1P45D45 RESOLUTE Welin-Lambie Davit Overhaul SOW 2.docx

DOCX document 32 KB Posted

Attached to
IN PLACE OVERHAUL DUAL POINT DAVIT SERVICES FOR CGC RESOLUTE
Solicitation number
70Z080-21-Q-P45D4500
Issued by

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Description/Specification/Work Statement For CGC RESOLUTE Welin-Lambie Davit In-Place Overhaul

Work Statement

CGC RESOLUTE requires a Welin-Lambie In-Place Overhaul of their TW.PIV 5.0B Dual-Point Davit. All the requirements for this work is detailed in the attached Work Item specification. The Government will provide the following, GFE and Welin-Lambie Technical Representative

Period of Performance: 14 June to 04 July 2021.

The CGC Cutter RESOLUTE POC: for this contract is LT Jonathan Upton: (727) 502-1555 or Jonathan.F.Upton@uscg.mil

The SFLC-MECPL POC: Mr. Pete Pilla (757) 628-4624 or peter.d.pilla@uscg.mil

Scope of Services

The contractor shall provide all labor, equipment, to perform an in-place overhaul

File details come from the government source that posted it. Updated .