a result of lack of compliance with the “Steel Products Procurement Act.”
Dated this_____________ day of_______________, _______.
(Name of Firm)
By: ______________________________
Officer Title: _______________________
12678282 00330 - 2 PA STEEL PRODUCTS
State of _________________________________
County of _______________________________
_______________________________________ being duly sworn, disposes and says that he/she is the _____________________of_____________________ and that the answers to the foregoing questions and all statements therein contained are true and correct.
Subscribed and sworn to before me this_________________ day of ________________, ______.
(Notary Public)
My commission expires _____________________________, _____.
Street Address 2
City State Zip Code
Doing Business As:
(if different from Legal Name)
Commonwealth of Pennsylvania Public Works Employment Verification Form
Complete and return the form to the contracting Public Body prior to the award of the contract.
Company Legal Name: ___________________________________________________________
Mailing Address: ______________________________________________________
Check one: Contractor Subcontractor
Contracting Public Body: _________________________________________________________
Contract/Project Number: ________________________________________________________
Project Description: _____________________________________________________________
Project Location: _______________________________________________________________
Date Enrolled in E-Verify (MM/DD/YYYY): ___________________________________________ As a contractor/subcontractor for the above referenced public works contract, I hereby affirm that as of today’s date, __________________________, our company is in compliance with the Public Works Employment Verification Act (‘the Act’) through utilization of the federal E-Verify Program (EVP) operated by the United States Department of Homeland Security. To the best of my/our knowledge, all employees hired are authorized to work in the United States.
It is also agreed to that all public works contractors/subcontractors will utilize the federal EVP to verify the employment eligibility of each new hire within five (5) business days of the employee start date throughout the duration of the public works contract. Documentation confirming the use of the federal EVP upon each new hire shall be maintained in the event of an investigation or audit.
I,____________________________________________, authorized representative of the company above, attest that the information contained in this verification form is true and correct and understand that the submission of false or misleading information in connection with the above verification shall be subject to sanctions provided by law.
Authorized Representative Signature Date of Signature
Printed Name: _________________________________________________________________
Phone Number: ______________________ Email: ____________________________________
Street Address 1
Document 00340 - Public Works Employment Verification Form
WTMA – ROUTE 16 WATER MAIN REPLACEMENT PROJECT PUBLIC WORKS
12678282 00340 – 1 EMPLOYMENT VERIFICATION FORM
12678282 00410-1 BID FORM
DOCUMENT 00410 – BID FORM
ROUTE 16 WATER MAIN REPLACEMENT PROJECT
ARTICLE 1 – BID RECIPIENT
1.01 This Bid is submitted to:
Washington Township Municipal Authority 11102 Buchanan Trail East Waynesboro, PA 17268
1.02 The undersigned Bidder proposes and agrees, if this Bid is accepted, to enter into an Agreement with Owner in the form included in the Bidding Documents to perform all Work as specified or indicated in the Bidding Documents for the prices and within the times indicated in this Bid and in accordance with the other terms and conditions of the Bidding Documents.
ARTICLE 2 – BIDDER’S ACKNOWLEDGEMENTS
2.01 Bidder accepts all of the terms and conditions of the Instructions to Bidders, including without limitation those dealing with the disposition of Bid security. This Bid will remain subject to acceptance for 60 days after the Bid opening, or for such longer period of time that Bidder may agree to in writing upon request of Owner.
ARTICLE 3 – BIDDER’S REPRESENTATIONS
3.01 In submitting this Bid, Bidder represents that:
A. Bidder has examined and carefully studied the Bidding Documents, and any data and reference items identified in the Bidding Documents, and hereby acknowledges receipt of the following Addenda:
Addendum No. Addendum, Date
B. Bidder has visited the Site, conducted a thorough, alert visual examination of the Site and adjacent areas, and become familiar with and satisfied itself as to the general, local, and Site conditions that may affect cost, progress, and performance of the Work.
C. Bidder is familiar with and has satisfied itself as to all Laws and Regulations that may affect cost, progress, and performance of the Work.
D. Bidder has carefully studied all: (1) reports of explorations and tests of subsurface conditions at or adjacent to the Site and all drawings of physical conditions relating to existing surface or subsurface structures at the Site that have been identified in the Supplementary Conditions, especially with respect to Technical Data in such reports and drawings, and (2) reports and drawings relating to Hazardous Environmental Conditions, 12678282 00410-2 BID FORM if any, at or adjacent to the Site that have been identified in the Supplementary Conditions, especially with respect to Technical Data in such reports and drawings.
