19SA7024Q0026 - V1.pdf
PDF 881 KB Posted
- Attached to
- A Platform for Embassy-Supplied Generator Federal contract opportunity
- Solicitation number
- 19SA7024Q0026
- Issued by
- Department of State
About this file
This document is a Request for Quotations (RFQ) for the design and construction of a platform to house an Embassy-supplied generator at the U.S. Embassy in Riyadh, Kingdom of Saudi Arabia. The U.S. Government intends to award a firm fixed-price contract/purchase order to the responsible company submitting an acceptable offer at the lowest price. A site visit will be held on September 12, 2024, and quotations are due by September 18, 2024. To be considered, offerors must submit a completed SF-1449, Section I Pricing, Section 5 Representations and Certifications, additional information in Section 3, and proof of SAM registration. The work includes design and construction of the concrete platform, supply and installation of the diesel tank and accessories, and cable routing to existing and new electrical panels to support the generator's power requirements for Embassy events and activities.
View the file
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Dear Prospective Quoter:
Subject: Request for Quotations No. 19SA7024Q0026 - A Platform for Embassy-Supplied Generator.
Enclosed is a Request for Quotations (RFQs) for A Platform for Embassy-Supplied Generator.
at the U.S. Embassy in Riyadh. If you would like to submit quotation, follow the instructions in Section 3 of the solicitation, complete the required portions of the attached document, and submit it to the address shown on the Standard Form 1449 that follows this letter.
The U.S. Government intends to award a contract/purchase order to the responsible company submitting an acceptable offer at the lowest price. We intend to award a contract/purchase order based on initial quotations, without holding discussions, although we may hold discussions with companies in the competitive range if there is a need to do so.
The Embassy intends to conduct a site visit. The site visit will be held on Wednesday, September 12, 2024, at 10:00h (local time) at the U.S. Embassy Riyadh, Saudi Arabia.
Prospective offerors should send email to RiyadhContracting@state.gov on or before closing of business Sunday, September 10, 2024, for additional information or to arrange entry to the building.
Quotations are due by Wednesday September 18, 2024 (no quotations will be accepted after this time). Proposals must be in English. Incomplete proposals will NOT be accepted. Your quotation must be submitted electronically to RiyadhContracting@state.gov. The Subject line of all emails must, at a minimum, read “Request for Quotations - 19SA7024Q0026”.
It is important to make sure the submission is made in specific size and format such as MS- Word 2007/2010, MS-Excel 2007/2010 or Adobe Acrobat (pdf file). In addition, file sizes must not exceed 30MB. If the file size should exceed 30MB, then please submit separate emails which are less than 30MB each. If multiple emails are submitted, please identify in the subject line the sequential order for each email (for example, if submitting two separate emails, you would include the following information: Email 1 of 2; Email 2 of 2).
In order for a quotation to be considered, you must also complete and submit the following:
1. SF-1449
2. Section I, Pricing
U.S. Embassy, Riyadh, Kingdom of Saudi Arabia September 9, 2024 mailto:RiyadhContracting@state.gov
A Platform for Embassy-Supplied Generator For the U.S. Embassy Riyadh, Saudi Arabia
Solicitation No. 19SA7024Q0026
P a g e 2 | 68
3. Section 5 Representations and Certifications
4. Additional information as required in Section 3
5. Proof of SAM Registration
As prescribed under FAR 4.1102, prior to submission of offers/proposals, offerors must be registered in the System for Award Management (SAM) at https://www.sam.gov. Failure to promptly register may deem the offeror’s proposal to be considered non-responsible and no further consideration will be given. Therefore, offerors are highly encouraged to register immediately if they are interested in submitting a response to this requirement.
Direct any questions regarding this solicitation by email to: RiyadhContracting@state.gov Questions should be submitted on or before close-of-business (17:00h local time), Sunday September 15, 2024.
U.S. Embassy Contracting Office ( RiyadhContracting@state.gov ) https://www.sam.gov/
P a g e 3 | 68
SOLICITATION
DOCUMENT
A PLATFORM FOR EMBASSY-SUPPLIED GENERATOR
FOR
U.S. EMBASSY RIYADH SAUDI ARABIA
Embassy of the United States of America P.O. Box 94309 Riyadh 11693 Saudi Arabia
SOLICITATION NO. 19SA7024Q0026
P a g e 4 | 68
TABLE OF CONTENTS
SECTION 1 - THE SCHEDULE
• SF 18 or SF 1449 cover sheet
• Continuation To SF-1449, RFQ Number 19SA7024Q0026, Prices, Block 23
• Continuation To SF-1449, RFQ Number 19SA7024Q0026, Schedule of Supplies/Services, Block 20 Description/Specifications/Work Statement
• Attachment 1 to Description/Specifications/Performance Work Statement, Government Furnished Property
SECTION 2 - CONTRACT CLAUSES
• Contract Clauses
• Addendum to Contract Clauses - FAR and DOSAR Clauses not Prescribed in Part 12
SECTION 3 - SOLICITATION PROVISIONS
• Solicitation Provisions
• Addendum to Solicitation Provisions - FAR and DOSAR Provisions not Prescribed in
Part 12
SECTION 4 - EVALUATION FACTORS
• Evaluation Factors
• Addendum to Evaluation Factors - FAR and DOSAR Provisions not Prescribed in Part
SECTION 5 - REPRESENTATIONS AND CERTIFICATIONS
• Offeror Representations and Certifications
• Addendum to Offeror Representations and Certifications - FAR and DOSAR
Provisions not Prescribed in Part 12
Attachment A – Concrete Platform Model.
Exhibit 1 – Trafficking in Persons.
P a g e 5 | 68
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, & 30
1. REQUISITION NUMBER
PR12817712
2. CONTRACT NO.
3. AWARD/EFFECTIVE DATE 4. ORDER NUMBER
5. SOLICITATION NUMBER
19SA7024Q0026
6. SOLICITATION ISSUE DATE
September 8, 2024,
7. FOR SOLICITATION
INFORMATION CALL:
a. NAME Ina Erickson
b. TELEPHONE NUMBER (No collect calls) +966-11-835-4000
8. OFFER DUE DATE/ LOCAL
TIME 1700 hours September 18, 2024
9. ISSUED BY CODE 19SA70 10. THIS ACQUISITION IS UNRESTRICTED OR SET ASIDE: ____ % FOR:
Contracting Officer Embassy of the United States of America
SMALL BUSINESS WOMEN-OWNED SMALL BUSINESS
Tel: +966-11-835-4000 RiyadhContracting@state.gov
HUBZONE SMALL
BUSINESS
(WOSB) ELLIGIBLE UNDER THE WOMEN-OWNED
SMALL BUSINESS PROGRAM NAICS:
SERVICE-DISABLED
VETERAN-OWNED
SMALL BUSINESS
EDWOSB
8 (A) SIZE STANDARD:
11. DELIVERY FOR FOB DESTINAT-
TION UNLESS BLOCK IS
MARKED
SEE SCHEDULE
12. DISCOUNT TERMS 13a. THIS CONTRACT IS A
RATED ORDER UNDER
DPAS (15 CFR 700)
13b. RATING
14. METHOD OF SOLICITATION
RFQ IFB RFP
15. DELIVER TO CODE 19SA70 16. ADMINISTERED BY CODE
17a. CONTRACTOR/
OFFERER
CODE FACILITY
CODE
18a. PAYMENT WILL BE MADE BY Financial Management Center Embassy of the United States of America Riyadh, Saudi Arabia RiyadhDBO@state.gov
CODE 19SA70
17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH ADDRESS IN
OFFER
18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a UNLESS BLOCK
BELOW IS CHECKED SEE ADDENDUM
19.
ITEM NO.
20.
SCHEDULE OF SUPPLIES/SERVICES
21.
QUANTITY
22.
UNIT
23.
UNIT PRICE
24.
AMOUNT
Design and construction of a platform for the Embassy-supplied generator, supply and installation of the diesel tank, refill line, accessories and fittings, and cable routing by conduit or trays to the existing panel boards and new panel boards to support and meet the power requirement for the grass area designated for events and activities at the U.S. Embassy, Riyadh, Saudi Arabia.
01 Lot
25. ACCOUNTING AND APPROPRIATION DATA
26. TOTAL AWARD AMOUNT (For Govt. Use Only)
27a.SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1, 52.212-4. FAR 52.212-3 AND 52.212-5 ARE ATTACHED. ADDENDA ARE ARE NOT ATTACHED
27b.CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED
28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN ____ COPIES TO
ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND DELIVER ALL ITEMS SET
FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY ADDITIONAL SHEETS SUBJECT
TO THE TERMS AND CONDITIONS SPECIFIED HEREIN.
29. AWARD OF CONTRACT: REF. _________________ OFFER DATED ____________.
YOUR OFFER ON SOLICITATION (BLOCK 5), INCLUDING ANY ADDITIONS OR
CHANGES WHICH ARE SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:
30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a. UNITED STATES OF AMERICA (SIGNATURE OF CONTRACTING OFFICER)
30b. NAME AND TITLE OF SIGNER 30c. DATE SIGNED
31b. NAME OF CONTRACTING OFFICER Ina Erickson
31c. DATE SIGNED
AUTHORIZED FOR LOCAL REPRODUCTIO
PREVIOUS EDITION IS NOT USABLE
Computer Generated STANDARD FORM 1449 (REV. 02/2012) Prescribed by GSA - FAR (48 CFR) 53.212 mailto:RiyadhDBO@state.gov
P a g e 6 | 68
SECTION 1 - THE SCHEDULE
CONTINUATION TO SF-1449 - RFQ NUMBER S- 19SA7024Q0026- PRICES, BLOCK 23
I. PERFORMANCE WORK STATEMENT
A. The purpose of this firm fixed price purchase order is to for Constructing a platform for Embassy-supplied generator in accordance with Attachment A.
B. The contract will be for a one-year period from the date of the contract award, with no option years.
QUALITY ASSURANCE AND SURVEILLANCE PLAN (QASP)
This plan provides an effective method to promote satisfactory contractor performance. The QASP provides a method for the Contracting Officer's Representative (COR) to monitor Contractor performance, advise the Contractor of unsatisfactory performance, and notify the Contracting Officer of continued unsatisfactory performance. The Contractor, not the Government, is responsible for management and quality control to meet the terms of the contract. The role of the Government is to monitor quality to ensure that contract standards are achieved.
Performance Objective Scope of Work Paragraphs
Performance Threshold
Services.
Performs all Constructing a platform for Embassy-supplied generator services set forth in the Scope of Work.
I thru II
All required services are performed and no more than one (1) customer complaint is received per month.
1. SURVEILLANCE. The COR will receive and document all complaints from Government personnel regarding the services provided. If appropriate, the COR will send the complaints to the Contractor for corrective action.
2. STANDARD. The performance standard is that the Government receives no more than one
(1) customer complaint per month. The COR shall notify the Contracting Officer of the complaints so that the Contracting Officer may take appropriate action to enforce the inspection clause (FAR 52.212.4, Contract Terms and Conditions-Commercial Items (May 2001), if any of the services exceed the standard.
JAMES ZADROGA 9/11 VICTIMS HEALTH AND COMPENSATION ACT OF 2010
NOTICE: UNLESS A WAIVER OR EXCEPTION APPLIES, PAYMENTS SUBSEQUENT TO
THIS PROCUREMENT ARE SUBJECT TO AN EXCISE TAX OF 2% PERSUANT TO 26
U.S.C. 5000C.
P a g e 7 | 68
3. PROCEDURES.
(a) If any Government personnel observe unacceptable services, either incomplete work or required services not being performed they should immediately contact the COR.
(b) The COR will complete appropriate documentation to record the complaint.
(c) If the COR determines the complaint is invalid, the COR will advise the complainant. The COR will retain the annotated copy of the written complaint for his/her files.
(d) If the COR determines the complaint is valid, the COR will inform the Contractor and give the Contractor additional time to correct the defect, if additional time is available. The COR shall determine how much time is reasonable.
(e) The COR shall, as a minimum, orally notify the Contractor of any valid complaints.
(f) If the Contractor disagrees with the complaint after investigation of the site and challenges the validity of the complaint, the Contractor will notify the COR. The COR will review the matter to determine the validity of the complaint.
(g) The COR will consider complaints as resolved unless notified otherwise by the complainant.
(h) Repeat customer complaints are not permitted for any services. If a repeat customer complaint is received for the same deficiency during the service period, the COR will contact the Contracting Officer for appropriate action under the Inspection clause.
II. PRICING
VALUE ADDED TAX. Value Added Tax (VAT) is not included in the CLIN rates. Instead, it will be priced as a separate Line Item in the contract and on Invoices. Local law dictates the portion of the contract price that is subject to VAT; this percentage is multiplied only against that portion. It is reflected for each performance period. The portions of the solicitation subject to VAT are:
19.
