RFQ - PR12390722 19PK4024Q5020 PMSC for Potable and HVAC Water Treatment System 1 (002).pdf
PDF 1 MB Posted
- Solicitation number
- 19PK4024Q5020
- Issued by
-
Department of State
About this file
This document is a Request for Quotations (RFQ) for preventive maintenance and water treatment services for the HVAC and potable water systems at the U.S. Consulate General in Karachi, Pakistan. The U.S. Department of State is seeking a contractor to provide these services, which include using physical and chemical methods to control water-related issues such as corrosion, scaling, and microbial fouling.
The RFQ outlines the scope of work, contract type (firm-fixed price), period of performance (one base year with four one-year option periods), and instructions for submitting quotes. Pricing is required for semi-annual preventive maintenance visits, and the contractor must also provide labor rates for any necessary repairs. Quotes are due by April 25, 2024. The government intends to award a contract to the responsible offeror submitting the lowest acceptable price.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| RFQ - PR12390722 19PK4024Q5020 PMSC for Potable and HVAC Water Treatment System.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SENSITIVE BUT UNCLASSIFIED
U.S. Consulate General, Karachi Date: 04th April 2024
Dear Prospective Quoter, Subject: Request for Quotations number PR12390722 19PK4024Q5020 PMSC for Potable and HVAC Water Treatment System
Enclosed is a Request for Quotations (RFQ) for PMSC for Potable and HVAC Water Treatment System at U.S. Consulate General, Karachi. If you would like to submit a quotation, follow the instructions in Section 3 of the solicitation, complete the required portions of the attached document, and submit it to the address shown on the Standard Form 1449 that follows this letter.
The U.S. Government intends to award a contract to the responsible company submitting an acceptable offer at the lowest price. We intend to award a contract based on initial quotations, without holding discussions, although we may hold discussions with companies in the competitive range if there is a need to do so
Quotations are due by April 25th, 2024 – Thursday. No quotations will be accepted after this time.
Proposals must be in English and incomplete proposals will not be accepted.
Your quotation must be submitted electronically to krcprocurementcontracting@state.gov. It is important to make sure the submission is made in specific size and format; in MS-Word 2007/2010 or Adobe Acrobat (pdf) file format. The file size must not exceed 30MB. If the file size should exceed the 30MB, the submission must be made in separate files and attached to separate emails with less than 30MB each.
In order for a quotation to be considered, you must also complete and submit the following:
1. SF-1449
2. Section 1 Pricing
3. Section 5, Representations and Certifications
4. Additional information as required in Section 3.
5. Attachment 1: DD-254
Offerors shall be registered in the SAM (System for Award Management) database at https://www.sam.gov prior to submittal of their offer/proposal as prescribed under FAR 4.1102. Failure to be registered at time of proposal submission may deem the offeror’s proposal to be considered non-responsible and no further consideration will be given.
Sincerely, Penelope J Erwin Contracting Officer
Enclosure:
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, & 30
1.REQUISITION
NUMBER
PR12390722
PAGE
2. CONTRACT NO.
3. AWARD/EFFECTIVE
DATE
4. ORDER NUMBER
5. SOLICITATION
19PK4024Q5020
6. SOLICITATION ISSUE
DATE
April 04th 2024
7. FOR SOLICITATION
INFORMATION CALL
a. NAME: Erwin, Penelope J.
b. TELEPHONE
+92-213-5275000
8. OFFER DUE
DATE/LOCAL
TIME, April 25th 2024
9. ISSUED BY CODE 10. THIS ACQUISITION IS
Contracting Officer (GSO) Mai Kolachi Road Karachi, Pakistan
UNRESTRICTED
SET ASIDE: % FOR
SMALL BUSINESS EMERGING SMALL BUSINESS
HUBZONE SMALL BUSINESS SMALL BUSINESS
SERVICE-DISABLED VETERAN OWNED 8(A)
NAICS:
SIZE STD:
11. DELIVERY FOR FOB 12. 13a. THIS CONTRACT IS A RATED ORDER
DESTINATION UNLESS BLOCK IS MARKED
SEE SCHEDULE
13b. RATING
14. METHOD OF SOLICITATION
RFQ IFB RFP
15. DELIVER TO: Cod e
16. Administered by:
U.S. Consulate General
New TPX- Plot No- 3,4,5- Mai Kolachi
Road Karachi
17.a. CONTRACTOR/OFFEROR CODE
FACILITY CODE
18a. PAYMENT WILL BE MADE BY Fiscal Section U.S. Consulate General, New TPX- Plot No- 3,4,5- Mai Kolachi Road Karachi
17b CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH
ADDRESS IN OFFER
18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a UNLESS BLOCK BELOW IS
CHECKED SEE ADDENDUM
19.
ITEM NO.
20.
SCHEDULE OF SUPPLIES/SERVICES
21.
QUANTITY
22.
UNIT
23.
UNIT PRICE
24.
