19SA4023C0013 CONTRACT ROOF REPAIR COATING - signed.pdf

PDF 1 MB Posted

Attached to
19SA4023C0013 - WAREHOUSE ROOF REPAIR & COATING SERVICES
Solicitation number
19SA4023C0013
Issued by

About this file

This document is an award notice for a roof repair and coating services contract issued by the Department of State. The contract is for roof repair and coating services on an existing 6,500 square foot warehouse located at the American Consulate General in Jeddah, Saudi Arabia. The services required include power washing, minor roof repairs, application of primer and base coats, installation of reinforcing fabric, application of flashing grade coating, and two topcoats. The fixed price for the roof repair and coating services is $24,192. An additional 5% VAT will also be charged. The period of performance is 30 calendar days starting from receipt of the notice to proceed. Liquidated damages of $100 per day will be charged for any days exceeding the schedule.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONTRACT

DOCUMENT

American Consulate General

Jeddah, Saudi Arabia

Contracting and Procurement Office

WAREHOUSE ROOF REPAIR & COATING

Solicitation No. 19SA4023C0013

American Consulate General, Jeddah

PO Box 149 Jeddah 21411 Saudi Arabia

TABLES OF CONTENTS

SECTION 1 - THE SCHEDULE

• SF 1449 cover sheet

• Continuation to SF 1449, Contract 19SA4023C0013,

• Statement of Work

• APPENDIX A - DRAWINGS

• APPENDIX B - TYPICAL ROOF COATING STEPS

• APPENDIX C - PROJECT SITE PHOTOGRAPHS

• APPENDIX D - SAFETY REQUIREMENTS

• APPENDIX E - ROOF FULL PROTECTION DIAGRAM

SECTION 2 - CONTRACT CLAUSES

• Contract Clauses

• Addendum to Contract Clauses, FAR and DOSAR clauses not prescribed in Part 12

ROOF REPAIR & COATING Contract 19SA4023C0013

SECTION 1 - THE SCHEDULE

CONTINUATION TO SF-1449

CONTRACT NUMBER 19SA4023C0013

PRICES, BLOCK 23

I. PERFORMANCE WORK STATEMENT

The US Consulate General Jeddah has a requirement for a solvent-based elastomeric roof coating and roof related repairs on the existing 6,500 square foot (600 square meters) Warehouse. The services to be performed are prescribed in this scope of work (SOW).

II. TYPE OF CONTRACT

This is a firm fixed-priced contract which include all labor, materials, overhead, and profit.

In consideration of satisfactory performance of the services required under this contract, the contractor shall be paid a firm fixed-price (FFP) upon job completion and acceptance.

III. VALUE ADDED TAX

Value added Tax (VAT) is not included in the CLIN rates. Instead, it will be priced as a separate Line Item in the contract and on Invoices. Local law dictates the portion of the contract price that is subject to VAT; this percentage is multiplied only against that portion.

IV. PRICES

The fixed price listed below shall include all labor, materials, overhead, and profit. The firm fixed-prices are in SAR (Saudi Arabian Riyals) OR USD (United States Dollar).

Clin# Service Description QTY Price

USD

1 Roof Repair and Coating Services 600 M2 ±5% 1 LS 24,192.00

VAT 15% 3,628.80

Total after VAT 27,820.00

CONTINUATION TO SF-1449,

CONTRACT NUMBER 19SA4023C0013

SCHEDULE OF SUPPLIES/SERVICES, BLOCK 20

STATEMENT OF WORK

1 – GENERAL

C.1.1 SUMMARY:

A. The U.S. Consulate General in Jeddah, Saudi Arabia, has a requirement for a solvent-based elastomeric roof coating and roof related repairs on the existing 6,500 square foot (600 square meters) Warehouse. The proposed roof repair coatings include, but is not limited to, the following:

B. Jeddah Warehouse Coating:

1. Clean/Pressure wash roof areas and allow to dry.

2. Perform minor repairs on the metal roofing systems.

3. Begin repair works at low end around roof edge transition into gutter and drains. All metal seams are to be sealed tight.

4. Apply one coat metal primer on all surfaces which will receive the elastomeric coatings and allow to dry.

5. Apply gray base coat over all metal panel seams with fabric. Apply seam sealer and fabric over each fastener, as well as each gutter seam.

6. Apply a second base coat embedding all fabric at standing seams, fasteners, and gutter seams.

7. Apply flashing grade to all difficult and necessary termination points, including fasteners if too difficult to apply fabric and seam sealer at these locations.

8. Apply first topcoat application and allow to dry.

9. Apply final topcoat application

10. Final Cleanup

C. Roof Area Included in Project:

Warehouse Metal Roof: 6,500 square feet (600 square meters)

C.1.2 SUBMITTALS:

A. Insurance certificates.

B. Contractor’s crew individual identification information for background checks.

C. Submit list of all mechanical, electrical, rigging, sheet metal, and all other subcontractors with evidence of subcontractor’s insurance coverage.

D. Project schedule showing work phasing and proposed daily progress.

E. Construction Accident Prevention Plan (CAPP).

F. Material manufacturers and accessory product data sheets.

C.1.3 SUBSTITUTIONS AND PRODUCT OPTIONS:

A. Contractor's Representation: Request for substitution constitutes a representation that Contractor:

1. Has investigated proposed product and determined that it is equal to or superior in all respects to that specified.

2. Shall coordinate installation of accepted substitution into Work and make such other changes as may be required for Work to be complete in all respects.

3. Waives all claims for additional costs, under his responsibility, related to substitution which subsequently becomes apparent.

4. If substitution is not approved or accepted, Contractor shall furnish specified product.

B. Substitutions:

1. During Solicitation only written requests for substitutions of products in place of those specified will be considered. Such requests must be received at least two weeks prior to Proposal Date. Requests received after that time will not be considered. Approval of substitutions will be set forth in an Amendment.

2. Requests for substitutions supported with complete data, drawings, and appropriate samples shall include data listed below:

a. Product description, performance, and test data, and applicable reference standards.

b. Changes required in other elements of Work because of substitution.

c. Effect on construction schedule.