ITEM NO.
20.
SCHEDULE OF SUPPLIES/SERVICES
21.
QUANTIT
22.
UNIT
23.
UNIT PRICE
24.
AMOUNT
01 Design and construction of a platform for the Embassy-supplied generator, supply and installation of the diesel tank, refill line, accessories and fittings, and cable routing by conduit or trays to the existing panel boards and new panel boards to support and meet the power requirement for the grass area designated for events and activities at the U.S. Embassy, Riyadh, Saudi Arabia.
1 Lot
DBA
VAT 15%
Grand Total
NOTE: Please include DBA insurance in line-item price (not in separate line) and awardee will provide DBA insurance certificate within 15 days of award. U.S. based offerors are not applicable for 15% Value Added Tax.
P a g e 8 | 68
CONTINUATION TO SF-1449, RFQ NUMBER 19SA7024Q0026
SCHEDULE OF SUPPLIES/SERVICES, BLOCK 20
DESCRIPTION/SPECIFICATIONS/WORK STATEMENT
SCOPE OF WORK
Constructing a platform for Embassy-supplied generator at the U.S. Embassy in Riyadh, Kingdom of Saudi Arabia.
Design and construction of a platform for the Embassy-supplied generator, supply and installation of the diesel tank, refill line, accessories and fittings, and cable routing by conduit or trays to the existing panel boards and new panel boards to support and meet the power requirement for the grass area designated for events and embassy activities at the Embassy of the United States of America, Riyadh, Saudi Arabia.
1.0 PROJECT DESCRIPTION
PROJECT SYNOPSIS
Design and construction of a platform for the Embassy-supplied generator, supply and installation of the diesel tank, refill line, accessories and fittings, and cable routing by CPVC/ Rigid conduit or Closed Duct Type trays to the existing panel boards and new panel boards:
Generator accessories to be supplied and installed inside the generator enclosure:
• Battery Charger (Check the genset specifications and recommend a suitable size of charger.)
• Switch-operated LED Trouble Lights (fixed on both sides of the enclosure.)
• Built-in Portable Industrial Outlets (110V and 220V, 2 outlets each powered by the generator during the run.)
• Supply a Distribution Panel for 220V Power: 160-200A adjustable trip main breaker rating and 36 branch circuits composed of 6x16A 1P, 6x20A 1P, 6x32A 1P, and 6x32A 3P. (Location shall be discussed during the site survey.)
• Supply a Distribution Panel for 220V Power: 160-200A adjustable trip main breaker rating and 36 branch circuits composed of 6x16A 1P, 6x20A 1P, 6x32A 1P, and 6x32A 3P. (Location shall be discussed during the site survey.)
• UL listed Day Tank 750 Liters, pipelined to the generator with supply and return lines routed and protected along the fence wall and a refilling port of 2" in diameter equipped with Camlock routed to the fence wall with an access door from the outside.
Concrete Platform Requirements:
P a g e 9 | 68
• Design and construct a platform capable of carrying the weight of the embassy supplied generator and the 750-liter diesel tank without sinking or cracking, taking into consideration the vibration factor produced by the generator set.
• The platform should be adequate to accommodate the size of the generator set, with at least 90 cm of walkable space on all sides and the diesel tank as well.
• All diesel lines linked from the tank to the generator should be installed with conduits or sleeves pre-routed as part of the platform.
• The platform shall be sloped outward to avoid water accumulation during cleaning.
• The platform should have a minimum compressive strength of 3000 psi and a concrete mixture ratio of 1:2:3.
• The platform shall be fully coated with UV Rated epoxy paint grey color.
• The design and load calculation shall be provided to the COR for approval prior to construction.
MDB and Cable Routing Requirements:
• Design and supply of the MDB with a steel stand and support capable of supporting the weight of the panel, cables and breakers, furnished with all the required glands, covers plates, assembly plates, pilot lights, selector switches, and adjustable trip breakers, all interconnected with code-compliant busbars rated 400A and soft cables with properly sized lugs.
• The MDB panel shall be installed with an adjustable trip main breaker rated 250-300A, 4D, 4P, and 3 distribution breakers: one adjustable trip breaker rated at maximum 200A, one adjustable trip breaker rated
• capacity.
• A schematic diagram shall be provided for approval prior to the assembly. All breakers are either ABB or Schneider brands.
• All cable terminations from the generator to the MDB and the MDB to the old and new load side panel boards are part of the contractor’s scope of work.
• All accessories needed and required for the completion of the cable termination works should be taken into consideration and must be added to the offer.
• The cable from the generator to the MDB shall be routed in such a way that all are protected with conduits or trays, and all conduits or trays are supported properly and adequately using channels, spring nuts, and anchors.
• All conduits and trays shall be sized accordingly and in compliance with the fill calculations.
Overcrowding is not acceptable.
P a g e 10 | 68
• All cables shall be Cu/PVC/XLPE, 600V/1000V, 5-core, and sized based on the over-current cut-off devices and voltage drop calculations for each run.
• Further details of the requirement will be discussed during the site survey.
• All installations shall comply with the local codes, NEC latest edition, and NFPA.
• All pertinent civil, mechanical, and ground works should be added to the offer and clarified during the site survey.
BACKGROUND
Currently, US Embassy Riyadh has a standing generator. The model is Caterpillar DE110E2, 110V/220V, 60Hz. (Generator nameplates photos are attached). The generator is planned to be utilized as a portable generator to cater to Embassy-sponsored events at grass area and the front fountain.
SOLUTION
To be able to implement the plan, the generator needs to be installed along the Embassy security fence on Abu Al Wafa Al Bouzjani Street. The generator should be retrofitted with all the required accessories and equipment to meet the power supply demand of every event hosted by the Embassy and the other affiliated agencies that require facility management support. The generator-designated area shall be pre-approved by RSO for placement inside the Embassy compound, and a concrete foundation will be designed and constructed in compliance with all applicable civil and concrete structural standards.
2.0 GENERAL CONDITIONS
Fixed-Price Proposal: The contractor shall provide one fixed-priced proposal for the complete project that includes every aspect of the work.
Specifications: The work shall be governed by the facilities management of the US Embassy, Riyadh, Saudi Arabia. International codes include the National Fire Prevention Association (NFPA) and the National Electric Code (NEC). Should there be a discrepancy between the U.S.