AMOUNT
1. PMSC for Potable and HVAC Water Treatment System at U.S. Consulate General, Karachi as per SOW Base Year
Option Year 1 Option Year 2 Option Year 3 Option Year 4
25. ACCOUNTING AND APPROPRIATION DATA
26. TOTAL AWARD AMOUNT (For Govt. Use
Only)
27a.SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1, 52.212-4. FAR 52.212-3 AND 52.212-5 ARE ATTACHED. ADDENDA ARE ARE NOT
ATTACHED.
28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN __02__
COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND DELIVER ALL
ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY ADDITIONAL
SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED HEREIN.
29. AWARD OF CONTRACT: REF. _ _______ OFFER DATED
_______________. YOUR OFFER ON SOLICITATION (BLOCK 5),
INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE SET
FORTH HEREIN, IS ACCEPTED AS TO ITEMS:
30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a. UNITED STATES OF AMERICA (SIGNATURE OF CONTRACTING OFFICER)
30b. NAME AND TITLE OF SIGNER (TYPE OR PRINT)
30c. DATE SIGNED
31b. NAME OF CONTRACTING OFFICER (Erwin
Penelope, J.)
31c. DATE SIGNED
TABLE OF CONTENTS
Section 1 - The Schedule
SF 18 or SF 1449 cover sheet
Continuation To SF-1449, RFQ Number 19PK4024Q5020 Prices, Block 23
Continuation To SF-1449, RFQ Number 19PK4024Q5020, Schedule of Supplies/Services, Block 20 Description/Specifications/Work Statement
Attachment 1 to Description/Specifications/Performance Work Statement, Government Furnished Property
Section 2 - Contract Clauses
Contract Clauses
Addendum to Contract Clauses - FAR and DOSAR Clauses not Prescribed in Part 12
Section 3 - Solicitation Provisions
Solicitation Provisions
Addendum to Solicitation Provisions - FAR and DOSAR Provisions not Prescribed in Part 12
Section 4 - Evaluation Factors
Evaluation Factors
Addendum to Evaluation Factors - FAR and DOSAR Provisions not Prescribed in Part 12
Section 5 - Representations and Certifications
Representations and Certifications
Addendum to Offeror Representations and Certifications - FAR and DOSAR Provisions not Prescribed in Part 12
SECTION 1 - THE SCHEDULE
CONTINUATION TO SF-1449
RFQ NUMBER 19PK4024Q5020
PRICES, BLOCK 23
1. SCOPE OF CONTRACT
The Contractor shall perform preventive maintenance on HVAC Water Treatment System & Potable Water Treatment System, which includes services, for the U.S. Consulate General, Karachi. The price listed below shall include all labor, insurance (see FAR 52.228-4 and 52.228-5), overhead, and profit. The Government will pay the Contractor the fixed price per visit for services that have been satisfactorily performed.
After contract award and submission of acceptable insurance certificates, the Contracting Officer shall issue a Notice to Proceed. The Notice to Proceed will establish a date (a minimum of ten
(10) days from date of contract award) on which performance shall start. September 2, 2024, to September 1st, 2025.
The performance period of this contract is from the start date in the Notice to Proceed and continuing for 12 months, with base plus four one-year options to renew. The initial period of performance includes any transition period authorized under the contract.
The Contracting Officer’s Representative (COR) shall order the services on a semi-annual basis. This work shall be performed by trained contractor staff. The Contracting Officer Representative (COR) may stipulate that the contractor must furnish all services.
All required Services are based on a firm fixed price.
The Contractor shall include in its next semi-annual invoice details of the Repair Labor Rates & Emergency Service Rates, if applicable. The Contractor shall also include a copy of the COR’s written confirmation for the Repair Labor Rates & Emergency Service Rates.
2. PRICING
The rates below include all costs associated with providing preventive maintenance services in accordance with the attached scope of work, and the manufacturer’s warranty including materials, labor, insurance (see FAR 52.228-4 and 52.228-5), overhead, profit and GST (if applicable).
2.1. BASE YEAR
The Contractor shall provide the services shown below for the base period of the contract and continuing for a period of 12 months.
2.2. OPTION YEAR 1
The Contractor shall provide the services shown below for Option Year 1 of the contract, and continuing for a period of 12 months.
2.3 OPTION YEAR 2
The Contractor shall provide the services shown below for Option Year 2 of the contract, and continuing for a period of 12 months.
CLIN Description Quantity of Equipment
Type of services
No. of service
Unit price / service
Total per year ($)
Potable Water Treatment System
[Semi-
Annual]
HVAC Water Treatment System
[Semi-
Annual]
Total Base Year
CLIN Description Quantity of Equipment
Type of services
No. of service
Unit price / service
Total per year ($)
Potable Water Treatment System
[Semi-
Annual]
HVAC Water Treatment System
[Semi-
Total Option Year 1
Quantity of Equipment
Type of services
No. of service
Unit price / service
Total per year ($)
Potable Water Treatment System
[Semi-
Annual]
HVAC Water Treatment System
[Semi-
2.4 OPTION YEAR 3
The Contractor shall provide the services shown below for Option Year 3 of the contract, and continuing for a period of 12 months
2.5 OPTION YEAR 4
The Contractor shall provide the services shown below for Option Year 4 of the contract, and continuing for a period of 12 months
2.6 GRAND TOTAL
Total Option Year 2
Quantity of Equipment
Type of services
No. of service
Unit price / service
Total per year ($)
Potable Water Treatment System
[Semi-
Annual] 2
HVAC Water Treatment System
[Semi-
Annual] 2
Total Option Year 3
Quantity of Equipment
Type of services
No. of service
Unit price / service ($)
Total per year ($)
Potable Water Treatment System
[Semi-
Annual] 2
HVAC Water Treatment System
[Semi-
Annual] 2
Total Option Year 4
Base Year *
First Option Year *
Second Option Year *
Third Option Year *
Fourth Option Year *
Grand Total – Base plus All Option Years **
2.7 REPAIR OPTION
Repairs are NOT included under this agreement and are to be done outside this contract.
