TSU _SOW and Design Drawings Specifications.pdf
PDF 3 MB Posted
- Solicitation number
- 19WZ6027Q0001
- Issued by
-
Department of State
About this file
This is a design package and scope of work document for a federal construction contract at the U.S. Embassy in Mbabane, Eswatini. The document outlines specifications for a local contractor to install underground infrastructure including handholes, pull boxes, and conduit systems. The project is identified as MBABANE-PME-25006 with a 100% design submission approval dated 03/26/2026.
The scope requires the local contractor to excavate trenches, install Schedule 80 PVC conduit buried 24 inches below finish grade, install lockable handholes with drainage, install junction boxes and access panels, and perform concrete repair and soil backfill work. All work must comply with 2018 International Fire Code, 2020 National Electrical Code, 2022 OBO Design Standards, and other referenced standards. The contractor must provide a resident registered/certified/licensed civil engineer or qualified construction supervisor on-site with at least two years' experience, submit detailed project schedules with critical path analysis, and provide weekly progress reports. The contractor is responsible for verifying existing utilities, protecting embassy equipment and property, maintaining a 1:5 escort ratio per post access control policy, and providing employee names for security vetting 72 hours in advance. Materials are PME-provided unless noted otherwise. Concrete shall be 25MPA, and all backfill and soil materials must meet specified compaction percentages per ASTM standards. Post maintains final approval authority over all work performed.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| RFQ_Construction Services-Technical Security Upgrade.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DS
U.S. DEPARTMENT of STATE
D E
P
A R T M E N T
U N
I T E
D
S T A T E S O F A
M E
R I C
A
OF
ST
A T
E
L
K
J
H
G
F
E
D
C
B
2 3 4
THE CONTRACTING OFFICER REPRESENTATIVE (HEREAFTER REFERRED TO AS POST)
WILL RETAIN THE SERVlCES OF A LOCAL CONTRACTOR TO PERFORM THE BELOW
SCOPE OF WORK. POST WILL HANDLE ALL THE CONTRACT LEGAL REQUIREMENTS
WITH THE LOCAL CONTRACTOR. DS/FSE/PME (HEREAFTER REFERRED TO AS PME)
WILL PROVIDE THE DESIGN DRAWINGS AND SCOPE OF WORK.
THIS DOCUMENT OUTLINES THE SCOPE OF WORK AND SPECIFICATIONS FOR THE
LOCAL CONTRACTOR AS FOLLOWS:
GENERAL
1.A. DESIGN DRAWINGS AND SPECIFICATIONS
PME WILL PROVIDE THE DESIGN PACKAGE AND SPECIFICATIONS FOR THE LOCAL
CONTRACTOR TO INSTALL THE INFRASTRUCTURE FOR THE HANDHOLES, PULL
BOXES, AND UNDERGROUND CONDUIT AS OUTLINED IN THIS DRAWING PACKAGE.
SOLICITATION AWARD AND IMPLEMENTATION OF THIS LOCAL CONTRACTOR PACKAGE
MUST MEET THE REQUIREMENTS DESCRIBED IN THE PROVIDED POST REQUEST
MEMO.
IT IS THE LOCAL CONTRACTORS RESPONSIBILITY TO REVIEW AND UNDERSTAND
THE WORK INVOLVED AND WHAT IS REQUIRED TO COMPLETE THE PROJECT. IF
ANY ERROR OR INCONSISTENCIES ARE FOUND ON THE DRAWINGS, LOCAL
CONTRACTOR WILL BRING THESE TO THE ATTENTION OF POST AND/OR PME.
LOCAL CONTRACTOR SHALL HAVE A RESIDENT REGISTERED/CERTIFIED/LICENSED
CIVIL ENGINEER OR GRADUATE ARCHITECT ON SITE OR A QUALIFIED
CONSTRUCTION SUPERVISOR AT ALL TIMES, WHO SHOULD HAVE AT LEAST TWO
YEARS EXPERIENCE IN SIMILAR WORK AND CAN SPEAK, WRITE AND READ ENGLISH
AT A MODERATE OR HIGHER LEVEL. LOCAL CONTRACTOR SHALL SUBMIT THE
CURRICULUM VITAE OF THE RESIDENT ENGINEER TO THE EMBASSY COMPOUND
FOR APPROVAL.
