This document is a Performance Work Statement (PWS) for a federal contract opportunity to perform premise wiring, install equipment, and update telecommunications infrastructure at Building 374 at Eglin AFB, Florida.
The key objectives include replacing an existing 2-post rack with a new 7-foot lockable cabinet, testing and relocating existing cabling, installing new CAT6 cabling and fiber optic cabling, and establishing proper grounding and bonding for the telecommunications systems. The work spans several rooms and requires cable pathways, sleeves, j-hooks, and new outlet installations. Testing, labeling, and documentation requirements are specified. This PWS outlines the detailed technical specifications, applicable standards, and deliverables for the contractor. The related federal contract opportunity is a solicitation (FA2823-24-Q-A022) seeking quotes to meet the requirements of this PWS.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| RM225_0465.JPG | JPG image | |
| RM225_0466.JPG | JPG image | |
| RM225_0462.JPG | JPG image | |
| RM225_0461.JPG | JPG image | |
| RM225_0467.JPG | JPG image | |
| RM225_0460.JPG | JPG image | |
| RM225_9619.JPG | JPG image | |
| RM225_9621.JPG | JPG image | |
| RM109-9614.JPG | JPG image | |
| RM109-9613.JPG | JPG image | |
| RM122_0455.JPG | JPG image | |
| RM225_0459.JPG | JPG image | |
| RM225_0463.JPG | JPG image | |
| RM225_9620.JPG | JPG image | |
| RM109_AboveStairs.JPG | JPG image | |
| Questions Answers.pdf | ||
| RM122_0457.JPG | JPG image | |
| RM122_0454.JPG | JPG image | |
| RM224_0468.JPG | JPG image | |
| RM122_0456.JPG | JPG image | |
| RM122_0458.JPG | JPG image | |
| Rm225_0464.JPG | JPG image | |
| RM224_0470.JPG | JPG image | |
| RM224_0469.JPG | JPG image | |
| RM225_9618.JPG | JPG image | |
| RM225_9616.JPG | JPG image | |
| RM225_9617.JPG | JPG image | |
| RM225_9622.JPG | JPG image | |
| RM225_9615.JPG | JPG image | |
| RM109_Mez.JPG | JPG image | |
| Floor Plan v9.pdf | ||
| (1)COMBO_Redacted.pdf | ||
| (1)Updated TRD_Redacted.pdf |
Show all 33
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Task Order Performance Work Statement (PWS) Building 374 GWEF NIPR/SIPR/VoIP Install
CIPS WO#: 96TW-2022-00004.v11
Organization: 782 TRS
Address: Bldg. 374
Eglin AFB, FL 32542
1.0.0 Purpose
Customer requesting premise wiring which consist of 49-NIPR & 6-SIPR drops to meet mission requirements.
1.1.0 Specific Task Objectives
Contractor shall perform and/or adhere to the following:
1.1.1 Room 122 (Communication Room):
1.1.2. Test all existing CAT 5 and CAT 6 cabling in the existing rack to be replaced.
1.1.3 Remove and replace the existing 2 post rack with a lockable 7-foot cabinet (GFE) and applicable hardware.
1.1.4. Existing CAT 5 and CAT 6 patch panels will require being relocated into the new cabinet. Multiple fiber patch panels will require relocation also.
1.1.4.1 Relocate electrical power from existing 2-post rack to new lockable 7-foot cabinet.
1.1.5. For the new CAT 6 locations being fed from this room. replace existing plastic modular patch panel (Panduit) with shielded variety and re-install existing connectors. Patch Panel must accept Panduit Mini-comms and come with integrated strain relief. (added)
1.1.6. Install 1-each 1.25-inch plenum innerduct from the new cabinet to comm room 225 rack 2.
1.1.6.1. Install a 12 strand SM MIC cable within this innerduct.
1.1.7. A 1 RU fiber FODP with splice on connectors will be required on both ends.
1.1.8. The new cabinet will require a bond to the building grounding system.
1.1.9 Pre and post test results of the existing CAT 5 and CAT 6 cabling that is relocated will be required for the 96 CS to approve the completed install.
