2-058110 Lehigh River Crossing Watermain Replacement.pdf
PDF 9 MB Posted
- Attached to
- Lehighton River Crossing Water Main Replacement
- Solicitation number
- Not on record
- Issued by
- Carbon County, Pennsylvania
About this file
Summary
This is a bid document set for the Lehigh River Crossing Watermain Replacement project by the Lehighton Water Authority, serving Lehighton and Weissport Boroughs in Carbon County, Pennsylvania. The project involves installation of approximately 375 linear feet of 12-inch ductile iron pipe (DIP) water main via open excavation and approximately 775 linear feet of 20-inch high-density polyethylene (HDPE) water main via horizontal directional drilling (HDD) across the Lehigh River. The work includes water main appurtenances, easement clearing, levee restoration and protection, and abandonment of existing 6-inch water main. The project site extends from Lehigh Drive in Lehighton Borough across the Lehigh River to Bridge Street in Weissport Borough, with the 12-inch DIP crossing a 65-linear-foot levee section. The bid documents include detailed drawing plans, profiles, erosion and sedimentation control specifications, details for pipe installation, valve connections, and trench requirements.
The bid documents contain comprehensive technical specifications and construction standards including typical trench details, reaction backing dimensions for fittings, pavement and levee restoration procedures, and erosion control measures. All work must comply with Pennsylvania Department of Environmental Protection regulations, particularly Chapter 102 erosion control requirements and Chapter 105 flood protection requirements. The contractor is required to notify the Pennsylvania One Call System at 1-800-242-1776 a minimum of three days prior to excavation and must provide PA DEP notification at least 15 days but not more than 30 days prior to construction commencement. Material excavated from levee work must be stockpiled separately and tested for Standard Proctor compaction before reuse, and all abandoned pipes through the levee must be removed or grouted completely. The documents indicate a July 2026 date on the cover sheets and reference survey work performed in April 2021 and June 2025, with known utility owners listed including Lehighton Borough Light and Power, UGI Utilities, and Pencor Services/Blue Ridge Communication.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 1-LWA-RiverCrossing Project Manual.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SITE
MECHANICSBURG, PENNSYLVANIA
JULY 2026
PROJECT NUMBER: 58110
LEHIGH RIVER CROSSING
WATERMAIN REPLACEMENT
LEHIGHTON WATER AUTHORITY
LEHIGHTON AND WEISSPORT BOROUGHS
CARBON COUNTY, PENNSYLVANIA
BID DOCUMENTS
DRAWING INDEX
DRAWING
NO.
SHEET
NUMBER SHEET NAME
GENERAL
G-01
COVER
CIVIL
C-01 12" AND 20" WATER MAIN PLAN AND PROFILE - STATION 0+00 TO 6+00
C-02
D ra w in g:
C
:\U se rs \a ke lls
\D C
\A C
C D oc s\
G
AN
N
ET
T
FL
EM
IN
G
IN
C \0
0- Le hi gh to n\
Pr oj ec t F ile s\
Sh ee ts \5
_C ov er _I nd ex
.d w g Pl ot te d:
J ul
0,
- 1 :4
3p m
G-00
GENERAL NOTES, LEGEND AND ABBREVIATIONS
12" AND 20" WATER MAIN PLAN AND PROFILE - STATION 6+00 TO 9+62
C-03 C-04
VICINITY MAP
SCALE: 1" = 2000'
40002000010002000
EROSION AND SEDIMENTATION CONTROL NOTES
EROSION AND SEDIMENTATION CONTROL DETAILSC-05
C-06
DETAILS AND BORING LOGS
REACTION BACKING AND MISCELLANEOUS DETAILS
G-02 KEY PLAN
BID DOCUMENTS
EROSION AND SEDIMENTATION CONTROL NOTESC-07
akells Image
SHEET No.JOB No.
DATE
DESIGNED
CHECKED
CADD
APPROVED
SCALE
GFT. ADVISES THAT IT HAS
COMPLIED WITH THE PROVISIONS OF THE PENNSYLVANIA UNDERGROUND
UTILITY LINE PROTECTION LAW, ACT 287 OF 1974 AS AMENDED, IN
PREPARING THESE PLANS. ALTHOUGH GFT MADE THE
TELEPHONE CALL(S) LISTED ON THESE PLANS ON THE DATE(S) SHOWN,
THE INFORMATION SHOWN MAY BE PRELIMINARY AS OF THE DATE OF
BIDDING. THE DATA PERTAINING TO UTILITIES SHOWN ON THE PLANS
IS FOR GENERAL INFORMATION AND GUIDANCE ONLY AND GFT
MAKES NO REPRESENTATIONS, WARRANTY, GUARANTY OR ASSURANCE
THAT THE INFORMATION RECEIVED PURSUANT TO SAID CALL(S) AND
REFLECTED ON THE PLANS IS COMPLETE, CORRECT OR ACCURATE, BUT
IS REFLECTING SAID INFORMATION IN ACCORDANCE WITH THE REQUIRE-
MENTS OF SUCH ACT AS OF THE DATE OF SAID CALL(S). THE AREAS IN
WHICH NEW UNDERGROUND FACILITIES AND APPURTENANCES ARE TO
BE CONSTRUCTED UNDER THIS CONTRACT MAY CONTAIN EXISTING
UNDERGROUND UTILITIES AND STRUCTURES THAT ARE NOT SHOWN ON
THE PLANS OR ARE IN THE LOCATIONS OTHER THAN AS SHOWN.
CONTRACTORS ARE ADVISED OF THEIR OBLIGATIONS TO NOTIFY ALL
FACILITY OWNERS, NOT LESS THAN 3 OR MORE THAN 10 DAYS PRIOR TO
EXCAVATION, VIA ONE CALL(S) IN ACCORDANCE WITH THE REQUIREMENTS
OF THE ACT [1-800-242-1776 OR 412-464-7100 (PITTSBURGH)], AND TO
PRECISELY IDENTIFY THE LOCATION OF, AVOID DAMAGE TO AND REPAIR
DAMAGED UNDERGROUND UTILITIES.
DATE BY
GFT
NOTICE
D ra w in g:
C
:\U se rs \a ke lls
\D C
\A C
C D oc s\
G
AN
N
ET
T
FL
EM
IN
G
IN
C \0
0- Le hi gh to n\
Pr oj ec t F ile s\
Sh ee ts \5
_G -0
1_ N ot es
.d w g Pl ot te d:
J ul
9,
- 1 1:
am
MECHANICSBURG, PENNSYLVANIA
LEHIGH RIVER CROSSING
LEHIGHTON WATER AUTHORITY
LEHIGHTON, PENNSYLVANIA 058110
JULY 2026
© GFT. 2023
APPROVED
REVISIONS
NO. DESCRIPTION DATE BY
THIS DRAWING IS AND SHALL REMAIN THE PROPERTY OF GFT. AND ANY MISUSE, REUSE,
ALTERATIONS, ADDITIONS, AND/OR DELETIONS OF THESE DRAWINGS ON PROJECT EXTENSIONS OR OTHER PROJECTS SHALL BE AT THE USER'S SOLE RISK AND WITHOUT LIABILITY TO GFT. IN THE EVENT THAT A CONFLICT ARISES BETWEEN THE SEALED DRAWINGS AND THE ELECTRONIC FILES, THE SEALED DRAWINGS WILL GOVERN.
7/2026 A. GLITZERONE CALL SYSTEM TELEPHONE NUMBER: 1-800-242-1776
PROJECT ONE CALL SERIAL NUMBER: 2026033809 & 20262033810
GENERAL NOTES:
1. ALL ELEVATIONS REFER TO U.S.G.S. DATUM UNLESS NOTED OTHERWISE.
2. HORIZONTAL CONTROL IS BASED UPON STATE PLANE COORDINATE SYSTEM.
3. INFORMATION SHOWN HEREIN IS BASED ON SURVEY PERFORMED BY GFT, INC., APRIL 2021 AND JUNE 2025.
4. IT IS ASSUMED THAT LOCATIONS OF PHYSICAL FEATURES, UTILITIES, ETC., FROM INVESTIGATIONS AND
FIELD SURVEYS, ARE APPROXIMATE AND THE NATURE OF MATERIALS IS NOT GUARANTEED.
5. THE CONTRACTOR SHALL BE REQUIRED TO VERIFY ALL CONDITIONS AND DIMENSIONS OF THE JOB SITE BEFORE PROCEEDING WITH THE WORK AND SHALL MAKE MINOR ADJUSTMENTS AS REQUIRED ON THE
JOB. SUCH ADJUSTMENTS ARE TO BE APPROVED BY THE ENGINEER AND THE OWNER.
6. LOCATION AND DEPTH OF EXISTING UTILITY LINES INCLUDING SERVICES SHALL BE VERIFIED BY THE CONTRACTOR IN ADVANCE OF THE WATER MAIN CONSTRUCTION. EXTREME CARE SHALL BE EXERCISED WHEN EXCAVATING EXISTING UTILITY LINES, HAND EXCAVATION ONLY WILL BE PERMITTED IN THE VICINITY OF EXISTING PIPES AND/OR CONDUITS. ANY DAMAGE TO UTILITIES SHALL BE REPAIRED BY
CONTRACTOR AT NO ADDITIONAL COST TO OWNER.
7. THE CONTRACTOR SHALL SUSTAIN IN THEIR PLACES AND PROTECT FROM DIRECT OR INDIRECT INJURY ALL PIPES, CONDUITS, UNDERGROUND TRAFFIC LOOPS, TRACKS, UTILITY POLES, GUIDE RAILS, GUARD POSTS, WALLS, FOUNDATIONS, BUILDINGS, AND OTHER STRUCTURES OR PROPERTY IN THE VICINITY OF HIS WORK, WHETHER ABOVE OR BELOW GROUND, OR THAT MAY APPEAR IN THE TRENCH. PIPES AND
UNDERGROUND CONDUITS EXPOSED AS A RESULT OF THE CONTRACTOR'S OPERATIONS SHALL BE
ADEQUATELY SUPPORTED ALONG THEIR ENTIRE EXPOSED LENGTHS.
8. THE CONTRACTOR SHALL VERIFY LOCATIONS OF PIPELINE, VALVES AND AIR VALVES WITH ENGINEER
PRIOR TO THEIR INSTALLATION.
9. IN ACCORDANCE WITH PROVISIONS OF ACT NO. 287/187 (AS AMENDED), THE CONTRACTOR SHALL NOTIFY EACH USER (AS DEFINED IN THE ACT) A MINIMUM OF THREE WORKING DAYS IN ADVANCE OF THE TIME HE
INTENDS TO BEGIN EXCAVATION OPERATIONS IN VICINITY OF THE USER'S LINES.
10. THE CONTRACTOR SHALL EXERCISE SPECIAL CARE WHEN WORKING IN RIGHT OF WAYS SO AS NOT TO DAMAGE TREES AND SHRUBS THAT ARE TO BE MAINTAINED. ALL SIGNS, MAILBOXES, FENCES, LAWNS, SHRUBS, HEDGES, TREES, OTHER LANDSCAPING, CURBS, DRIVEWAYS, ETC., DISTURBED DURING
CONSTRUCTION SHALL BE REPLACED IN KIND AT NO ADDITIONAL COST TO THE OWNER.
11. MAINTAIN MINIMUM 18" VERTICAL SEPARATION BETWEEN TRANSVERSE CROSSING OF WATER MAIN AND
SANITARY/STORM SEWER LINE.
12. ALL EROSION AND SEDIMENTATION CONTROL FACILITIES SHALL BE CONSTRUCTED AND MAINTAINED IN ACCORDANCE WITH THE PENNSYLVANIA "EROSION AND SEDIMENTATION POLLUTION CONTROL MANUAL"
AND THE EROSION AND SEDIMENTATION CONTROL PLAN(S) PREPARED FOR THIS PROJECT.