LOCAL CONTRACTOR WILL PROVIDE A DETAILED PROJECT SCHEDULE, WITH START
AND END DATES FOR WORK ACTIVITIES AND STATING A CRITICAL PATH.
LOCAL CONTRACTOR WILL PROVIDE POST WITH WEEKLY WORK PROGRESS REPORTS
AND CONSTRUCTION SCHEDULE UPDATES DURING THE DURATION OF THE
PROJECT.
POST WILL HAVE FINAL APPROVAL OF ALL WORK PERFORMED BY LOCAL
CONTRACTOR.
1.B. MATERIALS
1.B.1. PME PROVIDED MATERIALS
PME WILL PROVIDE ALL MATERIALS FOR THIS DESIGN PACKAGE, UNLESS
NOTED OTHERWISE WITHIN THE DOCUMENT.
1.C. CODES AND GUIDELINES
ALL WORK SHALL BE ACCOMPLISHED AS PER THE FOLLOWING CODES AND
GUIDELINES.
1. 2018 INTERNATIONAL FIRE CODE (IFC) AND 2020 NATIONAL ELECTRICAL
CODE (NEC).
2. 2022 OBO DESIGN STANDARDS (2018 INTERNATIONAL CODES AS ADOPTED
AND AMENDED).
3. OS SECURITY ENGINEERING APPLICATION GUIDELINES.
4. 1990 AMERICANS WITH DISABILITIES ACT.
5. ASCE/SEI 7-16 MINIMUM DESIGN LOADS AND ASSOCIATED CRITERIA FOR
BUILDINGS AND OTHER STRUCTURES.
1.D. DESIGN CRITERIA
1.0.1. RISK CATEGORY
1. OFFICE AND UTILITY BUILDINGS Ill
2. ALL OTHER BUILDINGS
1.D.2. WIND CRITERIA
1. ULTIMATE DESIGN WIND SPEED
A. RISK CATEGORY Ill
B. RISK CATEGORY II
47 m/s (105.1 MPH) 44 m/s (98.4 MPH)
2. EXPOSURE C
1.D.3. SEISMIC CRITERIA
1. MCE SPECTRAL RESPONSE ACCELERATIONS (MCEr)
A. SHORT PERIOD, Ss 0.62
B. 1-SECOND PERIOD, S, 0.3
2. SEISMIC IMPORTANCE FACTOR
A. OFFICE AND UTILITY BUILDINGS 1.25
B. ALL OTHER BUILDINGS 1.00
3. SITE CLASS D
4. DESIGN SPECTRAL RESPONSE COEFFICIENTS
2 3 4
5 6
A. SHORT PERIOD, Sos
B. 1-SECOND PERIOD, So1
5. SEISMIC DESIGN CATEGORY
0.54
0.40
6. SEISMIC REQUIREMENTS FOR NON-STRUCTURAL COMPONENTS
A. COMPONENT IMPORTANCE FACTOR, p 1.0
1.E. SITE AND SAFETY REQUIREMENTS
1.E.1. SITE INSTALLATION OVERSIGHT
INSTALLATION OVERSIGHT, SUPERVISION AND ESCORTING IS THE
RESPONSIBILITY OF POST IN ACCORDANCE WITH ANY SITE SPECIFIC SECURITY
DIRECTIVES.
1.E.2. SITE PREPARATION
LOCAL CONTRACTOR WILL BE RESPONSIBLE FOR CLEANING AND REMOVING
ALL DEBRIS FROM THE EMBASSY COMPOUND TO THE NEAREST AUTHORIZED
DUMP FACILITY (AUTHORIZED BY THE TOWN). THE AREAS AFFECTED BY
LOCAL CONTRACTOR'S WORK MUST BE RETURNED BACK TO
PRE-CONSTRUCTION CONDITIONS AFTER THE WORK IS COMPLETED. (E.G.