1.1.10 Telecommunications Rooms Grounding and Bonding (added):
1.1.10.1 Contractor shall install telecommunications copper Primary Busbar (PBB) in comm room 122 and conductors suitable for indoor installation in accordance with ANSI/TIA-607.
1.1.10.2 Busbar(s) and conductor(s) must be made of copper or copper alloys having a minimum of 95% conductivity.
1.1.10.3 Install ground conductor of appropriate sizing (#6 AWG up to #750 MCM) from the telecommunication room busbar location to the main building or servicing floor electrical panel in EMT conduit.
1.1.10.4 Conduit shall be identified, tagged, or labeled from point-to-point as Telecommunications Bonding Conductor (TBC).
1.1.10.5 Connections of the TBC and the Telecommunications Bonding Backbone (TBB) shall utilize UL listed compression two-hole lugs or two-hole irreversible crimp connector.
1.1.10.6 If two or more TBB are used in a multistory facility the TBB shall be bonded together with a Grounding Equalizer (GE) between telecommunication spaces.
1.1.10.7 The GE shall be, as a minimum, the same size as the largest TBB.
The following items shall be attached to the PBB…cable tray, cable ladder, racks, cabinets, metal conduits (over 2 feet in length) and PETs.
1.2.1. Room 146 (removed—see deleted para below):
1.3.1. Rooms 109A, 109, and mezzanine (removed—see deleted para below):
1.4.1. Room 108:
1.4.2. Reuse the existing cable tray through rooms 133 and 119 and down the hallway, and existing wall penetration into the front room of 108.
1.4.3. Reuse the existing 4-inch conduit around Room 108 into existing pull box. From pull box, contractor shall install 1-inch EMT to work area outlet location.
1.4.4. Install 2-total Plenum ScTP Non-secure Internet Protocol Router (NIPR) white CAT 6 data cabling and screened jacks from comm room 122 to room 108.
1.4.5. Removed.
1.4.6 Removed.
1.4.7 Removed.
1.5.1. Room 106A:
1.5.2. Reuse the existing cable tray through rooms 133 and 119 and down the hallway.
1.5.3. Core the concrete wall and install a 2-inch dielectric sleeve into room 106A.
1.5.4. Install j-hooks above the drop ceiling as necessary to the new work area outlet EMT stub up.
1.5.5. Install 2-total Plenum ScTP Non-secure Internet Protocol Router (NIPR) white CAT 6 data cabling and screened jacks from comm room 122 to room 106A.
1.6.1. Room 118:
1.6.2. Reuse the existing cable tray in room 133.
1.6.3. Install j-hooks the tray to the 4-inch sleeves in the floor of 133.
1.6.4. Install cable tray/ or basket or 2-ich EMT down the wall for cable pathway to the sleeves. Ensure newly installed pathway is bonded per applicable standards.
1.6.5. In room 132 install j-hooks under the raised floor from the sleeves into 133 to the existing sleeve into room 118.
1.6.6. Install 2-total Plenum ScTP Nonsecure Internet Protocol Router
122 to room 118.
1.7.1. Room 132:
1.7.2. Reuse the existing cable tray in room 133.
1.7.3. Install j-hooks under the raised floor from the sleeves into room 133.
1.7.4. Reusing the path built for 118, install 2-total Plenum ScTP Non-secure Internet Protocol Router (NIPR) white CAT 6 data cabling and screen jacks from comm room 122 to room 132.
1.8.1. Rooms 136, 139, 140, 143 and 145:
1.8.2. Core the concrete wall and install a 2-inch dielectric sleeve into room 136.
1.8.3. Install a 2-inch EMT down the wall to gain access to under the floor in room 136. Ensure newly installed EMT is bonded per applicable standards.
