Text version
W25G1V925300S2
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
THE REASON FOR THIS AMENDMENT IS TO ADD THE CONTRACTOR MANPOWER REPORTING CLIN AND THE CONTRACTOR MANPOWER STATEMENT IN THE STATEMENT OF WORK. THE PROVISION FOR THE OFFSITE CONTRACTS HAS BEEN ADDED TO THE STATEMENT OF
WORK. ALL OTHER TERMS AND CONDITIONS WILL REMAIN THE SAME.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 6
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 19-Sep-2019
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W25G1V19Q0420
X 9B. DATED (SEE ITEM 11)
16-Sep-2019
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
19-Sep-2019
CODE
ACC-APG, TOBYHANNA DIVISION
11 HAP ARNOLD BLVD
TOBYHANNA PA 18466-5100
W25G1V 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W25G1V19Q0420
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 1449 - CONTINUATION SHEET
SUPPLIES OR SERVICES AND PRICES
CLIN 0002 is added as follows:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0002 1 Lot
CONTRACTOR MANPOWER REPORTING
FFP
THIS REQUIREMENT APPLIES TO ALL CONTRACT LINE ITEMS.The Accounting for Contract Services/Contractor Manpower Reporting requirement has been added to the performance work statement, and contractor is required to provide data on contractor manpower (including subcontractor manpower) for performance of this contract. This CLIN is not separately priced, pricing should not be proposed.
FOB: Destination
PSC CD: W059
NET AMT
DELIVERIES AND PERFORMANCE
The following Delivery Schedule for CLIN 0002 has been added:
DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /
CAGE
POP 15-OCT-2019 TO
08-NOV-2019
N/A SEE BELOW FOR SEPARATE SHIPPING
INSTRUCT
XXX
XXX PA 00000
FOB: Destination
W25G1V
INSPECTION AND ACCEPTANCE
The following Acceptance/Inspection Schedule was added for CLIN 0002:
INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY
Destination Government Destination Government
The following have been modified:
STATEMENT OF WORK
SCAFFOLDING
SOW FOR SCAFFOLDING
Guided Missile Launcher (GML) For Rolling Airframe Missile (RAM)
PREPARED TOBYHANNA ARMY DEPOT
2017 MAY 22
PRODUCTION MANAGEMENT
Scope: Contractor will provide, erect, contain, dismantle and remove Scaffolding and containment around the RAM Launchers for accessibility and to protect from the weather and prevent damage To surrounding areas. Classes of ships to include CVN, LHA,LHD,LSD AND LCS 1.
REQUIREMENTS:
I: SCAFFOLDING DISTANCE AND HEIGHT
a. A 3ft to 5ft distance needs to be maintained up to a 7 ft height from the ground to give the team enough working space
b. At 7 ft there needs to be another level of scaffolding made for the workers to stand on in order to work on the higher parts of the Launchers. This second level must be a minimum of 1ft to 2ft from the Launcher.
c. From the second level the roof would need to be a minimum of 7 ft above this level for the team to be able to work on the second level. This would give total height at 14ft from the ground to the top of the enclosure.
d. The same distances and heights need to be maintained on the sides also where possible. It is obvious the distance will be maintained on the left side; ideally, get as close to this distance as possible on the left side near the wall.
e. Scaffolding must support 4 X working load.
f. The seller shall provide a ladder and entryway into the scaffolding area.
g. The seller shall ensure that guard rails and mid rails are installed around the perimeter of the working surface and meet applicable standards for weight and defection. platform
Scaffolding location /materials
a. East/West Coast Shipyards, Navy or private,any permits or clearances responsibility of scaffolding company.
b.The seller shall provide list of personnel and their qualifications for installation of scaffolding, who can gain access to ship and shipyard.
The seller shall notify the shipyard Team Lead of any issues at time of discovery.
d. Confined Space. Notify contractor if any employees will be working in a confined space and weather confined space is permit required. According to federal and state occupational safety and health laws the customer is responsible for providing any and all required confined space training for its employees and any other users of scaffolding equipment in the confined space.
e. Special Equipment. If any specialized equipment including but not limited to special tools,lighting or protective equipment is required for this project prior to commencement of work on this project.
a. Modification. Any modification or relocation of scaffolding equipment and its components is done solely at the customer risk and should be in compliance with and according to any and all federal and or state occupational safety and health laws rules and regulations. In addition to applicable city, county or local codes. The equipment shall only be used for the purpose for which it was designed.
b. Hazardous Material. Any hazardous material including but not limited to asbestos, lead, arsenic, chemicals and flammable material the potential for exposure told to customer prior to exposure, lll. Quality Assurance:
a. Competent Person. Scaffolding must be erected, used moved, and disassembled only under the direction of a competent person. The customer is responsible for following any and all applicable federal and state occupational safety and health laws, rules and regulations and ordinances in addition to applicable city, county or local codes and specific rules with regard to competent person and inspection requirements for scaffolding.
b. Training. The customer is responsible for providing any and all required training for its employees and any other user of the scaffolding equipment.
c. Lock out Tag out. According to federal and state occupational safety and health laws the customer is responsible for ensuring that all mechanical equipment, electrical circuits, or vessels containing chemicals or pressurized fluids are located in the immediate vicinity of the work area are de-energized or rendered inoperative prior to work, and the proper tags and or locks are attached to all points where such equipment can be energized.
d. Accident Notification. Notification of any accident involving the equipment and or any accident causing injury death or property damage that is related to or is alleged to be related to and or caused by the equipment in any way.
. Scaffolding Estimate
1) Each estimate needs to be itemized showing labor hours and labor rate for 28 days. If over the 28 day limit, estimate needs to have labor hours, rental fee, and erect/dismantle costs.
ENTERPRISE–WIDE CONTRACTOR MANPOWER REPORTING APPLICATION
(eCMRA) The contractor shall report ALL contractor labor hours (including subcontractor labor hours) required for performance of services provided under this contract for the Corporate Philosophy/Process Based Leadership at Tobyhanna Army Depot via a secure data collection site. The contractor is required to completely fill in all required data fields using the following web address: http://www.ecmra.mil/ Reporting inputs will be for the labor executed during the period of performance during each Government fiscal year (FY), which runs October 1 through September 30. While inputs may be reported any time during the FY, all data shall be reported no later than October 31 of each calendar year, beginning with 2013. Contractors may direct questions to the help desk at help desk at: http://www.ecmra.mil
Applicability of Other Safety, Security, and Environmental Laws and Regulations to Offsite Contracts While performing work under this contract, the contractor shall comply with all applicable federal, state, local, and specific DoD Instructions and service requirements, regulations, and laws regarding occupational safety and health, security, and the environment addressed in the PWS or the Safety Appendix to this contract. These requirements also apply to all subcontractors working under this contract.
(End of Summary of Changes)