C. Product Options: For products specified by naming several products or manufacturers, select any product and manufacturer named.

C.1.4 QUALITY CONTROL:

A. The Consulate and OBO has the right to inspect and test all services, to the extent practicable at all times and places during the work. OBO may perform full time quality assurance inspections [QAI] and tests during construction to confirm the work is installed according to the Construction Documents.

B. Maintain quality control over suppliers, manufacturers, products, services, site conditions, and workmanship to produce work of specified quality.

C. Contractor shall be approved by manufacturer to perform the work for the specified guarantee period.

C.1.5 STORAGE OF MATERIALS:

A. Proper storage of materials is the sole responsibility of Contractor. Keep all labels intact and legible, clearly showing the product, manufacturer, and other pertinent information.

B. Store materials on site. Cover and protect materials subject to damage by weather, including during transit. Stored materials shall be available for inspection.

C. Store flammable and volatile liquids in sealed containers located a minimum of 20 feet from existing buildings.

D. Liquid products shall be delivered sealed, in original containers. Store roll goods in an upright position.

E. Distribute material, debris, and equipment over the roof deck to avoid damage to the structural deck. Place materials and equipment to be stored on the roof as nearly direct over structural members as can be determined. Secure equipment, material, and debris on the roof to prevent movement by wind or other elements.

C.1.6 TEMPORARY FACILITIES:

A. Temporary Water:

1. Make arrangements with Consulate for water required for construction.

Consulate will pay for cost of water.

2. Do not disrupt existing water service to the building.

3. Provide hoses for conveyance.

B. Temporary Electrical

1. Make arrangements with Consulate for temporary electrical service.

Consulate will pay energy charges for temporary power and lighting.

2. Notify Consulate prior to each required interruption of mechanical or electrical services in building.

3. Provide all necessary temporary wiring extensions and temporary lighting devices.

C. Temporary Ladders, Chutes, Scaffolds, Hoists and Cranes:

1. Furnish and maintain temporary ramps, scaffolds, hoists, or chutes as required for proper execution of Work.

2. Provide overhead protection at all building entrances.

3. Restrict debris removal to Consulate -approved area of building site.

4. Restrict location of construction cranes to areas as approved by Consulate.

5. Such apparatus, equipment, and construction shall meet requirements of applicable federal, state, and local safety and labor laws.

C.1.7 PROJECT PROCEDURES:

A. Consulate will occupy premises during entire period of construction for the conduct of normal, daily operations. Contractor shall conduct his operations so as to ensure least inconvenience to Consulate’s operations.

B. Contractor shall take precautions to avoid excessive noise or vibration that would disturb Consulate’s operations. When directed by Consulate, Contractor shall perform certain operations at designated time of day or night in order to minimize disturbance.

C.1.8 PROJECT SAFTEY:

A. Contractor is responsible for safety and shall comply with all local labor laws, regulations, customs and practices pertaining to labor, safety and similar matters.

Contractor shall prepare a Construction Accident Prevention Plan to cover total project safety.

B. The products being used for this roof coating repair give off vapors while curing.

Close and seal all doors and windows near and around work area. Close off and seal all HVAC air intake points, goose necks, and vents with duct tape and polyethylene sheeting. Shutting down the HVAC may be necessary during the work so as not to affect the equipment.

C.1.9 PROJECT SECURITY:

A. Personnel Clearances: Labor Background checks will require a minimum of 21 days for clearance. Local labor may be used on this Project provided that they are escorted by local Consulate employees or U.S. cleared citizens according to Post escort ratio requirements.

B. Vehicle Clearances: Submit authorization requests, to include dates, vehicle type, license number, and driver name, for each motorized vehicular implement used on-site.

C. Access to Site: Contractor shall have limited access to or be admitted into the compound outside the areas designated for the project except with permission by the Consulate.

D. Access to Work Area:

1. Local Labor shall access from the EXTERIOR of the building

2. Material loading/off-loading shall be from the EXTERIOR of the building.

E. Procurement/Storage: Materials shall be stored NON-SECURE. All materials may be inspected prior to use on the project.

2 - PRODUCTS

C.2.1 SOLVENT-BASED ELASTOMERIC ROOF COATING MANUFACTURERS

A. Provide a high-performance base primers, intermediate coatings, and topcoats made of a proprietary blend of solvent-based polymers (SBS, SEBS, PMMA);

that are from single source manufacturer. All accessory materials shall be compatible with one another and with the substrate for application.

B. GSA Schedule Vendors which meet the specifications include but are not limited to:

1. Architectural Roof Coatings – Rowlett, Texas

a. Contact: Emily Cole – emendel@arccoat.com

2. TOPPS Products Inc. – South Africa

a. Contact: Dave Hedenskog – dave.cpt@toppsproductssa.co.za

3. Karnak – Clark, NJ USA

4. Sika Corporation – Sika GCC Dubai, United Arab Emirates

a. Contact Info: info@ae.sika.com

C.2.2 MATERIALS and ACCESSORIES

A. Topcoat & Basecoat: Single-component high solids polymer elastomer. The coating forms a non-breathing, high tensile strength and a highly elastic membrane which is designed to provide heat reduction, cold weather flexibility, chemical, weather, and water resistance. Brush, roller, or spray grade. Gray Basecoat and Bright White Topcoat in colors:

1. DynaSHIELD Lo-Odor Coating by Architectural Roof Coatings

2. Topps Seal Excel Protective Roof Coating by TOPPS Products

3. RC-W Elasto-Kote by Karnak

4. Sikalastic Lo VOC Liquid membrane by Sika

5. Physical Properties:

a. Solids by Weight (D1644): 50 ± 2%

b. Solids by Volume (D2697): 37 ± 2%

c. Weight per Gallon: 9.1 lbs.

d. Reflectance (Initial/Aged): 82% / 61%

e. Emittance (Initial/Aged): 0.95 / 0.91

B. Primer Coat for adhesion to metal surfaces: Single-component high solids polymer elastomer; brush, roller, or spray grade; gray in color.