1.8.4. Core the concrete wall under the floor from room 136 to 139.
1.8.5. Install j-hooks under the raised floor from 136 to 145.
1.8.6. Reuse the existing 4-inch sleeves between rooms 139, 140, 143 and 145. Note: Outlets may be terminated into an outlet box below the floor where no wall is readily available. In this case, an appropriately sized hole (large enough for 4 ScTP cables) that provides protection (grommet) for the patch cable will be provided by the contractor. A patch cable of appropriate length connecting below-floor outlet to customer work area will also be provided to the customer. In areas where outlet is requested on or near a wall, contractor will provide 1-inch EMT stubbed from below-floor to wall mounted outlet 18-inches above raised floor.
1.8.7. Install 10-total Plenum ScTP Non-secure Internet Protocol Router (NIPR) white CAT 6 data cabling and jacks from comm room 122 to rooms 136, 139, 140, 143 and 145.
1.9.1. Room 225 (Communication Room):
1.9.2. Install 1-each 1 RU FODP for the new 12 strand SM MIC cable to Comm room 122 in rack 2.
1.9.3. Install a 48 port SCTP CAT 6 Modular patch panel with strain relief in rack 2 for the NIPR cable going to rooms 203, 210, 224, 229B, 230, and 231.
1.10.1. Rooms 210 and 224:
1.10.2. Install j-hooks under the raised floor in both rooms.
1.10.3. Reuse the existing sleeve from room 210 to 224.
1.10.4. Reuse the existing 4-inch sleeve above the drop ceiling from 224 to 216.
1.10.5. Install a 2-inch EMT sleeve down the wall to gain access to below the raised floor in 224. Ensure newly installed EMT is bonded per applicable standards.
1.10.6. Install 4-total Plenum ScTP Non-secure Internet Protocol Router (NIPR) white CAT 6 data cabling and screened jacks from comm room 225 to rooms 210 and 224.
1.11.1 Rooms 229B, 230, and 231 (NIPR):
1.11.2. Core the concrete wall and install a 4-inch dielectric sleeve from the hallway into 230.
1.11.3. Place outlets on the wall where applicable using 1-inch EMT.
1.11.4. Install j-hooks under the floor to the work area outlet locations.
1.11.5. Some locations will require work area outlets to be placed on the walls, and patch cables routed to work areas.
1.11.6. (removed):
1.11.7. Install 25-total Plenum ScTP Non-secure Internet Protocol Router
225 to rooms 230, 231 and 229B.
1.12.1 Rooms 230, and 231 (SIPR):
1.12.2 Install a new wall mount cabinet (GFE) with fire retardant backboard in room 230.
1.12.2.1 The cabinet will require a grounding bond to building grounding system.
1.12.2.2 Relocate electrical power outlet beneath raised floor to new network cabinet. Ensure outlet meets NEMA standard 5-20R.
1.12.3 Install a 2-inch EMT from the cabinet to above the ceiling.
1.12.4 Install dedicated j-hook pathway for the SIPR cables above the ceiling.
1.12.5 (removed):
1.12.6 Install 6-total Plenum ScTP Secure Internet Protocol Router (SIPR) Red Screened CAT 6 data cabling and screened jacks from room 230 to room 231.
1.13.1. Room 203:
1.13.2 Reuse the existing cable tray to comm room 225.
1.13.3 Core the concrete wall and install a dielectric sleeve from the hallway into room 203.
1.13.4 Install j-hooks from the sleeve to the work area outlet location.
1.13.5 Install 2-total Plenum ScTP Non-secure Internet Protocol Router
225 to room 203.
Contractor shall also adhere to the following:
1.14.1 (removed—see deleted para below):
1.14.2 Contractor is required to include in their response to the request for quote, a list of the products they plan to provide, along with corresponding part umbers and quantities for technical approval.