However, we would like to have current labor rates in the event that there is an issue discovered during the preventive maintenance of the specified equipment. Please provide your current labor rates in the Repair Option fields below. Any necessary repairs or parts will be submitted for approval and then billed against a separate purchase order (PO). The Contractor is not approved to do any additional work without approval.
Repair Labor Rates
Base Year *
First Option Year *
Second Option Year *
Third Option Year *
2.7 EMERGENCY SERVICE OPTION
Emergency Service Option. Emergency Service is NOT included under this agreement and will be billed outside the contract. However, we would like to have the rates in the event of an emergency. Emergency Service, with a four-hour response time, must be available 24-hours per day, 365 days a year. Submit cost for Emergency Services below. Please indicate how the emergency service will be billed (hourly, trip charge, etc.).
Emergency Service Rates
Base Year *
First Option Year *
Second Option Year *
Third Option Year *
VALUE ADDED TAX.
Value Added Tax (VAT) is not applicable to this contract and shall not be included in the CLIN rates or Invoices because it is not applicable to the US Mission, Pakistan – U.S. Consulate General, Karachi from the host government.
CONTINUATION TO SF-1449
RFQ NUMBER 19PK4024Q5020
SCHEDULE OF SUPPLIES/SERVICES, BLOCK 20
US CONSULATE KARACHI, PAKISTAN
STATEMENT OF WORK
For
Water Treatment of HVAC and Potable Water Systems
1 INTRODUCTION
1.1 The United States Department of State (DOS) requires services at the unclassified clearance level, to provide water treatment maintenance services at the U.S. Consulate, Karachi, Pakistan in accordance with this contract.
1.2 The water treatment systems to be maintained are as:
HVAC Water Treatment System Domestic (Potable) Water Treatment System
1.3 The Overseas Buildings Operations (OBO) has a requirement to obtain water treatment maintenance services to execute this work, including logistics, customs, shipping, transportation, labor, water treatment chemicals, tools, water treatment testing kits/equipment, administrative and all associated management support functions. The water treatment service contract will include but not limited to combinations of physical methods, chemical methods, equipment servicing and testing to control water-related problems such as corrosion, scaling, general deposits, and microbiological fouling of the HVAC and potable water systems. All work shall comply with the requirements described in the following, as a minimum:
NSF Standards (National Sanitation Foundation)
AWWA Standards (American Water Works Association) ANSI Standards
SDS Regulations
ASTM D
NFPA Codes
UL Standards
IEEE Standards
NEMA Standards
OSHA Standards
And all applicable manufacturer O&M and installation instructions/requirements.
2 OBJECTIVES
2.1 The purpose of this scope of work is to define the requirements for the planning, procurement, and maintenance of the HVAC and potable water systems located at the Consulate Compound.
The intent of this service contract is to preserve the current piping, HVAC equipment, potable water systems, and establish a cost effective water treatment program to control water related problems such as corrosion, scaling, general deposits, and microbiological fouling and meet water treatment goals. All work shall be executed in accordance with the project SOW, approved water treatment chemicals, associated contract documents and be compliant with all applicable safety, equipment and building codes and standards.
3 TYPE OF CONTRACT
This is a firm fixed price contract payable entirely in US dollars. Prices are for all Contract Line Items. No additional sums will be payable for any escalation in the cost of materials, equipment or labor, or because of the Contractor's failure to properly estimate or accurately predict the cost or difficulty of achieving the results required. The contract price will not be adjusted due to fluctuations in currency exchange rates.
4 PERIOD OF PERFORMANCE
The contract will be for a period of one-year, with a maximum of four one-year optional periods of performance and will be expected to commence no later than September 2024.
5 NOTICE TO PROCEED
After Contract award and submission of acceptable insurance certificates and copies of all applicable licenses and permits have been provided, the Contracting Officer will issue a Notice to Proceed. The Notice to Proceed will establish a date (a minimum of ten (10) calendar days from date of Contract award unless the Contractor agrees to an earlier date) on which performance shall start.
6 GENERAL REQUIREMENTS
7.1 This statement of work (SOW) describes the preventive maintenance and testing services and deliverables to be performed by the Contractor at the U.S. Consulate Karachi, Pakistan.
