2-0007111.18 CONTRACT DRAWINGS.pdf

PDF 9 MB Posted

Attached to
SR 209 & Rausch Creek Road Signal Upgrade, Contract No. 0007111.18
Solicitation number
US.262195
Issued by
Pennsylvania

About this file

Contract Drawings Summary

This file contains contract drawings for the SR 209 & Rausch Creek Road Signal Upgrade project (Contract No. 0007111.18) in Tremont Township, Pennsylvania. The project involves improvements to the signalized intersection of State Route 209 and Rausch Creek Road (T-412), including installation of new signal heads and backplates, new LED countdown pedestrian signals with associated pavement markings, construction of concrete sidewalk, and concrete curb ramps. The contractor is responsible for maintenance and control of traffic during construction activities. All construction work must be completed by May 15, 2027. Bids must be submitted as lump sum or unit prices at the Township's option, accompanied by a certified check, bank draft, or bid bond equal to at least ten percent of the total bid amount.

The Pennsylvania Prevailing Wage Act and the Pennsylvania Public Workforce Employment Verification Act apply to this contract due to the estimated project cost exceeding $25,000, requiring the successful bidder to pay no less than the determined wage rates for the project area. The contractor must furnish separate performance and payment bonds with corporate surety authorized to do business in Pennsylvania or acceptable irrevocable letters of credit approved by the Township. All employees, subcontractors, and applicants must be legally authorized to work in the United States and cannot be discriminated against based on race, color, religion, sex, national origin, or any other basis prohibited by federal, state, or local law.

View the file

Other files

File Type Posted
3-TRAFFIC SIGNAL PLAN 8-14-26.pdf PDF
1-0007111.18 CONTRACT DOCUMENTS.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

TREMONT TOWNSHIP

PREPARED FOR:

SCHUYLKILL COUNTY, PENNSYLVANIA

S.R. 209 & RAUSCH CREEK ROAD

SIGNAL UPGRADE PROJECT

CONTRACT No. 0007111.18

N

LOCATION MAP

TITLE SHEET

DRAWING TITLE

DRAWING INDEX

SHEET NO.

5 OF 5TRAFFIC CONTROL DETAILS

CONSTRUCTION DETAILS 4 OF 5

OVERALL SITE PLAN

CURB RAMP DETAILS

GENERAL PLAN NOTES:

1. RIGHT-OF-WAY LINES, EASEMENTS, AND PROPERTY BOUNDARY INFORMATION SHOWN HEREON WERE TAKEN FROM

DEEDS AND PLANS OF RECORD.

2. TOPOGRAPHIC INFORMATION SHOWN HEREON IS BASED UPON PLANS OF RECORD AND LIMITED FIELD SURVEYS CONDUCTED BY CKS ENGINEERS DURING THE MONTH OF OCTOBER 2025. VERTICAL DATUM BASED ON NAVD88.

3. LOCATION OF EXISTING UTILITIES WERE OBTAINED FROM VARIOUS PLANS AND LIMITED FIELD EXPLORATION. THEY ARE APPROXIMATE. CONTRACTOR TO VERIFY LOCATION AND DEPTHS OF ALL UTILITIES PRIOR TO COMMENCING

WORK.

4. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE LOCATING AND MARKOUT OF ALL EXISTING UTILITIES IN THE

FIELD PRIOR TO COMMENCING WORK.

5. IN ACCORDANCE WITH ACT 287 AS AMENDED, THE CONTRACTOR SHALL CONTACT ALL UTILITY COMPANIES INDIVIDUALLY AND SHALL NOTIFY THE PENNSYLVANIA UTILITIES “ONE-CALL” SERVICE AT LEAST 72 HOURS PRIOR TO

COMMENCEMENT OF ANY EXCAVATION.

6. CONTRACTOR SHALL BE RESPONSIBLE FOR CONTACTING THE TOWNSHIP ENGINEER A MINIMUM OF 48 HOURS IN

ADVANCE OF ANY WORK BEING PERFORMED ON THIS PROJECT.

7. NO MATERIAL SHALL BE PLACED OR ANY DISTURBANCE PERMITTED BEYOND THE RIGHT-OF-WAY AND/OR ACQUIRED EASEMENTS SHOWN HEREON WITHOUT THE WRITTEN PERMISSION OF THE PROPERTY OWNER DIRECTLY INVOLVED

AND APPROVAL OF THE TOWNSHIP.

8. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE CLEARING, GRUBBING, PAVING, TOPSOILING, FERTILIZING, AND

SEEDING OR OTHERWISE RESTORING ALL AREAS DISTURBED BY HIS ACTIVITIES.

9. SILT FENCE AND/OR SILT SOCK SHALL BE PLACED DOWNSLOPE OF ALL GRADING AND EXCAVATION IN UNIMPROVED

AREAS, EXCEPT AS OTHERWISE SHOWN ON THE PLANS.

10. RETURN ROADWAY AND PRIVATE DRIVEWAYS TO PRECONSTRUCTION CONDITIONS OR BETTER.

11. CONTRACTOR SHALL BE RESPONSIBLE FOR PROTECTION AND MAINTENANCE OF TRAFFIC AT ALL TIMES IN ACCORDANCE WITH REQUIREMENTS SET FORTH BY PENNDOT, SEE NOTES AND DETAILS THIS PLAN SET.

12. ALL ITEMS DAMAGED AS A RESULT OF THE CONTRACTOR'S OPERATIONS (I.E. CURBING, PAVING, FENCES, ETC.) SHALL

BE REPLACED IN KIND BY THE CONTRACTOR, AT NO COST TO TREMONT TOWNSHIP.

13. CONTRACTOR MUST MAINTAIN ACCESS TO DRIVEWAYS AT ALL TIMES DURING CONSTRUCTION AND PROVIDE ACCESS THROUGH THE WORK ZONE FOR THE TRAVELING PUBLIC ON ALL ROADWAYS WITHIN THE PROJECT LIMIT.

14. ALL CONSTRUCTION SHALL BE IN ACCORDANCE WITH PENNDOT SPECIFICATIONS, PUBLICATION 408, LATEST EDITION, AND THE PROJECT SPECIFICATIONS.

15. IF THE PROPOSED IMPROVEMENTS REQUIRE THE RELOCATION OF PENNDOT FIBER OPTIC CABLE(S), THE PERMITTEE IS RESPONSIBLE FOR THE FULL EXPENSE OF RELOCATING THESE FACILITIES. ANY FIBER OPTIC CABLE THAT REQUIRES RELOCATION MUST BE MOVED BY A CONTRACTOR CERTIFIED BY PENNDOT TO PERFORM THIS TYPE OF WORK.

PENNDOT GENERAL PERMIT NOTES

1. APPLICANT: TREMONT TOWNSHIP, 116 MOLLYSTOWN ROAD, PINE GROVE, PA. 17963

2. ALL WORK IN PA STATE HIGHWAY RIGHT-OF-WAY IS TO BE PERFORMED CONSISTENT WITH THE FOLLOWING:

2.1. PENNDOT PUBLICATION 13M, DESIGN MANUAL PART 2 - HIGHWAY DESIGN

2.2. PENNDOT PUBLICATION 34, APPROVED AGGREGATE PRODUCERS (BULLETIN 14)

2.3. PENNDOT PUBLICATION 35, APPROVED CONSTRUCTION MATERIALS (BULLETIN 15)

2.4. PENNDOT PUBLICATION 41, PRODUCERS OF BITUMINOUS MATERIALS (BULLETIN 41)

2.5. PENNDOT PUBLICATION 42, PRODUCERS OF READY-MIX CONCRETE (BULLETIN 42)

2.6. PENNDOT PUBLICATION 72M, STANDARDS FOR ROADWAY CONSTRUCTION

2.7. PENNDOT PUBLICATION 111, PAVEMENT MARKINGS AND SIGNING STANDARDS

2.8. PENNDOT PUBLICATION 213, TEMPORARY TRAFFIC CONTROL GUIDELINES

2.9. PENNDOT PUBLICATION 408, SPECIFICATIONS

2.10. PENNDOT PUBLICATION 888 STORMWATER CONTROL MEASURES MANUAL

2.11.PENNDOT PUBLICATION 584 PENNDOT DRAINAGE MANUAL

3. PA STATE HIGHWAY RIGHT-OF-WAY MAY NOT BE USED FOR PARKING.

4. PERMITTEE IS RESPONSIBLE FOR MAINTENANCE OF ALL AUTHORIZED STRUCTURES, FACILITIES AND DRAINAGE.

5. PERMITTEE IS RESPONSIBLE FOR MAINTENANCE OF ALL AUTHORIZED SIGNS AND PAVEMENT MARKINGS.

6. CONTACT PENNSYLVANIA ONE-CALL (1-800-242-1776) THREE WORKING DAYS BEFORE EXCAVATION OR DEMOLITION

WORK. SERIAL NUMBER 20252952884 FOR TREMONT TOWNSHIP.