1. DynaSHIELD Lo Odor Rust Inhibiter Primer Coating by Architectural

Roof Coatings

2. Topps Seal Base Coat & Topps Bond It Bleed Through by TOPPS

Products

3. RC-W Elasto-Kote by Karnak

4. Sikalastic 502 Primer by Sika

5. Physical Properties:

a. Solids by Weight (D1644): 8 ± 2%

b. Solids by Volume (D2697) 11 ± 2%

c. Weight per Gallon: 7 lbs.

C. Flashing Grade: Trowel grade single component, block copolymer elastomeric mastic that forms as a tough and durable elastomeric membrane. The mastic has elongation properties, cold weather pliability, UV and water resistance, chemical resistance and a highly reflective finish. May also be used in sealing interfaces with accessories such as drains, scuppers, and pitch pans.

1. DynaSHIELD Flashing Grade by Architectural Roof Coatings

2. Topps Gutter Guard by TOPPS Products

3. 502 RC-W Elasto-Kote Seam Sealer by Karnak

4. Sikalastic 500 Flash by Sika

5. Physical Properties

a. Solids by Weight (calculated): 68 ± 2%

b. Solids by Volume (calculated): 52 ± 2%

c. Weight per Gallon: 9.4 lbs.

D. Seam Sealer: Trowel grade single component, block copolymer elastomeric mastic that forms as a tough and durable elastomeric membrane. The mastic has elongation properties, cold weather pliability, UV and water resistance, chemical resistance and a highly reflective finish. May also be used in sealing interfaces with accessories such as drains, scuppers, and pitch pans in conjunction with an embedded polyester fabric.

1. DynaSHIELD Lo Odor Seam Sealer by Architectural Roof Coatings

2. Gutter Guard by TOPPS Products

3. 502 RC-W Elasto Kote Seam Sealer by Karnak

4. Sikalastic 500 Flash by Sika

5. Physical Properties:

a. Solids by Weight (calculated): 58 ± 2%

b. Solids by Volume (calculated): 42 ± 2%

c. Weight per Gallon: 8.4 lbs.

E. Polyester Reinforcing Fabric and Tape: Flexible 100% stitch bond polyester fleece sheet product of high tear strength and elongation and type or composition recommended by manufacturer for embedment of elastomeric coating. 100% stitch bond. White in color. Weight: 0.9 pounds/100 SF. Size: 100mm, 150mm width rolls:

1. Reinforcement Fabric by Architectural Roof Coatings

2. Polycore Reinforcing Membrane by TOPPS Products

3. 3036 Poly-Mat by Karnak

4. Sika Fleece 140 by Sika

5. Physical Properties:

a. Tensile Strength (ASTM D-1682): 57 lbs.

b. Elongation (ASTM D-1682): 61.5%

c. Mullen Burst (ASTM D-3786): 175 lbs

F. Accessories and Cleaners: Supplied and/or recommended by manufacturer for product installation.

1. Power Washer: Minimum 3500 PSI / 250cc gasoline powered engine mounted on wheels with 10 meter hose and adjustable spray pressure nozzle

2. Power Drill & Mixing Paddle: Heavy duty for cement, plaster, or paint.

Such as Nordstrand PWTPM01 Pro Mixer Stirring Tool; 6 Speed;

1800Watt with 120mm round steel mixing paddle bit.

3. Caulking: Single component, non-sag elastomeric polyurethane sealant, as recommended or supplied by membrane manufacturer for use in making airtight and watertight seals such as Dynatrol I by Pecora Corp., white color.

4. Cleaning Solvent: 100% hydrocarbon for diluting solvent based coating products and cleaning.

5. Mineral Spirits for thinning solvent-based coating materials.

6. Roller Frames and Roller Sleeves; 225mm

7. Brushes; 50mm, 100mm, 150mm widths

8. Electrical extension cords: GFCI protected.

G. Metal Patching: Galvanized steel 24 gage, form into continuous sheets with integral drip edge, fasteners at 100mm on center.

H. Miscellaneous Fasteners: Appropriate for purpose intended, length required for thickness of material. Replacement fasteners may be one size larger in diameter and depth. Select fastener finish metal to be compatible or of same metal as substrate.

3 – EXECUTION

C.3.1 PREPARATION OF METAL PANEL WAREHOUSE ROOF

A. Contractor shall determine the condition of the existing structural deck/substrate.

All defects in the deck or substrate shall be corrected before new solvent-based elastomeric coating commences. Areas of deteriorated deck/substrate, porous or other affected materials must be removed and replaced with new to match existing.

B. Surface preparation is the most critical procedural requirement in paint applied coating systems. Remove all loose particles, delaminated paint, oil, grease, laitance, efflorescence, mild, mildew and other foreign materials. Areas shall be first scraped, swept clean, and then thoroughly power washed. Use high power adjustable pressure washer with a minimum 3500 PSI (Pounds per Square Inch) mechanical spray device.

C. Each individual container of elastomeric primer and topcoats shall be thoroughly mixed using a heavy-duty drill on slow RPM (Revolutions per Minute) with an elongated mixing paddle bit that will reach the bottom of the container. Coating shall be a uniform color, with no light or dark streaks present.

D. Coatings shall be applied in temperatures of fifty degrees Fahrenheit (50°F / 10°C) or greater.

E. Where concrete surfaces exist (CAC), concrete substrate shall be dry with a maximum moisture content of five (5) percent. Inspect substrates, and correct defects before application of new waterproofing. Fill all surface voids greater than 1/8 inch wide with a patching aggregate fill material.

F. Repair corroded or unsound metal surfaces and flashings for preparation of coating application.

G. Metal surfaces are to be clean and dry prior to primer application.

H. Repair adjacent metal sections of receivers, sealant joints, and counter-flashings and apply a continuous bead of sealant in lap.