7.2 The assigned Contracting Officer and Contracting Officer's Representative are the sole points of contact for all technical and contractual discussions or issues regarding the scope of work and its intent and execution. The Contractor shall take no direction verbal or otherwise from United States Government (USG) personnel other than the Contracting Officer or Contract Officer's Representative.
7.3 This Statement of Work requires the Contractor to provide site assessment and survey services, project management, professional water treatment services, water treatment logistics and material procurement services, preventive maintenance and testing services, cost estimating and scheduling services, and general support services for this water treatment maintenance contract.
7.4 The Contractor’s proposed and USG accepted maintenance contract cost proposal and maintenance schedule, including completion dates shall be incorporated into the task order.
Additionally, the task order shall be a firm fixed price task order.
7.5 This statement of work and applicable deliverables and documents as developed by the Contractor and accepted by the USG shall serve as the basis for describing and delineating the scope of the required services and work limits for service contract to be furnished and executed by the Contractor.
7.6 All deliverables, documents, proposals, etc. submitted by the Contractor under this statement of work shall remain the property of the U.S. Government. All U.S. Government documents and data provided to the Contractor shall remain the property of the U.S. Government. The Contractor shall limit duplication and dissemination of all U.S. Government documents and Contractor developed documents under this statement of work to/within the Contractor’s execution team.
Duplication or distribution of project documents outside the Contractor’s team is strictly prohibited without the express written approval and authorization of the contracting officer.
Upon completion of each service visit all documents, electronic media, photos, etc. shall be submitted to the Government, including all documents and data the Government provided to the Contractor. All service contract documents and media shall be submitted to the Government along with the Contractor’s service report.
7.7 The Contractor shall schedule, coordinate and arrange all work so as to cause the least interference with the normal occurrence of post operations. In those cases where some interference is unavoidable, the Contractor shall make every effort to minimize the impact of the interference and its effects on the occupants or users. All detailed work schedules required by this statement of work shall be electronically documented and updated and made available to the Contracting Officer's Representative (COR) upon request, oral or written. If the COR determines that the Contractor’s schedule conflicts with critical post operations, the Contractor shall modify the schedule as required.
7.8 The Contractor shall ensure that all Consulate/Post facilities, equipment and systems recommended for and maintained or installed by the Contractor are done so with the highest quality and cost effective materials, finishes, fixtures, equipment and system that provide for sustained operational reliability, dependability and durability. The Contractor shall assure that the equipment/water treatment chemicals furnished and installed are maintainable and equipment/parts can be readily replaced with locally available supplies and services as practical, taking into consideration local economy and resources. The Contractor shall utilize reliability-centered maintenance (RCM) principles and methodologies during and for all project activities and tasks. Uniformity of parts and components shall be taken into consideration to maximize part interchangeability with other existing Post systems. Except as otherwise directed by the contracting officer all parts, materials, components, equipment, systems, etc. furnished by the Contractor shall be new – not used or manufactured by third party entities. Except as otherwise directed by the contracting officer, all replacement or warranty parts shall be new and equal to or better than manufacturer recommended replacements.
7.9 After review of the US Government Statement of Work and provided technical data by the Contractor, any discrepancies, errors, conflicts, etc. that are discovered by the Contractor, the Contractor shall forward those items to the CO via written correspondence. Submittal of this written correspondence shall be completed, within 3 days upon receipt of the US Government Statement of Work.
7.9.1 The Contractor shall provide 3 customer references of similar scope of work and US Dollar value.
7.9.2 The Contractor will not use any method or substances which may cause damage to the equipment or systems. Any damage or loss through negligence and/or maintenance practices by the Contractor, Sub-contractor, or Contractor's staff shall be the entirely the responsibility of the Contractor. The U.S. Consulate, Karachi, Pakistan will require the Contractor to repair/replace any damaged systems or pay for the cost of rectification.
7.9.3 The Contractor must, for the duration of the contracted Services, continue to maintain a quality control process which has been agreed to by the U.S. Consulate Karachi, Pakistan COR and the Contractor.
7.9.4 The Contractor shall provide the technician’s resume and training documentations within 20 days of the notice to proceed.
7.9.5 NA
7 CONTRACTING OFFICER’S REPRESENTIVE and POST CONTROL OFFICER
8.1 All technical questions concerning the scope and requirements of the U.S. Consulate Karachi, Pakistan water treatment service contract shall be directed to the Contracting Officer’s Representative (COR):
COR
Mechanical Engineer
8.2 The Post Control Officer (PCO) will be the Contractor’s point of contact at the U.S. Consulate Karachi, Pakistan. All questions concerning coordination of water treatment Service activities while at post shall be directed to the PCO, with weekly reporting to the COR:
PCO
Facility Manager -Post Control Officer (PCO)
8 PERFORMANCE CRITERIA
9.1 Performance Objective
The objective of this Agreement is to provide, within the Term of this Contract, a professional level of service, which provides:
US Consulate satisfaction in respect to the maintenance of water treatment systems and prompt reaction to any change in arrangements or operational requirements of the US Consulate;
compliance with the statutory and regulatory provisions of the laws of the jurisdiction;
best in class practices within the industry;
risk reduction for the US Consulate;
preservation of asset value; and reduction in operating costs.
