This is a Rate Schedule attachment (Attachment F) for RFP #1-26-5-10-8 issued by the Maryland Environmental Service (MES) for the Building Energy Performance Standards (BEPS) Technical Assistance Pilot Program. The rate schedule is a spreadsheet template that offerors must complete to submit their proposed labor costs for prime contractors, subcontractors, and MBE subcontractors. Offerors are required to populate the spreadsheet with company names, staff names, job titles, base hourly labor rates, overhead/fringe rates, and fixed fee percentages for each proposed team member. The template includes pre-generated formulas to calculate subtotals and fully billable rates, though offerors may add additional rows or columns as needed while ensuring formula accuracy.

The pricing structure includes several regulatory constraints: base hourly labor rates are capped at $75 per hour (unloaded), and fixed fee markups are capped at 10 percent. Offerors must provide both MPA (Maryland Port Administration) and non-MPA overhead/burden rates, with the standard MPA overhead ceiling rate not to exceed 130 percent, unless the firm has prior written approval from MDOT MPA or MDOT for a higher rate. The program has a 25 percent MBE subcontracting requirement, as indicated in the contract opportunity title. Offerors must delete the example data provided in the template before submission.

View the file

Other files

File Type Posted
1-1-26-3-21-8 Solicitation.pdf PDF
3-Sample of % Increase Rate Schedule- - Spreadsheet.xlsx XLSX spreadsheet

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

RATE SCHEDULERFP # 1-26-5-10-8
Directions: An example has been provided below in yellow to show how to fill out the spreadsheet. Formulas have been generated for the spreadsheet. Please delete the example before submitting. If not enough rows or columns are provided, the Offeror can add these. However, it is the responsiblity of the Offeror to ensure that all formulas are correct. 1) Under the "Company" Column, please fill out the company name under the appropriate heading of Prime, Subcontractor or MBE Subcontractor that you propose to use. 2) Under "Staff Name", enter the name of each staff person you are proposing to use from each company. 3) Under "Job Title", include the job title of the proposed staff member in the corresponding row. 4) Under "Base Rate", enter the staff's base hourly labor rate (unloaded). 5) Under "Overhead/Fringe Rate" and "Fixed Fee (Profit)", please fill in the corresponding % in the blue box. Please also see notes below.
Prime Company NameStaff NameJob Title/Labor ClassificationBase RateOverhead/Fringe RateSubtotalfixed fee (profit)Fully Billable Rate
X%X%
EXAMPLE: ABC CompanyJane DoeProject Manager$38.00ERROR:#VALUE!ERROR:#VALUE!ERROR:#VALUE!ERROR:#VALUE!
ERROR:#VALUE!ERROR:#VALUE!ERROR:#VALUE!ERROR:#VALUE!
ERROR:#VALUE!ERROR:#VALUE!ERROR:#VALUE!ERROR:#VALUE!
ERROR:#VALUE!ERROR:#VALUE!ERROR:#VALUE!ERROR:#VALUE!
ERROR:#VALUE!ERROR:#VALUE!ERROR:#VALUE!ERROR:#VALUE!
ERROR:#VALUE!ERROR:#VALUE!ERROR:#VALUE!ERROR:#VALUE!
ERROR:#VALUE!ERROR:#VALUE!ERROR:#VALUE!ERROR:#VALUE!
Subcontractor Company NameStaff NameJob Title/Labor ClassificationBase Rate $Overhead/Fringe RateSubtotalfixed fee (profit)Fully Billable Rate
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
MBE Subcontractor Company NameStaff NameJob Title/Labor ClassificationBase Rate $Overhead/Fringe RateSubtotalfixed fee (profit)Fully Billable Rate
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
MBE Subcontractor Company NameStaff NameJob Title/Labor ClassificationBase Rate $Overhead/Fringe RateSubtotalfixed fee (profit)Fully Billable Rate
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
MBE Subcontractor Company NameStaff NameJob Title/Labor ClassificationBase Rate $Overhead/Fringe RateSubtotalfixed fee (profit)Fully Billable Rate
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00

NOTE: Please provide both MPA and non-MPA overhead/burden rates. On projects where MPA is the MES' client, firms shall not exceed the standard MPA overhead ceiling rate of 130%. If the firm has evidence of a higher existing overhead rate previously approved by MDOT MPA or MDOT, the firm shall not exceed such a rate. Proof of approval must be provided if MES does not already have record of it. There is also a cap on the highest hourly labor rate of $75 per hour, unloaded, and a cap on the fixed fee of 10%.

&"-,Bold"ATTACHMENT F

File details come from the government source that posted it. Updated .