7. THIS PERMIT MAY BE RESTRICTED ON WORKING HOURS AND TIMES FOR HOLIDAYS, WEEKENDS, AND SPECIAL OR UNFORESEEN EVENTS AND WILL REQUIRE APPROVAL FROM THE COUNTY OFFICE PRIOR TO WORKING DURING THESE

PERIODS.

8. ALL EXISTING PAVEMENT MARKINGS WHICH ARE NO LONGER APPROPRIATE SHALL BE ERADICATED BY THE

PERMITTEE. THE PERMITTEE SHALL PLACE ALL REQUIRED NEW PAVEMENT MARKINGS.

9. MATERIAL CERTIFICATION MUST BE PROVIDED, BY AN APPROVED MANUFACTURER LISTED IN THE DEPARTMENT'S PUBLICATION 35 (BULLETIN 15), FOR ALL MATERIALS AND STRUCTURES WITHIN PENNDOT RIGHT-OF-WAY.

10. ALL PROPOSED PEDESTRIAN FACILITIES REFLECTED ON THESE PLANS, INCLUDING THOSE THAT ARE OUTSIDE OF PENNDOT LEGAL RIGHT-OF-WAY, SHALL BE CONSTRUCTED TO COMPLY WITH THE REQUIREMENTS OF THE U.S.

ACCESS BOARD, PUBLIC RIGHT-OF-WAY ACCESSIBILITY GUIDELINES (PROWAG) OF THE ACCESSIBILITY GUIDELINES OF BUILDINGS AND FACILITIES (ADAAG). PENNDOT “DESIGN MANUAL PART 2”, CHAPTER 6, AND PENNDOT STANDARDS FOR ROADWAY CONSTRUCTION (PENNDOT PUBLICATION 72M, RC-67M) PROVIDE GUIDANCE ON ADA ACCESSIBLE

DESIGN FOR PEDESTRIAN FACILITIES AND CAN BE UTILIZED FOR REFERENCE.

11. ALL SLOPE MEASUREMENTS WILL BE INSPECTED/VERIFIED WITH A 2-FOOT SMART LEVEL.

12. THE PERMITTEE IS RESPONSIBLE FOR THE COORDINATION OF RELOCATING ANY CONFLICTING UTILITIES WHICH ARE A

RESULT OF THESE IMPROVEMENTS.

13. A LIST OF PUBLIC UTILITIES ARE INCLUDED ON THE PA ONE CALL NOTIFICATION IN ACCORDANCE WITH ACT 287-1974.

14. DETAILS, OTHER THAN THOSE INDICATED, ARE ON THE FOLLOWING STANDARD DRAWINGS: RC-45M - INLET TOPS, GRATES AND FRAMES, FEB. 19, 2021 RC-64M - CURBS AND GUTTERS, FEB. 19, 2021 RC-67M - CURB RAMPS AND SIDEWALKS, FEB. 19, 2021 RC-70M - PERIMETER CONTROL DEVICES, FEB. 8, 2019 TC-8600 - PAVEMENT MARKINGS, JUNE 13,2013 TC-8803 MISCELLANEOUS PEDESTRIAN PUSHBUTTON MOUNTING DETAILS, JUNE 20, 2023

15. THE PERMITTEE'S CONTRACTOR SHALL SAWCUT AND REMOVE SHOULDER MATERIAL AS NECESSARY TO ENSURE THE

PAVEMENT REPLACEMENT IS ADJACENT TO THE FULL-DEPTH PAVEMENT OF THE TRAVEL LANE.

