19WZ6024Q0001A0002_Internet Services.pdf

PDF 755 KB Posted

Attached to
Internet Services for U. S. Embassy Mbabane, Eswatini
Solicitation number
19WZ6024Q0001A0002
Issued by

About this file

This document is a Request for Quotations (RFQ) for primary and secondary VPN, internet services, and circuitry at the U.S. Embassy in Mbabane, Eswatini. The U.S. Department of State intends to award two contracts, one for primary and one for secondary services, to responsible companies submitting acceptable offers at the lowest price. The contract will have a one-year base period and four one-year option periods.

The RFQ specifies technical requirements for the internet services, including fiber optic connectivity, 30Mbps to 80Mbps bandwidth speeds, and 99.7% availability per month. Offerors must complete and submit the SF-1449 cover sheet, pricing information, and other required documents by the due date of July 18, 2024 at 17:00 local time. Pricing will be evaluated to ensure it is fair and reasonable, with the Government reserving the right to reject unreasonably low or high offers. The award will be based on the best value for the highest speed bandwidth among the five offered bandwidth options.

View the file

Other files

File Type Posted
SF0030 - 19WZ6024Q0001A0002 _ Internet Services.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

U.S. Embassy Mbabane

Date: April 4,2024

Dear Prospective Quoter:

Subject: Request for Quotations number 19WZ6024Q0001A0002

Enclosed is a Request for Quotations (RFQ) for Primary and Secondary VPN, internet services & circuitry. If you would like to submit quotation, follow the instructions in Section 3 of the solicitation, complete the required portions of the attached document, and submit it to the address shown on the Standard Form 1449 that follows this letter.

The U.S. Government intends to award a contract/purchase order to the responsible company submitting an acceptable offer at the lowest price. We intend to award a contract/purchase order based on initial quotations, without holding discussions, although we may hold discussions with companies in the competitive range if there is a need to do so.

A pre-proposal conference will be held on Wednesday (April 24,2024) at 1400 hours local time at the Embassy compound. Share names of team members who will attend, copies of their ID documents, company name & phone number, not later than 10:00 hours on Tuesday (April 23, 2024).

Quotations are due by Tuesday, May 13,2024 at 1700 hours local time. No quotations will be accepted after this time. Proposals must be in English and incomplete proposals will not be accepted. Your quotation must be submitted electronically to mbabaneprocurement@state.gov. It is important to make sure the submission is made in specific size and format; in MS-Word 2007/2010 or MS-Excel 2007/2010 or Adobe Acrobat (pdf) file format. The file size must not exceed 30MB. If the file size should exceed the 30MB, the submission must be made in separate files and attached to separate emails with less than 30MB each.

In order for a quotation to be considered, you must also complete and submit the following:

1. SF-1449

2. Section I, Pricing

3. Section 5 Representations and Certifications

4. Additional information as required in Section 3

5. Proof of SAM Registration

6. CYBERSECURITY SUPPLY CHAIN RISK MANAGEMENT (C-SCRM) C-

SCRM Questionnaire and C-SCRM Software Producer Attestation Form

Offerors shall be registered in the SAM (System for Award Management) database at https://www.sam.gov prior to submittal of their offer/proposal as prescribed under FAR 4.1102. Failure to be registered at time of proposal submission may deem the offeror’s proposal to be considered non-responsible and no further consideration will be given. Therefore, offerors are highly encouraged to register immediately if they are interested in submitting a response to this requirement.

Sincerely, Brauck Cullen Contracting Officer https://www.sam.gov/

Enclosure: TABLE OF CONTENTS

SECTION 1 - THE SCHEDULE

* SF 1449 cover sheet

* Continuation To SF-1449, RFQ Number 19WZ6024Q0001A0002, Prices, Block 23

* Continuation To SF-1449, RFQ Number 19WZ6024Q0001A0002, Schedule of

Supplies/Services, Block 20 Description/Specifications/Work Statement

* Attachment 2 CYBERSECURITY SUPPLY CHAIN RISK MANAGEMENT (C-SCRM)

SOFTWARE PRODUCER ATTESTATION FORM

SECTION 2 - CONTRACT CLAUSES

* Contract Clauses

* Addendum to Contract Clauses - FAR and DOSAR Clauses not Prescribed in Part 12

SECTION 3 - SOLICITATION PROVISIONS

* Solicitation Provisions

* Addendum to Solicitation Provisions - FAR and DOSAR Provisions not Prescribed in

Part 12

SECTION 4 - EVALUATION

* Evaluation

* Addendum to Evaluation - FAR and DOSAR Provisions not Prescribed in Part 12

SECTION 5 - OFFEROR REPRESENTATIONS AND CERTIFICATIONS

* Offeror Representations and Certifications

* Addendum to Offeror Representations and Certifications - FAR and DOSAR Provisions not Prescribed in Part 12

SECTION 1 - THE SCHEDULE

CONTINUATION TO SF-1449, RFQ NUMBER 19WZ6024Q0001A0002, PRICES BLOCK 23

JAMES ZADROGA 9/11 VICTIMS HEALTH AND COMPENSATION ACT OF 2010

NOTICE: UNLESS A WAIVER OR EXCEPTION APPLIES, PAYMENTS SUBSEQUENT

TO THIS PROCUREMENT ARE SUBJECT TO AN EXCISE TAX OF 2% PERSUANT TO 26

U.S.C. 5000C.

I. SCOPE OF SERVICES

The purpose of this firm fixed price contract is to obtain a PRIMARY VPN, Internet Services & circuitry and SECONDARY VPN, Internet Services & Circuitry for U.S. Embassy Mbabane.

The primary and secondary VPV circuits will be awarded to two different companies i.e., they can’t both be awarded to one Internet Service Provider (ISP). ISPs are encouraged to quote for both primary and secondary VPN circuitry.

NB: For the secondary VPN circuitry, the service provider should not traverse data links owned or managed by Eswatini Post and Telecommunications Corporation (EPTC).

The Contractor shall complete all work, including furnishing all labor, material, equipment, and services, unless otherwise specified herein, required under this contract for stated services within the time specified herein. The price listed below shall include all labor, materials, overhead, and profit. In consideration of satisfactory performance of all scheduled services required under this contract, the Contractor shall be paid a firm fixed prices for all services.

II. BASE PERIOD

The contract will be for a one-year period from the date of the contract award and a notice to proceed with four option years.