E. Bidder has considered the information known to Bidder itself; information commonly known to contractors doing business in the locality of the Site; information and observations obtained from visits to the Site; the Bidding Documents; and any Site-related reports and drawings identified in the Bidding Documents, with respect to the effect of such information, observations, and documents on (1) the cost, progress, and performance of the Work; (2) the means, methods, techniques, sequences, and procedures of construction to be employed by Bidder; and (3) Bidder’s safety precautions and programs.
F. Bidder agrees, based on the information and observations referred to in the preceding paragraph, that no further examinations, investigations, explorations, tests, studies, or data are necessary for the determination of this Bid for performance of the Work at the price bid and within the times required, and in accordance with the other terms and conditions of the Bidding Documents.
G. Bidder is aware of the general nature of work to be performed by Owner and others at the Site that relates to the Work as indicated in the Bidding Documents.
H. Bidder has given Engineer written notice of all conflicts, errors, ambiguities, or discrepancies that Bidder has discovered in the Bidding Documents and confirms that the written resolution thereof by Engineer is acceptable to Bidder.
I. The Bidding Documents are generally sufficient to indicate and convey understanding of all terms and conditions for the performance and furnishing of the Work.
J. The submission of this Bid constitutes an incontrovertible representation by Bidder that Bidder has complied with every requirement of this Article, and that without exception the Bid and all prices in the Bid are premised upon performing and furnishing the Work required by the Bidding Documents.
ARTICLE 4 – BIDDER’S CERTIFICATION
4.01 Bidder certifies that:
A. This Bid is genuine and not made in the interest of or on behalf of any undisclosed individual or entity and is not submitted in conformity with any collusive agreement or rules of any group, association, organization, or corporation;
B. Bidder has not directly or indirectly induced or solicited any other Bidder to submit a false or sham Bid;
C. Bidder has not solicited or induced any individual or entity to refrain from bidding; and
D. Bidder has not engaged in corrupt, fraudulent, collusive, or coercive practices in competing for the Contract. For the purposes of this Paragraph 4.01.D:
1. “corrupt practice” means the offering, giving, receiving, or soliciting of any thing of value likely to influence the action of a public official in the bidding process;
2. “fraudulent practice” means an intentional misrepresentation of facts made (a) to influence the bidding process to the detriment of Owner, (b) to establish bid
12678282 00410-3 BID FORM
prices at artificial non-competitive levels, or (c) to deprive Owner of the benefits of free and open competition;
3. “collusive practice” means a scheme or arrangement between two or more Bidders, with or without the knowledge of Owner, a purpose of which is to establish bid prices at artificial, non-competitive levels; and
4. “coercive practice” means harming or threatening to harm, directly or indirectly, persons or their property to influence their participation in the bidding process or affect the e execution of the Contract.
ARTICLE 5 – BASIS OF BID
5.01 GENERAL
A. The total work to be performed under this contract shall be performed under the pay items listed hereinafter. Any equipment or materials called for in the Specifications or shown on the Drawings and necessary for a complete and satisfactory installation, but which are not specifically mentioned in this basis of payment section, shall be included in the appropriate pay item by the CONTRACTOR at no additional expense to the OWNER.
B. It shall be understood that all pay items shall include the costs to the CONTRACTOR for tools, labor, equipment, insurance, workman's compensation, licenses, permits (including street cut permits), taxes, general overhead and profit, transportation, temporary utilities, start-up and testing, and all other expenses incidental to or necessary for the prosecution of the work. It shall be further understood that all pay items shall include the costs for the loading, transporting, unloading, handling, storing and protecting of all furnished equipment and materials under the pay items. The contractor will be required to obtain a street cutting permit from the Township.
C. The cost of removing and/or relocating storm drainage facilities and related structures removed or relocated at the CONTRACTOR's own volition to facilitate construction, shall be borne by the CONTRACTOR.
D. The CONTRACTOR shall obtain such permits as may be required by local and other governmental agencies and pay the necessary fees and charges. Contractor will comply with all EPA and DEP regulations in regard to disposal of any and all materials.
E. In addition to the Federally recognized holidays the Contractor will not be allowed to work on the following days: the Friday after Thanksgiving.
F. The Contractor is responsible for maintaining and/or supporting any underground or above ground facilities, including any utility…