This is a design package and scope of work document for a federal construction contract at the U.S. Embassy in Mbabane, Eswatini. The document outlines specifications for a local contractor to install underground infrastructure including handholes, pull boxes, and conduit systems. The project is identified as MBABANE-PME-25006 with a 100% design submission approval dated 03/26/2026.

The scope requires the local contractor to excavate trenches, install Schedule 80 PVC conduit buried 24 inches below finish grade, install lockable handholes with drainage, install junction boxes and access panels, and perform concrete repair and soil backfill work. All work must comply with 2018 International Fire Code, 2020 National Electrical Code, 2022 OBO Design Standards, and other referenced standards. The contractor must provide a resident registered/certified/licensed civil engineer or qualified construction supervisor on-site with at least two years' experience, submit detailed project schedules with critical path analysis, and provide weekly progress reports. The contractor is responsible for verifying existing utilities, protecting embassy equipment and property, maintaining a 1:5 escort ratio per post access control policy, and providing employee names for security vetting 72 hours in advance. Materials are PME-provided unless noted otherwise. Concrete shall be 25MPA, and all backfill and soil materials must meet specified compaction percentages per ASTM standards. Post maintains final approval authority over all work performed.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DS

U.S. DEPARTMENT of STATE

D E

P

A R T M E N T

U N

I T E

D

S T A T E S O F A

M E

R I C

A

OF

ST

A T

E

L

K

J

H

G

F

E

D

C

B

2 3 4

THE CONTRACTING OFFICER REPRESENTATIVE (HEREAFTER REFERRED TO AS POST)

WILL RETAIN THE SERVlCES OF A LOCAL CONTRACTOR TO PERFORM THE BELOW

SCOPE OF WORK. POST WILL HANDLE ALL THE CONTRACT LEGAL REQUIREMENTS

WITH THE LOCAL CONTRACTOR. DS/FSE/PME (HEREAFTER REFERRED TO AS PME)

WILL PROVIDE THE DESIGN DRAWINGS AND SCOPE OF WORK.

THIS DOCUMENT OUTLINES THE SCOPE OF WORK AND SPECIFICATIONS FOR THE

LOCAL CONTRACTOR AS FOLLOWS:

GENERAL

1.A. DESIGN DRAWINGS AND SPECIFICATIONS

PME WILL PROVIDE THE DESIGN PACKAGE AND SPECIFICATIONS FOR THE LOCAL

CONTRACTOR TO INSTALL THE INFRASTRUCTURE FOR THE HANDHOLES, PULL

BOXES, AND UNDERGROUND CONDUIT AS OUTLINED IN THIS DRAWING PACKAGE.

SOLICITATION AWARD AND IMPLEMENTATION OF THIS LOCAL CONTRACTOR PACKAGE

MUST MEET THE REQUIREMENTS DESCRIBED IN THE PROVIDED POST REQUEST

MEMO.

IT IS THE LOCAL CONTRACTORS RESPONSIBILITY TO REVIEW AND UNDERSTAND

THE WORK INVOLVED AND WHAT IS REQUIRED TO COMPLETE THE PROJECT. IF

ANY ERROR OR INCONSISTENCIES ARE FOUND ON THE DRAWINGS, LOCAL

CONTRACTOR WILL BRING THESE TO THE ATTENTION OF POST AND/OR PME.

LOCAL CONTRACTOR SHALL HAVE A RESIDENT REGISTERED/CERTIFIED/LICENSED

CIVIL ENGINEER OR GRADUATE ARCHITECT ON SITE OR A QUALIFIED

CONSTRUCTION SUPERVISOR AT ALL TIMES, WHO SHOULD HAVE AT LEAST TWO

YEARS EXPERIENCE IN SIMILAR WORK AND CAN SPEAK, WRITE AND READ ENGLISH

AT A MODERATE OR HIGHER LEVEL. LOCAL CONTRACTOR SHALL SUBMIT THE

CURRICULUM VITAE OF THE RESIDENT ENGINEER TO THE EMBASSY COMPOUND

FOR APPROVAL.