16. FINAL APPROVAL OF THE PROPOSED SAWCUT LOCATION WILL BE AT THE DISCRETION OF THE INSPECTOR-IN-CHARGE AND WILL BE CONFIRMED AT THE PRE-CONSTUCTION MEETING. IF THE SAWCUT MUST BE LOCATED WITHIN A TRAVEL LANE, IT WILL BE NECESSARY TO MILL AND OVERLAY THE TRAVEL LANE TO PREVENT A JOINT IN A WHEEL

PATH.

17. THE PROPOSED PAVEMENT SECTION MUST BE AS INDICATED ON THE PLAN, OR MATCH THE EXISTING AS FOUND IN

THE FIELD, WHICHEVER IS GREATER.

18. ALL PAVEMENT MARKINGS OTHER THAN LONGITUDINAL LINES TO BE HOT THERMOPLASTIC (PENNDOT PUBLICATION

111, TC-8600)

PROJECT

LOCATION

PREPARED BY:

SEQUENCE OF CONSTRUCTION NOTES:

1. COORDINATE ALL IMPROVEMENT WORK WITH THE IMPLEMENTATION OF E&S CONTROLS.

2. INSTALL WORK ZONE TRAFFIC CONTROL SIGNS AND DEVICES ACCORDING TO PUB 213 FIGURES, IF

NECESSARY PRIOR TO ANY WORK WITHIN THE ROAD RIGHT-OF-WAY.

3. INSTALL NEW SIDEWALK. FOR WORK AT THE INTERSECTION INSTALL WORK ZONE TRAFFIC CONTROL SIGNS

AND DEVICES IN ACCORDANCE WITH PATA.

4. FINAL GRADE AND STABILIZE ALL REMAINING RIGHT-OF-WAY AREAS.

5. COMPLETE ALL PROPOSED IMPROVEMENTS AND INSTALLATION OF TRAFFIC CONTROL DEVICES (STRIPING AND SIGNAGE). AFTER ALL WORK WITHIN WORK AREA IS COMPLETE, REMOVE ALL WORK ZONE TRAFFIC

CONTROL SIGNS AND DEVICES AND RESTORE PERMANENT TRAFFIC PATTERNS.

GENERAL PLAN NOTES:

1. RIGHT-OF-WAY LINES EASEMENTS, AND PROPERTY BOUNDARY INFORMATION SHOWN HEREON WERE

TAKEN FROM DEEDS AND PLANS OF RECORD.

2. TOPOGRAPHIC INFORMATION SHOWN HEREON IS BASED UPON PLANS OF RECORD AND LIMITED FIELD SURVEYS CONDUCTED BY CKS ENGINEERS DURING THE MONTH OF OCTOBER 2025. VERTICAL DATUM

BASED ON NAVD88.

3. LOCATION OF EXISTING UTILITIES WERE OBTAINED FROM VARIOUS PLANS AND LIMITED FIELD EXPLORATION. THEY ARE APPROXIMATE. CONTRACTOR TO VERIFY LOCATION AND DEPTHS OF ALL UTILITIES

PRIOR TO COMMENCING WORK.

4. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE LOCATING AND MARKOUT OF ALL EXISTING UTILITIES IN

THE FIELD PRIOR TO COMMENCING WORK.

5. IN ACCORDANCE WITH ACT 287 AS AMENDED, THE CONTRACTOR SHALL CONTACT ALL UTILITY COMPANIES INDIVIDUALLY AND SHALL NOTIFY THE PENNSYLVANIA UTILITIES “ONE-CALL” SERVICE AT LEAST 72 HOURS

PRIOR TO COMMENCEMENT OF ANY EXCAVATION.

6. CONTRACTOR SHALL BE RESPONSIBLE FOR CONTACTING THE TOWNSHIP ENGINEER A MINIMUM OF 48

HOURS IN ADVANCE OF ANY WORK BEING PERFORMED ON THIS PROJECT.

7. NO MATERIAL SHALL BE PLACED OR ANY DISTURBANCE PERMITTED BEYOND THE RIGHT-OF-WAY AND/OR ACQUIRED EASEMENTS SHOWN HEREON WITHOUT THE WRITTEN PERMISSION OF THE PROPERTY OWNER

DIRECTLY INVOLVED AND APPROVAL OF THE TOWNSHIP.

8. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE CLEARING, GRUBBING, PAVING, TOPSOILING, FERTILIZING, AND SEEDING OR OTHERWISE RESTORING ALL AREAS DISTURBED BY HIS ACTIVITIES.

9. SILT FENCE AND/OR SILT SOCK SHALL BE PLACED DOWNSLOPE OF ALL GRADING AND EXCAVATION IN

UNIMPROVED AREAS, EXCEPT AS OTHERWISE SHOWN ON THE PLANS.

10. RETURN ROADWAY TO PRECONSTRUCTION CONDITIONS OR BETTER.

11. CONTRACTOR SHALL BE RESPONSIBLE FOR PROTECTION AND MAINTENANCE OF TRAFFIC AT ALL TIMES IN ACCORDANCE WITH REQUIREMENTS SET FORTH BY PENNDOT, SEE NOTES AND DETAILS THIS PLAN SET.

12. ALL ITEMS DAMAGED AS A RESULT OF THE CONTRACTOR'S OPERATIONS (I.E. CURBING, PAVING, FENCES, ETC.) SHALL BE REPLACED IN KIND BY THE CONTRACTOR, AT NO COST TO TREMONT TOWNSHIP.

13. CONTRACTOR MUST MAINTAIN ACCESS TO DRIVEWAYS AT ALL TIMES DURING CONSTRUCTION AND PROVIDE ACCESS THROUGH THE WORK ZONE FOR THE TRAVELING PUBLIC ON ALL ROADWAYS WITHIN THE

PROJECT LIMIT.

14. ALL CONSTRUCTION SHALL BE IN ACCORDANCE WITH PENNDOT SPECIFICATIONS, PUBLICATION 408, LATEST

EDITION, AND THE PROJECT SPECIFICATIONS.

PENNDOT MAINTENANCE AND PROTECTION OF TRAFFIC (MPT) NOTES

1. THIS WORK CONSISTS OF THE MAINTENANCE AND PROTECTION OF TRAFFIC AND THE PROTECTION OF THE

PUBLIC WHEN APPROACHING AND DEPARTING THE CONSTRUCTION AREA AND WITHIN THE LIMITS OF

CONSTRUCTION.

2. MAINTENANCE AND PROTECTION OF TRAFFIC DURING CONSTRUCTION SHALL BE IN ACCORDANCE WITH APPLICABLE FIGURES PATA 102, PATA 123-A AND FIGURES 6-38 AND 6-39 IN PENNDOT PUBLICATION 213, "WORK ZONE TRAFFIC CONTROL GUIDELINES", APRIL, 2022 EDITION, AND TITLE 67 PA CODE, CHAPTER 212, "OFFICIAL TRAFFIC CONTROL DEVICES", DATED MARCH, 2008 OR MOST CURRENT.

3. FURNISH, ERECT, PLACE AND MAINTAIN TRAFFIC CONTROL SIGNS AND DEVICES. MAINTAIN TRAFFIC DURING HOURS OF CONSTRUCTION AND AT ALL OTHER TIMES CONSISTENT WITH THE METHODS INDICATED ON

THESE DRAWINGS AND THE FOLLOWING:

3.1. PENNDOT PUBLICATION 35;

3.2. PENNDOT PUBLICATION 46;

3.3. PENNDOT PUBLICATION 72M;

3.4. PENNDOT PUBLICATION 111;

3.5. PENNDOT PUBLICATION 212;

3.6. PENNDOT PUBLICATION 213;

3.7. PENNDOT PUBLICATION 236;

3.8. PENNDOT PUBLICATION 408; AND

3.9. MUTCD, LATEST PENNDOT ADOPTED EDITION.

4. REMOVE THESE DEVICES IMMEDIATELY UPON COMPLETION OF THE WORK. PENNDOT WILL REMOVE ANY

TRAFFIC CONTROL DEVICES ERECTED BY DEPARTMENT FORCES.

5. THE CONTRACTOR MUST NOTIFY THE DISTRICT 5-0 REGIONAL TRAFFIC MANAGEMENT CENTER (RTMC) 15 MINUTES IN ADVANCE OF ANY PROPOSED LANE OR SHOULDER RESTRICTIONS OR ROAD CLOSURES. THE

CONTRACTOR MUST NOTIFY THE RTMC WHEN THE ROAD IS RESTORED TO NORMAL OPERATION.

