2-003-Scope Of Work-Montford.pdf

PDF 11 KB Posted

Attached to
TDCJ-Montford Unit-Water Softener
Solicitation number
IW268130
Issued by
Henderson County, Texas

About this file

This is a Scope of Work document for the Texas Department of Criminal Justice (TDCJ) related to the replacement of a water softener system at the Montford Unit in Lubbock, Texas. The project involves the removal of an existing water softener system from the Montford Unit Boiler Room and the installation of a new replacement system. The vendor is required to furnish and install one new water softener system, Model MCSMF-39-18NXT-TRI-1200-C5060, featuring a 1,200,000 grain side-mount configuration with a 3-inch industrial metered control valve, PVC piping, and three composite (FRP) mineral tanks sized 48" x 72". The owner will be responsible for disconnecting and disposing of the existing system prior to vendor mobilization, while the vendor is responsible for all labor, materials, tools, and equipment necessary for installation, startup, testing, and commissioning in accordance with manufacturer specifications. No specific response dates, due dates, site visit requirements, bidder meetings, award dates, or contract term information is provided in this document.

The document does not contain pricing information, set-asides, incumbent information, funding sources, or contract amounts. The vendor's scope explicitly excludes the supply of brine tanks unless separately contracted. Project deliverables include completed installation, detailed startup and commissioning documentation, comprehensive operating parameters and regeneration settings, documented operational verification, manufacturer warranty documentation and product literature, and basic operator training for designated facility personnel upon project completion.

View the file

Other files

File Type Posted
5-000-IW268130.pdf PDF
4-001-IW268130.pdf PDF
1-002-Terms and Conditions.pdf PDF
3-004-Drawings.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SCOPE OF WORK (SOW)

Project: Montford Unit Boiler Room Water Softener Replacement

1. Project Purpose & Summary

The purpose of this project is to remove the existing water softener system from the Montford Unit Boiler Room and install a new replacement water softener system. The Owner will disconnect, remove, and safely dispose of the existing system prior to vendor mobilization. The Vendor will subsequently furnish all labor, materials, tools, and equipment necessary to install, start up, test, and commission the new system in strict accordance with the project specifications.

2. Owner Responsibilities

• Disconnection & Disposal: Disconnect, remove, and properly dispose of the existing water softener system prior to Vendor mobilization.

• Site Access & Safety: Ensure the installation area within the boiler room is clear, accessible, and completely safe for Vendor personnel.

• Utilities: Provide stable utility access (including water, power, and operational drains) as required for the new system installation.

• Operations Coordination: Coordinate and manage any operational facility downtime required during the installation window.

3. Vendor Responsibilities & Scope of Supply

• Equipment Procurement & Installation: Furnish and install one (1) new water softener system, Model MCSMF-39-18NXT-TRI-1200-C5060, featuring:

- 1,200,000 grain side-mount water softener.

- Super, heavy-duty, 3-inch industrial metered water softener system.

- Metered control valve configuration.

- PVC piping as required for proper mechanical connection.

- Composite (FRP) mineral tanks sized 48" x 72" (Quantity: 3).

- Note: Brine tanks are explicitly not included and will not be supplied by the Vendor unless separately contracted.

• Site Verification: Verify all installation area conditions prior to work and immediately notify the Owner of any pre-existing issues that may affect proper installation.

• Plumbing & Integration: Complete all plumbing connections, control valve setup, meter configuration, and all facility system tie-ins in compliance with manufacturer specifications.

Scope of Work: Montford Boiler Room Water Softener Replacement

Page 1 of 2CONFIDENTIAL & PROPRIETARY

• Commissioning & Testing: Perform comprehensive system startup, commissioning, performance testing, and verification to ensure proper operation, targeted flow rates, metering accuracy, and automated regeneration controls.

• Training: Provide basic operator training to designated facility staff, covering an overarching system operation overview and routine maintenance expectations.

4. Project Deliverables

• Completed Installation: Successful installation of the specified water softener system hardware and physical components.

• Documentation: Detailed startup and commissioning documentation, including precise control valve programming and system configuration settings.

• Operating Metrics: Comprehensive list of recommended operating parameters alongside initial system regeneration settings.

• Operational Verification: Formally documented confirmation of successful operational testing under facility conditions.

• Literature & Warranties: Official manufacturer warranty documentation and all associated product literature.

• Operator Training: Provision of basic operator training for designated personnel upon immediate project completion.

5. Project Authorization & Sign-Off

By signing below, both parties acknowledge and accept the duties, equipment provisions, exclusions, and deliverables detailed within this Scope of Work document.

Owner Representative Authorization Vendor Representative Authorization

Signature: __________________________ Signature: __________________________

Name: ____________________________ Name: ____________________________

Title: _____________________________ Title: _____________________________

Date: _____________________________ Date: _____________________________

Scope of Work: Montford Boiler Room Water Softener Replacement

Page 2 of 2CONFIDENTIAL & PROPRIETARY