LOCAL CONTRACTOR WILL PROVIDE A DETAILED PROJECT SCHEDULE, WITH START

AND END DATES FOR WORK ACTIVITIES AND STATING A CRITICAL PATH.

LOCAL CONTRACTOR WILL PROVIDE POST WITH WEEKLY WORK PROGRESS REPORTS

AND CONSTRUCTION SCHEDULE UPDATES DURING THE DURATION OF THE

PROJECT.

POST WILL HAVE FINAL APPROVAL OF ALL WORK PERFORMED BY LOCAL

CONTRACTOR.

1.B. MATERIALS

1.B.1. PME PROVIDED MATERIALS

PME WILL PROVIDE ALL MATERIALS FOR THIS DESIGN PACKAGE, UNLESS

NOTED OTHERWISE WITHIN THE DOCUMENT.

1.C. CODES AND GUIDELINES

ALL WORK SHALL BE ACCOMPLISHED AS PER THE FOLLOWING CODES AND

GUIDELINES.

1. 2018 INTERNATIONAL FIRE CODE (IFC) AND 2020 NATIONAL ELECTRICAL

CODE (NEC).

2. 2022 OBO DESIGN STANDARDS (2018 INTERNATIONAL CODES AS ADOPTED

AND AMENDED).

3. OS SECURITY ENGINEERING APPLICATION GUIDELINES.

4. 1990 AMERICANS WITH DISABILITIES ACT.

5. ASCE/SEI 7-16 MINIMUM DESIGN LOADS AND ASSOCIATED CRITERIA FOR

BUILDINGS AND OTHER STRUCTURES.

1.D. DESIGN CRITERIA

1.0.1. RISK CATEGORY

1. OFFICE AND UTILITY BUILDINGS Ill

2. ALL OTHER BUILDINGS

1.D.2. WIND CRITERIA

1. ULTIMATE DESIGN WIND SPEED

A. RISK CATEGORY Ill

B. RISK CATEGORY II

47 m/s (105.1 MPH) 44 m/s (98.4 MPH)

2. EXPOSURE C

1.D.3. SEISMIC CRITERIA

1. MCE SPECTRAL RESPONSE ACCELERATIONS (MCEr)

A. SHORT PERIOD, Ss 0.62

B. 1-SECOND PERIOD, S, 0.3

2. SEISMIC IMPORTANCE FACTOR

A. OFFICE AND UTILITY BUILDINGS 1.25

B. ALL OTHER BUILDINGS 1.00

3. SITE CLASS D

4. DESIGN SPECTRAL RESPONSE COEFFICIENTS

2 3 4

5 6

A. SHORT PERIOD, Sos

B. 1-SECOND PERIOD, So1

5. SEISMIC DESIGN CATEGORY

0.54

0.40

6. SEISMIC REQUIREMENTS FOR NON-STRUCTURAL COMPONENTS

A. COMPONENT IMPORTANCE FACTOR, p 1.0

1.E. SITE AND SAFETY REQUIREMENTS

1.E.1. SITE INSTALLATION OVERSIGHT

INSTALLATION OVERSIGHT, SUPERVISION AND ESCORTING IS THE

RESPONSIBILITY OF POST IN ACCORDANCE WITH ANY SITE SPECIFIC SECURITY

DIRECTIVES.

1.E.2. SITE PREPARATION

LOCAL CONTRACTOR WILL BE RESPONSIBLE FOR CLEANING AND REMOVING

ALL DEBRIS FROM THE EMBASSY COMPOUND TO THE NEAREST AUTHORIZED

DUMP FACILITY (AUTHORIZED BY THE TOWN). THE AREAS AFFECTED BY

LOCAL CONTRACTOR'S WORK MUST BE RETURNED BACK TO

PRE-CONSTRUCTION CONDITIONS AFTER THE WORK IS COMPLETED. (E.G.

GRASS, GRAVEL, SIDEWALK, LANDSCAPING, ASPHALT ETC.)