1. The Contractor shall furnish all engineering, labor, tools, equipment, materials, supplies and services to provide the required circuit as specified under Section 1, hereof.

2. Prices. In consideration of satisfactory performance of the services required under this contract, the Contractor shall be paid a firm fixed price (FFP) as stated in the schedule below in _________________ (Offeror to identify currency). Local companies shall offer in Eswatini Lilangeni (E).

Price will be evaluated to ensure the proposed price is fair and reasonable. The price will be determined by multiplying the offered prices per CLIN times the estimated quantities in “Prices - Continuation of SF-1449, block 23”, and arriving at a grand total, including all options. The Government reserves the right to reject proposals that are unreasonably low or high in price.

2.1 VALUE ADDED TAX

VALUE ADDED TAX. Value Added Tax (VAT) is not included in the CLIN rates. Instead, it will be priced as a separate Line Item in the contract and on Invoices. Local law dictates the portion of the contract price that is subject to VAT; this percentage is multiplied only against that portion. It is reflected for each performance period. All the portions of the solicitation are subject to 15% VAT.

2.2. The firm fixed prices are in Eswatini Lilangeni (E).

BASE YEAR: JUNE 01,2024 TO MAY 31,2025

Contract Line

Item # Description of Services Number of

Months Monthly Price Total Firm-Fixed-Price

OpenNet - VPN OpenNet Plus (VPN through the Internet) at the U.S.

Embassy Mbabane, Eswatini.

One (1) dedicated Internet channel at ENM specified minimum 30Mbps speed providing fault tolerance in the last mile.

OpenNet - VPN OpenNet Plus (VPN through the Internet) at the U.S.

Embassy Mbabane, Eswatini.

One (1) dedicated Internet channel at ENM specified minimum 30Mbps speed providing fault tolerance in the last mile.

OpenNet - VPN OpenNet Plus (VPN through the Internet) at the U.S.

Embassy Mbabane, Eswatini.

One (1) dedicated Internet channel at ENM specified minimum 35Mbps speed providing fault tolerance in the last mile.

OpenNet - VPN OpenNet Plus (VPN through the Internet) at the U.S.

Embassy Mbabane, Eswatini.

One (1) dedicated Internet channel at ENM specified minimum 35Mbps speed providing fault tolerance in the last mile.

OpenNet - VPN OpenNet Plus (VPN through the Internet) at the U.S.

Embassy Mbabane, Eswatini.

One (1) dedicated Internet channel at ENM specified minimum 45Mbps speed providing fault tolerance in the last mile.

OpenNet - VPN OpenNet Plus (VPN through the Internet) at the U.S.

Embassy Mbabane, Eswatini.

One (1) dedicated Internet channel at ENM specified minimum 45Mbps speed providing fault tolerance in the last mile.

OpenNet - VPN OpenNet Plus (VPN through the Internet) at the U.S.

Embassy Mbabane, Eswatini.

One (1) dedicated Internet channel at ENM specified minimum 50Mbps speed providing fault tolerance in the last mile.

OpenNet - VPN OpenNet Plus (VPN through the Internet) at the U.S.

Embassy Mbabane, Eswatini.

One (1) dedicated Internet channel at ENM specified minimum 50Mbps speed providing fault tolerance in

OpenNet Plus (VPN through the Internet) at the U.S.

Embassy Mbabane, Eswatini.

One (1) dedicated Internet channel at ENM specified minimum 80Mbps speed providing fault tolerance in the last mile.

OpenNet - VPN OpenNet Plus (VPN through the Internet) at the U.S.

Embassy Mbabane, Eswatini.

One (1) dedicated Internet channel at ENM specified minimum 80Mbps speed providing fault tolerance in the last mile.

11 Initial Installation (Non- Recurring)

SUB-TOTAL

PLUS 15% VAT

GRAND TOTAL FOR BASE YEAR

OPTION YEAR 1: JUNE 01,2025 TO MAY 31,2026

Item # Description of Services Number of

Months Monthly Price Total Firm-Fixed-Price

OpenNet - VPN OpenNet Plus (VPN through the Internet) at the U.S.

Embassy Mbabane, Eswatini.

One (1) dedicated Internet channel at ENM specified minimum 30Mbps speed providing fault tolerance in the last mile.

OpenNet - VPN OpenNet Plus (VPN through the Internet) at the U.S.

Embassy Mbabane, Eswatini.

One (1) dedicated Internet channel at ENM specified minimum 30Mbps speed providing fault tolerance in the last mile.

OpenNet - VPN OpenNet Plus (VPN through the Internet) at the U.S.

Embassy Mbabane, Eswatini.

One (1) dedicated Internet channel at ENM specified minimum 35Mbps speed providing fault tolerance in the last mile.

OpenNet - VPN OpenNet Plus (VPN through the Internet) at the U.S.

Embassy Mbabane, Eswatini.

One (1) dedicated Internet channel at ENM specified minimum 35Mbps speed providing fault tolerance in

OpenNet Plus (VPN through the Internet) at the U.S.

Embassy Mbabane, Eswatini.

One (1) dedicated Internet channel at ENM specified minimum 45Mbps speed providing fault tolerance in the last mile.

OpenNet - VPN OpenNet Plus (VPN through the Internet) at the U.S.

Embassy Mbabane, Eswatini.

One (1) dedicated Internet channel at ENM specified minimum 45Mbps speed providing fault tolerance in the last mile.

OpenNet - VPN OpenNet Plus (VPN through the Internet) at the U.S.

Embassy Mbabane, Eswatini.

One (1) dedicated Internet channel at ENM specified minimum 50Mbps speed providing fault tolerance in the last mile.

OpenNet - VPN OpenNet Plus (VPN through the Internet) at the U.S.

Embassy Mbabane, Eswatini.

One (1) dedicated Internet channel at ENM specified minimum 50Mbps speed providing fault tolerance in the last mile.

OpenNet - VPN OpenNet Plus (VPN through the Internet) at the U.S.

Embassy Mbabane, Eswatini.

One (1) dedicated Internet channel at ENM specified minimum 80Mbps speed providing fault tolerance in

OpenNet Plus (VPN through the Internet) at the U.S.

Embassy Mbabane, Eswatini.

One (1) dedicated Internet channel at ENM specified minimum 80Mbps speed providing fault tolerance in the last mile.