GRASS, GRAVEL, SIDEWALK, LANDSCAPING, ASPHALT ETC.)
LOCAL CONTRACTOR SHALL LIMIT THE SITE DISTURBANCE TO A MAXIMUM 6
FEET (1829 MM) ON EACH SIDE OF TRENCH. EXCAVATED MATERIAL WILL BE
PLACED NEXT TO THE EXCAVATED AREA TO BE USED AS SELECT BACKFILL.
A CONSTRUCTION LAYDOWN AREA. IF NEEDED, WILL BE THE RESPONSIBILITY
OF POST TO COORDINATE.
1.E.3. SITE SAFETY
LOCAL CONTRACTOR MUST CLEARLY MAJRK ALL EXCAVATION WORK ZONES
WITH WAJRNING SIGNS AND YELLOW PLASTIC SAFETY TAPE FIXED TO WOOD
POSTS. LOCAL CONTRACTOR MUST COMPLY WITH ALL APPLICABLE SAFETY
STANDARDS TO PROTECT THE EMBASSY COMPOUND EMPLOYEES, THE PUBLIC
AND LOCAL CONTRACTOR WORKERS FROM INJURIES AND ACCIDENTS. LOCAL
CONTRACTOR WILL BE HELD LIABLE FOR INJURIES OR ACCIDENTS SUSTAINED
DUE TO NEGLIGENCE BY LOCAL CONTRACTOR DURING THE COURSE OF THIS
PROJECT.
1.E.4. PROTECTION OF THE EMBASSY COMPOUND EQUIPMENT
LOCAL CONTRACTOR MUST MAKE SURE THAT THE EMBASSY COMPOUND
EQUIPMENT AND PROPERTY IN THE WORK ZONE OR SURROUNDING AREAS
ARE PROTECTED TO PREVENT THEM FROM GITTING DAMAGED DURING
CONSTRUCTION. SHOULD ANY REPAIR OR CHANGE HAVE TO BE DONE DUE
NEGLIGENCE BY LOCAL CONTRACTOR OR ITS WORKERS, LOCAL CONTRACTOR
WILL BE RESPONSIBLE FOR THE COSTS INCURRED IN THE REPAIR.
LOCAL CONTRACTOR MUST KEEP ALL DEBRIS AND EXCAVATED MATERIAL
CLEAR OF SERVICE NETWORK DRAJNS, COVERS AND SUMPS NEAR THE
TRENCHES, TO PREVENT CLOGS OR DAMAGE.
1.E.5. THE EMBASSY COMPOUND SECURITY REQUIREMENTS
SEE SECTION 3.A.
2. INFRASTRUCTURE SUPPORT SYSTEM
2.A. HANDHOLE/UNDERGROUND CONDUIT SYSTEM
2.A.1. TRENCH
LOCAL CONTRACTOR WILL VERIFY EXISTING UTILITIES AND PROVIDE AS-BUILT
DRAWINGS PRIOR TO EXCAVATING OF TRENCH. IF THE EXCAVATION WORK
INTERFERES WITH DRAIN OR PIPING, THE LOCAL CONTRACTOR SHALL INFORM
POST AND PROVIDE SUITABLE PROTECTION FOR THESE STRUCTURES PRIOR
TO PROCEEDING WITH THE WORK. IF EXCAVATION CANNOT PROCEED DUE TO
EXISTING OBSTACLES THEN POST WILL PROVIDE A NEW CONDUIT ROUTE.
ALL TRENCHES WILL BE EXCAVATED TO THE REQUIRED DEPTH ACCORDING TO
SPECIFICATIONS SHOWN ON DRAWINGS.
2.A.2. HANDHOLE (WITH DRAINAGE)
LOCKABLE HANDHOLES WILL BE INSTALLED BY THE LOCAL CONTRACTOR AS
SPECIFIED ON DETAIL DRAWINGS.
LOCAL CONTRACTOR WILL MAKE HOLE PENETRATIONS TO THE EXISTING
MAJNTENANCE HOLES ACCORDING TO NUMBER OF CONDUITS ENTERING AND
EXITING THE MAINTENANCE HOLE.
THE BASE OF THE HANDHOLES SHALL BE PLACED OVER A BASE OF
CRUSHED NON-POROUS ROCK OR GRAVEL AND SAND. THE GRAVEL SIZE
SHALL NOT EXCEED 1/2 INCH (13MM).
2.A.3. CONDUIT
ALL EXISTING CONDUIT SHALL BE LEFT IN PLACE UNLESS NOTED OTHERWISE
ON THE DESIGN DRAWINGS.
UNDER GRASS, DIRT, SIDEWALK OR ASPHALT, INSTALL SCHEDULE 80 PVC
CONDUIT 24 INCHES (610MM) BELOW FINISH GRADE TO THE TOP OF THE
CONDUIT AS SPECIFIED ON THE DRAWINGS.
ALL UNDERGROUND 90 DEGREE BENDS WITH A 12 INCH (305MM) RADIUS
SHALL BE MADE WITH PRE-FABRICATED 90 DEGREE SWEEPING BEND.
6 7 8
9 10 11
UNCLASSIFIED
ALL UNDERGROUND CONDUIT SHALL BE CONVERTED FROM SCHEDULE 80 PVC
TO RGS ABOVE GROUND USING PVC TO RGS COUPLERS.
LOCAL CONTRACTOR SHALL LEAVE A PULL LINE IN ALL INSTALLED CONDUIT
PATHS.
LOCAL CONTRACTOR WILL INSTALL THE CONDUIT FROM THE HANDHOLE TO
HANDHOLE OR THE EXTERIOR JUNCTION BOX AS SHOWN ON DRAWINGS.
ALL CONDUIT STUBBED AND CAPPED ABOVE THE GROUND SHALL BE AT A
HEIGHT OF NO LESS THAN 12" (305mm) FROM THE GROUND. WHEN THE
STUBBED CONDUIT IS NEAR A WALL OR POLE IT MUST BE AT A LEAST 2"
(51mm) FROM THE WALL OR POLE TO ALLOW FOR BOX MOUNTING.
2.A.4. JUNCTION BOXES
LOCAL CONTRACTOR WILL INSTALL JUNCTION BOXES IN ALL LOCATIONS SHOWN
ON DRAWINGS.
2.A.5. ACCESS PANELS
LOCAL CONTRACTOR WILL INSTALL ACCESS PANELS IN ALL LOCATIONS SHOWN
ON DRAWINGS.
2.A.6. CONCRETE
LOCAL CONTRACTOR WILL PROVIDE LABOR AND MATERIALS TO REPAJR
CONCRETE WHERE DISTURBED. CONCRETE COLOR, TYPE AND THICKNESS SHALL
MATCH EXISTING.
CONCRETE USED SHALL BE 25MPA.
CONCRETE MAY NOT BE POURED IF WEATHER CONDITIONS DO NOT PERMIT.
APPROVAL FROM POST MUST BE OBTAINED 24 HOURS PRIOR TO POURING OF
CONCRETE. POST AND LOCAL CONTRACTOR CREW SUPERVISOR MUST BE
PRESENT DURING THE POURING OF CONCRETE.
CONCRETE PLACEMENT
COMPLY WITH REQUIREMENTS AND WITH RECOMMENDATIONS IN ACI 304R FOR
MEASURING, MIXING, TRANSPORTING, AND PLACING CONCRETE.
CONSOLIDATE CONCRETE BY MECHANICAL VIBRATING EQUIPMENT SUPPLEMENTED
BY HAND-SPADING, RODDING, OR TAMPING. USE EQUIPMENT AND
PROCEDURES TO CONSOLIDATE SCREED PAVEMENT SURFACES WITH A
STRAIGHTEDGE AND STRIKE OFF. COMMENCE INITIAL FLOATING USING BULL
FLOATS OR DARBIES TO FORM AN OPEN TEXTURED AND UNIFORM SURFACE
PLANE BEFORE EXCESS MOISTURE OR BLEED WATER APPEARS ON THE
SURFACE. DO NOT FURTHER DISTURB CONCRETE SURFACES BEFORE
BEGINNING FINISHING OPERATIONS OR SPREADING DRY-SHAKE SURFACE
TREATMENTS.
CONCRETE FINISHING
GENERAL: WITTING OF CONCRETE SURFACES DURING SCREEDING, INITIAL
FLOATING, OR FINISHING OPERATIONS IS PROHIBITED.
FLOAT FINISH: BEGIN THE SECOND FLOATING OPERATION WHEN
BLEED-WATER SHEEN HAS DISAPPEARED AND THE CONCRETE SURFACE HAS
STIFFENED SUFFICIENTLY TO PERMIT OPERATIONS. FLOAT SURFACE WITH
POWER-DRIVEN FLOATS, OR BY HAND FLOATING IF AREA IS SMALL OR
INACCESSIBLE TO POWER UNITS. FINISH SURFACES TO TRUE PLANES.
CUT DOWN HIGH SPOTS, AND FILL LOW SPOTS. REFLOAT SURFACE
IMMEDu\TELY TO UNIFORM GRANULAR TEXTURE
- BURLAP FINISH: DRAG A SEAMLESS STRIP OF DAMP BURLAP ACROSS
FLOAT-FINISHED CONCRETE, PERPENDICULAR TO LINE OF TRAFFIC, TO
PROVlDE A UNIFORM, GRITTY TEXTURE.
- MEDIUM-TO-FINE-TEXTURED BROOM FINISH: DRAW A SOFT BRISTLE
BROOM ACROSS FLOAT-FINISHED CONCRETE SURFACE PERPENDICULAR
TO LINE OF TRAFFIC TO PROVIDE A UNIFORM, FINE-LINE TEXTURE.
- MEDIUM-TO-COARSE-TEXTURED BROOM FINISH: PROVIDE A COARSE
FINISH BY STRIATING FLOAT-FINISHED CONCRETE SURFACE
1/16-INCH (1.6MM) TO 1/8-INCHES (3MM) DEEP WITH A
STIFF-BRISTLED BROOM, PERPENDICULAR TO LINE OF TRAFFIC.
3.A. SECURITY REQUIREMENTS
LOCAL CONTRACTOR WILL PROVIDE LABOR AND MATERIALS FOR SOIL WHERE
DISTRIBUTED.
SELECT BACKFILL: ASTM D 2487 SOIL CLASSIFICATION GROUPS SW, SP, AND
SM, OR A COMBINATION OF THESE GROUPS; FREE OF ROCK OR GRAVEL
LARGER THAN 3-INCHES (75MM) IN ANY DIMENSION, DEBRIS, WASTE, FROZEN
MATERIALS, VEGETATION, AND OTHER DELETERIOUS MATTER.
(ASPHALT/CONCRETE) BASE COURSE: NATURALLY OR ARTIFICIALLY GRADED
MIXTURE OF NATURAL OR CRUSHED GRAVEL, CRUSHED STONE, AND NATURAL
OR CRUSHED SAND; ASTM D 2940; WITH AT LEAST 95 PERCENT PASSING A
1-1 /2-INCH ( 40MM) SIEVE AND NOT MORE THAN 8 PERCENT PASSING A
1/4-INCH (6.4MM) SIEVE.
BASE GRAVEL: NATURALLY OR ARTIFICIALLY GRADED MIXTURE OF NATURAL OR
CRUSHED GRAVEL, CRUSHED STONE, AND NATURAL OR CRUSHED SAND;
ASTM D 2940; EXCEPT WITH 100 PERCENT PASSING A 1-INCH (25MM)
SIEVE AND NOT MORE THAN 8 PERCENT PASSING A 1/4-INCH (6.4MM)
SIEVE.
SAND CUSHION: ASTM C 33; FINE AGGREGATE, NATURAL, OR MANUFACTURED
9 10 11
13 14 15
SAND.
COMPACTION OF SOIL BACKFILLS AND FILLS
PLACE BACKFILL AND FILL SOIL MATERIALS IN LAYERS NOT MORE THAN
8-INCHES (203MM) IN LOOSE DEPTH FOR MATERIAL COMPACTED BY HEAVY
COMPACTION EQUIPMENT, AND NOT MORE THAN 4-INCHES (102MM) IN
LOOSE DEPTH FOR MATERIAL COMPACTED BY HAND-OPERATED TAMPERS.
PLACE BACKFILL AND FILL SOIL MATERIALS EVENLY ON ALL SIDES OF
STRUCTURES TO REQUIRED ELEVATIONS, AND UNIFORMLY ALONG THE FULL
LENGTH OF EACH STRUCTURE.
COMPACT SOIL MATERIALS TO NOT LESS THAN THE FOLLOWING PERCENTAGES
OF MAXIMUM DRY UNIT WEIGHT ACCORDING TO ASTM D 1557:
- UNDER STRUCTURES, BUILDING SLABS, STEPS, AND PAVEMENTS,
SCARIFY AND RE-COMPACT TOP 11-INCHES (280MM) OF EXISTING
SUB GRADE AND EACH LAYER OF BACKFILL OR FILL SOIL MATERIAL
AT 95 PERCENT.
- UNDER WALKWAYS, SCARIFY AND RE-COMPACT TOP 6-INCHES
(152MM) BELOW SUB GRADE AND COMPACT EACH LAYER OF
BACKFILL OR FILL SOIL MATERIAL AT 92 PERCENT.
UNDER LAWN OR UNPAVED AREAS, SCARIFY AND RE-COMPACT TOP
6-INCHES (152MM) BELOW SUB GRADE AND COMPACT EACH LAYER
OF BACKFILL OR FILL SOIL MATERIAL AT 85 PERCENT.
- FOR UTILITY TRENCHES, COMPACT EACH LAYER OF INITIAL AND FINAL
BACKFILL SOIL MATERIAL AT 85 PERCENT.
CONVERSION TABLE
CONDUIT SIZE CONDUIT SIZE
IMPERIAL METRIC
1 INCH 25 MILLIMETERS
2 INCHES 51 MILLIMETERS
3 INCHES 76 MILLIMETERS
4 INCHES 102 MILLIMETERS
13 14 15
16 17
L if)_
E-< u �- <� z� �c:., E-< < < rs z� o:l < au <� u< o:l r.n 0...
....:l ::s�
K
< J u 0
....:l
H
G
F
E
� D
C
I I CAD Fll.£ NAME
C-1-240520.dw
PROJECT NUMBER
MBABANE-PME-25006
SIGNED DATE B
11 13 2025 DESIGNED BY DRAWING NUt.13ER
AL Cl.03 DRA'M-lBY
TP
SHEEf
3 OF
A
16 17
2.A.7. SOIL MATERIALS
CONTRACTORS WILL MAINTAIN AN ESCORT RATIO OF 1 : 5 IN ACCORDANCE
WITH POST ACCESS CONTROL POLICY. EMBASSY ESCORTS WILL BE ARRANGED
BY RSO, EITHER THROUGH LOCAL GUARD FORCE, OR IN COORDINATION WITH
FACILITIES MAINTENANCE. LOCAL CONTRACTING PERSONNEL, VEHICLES AND
EQUIPMENT WILL BE SCREENED BEFORE GAINING ENTRY TO THE COMPOUND.
CONTRACTORS ARE REQUIRED TO PROVIDE NAMES AND OTHER PERTINENT
PERSONAL DETAILS OF ALL EMPLOYEES FOR PRE-VETTING AT LEAST 72
HOURS IN ADVANCE OF ANY WORK PERFORMED TO A DESIGNATED EMBASSY
POINT OF CONTACT (POC).
AT THE CLOSE OF EACH BUSINESS DAY, CONTRACTORS WILL GATHER UP
LOOSE TOOLS AND EQUIPMENT TO ENSURE THEY ARE PROPERLY SECURED.