Embassy Specifications and the applicable Building Code, the more stringent of the two shall govern.
The contractor is responsible for compliance with all building codes; work not in compliance with the codes shall be deemed unacceptable.
Execution: The work shall be executed in a diligent and workmanlike manner in accordance with the negotiated fixed price, this scope of work, the project schedule, international codes, and local laws where applicable.
Work Hours: Unless otherwise agreed with COR, the work shall be executed during normal Embassy work hours from 8:00 a.m. to 5:00 p.m. Night, weekend, or holiday work shall not be
P a g e 11 | 68 permitted except as arranged in advance with the COR. The U.S. Embassy holiday schedule is available from the COR.
Safety: The contractor shall be responsible for conducting the work in a manner that ensures the safety of residents, employees, visitors to the compound, and the contractor’s employees.
Workforce: The contractor shall provide all supervision, skilled and unskilled labor needed to perform the work. The contractor shall comply with the U.S. Embassy security policy by providing approved, legal, and valid labor documents. Contractor-provided labor shall be in quantity sufficient to comply with RSO escort ratios for the number of workers on the project.
The COR shall prepare requests to the RSO for the vetting of employees to get contractor badges.
Subcontractors: The contractor shall be responsible for the conduct and workmanship of subcontractors engaged in the project and for subcontractors’ compliance with the terms of this Statement of Work. The contractor is responsible for the behavior and workmanship of subcontractors while on Embassy property.
Modification to the Contract: The contractor shall not incur any costs beyond those described in this SOW unless directed otherwise in writing by the contracting officer. Any work performed by the contractor beyond this SOW without written direction from the contracting officer will be at the contractor’s own risk and at no cost to the Embassy.
Stop Work: At any time during the project, the contracting officer reserves the right to stop work for the protection of employees or visitors, security, or any other reason at his or her discretion.
Submittals: The contractor is responsible for submitting shop drawings prior to the fabrication and release of any materials for the facility manager and COR review and approval. The review, however, does not relieve the contractor of the responsibility to engineer the work to provide a complete working system.
Excavation and Utilities: The contractor is responsible for locating all existing utility lines prior to any excavation. Prior to disconnecting any existing utility services, the contractor is responsible for providing 48-hour advance notice to the COR so an outage can be mutually scheduled.
Close-out: Prior to final acceptance, the contractor is to submit to the COR marked-up drawings (as built) reflecting the work as constructed. The drawings shall be digitally submitted on a CD- ROM in both AutoCAD and PDF format and provide one hard copy in size A3.
Housekeeping: The contractor is responsible for cleaning up daily before departing the Embassy compound. At the completion of the work, the contractor shall clean any impacted areas to a condition equal to the original condition. Contractor tools and equipment will be secured when not in use.
P a g e 12 | 68
3.0 SCOPE OF WORK:
Construction of the concrete platform for the placement of the portable generator at the Embassy compound and supply and installation of all the necessary accessories to facilitate the full operational capability of the Embassy-supplied generator. The contractor shall provide all materials, tools, and equipment, labor, transportation, and supervision, and ensure the work is completed safely and properly without incurring any damages or additional costs to the United States Government.
General Requirements
1. The contractor is responsible for field verifying all the dimensions, measurements, and site conditions.
2. Within 5 days of Notice to Proceed (NTP), the contractor shall provide the COR with a project schedule showing start-to-finish dates, including significant milestones.
3. Within 5 days of the NTP, the contractor shall provide the COR with details of the proposed construction plan of the concrete foundation and the installation of the generator with the supplied tank, utilizing a written description, sketches, or both.
4. Within 5 days of NTP, the contractor shall provide the COR with detailed shop drawings of the proposed concrete foundation with all details and calculations of the structure, the load-bearing capacities, and the designs and layout of the rebars and footings.
5. Within 5 days of NTP, the contractor shall provide the COR with detailed shop drawings of the proposed diesel tank with all details and calculations, materials samples, a technical data sheet (UL-listed), and the designs and layout of the tank structure, outlets, and refilling ports.
6. Within 10 days of the NTP, the contractor shall arrange the retrofitting of the client-supplied generator from the US Embassy Annex to start the fit-out process, fabrication, and installation of the necessary accessories to meet all the requirements in the SOW.
7. The contractor is responsible for properly laying out and preparing the site for the construction of the pad based on locations provided by the COR, or facility manager, if the COR is unavailable.
8. The contractor is responsible for properly removing and disposing of all debris related to their work, including, but not limited to, electrical, mechanical, sanitary accessories, soils, rock excavation, packing materials and scrap steel, uninstalled materials, and/or environmental waste.
9. When pursuing the work, the contractor is to take extra care not to damage existing utilities and adjacent structures. The contractor is responsible for repairing any damage caused as a result of their work. A site survey and ground scan are required to ensure that no utility lines will be affected by the construction.
P a g e 13 | 68
10. When pursuing the work, the contractor is to implement safety measures to protect existing structures that are not designated as part of the scope of work. The limits of construction will be clearly identified and marked to deter unauthorized personnel access.
11. All work shall be done according to the approved layout/drawings and specifications, codes (listed below), and SHEM requirements. If there is a conflict between codes, drawings, or specifications, the more stringent will apply.
12. Storage of “useful" and uninstalled materials will be in a location as directed by the COR.
13. At completion of work, the contractor shall clean any impacted areas to a condition equal to the original condition.
14. The contractor will warranty all construction work for a minimum of one (1) year and provide manufacturer warranties and equipment manuals for all equipment installed at the COR.
All construction work will be in conformance with the following codes: International Building Code, Latest Edition, plus the 2011 OBO International Code
International Fire Code, 2009 Edition, plus the 2011 OBO International Code
National Electric Code, 2011 Edition, plus the 2011 OBO International Code
International Residential Code 2009 Edition plus the 2011 OBO International Code
National Fire Protection Association, NFPA 101, and NFPA 58
ICC/ANSI 1-98 Accessible and usable buildings and facilities
NECA 90: Recommended Practice for Commissioning Building Electrical Systems (ANSI)
NECA 1-2010 Standard Practice of Good Workmanship in Electrical Construction (ANSI)
IEEE C2-2012 National Electrical Safety Code (NESC)
EM 385-1-1 S. Army Corps of Engineers Safety and Health Requirements
ASTM C150, C33, and C260 American Society for Testing and
1. Work Requirements:
The contractor shall provide complete design and construction services, including all coordination, supervision, and management necessary to meet the requirements of this SOW.