SUB-TOTAL

GRAND TOTAL FOR OPTION YEAR 1

OPTION YEAR 2: JUNE 01,2026 TO MAY 31,2027

Item # Description of Services Number of

Months Monthly Price Total Firm-Fixed-Price

OpenNet - VPN OpenNet Plus (VPN through the Internet) at the U.S.

Embassy Mbabane, Eswatini.

One (1) dedicated Internet channel at ENM specified minimum 30Mbps speed providing fault tolerance in the last mile.

OpenNet - VPN OpenNet Plus (VPN through the Internet) at the U.S.

Embassy Mbabane, Eswatini.

One (1) dedicated Internet channel at ENM specified minimum 30Mbps speed providing fault tolerance in

OpenNet - VPN OpenNet Plus (VPN through the Internet) at the U.S.

Embassy Mbabane, Eswatini.

One (1) dedicated Internet channel at ENM specified minimum 35Mbps speed providing fault tolerance in the last mile.

OpenNet - VPN OpenNet Plus (VPN through the Internet) at the U.S.

Embassy Mbabane, Eswatini.

One (1) dedicated Internet channel at ENM specified minimum 35Mbps speed providing fault tolerance in the last mile.

OpenNet - VPN OpenNet Plus (VPN through the Internet) at the U.S.

Embassy Mbabane, Eswatini.

One (1) dedicated Internet channel at ENM specified minimum 45Mbps speed providing fault tolerance in the last mile.

OpenNet - VPN OpenNet Plus (VPN through the Internet) at the U.S.

Embassy Mbabane, Eswatini.

One (1) dedicated Internet channel at ENM specified minimum 45Mbps speed providing fault tolerance in

OpenNet Plus (VPN through the Internet) at the U.S.

Embassy Mbabane, Eswatini.

One (1) dedicated Internet channel at ENM specified minimum 50Mbps speed providing fault tolerance in the last mile.

OpenNet - VPN OpenNet Plus (VPN through the Internet) at the U.S.

Embassy Mbabane, Eswatini.

One (1) dedicated Internet channel at ENM specified minimum 50Mbps speed providing fault tolerance in the last mile.

OpenNet - VPN OpenNet Plus (VPN through the Internet) at the U.S.

Embassy Mbabane, Eswatini.

One (1) dedicated Internet channel at ENM specified minimum 80Mbps speed providing fault tolerance in the last mile.

OpenNet - VPN OpenNet Plus (VPN through the Internet) at the U.S.

Embassy Mbabane, Eswatini.

One (1) dedicated Internet channel at ENM specified minimum 80Mbps speed providing fault tolerance in the last mile.

SUB-TOTAL

GRAND TOTAL FOR OPTION YEAR 2

OPTION YEAR 3: JUNE 01,2027 TO MAY 31, 2028

Item # Description of Services Number of

Months Monthly Price Total Firm-Fixed-Price

OpenNet - VPN OpenNet Plus (VPN through the Internet) at the U.S.

Embassy Mbabane, Eswatini.

One (1) dedicated Internet channel at ENM specified minimum 30Mbps speed providing fault tolerance in the last mile.

OpenNet - VPN OpenNet Plus (VPN through the Internet) at the U.S.

Embassy Mbabane, Eswatini.

One (1) dedicated Internet channel at ENM specified minimum 30Mbps speed providing fault tolerance in the last mile.

OpenNet - VPN OpenNet Plus (VPN through the Internet) at the U.S.

Embassy Mbabane, Eswatini.

One (1) dedicated Internet channel at ENM specified minimum 35Mbps speed providing fault tolerance in the last mile.

OpenNet - VPN OpenNet Plus (VPN through the Internet) at the U.S.

Embassy Mbabane, Eswatini.

One (1) dedicated Internet channel at ENM specified minimum 35Mbps speed providing fault tolerance in

OpenNet Plus (VPN through the Internet) at the U.S.

Embassy Mbabane, Eswatini.

One (1) dedicated Internet channel at ENM specified minimum 45Mbps speed providing fault tolerance in the last mile.

OpenNet - VPN OpenNet Plus (VPN through the Internet) at the U.S.

Embassy Mbabane, Eswatini.

One (1) dedicated Internet channel at ENM specified minimum 45Mbps speed providing fault tolerance in the last mile.

OpenNet - VPN OpenNet Plus (VPN through the Internet) at the U.S.

Embassy Mbabane, Eswatini.

One (1) dedicated Internet channel at ENM specified minimum 50Mbps speed providing fault tolerance in the last mile.

OpenNet - VPN OpenNet Plus (VPN through the Internet) at the U.S.

Embassy Mbabane, Eswatini.

One (1) dedicated Internet channel at ENM specified minimum 50Mbps speed providing fault tolerance in the last mile.

OpenNet - VPN OpenNet Plus (VPN through the Internet) at the U.S.

Embassy Mbabane, Eswatini.

One (1) dedicated Internet channel at ENM specified minimum 80Mbps speed providing fault tolerance in

OpenNet Plus (VPN through the Internet) at the U.S.

Embassy Mbabane, Eswatini.

One (1) dedicated Internet channel at ENM specified minimum 80Mbps speed providing fault tolerance in the last mile.

SUB-TOTAL

GRAND TOTAL FOR OPTION YEAR 3

OPTION YEAR 4: JUNE 01,2028 TO MAY 31,2029

Item # Description of Services Number of

Months Monthly Price Total Firm-Fixed-Price

OpenNet - VPN OpenNet Plus (VPN through the Internet) at the U.S.

Embassy Mbabane, Eswatini.

One (1) dedicated Internet channel at ENM specified minimum 30Mbps speed providing fault tolerance in

OpenNet Plus (VPN through the Internet) at the U.S.

Embassy Mbabane, Eswatini.

One (1) dedicated Internet channel at ENM specified minimum 30Mbps speed providing fault tolerance in the last mile.

OpenNet - VPN OpenNet Plus (VPN through the Internet) at the U.S.

Embassy Mbabane, Eswatini.

One (1) dedicated Internet channel at ENM specified minimum 35Mbps speed providing fault tolerance in the last mile.

OpenNet - VPN OpenNet Plus (VPN through the Internet) at the U.S.

Embassy Mbabane, Eswatini.

One (1) dedicated Internet channel at ENM specified minimum 35Mbps speed providing fault tolerance in the last mile.

OpenNet - VPN OpenNet Plus (VPN through the Internet) at the U.S.

Embassy Mbabane, Eswatini.

One (1) dedicated Internet channel at ENM specified minimum 45Mbps speed providing fault tolerance in the last mile.