13. AT POINTS OF CONNECTION, CONTRACTOR SHALL EXPOSE EXISTING WATER MAINS TO VERIFY LOCATION, GEOMETRY, AND MATERIAL REQUIREMENTS PRIOR TO ORDERING MATERIALS OR STARTING
CONSTRUCTION OF ANY MAIN CONNECTING THERETO.
EXISTING LINE WORK
PROPOSED PIPE (4" DIA. AND LARGER)
STORM SEWER AND INLET
PROPOSED LINE WORK
PROPERTY LINE
TEMP. CONSTRUCTION EASEMENT LINE
GRADING SLOPE2:1
SLOPE DIRECTION
WV
WATER MAIN AND VALVE
SANITARY SEWER AND MANHOLES
W
STORM SEWER AND INLETSS
GAS MAIN AND VALVEG
GV
OVERHEAD ELECTRIC LINEOHE
UNDERGROUND ELECTRIC CABLEUGE
T
UNDERGROUND TELEPHONE CABLEUGT
OVERHEAD TELEPHONE LINE
MH
AIR LINEA
FENCEX
DITCH, STREAM OR SWALE
ONE FOOT CONTOUR INTERVAL
FIVE FOOT CONTOUR INTERVAL
BITUMINOUS ROAD SURFACE AND DRIVES
GRAVEL OR EARTH DRIVES
CONCRETE SIDEWALK OR RETAINING WALL
WOOD OR VEGETATION LINE
PROPERTY LINE
SANITARY FORCE MAINFM
WASTEWATER MAINWW
WETLANDS
CENTER LINE
PROPOSED PIPE (3" DIA. AND SMALLER)
RIGHT-OF-WAY LINE
RIGHT-OF-WAY LINE
TO BE ABANDONED
LIST OF KNOWN UTILITY OWNERS
CABLE TELEVISION LINEC
REINFORCED SILT FENCE - HEIGHT
STANDARD SILT FENCE - HEIGHT
SFR-30
PROTECTIVE FENCE
E&S LINE WORK
SUPER SILT FENCE - HEIGHT
SF-18
SSF-30
PF
REINFORCED PROTECTIVE FENCEPFR
LIMIT OF DISTURBANCELOD
RCE
IP
DC
ST
ROCK CONSTRUCTION ENTRANCE
INLET PROTECTION
SEDIMENT TRAP
TEMPORARY DIVERSION CHANNEL
ROCK FILTER
FILTER SOCK - HEIGHTFS-18
XxX SOIL TYPE DESIGNATION
EROSION CONTROL MATTING
SOIL TYPE BOUNDARY LINE ANY BORINGS, SOUNDINGS, TEST PITS, SUBSURFACE
CONDITIONS AND LOCATIONS OF AND NATURE OF EXISTING
UNDERGROUND STRUCTURES SHOWN OR INDICATED ON THESE
DRAWINGS ARE FOR THE INFORMATION OF THE OWNER AND IN
NO EVENT IS THIS INFORMATION TO BE CONSIDERED AS PART
OF THE CONTRACT. SEE PROJECT MANUAL.
STA STATION
TYP TYPICAL
SHT
NTS
PC
OD
MC
MIN
NA
FT
ID
OUTSIDE DIAMETER
SHEET
PLATE
PLUMBING CONTRACT
NOT TO SCALE
NOT APPLICABLE
MINIMUM
MECHANICAL CONTRACT
INSIDE DIAMETER
FOOT OR FEET
CMU
EL or ELEV
CLR
ELEVATION
CONCRETE MASONRY UNIT
CENTERLINE
CLEARANCE
EX EXISTING
SQ SQUARE
GENERAL ABBREVIATIONS
PL
SS
STL
PCCP
PVC
RCCP
FRP
GI
STEEL
STAINLESS STEEL
REINFORCED CONCRETE CYLINDER PIPE
POLYVINYL CHLORIDE PIPE
PRESTRESSED CONCRETE CYLINDER PIPE
GALVANIZED IRON
FIBERGLASS REINFORCED PLASTIC
CMP
CPVC
CU
AL
CI
COPPER
CORRUGATED METAL PIPE
CHLORINATED POLYVINYL CHLORIDE PIPE
CAST IRON
ALUMINUM
DI DUCTILE IRON
MATERIAL ABBREVIATIONS
DIP DUCTILE IRON PIPE
GLDIP GLASS LINED DUCTILE IRON PIPE
CIP CAST IRON PIPE
CISP CAST IRON SOIL PIPE
HDPE HIGH DENSITY POLYETHYLENE
PEX CROSS-LINKED POLYETHYLENE
ACP ASBESTOS CEMENT PIPE
INV INVERT
MAX MAXIMUM
DIA DIAMETER
W WATER
WW WASTEWATER
GC GENERAL CONTRACT
HES HIGH EARLY STRENGTH
WCB
WV
WS
UGT
W
ST
UGE
SWS
S
SD
WATER CURB BOX
UNDERGROUND TELEPHONE
WATER SERVICE
WATER VALVE
WATER
SHORT WATER SERVICE
UNDERGROUND ELECTRIC
SANITARY SEWER
STREET
STORM DRAIN
LA LANE
OE
PM
RTE
RD
OT
MH
NC
MAC
LWS
OVERHEAD ELECTRICAL
PIPELINE MARKER
OVERHEAD TELEPHONE
PROPERTY LINE
ROAD
ROUTE
LONG WATER SERVICE
NETWORK CABLE
MANHOLE
MACADAM
HWY
HYD
G
GV
GCB
D
DR
FH
CIR
CT
GAS CURB BOX
HYDRANT
HIGHWAY
GAS VALVE
GAS
FIRE HYDRANT
DRIVE
DRAIN
COURT
CIRCLE
BLVD
CB
AVE
BIT
BOULEVARD
CATCH BASIN
BITUMINOUS
AVENUE
CM CONCRETE MONUMENT
IP IRON PIN
PC POINT OF CURVE
PI POINT OF INTERSECTION
POB POINT OF BEGINNING
POE POINT OF ENDING
POL POINT ON LINE
PT POINT OF TANGENT
PVC POINT OF VERTICAL CURVE
POINT OF VERTICAL TANGENTPVT
SS STORM SEWER
CIVIL/SITE ABBREVIATIONS
CIVIL/SITE SYMBOLS
TELEPHONE OR ELECTRIC POLE
WATER CURB BOX
EXISTING WATER VALVE
VENT
SIGNAL
SIGN
LIGHT
EXISTING GAS CURB BOX
EXISTING GAS VALVE
CHECK VALVE
CATCH BASIN/INLET
BUTTERFLY VALVE AND VALVE BOX
HYDRANT
BORING
GATE VALVE AND VALVE BOX
CONTROL POINT
TREES, BUSHES AND SHRUBS
BENCH MARK
B-1 B.M.
AIR RELEASE MANHOLE
RJ RESTRAINED JOINT
MJ MECHANICAL JOINT
TEST PIT
MANHOLE
RW RAW WATER
WARG WEDGE ACTION RETAINING GLAND
RCP REINFORCED CONCRETE PIPE
1 1/2" MILL AND OVERLAY
TRV SURVEY TRAVERSE POINT
LINE COMPOSITION
CC CHEMICAL CONDUIT
EC ELECTRICAL CONTRACT
NEW FACILITIES SHOWN WITH HEAVIER AND
BOLDER LINE WORK AND CALLOUTS IN
VERTICAL TEXT
PROPOSED WORK SHOWN ON ADJOINING SHEET
EXISTING FACILITIES SHOWN WITH LIGHT LINE
WORK AND CALLOUTS IN ITALICIZED TEXT
SWL SOLID WHITE LINE
BWL BROKEN WHITE LINE
BYL BROKEN YELLOW LINE
DYL DOUBLE YELLOW LINE
SYL SOLID YELLOW LINE
VCP VITRIFIED CLAY PIPE
GENERAL NOTES, LEGEND
AND ABBREVIATIONS G-01
SAARG NONE
TAF
LEHIGHTON BOROUGH LIGHT AND POWER
675 BRIDGE ST
PO BOX 29
LEHIGHTON, PA 18235
CONTACT: BARRY FISHER
EMAIL: POWER@LEHIGHTONBOROUGH.ORG
PHONE: 484-629-4263
LEHIGHTON BOROUGH PUBLIC WORKS
74 EAST PENN ST
LEHIGHTON, PA 18235
CONTACT: KRIS KUNKLE
EMAIL: PUBLICWORKS@LEHIGHTONBOROUGH.ORG
PHONE: 610-377-4009
LEHIGHTON WATER AUTHORITY
1 CONSTITUTION AVE
PO BOX 29
LEHIGHTON, PA 18235
CONTACT: NICOLE NOTHSTEIN
EMAIL: LWAOFFICE@LEHIGHTONWATER.COM
PHONE: 610-377-1912 EXT. 213
PENCOR SERVICES/BLUE RIDGE COMMUNICATION
475 DELAWARE AVE
PALMERTON, PA 18071
CONTACT: JOE BUCCIERI
EMAIL: JBUCCIERI@BRCTV.COM
PHONE: 610-826-9504
UGI UTILITIES INC
1 UGI DRIVE
DENVER, PA 17517
CONTACT: ANALIZ RIVERA
EMAIL: ARIVERA1@UGI.COM
PHONE: 610-736-5970
C
OHE
UGE
G
W
S
FM
SS
EASEMENT LINE
AutoCAD SHX Text
TP
W
W
W
W
W
W
W
W
W
W
W
W
W W
W W
W W
W W
W W
W
W
W
W
W
W
W
W
W
W
W W W
W
W
W
W
W
W
W
W
W
W
OHE
OHE
OHE
OHE
S S
S S
460 465
S
S
S
S
S
S
S
S
0+
1+
2+00 3+00
4+00 5+00
6+00 7+00
8+00 9+00
10+00
11+00
11+66
12" 11.25° BEND
12" 22.5° BEND
12" 45° BEND
12" 45° BEND
0+
1+
2+00 3+00
4+00 5+00
6+00 7+00
8+00 9+00
10+00
11+00
11+66
0+
1+
2+00 3+00
4+00 5+00
6+00 7+00
8+00 9+00
10+00
11+00
11+66
0+
1+
2+00 3+00
4+00 5+00
6+00 7+00
8+00 9+00
10+00
11+00
11+66
LO
D
LOD
LOD
LO
D
LO
D
LOD
LOD
LOD
LOD
LOD
LOD
LO
D
LOD
LOD
LO
D LO
D
LOD
LO
D
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LO
D
LO
D
LO
D
SOIL BORING B-1
SEE SHEET C-03
SOIL BORING B-2
SEE SHEET C-03
SHEET No.JOB No.
DATE
DESIGNED
CHECKED
CADD
APPROVED
SCALE
D ra w in g:
C
:\U se rs \a ke lls
\D C
\A C
C D oc s\
G
AN
N
ET
T
FL
EM
IN
G
IN
C \0
0- Le hi gh to n\
Pr oj ec t F ile s\
Sh ee ts \5
_K ey
_P la n.
dw g Pl ot te d:
J ul
9,
- 1 1:
am
MECHANICSBURG, PENNSYLVANIA
LEHIGH RIVER CROSSING
LEHIGHTON WATER AUTHORITY
LEHIGHTON, PENNSYLVANIA 058110
JULY 2026
© GFT. 2023
APPROVED
REVISIONS
NO. DESCRIPTION DATE BY
THIS DRAWING IS AND SHALL REMAIN THE PROPERTY OF GFT. AND ANY MISUSE, REUSE,
ALTERATIONS, ADDITIONS, AND/OR DELETIONS OF THESE DRAWINGS ON PROJECT EXTENSIONS OR OTHER PROJECTS SHALL BE AT THE USER'S SOLE RISK AND WITHOUT LIABILITY TO GFT. IN THE EVENT THAT A CONFLICT ARISES BETWEEN THE SEALED DRAWINGS AND THE ELECTRONIC FILES, THE SEALED DRAWINGS WILL GOVERN.
KEY PLAN G-02
LKARG ASNOTED
TAF
N
KEY PLAN
SCALE: 1" = 40'
804002040
LE
H
IG
H
R
IV
ER
C-01 C-02
100-YEAR
FLO
O D
W
AY
100-YEAR FLOODPLAIN
POCONO WHITEWATER
70A12-29-V25B
GARY SCHOENBERGER
70A13-28-L32
TOM MCEVILLY
70B-62-A22
TOM MCEVILLY
70B-62-A22POCONO WHITEWATER
70A12-29-V25B
LEH
IG
H
TO
N
BO
R
O U
G H
W
EISSPO
R T
BO
R
O U
G H
LEHIGH DRIVE
BR
ID
G E
ST
R
EE
T
EXISTING MAIN WITHIN
20' OF RIVER BANK TO BE FILLED
WITH FLOWABLE FILL
AS PART OF ABANDONMENT
6" CAP (TYP)
6" CAP (TYP)
TEMPORARY
CONSTRUCTION
EASEMENT
TEMPORARY ACCESS RAMP
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W W
W W
W W
W W
W W
W
W
W
W
X
S
S
S
S
S
S
S
S
S
0+00
1+00
2+00
3+00
4+00
5+00
6+00775'-0"
0+00
1+00
2+00
3+00
4+00
5+00
6+00
0+00
1+00
2+00
3+00
4+00
5+00
6+00
0+00
1+00
2+00
3+00
4+00
5+00
6+00
FS-12
FS-12
FS-12
FS-12
FS
-1
FS
-1
SOIL BORING B-1
SEE SHEET C-03
LODLO
D
LOD
LOD
LOD
LO
D
LO
D
LO
D
LO
D
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LO
D
LOD
LOD
LOD
LO
D
LOD
LO
D
LOD
LO
D
TF W
W TF
0+00 1+00 2+00 3+00 4+00 5+00 6+00
1+
" 4
5° B
EN
D
(H O
R Z.
' 9
4' (T
YP
0-
YE
AR
F
LO
O D
PL
AN
ST
A:
2.
0-
YE
AR
F
LO
O D
W
AY
ST
A:
+5
6.
ED
G
E O
F R
IV
ER
ST
A:
+9
1.
ED
G
E O
F R
IV
ER
ST
A:
+9
7.
SHEET No.JOB No.
DATE
DESIGNED
CHECKED
CADD
APPROVED
SCALE
D ra w in g:
C
:\U se rs \a ke lls
\D C
\A C
C D oc s\
G
AN
N
ET
T
FL
EM
IN
G
IN
C \0
0- Le hi gh to n\
Pr oj ec t F ile s\
Sh ee ts \5
_W at er m ai n_
Pl an
_S he et s.
dw g
Pl ot te d:
J ul
9,
- 1
1:
am
MECHANICSBURG, PENNSYLVANIA
LEHIGH RIVER CROSSING
LEHIGHTON WATER AUTHORITY
LEHIGHTON, PENNSYLVANIA 058110
JULY 2026
© GFT. 2023
APPROVED
REVISIONS
NO. DESCRIPTION DATE BY
THIS DRAWING IS AND SHALL REMAIN THE PROPERTY OF GFT. AND ANY MISUSE, REUSE,
ALTERATIONS, ADDITIONS, AND/OR DELETIONS OF THESE DRAWINGS ON PROJECT EXTENSIONS OR OTHER PROJECTS SHALL BE AT THE USER'S SOLE RISK AND WITHOUT LIABILITY TO GFT. IN THE EVENT THAT A CONFLICT ARISES BETWEEN THE SEALED DRAWINGS AND THE ELECTRONIC FILES, THE SEALED DRAWINGS WILL GOVERN.
12" AND 20" WATER MAIN
PLAN AND PROFILE
STATION 0+00 TO 6+00
C-01
SAARG ASNOTED
TAF
N
PLAN
SCALE: 1" = 20'
402001020
LE
H
IG
H
R
IV
ER
TREE (TYP.)
EXISTING 6" WATER MAIN
(TO BE ABANDONED IN PLACE)
SCALE
010PROFILE
VERT. 1" = 10'
HORZ. 1" = 20'
201005
VERTICAL
HORIZONTAL
12" FILTER SOCK
PROPOSED 12" DIP
WATER MAIN
DEFLECT JOINTS
AS REQ'D. (TYP.)
EXISTING GRADE
100-YEAR
FLO
O D
W
AY
LEHIGH DRIVE
0-
YE
AR
F
LO
O D
W
AY
100-YEAR FLOODPLAIN
100-YEAR
FLO
O D
PLAIN
EXISTING 12" DIP
WATER MAIN
EXISTING 6" CI
WATER MAIN
12" TAPPING
SLEEVE
AND VALVE
APPROXIMATE WATER LEVEL
LEHIGH RIVER
' P
RO
PO
SE
D
PE
RM
AN
EN
T W
AT
ER
EA
SE
M
EN
T
20" DR9 HDPE DIRECTIONAL DRILL
PROPOSED 20" DR 9 HDPE
WATER MAIN BY
DIRECTIONAL DRILL
TRENCH PLUG
HDD LAUNCH PIT
DIP TO HDPE TRANSITION
COUPLING
HDD 12° ENTRY LAUNCH PIT
TRENCH PLUG
DIP TO HDPE TRANSITION COUPLING
TEMPORARY
CONSTRUCTION
EASEMENT
TEMPORARY
CONSTRUCTION
EASEMENT
POCONO WHITEWATER
70A12-29-V25B
GARY SCHOENBERGER
70A13-28-L32
TOM MCEVILLY
70B-62-A22
POCONO WHITEWATER
70A12-29-V25B
LE
H
IG
H
TO
N
BO
R
O U
G H
W
EI
SS
PO
R T
BO
R
O U
G H
CUT AND CAP
EXISTING 6"
WATERMAIN
TAPPING SLEEVE
VALVE 12" DIP
EXISTING EDGE OF GRAVEL
EXISTING 6" WATER MAIN
(TO BE ABANDONED)
EXISTING 15" SANITARY SEWER
BENDING RADIUS 1185 FT
20"X12" REDUCER
SEE FULL TEMPORARY CONSTRUCTION EASEMENT AREA ON SHEET G-02
HDD ENTRY LOCATION
ANGLE 12°
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W W W W
W W
W
W
W
W
W
W
W
W
W
W
W
W
W OHE
OHE
OHE
OHE
OHE
OHE
OHE
S S
S S
SS
S S
S S
460 465
6+00
7+00
8+00
9+00
10+00
11+00
11+66
12" 11.25° BEND
12" 22.5° BEND
12" 45° BEND
12" 45° BEND12"∅ MJ VALVE
6+00
7+00
8+00
9+00
10+00
11+00
11+66
6+00
7+00
8+00
9+00
10+00
11+00
11+66
6+00
7+00
8+00
9+00
10+00
11+00
11+66
FS-12
FS-12
FS-12
FS-12
FS-12
FS-12
FS-12
FS-12
LODLOD
LOD
LOD
LO
D
LOD
LOD
LO
D
LO
D
LOD
LO
D
LO
D LOD
LOD
LOD
LOD
LO
D
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LO
D
LOD
LOD
LOD
LOD
LOD
LOD
LOD
FS-12
FS-12
FS-12
FS-12
FS-12
FS-12
FS
-1
FS
-1
FS-12
FS-12
FS-12
FS-12
FS-12
FS-12
FS-12
FS-12
FS-12
FS-12
FS-12
FS-12
FS-12
FS-12
FS-12
FS-12
FS-12
FS-12
FS-12
Ra Tf
6+00 7+00 8+00 9+00 10+00 11+00 12+00
9+
" 1
1.
° B
EN
D (H
O R
Z.
+6
" 4 5°
B
EN
D (H
O R
Z.
12"∅ MJ VALVE
9+
" 2
2.
5°
B
EN
D (H
O R
Z.
+5
" 4 5°
B
EN
D (H
O R
Z.
)18
' 1 1" 4'
(T
YP
LE
VE
E
0-
YE
AR
F
LO
O
D
PL
AN
AN
D
-Y
EA
R
F
LO
O D
W
AY
ST
A:
0+
.8
SHEET No.JOB No.
DATE
DESIGNED
CHECKED
CADD
APPROVED
SCALE
D ra w in g:
C
:\U se rs \a ke lls
\D C
\A C
C D oc s\
G
AN
N
ET
T
FL
EM
IN
G
IN
C \0
0- Le hi gh to n\
Pr oj ec t F ile s\
Sh ee ts \5
_W at er m ai n_
Pl an
_S he et s.
dw g
Pl ot te d:
J ul
0,
- 9
:2 5a m
MECHANICSBURG, PENNSYLVANIA
LEHIGH RIVER CROSSING
LEHIGHTON WATER AUTHORITY
LEHIGHTON, PENNSYLVANIA 058110
JULY 2026
© GFT. 2023
APPROVED
REVISIONS
NO. DESCRIPTION DATE BY
THIS DRAWING IS AND SHALL REMAIN THE PROPERTY OF GFT. AND ANY MISUSE, REUSE,
ALTERATIONS, ADDITIONS, AND/OR DELETIONS OF THESE DRAWINGS ON PROJECT EXTENSIONS OR OTHER PROJECTS SHALL BE AT THE USER'S SOLE RISK AND WITHOUT LIABILITY TO GFT. IN THE EVENT THAT A CONFLICT ARISES BETWEEN THE SEALED DRAWINGS AND THE ELECTRONIC FILES, THE SEALED DRAWINGS WILL GOVERN.
12" AND 20" WATER MAIN
PLAN AND PROFILE
STATION 6+00 TO 11+65.87
C-02
SAARG ASNOTED
TAF
N
PLAN
SCALE: 1" = 20'
402001020
SCALE
PROFILE
VERT. 1" = 10'
HORZ. 1" = 20'
201005
VERTICAL
HORIZONTAL
PROPOSED 12" DIP
WATER MAIN
LEVEE
DEFLECT JOINTS
AS REQ'D. (TYP.)
EXISTING
CONCRETE
LEVEE
12" FILTER SOCK
EXISTING GRADE
GRAVEL
ROAD
GRAVEL ROAD
TOP OF LEVEE
100-YEAR FLOODPLAIN
100-YEAR FLOODW
AY
' P
R O
PO
SE
D
PE
R M
AN
EN
T W
AT
ER
EA
SE
M
EN
T
20" DR 9 HDPE
PROPOSED 20" DR9 HDPE
WATER MAIN
TRENCH PLUG
HDPE TO DIP TRANSITION COUPLING
BRIDGE ST ROW
' L
EV
EE
R /W
50' LEVEE R/W
TOM MCEVILLY
70B-62-A22
TOM MCEVILLY
70B-62-A22
HDPE TO DIP TRANSITION
COUPLING
NOTES:
1. PA DEP’S DIVISION OF PROJECT INSPECTION (DPI) MUST BE NOTIFIED AT LEAST 15 DAYS, BUT NOT MORE THAN 30 DAYS PRIOR TO COMMENCEMENT OF CONSTRUCTION. PLEASE CONTACT MATT BIXLER AT MABIXLER@PA.GOV OR BY
TELEPHONE AT 717.772.5907.
2. THE PERMITTEE WILL BE RESPONSIBLE FOR ANY DAMAGES TO THE LEVEE AND ASSOCIATED FLOOD PROTECTION PROJECT FEATURES DURING AND AFTER CONSTRUCTION OF THE PROJECT UNDER 25 PA. CODE §105.51.
3. PROVIDE COPIES OF AS-BUILT DRAWINGS TO THE DPI WHEN CONSTRUCTION IS COMPLETE.
4. ALL EXCAVATION WITHIN THE LEVEE MUST BE SLOPED AT THE PROPER OSHA REQUIREMENTS FOR THE TYPE OF SOIL.
THE USE OF SHORING OR SHIELDING IS NOT PERMITTED AS SEEPAGE PATHS COULD BE CREATED AT THE VERTICAL SEAM
WITHIN THE LEVEE.
5. NO AGGREGATE BACKFILL IS TO BE USED WITHIN THE LEVEE EMBANKMENT.
6. ALL ABANDONED PIPES THROUGH THE LEVEE MUST BE EITHER BE REMOVED OR COMPLETELY FILLED WITH GROUT FROM
WATERSIDE TO THE LANDSIDE.
7. MAX EXCAVATION THROUGH LEVEE, 30' WIDE CENTERED ON A NEW WATER MAIN.
8. LEVEE TO BE RESTORED TO PRECONSTRUCTION CONDITION.
9. CONTRACTOR SHALL COORDINATE WITH WEISSPORT BOROUGH REGARDING INSPECTION REQUIREMENTS DURING
CONSTRUCTION.
10.MATERIAL EXCAVATED FROM THE LEVEE SHALL BE STOCKPILED SEPARATELY FROM OTHER MATERIAL ON THE PROJECT
AND USED FOR LEVEE RECONSTRUCTION. STANDARD PROCTOR AND COMPACTION TESTING ARE REQUIRED FOR THE
REUSE OF THE LEVEE MATERIALS. TEST RESULTS SHALL BE PROVIDED TO PA DEP.
11.EXCEPT AS REQUIRED FOR THE WATERMAIN CROSSING OF THE LEVEE, NO EQUIPMENT OR MATERIALS MAY BE STORED OR STOCKPILED WITHIN 15 FEET OF THE LEVEE TOE, FLOODWALL, OR ANY OTHER FLOOD PROTECTION PROJECT
FEATURES WITHOUT PRIOR CONSENT FROM PA DEP.
12.UNDERGROUND UTILITY LINES OF ANY TYPE THAT CROSS THE LEVEE SHALL HAVE MARKERS PLACED ON THE SURFACE
TO INDICATE LOCATION, TYPE, AND USAGE OF THE LINE.
13.THE CONTRACTOR SHALL SUBMIT A FLOOD RESPONSE PLAN FOR USACE APPROVAL. SUBMIT A DETAILED PLAN FOR MANAGING FLOOD EVENTS, OUTLINING STEPS FOR SECURING THE EXCAVATION SITE IN THE EVENT OF RISING WATER OR FLOOD FORECASTS. INCLUDE MEASURES FOR STOCKPILING MATERIALS FOR EMERGENCY BACKFILLING, PROVIDING PUMPS FOR DEWATERING, ESTABLISHING NOTIFICATION PROCEDURES, AND ENSURING THAT ALL EQUIPMENT IS
SECURED OR REMOVED.
14.CONTRACTOR IS PROHIBITED FROM TAKING THE LEVEE DOWN DURING FREEZING CONDITIONS. RESTORATION OF THE
LEVEE CAN’T BE DONE WITH PARTIALLY FROZEN MATERIALS.
HDD EXIT PIT
HDD 9.9° EXIT PIT
TRENCH PLUG
CUT AND CAP
EXISTING 6"
WATERMAIN
TEST PIT TO
FIELD VERIFY
TIE IN POINT
TO EXISTING
12" DIP
EXIT BENDING RADIUS 1722 FT
20"X12" REDUCER
10' WIDE CONSTRUCTION
EASEMENT
ROCK
CONSTRUCTION
ENTRANCE
HDD EXIT LOCATION
ANGLE 9.9°
10' WIDE CONSTRUCTION
EASEMENT
TEMPORARY ACCESS RAMP TO BE BUILT
AT THE DISCRETION OF THE CONTRACTOR,
WITH FINAL APPROVAL OF DEP.
VARIABLE WIDTH
CONSTRUCTION EASEMENT
FI
LE
P
AT
H : C
:\U se rs \a ke lls
\D C
\A C
C D oc s\
G
AN
N
ET
T
FL
EM
IN
G
IN
C \0
0- Le hi gh to n\
Pr oj ec t F ile s\
Sh ee ts \5
-C
.d w g D
AT
E
SA
VE
D : 7
/2 9/
2:
P
M B
Y:
a ke lls
D
AT
E
PL
O
TT
ED
: 7 /2
9/
2:
P M
TRENCH NOTES:
1. IF UNSUITABLE SUBSOIL IS ENCOUNTERED AT THE NORMAL
TRENCH SUBGRADE, THE CONTRACTOR SHALL REMOVE IT TO THE
DEPTH DIRECTED BY THE ENGINEER IN THE FIELD, AND BACKFILL
w/ PA NO. 2A COURSE AGGREGATE MATERIAL IN 4" LAYERS.
2. BOTTOM OF TRENCH SHALL BE FREE OF WATER PRIOR TO
PLACING BEDDING.
3. IF VIBRATORY COMPACTION EQUIPMENT IS USED BACKFILL MAY
BE IN 8" LAYERS.
4. PROVIDE 4" OF TOPSOIL WHERE SEEDING IS REQUIRED.
5. CONTRACTOR SHALL SHORE THE TRENCH IN ACCORDANCE WITH
THE SPECIFICATIONS.
6. GRAVEL AND PAVED DRIVEWAYS TO BE RESTORED IN KIND WITH
MINIMUM REQUIREMENTS AS INDICATED ON THIS SHEET.
7. PERFORM BACKFILL COMPACTION TESTS AS INDICATED IN
PROJECT MANUAL.
TOPSOIL AND SEED,
WHERE REQ'D. 4" MIN.
SEE NOTE 4
APPROVED
BACKFILL
APPROVED
BACKFILL
1' -0
PA NO. 2A
COARSE
AGGREGATE
4' -0
" M
IN
. C O
VE
R
TA
M
P
IN
" L
AY
ER
S
SE
E N
O
TE
UNDISTURBED EARTH
OR ROCK SUBGRADE
** 4" IN EARTH, SEE NOTE 1
8" IN ROCK
TYPICAL TRENCH UNPAVED AREAS
NO SCALE
1'-0" PIPE O.D. 1'-0"
EXISTING
GRADE
*NOT FOR USE IN PENNDOT R/W
ADJUSTABLE CAST
IRON VALVE BOX
WITH COVER
PIPE BEDDING
MATERIAL
NEW PIPE
VALVE
(RIGHT/CLOCKWISE
TO OPEN)
℄ VALVE AND VALVE BOX
FINISH GRADE (FLUSH WITH TOP
OF COVER ON ADJUSTABLE CAST
IRON VALE BOX)
3' -6
" M
IN
6" MIN
(TYP)
6"
VALVE AND VALVE BOX
NO SCALE
GRAVEL DRIVEWAY
REPLACEMENT
NO SCALE
SEE TYPICAL
TRENCH DETAIL
PIPE TRENCH
UNDERGROUND
WARNING TAPE
SHEET No.JOB No.
DATE
DESIGNED
CHECKED
CADD
APPROVED
SCALE
D ra w in g:
C
:\U se rs \a ke lls
\D C
\A C
C D oc s\
G
AN
N
ET
T
FL
EM
IN
G
IN
C \0
0- Le hi gh to n\
Pr oj ec t F ile s\
Sh ee ts \5
-C
.d w g Pl ot te d:
J ul
9,
- 1 2:
pm
MECHANICSBURG, PENNSYLVANIA
LEHIGH RIVER CROSSING
LEHIGHTON WATER AUTHORITY
LEHIGHTON, PENNSYLVANIA 058110
JULY 2026
© GFT. 2023
APPROVED
REVISIONS
NO. DESCRIPTION DATE BY
THIS DRAWING IS AND SHALL REMAIN THE PROPERTY OF GFT. AND ANY MISUSE, REUSE,
ALTERATIONS, ADDITIONS, AND/OR DELETIONS OF THESE DRAWINGS ON PROJECT EXTENSIONS OR OTHER PROJECTS SHALL BE AT THE USER'S SOLE RISK AND WITHOUT LIABILITY TO GFT. IN THE EVENT THAT A CONFLICT ARISES BETWEEN THE SEALED DRAWINGS AND THE ELECTRONIC FILES, THE SEALED DRAWINGS WILL GOVERN.
ONE CALL SYSTEM TELEPHONE NUMBER: 1-800-242-1776
PROJECT ONE CALL SERIAL NUMBER: 2026033809 & 20262033810
EXISTING GRAVEL
DRIVEWAY
MIN. 5" PA NO. 2A
COURSE AGGREGATE
DETAILS AND BORING LOGS C-03
AS NOTEDARG
TAF
SA
TYPICAL TRENCH PAVED AREAS
PIPE OD
EXCAVATE TRENCH WIDTH
(SEE TABLE)
4' -0
" M
IN
C O
VE
R
PI
PE
ZO
N
E
1' -0
PI
PE
E M
BE
D
M
EN
T
6"
PA NO 2A
COURSE
AGGREGATE
EXISTING
PAVEMENT
PA NO 2A COURSE AGGREGATE
PIPE BEDDING
MATERIAL TO 1'
OVER PIPE
UNDISTURBED EARTH
OR ROCK SUBGRADE
SEE PAVEMENT
REPLACEMENT DETAILS
UNDERGROUND
WARNING TAPE
TEMPORARY PAVEMENT
REPLACEMENT
NO SCALE
TRENCH DETAIL
SEE TYPICAL
BOROUGH ROAD
PAVEMENT REPLACEMENT
NO SCALE
SAW CUT (TYP.)
PIPE TRENCH
TRENCH DETAIL
SEE TYPICAL
1'-0" 1'-0"
EXISTING
PAVEMENT
1 1/2 " ID-2
WEARING
COURSE
PAINT EDGE OF EXISTING PAVING w/ AE-T BITUMINOUS
TACK COAT BEFORE PAVING. AFTER PAVING SEAL
JOINT BETWEEN NEW NEW AND EXISTING PAVEMENT
w/ AC-20 ASPHALT CEMENT.
EXISTING BITUMINOUS
PAVEMENT OR CONCRETE
2"OF TYPE 2-P BITUMINOUS
STOCKPILE PATCHING
MATERIAL
6" 25mm WMA/HMA
BASE COURSE
LEVEE RESTORATION
NO SCALE
AutoCAD SHX Text
TOE OF LEVEE
AutoCAD SHX Text
SUBGRADE TO BE RESTORED TO PRECONSTRUCTION CONDITION
AutoCAD SHX Text
12" R-3 RIPRAP EMBEDDED IN SHOTCRETE. (SEE NOTE 10)
AutoCAD SHX Text 10.
AutoCAD SHX Text
PLACE R-3 RIPRAP ON PREPARED SUBGRADE AND ENCAPSULATE
AutoCAD SHX Text
STONES WITH SHOTCRETE TO FORM A MONOLITHIC
AutoCAD SHX Text
EROSION-RESISTANT FACING.
P
AT
H : C
:\U se rs \a ke lls
\D C
\A C
C D oc s\
G
AN
N
ET
T
FL
EM
IN
G
IN
C \0
0- Le hi gh to n\
Pr oj ec t F ile s\
Sh ee ts \5
-C
.d w g D
AT
E
SA
VE
D : 7
/2 8/
:1
PM
B Y:
a
E
PL
O
TT
ED
: 7
/2 9/
2:
P
M
1. UNCOVER EXISTING PIPE.
2. CUT 2'-0" SECTION FROM
MAIN IN CENTER OF
EXCAVATION.
3. CAP EXISTING MAIN.
4. PLACE NOMINAL 6x6 SOLID
CONCRETE BRICKS AS
SHOWN. WEDGE TIGHTLY
BETWEEN ENDS OF PIPES.
5. ENCASE IN CONCRETE TO AT
LEAST LIMITS SHOWN.
CONCRETE ENCASEMENT
OPPOSITE CAP MUST BEAR
ON UNDISTURBED EARTH.
1. CONCRETE ANCHOR BLOCK SHALL BE
INSTALLED A MIN. OF 7 DAYS PRIOR TO
INSTALLATION OF CONNECTION.
2. TIE RODS AND SOCKET CLAMPS SHALL BE
COATED w/ 2 COATS BITUMASTIC PAINT, AND WRAPPED WITH 8 MIL THICK
POLYETHYLENE. (TYP.)
3. SIZE AND NO. OF TIE RODS FOR 200 PSI
TEST PRESSURE
4"-8" = 3/4"Ø 1 PAIR
10"-12" = 1"Ø 1 PAIR
14"-16" = 1 1/4"Ø 2 PAIR
4. REFERENCE SPECIFICATION FOR FITTINGS
AND CONNECTION TO EXISTING MAIN.
1. REACTION BACKING DIMENSIONS HAVE BEEN CALCULATED
USING A SOIL BEARING CAPACITY OF 2000 POUNDS PER
SQUARE FOOT AND TEST PRESSURES AS INDICATED.
2. ALL FITTINGS SHALL BE MECHANICAL JOINT AND SHALL HAVE
WEDGE ACTION FOLLOWER GLANDS INSTALLED TO
MANUFACTURER'S SPECIFICATIONS.
3. ALL CONCRETE SHALL BE CLASS AA ACCELERATED.
90° BEND
CONCRETE
BLOCK
UNDISTURBED
EARTH
A
90° BEND 45° BEND
22 1/2° BEND 11 1/4° BEND
45° BEND
CONCRETE
BLOCK
UNDISTURBED
EARTH
C D
22 1/2° BEND
CONCRETE
BLOCK
UNDISTURBED
EARTH
11 1/4° BEND
CONCRETE
BLOCK UNDISTURBED
EARTH
ELEVATION SECTION
UNDISTURBED
EARTH
CONCRETE
BLOCK
M.J. FITTING
H G
BEDDING
DEPTH
+1'-0"
UNDISTURBED EARTH
OR ROCK SUBGRADE
UNDISTURBED EARTH
OR ROCK SUBGRADE
RESTRAINED PLUG
FOSTER ADAPTOR
(TYP.)
CONCRETE
BLOCK
SEE NOTE
GATE VALVE OR
BUTTERFLY VALVE
(TYP.)
E
E x
F
CONCRETE
BLOCK
PIPE
O.D.+6"
1 FULL
LENGTH
3 LAYERS OF ASPHALT
BUILDING PAPERNOTE:
TAPPING SLEEVE AND VALVE TO
HAVE SAME RETRAINT AS TEE
PLUG AND TEE
SECTION
UNDISTURBED
EARTH
F
F/
F/
TRENCH WIDTH
2 + 6"
FITTING
CONCRETE
BLOCK
REDUCER
#5@12
CONCRETE
BLOCK
UNDISTURBED
EARTH
1' -6
1'
-6
PLAN ELEVATION
REDUCER
CONCRETE
BLOCK
REDUCER
#5@12
1'-0"
PI
PE
O .D
UNDISTURBED
EARTH
PI
PE
O .D
HORIZONTAL REACTION BACKINGS
NO SCALE
ELEVATION SECTION
VERTICAL REACTION BACKINGS
NO SCALE
M.J. FITTING
#6@12
CONCRETE
BLOCK
#4 (TYP.)
I
J
#6@12
#4 (TYP.)
UNDISTURBED
EARTH
L M
K K
EXISTING
WATER MAIN
CLASS AA ACCELERATED CONCRETE
ANCHOR BLOCK, SEE NOTE 1
UNDISTURBED EARTH
OR ROCK SUBGRADE
CORTEN OR HIGH
STRENGTH F1554,
GR 55 STEEL TIE
ROD SEE NOTE 3
SPOOL PIECE
SEE NOTE 4
SOCKET CLAMP AND SOCKET
CLAMP WASHERS, FIG. 595 &
594 BY GRINNELL (TYP.)
EXISTING WATER
MAIN (TO BE
ABANDONED)
FITTING
SEE NOTE 4
1'-6"
#6@12#6@12
3"
10'-0"±
MIN.
COUPLING
SEE NOTE 4
REDUCER
(WHERE REQ'D.)
SEE NOTE 4
PLAN
2 O.D. O.D. + 2'-0" UNDISTURBED EARTH
OR ROCK SUBGRADE
CONCRETE
ANCHOR BLOCK
2' -0
1'
-0
SUBGRADE
SECTION
ANCHOR BLOCK ASSEMBLY DETAIL
NO SCALE
PLAN
B
TYPICAL
CONNECTION DETAIL
NO SCALE
NEW PIPE-BEGIN
w/ BELL END
INSTALLED OVER
PREPARED END
OF EXISTING PIPE
EXISTING
WATER
MAIN
CUT EXISTING
MAIN SQUARE
AND BEVEL END
E F G I K L M
1'-4"
J
2'-0" 2'-9" 9'-3" 4'-9" 2'-6" 1'-9" 1'-9"
6'-9" 3'-6" 1'-9" 1'-3" 1'-6" 1'-6" 4'-0" 2'-3" 1'-0" 3'-6" 1'-9" 0'-9"
H
2'-8" 2'-6" 1'-6"
1'-0" 1'-0"1'-0"
1'-3"2'-6"
122 2 1411 2221 41 2221 4111 11 A B C D
1'-0" 1'-0"
8" 6"
4'-3" 3'-6"
2'-6" 2'-0"
1'-3" 1'-0"
TABLE OF REACTION BACKING DIMENSIONS
2'-6" 3'-0"
4'-0" 2'-9" 1'-3"12'-0"6'-3" 3'-6" 1'-6" 2'-3" 2'-9"5'-0"3'-0" 4'-6" 2'-6" 1'-3"25012" 6'-3" 3'-6" 1'-4" 1'-0" 4'-6"
NOTES: PIPE
DIA.
TEST
PRESSURE
(PSI)
CUT AND PLUG DETAIL
NO SCALE
6"
PI
PE
D
IA
6"
6" 6"
CLASS AA ACCELERATED
CONCRETE BLOCK
PLUG OR COVER
END OF PIPE
NOTES:
NOTES:
SHEET No.JOB No.
DATE
DESIGNED
CHECKED
CADD
APPROVED
SCALE
THE RECORD DRAWING INFORMATION SHOWN ON THESE DRAWINGS HAS BEEN
OBTAINED FROM THE CONTRACTOR. NEITHER THE XXXXXXXXXXXXX MUNICIPAL
SEWAGE AUTHORITY NOR GFT. ASSUMES RESPONSIBILITY
FOR THE ACCURACY OF THE INFORMATION SHOWN.
D ra w in g:
C
:\U se rs \a ke lls
\D C
\A C
C D oc s\
G
AN
N
ET
T
FL
EM
IN
G
IN
C \0
0- Le hi gh to n\
Pr oj ec t F ile s\
Sh ee ts \5
-C
.d w g Pl ot te d:
J ul
9,
- 1 2:
pm
MECHANICSBURG, PENNSYLVANIA
LEHIGH RIVER CROSSING
LEHIGHTON WATER AUTHORITY
LEHIGHTON, PENNSYLVANIA 058110
JULY 2026
© GFT. 2023
APPROVED
REVISIONS
NO. DESCRIPTION DATE BY
THIS DRAWING IS AND SHALL REMAIN THE PROPERTY OF GFT. AND ANY MISUSE, REUSE,
ALTERATIONS, ADDITIONS, AND/OR DELETIONS OF THESE DRAWINGS ON PROJECT EXTENSIONS OR OTHER PROJECTS SHALL BE AT THE USER'S SOLE RISK AND WITHOUT LIABILITY TO GFT. IN THE EVENT THAT A CONFLICT ARISES BETWEEN THE SEALED DRAWINGS AND THE ELECTRONIC FILES, THE SEALED DRAWINGS WILL GOVERN.
ONE CALL SYSTEM TELEPHONE NUMBER: 1-800-242-1776
PROJECT ONE CALL SERIAL NUMBER: 2026033809 & 20262033810
REACTION BACKING AND
MISCELLANEOUS DETAILS C-04
AS NOTEDARG
TAF
SA
P
AT
H : C
:\U se rs \a ke lls
\D C
\A C
C D oc s\
G
AN
N
ET
T
FL
EM
IN
G
IN
C \0
0- Le hi gh to n\
Pr oj ec t F ile s\
Sh ee ts \5
-C
.d w g D
AT
E
SA
VE
D : 7
/2 8/
:1
PM
B Y:
a
E
PL
O
TT
ED
: 7
/2 9/
2:
P
M
SHEET No.JOB No.
DATE
DESIGNED
CHECKED
CADD
APPROVED
SCALE
D ra w in g:
C
:\U se rs \a ke lls
\D C
\A C
C D oc s\
G
AN
N
ET
T
FL
EM
IN
G
IN
C \0
0- Le hi gh to n\
Pr oj ec t F ile s\
Sh ee ts \5
-C
.d w g Pl ot te d:
J ul
9,
- 1 2:
pm
MECHANICSBURG, PENNSYLVANIA
LEHIGH RIVER CROSSING
LEHIGHTON WATER AUTHORITY
LEHIGHTON, PENNSYLVANIA 058110
JULY 2026
© GFT. 2023
APPROVED
REVISIONS
NO. DESCRIPTION DATE BY
THIS DRAWING IS AND SHALL REMAIN THE PROPERTY OF GFT. AND ANY MISUSE, REUSE,
ALTERATIONS, ADDITIONS, AND/OR DELETIONS OF THESE DRAWINGS ON PROJECT EXTENSIONS OR OTHER PROJECTS SHALL BE AT THE USER'S SOLE RISK AND WITHOUT LIABILITY TO GFT. IN THE EVENT THAT A CONFLICT ARISES BETWEEN THE SEALED DRAWINGS AND THE ELECTRONIC FILES, THE SEALED DRAWINGS WILL GOVERN.
ONE CALL SYSTEM TELEPHONE NUMBER: 1-800-242-1776
PROJECT ONE CALL SERIAL NUMBER: 2026033809 & 20262033810
PA DEP EROSION CONTROL MANUAL TABLE 13.1
MAXIMUM SPACING AND MATERIALS FOR TRENCH PLUGS
TRENCH SLOPE (%)
SPACING
L
(FT)
PLUG MATERIAL
< 5 1000 * CLAY, BENTONITE, OR CONCRETE FILLED SACKS
5 - 15 500 * CLAY, BENTONITE, OR CONCRETE FILLED SACKS
15 - 25 300 * CLAY, BENTONITE, OR CONCRETE FILLED SACKS
25 - 35 200 * CLAY, BENTONITE, OR CONCRETE FILLED SACKS
35 - 100 100 * CLAY, BENTONITE, OR CONCRETE FILLED SACKS
> 100 50 CEMENT BAGS (WETTED) OR MORTARED STONE
* TOPSOIL MAY NOT BE USED TO FILL SACKS
NOTES:
1. IMPERVIOUS TRENCH PLUGS ARE REQUIRED FOR
ALL STREAM, RIVER, WETLAND, OR OTHER WATER
BODY CROSSINGS.
STANDARD CONSTRUCTION DETAIL #13-4
TRENCH PLUG INSTALLATION
NO SCALE
FU
LL
T R
EN
C
H D
EP
TH
" M
IN
STANDARD
COMPACTED
BACKFILL
STACKED CLAY,
BENTONITE OR
CONCRETE-FILLED
SACKSSECTION VIEW
PROFILE VIEW
TRENCH PLUG
TRENCH BOTTOMPIPE INVERTPIPE BEDDING
CL CLTRENCH PLUG SPACING (L)
NO SCALE
STANDARD CONSTRUCTION DETAIL #3-1
ROCK CONSTRUCTION ENTRANCE
50' MIN.
FT.
EXISTING ROADWAY
EARTH FILL
PIPE AS NECESSARY
GEOTEXTILE
EXISTING
GROUND
MIN 8" AASHTO #1
MOUNTABLE
BERM (6 IN. MIN.)*
M
IN
M
IN
M
IN
EX
IS
TI
N
G R
O
AD
W
AY
PROFILE
PLAN VIEW
NOTES:
REMOVE TOPSOIL PRIOR TO INSTALLATION OF ROCK CONSTRUCTION ENTRANCE.
EXTEND ROCK OVER FULL WIDTH OF ENTRANCE.
RUNOFF SHALL BE DIVERTED FROM ROADWAY TO A SUITABLE SEDIMENT REMOVAL
BMP PRIOR TO ENTERING ROCK CONSTRUCTION ENTRANCE.
MOUNTABLE BERM SHALL BE INSTALLED WHEREVER OPTIONAL CULVERT PIPE IS
USED AND PROPER PIPE COVER AS SPECIFIED BY MANUFACTURER IS NOT
OTHERWISE PROVIDED. PIPE SHALL BE SIZED APPROPRIATELY FOR SIZE OF DITCH
BEING CROSSED.
MAINTENANCE: ROCK CONSTRUCTION ENTRANCE THICKNESS SHALL BE
CONSTANTLY MAINTAINED TO THE SPECIFIED DIMENSIONS BY ADDING ROCK. A
STOCKPILE SHALL BE MAINTAINED ON SITE FOR THIS PURPOSE. ALL SEDIMENT
DEPOSITED ON PAVED ROADWAYS SHALL BE REMOVED AND RETURNED TO THE
CONSTRUCTION SITE IMMEDIATELY. IF EXCESSIVE AMOUNTS OF SEDIMENT ARE
BEING DEPOSITED ON ROADWAY, EXTEND LENGTH OF ROCK CONSTRUCTION
ENTRANCE BY 50 FOOT INCREMENTS UNTIL CONDITION IS ALLEVIATED OR INSTALL
WASH RACK. WASHING THE ROADWAY OR SWEEPING THE DEPOSITS INTO ROADWAY
DITCHES, SEWERS, CULVERTS, OR OTHER DRAINAGE COURSES IS NOT ACCEPTABLE.
* MOUNTABLE BERM USED TO PROVIDE PROPER COVER FOR PIPE
NO SCALE
STANDARD CONSTRUCTION DETAIL #4-1
COMPOST FILTER SOCK
FL
OW
FLO
W
DISTURBED AREA
UNDISTURBED AREA
SECTION
PLAN VIEW
EXISTING
CONTOURS
COMPOST FILTER SOCK
2 IN. x 2 IN. WOODEN STAKES
PLACED 10 FT ON CENTER
2 IN. x 2 IN. WOODEN STAKES
PLACED 10 FT ON CENTER
COMPOST FILTER SOCK
BLOWN/PLACED
FILTER MEDIA
DISTURBED AREA
UNDISTURBED AREA
NOTES:
SOCK FABRIC SHALL MEET STANDARDS OF TABLE 4.1 OF THE PA DEP EROSION CONTROL MANUAL.
COMPOST SHALL MEET THE STANDARDS OF TABLE 4.2 OF THE PA DEP EROSION CONTROL MANUAL.
COMPOST FILTER SOCK SHALL BE PLACED AT EXISTING LEVEL GRADE. BOTH ENDS OF THE BARRIER SHALL BE EXTENDED AT LEAST 8 FEET UP SLOPE AT 45 DEGREES TO THE MAIN BARRIER ALIGNMENT.
MAXIMUM SLOPE LENGTH ABOVE ANY BARRIER SHALL NOT EXCEED THAT SPECIFIED FOR THE SIZE
OF THE SOCK AND THE SLOPE OF ITS TRIBUTARY AREA.
TRAFFIC SHALL NOT BE PERMITTED TO CROSS COMPOST FILTER SOCKS.
ACCUMULATED SEDIMENT SHALL BE REMOVED WHEN IT REACHES 1/2 THE ABOVE GROUND HEIGHT
OF THE BARRIER AND DISPOSED IN THE MANNER DESCRIBED ELSEWHERE IN THE PLAN.
COMPOST FILTER SOCKS SHALL BE INSPECTED WEEKLY AND AFTER EACH RUNOFF EVENT.
DAMAGED SOCKS SHALL BE REPAIRED ACCORDING TO MANUFACTURER’S SPECIFICATIONS OR
REPLACED WITHIN 24 HOURS OF INSPECTION.
BIODEGRADABLE COMPOST FILTER SOCKS SHALL BE REPLACED AFTER 6 MONTHS;
PHOTODEGRADABLE SOCKS AFTER 1 YEAR. POLYPROPYLENE SOCKS SHALL BE REPLACED
ACCORDING TO MANUFACTURER’S RECOMMENDATIONS.
UPON STABILIZATION OF THE AREA TRIBUTARY TO THE SOCK, STAKES SHALL BE REMOVED. THE SOCK MAY BE LEFT IN PLACE AND VEGETATED OR REMOVED. IN THE LATTER CASE, THE MESH SHALL
BE CUT OPEN AND THE MULCH SPREAD AS A SOIL SUPPLEMENT.
IN
M
IN
TABLE 4.2
COMPOST STANDARDS
ORGANIC MATTER CONTENT 25%-100% (DRY WEIGHT BASIS)
ORGANIC PORTION FIBROUS AND ELONGATED
pH 5.5-8.5
MOISTURE CONTENT 30%-60%
PARTICLE SIZE 30%-50% PASS THROUGH 3/8" SIEVE
SOLUBLE SALT CONCENTRATION 5.0 dS/m (MMHOS/CM) MAXIMUM
NOTES:
SEED AND SOIL AMENDMENTS SHALL BE APPLIED ACCORDING TO THE RATES IN THE PLAN
DRAWINGS PRIOR TO INSTALLING THE BLANKET.
PROVIDE ANCHOR TRENCH AT TOE OF SLOPE IN SIMILAR FASHION AS AT TOP OF SLOPE.
SLOPE SURFACE SHALL BE FREE OF ROCKS, CLODS, STICKS, AND GRASS.
BLANKET SHALL HAVE GOOD CONTINUOUS CONTACT WITH UNDERLYING SOIL THROUGHOUT ENTIRE LENGTH. LAY BLANKET LOOSELY AND STAKE OR STAPLE TO MAINTAIN DIRECT CONTACT WITH SOIL.
DO NOT STRETCH BLANKET.
THE BLANKET SHALL BE STAPLED IN ACCORDANCE WITH THE MANUFACTURER'S
RECOMMENDATIONS.
BLANKETED AREAS SHALL BE INSPECTED WEEKLY AND AFTER EACH RUNOFF EVENT UNTIL
PERENNIAL VEGETATION IS ESTABLISHED TO A MINIMUM UNIFORM 70% COVERAGE THROUGHOUT
THE BLANKETED AREA. DAMAGED OR DISPLACED BLANKETS SHALL BE RESTORED OR REPLACED
WITHIN 4 CALENDAR DAYS.
BLANKET EDGES
STAPLED AND
OVERLAPPED
(4 IN. MIN.)
INSTALL BEGINNING OF ROLL
IN 6 IN. x 6 IN. ANCHOR
TRENCH, STAPLE, BACKFILL
AND COMPACT SOIL
STARTING AT TOP OF
SLOPE, ROLL BLANKETS IN
DIRECTION OF WATER FLOW
PREPARE SEED BED
(INCLUDING APPLICATION OF LIME,
FERTILIZER AND SEED) PRIOR TO
BLANKET INSTALLATION
REFER TO MANUF. RECOMMENDED
STAPLING PATTERN FOR
STEEPNESS AND LENGTH OF
SLOPE BEING BLANKETED
THE BLANKET SHOULD
NOT BE STRETCHED;
IT MUST MAINTAIN
GOOD SOIL CONTACT
OVERLAP BLANKET ENDS 6 IN. MIN.
WITH THE UPSLOPE BLANKED
OVERLYING THE DOWNSLOPE BLANKET
(SHINGLE STYLE). STAPLE SECURELY.
STANDARD CONSTRUCTION DETAIL #11-1
EROSION CONTROL BLANKET INSTALLATION
NO SCALE
A MACHINE PRODUCED MAT OF ORGANIC, BIODEGRADABLE MULCH MATERIAL SUCH AS STRAW,
CURLED WOOD CELLULOSE, COCONUT FIBER, OR COMBINATIONS OF MATERIAL EVENLY
DISTRIBUTED AND ATTACHED ON ONE SIDE OF A PHOTODEGRADABLE POLYPROPYLENE MESH WITH
HIGH-STRENGTH THREADS. BLANKET CONFORMING TO THE FOLLOWING PHYSICAL PROPERTIES:
1. WEIGHT 8 OUNCES PER SQUARE YARD, MINIMUM
2. MAT THICKNESS APPROXIMATELY 0.125 INCH TO 0.6 INCH
EROSION CONTROL BLANKET
NO SCALE
STANDARD CONSTRUCTION DETAIL #3-16
PUMPED WATER FILTER BAG
FILTER BAG
WELL VEGETATED, GRASSY AREA
WELL VEGETATED, GRASSY AREA
FILTER BAG
INTAKE HOSE
PUMP
DISCHARGE HOSE
CLAMPS
CLAMPS
DISCHARGE HOSE
PUMP
INTAKE HOSE
HEAVY DUTY LIFTING STRAPS
(RECOMMENDED)PLAN VIEW
ELEVATION VIEWNOTES:
LOW VOLUME FILTER BAGS SHALL BE MADE FROM NON-WOVEN GEOTEXTILE MATERIAL SEWN WITH HIGH STRENGTH, DOUBLE STITCHED "J" TYPE SEAMS. THEY SHALL BE CAPABLE OF TRAPPING PARTICLES LARGER THAN 150 MICRONS. HIGH VOLUME FILTER BAGS SHALL BE MADE
FROM WOVEN GEOTEXTILES THAT MEET THE FOLLOWING STANDARDS:
A SUITABLE MEANS OF ACCESSING THE BAG WITH MACHINERY REQUIRED FOR DISPOSAL PURPOSES SHALL BE PROVIDED. FILTER BAGS SHALL BE REPLACED WHEN THEY BECOME 1/2 FULL OF SEDIMENT. SPARE BAGS SHALL BE KEPT AVAILABLE FOR REPLACEMENT OF THOSE THAT HAVE FAILED OR ARE FILLED. BAGS SHALL BE PLACED ON STRAPS TO FACILITATE REMOVAL UNLESS BAGS COME WITH LIFTING STRAPS
ALREADY ATTACHED.
BAGS SHALL BE LOCATED IN WELL-VEGETATED (GRASSY) AREA, AND DISCHARGE ONTO STABLE, EROSION RESISTANT AREAS. WHERE THIS IS NOT POSSIBLE, A GEOTEXTILE UNDERLAYMENT AND FLOW PATH SHALL BE PROVIDED. BAGS MAY BE PLACED ON FILTER STONE TO INCREASE DISCHARGE CAPACITY. BAGS SHALL NOT BE PLACED ON SLOPES GREATER THAN 5%. FOR SLOPES EXCEEDING 5%, CLEAN ROCK OR OTHER NON-ERODIBLE AND NON-POLLUTING MATERIAL MAY BE PLACED UNDER THE BAG TO REDUCE SLOPE STEEPNESS.
NO DOWNSLOPE SEDIMENT BARRIER IS REQUIRED FOR MOST INSTALLATIONS. COMPOST BERM OR COMPOST FILTER SOCK SHALL BE INSTALLED BELOW BAGS LOCATED IN HQ OR EV WATERSHEDS, WITHIN 50 FEET OF ANY RECEIVING SURFACE WATER OR WHERE GRASSY
AREA IS NOT AVAILABLE.
THE PUMP DISCHARGE HOSE SHALL BE INSERTED INTO THE BAGS IN THE MANNER SPECIFIED BY THE MANUFACTURER AND SECURELY
CLAMPED. A PIECE OF PVC PIPE IS RECOMMENDED FOR THIS PURPOSE.
THE PUMPING RATE SHALL BE NO GREATER THAN 750 GPM OR 1/2 THE MAXIMUM SPECIFIED BY THE MANUFACTURER, WHICHEVER IS LESS.
PUMP INTAKES SHALL BE FLOATING AND SCREENED.
FILTER BAGS SHALL BE INSPECTED DAILY. IF ANY PROBLEM IS DETECTED, PUMPING SHALL CEASE IMMEDIATELY AND NOT RESUME UNTIL
THE PROBLEM IS CORRECTED.
EROSION AND SEDIMENTATION
CONTROL DETAILS C-05
SAARG NONE
TAF
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
PROPERTY
AutoCAD SHX Text
TEST METHOD
AutoCAD SHX Text
MINIMUM STANDARD
AutoCAD SHX Text
AVG. WIDE WIDTH STRENGTH
AutoCAD SHX Text
ASTM D-4884
AutoCAD SHX Text
60 LB/IN
AutoCAD SHX Text
GRAB TENSILE
AutoCAD SHX Text
ASTM D-4632
AutoCAD SHX Text
205 LB
AutoCAD SHX Text
PUNCTURE
AutoCAD SHX Text
ASTM D-4833
AutoCAD SHX Text
110 LB
AutoCAD SHX Text
MULLEN BURST
AutoCAD SHX Text
ASTM D-3786
AutoCAD SHX Text
350 PSI
AutoCAD SHX Text
UV RESISTANCE
AutoCAD SHX Text
ASTM D-4355
AutoCAD SHX Text 70%
AutoCAD SHX Text
AOS % RETAINED
AutoCAD SHX Text
ASTM D-4751
AutoCAD SHX Text
80 SIEVE
P
AT
H : C
:\U se rs \a ke lls
\D C
\A C
C D oc s\
G
AN
N
ET
T
FL
EM
IN
G
IN
C \0
0- Le hi gh to n\
Pr oj ec t F ile s\
Sh ee ts \5
-C
.d w g D
AT
E
SA
VE
D : 7
/2 8/
:1
PM
B Y:
a
E
PL
O
TT
ED
: 7
/2 9/
2:
P
M
1. EROSION AND SEDIMENTATION CONTROL MUST BE CONSTRUCTED, STABILIZED, AND FUNCTIONAL BEFORE SITE
DISTURBANCE WITHIN THE TRIBUTARY AREAS OF THESE CONTROLS.
2. ALL EXCAVATION FOR UTILITY LINE INSTALLATION SHALL BE LIMITED TO THE AMOUNT THAT CAN BE EXCAVATED, INSTALLED, BACKFILLED AND STABILIZED WITHIN ONE WORKING DAY. ALL EXCAVATED MATERIAL SHALL BE DEPOSITED ON
THE UPSLOPE SIDE OF THE TRENCH.
3. ANY DISTURBED AREAS NOT SUBJECT TO CONSTRUCTION TRAFFIC, WILL IMMEDIATELY RECEIVE A TEMPORARY SEEDING AND MULCHING. IF THE SEASON PREVENTS THE ESTABLISHMENT OF A TEMPORARY COVER, THE DISTURBED AREAS WILL
BE MULCHED WITH STRAW OR EQUIVALENT MATERIAL, AT A RATE OF 3 TONS PER ACRE.
4. IMMEDIATELY FOLLOWING INITIAL DISTURBANCE OR ROUGH GRADING, ALL CRITICAL AREAS SUBJECT TO EROSION (I.E.
STEEP SLOPES AND ROADWAY EMBANKMENTS) WILL RECEIVE A TEMPORARY SEEDING IN COMBINATION WITH STRAW MULCH OR SUITABLE EQUIVALENT, AT A RATE OF 3 TONS PER ACRE. ON SLOPES 3:1 OR STEEPER, TEMPORARY SEEDING
SHALL BE STABILIZED WITH EROSION CONTROL BLANKETS.
5. PERMANENT VEGETATION TO BE SEEDED OR SODDED ON ALL EXPOSED AREAS IMMEDIATELY AFTER FINAL GRADING.
MULCH TO BE USED AT RATE OF 3 TONS PER ACRE FOR PROTECTION UNTIL SEEDING IS ESTABLISHED. EROSION CONTROL
BLANKETS WILL BE USED ON ALL SLOPES 3:1 OR STEEPER AND WITHIN DRAIN CHANNEL.
6. UPON COMPLETION OF AN EARTH DISTURBANCE ACTIVITY OR ANY STAGE OR PHASE OF AN ACTIVITY, THE OPERATOR SHALL STABILIZE IMMEDIATELY THE DISTURBED AREAS TO PROTECT FROM ACCELERATED EROSION. DURING NON-GERMINATING PERIODS, MULCH MUST BE APPLIED AT THE SPECIFIED RATES. DISTURBED AREAS WHICH ARE NOT AT FINISHED GRADE AND WHICH WILL BE REDISTURBED WITHIN 1 YEAR, MAY BE STABILIZED IN ACCORDANCE WITH TEMPORARY SEEDING SPECIFICATIONS. DISTURBED AREAS, WHICH ARE EITHER AT FINISHED GRADE OR WILL NOT BE REDISTURBED WITHIN ONE YEAR, MUST BE STABILIZED IN ACCORDANCE WITH PERMANENT SEEDING SPECIFICATIONS.
7. TEMPORARY AND PERMANENT SEEDING RATES WILL BE AS FOLLOWS:
TEMPORARY SPECIES: ANNUAL RYEGRASS
APPLICATION RATE: 10 LBS/1,000 SY
FERTILIZER TYPE: 10-20-20
FERTILIZER APPL. RATE: 140 LBS/1,000 SY
LIMING RATE: 1 TON PER ACRE
SEEDING DATES: MARCH 15 TO OCTOBER 15
NOTE:
TEMPORARY SOIL STABILIZATION BEYOND THE SEEDING DATES WILL BE WITH STRAW MULCH OR SUITABLE EQUIVALENT AS
REFERENCED IN NOTES 3 AND 4.
PERMANENT SPECIES: (SEEDING DATES, MARCH 1 TO JUNE 1 & AUGUST 1 TO OCTOBER 1)
LAWN AREA (MIXTURE NO. 1)
SPECIES IN MIX MIX % BY WEIGHT MIN. % PURITY GERMINATION MAX. %
WEED SEED
RED FESCUE CHEWINGS 30 95 85 0.50
KENTUCKY BLUEGRASS 50 85 80 0.40
RED TOP 3 90 90 0.75
PERENNIAL RYE GRASS 17 90 90 0.50
STEEP SLOPES (MIXTURE NO. 2) (3:1 OR STEEPER)
ANNUAL RYE 100 95 90 0.15
MULCH:
ANY THRESHED GRAIN OR TALL HAY GRASS STALKS FREE OF SEED BEARING STALKS, WEEDS OR ROOTS HARMFUL
TO LAWN GROWTH.
EROSION CONTROL BLANKET:
ASOIL COVERING MADE FROM STRAW, COIR, EXCELSIOR, OR SYNTHETIC MATERIAL EITHER ROLLED ON OR SPRAYED ON USED TO MINIMIZE THE POTENTIAL FOR EROSION OF AN EXPOSED SOIL UNTIL A SUITABLE VEGETATIVE COVER CAN BE
ESTABLISHED.
HYDROSEEDING:
SEEDING AND SOIL SUPPLEMENT MAY BE PERFORMED BY HYDROSEEDING (SLURRY) APPLICATIONS. ALL APPLICATIONS MUST HAVE A MULCH BINDER. HYDROSEEDING SHALL BE PERFORMED BETWEEN MARCH 1 TO JUNE 1 & AUGUST 1
TO OCTOBER 1.
APPLICATION RATE:
LAWN AREA - 45 LBS. PER 1000 SQ. YD. AREA; STEEP SLOPES - 9 LBS. PER 1000 SQ. YD. AREA.
FERTILIZER TYPE:
FERTILIZER APPL. RATE: 140LBS/1000 SY
FERTILIZER TYPE: 10-20-20
LIMING RATE:
4 TONS PER ACRE
8. A ROCK CONSTRUCTION ENTRANCE OF AASHTO #1 CLEAN STONE WILL BE PLACED AT CONSTRUCTION ENTRANCES.
ENTRANCES SHALL BE 50 FT. MINIMUM IN LENGTH AND 20 FT. IN WIDTH. FILTER CLOTH IS REQUIRED PRIOR TO STONE
PLACEMENT.
9. ANY CHANGES TO THE EROSION AND SEDIMENT CONTROL PLAN MUST MEET ALL CURRENT STATE EROSION AND SEDIMENT
POLLUTION CONTROL REQUIREMENTS AS WELL AS DISTRICT REQUIREMENTS.
10. THE CONTRACTOR SHALL COMPLY WITH CHAPTER 105 (DAM SAFETY AND WATERWAYS), ALL GP-5 PERMIT CONDITIONS, AND
COMPLETE ALL WORK IN ACCORDANCE WITH CHAPTER 102 (EROSION CONTROL REQUIREMENTS).
11. THE COUNTY CONSERVATION DISTRICT SHALL BE NOTIFIED 72 HOURS IN ADVANCE OF BEGINNING LAND
DISTURBANCE ACTIVITIES.
12. PUMPED WATER FILTER BAG SEDIMENT TRAP WILL BE USED AS REQUIRED FOR THE DEWATERING OF
EXCAVATIONS.
13. INSTALL FILTER SOCK BARRIERS ON THE DOWNSLOPE SIDE OF ALL STOCK PILES AND WHERE SHOWN ON
THE DRAWINGS.
14. THE CONTRACTOR SHALL BE RESPONSIBLE FOR REMOVAL OF ANY EXCESS MATERIAL AND MAKE SURE SITE(S) RECEIVING THE EXCESS MATERIAL HAS AN APPROVED EROSION CONTROL PLAN THAT MEETS THE
CONDITION OF CHAPTER 102 AND/OR OTHER STATE AND FEDERAL REGULATIONS.
15. UNTIL THE SITE HAS ACHIEVED FINAL STABILIZATION THE CONTRACTOR SHALL PROPERLY IMPLEMENT, OPERATE AND MAINTAIN ALL THE BEST MANAGEMENT PRACTICES. MAINTENANCE SHALL INCLUDE INSPECTIONS OF ALL EROSION AND SEDIMENTATION CONTROL AFTER EACH RUNOFF EVENT AND ON A WEEKLY BASIS. ALL PREVENTATIVE AND REMEDIAL MAINTENANCE WORK, INCLUDING CLEAN OUT, REPAIR, REPLACEMENT, REGRADING, RESEEDING, REMULCHING, AND RENETTING, MUST BE PERFORMED
IMMEDIATELY.
16. AFTER FINAL SITE STABILIZATION HAS BEEN ACHIEVED, TEMPORARY EROSION AND SEDIMENTATION
CONTROLS MUST BE REMOVED. AREAS DISTURBED DURING REMOVAL OF THE CONTROLS MUST BE
STABILIZED IMMEDIATELY.
17. AT THE END OF EACH WORKING DAY, ANY SEDIMENT TRACKED OR CONVEYED ONTO A PUBLIC ROADWAY WILL BE REMOVED AND REDEPOSITED ONTO THE CONSTRUCTION SITE. REMOVAL CAN BE COMPLETED THROUGH USE OF MECHANICAL OR HAND TOOLS, BUT MUST NEVER BE WASHED OFF THE ROAD BY USE
OF WATER.
18. SEDIMENT REMOVED FROM E&SPC CONTROLS AND FACILITIES SHALL BE DISPOSED OF IN LANDSCAPED AREAS OUTSIDE OF STEEP SLOPES, WETLANDS, FLOOD PLAINS OR DRAINAGE SWALES AND IMMEDIATELY
STABILIZED OR PLACED IN TOPSOIL STOCKPILES.
19. SHOULD UNFORESEEN EROSION CONDITIONS DEVELOP DURING CONSTRUCTION, THE CONTRACTOR
SHALL TAKE ACTION TO REMEDY SUCH CONDITIONS AND TO PREVENT DAMAGE TO ADJACENT
PROPERTIES AS A RESULT OF INCREASED RUNOFF AND/OR SEDIMENT DISPLACEMENT. STOCKPILES OF WOOD CHIPS, HAY BALES, CRUSHED STONE AND OTHER MULCHES SHALL BE HELD IN READINESS TO DEAL
IMMEDIATELY WITH EMERGENCY PROBLEMS OF EROSION.
20. THE CONTRACTOR IS ADVISED TO BECOME THOROUGHLY FAMILIAR WITH THE PROVISIONS, EROSION CONTROL RULES AND REGULATIONS, TITLE 25, PART 1, DEPARTMENT OF ENVIRONMENTAL PROTECTION, SUBPART C, PROTECTION OF NATURAL RESOURCES, ARTICLE , WATER RESOURCES, CHAPTER 102, EROSION CONTROL.
21. A COPY OF THIS EROSION AND SEDIMENTATION CONTROL REPORT AND PLANS MUST BE POSTED AT THE
CONSTRUCTION SITE.
22. STORMWATER INLETS, WHICH DO NOT DISCHARGE TO SEDIMENT TRAPS OR BASINS, MUST BE PROTECTED
UNTIL THE TRIBUTARY AREAS ARE STABILIZED.
23. SEDIMENT MUST BE REMOVED FROM INLET PROTECTION AFTER EACH STORM EVENT.
24. STOCKPILE HEIGHTS MUST NOT EXCEED 35'. STOCKPILE SLOPES MUST BE 2:1 OR FLATTER.
25. DIVERSION CHANNELS, SEDIMENTATION BASINS, SEDIMENT TRAPS, AND STOCKPILES MUST BE STABILIZED
IMMEDIATELY.
26. HAY AND STRAW MULCH MUST BE APPLIED AT RATES OF AT LEAST 3.0 TONS PER ACRE.
27. AN AREA SHALL BE CONSIDERED TO HAVE ACHIEVED FINAL STABILIZATION WHEN IT HAS A MINIMUM OF 70% UNIFORM PERENNIAL VEGETATIVE COVER OR OTHER PERMANENT NON-VEGETATIVE COVER WITH A DENSITY SUFFICIENT TO RESIST ACCELERATED SURFACE EROSION AND SUBSURFACE CHARACTERISTICS
SUFFICIENT TO RESIST SLIDING OR OTHER MOVEMENTS.
28. ALL EARTH DISTURBANCE ACTIVITIES SHALL PROCEED IN ACCORDANCE WITH THE FOLLOWING SEQUENCE. EACH STAGE SHALL BE COMPLETED IN COMPLIANCE WITH CHAPTER 102 REGULATIONS BEFORE ANY FOLLOWING STAGE IS INITIATED. CLEARING AND GRUBBING SHALL BE LIMITED ONLY TO
THOSE AREAS DESCRIBED IN EACH STAGE.
29. AT LEAST 7 DAYS BEFORE STARTING ANY EARTH DISTURBANCE ACTIVITIES, THE OPERATOR SHALL INVITE ALL CONTRACTORS INVOLVED IN THOSE ACTIVITIES, THE LANDOWNER, ALL APPROPRIATE MUNICIPAL OFFICIALS, THE EROSION AND SEDIMENTATION CONTROL PLAN PREPARER, AND A REPRESENTATIVE OF THE COUNTY CONSERVATION DISTRICT TO SCHEDULE AN ON-SITE PRE-CONSTRUCTION MEETING. ALSO, AT LEAST 3 DAYS BEFORE STARTING ANY EARTH DISTURBANCE ACTIVITIES, ALL CONTRACTORS INVOLVED IN THOSE ACTIVITIES SHALL NOTIFY THE PENNSYLVANIA ONE CALL SYSTEM INC. AT 1-800-242-1776 FOR
BURIED UTILITIES LOCATION.
30. BEFORE IMPLEMENTING ANY REVISIONS TO THE EROSION AND SEDIMENT CONTROL PLAN OR REVISIONS TO OTHER PLANS WHICH MAY AFFECT THE EFFECTIVENESS OF THE E&S CONTROL PLAN, THE OPERATOR
MUST RECEIVE APPROVAL OF THE REVISIONS FROM THE COUNTY CONSERVATION DISTRICT.
31. THE OPERATOR SHALL REMOVE FROM THE SITE, RECYCLE OR DISPOSE OF ALL BUILDING MATERIALS AND WASTES IN ACCORDANCE WITH THE DEPARTMENT'S SOLID WASTE MANAGEMENT REGULATIONS AT 25 PA
CODE 260.1 ET SEQ. 271.1 E. SEQ. AND 287.1 ET SEQ.
32. BEFORE DISPOSING OF SOIL OR RECEIVING BORROW FOR THE SITE, THE OPERATOR MUST ASSURE THAT EACH SPOIL OR BORROW AREA HAS AN EROSION AND SEDIMENT CONTROL PLAN APPROVED BY THE COUNTY CONSERVATION DISTRICT, AND WHICH IS BEING IMPLEMENTED AND MAINTAINED ACCORDING TO CHAPTER 102 REGULATIONS. THE OPERATOR SHALL ALSO NOTIFY THE COUNTY CONSERVATION DISTRICT IN WRITING OF ALL RECEIVING SPOIL AND BORROW AREAS WHEN THEY HAVE BEEN IDENTIFIED.
33. THE CONTRACTOR SHALL PROVIDE INLET PROTECTION DOWN SIDE STREETS WHERE THE POTENTIAL OF
RUNOFF FROM THE WORK AREA EXISTS.
34. ALL INLETS AS SHOWN WITH TYPE 1 OR TYPE 2 INLET PROTECTION ARE WITHIN THE HALF ACRE DRAINAGE
REQUIREMENT.
1. THE CONTRACTOR SHALL SUBMIT EROSION AND SEDIMENTATION CONTROL PLANS FOR
ALL STAGING AND/OR STOCKPILE AREAS TO THE COUNTY CONSERVATION DISTRICT
FOR THEIR REVIEW AND APPROVAL A MINIMUM OF THIRTY DAYS IN ADVANCE OF ANY
EARTH DISTURBANCE ACTIVITY. PROVIDE PROOF OF APPROVAL TO ENGINEER/OWNER.
2. INSTALL ALL TEMPORARY EROSION AND SEDIMENTATION CONTROL FACILITIES, i.e.
INLET PROTECTION TYPES 1 AND 2 AND SILT SOCK ASSOCIATED WITH THE DRAINAGE
OF THE AREA TO BE DISTURBED AS SHOWN ON THE DRAWINGS.
3. SAW CUT PAVEMENT AS NECESSARY TO CONSTRUCT THE MAIN, BUT NO DISTURBANCE
IS TO EXCEED RIGHT-OF-WAY LIMITS AND NO MORE THAN 5 DAYS IN ADVANCE OF
CONSTRUCTION.
4. EXCAVATE THE TRENCH. LENGTH OF EXCAVATION TO BE LIMITED TO WHAT PIPE CAN
INSTALLED THE SAME DAY.
5. INSTALL THE REQUIRED PIPING IN THE TRENCH.
6. BACKFILL TRENCH AND PERFORM THE GRADING.
7. PERFORM HYDROSTATIC TESTING.
8. IN CRITICAL SLOPE AREAS WORK SHALL BE CONTINUOUS UNTIL STABILIZATION IS
ACHIEVED.
9. FINALIZE PERMANENT SITE RESTORATION AND SEEDING.
10. REMOVE TEMPORARY EROSION AND SEDIMENTATION CONTROL FACILITIES AFTER SITE
STABILIZATION. AN AREA SHALL BE CONSIDERED TO HAVE ACHIEVED FINAL
STABILIZATION WHEN IT HAS A MINIMUM OF 70% UNIFORM PERENNIAL VEGETATIVE
COVER OR OTHER PERMANENT NON-VEGETATIVE COVER WITH A DENSITY SUFFICIENT
TO RESIST ACCELERATED SURFACE EROSION AND SUBSURFACE CHARACTERISTICS
SUFFICIENT TO RESIST SLIDING OR OTHER MOVEMENTS.
EROSION AND SEDIMENT POLLUTION CONTROL GENERAL NOTES
SEQUENCE OF CONSTRUCTION
SHEET No.JOB No.
DATE
DESIGNED
CHECKED
CADD
APPROVED
SCALE
D ra w in g:
C
:\U se rs \a ke lls
\D C
\A C
C D oc s\
G
AN
N
ET
T
FL
EM
IN
G
IN
C \0
0- Le hi gh to n\
Pr oj ec t F ile s\
Sh ee ts \5
-C
.d w g Pl ot te d:
J ul
9,
- 1 2:
pm
MECHANICSBURG, PENNSYLVANIA
LEHIGH RIVER CROSSING
LEHIGHTON WATER AUTHORITY
LEHIGHTON, PENNSYLVANIA 058110
JULY 2026
© GFT. 2023
APPROVED
REVISIONS
NO. DESCRIPTION DATE BY
THIS DRAWING IS AND SHALL REMAIN THE PROPERTY OF GFT. AND ANY MISUSE, REUSE,
ALTERATIONS, ADDITIONS, AND/OR DELETIONS OF THESE DRAWINGS ON PROJECT EXTENSIONS OR OTHER PROJECTS SHALL BE AT THE USER'S SOLE RISK AND WITHOUT LIABILITY TO GFT. IN THE EVENT THAT A CONFLICT ARISES BETWEEN THE SEALED DRAWINGS AND THE ELECTRONIC FILES, THE SEALED DRAWINGS WILL GOVERN.
ONE CALL SYSTEM TELEPHONE NUMBER: 1-800-242-1776
PROJECT ONE CALL SERIAL NUMBER: 2026033809 & 20262033810
EROSION AND SEDIMENTATION
CONTROL NOTES C-06
SAARG NONE
TAF
AutoCAD SHX Text
II, WATER RESOURCES, CHAPTER 102,
P
AT
H : C
:\U se rs \a ke lls
\D C
\A C
C D oc s\
G
AN
N
ET
T
FL
EM
IN
G
IN
C \0
0- Le hi gh to n\
Pr oj ec t F ile s\
Sh ee ts \5
-C
.d w g D
AT
E
SA
VE
D : 7
/2 8/
:1
PM
B Y:
a
E
PL
O
TT
ED
: 7
/2 9/
2:
P
M
PREPAREDNESS, PREVENTION, AND CONTINGENCY PLAN:
NOTE: A COPY OF THIS PLAN MUST BE KEPT AT THE CONSTRUCTION SITE AT ALL TIMES.
THE PURPOSE OF THIS PLAN IS TO ADDRESS OTHER ASPECTS OF POLLUTION CONTROL
OTHER THAN EROSION AND SEDIMENTATION POLLUTION CONTROL PLAN. THIS PLAN WILL
COVER SOLID WASTE DISPOSAL, SANITARY FACILITIES, WATER SOURCES, CONCRETE
WASTE, FUEL TANKS, HAZARDOUS WASTE AND SPILL REPORTING.
1. SOLID WASTE DISPOSAL
NO SOLID MATERIALS, INCLUDING BUILDING MATERIALS, ARE ALLOWED TO BE
DISCHARGED FROM THE SITE WITH STORMWATER. ALL SOLID WASTE, INCLUDING
DISPOSABLE MATERIALS INCIDENTAL TO THE MAJOR CONSTRUCTION ACTIVITIES, MUST BE
COLLECTED AND PLACED IN…