1.14.3 Category 6 network wiring shall be tested per industry standards, such as DB loss, head room, wire map, attenuation, and length of the cable between the telecommunications room and the work area outlet or connection point. The test results shall be documented with equipment having a current calibration date within one year of testing.
1.14.4 The government reserves the right to refuse final acceptance until all discrepancies have been resolved to the satisfaction of the government.
1.14.5 Communications Deliverables: Contractor/Installer shall provide for review final ISP/OSP copper or fiber test report(s) and as-built/as-installed drawings prior to scheduling a final quality assurance inspection. Note:
Deliverable guidance can be found in the 96 CS Cyber Infrastructure Standards and Installation Specifications.
1.14.6 Contractor shall provide copper cable slack within the cable tray for maintenance within the horizontal cabling system configuration as follows in Telecommunications room cable ladder -ScTP 10-feet, Work area outlet
- ScTP 1-foot above ceiling. Do not put slack or service loops in communications cabinets or racks.
1.14.7 Downward sloped 4 port face plates with label windows shall be used. All CAT 6 terminations shall be TIA-568A. All new work area outlets shall have a j-hook placed either above the ceiling or with in proximity to an under the floor outlet and a minimum of 12-inches of slack provided on the j-hook. Reference drawing T-001 and T-002.
1.14.8 Perform 100% verification acceptance test and provide a test report for Single mode optical fibers, (all strands) end-to-end attenuation tests IAW NECA/FOA 301-2016, OFSTP-14, OFSTP-7, TIA-568-C.3, and TIA-526-7.
Installer shall use Tier One Testing using an Optical Power Meter and Light
Source for all Inside Plant (ISP) multi-mode optical fibers. Fiber test equipment must be calibrated within one year of testing.
1.14.9 This statement outlines that the technical solutions provided are offered as recommendations and that the contractor is obligated to undertake the design and engineering process in compliance with all relevant and applicable standards.
1.14.9 The provided floor plan illustrates our customers’ preliminary requirement (See Attachments below)
2.0 General Technical Requirements
The following design criteria provides additional requirements and guidance for Eglin AFB installations. These specific requirements are to be implemented by means of all applicable publications and documents referenced within this guide:
2.1 Inside Plant:
Common Patch Panel configuration with Modular style terminations. Site survey will be used to determine best arrangement to fit customer needs and system standards. Ladder rack and cable tray will be included in the TR design to properly facilitate cable routing. All cabinets, racks, ladder rack and cable tray will be grounded per Industry Standard, ANSI 607.
2.3. Telecomm Outlets/Jacks:
Single Gang Outlet Box - Flush Mount. (Single Gang Faceplate Mounting Bracket for Low Voltage Applications, 1-1/4" Maximum Wall Thickness, Finish:
Pre-galvanized.)
Single Gang Outlet Box - Surface Mount. (Single gang two-piece screw together outlet box. Box accepts Pan-Way® Screw-On Faceplates or any NEMA standard single gang faceplate. For use with Pan-Way® LD profile raceway.
5.19in L x 3.45in W x 1.75in H (131.9mm x 87.7mm x 44.4mm). Breakouts for 1/2in, 3/4in, or 1in diameter conduit, International White)
Single Gang 4 Port Faceplate. (4 port minimum. Mini Com Classic series single gang downward sloped faceplate that accepts four modular jacks, Off White)
Data Jack. (The Category 6, RJ45, 8-position, 8-wire, UTP Mini-Com® universal jack module has TG-style termination. Off white)
Blank Inserts. (Mini-Com® 1-port blank module, reserves space for future use, Off White)
Surface Mount Raceway System. Tamper resistant two-piece latching surface raceway. Supplied with pre-punched mounting holes and factory applied adhesive tape. Available in 6', 8', and 10' lengths, Off White. Compatible with surface mount outlet box. Additionally, all surface mounted raceway systems shall be screwed to the wall to prevent adhesive from detaching from mounted surface.
2.4 Telecommunications Cabling:
Riser CAT 6. (CAT6+ (600MHz), 4-Pair, U/UTP-Unshielded, Riser-CMR, Premise Horizontal Cable, 23 AWG Solid Bare Copper Conductors, Polyolefin Insulation, X Spline, Ripcord, PVC Jacket)
Plenum CAT 6 (NIPR). Copper Cable, Giga SPEED XL 2071E, 23 AWG, 4 Pair, Unshielded, UTP, Solid Bare Copper Conductor, FEP/PVC, CMP, white jacket)
Plenum CAT 6 (SIPR). Copper Cable, Giga SPEED XL 2071, 23AWG, 4 Pair, Shielded, ScTP, Solid Bare Copper Conductor, FEP/PVC, CMP, red jacket.
2.5 Cat 6 Connector Block (Patch Panel):
24/48 Port. Constructed for maximum strength and durability. Supports both T568A and T568B wiring configurations using an easy-to-read color-coded wiring label. Rack-mount modular panels shall include an integrated cable management requirement for cable routing and strain relief. Provide a complete modular system from patch panel to work area outlet.
Strain Relief Requirements. All Strain relief bars shall consist of a metal bar that mounts to the rear of a standard EIA 19" rack to support a minimum of 24 cables exiting from the back of a patch panel with a 2-inch to 5-inch inward mounted offset. Cables shall be secured with integrated adjustable clips, hook and loop strips or cable ties. Optional quick release brackets shall provide an easy way to remove the strain relief bar without the use of tools.
3.0 Singularly Managed Infrastructure with Enterprise Level Security (SMI-ELS)
3.1 Infrastructure Implementation and Operation
3.2 Network Services and Solutions
3.2.1 Site Preparation and Installation Services
The contractor shall perform site preparation and installation activities to support implementation of required services and solutions under this contract at any AF, DoD, or other Federal Agency location.
3.2.2. Requirements Analysis and Conceptual Design
3.2.3 Site Survey
The contractor shall perform site surveys at required locations. The findings of the site survey and any actions required in preparation for system installation shall be documented.
3.2.4 Installation
The contractor shall engineer, install, configure, modify, relocate, or remove Communication and Information (C&I) systems for operational use. The systems and equipment installations or modifications must comply with established architectures. The contractor shall perform validation and verification testing on the system, assist users in configuring the system to meet their system requirements and provide all applicable operating manuals/system management guides. Further, the contractor shall provide pre-cutover and post-cutover on-site training IAW with TOs. The government will identify personnel who will receive this training. The training shall provide for in-depth hands-on maintenance, operations, and database administration.
3.2.5 Inside Plant
The contractor shall, (as required by each TO), install and configure all the components for inside the plant (e.g., power, groundings, racks, fiber optic distribution panels, equipment, internal cabling, comm. closet, etc.). The contractor shall install and test all cable and components IAW accepted industry standards, unless superseded by a Government approved IS indicated within the TO. Electrical and communications cable, conduits, and circuits shall be installed IAW the National Electric Code (NEC). The contractor shall clearly label each end of every individual cable in accordance with the floor plans or engineering drawings. The contractor shall provide attached labels that are durable and legible. For any deviations to the specific installation specification, the contractor shall submit a proposal to the CO for approval.
3.2.6 Tools and Testing Support
The contractor shall provide all tools, installation materials and test equipment required to perform any required product installation and maintenance as called for by the TO. All tools and test equipment shall remain the property of the contractor. Any damage caused by the contractor to existing site facilities or equipment which might occur during site preparation, installation, testing or cutover of the system will be repaired at the expense of the contractor unless otherwise directed by the government. The site shall be restored to the original condition which existed prior to the event unless otherwise directed. The TO will specify testing and inspection requirements. The contractor shall demonstrate that the system design meets the reliability/availability/maintainability requirements of the TO.
4.0. DELIVERABLES
As-Built Documentation. Contractor format for deliverables is subject to Government acceptance. The installer shall provide accurate As-Built documentation of the entire install (i.e., rack elevations, cable route drawings, etc.) with type of cable path variations identified clearly. All deliverables shall be produced using recommended software tools/versions as accepted by the Government.
Standard Air Force NIPR/SIPR Data/Voice Wall-Mount Rack Elevation
5.0 Test and Acceptance Documentation.
The Contractor shall submit test reports within 3 duty days prior to final test and acceptance. The test reports shall show the tests performed to verify compliance with the specified performance criteria. Test reports shall include record of the physical parameters verified during testing. The contractor shall correct any errors or performance deficiencies detected by testing. The government reserves the right to refuse final acceptance until all discrepancies have been resolved to the satisfaction of the government.
APPLICABLE STANDARDS CONTRACTORS & INSTALLERS SHALL ADHEAR TO:
Standards shall be used as a baseline of quality and craftmanship for installing communications products and systems connectivity the AFNET
National Electrical Code (NEC) and National Electrical Manufacturers Association (NEMA) Standards: NFPA 70
Unified Facilities Criteria: (UFC) 3-520-1, 3-580-1, 4-010-06 dated most recent.
American National Standards Institute/Telecommunications Industry Association (ANSI/TIA) Standards: 568, 569, 606, 607 dated most recent.
National Electrical Contractors Association/Fiber Optic Association: (NECA/FOA) 301- 2016 Installing and Testing Fiber Optics
Building Industry Consulting Service International (BICSI) - Telecommunications Distribution Methods Manual 14, Industry Best Practices “Preferred”
96th Communications Squadron Cyber Infrastructure Standards and Installation Specifications, to include Applicable Publications and Standards referenced in Attachment G, dated NOV 2022
All DoD and Industry standards/guidelines shall be used to provide a complete system, from end to end. Note: Since Standards are continually being revised, contractors and installers should refer to the latest version of any relevant standard for compliance.
6. Contractual Requirements
6.1 Performance Reporting
The contractor’s performance will be monitored by the government and reported in Contractor Performance Assessment Reporting (CPARs). Performance standards shall include the contractor’s ability to:
1. Provide quality products, incidentals and customer support.
2. Meet customer’s agreed-upon timelines for scheduled delivery of items, warranty, and/or incidental services: Emergency/critical, Maintenance/Warranty – 24 x 7 x 365, and remote OCONUS, OCONUS vs.
CONUS response times.
3. Provide satisfactory product repairs or advance replacement, as appropriate.
4. Provide timely and accurate reports.
5. Respond to the customer’s requests for proposals and configuration assistance as identified in each delivery order.
6. Meet subcontracting goals.
6.2 Program Management
The contractor shall identify a Program Manager who shall be the primary representative responsible for all work awarded under this contract, participating in Program Management Reviews and ensuring all standards referenced herein are adhered to.
6.2.1 Services Delivery Summary
The Services Delivery Summary (SDS) will be in accordance with AFI 63-101, Acquisition and Sustainment Life Cycle Management and FAR Subpart 37.6, Performance-Based Acquisition. SLAs will be defined in each TO.
Desired Outcome Performance
Objective Performance Threshold
Overall Outcome
Specific Outcomes
Target Tolerance
Compliance Ensure Deliver the Documentation 98% of the with compliance with Infrastructure submitted IAW time Infrastructure Infrastructure Solutions w/ CDRL A001
Solutions Solutions predetermined verifies the TO support deliverables outcomes and on was completed on requirements requirements time time
(delivery, quality)
6.2.2 TO Management
The contractor shall establish and provide a qualified workforce capable of performing the required tasks. The workforce may include a project/TO manager who will oversee all aspects of the TO. The contractor shall use key performance parameters to monitor work performance, measure results, ensure delivery of contracted product deliverables and services, support management and decision-making and facilitate communications. The contractor shall identify risks, resolve problems and verify effectiveness of corrective actions. The contractor shall institute and maintain a process that ensures problems and action items discussed with the government are tracked through resolution and shall provide timely status reporting. Results of contractor actions taken to improve performance should be tracked and lessons learned incorporated into applicable processes. The contractor shall establish and maintain a documented set of disciplined, mature and continuously improving processes for administering all contract and TO efforts with an emphasis on cost-efficiency, schedule, performance, responsiveness and consistently high-quality delivery.
6.2.3 Configuration and Data Management
The contractor shall establish, maintain and administer an integrated data management system for collection, control, publishing and delivery of all program documents. The data management system shall include but not be limited to the following types of documents: CDRLs, White Papers, Status Reports, Audit Reports, Agendas, Presentation Materials, Minutes, Contract Letters and TO Proposals. The contractor shall provide the government with electronic access to this data, including access to printable reports. The contractor shall have an approved property control system IAW FAR 45, DFARS 245 and approved procedures to document and track all GFM and GFE. The contractor shall provide as-built documentation including, but not limited to, drawings and diagrams of the solution provided under each TO identifying specific cards in a chassis/shelf. The as-built documentation shall also include layout drawings, power drawings/specifications, floor plans and engineering specifications generated in support of the installation of the system. Documentation shall also include equipment listing with serial/model numbers and manufacturer specifications.
6.2.4 Records, Files and Documents
All physical records, files, documents and work papers, provided and/or generated by the government and/or generated for the government in performance of this PWS, maintained by the contractor which are to be transferred or released to the government or successor contractor, shall become and remain government property and shall be maintained and disposed of IAW AFMAN 33-363, Management of Records; AFI 33-364, Records Disposition – Procedures and Responsibilities; the Federal Acquisition Regulation, and/or the Defense Federal Acquisition Regulation Supplement, as applicable. Nothing in this section alters the rights of the government or the contractor with respect to patents, data rights, copyrights, or any other intellectual property or proprietary information as set forth in any other part of this PWS and Infrastructure Solutions contract of which this PWS is a part (including all clauses that are or shall be included or incorporated by reference into that contract).
6.3 Security Management
6.3.1 Safeguarding Classified Information
The contractor shall transmit and deliver classified material/reports IAW the National Industrial Security Program Operations Manual (NISPOM) and the National Industrial Security Program Operating Manual (DoD 5220.22-M). These requirements shall be accomplished as specified in the TO. All Classified Contracts must have at a minimum, the Clause 52.204-2 Security Requirement, incorporated into the contract.
Each base will follow its own classified process IAW with the proscribed Federal guidance of the NISPOM and FAR “Subpart 4.4 along with DD Form 254. When transmitting classified information ensure all classified information is properly sanitized and/or degaussed of all sensitive/classified information IAW AFSSI 5020.
6.3.2 Personnel Security
Individuals performing work under these TOs shall comply with applicable program security requirements as stated in the TO.
6.3.3 Travel Requirements
The contractor shall coordinate specific travel arrangements with the individual CO or COR to obtain advance, written approval for the travel about to be conducted. The contractor’s request for travel shall be in writing and contain the dates, locations and estimated costs of the travel in accordance with the basic contract clause H047.
If any travel arrangements cause additional costs to the TO that exceed those previously negotiated, written approval by CO is required, prior to undertaking such travel. Costs associated with contractor travel shall be in accordance with FAR Part 31.205-46, Travel Costs. The contractor shall travel using the lower cost mode transportation commensurate with the mission requirements. When necessary to use air travel, the contractor shall use the tourist class, economy class or similar accommodations to the extent they are available and commensurate with the mission requirements. Travel will be reimbursed on a cost reimbursable basis; no profit or fee will be paid.
6.3.4 Other Direct Cost (ODC)
The contractor shall identify ODC and miscellaneous items as specified in each TO. No profit or fee will be added; however, DCAA approved burdened rates are authorized.