OpenNet - VPN OpenNet Plus (VPN through the Internet) at the U.S.

Embassy Mbabane, Eswatini.

One (1) dedicated Internet channel at ENM specified minimum 45Mbps speed providing fault tolerance in

OpenNet Plus (VPN through the Internet) at the U.S.

Embassy Mbabane, Eswatini.

One (1) dedicated Internet channel at ENM specified minimum 50Mbps speed providing fault tolerance in the last mile.

OpenNet - VPN OpenNet Plus (VPN through the Internet) at the U.S.

Embassy Mbabane, Eswatini.

One (1) dedicated Internet channel at ENM specified minimum 50Mbps speed providing fault tolerance in the last mile.

OpenNet - VPN OpenNet Plus (VPN through the Internet) at the U.S.

Embassy Mbabane, Eswatini.

One (1) dedicated Internet channel at ENM specified minimum 80Mbps speed providing fault tolerance in the last mile.

OpenNet - VPN OpenNet Plus (VPN through the Internet) at the U.S.

Embassy Mbabane, Eswatini.

One (1) dedicated Internet channel at ENM specified minimum 80Mbps speed providing fault tolerance in the last mile.

SUB-TOTAL

GRAND TOTAL FOR OPTION YEAR 4

GRAND TOTAL CONTRACT PRICE, INCLUDING ALL OPTION YEARS

Base Period Total Price

First Option Year Total Price

Second Option Year Total Price

Third Option Year Total Price

Fourth Option Year Total Price

GRAND TOTAL FIRM-FIXED PRICE

FOR BASE YEAR PLUS ALL OPTION YEARS

CONTINUATION TO SF-1449, RFQ NUMBER 19WZ6024Q00001

SCHEDULE OF SUPPLIES/SERVICES, BLOCK 20

DESCRIPTION/SPECIFICATIONS/WORK STATEMENT

I. SCOPE OF WORK

THE PROVIDED INTERNET SERVICE SHALL COMPLY WITH THE FOLLOWING

REQUIREMENTS:

Internet Services Quality

This internet circuit shall be high-end, professional grade service that differs from the residential service. ENM requires dedicated (not shared or bundled) Internet Bandwidth, 24/7, “always-on” with unlimited usage. Fiber optic, terrestrial connectivity is preferred. The local ISP access circuit to the Post must meet the following specifications/requirements for connectivity.

Internet Service Provider (ISP) must provide Fiber Optic connectivity to the very end at the U.S. Embassy Mbabane compound Telecommunications Service Entrance Facilities (TSEF) Room.

A /28 subnet static Public IP addresses for VPN equipment, network mask, and default gateway IP address.

ISP interface connectors: LC fiber connector (MM-multimode) – Gigabit interface. Internet Service Provider (ISP) must provide all data media converters or transmission devices in all cases.

ISP availability: "Always on". Bandwidth sharing between other non-Embassy customers is not allowed. Connection Ratio must be 1/1.

ISP connection: IPs must NOT use Network Address Translation (NAT).

ISP must permit all IP protocols (including but not limited to ICMP, UDP, TCP, and IPSEC) to transit without filters or proxies. Unfiltered access to the Internet is required without ISP firewall blocking or stateful inspection.

ISP must permit installation of Customer VPN encryption devices on circuit.

ISP must permit ping and trace route traffic from 169.252.0.0/16 and 169.253.0.0/16 to the ISP connection (LC fiber Gigabit MM router interface which terminates Customer VPN encryption device).

High quality performance, the following parameters in a vendor’s Service Level Agreement (SLA) should be used:

a. Packet Loss <=.5%

b. Availability of 99.9%.

Network Devices

The network devices shall comply with the following characteristics:

Must not have ZTE, Huawei, Xiaomi and affiliated branded products in use on the internet connection. Post may not enter into contract (or extend or renew contract) with an entity that uses above mentioned equipment, system, or service that uses covered telecommunications equipment or services as a substantial or essential component of any system, or as critical technology as part of any system.

Service Support and Contingencies

ISP must warrant service support 7X24X365.

ISP must warrant service support on site if necessary 7X24X365, services must be coordinated directly with Embassy’s Contracting Office Representative (COR) or Information Technology (IT) representative from the Embassy Information Systems Center (ISC).

ISP should have direct connection capability with major United States of America (U.S.A) telecommunication providers (ISPs) at Internet tier 1 level, having alternative line channels or backups in case of main Internet path malfunctioning, if local conditions permit.

ISP must provide a central Information Technology (IT) point of contact (POC) in order to promptly coordinate technical issues during the initial installation process.

II. GENERAL:

A. The Department of State has a requirement for one full period, full duplex, clear channels, digital circuits and Internet leased lines capable of supporting synchronous traffic. For clear channel circuits, they shall be completely transparent, with no bits added to or deleted from the bit stream provided to the interface of the Department of State equipment.

The Department of State reserves the right to increase or decrease this digital circuit bandwidth requirement from no less than 30Mbps and up to 80Mbps within 30 days written notice to the Contractor. The desired intervals for circuit bandwidth are as follows: 30Mbps,35Mbps, 45Mbps,50Mbps, and 80Mbps. The Contractor is to provide fractional T-1 fixed cost pricing for this increase or decrease of digital service. The availability of this circuit shall not be less than

99.7 percent per month over the period of the contract.

B. This digital service shall be via whatever facilities are available to the Contractor.

However, the preferred method of transport is via Optic Fiber or Fiber over Wireless.

NOTE: Double satellite hops are not acceptable. The service shall be for the exclusive use of the Department of State, 24-hours per day, 7 days per week, and 52 weeks per year. No on-premise satellite ground station will be considered for this circuit.

C. The Contractor shall coordinate the service and shall be responsible for the technical sufficiency of the circuit, including services necessary to establish, operate, and restore the circuit. Except for modems and terminal equipment furnished by the Government, the Contractor shall provide all equipment, materials, and supplies required to provide the service which includes the Data Service Unit (DSU) configured with Data Communications Equipment (DCE) interface. If required, signal element timing shall be provided by the Contractor’s facility.

D. The Contractor shall provide sufficient technical support to ensure uninterrupted end-to-end service between such terminal points as are covered in this contract. The Contractor shall provide, properly adjust, and maintain the circuit for continuous Department of State use. The Contractor shall ensure that the circuit complies with service changes, additions, or deletions as required under this contract.

E. The Contractor shall supply a Data Service Unit(s) (DSUs) configured with a Data Communications Equipment (DCE) interface. Signal element timing shall be provided as follows: (1) timing to the American Embassy will be provided by the Contractor’s facility.

F. Services. This is a firm fixed-price contract for the lease of one full period, full duplex, clear channels, digital circuits and internet leased lines capable of supporting synchronous traffic.

For the clear channel circuits, they shall be completely transparent to 2,048 kbps data or different if specified on the service requirements, with no bits added to or deleted from the bit stream provided to the interface of the Department of State equipment.

G. Bit Error Rate Test (BERT) The bit error rate (BER) for the service shall not be greater than 1 in 10 to the 6 bits for 99.7% of the time, for all time.

H. Acceptable Level of Performance. The Standard of Performance (SP) for this contract is 99.7% percent availability per month (100 percent less 0.3 percent each month for corrective and preventive maintenance).

I. Inspection and Acceptance. Unless specified in the Contract, the Government shall require a period not to exceed 24 hours in order to perform testing to determine acceptance of the required circuit under Section C. The U.S. destination point or the U.S. foreign post shall conduct the testing.

J. Term of Contract: The required circuits shall be installed and delivered to the Destination Point on or before 60 Days after Contract Award. Upon successful installation and acceptance by the Government of the required circuit under Section C, the Contractor shall be provided, in writing, notice to proceed and shall provide contractual services for a twelve (12) month period, commencing on the date specified in the notice to proceed.

K. The Contractor agrees that the work and services set forth in this contract shall be performed during the period commencing the effective date of this contract and shall continue through the end of the twelve month period of service (CLIN 1 through 8), excluding the exercise of any option.

L. Option CLINs, e.g. 0005 through 012, if exercised, as reflected in Section 1, shall be for Twelve (12) months each, commencing at the expiration of the previous period of performance or a negotiated period.

M. An Invoice, suitable for payment, shall contain, but not limited to, the following information:

1. Name of Contractor;

2. Date of Invoice;

3. Original Invoice Number (Consecutive numbers);

4. Contract number;

5. Task or Delivery Order number, as applicable;

6. Government Specific Accounting and Appropriation Data (Funding Cite.)

(Example: 19X0113-2015-X75041-180100-5327-2332);

7. Contract Line Item Number (CLIN) of item or service provided;

8. Description of the item, or service actually provided;

9. Period of performance of service or date item is provided;

10. Block/Space reserved for COR acceptance signature and date;

11. Signature, Name and Phone number of Company representative authorized to sign invoices;

12. Remit to address

13. Name, phone number and Mailing address to whom any disputed invoices should be addressed;

14. Credits with explanation and period covered.

Failure to submit Invoices which do not identify this information shall be returned without payment to the Contractor for correction.

N. Authorized Instruction to Contractor

a. No person or agency other than the Contracting Officer (CO) is authorized to give instruction, orders or directions on behalf of the Government to the Contractor or his employees, unless such person or agency is authorized in writing by the CO to so act. The authority of such person or agency is strictly limited to the written authorization provided by the CO. The duty is upon the Contractor to determine the authority of such person or agency. Any questions regarding the authority of such person or agency should be directed to the CO in writing.

b. Contracting Officer’s Representative (COR): The CO may designate and authorize a representative(s) to act on his/her behalf under this contract. Such representative(s) as may be appointed shall be designated by a letter from the CO and a copy of the letter shall be given to the Contractor. The COR shall represent the CO as specified in his/her delegation of authority letter. The COR shall not be authorized to issue change orders or adjustments.

Changes in the Scope of Work/Specifications or any increase or decrease in the work called for by this contract shall be made by the CO by an executed modification to this contract.

O. Release of Information

1. The Contractor’s organization shall clear with the Information Office listed below any public release of information on this contract. This information includes news stories, articles, sales literature, advertisements, radio-TV spots, etc.

2. The request for public release of information should be addressed to: Contracting Officer, U.S. Embassy Mbabane, Cnr of MR103 & Cultural Drive, P.O. box D202, The Gables, H106, Eswatini.

3. Limited Use of Data and Information. Performance of this contract may require the Contractor to access and use data and information proprietary to the Government agency or agency personnel, or which is of such a nature that its dissemination or use, other than in performance of this contract would be adverse to the interests of the Government or others. The Contractor and Contractor personnel shall not divulge or release data or information developed or obtained in performance of this contract, until made public by the Government, except to authorized Government personnel or upon written approval of the Contracting Officer. The Contractor will not use, disclose, or reproduce proprietary data which bears a restrictive legend, other than as required in the performance of this contract. Nothing herein shall preclude the use of any data independently acquired by the Contractor without such limitations or prohibit an agreement at no costs to the Government between the Contractor and the data owner provides for greater rights to the Contractor.

P. Circuit Downtime and Credits

Credits shall be assessed against the Contractor in those instances where the circuit during any given month or year that fail to achieve and sustain the minimum acceptance standards stated above.

1. Definitions:

Circuit Availability Acceptance Level: Yearly Circuit Availability Acceptance Level is computed by 365 calendar days times 24 (hours per day) times 99.7% acceptance level equals 8,716.20 hours annum. (365 x 24 = 8760 x 99.7% = 8,733.72). Monthly Circuit Availability is computed by the calendar days per month times 24 (hours per day) times 99.7% acceptance level (example: 31 x 24 = 744 x 99.7% = 741.76).

Downtime: That period of time when the circuit becomes non-operational or unusable for communication or transfer of data or failures to meet the minimum acceptance standards. The maximum cumulative Annual downtime that shall be acceptable for corrective or preventative maintenance is 26.28 hours (8760 x .3%). The maximum cumulative Monthly downtime that shall be acceptable for corrective or preventative maintenance shall be .3% of the total available hours for the month (example: 31 x 24 = 744 x .3% = 2.23 hours).

Period of Downtime: Downtime shall commence at the time first attempt for contact is made by the Government (or its representative) to the Contractor’s Point of Contact and shall be annotated on the Remedy Ticket and shall continue until the circuit is returned into Service by the Government.

Downtime Credits: Monetary value returned to the Government for failure to meet the Circuit availability requirements. Downtime Credits shall be assessed based on cumulative downtime time with the minimum assessment being one hour. Downtime credit shall be equal to the hourly or daily rate (as applicable) as identified in the schedule in Section B. There are two

(2) situations when circuit Downtime Credits can be accumulated:

1) Below Availability Level,

2) Extended Downtime.

2. Credit for Circuit Downtime by Situation

Below Availability Level: If the downtime accumulated for a circuit adds up to 26.28 (8760 x 0.3%) cumulative hours or more during any one contract year (365 calendar days) or depending on the number of hours for the month (example 744 x .3%) cumulative hours per month (example: 31 calendar day month) the Contractor shall grant a hourly credit to the Government for each hour of downtime. Each additional one hour increment or portion thereof will be assessed as an additional hour.

Extended Downtime Credit(s): Cumulative time of more than 18 hours but not greater than 24 hours for any one outage shall be assessed at a daily rate. Any increment of 24 hours beyond the initial 24 hours of any one outage shall be assessed at the standards for the hourly rate up to 12 hours, however between 12 and 24 hours the credit shall be assessed at the daily rate.

3. Exceptions to Cumulating of Downtime

Cumulating of circuit downtime shall include all unscheduled downtime deemed to be the responsibility of the Contractor, with the following exceptions:

a. When the failure to perform arises out of causes beyond the control and without the fault or negligence of the Contractor or Sub-contractor as defined in the Termination for Default clause in Section I of this contract.

b. Malfunction of equipment, frequency fading and interference, errors of commission and/or omission by the Contractor or Sub-contractor, and commercial power surges or failures are considered to be normal hazards of the industry and therefore do not qualify as causes beyond the control of the Contractor or Sub-contractor. The Contractor shall be charged with credits for all reported outages determined “no trouble found” or “came clear while testing” but which exceed 45 minutes.

The Contracting Officer shall make final determination as to whether downtime is the responsibility of the Contractor. If requested by the Contracting Officer, the Contractor shall provide documentation to support claims of excusable downtime. For downtime determined to be the Contractor’s responsibility, the Contracting Officer may elect to assess a credit for each instance of non-performance.

4. Payment Reduction for Downtime Credits

When Circuit Downtime credit(s) is owed to the Government, the total number of creditable hours shall be accumulated for the month and will be deducted from the payment due the Contractor in the month they accrued.

5. Trouble Escalation Procedure

a. The Government shall refer the problem to the carrier after performing tests as prescribed in the Trouble Analysis procedure. Obtain the name of the carrier test person and a carrier ticket number; record this information on the Government’s Remedy Ticket.

b. After the trouble has been referred to the carrier for two (2) hours, recall the carrier for an update on the current trouble. Record the carrier’s response, the name of the individual you talked with, and the carrier ticket number on the Remedy Ticket.

c. After the trouble has been referred to the carrier for four (4) hours, recall the carrier for an update on the current trouble. If the carrier’s response is not satisfactory escalate the trouble to the carrier’s management. Record the carrier’s response, the name of the individual you talked with, and the carrier ticket number on the Remedy Ticket.

d. After the trouble has been referred to the Contractor for six (6) hours the COR shall escalate the trouble to the Contractor’s manager; also notify IRM/IMO and the Contracting Officer and the STATE IRM/ISC Office. Record the contractor’s response, the name of the individual you talked with, the Contractor ticket number, and the names of the IRM managers that were notified on the Remedy Ticket.

e. Continue to status the Contractor for the remainder of the outage or until you have received a problem resolved status.

6. Technological Refreshment

After contract award, the Government may; pursuant to FAR clause 52.212-4 - Contract Terms and Conditions –Commercial Items, paragraph (c), Changes; request changes within the scope of the contract. These changes may be required to improve performance or react to changes in technology.

The Contractor may propose for the Government’s technological refreshment, substitutions or additions for any provided products or services that may become available as a result of technological improvements. The Government may, at any time during the term of this contract or any extensions thereof, modify the contract to acquire products which are similar to those under the contract and that the Contractor has, or has not, formally announced for marketing purposes. This action is considered to be within the scope of the contract. At the option of the Government, a demonstration of the substitute product may be required. The Government is under no obligation to modify the contract in response to the proposed additions or substitutions.

Such substitutions or additions may include any part of, or all of, a given product(s) provided that the following conditions are met and substantiated by documentation in the technological refreshment proposal:

a. The proposed product(s) shall meet all of the technical specifications of this document and conform to the terms and conditions cited in the contract.

b. The proposed product(s) shall have the capacity, performance, or functional characteristics equal to or greater than, the current product(s).

c. The proposal shall discuss the impact on hardware, services, and delivery schedules. The cost of the changes not specifically addressed in the proposal shall be borne entirely by the Contractor.

d. Contractor has the right to withdraw, in whole or in part, any technological refreshment proposal prior to acceptance by the Government. Contractor will use commercially reasonable efforts to ensure that prices for substitutions or additions are comparable to replaced or discontinued products. If a technological refreshment proposal is accepted and made a part of this contract, an equitable adjustment, increasing or decreasing the contract price, may be required and any other affected provisions of this contract shall be made in accordance with FAR clause 52.212-4, paragraph (c), Changes, and other applicable clauses of the contract.

7. QUALITY ASSURANCE AND SURVEILLANCE PLAN (QASP)

This plan provides an effective method to promote satisfactory contractor performance. The QASP provides a method for the Contracting Officer's Representative (COR) to monitor Contractor performance, advise the Contractor of unsatisfactory performance, and notify the Contracting Officer of continued unsatisfactory performance. The Contractor, not the Government, is responsible for management and quality control to meet the terms of the contract.

The role of the Government is to monitor quality to ensure that contract standards are achieved.

Performance Objective Scope of Work Para Performance Threshold Services.

Performs all VPN Circuit Internet services set forth in the scope of work.

1. thru 6.

All required services are performed and no more than one

(1) customer complaint is received per month.

SECTION 2 - CONTRACT CLAUSES

52.212-4 CONTRACT TERMS AND CONDITIONS – COMMERCIAL ITEMS

(DEC 2022) IS INCORPORATED BY REFERENCE. (SEE SF-1449,

BLOCK 27A)

52.212-5 CONTRACT TERMS AND CONDITIONS REQUIRED TO IMPLEMENT

STATUTES OR EXECUTIVE ORDERS—COMMERCIAL PRODUCTS AND

COMMERCIAL SERVICES

As prescribed in 12.301(b)(4), insert the following clause:

CONTRACT TERMS AND CONDITIONS REQUIRED TO IMPLEMENT STATUTES OR EXECUTIVE

ORDERS—COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES (FEB 2024)

(a) The Contractor shall comply with the following Federal Acquisition Regulation (FAR) clauses, which are incorporated in this contract by reference, to implement provisions of law or Executive orders applicable to acquisitions of commercial products and commercial services:

(1) 52.203-19, Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements (JAN 2017) (section 743 of Division E, Title VII, of the Consolidated and Further Continuing Appropriations Act, 2015 (Pub. L. 113-235) and its successor provisions in subsequent appropriations acts (and as extended in continuing resolutions)).

(2) 52.204-23, Prohibition on Contracting for Hardware, Software, and Services Developed or Provided by Kaspersky Lab Covered Entities (DEC 2023) (Section 1634 of Pub. L.

115-91).

(3) 52.204-25, Prohibition on Contracting for Certain Telecommunications and Video Surveillance Services or Equipment. (NOV 2021) (Section 889(a)(1)(A) of Pub. L. 115-232).

(4) 52.209-10, Prohibition on Contracting with Inverted Domestic Corporations (NOV 2015).

(5) 52.232-40, Providing Accelerated Payments to Small Business Subcontractors (MAR 2023) ( 31 U.S.C. 3903 and 10 U.S.C. 3801).

(6) 52.233-3, Protest After Award (AUG 1996) ( 31 U.S.C. 3553).

(7) 52.233-4, Applicable Law for Breach of Contract Claim (OCT 2004) (Public Laws 108-77 and 108-78 ( 19 U.S.C. 3805 note)).

(b) The Contractor shall comply with the FAR clauses in this paragraph (b) that the Contracting Officer has indicated as being incorporated in this contract by reference to https://www.acquisition.gov/far/12.301#FAR_12_301 https://www.acquisition.gov/far/52.203-19#FAR_52_203_19 https://www.acquisition.gov/far/52.204-23#FAR_52_204_23 https://www.acquisition.gov/far/52.204-25#FAR_52_204_25 https://www.acquisition.gov/far/52.209-10#FAR_52_209_10 https://www.acquisition.gov/far/52.232-40#FAR_52_232_40 https://www.govinfo.gov/link/uscode/31/3903 https://www.govinfo.gov/link/uscode/10/3801 https://www.acquisition.gov/far/52.233-3#FAR_52_233_3 http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 https://www.acquisition.gov/far/52.233-4#FAR_52_233_4 http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 implement provisions of law or Executive orders applicable to acquisitions of commercial products and commercial services:

_X_(1) 52.203-6, Restrictions on Subcontractor Sales to the Government (JUN 2020), with Alternate I (NOV 2021) ( 41 U.S.C. 4704 and 10 U.S.C. 4655).

__(2) 52.203-13, Contractor Code of Business Ethics and Conduct (NOV 2021) ( 41 U.S.C. 3509)).

__(3) 52.203-15, Whistleblower Protections under the American Recovery and Reinvestment Act of 2009 (JUN 2010) (Section 1553 of Pub. L. 111-5). (Applies to contracts funded by the American Recovery and Reinvestment Act of 2009.)

__(4) 52.203-17, Contractor Employee Whistleblower Rights (NOV 2023) ( 41 U.S.C.

4712); this clause does not apply to contracts of DoD, NASA, the Coast Guard, or applicable elements of the intelligence community—see FAR 3.900(a).

_X_(5) 52.204-10, Reporting Executive Compensation and First-Tier Subcontract Awards (JUN 2020) (Pub. L. 109-282) ( 31 U.S.C. 6101 note).

__(6) [Reserved].

__(7) 52.204-14, Service Contract Reporting Requirements (OCT 2016) (Pub. L. 111-117, section 743 of Div. C).

__(8) 52.204-15, Service Contract Reporting Requirements for Indefinite-Delivery Contracts (OCT 2016) (Pub. L. 111-117, section 743 of Div. C).

_X_(9) 52.204-27, Prohibition on a ByteDance Covered Application (JUN 2023) (Section 102 of Division R of Pub. L. 117-328).

__(10) 52.204-28, Federal Acquisition Supply Chain Security Act Orders—Federal Supply Schedules, Governmentwide Acquisition Contracts, and Multi-Agency Contracts. (DEC 2023) ( Pub. L. 115–390, title II).

_X_ (11)

(i) 52.204-30, Federal Acquisition Supply Chain Security Act Orders— Prohibition. (DEC 2023) ( Pub. L. 115–390, title II).

__(ii) Alternate I (DEC 2023) of 52.204–30.

_X_(12) 52.209-6, Protecting the Government’s Interest When Subcontracting with Contractors Debarred, Suspended, or Proposed for Debarment. (NOV 2021) ( 31 U.S.C. 6101 note).

https://www.acquisition.gov/far/52.203-6#FAR_52_203_6 http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 https://www.govinfo.gov/link/uscode/10/4655 https://www.acquisition.gov/far/52.203-13#FAR_52_203_13 http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 https://www.acquisition.gov/far/52.203-15#FAR_52_203_15 https://www.acquisition.gov/far/52.203-17#FAR_52_203_17 https://www.govinfo.gov/link/uscode/41/4712 https://www.govinfo.gov/link/uscode/41/4712 https://www.acquisition.gov/far/3.900#FAR_3_900 https://www.acquisition.gov/far/52.204-10#FAR_52_204_10 http://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title31-section6101&num=0&edition=prelim https://www.acquisition.gov/far/52.204-14#FAR_52_204_14 https://www.acquisition.gov/far/52.204-15#FAR_52_204_15 https://www.acquisition.gov/far/52.204-27#FAR_52_204_27 https://www.acquisition.gov/far/52.204-28#FAR_52_204_28 https://www.govinfo.gov/link/plaw/115/public/390 https://www.acquisition.gov/far/52.204-30#FAR_52_204_30 https://www.govinfo.gov/link/plaw/115/public/390 https://www.acquisition.gov/far/52.209-6#FAR_52_209_6 http://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title31-section6101&num=0&edition=prelim

_X_(13) 52.209-9, Updates of Publicly Available Information Regarding Responsibility Matters (OCT 2018) ( 41 U.S.C. 2313).

__(14) [Reserved].

__(15) 52.219-3, Notice of HUBZone Set-Aside or Sole-Source Award (OCT 2022) ( 15 U.S.C. 657a).

__(16) 52.219-4, Notice of Price Evaluation Preference for HUBZone Small Business Concerns (OCT 2022) (if the offeror elects to waive the preference, it shall so indicate in its offer) ( 15 U.S.C. 657a).

__(17) [Reserved]

__(18)

(i) 52.219-6, Notice of Total Small Business Set-Aside (NOV 2020) ( 15 U.S.C. 644).

__(ii) Alternate I (MAR 2020) of 52.219-6.

__(19)

(i) 52.219-7, Notice of Partial Small Business Set-Aside (NOV 2020) ( 15 U.S.C. 644).

__(ii) Alternate I (MAR 2020) of 52.219-7.

__(20) 52.219-8, Utilization of Small Business Concerns (FEB 2024) ( 15 U.S.C. 637(d)(2) and (3)).

__(21)

(i) 52.219-9, Small Business Subcontracting Plan (SEP 2023) ( 15 U.S.C. 637(d)(4)).

__(ii) Alternate I (NOV 2016) of 52.219-9.

__(iii) Alternate II (NOV 2016) of 52.219-9.

__(iv) Alternate III (JUN 2020) of 52.219-9.

__(v) Alternate IV (SEP 2023) of 52.219-9.

__(22)

(i) 52.219-13, Notice of Set-Aside of Orders (MAR 2020) ( 15 U.S.C. 644(r)).

https://www.acquisition.gov/far/52.209-9#FAR_52_209_9 http://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title41-section2313&num=0&edition=prelim https://www.acquisition.gov/far/52.219-3#FAR_52_219_3 http://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title15-section637a&num=0&edition=prelim https://www.acquisition.gov/far/52.219-4#FAR_52_219_4 http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 https://www.acquisition.gov/far/52.219-6#FAR_52_219_6 http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 https://www.acquisition.gov/far/52.219-6#FAR_52_219_6 https://www.acquisition.gov/far/52.219-7#FAR_52_219_7 http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 https://www.acquisition.gov/far/52.219-7#FAR_52_219_7 https://www.acquisition.gov/far/52.219-8#FAR_52_219_8 http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 https://www.acquisition.gov/far/52.219-9#FAR_52_219_9 http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 https://www.acquisition.gov/far/52.219-9#FAR_52_219_9 https://www.acquisition.gov/far/52.219-9#FAR_52_219_9 https://www.acquisition.gov/far/52.219-9#FAR_52_219_9 https://www.acquisition.gov/far/52.219-9#FAR_52_219_9 https://www.acquisition.gov/far/52.219-13#FAR_52_219_13

__(ii) Alternate I (MAR 2020) of 52.219-13.

__(23) 52.219-14, Limitations on Subcontracting (OCT 2022) ( 15 U.S.C. 637s).

__(24) 52.219-16, Liquidated Damages—Subcontracting Plan (SEP 2021) ( 15 U.S.C. 637(d)(4)(F)(i)).

__(25) 52.219-27, Notice of Set-Aside for, or Sole-Source Award to, Service-Disabled Veteran-Owned Small Business (SDVOSB) Concerns Eligible Under the SDVOSB Program (FEB 2024) ( 15 U.S.C. 657f).

__(26)

(i) 52.219-28, Post Award Small Business Program Representation (FEB 2024) ( 15 U.S.C. 632(a)(2)).

__(ii) Alternate I (MAR 2020) of 52.219-28.

__(27) 52.219-29, Notice of Set-Aside for, or Sole-Source Award to, Economically Disadvantaged Women-Owned Small Business Concerns (OCT 2022) ( 15 U.S.C. 637(m)).

__(28) 52.219-30, Notice of Set-Aside for, or Sole-Source Award to, Women-Owned Small Business Concerns Eligible Under the Women-Owned Small Business Program (OCT 2022) ( 15 U.S.C. 637(m)).

__(29) 52.219-32, Orders Issued Directly Under Small Business Reserves (MAR 2020) ( 15 U.S.C. 644(r)).

__(30) 52.219-33, Nonmanufacturer Rule (SEP 2021) ( 15U.S.C. 637(a)(17)).

__(31) 52.222-3, Convict Labor (JUN 2003) (E.O.11755).

_X_(32) 52.222-19, Child Labor-Cooperation with Authorities and Remedies (FEB 2024).

__(33) 52.222-21, Prohibition of Segregated Facilities (APR 2015).

__(34)

(i) 52.222-26, Equal Opportunity (SEP 2016) (E.O.11246).

__(ii) Alternate I (FEB 1999) of 52.222-26.

__(35)

(i) 52.222-35, Equal Opportunity for Veterans (JUN 2020) ( 38 U.S.C. 4212).

https://www.acquisition.gov/far/52.219-13#FAR_52_219_13 https://www.acquisition.gov/far/52.219-14#FAR_52_219_14 http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 https://www.acquisition.gov/far/52.219-16#FAR_52_219_16 http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 https://www.acquisition.gov/far/52.219-27#FAR_52_219_27 http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 https://www.acquisition.gov/far/52.219-28#FAR_52_219_28 http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 https://www.acquisition.gov/far/52.219-28#FAR_52_219_28 https://www.acquisition.gov/far/52.219-29#FAR_52_219_29 http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 https://www.acquisition.gov/far/52.219-30#FAR_52_219_30 http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 https://www.acquisition.gov/far/52.219-32#FAR_52_219_32 https://www.govinfo.gov/content/pkg/USCODE-2018-title15/html/USCODE-2018-title15-chap14A-sec644.htm https://www.acquisition.gov/far/52.219-33#FAR_52_219_33 https://www.govinfo.gov/content/pkg/USCODE-2018-title15/html/USCODE-2018-title15-chap14A-sec637.htm https://www.acquisition.gov/far/52.222-3#FAR_52_222_3 https://www.acquisition.gov/far/52.222-19#FAR_52_222_19 https://www.acquisition.gov/far/52.222-21#FAR_52_222_21 https://www.acquisition.gov/far/52.222-26#FAR_52_222_26 https://www.acquisition.gov/far/52.222-26#FAR_52_222_26 https://www.acquisition.gov/far/52.222-35#FAR_52_222_35 http://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title38-section4212&num=0&edition=prelim

__(ii) Alternate I (JUL 2014) of 52.222-35.

__(36)

(i) 52.222-36, Equal Opportunity for Workers with Disabilities (JUN 2020) ( 29 U.S.C. 793).

__(ii) Alternate I (JUL 2014) of 52.222-36.

__(37) 52.222-37,…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .