1P2YH13 SOW Cat D-398 Line Bore Insp OHAUL KIT.docx
DOCX document 14 KB Posted
- Solicitation number
- 70Z080-21-Q-P2YH1300
View the file
Other files
| File | Type | Posted |
|---|---|---|
| SOW CAT OHAUL KIT LINE BORE INSP FORWARD 1P2YH13.docx | DOCX document | |
| SOW 1P2YH13 NR 2 Caterpillar D-398 Overhaul Kit.docx | DOCX document | |
| 21P2YH13 AUG 2021 FAR CLAUSE 52.212-5.docx | DOCX document | |
| DOL WAGE RATES PORTSMOUTH VA AUG 21.txt | TXT text file | |
| LIST for NR 3 270 WMEC D398 CAT OVHL KIT.xlsx | XLSX spreadsheet | |
| SF 18 21P2YH13.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOW for Caterpillar D-398 Line Bore Inspection
RFQ NR 70Z08021QP2YH1300
The U.S. Coast Guard is completing an overhaul of a ship service diesel generator. This engine is a Caterpillar D-398 series. The engine serial number is 66B09868. The arrangement number is 3N1127. As part of our overhaul process, we need to determine if the crankshaft main bearing bore, alignment is correct or must be corrected via machine work.
This work is restricted to Caterpillar Service Centers only as the timeline is extremely short and cannot be extended without a negative impact to the project timeline. Caterpillar Service Centers are familiar with this engine, the inspection process, and the detailed machine work involved with correcting for any misalignment that might be identified.
The purpose of this inspection is to compare the actual crank line bore measurements as found upon disassembly to the Caterpillar (OEM) specifications for a D-398 engine. Once the measurements have been taken, the machinist must provide a preliminary report to the ships engineer officer detailing the results for each main bearing. The report must include a recovery plan detailing what actions should be taken (if necessary) to return the bores to OEM specifications.
As we have a very limited performance period to work within, the inspection and any necessary machine work must be completed on the dates given below. Because of the compressed schedule any machine work (once approved) can be conducted non-stop until completed. The vessel will provide an inspector/assistant to support this effort.
A final report providing detailed measurements against the OEM specifications must be provided in writing and reviewed with the ships engineer officer prior to departing the vessel.
The vessel will have the NR. 1 Ship Service Diesel Engine completely disassembled and flipped upside down to facilitate the crankshaft line bore inspection prior to vendor arrival. The work will be completed within CGC FORWARD’s engine room on the November 8th & 9th of 2021 at the following address:
COMMANDING OFFICER
USCGC FORWARD (WMEC 911)
4000 COAST GUARD BLVD
PORTSMOUTH, VA 23703
ATTN: LT Jeffrey Cancel at 757-483-8740 As the vessel will be deployed until shortly prior to the start of this project, all questions should be directed to Phillip. W. Norris at 757-628-4556 or via email at Phillip.W.Norris@uscg.mil