Supplying and installing all needed accessories listed in this SOW and constructing the concrete platform for the placement of the encased generator in the assigned location in the Embassy compound.
P a g e 14 | 68
The main work items will be according to the following bill of quantities: 1
Generator accessories to be supplied and installed inside the generator enclosure:
• Battery Charger (Check the genset specifications and recommend a suitable size of charger.)
• Switch Operated LED Trouble Lights (Fixed on both sides of the enclosure.)
• Built-in Portable Industrial Outlets (110V and 220V, 2 outlets each powered by the genset during run.)
• Supply a Distribution Panel for 220V Power: 160-200A adjustable trip main breaker rating and 36 branch circuits composed of 6x16A 1P, 6x20A 1P, 6x32A 1P and 6x32A 3P. (Location shall be discussed during the site survey.)
• Supply a Distribution Panel for 220V Power: 160-200A adjustable trip main breaker rating and 36 branch circuits composed of 6x16A 1P, 6x20A 1P, 6x32A 1P and 6x32A 3P. (Location shall be discussed during the site survey.)
• UL listed Day Tank 750 Liters, pipelined to the generator with supply and return lines routed and protected along the fence wall and a refilling port of 2" in diameter equipped with Camlock routed to the fence wall with an access door from the outside.
LS 1
2 Concrete Platform Requirements:
• Design and construct a platform capable of carrying the weight of the embassy supplied generator and the 750 liters diesel tank without sinking or cracking and taking into consideration the vibration factor produced by the generator set.
• The platform should be adequate to accommodate the size of the generator set with at least 90cm walkable space on all sides and the diesel tank as well. Refer to the attached draft layout.
LS 1
P a g e 15 | 68
SECTION 2 - CONTRACT CLAUSES
52.212-4 CONTRACT TERMS AND CONDITIONS – COMMERCIAL ITEMS
(NOV 2021) IS INCORPORATED BY REFERENCE. (SEE SF-1449,
BLOCK 27A)
52.212-5 CONTRACT TERMS AND CONDITIONS REQUIRED TO IMPLEMENT STATUTES OR
EXECUTIVE ORDERS—COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES
(SEP 2023)
(a) The Contractor shall comply with the following Federal Acquisition Regulation (FAR) clauses, which are incorporated in this contract by reference, to implement provisions of law or Executive orders applicable to acquisitions of commercial products and commercial services:
(1) 52.203-19, Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements (JAN 2017) (section 743 of Division E, Title VII, of the Consolidated and Further Continuing Appropriations Act, 2015 (Pub. L. 113-235) and its successor provisions in subsequent appropriations acts (and as extended in continuing resolutions)).
(2) 52.204-23, Prohibition on Contracting for Hardware, Software, and Services Developed or Provided by Kaspersky Lab and Other Covered Entities (NOV 2021) (Section 1634 of Pub. L. 115-91).
(3) 52.204-25, Prohibition on Contracting for Certain Telecommunications and Video Surveillance Services or Equipment. (NOV 2021) (Section 889(a)(1)(A) of Pub. L. 115- 232).
(4) 52.209-10, Prohibition on Contracting with Inverted Domestic Corporations (NOV 2015).
(5) 52.232-40, Providing Accelerated Payments to Small Business Subcontractors (MAR 2023) ( 31 U.S.C. 3903 and 10 U.S.C. 3801).
(6) 52.233-3, Protest After Award (AUG 1996) ( 31 U.S.C. 3553).
(7) 52.233-4, Applicable Law for Breach of Contract Claim (OCT 2004) (Public Laws 108-77 and 108-78 ( 19 U.S.C. 3805 note)).
(b) The Contractor shall comply with the FAR clauses in this paragraph (b) that the Contracting Officer has indicated as being incorporated in this contract by reference to implement provisions of law or Executive orders applicable to acquisitions of commercial products and commercial services:
__ (1) 52.203-6, Restrictions on Subcontractor Sales to the Government (JUN 2020), with Alternate I (NOV 2021) ( 41 U.S.C. 4704 and 10 U.S.C. 4655).
__ (2) 52.203-13, Contractor Code of Business Ethics and Conduct (NOV 2021) ( 41 U.S.C. 3509)).
https://www.acquisition.gov/far/part-52#FAR_52_203_19 https://www.acquisition.gov/far/part-52#FAR_52_204_23 https://www.acquisition.gov/far/part-52#FAR_52_204_25 https://www.acquisition.gov/far/part-52#FAR_52_209_10 https://www.acquisition.gov/far/part-52#FAR_52_232_40 https://www.govinfo.gov/link/uscode/31/3903 https://www.govinfo.gov/link/uscode/10/3801 https://www.acquisition.gov/far/part-52#FAR_52_233_3 http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 https://www.acquisition.gov/far/part-52#FAR_52_233_4 http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 https://www.acquisition.gov/far/part-52#FAR_52_203_6 http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 https://www.govinfo.gov/link/uscode/10/4655 https://www.acquisition.gov/far/part-52#FAR_52_203_13 http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3
P a g e 16 | 68
__ (3) 52.203-15, Whistleblower Protections under the American Recovery and Reinvestment Act of 2009 (JUN 2010) (Section 1553 of Pub. L. 111-5). (Applies to contracts funded by the American Recovery and Reinvestment Act of 2009.)
_X_ (4) 52.204-10, Reporting Executive Compensation and First-Tier Subcontract Awards (JUN 2020) (Pub. L. 109-282) ( 31 U.S.C. 6101 note).
__ (5) [Reserved].
__ (6) 52.204-14, Service Contract Reporting Requirements (OCT 2016) (Pub. L. 111-117, section 743 of Div. C).
__ (7) 52.204-15, Service Contract Reporting Requirements for Indefinite-Delivery Contracts (OCT 2016) (Pub. L. 111-117, section 743 of Div. C).
_X_ (8) 52.204-27, Prohibition on a ByteDance Covered Application (JUN 2023) (Section 102 of Division R of Pub. L. 117-328).
_X_ (9) 52.209-6, Protecting the Government’s Interest When Subcontracting with Contractors Debarred, Suspended, or Proposed for Debarment. (NOV 2021) ( 31 U.S.C. 6101 note).
__ (10) 52.209-9, Updates of Publicly Available Information Regarding Responsibility Matters (OCT 2018) ( 41 U.S.C. 2313).
__ (11) [Reserved].
__ (12) 52.219-3, Notice of HUBZone Set-Aside or Sole-Source Award (OCT 2022) ( 15 U.S.C. 657a).
__ (13) 52.219-4, Notice of Price Evaluation Preference for HUBZone Small Business Concerns (OCT 2022) (if the offeror elects to waive the preference, it shall so indicate in its offer) ( 15 U.S.C. 657a).
__ (14) [Reserved]
__ (15)
(i) 52.219-6, Notice of Total Small Business Set-Aside (NOV 2020) ( 15 U.S.C. 644).
__ (ii) Alternate I (MAR 2020) of 52.219-6.
__ (16)
(i) 52.219-7, Notice of Partial Small Business Set-Aside (NOV 2020) ( 15 U.S.C. 644).
__ (ii) Alternate I (MAR 2020) of 52.219-7.
__ (17) 52.219-8, Utilization of Small Business Concerns (SEP 2023) ( 15 U.S.C. 637(d)(2) and (3)).
__ (18)
(i) 52.219-9, Small Business Subcontracting Plan (SEP 2023) ( 15 U.S.C. 637(d)(4)).
__ (ii) Alternate I (NOV 2016) of 52.219-9.
__ (iii) Alternate II (NOV 2016) of 52.219-9.
https://www.acquisition.gov/far/part-52#FAR_52_203_15 https://www.acquisition.gov/far/part-52#FAR_52_204_10 http://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title31-section6101&num=0&edition=prelim https://www.acquisition.gov/far/part-52#FAR_52_204_14 https://www.acquisition.gov/far/part-52#FAR_52_204_15 https://www.acquisition.gov/far/part-52#FAR_52_204_27 https://www.acquisition.gov/far/part-52#FAR_52_209_6 http://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title31-section6101&num=0&edition=prelim https://www.acquisition.gov/far/part-52#FAR_52_209_9 http://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title41-section2313&num=0&edition=prelim https://www.acquisition.gov/far/part-52#FAR_52_219_3 http://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title15-section637a&num=0&edition=prelim https://www.acquisition.gov/far/part-52#FAR_52_219_4 http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 https://www.acquisition.gov/far/part-52#FAR_52_219_6 http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 https://www.acquisition.gov/far/part-52#FAR_52_219_6 https://www.acquisition.gov/far/part-52#FAR_52_219_7 http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 https://www.acquisition.gov/far/part-52#FAR_52_219_7 https://www.acquisition.gov/far/part-52#FAR_52_219_8 http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 https://www.acquisition.gov/far/part-52#FAR_52_219_9 http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 https://www.acquisition.gov/far/part-52#FAR_52_219_9 https://www.acquisition.gov/far/part-52#FAR_52_219_9
P a g e 17 | 68
__ (iv) Alternate III (JUN 2020) of 52.219-9.
__ (v) Alternate IV (SEP 2023) of 52.219-9.
__ (19)
(i) 52.219-13, Notice of Set-Aside of Orders (MAR 2020) ( 15 U.S.C. 644(r)).
__ (ii) Alternate I (MAR 2020) of 52.219-13.
__ (20) 52.219-14, Limitations on Subcontracting (OCT 2022) ( 15 U.S.C. 637s).
__ (21) 52.219-16, Liquidated Damages—Subcontracting Plan (SEP 2021) ( 15 U.S.C. 637(d)(4)(F)(i)).
__ (22) 52.219-27, Notice of Service-Disabled Veteran-Owned Small Business Set-Aside (OCT 2022) ( 15 U.S.C. 657f).
__ (23)
(i) 52.219-28, Post Award Small Business Program Rerepresentation (SEP 2023)( 15 U.S.C. 632(a)(2)).
__ (ii) Alternate I (MAR 2020) of 52.219-28.
__ (24) 52.219-29, Notice of Set-Aside for, or Sole-Source Award to, Economically Disadvantaged Women-Owned Small Business Concerns (OCT 2022) ( 15 U.S.C. 637(m)).
__ (25) 52.219-30, Notice of Set-Aside for, or Sole-Source Award to, Women-Owned Small Business Concerns Eligible Under the Women-Owned Small Business Program (OCT 2022) ( 15 U.S.C. 637(m)).
__ (26) 52.219-32, Orders Issued Directly Under Small Business Reserves (MAR 2020) ( 15 U.S.C. 644(r)).
__ (27) 52.219-33, Nonmanufacturer Rule (SEP 2021) ( 15U.S.C. 637(a)(17)).
__ (28) 52.222-3, Convict Labor (JUN 2003) (E.O.11755).
_X_ (29) 52.222-19, Child Labor-Cooperation with Authorities and Remedies (DEC 2022) (E.O.13126).
__ (30) 52.222-21, Prohibition of Segregated Facilities (APR 2015).
__ (31)
(i) 52.222-26, Equal Opportunity (SEP 2016) (E.O.11246).
__ (ii) Alternate I (FEB 1999) of 52.222-26.
__ (32)
(i) 52.222-35, Equal Opportunity for Veterans (JUN 2020) ( 38 U.S.C. 4212).
__ (ii) Alternate I (JUL 2014) of 52.222-35.
__ (33) https://www.acquisition.gov/far/part-52#FAR_52_219_9 https://www.acquisition.gov/far/part-52#FAR_52_219_9 https://www.acquisition.gov/far/part-52#FAR_52_219_13 http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 https://www.acquisition.gov/far/part-52#FAR_52_219_13 https://www.acquisition.gov/far/part-52#FAR_52_219_14 http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 https://www.acquisition.gov/far/part-52#FAR_52_219_16 http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 https://www.acquisition.gov/far/part-52#FAR_52_219_27 http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 https://www.acquisition.gov/far/part-52#FAR_52_219_28 http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 https://www.acquisition.gov/far/part-52#FAR_52_219_28 https://www.acquisition.gov/far/part-52#FAR_52_219_29 http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 https://www.acquisition.gov/far/part-52#FAR_52_219_30 http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 https://www.acquisition.gov/far/part-52#FAR_52_219_32 https://www.govinfo.gov/content/pkg/USCODE-2018-title15/html/USCODE-2018-title15-chap14A-sec644.htm https://www.acquisition.gov/far/part-52#FAR_52_219_33 https://www.govinfo.gov/content/pkg/USCODE-2018-title15/html/USCODE-2018-title15-chap14A-sec637.htm https://www.acquisition.gov/far/part-52#FAR_52_222_3 https://www.acquisition.gov/far/part-52#FAR_52_222_19 https://www.acquisition.gov/far/part-52#FAR_52_222_21 https://www.acquisition.gov/far/part-52#FAR_52_222_26 https://www.acquisition.gov/far/part-52#FAR_52_222_26 https://www.acquisition.gov/far/part-52#FAR_52_222_35 http://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title38-section4212&num=0&edition=prelim https://www.acquisition.gov/far/part-52#FAR_52_222_35
P a g e 18 | 68
(i) 52.222-36, Equal Opportunity for Workers with Disabilities (JUN 2020) ( 29 U.S.C. 793).
__ (ii) Alternate I (JUL 2014) of 52.222-36.
__ (34) 52.222-37, Employment Reports on Veterans (JUN 2020) ( 38 U.S.C. 4212).
__ (35) 52.222-40, Notification of Employee Rights Under the National Labor Relations Act (DEC 2010) (E.O. 13496).
_X_ (36)
(i) 52.222-50, Combating Trafficking in Persons (NOV 2021) ( 22 U.S.C. chapter 78 and E.O. 13627).
__ (ii) Alternate I (MAR 2015) of 52.222-50 ( 22 U.S.C. chapter 78 and E.O. 13627).
__ (37) 52.222-54, Employment Eligibility Verification (MAY 2022) (Executive Order 12989). (Not applicable to the acquisition of commercially available off-the-shelf items or certain other types of commercial products or commercial services as prescribed in
FAR 22.1803.)
__ (38)
(i) 52.223-9, Estimate of Percentage of Recovered Material Content for EPA– Designated Items (May 2008) ( 42 U.S.C. 6962(c)(3)(A)(ii)). (Not applicable to the acquisition of commercially available off-the-shelf items.)
__ (ii) Alternate I (MAY 2008) of 52.223-9 ( 42 U.S.C. 6962(i)(2)(C)). (Not applicable to the acquisition of commercially available off-the-shelf items.)
__ (39) 52.223-11, Ozone-Depleting Substances and High Global Warming Potential Hydrofluorocarbons (Jun 2016) (E.O. 13693).
__ (40) 52.223-12, Maintenance, Service, Repair, or Disposal of Refrigeration Equipment and Air Conditioners (JUN 2016) (E.O. 13693).
__ (41)
(i) 52.223-13, Acquisition of EPEAT®-Registered Imaging Equipment (JUN 2014) (E.O.s 13423 and 13514).
__ (ii) Alternate I (OCT 2015) of 52.223-13.
__ (42)
(i) 52.223-14, Acquisition of EPEAT®-Registered Televisions (JUN 2014) (E.O.s 13423 and 13514).
__ (ii) Alternate I (Jun2014) of 52.223-14.
__ (43) 52.223-15, Energy Efficiency in Energy- Consuming Products (MAY 2020) ( 42 U.S.C. 8259b).
__ (44) https://www.acquisition.gov/far/part-52#FAR_52_222_36 http://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title29-section793&num=0&edition=prelim https://www.acquisition.gov/far/part-52#FAR_52_222_36 https://www.acquisition.gov/far/part-52#FAR_52_222_37 http://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title38-section4212&num=0&edition=prelim https://www.acquisition.gov/far/part-52#FAR_52_222_40 https://www.acquisition.gov/far/part-52#FAR_52_222_50 http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 https://www.acquisition.gov/far/part-52#FAR_52_222_50 http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 https://www.acquisition.gov/far/part-52#FAR_52_222_54 https://www.acquisition.gov/far/part-22#FAR_22_1803 https://www.acquisition.gov/far/part-52#FAR_52_223_9 http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 https://www.acquisition.gov/far/part-52#FAR_52_223_9 http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 https://www.acquisition.gov/far/part-52#FAR_52_223_11 https://www.acquisition.gov/far/part-52#FAR_52_223_12 https://www.acquisition.gov/far/part-52#FAR_52_223_13 https://www.acquisition.gov/far/part-52#FAR_52_223_13 https://www.acquisition.gov/far/part-52#FAR_52_223_14 https://www.acquisition.gov/far/part-52#FAR_52_223_14 https://www.acquisition.gov/far/part-52#FAR_52_223_15
P a g e 19 | 68
(i) 52.223-16, Acquisition of EPEAT®-Registered Personal Computer Products (OCT 2015) (E.O.s 13423 and 13514).
__ (ii) Alternate I (JUN 2014) of 52.223-16.
_X_ (45) 52.223-18, Encouraging Contractor Policies to Ban Text Messaging While Driving (JUN 2020) (E.O. 13513).
__ (46) 52.223-20, Aerosols (JUN 2016) (E.O. 13693).
__ (47) 52.223-21, Foams (Jun2016) (E.O. 13693).
__ (48)
(i) 52.224-3 Privacy Training (JAN 2017) (5 U.S.C. 552 a).
__ (ii) Alternate I (JAN 2017) of 52.224-3.
__ (49)
(i) 52.225-1, Buy American-Supplies (OCT 2022) ( 41 U.S.C. chapter 83).
__ (ii) Alternate I (OCT 2022) of 52.225-1.
__ (50)
(i) 52.225-3, Buy American-Free Trade Agreements-Israeli Trade Act (DEC 2022) ( 19 U.S.C. 3301 note, 19 U.S.C. 2112 note, 19 U.S.C. 3805 note, 19 U.S.C.
4001 note, 19 U.S.C. chapter 29 (sections 4501-4732), Public Law 103-182, 108- 77, 108-78, 108-286, 108-302, 109-53, 109-169, 109-283, 110-138, 112-41, 112- 42, and 112-43.
__ (ii) Alternate I [Reserved].
__ (iii) Alternate II (DEC 2022) of 52.225-3.
__ (iv) Alternate III (JAN 2021) of 52.225-3.
__ (v) Alternate IV (Oct 2022) of 52.225-3.
__ (51) 52.225-5, Trade Agreements (DEC 2022) ( 19 U.S.C. 2501, et seq., 19 U.S.C. 3301 note).
_X_ (52) 52.225-13, Restrictions on Certain Foreign Purchases (FEB 2021) (E.O.’s, proclamations, and statutes administered by the Office of Foreign Assets Control of the Department of the Treasury).
__ (53) 52.225-26, Contractors Performing Private Security Functions Outside the United States (Oct 2016) (Section 862, as amended, of the National Defense Authorization Act for Fiscal Year 2008; 10 U.S.C. Subtitle A, Part V, Subpart G Note).
__ (54) 52.226-4, Notice of Disaster or Emergency Area Set-Aside (Nov 2007) ( 42 U.S.C. 5150).
__ (55) 52.226-5, Restrictions on Subcontracting Outside Disaster or Emergency Area (Nov2007) ( 42 U.S.C. 5150).
https://www.acquisition.gov/far/part-52#FAR_52_223_16 https://www.acquisition.gov/far/part-52#FAR_52_223_16 https://www.acquisition.gov/far/part-52#FAR_52_223_18 https://www.acquisition.gov/far/part-52#FAR_52_223_20 https://www.acquisition.gov/far/part-52#FAR_52_223_21 https://www.acquisition.gov/far/part-52#FAR_52_224_3 https://www.acquisition.gov/far/part-52#FAR_52_224_3 https://www.acquisition.gov/far/part-52#FAR_52_225_1 http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 https://www.acquisition.gov/far/part-52#FAR_52_225_1 https://www.acquisition.gov/far/part-52#FAR_52_225_3 https://www.govinfo.gov/link/uscode/19/3301 https://www.govinfo.gov/link/uscode/19/2112 https://www.govinfo.gov/link/uscode/19/3805 https://www.govinfo.gov/link/uscode/19/4001 https://www.govinfo.gov/link/uscode/19/4001 https://www.acquisition.gov/far/part-52#FAR_52_225_3 https://www.acquisition.gov/far/part-52#FAR_52_225_3 https://www.acquisition.gov/far/part-52#FAR_52_225_3 https://www.acquisition.gov/far/part-52#FAR_52_225_5 http://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title19-section2501&num=0&edition=prelim http://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title19-section3301&num=0&edition=prelim https://www.acquisition.gov/far/part-52#FAR_52_225_13 https://www.acquisition.gov/far/part-52#FAR_52_225_26 https://www.acquisition.gov/far/part-52#FAR_52_226_4 http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 https://www.acquisition.gov/far/part-52#FAR_52_226_5
P a g e 20 | 68
__ (56) 52.229-12, Tax on Certain Foreign Procurements (FEB 2021).
_X_ (57) 52.232-29, Terms for Financing of Purchases of Commercial Products and Commercial Services (NOV 2021) ( 41 U.S.C. 4505, 10 U.S.C. 3805).
__ (58) 52.232-30, Installment Payments for Commercial Products and Commercial Services (NOV 2021) ( 41 U.S.C. 4505, 10 U.S.C. 3805).
_X_ (59) 52.232-33, Payment by Electronic Funds Transfer-System for Award Management (OCT2018) ( 31 U.S.C. 3332).
_X_ (60) 52.232-34, Payment by Electronic Funds Transfer-Other than System for Award Management (Jul 2013) ( 31 U.S.C. 3332).
__ (61) 52.232-36, Payment by Third Party (MAY 2014) ( 31 U.S.C. 3332).
__ (62) 52.239-1, Privacy or Security Safeguards (AUG 1996) ( 5 U.S.C. 552a).
__ (63) 52.242-5, Payments to Small Business Subcontractors (JAN 2017) ( 15 U.S.C. 637(d)(13)).
__ (64)
(i) 52.247-64, Preference for Privately Owned U.S.-Flag Commercial Vessels (NOV 2021) ( 46 U.S.C. 55305 and 10 U.S.C. 2631).
__ (ii) Alternate I (APR 2003) of 52.247-64.
__ (iii) Alternate II (NOV 2021) of 52.247-64.
(c) The Contractor shall comply with the FAR clauses in this paragraph (c), applicable to commercial services, that the Contracting Officer has indicated as being incorporated in this contract by reference to implement provisions of law or Executive orders applicable to acquisitions of commercial products and commercial services:
__ (1) 52.222-41, Service Contract Labor Standards (AUG 2018) ( 41 U.S.C. chapter67).
__ (2) 52.222-42, Statement of Equivalent Rates for Federal Hires (MAY 2014) ( 29 U.S.C. 206 and 41 U.S.C. chapter 67).
__ (3) 52.222-43, Fair Labor Standards Act and Service Contract Labor Standards-Price Adjustment (Multiple Year and Option Contracts) (AUG 2018) ( 29 U.S.C. 206 and 41 U.S.C. chapter 67).
__ (4) 52.222-44, Fair Labor Standards Act and Service Contract Labor Standards-Price Adjustment (May 2014) ( 29U.S.C.206 and 41 U.S.C. chapter 67).
__ (5) 52.222-51, Exemption from Application of the Service Contract Labor Standards to Contracts for Maintenance, Calibration, or Repair of Certain Equipment-Requirements (May 2014) ( 41 U.S.C. chapter 67).
__ (6) 52.222-53, Exemption from Application of the Service Contract Labor Standards to Contracts for Certain Services-Requirements (MAY 2014) ( 41 U.S.C. chapter 67).
__ (7) 52.222-55, Minimum Wages for Contractor Workers Under Executive Order 14026 (JAN 2022).
https://www.acquisition.gov/far/part-52#FAR_52_229_12 https://www.acquisition.gov/far/part-52#FAR_52_232_29 http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 https://www.govinfo.gov/link/uscode/10/3805 https://www.acquisition.gov/far/part-52#FAR_52_232_30 http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 https://www.govinfo.gov/link/uscode/10/3805 https://www.acquisition.gov/far/part-52#FAR_52_232_33 http://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title31-section3332&num=0&edition=prelim https://www.acquisition.gov/far/part-52#FAR_52_232_34 http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 https://www.acquisition.gov/far/part-52#FAR_52_232_36 http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 https://www.acquisition.gov/far/part-52#FAR_52_239_1 http://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title5-section552a&num=0&edition=prelim https://www.acquisition.gov/far/part-52#FAR_52_242_5 http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 https://www.acquisition.gov/far/part-52#FAR_52_247_64 https://www.govinfo.gov/content/pkg/USCODE-2019-title46/html/USCODE-2019-title46-subtitleV-partD-chap553-subchapI-sec55305.htm http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 https://www.acquisition.gov/far/part-52#FAR_52_247_64 https://www.acquisition.gov/far/part-52#FAR_52_247_64 https://www.acquisition.gov/far/part-52#FAR_52_222_41 http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 https://www.acquisition.gov/far/part-52#FAR_52_222_42 http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 https://www.acquisition.gov/far/part-52#FAR_52_222_43 http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 https://www.acquisition.gov/far/part-52#FAR_52_222_44 http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3…