I. Substrate shall receive a rust inhibitor polymer primer (C.2.2.C & C.3.5) for adhesion to metal surfaces.

C.3.2 THINNING SOLVENT-BASED ELASTOMERIC FOR SPRAY EQUIPMENT

A. Thinning Mix: One-quart mineral spirits to 5 gallons solvent-based elastomeric.

1. Pour 1 gallon from a 5-gallon pail coating into another container. Add one-quart mineral spirits to 4 gallons and mix thoroughly. Use an electric drill and mixing paddle. Add portions of the removed 1 gallon and continue to mix until the coating is properly thinned.

2. Spray apply thinned elastomeric coating in two coats to meet minimum thickness.

B. Additional Thinning Mix: Maximum two quarts mineral spirits to 5 gallons elastomeric.

1. Spray apply thinned elastomeric coating in three coats to meet minimum thickness.

C. DO NOT thin elastomeric coatings for brush or roller applications.

C.3.3 PRIMER COAT APPLICATION for METAL SURFACES

A. Metal surfaces and substrates to receive Rust Inhibitive Metal Primer.

B. Coverage rate: Apply at 0.7–1.4 gallons (2.65-5.30L) per 100 square feet (9 SM) C. Brush, roll or spray the primer evenly onto the surface to fully saturate the substrate in one application with brush or roller: multiple applications with sprayer. DO NOT allow primer to pond or collect in low areas. Apply primer up to the perimeter roof edge of the flashing terminations and penetrations.

D. Areas observed with residual “bleed” through of prior surfacing causing discoloration shall be re-primed to prevent discoloration.

E. Allow standard metal primer to cure for a minimum of four (4) hours before application of elastomeric base coatings.

F. DO NOT apply elastomeric coatings over; primer prematurely exposed to excessive moisture, primer used as temporary waterproofing, or primer older than eight (8) days. Exposure of the primer to UV and/or weather in excess of eight (8) days may require removal and application of new primer.

C.3.4 BASECOAT APPLICATION and REINFORCING FABRIC EMBEDMENT

A. Coverage rate: Apply initial elastomeric basecoat at 0.7–1.4 gallons (2.65-5.30L) per 100 square feet (9 SM)

B. Reinforcing fabric embedment requires either hand brush or roller application to evenly lay the fabric within the basecoat. The basecoat shall be rolled or brushed liberally and evenly onto the surface using a broad, even strokes.

1. The polyester fabric can only hold so much basecoat and all excess shall be rolled forward to the unsaturated fleece, eliminating ponding or excessive build-up.

C. Reinforcing Fabric on Metal Roof Vertical & Horizontal Seams: Apply 100mm fabric on metal panel seams and overlaps. Roll out polyester fabric (natural unrolling procedure) into the basecoat. The fabric will begin to rapidly saturate with the elastomeric basecoat.

D. Use a medium nap roller or brush to work the basecoat into the fabric, saturating from the bottom up, and eliminating air bubbles, folds, and wrinkles.

1. The appearance of the saturated fabric shall be light opaque with no white spots. White spots are indications of unsaturated fabric or lack of adhesion.

E. Allow 50mm overlap for all side joints and 100mm overlap for all end joints.

F. Apply the Flashing Grade Elastomeric Coating at all exposed metal panel fasteners after ensuring that the fasteners are tight. Replace loose fasteners.

G. Apply a final basecoat on top of fabric to finish the saturation process or the embedment of the fabric into the elastomeric basecoat. Rolling this final coating into the fabric, shall result in a semi-gloss appearance.

H. Allow basecoat to cure for a minimum of twenty-four (24) hours before application of the finish coats depending on climate and humidity.

C.3.5 FLASHING DETAILING

A. Using a trowel or heavy brush, apply the Flashing Grade coating at any areas where there are difficult terminations, penetrations, flashings, seams, or transitional joints, including gutters. It may be applied to both difficult surfaces and will bridge gaps up to 12mm in width.

B. Reinforcing fabric may be embedded in flashing coat for additional strength and mobility. Please understand that the flashing grade coating is thick and may cause unnecessary wrinkles and gaps in the fabric. Fabric must be used to bridge large openings in conjunction with the Flashing Grade Elastomeric Coating.

C. Reinforce all inside and outside corners with a 100mm diameter conical piece of fabric prior to installing the flashing layer.

D. Flashing is typically constructed as a two-part assembly consisting of a vertical wrap and a horizontal target patch. There must be a minimum of a 100mm overlap between vertical and horizontal flashing components.

E. Flashing material shall extend 100mm minimum onto gutters or insert flanges.

C.3.6 TOPCOAT APPLICATION

A. Coverage rate: Apply topcoats at 0.7–1.4 gallons (2.65-5.30L) per 100 square feet (9 SM). Based on first topcoat smooth texture, the second topcoat may be reduced to 0.5 gallons (2.50L) to 100 square feet (9 SM).

B. Brush, roll or spray the elastomeric topcoat evenly onto the surface to fully saturate the primed surfaces in one application with brush or roller: multiple applications with sprayer. DO NOT allow coating to pond or collect in low areas.

C. Apply elastomeric topcoat up to the perimeter roof edge.

D. Allow to cure for a minimum of twenty-four (24) hours before second finish coat.

E. DO NOT allow any excess coating to remain on the surface, the correct amount of coating will leave no fibrous surface texture from the fleece fabric. The final coating should be smooth, uniform, and bright white.

F. Dry finish (1 prime coat + 1 basecoat + 2 topcoats) thickness: 48 mils.

C.3.7 FIELD QUALITY CONTROL

A. The Consulate or OBO may direct Contractor to stop applying coatings if results show materials being used do not comply with specified requirements or coating materials and accessories are not compatible. Contractor shall remove noncomplying coating materials from site, pay for testing, and recoat surfaces.

C.3.8 CLEANING and ADJUSTING

A. After completing coating application, clean spattered surfaces. Remove spattered coatings by washing, scraping, or other methods. Do not scratch or damage adjacent finished surfaces.

B. During progress of work, remove discarded paint materials, rubbish, cans, and rags from site at end of each workday. Thoroughly mixed and cured coating products may be disposed of in standard landfills. Uncured products are considered a hazardous material and must be handled as such and disposed in accordance with local regulations.

C. Correct any damage by cleaning, repairing or replacing, and painting as acceptable to the Consulate.

4 - SCHEDULE

C.4.1 PERIOD OF PERFORMANCE:

A. Solicitation & Award of Contract:

1. Solicitation & Pre-Site Visit: 30 days prior to Award

2. Award Zero Day

B. Pre-Construction Submittals:

1. Insurance 14 days after Award

2. Crew Information: 10 days

3. Consulate Review: 21 days

4. Schedule: 15 days

5. OBO & Consulate Approval: 5 days

C. Material Procurement:

1. Material Order 30 Days

2. Shipping & Customs (if requested by Contractor) days

D. Mobilization & Construction 30 Calendar Day starts from receiving the Notice to Proceed (NTP):

1. On-Site Repairs Warehouse 20 days on-site

2. Final Cleanup Begins: 10 days prior to completion

E. TOTAL PERIOD of PERFORMACE: 115 days

F. Liquidated damages shall apply at a rate of 100 USD per working day for any day beyond the 30-day project execution schedule.

G. Rainy Season in Jeddah: November through March

5 - INSURANCE

A. The Contractor is required by FAR 52.228-5, "Insurance - Work on a Government

Installation" to provide whatever insurance is legally necessary. The Contractor shall at its own expense provide and maintain during the entire performance period the following insurance amounts:

B. GENERAL LIABILITY (includes premises/operations, collapse hazard, products, completed operations, contractual, independent contractors, broad form property damage, personal injury) :

(1) BODILY INJURY, ON OR OFF THE SITE, IN U.S. DOLLARS

Per Occurrence USD250,000.00

Cumulative USD500,000.00

(2) PROPERTY DAMAGE, ON OR OFF THE SITE, IN U.S. DOLLARS

Per Occurrence USD250,000.00

Cumulative USD500,000.00

C. The foregoing types and amounts of insurance are the minimums required. The

Contractor shall obtain any other types of insurance required by local law or that are ordinarily or customarily obtained in the location of the work. The limit of such insurance shall be as provided by law or sufficient to meet normal and customary claims.

D. The Contractor agrees that the Government shall not be responsible for personal injuries or for damages to any property of the Contractor, its officers, agents, servants, and employees, or any other person, arising from and incident to the Contractor's performance of this contract. The Contractor shall hold harmless and indemnify the Government from any and all claims arising therefrom, except in the instance of gross negligence on the part of the Government.

E. The Contractor shall obtain adequate insurance for damage to, or theft of, materials and equipment in insurance coverage for loose transit to the site or in storage on or off the site.

F. The general liability policy required of the Contractor shall name "the United

States of America, acting by and through the Department of State", as an additional insured with respect to operations performed under this contract.

6 – SAFETY REQUIREMENTS FOR CONTRACTORS AND

SUBCONTRACTORS (APPENDIX D)

The purpose of this document is to ensure compliance with current safety regulations as well as the health and safety of personnel avoiding any damage or injury. The contractor will accept all legal requirements or regulations currently enforced that concern safety for staff and workers, as well as for the public who directly or indirectly may be affected by the work. Please see Appendix D for more details.

The Contracting Officer’s Representative (COR) will ensure all the Safety Requirements are implemented before and during the project and, in case it is needed, the COR will be in contact with the Post Occupational Safety and Health Officer (POSHO) to ensure all the safety standards are followed and to share any related information if possible.

The contractor will follow the more restrictive standard between the Safety and Health Requirements Manual established by the US Army Corps of Engineers (http://www.publications.usace.army.mil/Portals/76/Publications/EngineerManuals/EM_ 385-1-1.pdf)

7- QUALITY ASSURANCE AND SURVEILLANCE PLAN (QASP)

This plan provides an effective method to promote satisfactory contractor performance. The QASP provides a method for the Contracting Officer's Representative (COR) to monitor Contractor performance, advise the Contractor of unsatisfactory performance, and notify the Contracting Officer of continued unsatisfactory performance. The Contractor, not the Government, is responsible for management and quality control to meet the terms of the contract.

The role of the Government is to monitor quality to ensure that contract standards are achieved.

Performance Objective Scope of Work

Paragraphs

Performance Threshold

Services.

Performs all tile installation services set forth in the scope of work.

_1_ thru _6__

All required services are performed and no more than one

(1) customer complaint is received per month.

http://www.publications.usace.army.mil/Portals/76/Publications/EngineerManuals/EM_385-1-1.pdf http://www.publications.usace.army.mil/Portals/76/Publications/EngineerManuals/EM_385-1-1.pdf

APPENDIX A - DRAWINGS

CONSULATE WAREHOUSE

APPENDIX B - TYPICAL ROOF COATING STEPS

APPENDIX C - PROJECT SITE PHOTOGRAPHS

APPENDIX D - SAFETY REQUIREMENTS

1. General Safety Requirements

a. The contractor must demonstrate understanding of his/her responsibilities related to the safety requirements by addressing hazards in preplanning processes and meetings.

b. Prior to starting a project, the contractor is required to review the work site and identify hazards that may occur while performing the job.

c. The contractor is expected to provide a “competent person” to implement Site health and safety plan and to oversee its compliance. A competent person is an individual who, by way of training and/or experience, is knowledgeable of applicable standards, is capable of identifying workplace hazards relating to the specific operation, is designated by the employer, and has authority to take appropriate actions.

d. The contractor will conduct a safety briefing before starting daily work.

e. Contractor personnel who have signs of drunkenness or who are under the influence of stimulants or hallucinogens will be denied entry to the work area.

f. The contractor shall ensure individuals working at the site are trained and aware of potential hazards. The contractor shall ensure that these individuals are provided with proper safety equipment to prevent accidental injury in accordance with the requirements of the contract.

g. The contractor must accept the safety standards set by the US Embassy.

h. All workers will remove all chains, rings, watches and/or bracelets during the execution of work.

i. Smoking is prohibited at the work site and will use only designated area for smokers.

j. The contractor will report accidents to the COR who will pass the proper data to the POSHO or Safety Coordinator.

k. The contractor must submit a Risk Assessment/Activity Hazard Analysis (AHA).

2. Barricading and Warning Signs

a. The contractor must place provisional barricades and warning signs to maintain a safe and accessible path-of-travel for all pedestrians, including those with disabilities, in order to avoid accidents to third parties. Barricades alert others about hazards created by construction activities and should be used to control vehicular traffic around the work site as well.

b. Erect and maintain for the duration of the Contract proper barricades including fencing material, traffic cones, caution tape and temporary curb ramps complying with all access codes and regulations.

c. Ensure that no construction materials be stored and/or placed on the path-of travel.

d. Maintain the construction barriers in a sound, neat, and clean condition.

3. Personal Protective Equipment (PPE) Requirements

a. Contractor personnel must use personal protective equipment (PPE) required and in accordance with the contracted work.

b. The contractor is required to inspect and maintain spare PPE in case of damage, deterioration or loss of the equipment.

c. The PPE used must meet the technical specifications required by Colombian regulation and international standards.

d. Sharp cutting tools must be carried in Tools Carrying Cases; under no circumstances they are to be carried in uniform pockets.

e. The contractor must provide records of PPE received for all the employees involved in the task.

4. Safety inspections requirements

a. All tools, equipment and/or machinery that will be used in the execution of the contracted work must be inspected by a competent person before starting the project.

b. COR and/or Safety representatives of the US Embassy may inspect equipment, tools and/or machinery of the contractor at any time and may request to change it if deemed necessary.

5. Hand and Power Tool Safety

a. The contractor must ensure the safety of tools and equipment used by its employees.

b. Inspected at regular intervals and maintain in good condition all tools in accordance with the manufacture’s specifications.

c. Ensure that tools are used for their intended purposes.

6. Emergency Response Requirements

a. In case of an emergency within the US Embassy facilities and/or during the execution of the contracted work, contractor personnel must follow the instructions given by the Embassy representative (escort) who is supervising the work, or security personnel.

b. The contractor must not obstruct emergency response equipment such as first aid kits, fire extinguishers, fire cabinets, defibrillators, spill kits, stretchers, eye wash stations or safety signs.

7. High Risk Work Requirements

a. The contractor shall submit certificates of training for each person who will conduct the task. These certificates must be submitted before starting the execution of the project.

b. The contractor shall prepare a work permit specifically for the task and must be provided to the COR before the initiation of work.

c. The contractor must send a risk assessment of the task in a minimum period of eight working days before commencement of work. The POSHO or Safety

Coordinator will review the document and make any comment it deems necessary.

d. The execution of high-risk activities will be carried out with a minimum of two people present that may give first aid or notice in case of emergency.

8. Electrical Safety

a. The contractor shall fully comply with the Embassy policies related with Electrical Safety Work Practices and Work-de energized to prevent any incident that may impact the health of personnel and/or Post electrical systems.

b. All personnel conducting electrical work shall be sufficient trained and considered as competent persons prior to performing the work.

c. The contractor should identify any potential sources of electrical energy likely to cause death, injury, or serious physical harm.

d. Ensure all work is performed in accordance with local regulation and U.S.

standards.

9. Fall Protection Requirements

All work performed at 1.82 meters (6ft) and above is considered work at heights based on OSHA, therefore strict compliance from the contractor is required:

a. All equipment to work at elevated surfaces must meet at least the ANSI Z359.1 standards or European counterparts.

b. All contractor personnel using equipment for work at heights must follow the instructions and warnings associated with such equipment.

c. Contractor personnel will not use, ladders, piping or pipe supports as an anchor point for work.

d. If an anchor point does not offer the recommended resistance for fall protection (5000lbs), the contractor must provide protective equipment for heights with dampers that may decrease the impact force.

e. Use fiberglass ladders to work with electricity and areas with electrical influence.

f. It is forbidden to stand on or above the second top rung of the ladders.

g. All personnel performing work on 6 ft. (1.82mts) and above must use at least the following personal protection equipment: helmet (dielectric if needed), with chin strap and three support points, safety glasses that protect eyes from impacts, with UV protection; hearing protection if necessary, gloves with high resistance to abrasion, slip reinforced toe boots, work clothes according to weather conditions and risk factors and proper fall protection systems.

h. The contractor must submit to the COR, in a minimum period of eight working days before starting the work, the training certificates of all workers who will perform the job. A re-training should be provided to employees at least once a year.

10. Scaffolding Requirements

a. The contractor is responsible for proving safe conditions when using, erecting and breaking down scaffolding.

b. Scaffolds should be erected, dismantled and tagged by competent workers, under the supervision of knowledgeable and experienced supervisors.

c. Scaffolds should be erected on a rigid surface, capable of carrying the maximum intended load without settling or displacement.

d. Ensure scaffold is equipped with standard guardrails and toe boards on all open sides and ends.

e. Provide an access ladder or equivalent safe access.

f. Supported scaffolds with a height to base width ratio of more than four to one

(4:1) shall be restrained from tipping by guying, tying, bracing, or equivalent means.

11. Requirements for Chemical Substance Management

a. If the contracted task requires the use of chemicals, the contractor must comply with the specifications required by local law or U.S standards for storage, handling and transportation.

b. The contractor is responsible for verifying the correct handling of each product such as storage, labeling, required PPE, disposal of waste in compliance with safety and environment regulations.

c. Contractor shall have accessible copies of Safety Data Sheets (SDS) for each chemical brought onto Post’s property.

d. Forward SDSs of hazardous materials to the COR for review.

e. Use and store all hazardous or flammable chemicals brought on the project site in approved containers.

12. Requirements for Lifting loads, use of cranes or elevating work platforms

a. The contractor must submit to the COR certificates of the equipment (issued by a certifying agency) used for the work (including forklift, cranes and elevating platforms) and required documents of the vehicles.

b. The contractor shall send to the COR all the certificates (issued by a certifying agency) of all the slings, chains, shackles or other elements used for lifting loads.

c. The contractor shall send to the COR training certificates of the equipment operator and riggers (issued by a certifying agency).

d. The contractor shall send to the COR training certificates of all the personnel that will perform the task.

e. The contractor shall send to the COR the Maintenance Program of the equipment and machinery that will be brought onto the compound.

f. The contractor shall forward to the COR the loading and unloading procedure prior to the operation.

g. The contractor must make a plan to ensure the lifting capacity of the crane or arm relative to its load.

13. Welding

a. Before cutting or welding is permitted, the COR shall inspect the area for authorizing the operation to reduce the potential of an uncontrolled ignition of materials.

b. The contractor shall obtained a hot work permit thru the COR from the POSHO or Safety Coordinator prior to the hot work activity within occupied existing facilities, 40 feet of a building or potential hazard such as a fuel storage tank, and confined spaces regardless of location.

c. Establish work area barriers according to the job to be performed to protect pedestrians, these barriers shall comply with OSHA standards and post’s hot work policy.

d. Suitable fire extinguishing equipment shall be maintained on site and in a state of readiness for instant use, use fire blanket if necessary.

e. Cutting and welding shall be performed only in areas that are or have been made fire safe. When the task cannot be relocated, the area shall be made safe by removing combustibles or protecting combustibles from ignition sources.

f. The contractor shall ensure all welder operators and attendants exposed to the hazard use proper welding personal protection equipment.

14. Road Safety Requirements

a. Vans and trucks must have vehicle back-up alarms and back-up sensors.

b. The contractor must submit to the COR the required documents of vehicles

(ownership card and mechanical inspections).

15. Requirements Confined Spaces

a. For any work to be performed in confined spaces, you must consult with the Safety Office to identify and comply with all the mandatory requirements established by OBO/SHEM.

16. Tree trimming and removal

a. Assume that all power lines are energized.

b. Contact the utility company to discuss de-energizing and grounding or shielding of power lines.

c. All tree trimming or removal work within ten feet of a power line must be done by trained and experienced line-clearance tree trimmers. A second tree trimmer is required within normal voice communication range.

d. Line-clearance tree trimmers must be aware of and maintain the proper minimum approach distances when working around energized power lines.

e. Use extreme caution when moving ladders and equipment around downed trees and power lines.

f. Stay alert at all times.

g. Do not trim trees in dangerous weather conditions.

h. Perform a hazard assessment of the work area before starting work.

i. Eliminate or minimize exposure to hazards at the tree and in the surrounding area.

j. Operators of chain saws and other equipment should be trained and the equipment properly maintained.

k. Use personal protective equipment such as gloves, safety glasses, hard hats, hearing protection, etc., as recommended in the equipment manufacturer’s operating manual.

l. Determine the tree’s felling direction. Address forward lean, back lean, and/or side lean issues.

m. Determine the proper amount of hinge wood to safely guide the tree’s fall.

Provide a retreat path to a safe location.

n. Inspect tree limbs for strength and stability before climbing. Tree trimmers working aloft must use appropriate fall protection.

o. Do not climb with tools in your hands.

p. If broken trees are under pressure, determine the direction of the pressure and make small cuts to release it.

q. Use extreme care when felling a tree that has not fallen completely to the ground and is lodged against another tree.

r. Never turn your back on a falling tree.

s. Be alert and avoid objects thrown back by a tree as it falls.

17. Covid-19

The contractor must follow the guidelines and protocols established by the local government, as well as those issued by the Centers for Disease Control and Prevention (CDC) to prevent the spread of the Covid-19 and to guarantee the health and safety of both contractor personnel and Mission personnel.

Roof Works Safety Requirements:

For roof works 1 meter and more from the edge.

Use of a self-retrain harness and a back-up self-retract harness double rope configuration for all the sections.

The longest distance from the hook point is 29.096m. Ensure that the length of both Self-restrain and Self-retract harness are adequate.

The self-restrain harness can be adjusted depends on the distance of the work from the hook point to prevent workers from reaching 1 meter from the edge.

Please see the below Fall Protection Standards (US Army Corps of Engineering EM 385- 1-1):

1. Ropes: Used as working line and safety line shall be made of synthetic fiber with a nominal breaking strength of at least 5400 lbs (24 kN) when new. The working lines and safety lines shall be specifically designed and intended for life safety use. Additionally, elasticity (elongation) of both lines shall be limited to 7% with a load of 540 lbs applied.

2. Carabiners and snap hooks: Used for climbing (life support) shall have at least two consecutive, deliberate actions to prepare the gate for opening and shall be rated at 5,000 lbs (22.2kN) and shall meet the ANSI/ASSE Z359 Fall Protection Code. Gates shall be rated at 3600 lbs (16kN). Rope snaps and snap hooks shall be self-closing and self-locking. The use of rope thimbles when attaching rope snaps is recommended to prevent rope fraying.

3. Pulleys/Rope Sleeves: Anti-friction devices are also recommended to prevent rope damage.

d. Rope Blocks/Brakes: Used to make the work safer and requires less hands to control heavy loads. When handling limb removal ropes, ground personnel should not wrap the rope around their hands or waist and keep the rope away from their feet to prevent entanglement.

4. Ropes shall be inspected before and after each use.

5. Harnesses and other personal fall protection equipment used in rope access shall meet the ANSI Z359/ASSE Z359, Fall protection Code.

6. PPE: Safety Shoes, long pants, work shirt with a minimum 4 in (10.2 cm) sleeve length, eye protection, hard hat with chin strap or ANSI Z89.1 approved helmet (vented or nonvented), And work gloves.

For roof works 1 meter and less from the edge in all sections use an Elevating working

Platform (Manlift).

Elevating work platforms Requirements:

1. The contractor must submit to the COR fitness certificates of the equipment (issued by a certifying agency) used for the work.

2. The contractor shall send to the COR training certificates of the equipment operator (issued by a certifying agency).

3. PPE: Safety shoes, long pants, work shirt with a minimum 4 in (10.2 cm) sleeve length, eye protection, hard hat with chin strap or ANSI Z89.1 approved helmet (vented or nonvented), work gloves, and full body harness.

Additional Notes

The Embassy COR will work directly with the contractor ensuring all Safety Requirements are met as describe in this document and in case it is needed the COR will report to the Embassy POSHO or Safety Coordinator any deficiency found before or during the execution of the project.

In case the COR identifies unsafe acts or conditions that could affect significantly the health or safety of Embassy personnel, contractors, subcontractors, third parties or government property, the work can be stopped by the COR until the condition is fixed. If different work conditions appear during the project, the COR can indicate further safety requirements to the contractor.

The COR may share safety related information with the POSHO and Safety Coordinator to guarantee personnel safety and government property conservation.

APPENDIX E - ROOF FULL PROTECTION DIAGRAM

END OF SCOPE OF WORK

SECTION 2 - CONTRACT CLAUSES

52.212-4 CONTRACT TERMS AND CONDITIONS – COMMERCIAL PRODUCTS

AND COMMERCIAL SERVICES (DEC 2022) IS INCORPORATED BY REFERENCE. (SEE

SF-1449, BLOCK 27A)

52.212-5 CONTRACT TERMS AND CONDITIONS REQUIRED TO IMPLEMENT

STATUTES OR EXECUTIVE ORDERS—COMMERCIAL PRODUCTS AND

COMMERCIAL SERVICES (JUN 2023)

(a) The Contractor shall comply with the following Federal Acquisition Regulation (FAR) clauses, which are incorporated in this contract by reference, to implement provisions of law or Executive orders applicable to acquisitions of commercial products and commercial services:

(1) 52.203-19, Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements (JAN 2017) (section 743 of Division E, Title VII, of the Consolidated and Further Continuing Appropriations Act, 2015 (Pub. L. 113-235) and its successor provisions in subsequent appropriations acts (and as extended in continuing resolutions)).

(2) 52.204-23, Prohibition on Contracting for Hardware, Software, and Services Developed or Provided by Kaspersky Lab and Other Covered Entities (NOV 2021) (Section 1634 of Pub. L. 115-91).

(3) 52.204-25, Prohibition on Contracting for Certain Telecommunications and Video Surveillance Services or Equipment. (NOV 2021) (Section 889(a)(1)(A) of Pub. L. 115-232).

(4) 52.209-10, Prohibition on Contracting with Inverted Domestic Corporations (NOV 2015).

(5) 52.232-40, Providing Accelerated Payments to Small Business Subcontractors (MAR 2023) ( 31 U.S.C. 3903 and 10 U.S.C. 3801).

(6) 52.233-3, Protest After Award (AUG 1996) ( 31 U.S.C. 3553).

(7) 52.233-4, Applicable Law for Breach of Contract Claim (OCT 2004) (Public Laws 108-77 and 108-78 ( 19 U.S.C. 3805 note)).

(b) The Contractor shall comply with the FAR clauses in this paragraph (b) that the Contracting Officer has indicated as being incorporated in this contract by reference to implement provisions of law or Executive orders applicable to acquisitions of commercial products and commercial services:

[Contracting Officer check as appropriate.]

__ (1) 52.203-6, Restrictions on Subcontractor Sales to the Government (JUN 2020), with Alternate I (NOV 2021) ( 41 U.S.C. 4704 and 10 U.S.C. 4655).

ROOF REPAIR & COATING Contract 19SA4023C0013 https://www.acquisition.gov/far/part-52#FAR_52_203_19 https://www.acquisition.gov/far/part-52#FAR_52_204_23 https://www.acquisition.gov/far/part-52#FAR_52_204_25 https://www.acquisition.gov/far/part-52#FAR_52_209_10 https://www.acquisition.gov/far/part-52#FAR_52_232_40 https://www.govinfo.gov/link/uscode/31/3903 https://www.govinfo.gov/link/uscode/10/3801 https://www.acquisition.gov/far/part-52#FAR_52_233_3 http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 https://www.acquisition.gov/far/part-52#FAR_52_233_4 http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 https://www.acquisition.gov/far/part-52#FAR_52_203_6 http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 https://www.govinfo.gov/link/uscode/10/4655

__ (2) 52.203-13, Contractor Code of Business Ethics and Conduct (NOV 2021) ( 41 U.S.C. 3509)).

__ (3) 52.203-15, Whistleblower Protections under the American Recovery and Reinvestment Act of 2009 (JUN 2010) (Section 1553 of Pub. L. 111-5). (Applies to contracts funded by the American Recovery and Reinvestment Act of 2009.)

__ (4) 52.204-10, Reporting Executive Compensation and First-Tier Subcontract Awards (JUN 2020) (Pub. L. 109-282) ( 31 U.S.C. 6101 note).

__ (5) [Reserved].

__ (6) 52.204-14, Service Contract Reporting Requirements (OCT 2016) (Pub. L. 111- 117, section 743 of Div. C).

__ (7) 52.204-15, Service Contract Reporting Requirements for Indefinite-Delivery Contracts (OCT 2016) (Pub. L. 111-117, section 743 of Div. C).

__ (8) 52.204-27, Prohibition on a ByteDance Covered Application (JUN 2023) (Section 102 of Division R of Pub. L. 117-328).

__ (9) 52.209-6, Protecting the Government’s Interest When Subcontracting with

Contractors Debarred, Suspended, or Proposed for Debarment. (NOV 2021) ( 31 U.S.C. 6101 note).

__ (10) 52.209-9, Updates of Publicly Available Information Regarding Responsibility Matters (OCT 2018) ( 41 U.S.C. 2313).

__ (11) [Reserved].

__ (12) 52.219-3, Notice of HUBZone Set-Aside or Sole-Source Award (OCT 2022) ( 15…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .