2-03 - ITB 2026-011 Bid Sheet.xlsx

XLSX spreadsheet 33 KB Posted

Attached to
ITB 2026-011 Rehabilitation of Lift Stations
Solicitation number
ITB 2026-011
Issued by
Johnson County, Texas

About this file

This is a bid sheet for the City of Burleson, Texas, Invitation to Bid (ITB) 2026-011 for the rehabilitation of three lift stations: Gateway Lift Station, Service Center Lift Station, and Mockingbird Lift Station (Project WW2302). The project requires contractors to furnish all labor, materials, equipment, and perform all work necessary for the rehabilitation of these three lift stations and associated appurtenances, with an expected project duration of 120 calendar days. Section 1 addresses Gateway Lift Station work and includes 18 line items encompassing site preparation (fence and parking lot removal, sprinkler head adjustment, bush removal), concrete driveway placement, ornamental fencing installation, safety grates, bypass pumping, wet well and overflow cleaning/patching/lining, submersible sewage pump installation and operation, piping and valve work, electrical equipment installation, and site restoration. Section 2 covers Service Center Lift Station work with 12 line items including concrete driveway and pavement placement, pipe bollards, stainless steel chain replacement, cable hanger assembly, electrical panel installation, and site restoration. Section 3 addresses Mockingbird Lift Station work with four line items for wet well float installation, relay logic controller installation, electrical rack awning, and chain link vinyl slat installation.

The bid sheet is formatted as a standard construction estimate with columns for item numbers, estimated quantities, units of measure, and pricing in both words and figures, with extended amounts to be calculated by bidders. All work items are specified as "complete in place," indicating full responsibility for labor and materials. The bid sheet does not contain specific pricing information, response deadlines, award dates, funding sources, or set-aside provisions, as these details would be contained in the associated invitation to bid documents and project specifications.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Table 1

CITY OF BURLESON, TEXAS REHABILITATION OF LIFT STATIONS - PROJECT WW2302

GATEWAY LIFT STATION - SERVICE CENTER LIFT STATION - MOCKINGBIRD LIFT STATION BID SCHEDULE

Item No.Estimated QuantityUnitDescription and Price in WordsPrice in FiguresExtended Amount
Section 1 - Gateway Lift Station
1011L.S.Remove & Dispose Existing Fence and Gates complete in place, the sum of
Dollars
and
Cents per Lump Sum
1021L.S.Remove Reinforced Concrete Parking Lot and Curb Including Saw Cut

complete in place, the sum of

Dollars
and
Cents per Lump Sum
1031L.S.Adjust Sprinkler Heads and Distribution Lines complete in place, the sum of
Dollars
and
Cents per Lump Sum
10411Ea.Remove Bushes including Backfill complete in place, the sum of
Dollars
and
Cents per Each
10525S.Y.Furnish and Place 8-Inch Reinforced Concrete Driveway complete in place, the sum of
Dollars
and
Cents per Square Yard
106105L.F.Furnish and Install Ornamental Fence Including Mow Strip complete in place, the sum of
Dollars
and
Cents per Linear Foot
1071L.S.Furnish and Install Ornamental Swing Gates

complete in place, the sum of

Dollars
and
Cents per Lump Sum
Item No.Estimated QuantityUnitDescription and Price in WordsPrice in FiguresExtended Amount
1083Ea.Furnish and Install Safety Grates at Existing Hatches

complete in place, the sum of

Dollars
and
Cents per Each
1091L.S.For Bypass Pumping complete in place, the sum of
Dollars
and
Cents per Lump Sum
1101L.S.For Cleaning, Patching and Lining Wet Well complete in place, the sum of
Dollars
and
Cents per Lump Sum
1111L.S.For Cleaning, Patching and Lining Overflow Wet Well complete in place, the sum of
Dollars
and
Cents per Lump Sum
1122Ea.Furnish, Install and Make Operational Submergible Sewage Pumps

complete in place, the sum of

Dollars
and
Cents per Each
1131L.S.For Removal of Wet Well and Valve Vault Piping, Fittings and Valving Including Pump Rails and Pump

complete in place, the sum of

Dollars
and
Cents per Lump Sum
1141L.S.Furnish and Install New Wet Well and Valve Vault Piping,

Fittings, Valves and Pump Rails complete in place, the sum of

Dollars
and
Cents per Lump Sum
1151L.S.Furnish and Install Electrical Equipment Foundation, Rack and Canopy

complete in place, the sum of

Dollars
and
Cents per Lump Sum
Item No.Estimated QuantityUnitDescription and Price in WordsPrice in FiguresExtended Amount
1161L.S.Furnish and Install Electrical Equipment, Complete Terminations, and Make System Operational complete in place, the sum of
Dollars
and
Cents per Lump Sum
1171L.S.For Site Restoration complete in place, the sum of
Dollars
and
Cents per Lump Sum
1181Ea.Constructing 4-Foot Diameter By-Pass Manhole

complete in place, the sum of

Dollars
and
Cents per Each
SUBTOTAL SECTION 1 GATEWAY LIFT STATION (101 Through 118)
Item No.Estimated QuantityUnitDescription and Price in WordsPrice in FiguresExtended Amount
Section 2 - Service Center Lift Station
201226S.Y.Furnish and Place 8-Inch 3,000 PSI Reinforced Concrete Driveway

complete in place, the sum of

Dollars
and
Cents per Square Yard
20260S.Y.Furnish and Place 4-Inch 3,000 PSI Reinforced Concrete Pavement

complete in place, the sum of

Dollars
and
Cents per Square Yard
2032Ea.Furnish and Install Pipe Bollard complete in place, the sum of
Dollars
and
Cents per Each
2042Ea.Furnish and Install Stainless Steel Replacement Chain for Each Pump

complete in place, the sum of

Dollars
and
Cents per Each
2051L.S.Furnish and Install Cable Hanger Assembly including All Connections to Cables

complete in place, the sum of

Dollars
and
Cents per Lump Sum
2061L.S.Furnish and Install New Kellum Grips complete in place, the sum of
Dollars
and
Cents per Lump Sum
2071L.S.Furnish and Install Electrical Panel Foundation, Rack and Canopy

complete in place, the sum of

Dollars
and
Cents per Lump Sum
Item No.Estimated QuantityUnitDescription and Price in WordsPrice in FiguresExtended Amount
2081L.S.Furnish and Install Electrical Panel Foundation, Rack and

Canopy complete in place, the sum of

Dollars
and
Cents per Lump Sum
2091L.S.Furnish and Install Electrical Equipment, Complete

Terminations, and Make System Operational complete in place, the sum of

Dollars
and
Cents per Lump Sum
2101L.S.For Erosion Control complete in place, the sum of
Dollars
and
Cents per Lump Sum
2111L.S.For Site Restoration complete in place, the sum of
Dollars
and
Cents per Lump Sum
2121L.S.For Adjusting Valve Tops to Finish Grade complete in place, the sum of
Dollars
and
Cents per Lump Sum
SUBTOTAL SECTION 2 SERVICE CENTER LIFT STATION (Items 201 Through 212)
Item No.Estimated QuantityUnitDescription and Price in WordsPrice in FiguresExtended Amount
Section 3 - Mockingbird Lift Station
3011L.S.Furnish and Install Wet Well Floats complete in place, the sum of
Dollars
and
Cents per Lump Sum
3021L.S.Furnish, Install and Make Operational Relay Logic Controller complete in place, the sum of
Dollars
and
Cents per Lump Sum
3031L.S.Furnish and Install Electrical Rack Awning complete in place, the sum of
Dollars
and
Cents per Lump Sum
30444L.F.Furnish and Install Chain Link Vinyl Slats in Fence and Swing Gates

complete in place, the sum of

Dollars
and
Cents per Linear Foot
SUBTOTAL SECTION 3 MOCKINGBIRD LIFT STATION (Items 301 Through 304)

TOTAL AMOUNT BID (Sections 1 Through 3)