6. THE CONTRACTOR IS REQUIRED TO SUBMIT A ROAD RESTRICTION FORM TO THE DISTRICT 5-0 PRESS OFFICE ONE (1) WEEK IN ADVANCE OF ANY LANE CLOSURES AND TWO (2) WEEKS IN ADVANCE OF ANY FULL CLOSURES THAT NECESSITATE A DETOUR. THE FORM IS AVAILABLE ONLINE AT PENNDOT.GOV/DISTRICT

5/ROAD RESTRICTION FORM.

7. PERMITTEE MUST ARRANGE FOR INSPECTION OF ALL TRAFFIC CONTROL DEVICES PRIOR TO START OF WORK.

8. COVER OR REMOVE ALL CONFLICTING SIGNS AND ERADICATE ALL CONFLICTING PAVEMENT MARKINGS.

9. MOUNT ALL LONG-TERM ADVANCE WARNING SIGNS ON TYPE III BARRICADES UNLESS OTHERWISE NOTED

OR INSTRUCTED BY DISTRICT OFFICE.

10. ALL SIGNS AND DEVICES TO BE MAINTAINED IN NEW OR LIKE NEW CONDITION.

11. DRIVEWAYS WILL BE KEPT ACCESSIBLE AT ALL TIMES.

12. LOCATE ALL SIGNS SO THAT SIGHT DISTANCES WILL NOT BE OBSTRUCTED AT DRIVEWAYS AND LOCAL ROADS.

13. ALL CHANNELIZING DEVICES, BARRICADES, AND SIGNS SHALL HAVE TYPE III OR BETTER PRISMATIC RETROREFLECTIVE SHEETING. SHEETING SHALL BE APPROVED AND LISTED IN PENNDOT PUBLICATION 35

(BULLETIN 15).

14. NO TRAFFIC RESTRICTIONS OR LANE CLOSURES ARE PERMITTED BETWEEN 6:00 AM AND 9:00 AM AND BETWEEN 3:00 PM AND 7:00 PM MONDAYS THROUGH FRIDAYS OR ON LEGAL HOLIDAYS AND WEEKENDS ASSOCIATED WITH LEGAL HOLIDAYS. ALL RESTRICTIONS AND CLOSURES ARE TO BE REMOVED BY NOON ON

THE DAY PRIOR TO THE LEGAL HOLIDAY. HIGHWAY OCCUPANCY PERMIT

15. PERMITTEE SHALL NOTIFY LOCAL EMERGENCY AUTHORITIES (E.G., POLICE, FIRE, MEDICAL), AFFECTED BUSINESSES, SCHOOL DISTRICT(S), THE GENERAL PUBLIC, THE DISTRICT PERMIT MANAGER AND THE DISTRICT APRAS COORDINATOR AT LEAST 14 DAYS PRIOR TO ANY SIGNIFICANT TRAFFIC IMPACTS (E.G., LATERAL

WIDTH RESTRICTIONS LESS THAN 16 FEET, DETOURS).

16. DROPOFFS CREATED BY CONSTRUCTION OPERATIONS SHALL BE TREATED CONSISTENT WITH PUBLICATION

408, SECTION 901.3(J).

17. REMOVE ALL SHORT-TERM WORK ZONE TRAFFIC CONTROL SIGNING UPON COMPLETION OF THAT DAY'S

WORK PERIOD.

18. RESTRICTING TRAFFIC FLOW WITHIN THE WORK AREA SHALL BE MINIMIZED TO PREVENT TRAFFIC

CONGESTION AND UNSAFE TRAFFIC CONDITIONS.

19. DURING FLAGGING OPERATIONS, DO NOT STOP TRAFFIC FLOW WITHIN THE WORK AREA FOR MORE THAN A

5-MINUTE PERIOD AT ANY ONE TIME.

20. THE CONTRACTOR SHALL COMPLY WITH ACT 229 OF DECEMBER 2002 DURING CONSTRUCTION ACTIVITIES

WITHIN PENNDOT'S RIGHT-OF-WAY.

Sheets and Views
SHEET #5

File details come from the government source that posted it. Updated .