LOCAL CONTRACTOR SHALL LIMIT THE SITE DISTURBANCE TO A MAXIMUM 6

FEET (1829 MM) ON EACH SIDE OF TRENCH. EXCAVATED MATERIAL WILL BE

PLACED NEXT TO THE EXCAVATED AREA TO BE USED AS SELECT BACKFILL.

A CONSTRUCTION LAYDOWN AREA. IF NEEDED, WILL BE THE RESPONSIBILITY

OF POST TO COORDINATE.

1.E.3. SITE SAFETY

LOCAL CONTRACTOR MUST CLEARLY MAJRK ALL EXCAVATION WORK ZONES

WITH WAJRNING SIGNS AND YELLOW PLASTIC SAFETY TAPE FIXED TO WOOD

POSTS. LOCAL CONTRACTOR MUST COMPLY WITH ALL APPLICABLE SAFETY

STANDARDS TO PROTECT THE EMBASSY COMPOUND EMPLOYEES, THE PUBLIC

AND LOCAL CONTRACTOR WORKERS FROM INJURIES AND ACCIDENTS. LOCAL

CONTRACTOR WILL BE HELD LIABLE FOR INJURIES OR ACCIDENTS SUSTAINED

DUE TO NEGLIGENCE BY LOCAL CONTRACTOR DURING THE COURSE OF THIS

PROJECT.

1.E.4. PROTECTION OF THE EMBASSY COMPOUND EQUIPMENT

LOCAL CONTRACTOR MUST MAKE SURE THAT THE EMBASSY COMPOUND

EQUIPMENT AND PROPERTY IN THE WORK ZONE OR SURROUNDING AREAS

ARE PROTECTED TO PREVENT THEM FROM GITTING DAMAGED DURING

CONSTRUCTION. SHOULD ANY REPAIR OR CHANGE HAVE TO BE DONE DUE

NEGLIGENCE BY LOCAL CONTRACTOR OR ITS WORKERS, LOCAL CONTRACTOR

WILL BE RESPONSIBLE FOR THE COSTS INCURRED IN THE REPAIR.

LOCAL CONTRACTOR MUST KEEP ALL DEBRIS AND EXCAVATED MATERIAL

CLEAR OF SERVICE NETWORK DRAJNS, COVERS AND SUMPS NEAR THE

TRENCHES, TO PREVENT CLOGS OR DAMAGE.

1.E.5. THE EMBASSY COMPOUND SECURITY REQUIREMENTS

SEE SECTION 3.A.

2. INFRASTRUCTURE SUPPORT SYSTEM

2.A. HANDHOLE/UNDERGROUND CONDUIT SYSTEM

2.A.1. TRENCH

LOCAL CONTRACTOR WILL VERIFY EXISTING UTILITIES AND PROVIDE AS-BUILT

DRAWINGS PRIOR TO EXCAVATING OF TRENCH. IF THE EXCAVATION WORK

INTERFERES WITH DRAIN OR PIPING, THE LOCAL CONTRACTOR SHALL INFORM

POST AND PROVIDE SUITABLE PROTECTION FOR THESE STRUCTURES PRIOR

TO PROCEEDING WITH THE WORK. IF EXCAVATION CANNOT PROCEED DUE TO

EXISTING OBSTACLES THEN POST WILL PROVIDE A NEW CONDUIT ROUTE.

ALL TRENCHES WILL BE EXCAVATED TO THE REQUIRED DEPTH ACCORDING TO

SPECIFICATIONS SHOWN ON DRAWINGS.

2.A.2. HANDHOLE (WITH DRAINAGE)

LOCKABLE HANDHOLES WILL BE INSTALLED BY THE LOCAL CONTRACTOR AS

SPECIFIED ON DETAIL DRAWINGS.

LOCAL CONTRACTOR WILL MAKE HOLE PENETRATIONS TO THE EXISTING

MAJNTENANCE HOLES ACCORDING TO NUMBER OF CONDUITS ENTERING AND

EXITING THE MAINTENANCE HOLE.

THE BASE OF THE HANDHOLES SHALL BE PLACED OVER A BASE OF

CRUSHED NON-POROUS ROCK OR GRAVEL AND SAND. THE GRAVEL SIZE

SHALL NOT EXCEED 1/2 INCH (13MM).

2.A.3. CONDUIT

ALL EXISTING CONDUIT SHALL BE LEFT IN PLACE UNLESS NOTED OTHERWISE

ON THE DESIGN DRAWINGS.

UNDER GRASS, DIRT, SIDEWALK OR ASPHALT, INSTALL SCHEDULE 80 PVC

CONDUIT 24 INCHES (610MM) BELOW FINISH GRADE TO THE TOP OF THE

CONDUIT AS SPECIFIED ON THE DRAWINGS.

ALL UNDERGROUND 90 DEGREE BENDS WITH A 12 INCH (305MM) RADIUS

SHALL BE MADE WITH PRE-FABRICATED 90 DEGREE SWEEPING BEND.

6 7 8

9 10 11

UNCLASSIFIED

ALL UNDERGROUND CONDUIT SHALL BE CONVERTED FROM SCHEDULE 80 PVC

TO RGS ABOVE GROUND USING PVC TO RGS COUPLERS.

LOCAL CONTRACTOR SHALL LEAVE A PULL LINE IN ALL INSTALLED CONDUIT

PATHS.

LOCAL CONTRACTOR WILL INSTALL THE CONDUIT FROM THE HANDHOLE TO

HANDHOLE OR THE EXTERIOR JUNCTION BOX AS SHOWN ON DRAWINGS.

ALL CONDUIT STUBBED AND CAPPED ABOVE THE GROUND SHALL BE AT A

HEIGHT OF NO LESS THAN 12" (305mm) FROM THE GROUND. WHEN THE

STUBBED CONDUIT IS NEAR A WALL OR POLE IT MUST BE AT A LEAST 2"

(51mm) FROM THE WALL OR POLE TO ALLOW FOR BOX MOUNTING.

2.A.4. JUNCTION BOXES

LOCAL CONTRACTOR WILL INSTALL JUNCTION BOXES IN ALL LOCATIONS SHOWN

ON DRAWINGS.

2.A.5. ACCESS PANELS

LOCAL CONTRACTOR WILL INSTALL ACCESS PANELS IN ALL LOCATIONS SHOWN

ON DRAWINGS.

2.A.6. CONCRETE

LOCAL CONTRACTOR WILL PROVIDE LABOR AND MATERIALS TO REPAJR

CONCRETE WHERE DISTURBED. CONCRETE COLOR, TYPE AND THICKNESS SHALL

MATCH EXISTING.

CONCRETE USED SHALL BE 25MPA.

CONCRETE MAY NOT BE POURED IF WEATHER CONDITIONS DO NOT PERMIT.

APPROVAL FROM POST MUST BE OBTAINED 24 HOURS PRIOR TO POURING OF

CONCRETE. POST AND LOCAL CONTRACTOR CREW SUPERVISOR MUST BE

PRESENT DURING THE POURING OF CONCRETE.

CONCRETE PLACEMENT

COMPLY WITH REQUIREMENTS AND WITH RECOMMENDATIONS IN ACI 304R FOR

MEASURING, MIXING, TRANSPORTING, AND PLACING CONCRETE.

CONSOLIDATE CONCRETE BY MECHANICAL VIBRATING EQUIPMENT SUPPLEMENTED

BY HAND-SPADING, RODDING, OR TAMPING. USE EQUIPMENT AND

PROCEDURES TO CONSOLIDATE SCREED PAVEMENT SURFACES WITH A

STRAIGHTEDGE AND STRIKE OFF. COMMENCE INITIAL FLOATING USING BULL

FLOATS OR DARBIES TO FORM AN OPEN TEXTURED AND UNIFORM SURFACE

PLANE BEFORE EXCESS MOISTURE OR BLEED WATER APPEARS ON THE

SURFACE. DO NOT FURTHER DISTURB CONCRETE SURFACES BEFORE

BEGINNING FINISHING OPERATIONS OR SPREADING DRY-SHAKE SURFACE

TREATMENTS.

CONCRETE FINISHING

GENERAL: WITTING OF CONCRETE SURFACES DURING SCREEDING, INITIAL

FLOATING, OR FINISHING OPERATIONS IS PROHIBITED.

FLOAT FINISH: BEGIN THE SECOND FLOATING OPERATION WHEN

BLEED-WATER SHEEN HAS DISAPPEARED AND THE CONCRETE SURFACE HAS

STIFFENED SUFFICIENTLY TO PERMIT OPERATIONS. FLOAT SURFACE WITH

POWER-DRIVEN FLOATS, OR BY HAND FLOATING IF AREA IS SMALL OR

INACCESSIBLE TO POWER UNITS. FINISH SURFACES TO TRUE PLANES.

CUT DOWN HIGH SPOTS, AND FILL LOW SPOTS. REFLOAT SURFACE

IMMEDu\TELY TO UNIFORM GRANULAR TEXTURE

- BURLAP FINISH: DRAG A SEAMLESS STRIP OF DAMP BURLAP ACROSS

FLOAT-FINISHED CONCRETE, PERPENDICULAR TO LINE OF TRAFFIC, TO

PROVlDE A UNIFORM, GRITTY TEXTURE.

- MEDIUM-TO-FINE-TEXTURED BROOM FINISH: DRAW A SOFT BRISTLE

BROOM ACROSS FLOAT-FINISHED CONCRETE SURFACE PERPENDICULAR

TO LINE OF TRAFFIC TO PROVIDE A UNIFORM, FINE-LINE TEXTURE.

- MEDIUM-TO-COARSE-TEXTURED BROOM FINISH: PROVIDE A COARSE

FINISH BY STRIATING FLOAT-FINISHED CONCRETE SURFACE

1/16-INCH (1.6MM) TO 1/8-INCHES (3MM) DEEP WITH A

STIFF-BRISTLED BROOM, PERPENDICULAR TO LINE OF TRAFFIC.

3.A. SECURITY REQUIREMENTS

LOCAL CONTRACTOR WILL PROVIDE LABOR AND MATERIALS FOR SOIL WHERE

DISTRIBUTED.

SELECT BACKFILL: ASTM D 2487 SOIL CLASSIFICATION GROUPS SW, SP, AND

SM, OR A COMBINATION OF THESE GROUPS; FREE OF ROCK OR GRAVEL

LARGER THAN 3-INCHES (75MM) IN ANY DIMENSION, DEBRIS, WASTE, FROZEN

MATERIALS, VEGETATION, AND OTHER DELETERIOUS MATTER.

(ASPHALT/CONCRETE) BASE COURSE: NATURALLY OR ARTIFICIALLY GRADED

MIXTURE OF NATURAL OR CRUSHED GRAVEL, CRUSHED STONE, AND NATURAL

OR CRUSHED SAND; ASTM D 2940; WITH AT LEAST 95 PERCENT PASSING A

1-1 /2-INCH ( 40MM) SIEVE AND NOT MORE THAN 8 PERCENT PASSING A

1/4-INCH (6.4MM) SIEVE.

BASE GRAVEL: NATURALLY OR ARTIFICIALLY GRADED MIXTURE OF NATURAL OR

CRUSHED GRAVEL, CRUSHED STONE, AND NATURAL OR CRUSHED SAND;

ASTM D 2940; EXCEPT WITH 100 PERCENT PASSING A 1-INCH (25MM)

SIEVE AND NOT MORE THAN 8 PERCENT PASSING A 1/4-INCH (6.4MM)

SIEVE.

SAND CUSHION: ASTM C 33; FINE AGGREGATE, NATURAL, OR MANUFACTURED

9 10 11

13 14 15

SAND.

COMPACTION OF SOIL BACKFILLS AND FILLS

PLACE BACKFILL AND FILL SOIL MATERIALS IN LAYERS NOT MORE THAN

8-INCHES (203MM) IN LOOSE DEPTH FOR MATERIAL COMPACTED BY HEAVY

COMPACTION EQUIPMENT, AND NOT MORE THAN 4-INCHES (102MM) IN

LOOSE DEPTH FOR MATERIAL COMPACTED BY HAND-OPERATED TAMPERS.

PLACE BACKFILL AND FILL SOIL MATERIALS EVENLY ON ALL SIDES OF

STRUCTURES TO REQUIRED ELEVATIONS, AND UNIFORMLY ALONG THE FULL

LENGTH OF EACH STRUCTURE.

COMPACT SOIL MATERIALS TO NOT LESS THAN THE FOLLOWING PERCENTAGES

OF MAXIMUM DRY UNIT WEIGHT ACCORDING TO ASTM D 1557:

- UNDER STRUCTURES, BUILDING SLABS, STEPS, AND PAVEMENTS,

SCARIFY AND RE-COMPACT TOP 11-INCHES (280MM) OF EXISTING

SUB GRADE AND EACH LAYER OF BACKFILL OR FILL SOIL MATERIAL

AT 95 PERCENT.

- UNDER WALKWAYS, SCARIFY AND RE-COMPACT TOP 6-INCHES

(152MM) BELOW SUB GRADE AND COMPACT EACH LAYER OF

BACKFILL OR FILL SOIL MATERIAL AT 92 PERCENT.

UNDER LAWN OR UNPAVED AREAS, SCARIFY AND RE-COMPACT TOP

6-INCHES (152MM) BELOW SUB GRADE AND COMPACT EACH LAYER

OF BACKFILL OR FILL SOIL MATERIAL AT 85 PERCENT.

- FOR UTILITY TRENCHES, COMPACT EACH LAYER OF INITIAL AND FINAL

BACKFILL SOIL MATERIAL AT 85 PERCENT.

CONVERSION TABLE

CONDUIT SIZE CONDUIT SIZE

IMPERIAL METRIC

1 INCH 25 MILLIMETERS

2 INCHES 51 MILLIMETERS

3 INCHES 76 MILLIMETERS

4 INCHES 102 MILLIMETERS

13 14 15

16 17

L if)_

E-< u �- <� z� �c:., E-< < < rs z� o:l < au <� u< o:l r.n 0...

....:l ::s�

K

< J u 0

....:l

H

G

F

E

� D

C

I I CAD Fll.£ NAME

C-1-240520.dw

PROJECT NUMBER

MBABANE-PME-25006

SIGNED DATE B

11 13 2025 DESIGNED BY DRAWING NUt.13ER

AL Cl.03 DRA'M-lBY

TP

SHEEf

3 OF

A

16 17

2.A.7. SOIL MATERIALS

CONTRACTORS WILL MAINTAIN AN ESCORT RATIO OF 1 : 5 IN ACCORDANCE

WITH POST ACCESS CONTROL POLICY. EMBASSY ESCORTS WILL BE ARRANGED

BY RSO, EITHER THROUGH LOCAL GUARD FORCE, OR IN COORDINATION WITH

FACILITIES MAINTENANCE. LOCAL CONTRACTING PERSONNEL, VEHICLES AND

EQUIPMENT WILL BE SCREENED BEFORE GAINING ENTRY TO THE COMPOUND.

CONTRACTORS ARE REQUIRED TO PROVIDE NAMES AND OTHER PERTINENT

PERSONAL DETAILS OF ALL EMPLOYEES FOR PRE-VETTING AT LEAST 72

HOURS IN ADVANCE OF ANY WORK PERFORMED TO A DESIGNATED EMBASSY

POINT OF CONTACT (POC).

AT THE CLOSE OF EACH BUSINESS DAY, CONTRACTORS WILL GATHER UP

LOOSE TOOLS AND EQUIPMENT TO ENSURE THEY ARE PROPERLY SECURED.

File details come from the government source that posted it. Updated .