The Service Contractor agrees that its performance under the Contract shall be measured against performance criteria specified in this document or otherwise agreed at the time of commencement.
9.2 Performance Benchmarks
The Service Contractor must for the duration of the contracted Services continue to maintain a quality control process, which has been agreed by the US Consulate and the Service Contractor.
The Service Contractor must allow the US Consulate access to the quality control system as well as the relevant quality systems of its subcontractors so as to enable monitoring and quality auditing of the maintenance service.
The US Consulate may reject any aspect of the Services that fails to comply with the requirements of the Contract, or its quality system, at any time.
9.3 Performance Monitoring and Reporting
The Service Contractor shall monitor its own performance against the criteria and benchmarks identified in this document, and shall provide reports when required by the US Consulate.
9 SPECIFICATIONS
10.1 All equipment, chemicals, and testing procedures and kits shall be approved by the COR prior to use in the service contract.
10.2 The Contractor will be responsible for submitting the manufacture specifications, SDS sheets and equipment cut sheets for all equipment, chemicals (including chemical composition), and testing procedures in English language.
10.3 HVAC Water Treatment System:
10.3.1 The Contractor shall use molybdate based corrosion and scale inhibitor designed for closed hot and chilled recirculating water systems. The molybdate shall be in a liquid form with a pH level ranging from 10.8 to 12.5. The density of the molybdate shall be between 1.03 to
1.07 kg/L. The molybdate shall not contain any sodium nitrites. The chemicals shall be compatible with propylene glycol. The chemical composition of the molybdate shall contain at the minimum the following chemicals: Sodium Molybdate, Sodium Hydroxide, Sodium Tetraborate, and Pentahydrate.
10.3.2 The Contractor shall provide propylene glycol and maintain a 30% concentration in the chilled water systems. The glycol shall contain propylene with inhibitors and meet all specification requirements as the “Dowfrost” by Dow Chemical Company or approved equal.
10.3.3 The hot water / chilled water filter media shall be rated at 98 percent efficiency for 20 micrometer particulates. The filters shall fit in the Consulate’s current filtration unit.
10.3.4 The hot and chilled water shall be maintained with the parameters specified in Exhibit A HVAC Water Treatment Systems Statement of Work
10.4 Potable Water Treatment System:
10.4.1 The potable water shall be maintained with the parameters specified in Exhibit B Domestic (Potable) Water Treatment Systems Statement of Work
10 SAFETY HEALTH AND ENVIROMENTAL MANAGEMENT (SHEM)
11.1 The Service Contractor shall take all reasonable and proper safety precautions to prevent death or injury to any person or damage to any property at the US Consulate Karachi Compound and in particular all equipment used by the Service Contractor shall be used in such a manner and maintained so as to minimize the danger of accident, death, injury, loss or damage arising from the use of such equipment. In addition to relevant statutory requirements, standards and other provisions of this Contract, the Service Contractor shall have the following requirements:
Numbers (CLIN) shall include proper disposal of toxic substances where applicable.
The Service Contractor’s personnel shall be knowledgeable with and adhere to all relevant occupational health and safety legislation and MSDS sheets.
All electrical equipment and associated materials for the Services Contract comply with UL requirements.
Follow all NFPA guidelines against fire, production of smoke or the venting of any noxious substances
Ensure that the Service Contractor’s personnel comply with all safety procedures and requirements
Ensure that the Service Contractor’s personnel are adequately trained and instructed in the safe and correct usage, handling and operation of materials and equipment relevant to the Services and provide reasonable proof of such to the US Consulate Karachi on request.
Ensure the Service Contractor’s personnel are certified as having completed occupational health and safety training and have been issued all the necessary Personal Protection Equipment (PPE) required for safe implementation of this contract;
Training program(s) shall be presented and must satisfy the US Consulate Karachi during the submittal process.
11 MAINTENANCE SPECIFICATION DETAILS
12.1 Precedence of Specifications. If and to the extent that there is an inconsistency between this maintenance specification and any Manufacture’s maintenance specification, the Manufacture’s maintenance specification shall prevail.
12.2 Hours of Work. The Service Contractor shall schedule all preventive maintenance during normal working hour which are defined as Monday to Friday 0800 am till 0430 pm, inclusive of periodic maintenance that may be required on Saturdays, with the exception of any regular or special public holidays on which the US Consulate Compound is not open, or as agreed with the US Consulate prior to commencement of the contract.
12 SCOPE OF WORK
13.1 The water treatment Contractor shall provide both the required chemical products and necessary services to apply the chemicals, monitor their performance, and report the results. The water treatment service contract shall 1) preserve the interior waterside of current piping, HVAC equipment, potable water systems, and sprinkler piping/equipment, 2) reduce operating costs and establish a cost effective water treatment program to control water related problems such as corrosion, scaling, general deposits, and microbiological fouling, and 3) ensure the proper operation of water treatment equipment.
13.2 The water treatment Contractor shall provide a “support service water treatment” contract.
The support service water treatment contract shall involve joint responsibilities between the Consulate facility management staff and the water treatment vendor.
13.3 The support service water treatment program shall consist of the Consulate facility management staff conducting routine (daily, weekly) water treatment tests of the HVAC and potable water treatment systems and emailing the results to the water treatment Contractor on a weekly basis. The Contractor will then be responsible for conducting a technical analysis of the weekly water treatment testing results from the Consulate. The Contractor will then respond to the Consulate within 24 hours to direct the Consulate facility management staff to make any changes to the chemical dosages and/or equipment operations as necessary.
13.4 The water treatment Contractor shall visit the Consulate on semi-annual basis. The Contractor shall be responsible for all logistics including but not limited to transportation and hotel reservations for their staff.
13.5 The water treatment Contractor shall provide good chemicals and have a storage life expectance of at least 1 year.
13.6 The water treatment Contractor shall establish minimum and maximum control ranges for each treatment chemical and avoid unnecessary high levels of chemicals to mitigate cost and adverse chemical reactions from improper high level chemical dosage.
13.7 The water treatment Contractor shall perform the required services as described in the following SOW attachments, as applicable:
Exhibit A – HVAC Water Treatment System Exhibit B – Potable Water Treatment System
13.8 The water treatment Contractor shall provide 8 hours of familiarization annually in English and with Urdu translator to acquaint operators in the necessary water treatment tests, the control ranges for each treatment chemical, safe handling of equipment and chemicals, and new water treatment procedures/technologies.
13.9 The water treatment Contractor shall review the facility water treatment logs and the operating logs to verify the chemicals are within design parameters.
13.10 The water treatment Contractor shall discuss the water treatment conditions with the Facility Manager and operating engineers on a monthly basis and follow up with a written service report within 15 business days after each visit. The report shall be in English and contain the results of water treatment Contractor’s on-site and laboratory tests, comment on the status of each system, and specific recommendations for action if necessary.
13 ACCESS TO GOVERNMENT BUILDINGS AND STANDARDS OF CONDUCT
14.1 The Contractor shall designate a representative who shall supervise the Contractor’s technicians and be the Contractor's liaison with the US Consulate Karachi. The Contractor's employees shall be on-site only for contractual duties and not for any other business or purposes.
Contractor employees shall have access to the systems dedicated rooms with or without security escorts, only with specific permission by the Facility Manager, Contracting Officer, or the COR.
14.2 Personnel security: The US Consulate reserves the right to deny access to U.S owned and U.S.-operated facilities to any individual. The Contractor shall provide the names, biographic data and police clearance on all Contractor personnel, who shall be used on this contract prior to their utilization on this contract.
14.3 Standards of Conduct.
14.3.1 General: The Contractor shall maintain satisfactory standards of employee competency, conduct, cleanliness, appearance, and integrity and shall be responsible for taking such disciplinary action with respect to employees as necessary. Each Contractor employee shall adhere to standards of conduct that reflect credit on themselves, their employer, and the United States Government. The US Consulate reserves the right to direct the Contractor to remove an employee from the worksite for failure to comply with the standards of conduct. The Contractor shall immediately replace such an employee to maintain continuity of services at no additional cost to the Government.
14.3.2 Uniforms and Personal Equipment. The Contractor's employees shall wear clean, neat and complete uniforms when on duty. The Contractor shall provide, to each employee and supervisor, uniforms and personal equipment. The Contractor shall be responsible for the cost of purchasing, cleaning, pressing, and repair of the uniforms.
14.3.3 Neglect of Duties. Neglect of duties shall not be condoned. This includes sleeping while on duty, unreasonable delays or failures to carry out assigned tasks, conducting personal affairs during duty hours and refusing to render assistance or cooperate in upholding the integrity of the worksite security.
14.3.4 Intoxicants and Narcotics. The Contractor shall not allow its employees while on duty to possess, sell, consume, or be under the influence of intoxicants, drugs or substances which produce similar effects.
EXHIBIT A
Statement of Work
HVAC Water Treatment Systems
I. GENERAL INFORMATION:
The United States Consulate in Karachi requires professional services and contractor cost proposals to perform preventive maintenance services of the facility’s HVAC Water Treatment Systems.
II. PROJECT REQUIREMENTS:
HVAC System Description:__02 x 176 tons Air cooled Chillers, 02 x 185 tons Air Cooled Chillers, 01 x 160 tons modular Chiller, 01 x 40 tons modular chiller, 01 x 60 tons modular chiller, 01 x 160 tons modular chiller 14 x PCHWP and SCHWP.
Primary and Secondary Chilled Water Loop 22.0 l/sec primary and 40.4 l/sec secondary, 11 liter expansion tank.
DESCRIPTION OF EQUIPMENT *:
*Please see attachment at the end of this sheet for more details
III. GENERAL REQUIREMENTS:
The Contractor SOW shall provide all labor, tools, and materials required to carry out all preventive maintenance as outlined in this SOW. US Consulate staff may have service manuals for all equipment included in this SOW. If they do not, the Contractor shall assist Consulate Staff in obtaining the manuals.
IV. SCOPE OF WORK - PREVENTIVE MAINTENANCE
Contractor shall provide all materials, supervision, labor, tools and equipment to perform preventive maintenance. All personnel working in the vicinity shall wear and /or use safety protection while all work is performed. Any questions or injuries shall be brought to the attention of the Post Occupation Safety and Health Officer (POSHO). Safety Data Sheets (SDS) shall be provided by the Contractor for all HAZMAT materials. Copies will be provided to the COR for approval.
At a minimum, the following work shall be accomplished:
HVAC Water Treatment Preventive Maintenance (PM)
Semi- Annually:
Water Treatment System, Closed Loop
i. Safety & Special Instructions:
1. Chemicals must comply with the Environmental Protection Agency (EPA) regulations and handled in accordance with occupational safety requirements. Employ personal protection against corrosive or hazardous treatment chemicals as appropriate.
2. Be familiar with the Safety Data Sheets of any chemicals used in the water treatment program.
3. Water treatment specialists must be properly trained and certified.
4. Water treatment must be based on proven standard engineering practices.
5. Follow treatment as directed by manufacturer and in accordance with requirements specified under Section 10.
6. Maintenance includes chemicals, chemical feeding, maintaining proper water conditions, controlling bleed off, protecting idle equipment, and record keeping.
7. Ensure chemicals are properly stored; test equipment clean, and that chemicals have not passed expiration date.
8. Maintain records and test results.
9. All tests shall conform to the manufacturer test procedures and standard values.
ii. Maintenance Description:
1. Inspect system and complete water analysis.
2. Monitor and test corrosion coupons (every 180 days for mild steel and copper coupons)
iii. Maintenance Procedures:
1. Sample water from the closed loop system per manufacturer’s recommendations.
2. Test for the proper levels of chemicals in the closed loop system and adjust chemical feeds as necessary to maintain optimal conditions in the system.
3. Record test results in a logbook.
4. Use the conductivity meter to test for total solids and plot in a logbook. Record and analyze abnormal changes.
5. Check the total conductivity of the system with a conductivity meter. Record results in a logbook.
6. Check pH with the pH test strips and/or pH meter.
7. Clean sample bottles and wipe down all chemical treatment equipment.
8. Change corrosion coupons. Send used coupons to the laboratory for analysis.
Contractor to supply written coupon corrosion test report to the Facilities Manager within fourteen (14) calendar days after analysis.
iv. Process Instrumentation Engineer Checks and Adjustments
1. Visual inspection for the controller, sensor, pumps, tubing and other accessories
2. Testing of the chemical parameters
a. pH
b. Total dissolved solids
c. Conductivity
d. Aerobic Plate Count
e. Corrosion Inhibitor Level
f. Biocide dosage of both the Biocides
g. Test supply water for base conditions (iron, manganese, alkalinity, total hardness, silica chloride)
3. Calibration of the sensor with known standard
4. Process calibration of conductivity by a calibrated instrument with a known standard
5. Make sure that the controller is functioning properly.
6. Make sure that the solenoid valves, contact water meter, inhibitor pump and biocide pumps are physically functioning properly as per the settings in the controller.
7. Make sure that the chemical is dosed only as per the specification
8. Submit service report with detailed description of errors and causes(if any) and corrective action taken.
The water treatment Contractor shall determine the dosage levels of chemicals and stay within the specified operating parameters:
Parameters Maintenance Levels Open System Closed System Corrosion on mild steel Less than 2.0 mpy Less than 1.0 mpy Pitting attack on mild steel None None Corrosion on copper alloys Less than 0.2 mpy Less than 0.1 mpy Scaling and deposition None None Microbiological fouling 1. No visible deposits
2. No health hazards
3. Total aerobic count less than 10,000/ml
1. No visible deposits
2. No health hazards
3. Total aerobic count less than 10,000/ml
List of Equipment:
Control Panel and Valves
Manufacturer Make Model Specifications Location
Control Panel Valves & Switches
Filtration/Water Treatment Equipment Filtration and Membranes
Manufacturer Make Model Number Specifications Location Micron rating (�) Absolute or nominal
Filtration Unit Replaceable Filter Media
Sand Filters Other Chemical Feeding
Manufacturer Make Model Number Specifications (Media)
Location
Chemical Pot Feeder
J L Wingart HP-5 2 ¾” in, ¾” out, 300psi max
3rd floor
NOB
Pumps Agitator Chemical Solution Tank
Chemical Manufacturer Make Model Number Specifications
Location
System Cleaner pH Adjustment Corrosion Inhibitor
Softener Other Chemical Pumps Manufacturer Model
Number Serial Number
Capacity Electrical
PCHWP PACO 11-3095-7 326 gpm @ 35’ 5hp, 415/50/3 SCHWP PACO 11-4012-A 523 gpm @ 85’ 20hp, 415/50/3
PR12381336 19PK4024Q5018 KHI-FAC: Field Support Services for Facilities Maintenance at U.S. Consulate General, Karachi
EXHIBIT B
Statement of Work
Domestic (Potable) Water Treatment System
I. GENERAL INFORMATION:
The United States Consulate in Karachi requires professional services and contractor cost proposals to perform preventive maintenance services of the facility’s Potable Water Treatment System.
II. PROJECT REQUIREMENTS:
Description:
1. Culligan Softener and Carbon filters, Water professional raw water circulation system, Prominent Chlorination and pH skids, Bag and cartridge filters.
Volume: Domestic Water 25000 gallons per day
2. Reverse Osmosis system 10000 GPD Seven Trent Inc. U.S.A
3. Reverse Osmosis system 25000 GPD Aqua Shine Turkey
III. GENERAL REQUIREMENTS:
The Contractor under this SOW will be responsible for labor, tools, and materials required to carry out all preventive maintenance as outlined in this SOW. Consulate staff should have service manuals for all equipment included in this SOW. If they do not, the Contractor will assist Consulate Staff in obtaining the manuals and ensure they have been received.
IV. SCOPE OF WORK - PREVENTIVE MAINTENANCE
Contractor shall provide all materials, supervision, labor, tools and equipment to perform preventive maintenance. All personnel working in the vicinity shall wear and /or use safety protection while all work is performed. Any questions or injuries shall be brought to the attention of the Post Occupation Safety and Health Officer (POSHO). Safety Data Sheets (SDS) shall be provided by the Contractor for all HAZMAT materials. Copies will be provided to the COR for approval.
At a minimum, the following work must be done:
Monthly:
The Service program shall consist of the Consulate facility management staff conducting routine (daily/weekly) operator testing of the potable water treatment systems and monthly e-mailing the results to the service contractor, with copy to OBO/FAC (water_testing_group@state.gov). The Contractor will then be responsible for conducting a technical analysis of the routine potable water treatment testing results from the Consulate. The Contractor will then respond to the Consulate within 24 hours to direct the Consulate facility management staff to make any changes to the treatment plant operations to reestablish effective and efficient potable water treatment to meet water quality standards.
Potable Water Treatment System Semi- Annually:
i. Maintenance Description:
1. Check and record pressures and chemical levels.
2. Replace chemical dosing detection probes
PR12390722 19PK4024Q5020 KHI-FAC: PMSC for Potable and HVAC Water Treatment System at U.S. Consulate General, Karachi ii.Safety and Special Handling Description:
1. Chemicals must comply with the Environmental Protection Agency (EPA) regulations, ANSI/NSF Standard 60 Certification and be handled in accordance with occupational safety requirements. Employ personal protection against corrosive or hazardous treatment chemicals as appropriate.
2. Be familiar with the Safety Data Sheets of any chemicals used in the water treatment program
3. Assure that post water treatment specialists understand the proper operation and maintenance of the equipment and correct any deficiencies found with on-site personnel’s familiarizations with equipment.
4. Water treatment must be based on proven standard engineering practices and Post specific water treatment goals.
5. Follow treatment as directed by manufacturer.
6. Maintenance includes chemicals, chemical feeding, maintaining proper water conditions, controlling bleed off, protecting idle equipment, and record-,keeping
7. Ensure chemicals are properly stored, test equipment clean, and that chemicals have not passed expiration date.
8. All tests shall conform to the manufacturer test procedures and standard values.
9. Maintain records and test results
iii. Maintenance Procedures:
1. Review daily logs for trends
2. Check chemical levels in the chemical addition tanks. Adjust chemical level and clean tank if necessary.
3. Check system for any signs of leakage
4. Check all tubing for tightness
5. Inspect and clean metering pumps:
a. Check the pump diaphragm for damage, clean if needed.
b. Check chemical seepage at vent hole.
c. Check that the discharge tubing is connected firmly to the liquid end.
d. Check that the liquid end is generally watertight (especially vent hole)
e. Check for correct feed.
f. Check electrical connections for wear.
6. Replace the sensors (pH, chlorine, as applicable).
a. Clean filters, flow cell, and fittings.
7. Calibrate the new sensors.
8. Check chemical addition tanks to ensure no damage or leakage.
9. Test unit safety functions:
a. Ensure the alarm relay works.
b. Check the function of the flow sensor and ensure the controller stops.
10. Wipe down the unit.
PR12390722 19PK4024Q5020 KHI-FAC: PMSC for Potable and HVAC Water Treatment System at U.S. Consulate General, Karachi
11. Verify maintenance records for all components of the water treatment system.
12. Check total and free chlorine and pH in all domestic water tanks.
Booster Pumps
1. Perform applicable lockout/tag-out steps of site safety procedures.
2. Schedule outage with operating personnel.
3. Follow site and manufacturer’s safety procedures.
4. Record and report equipment damage or deficiencies.
5. Obtain and review manufacturer operation and maintenance instructions.
6. All tests shall conform to the manufacturer test procedures and standard values.
ii. Maintenance Description:
1. Clean and inspect the booster pump.
2. Clean and inspect motor.
3. Lubricate motor.
iii. Maintenance Procedures:
1. Tag out unit.
2. Clean and inspect pump.
a. Clean accumulated dirt and grime from pump casing, shaft coupling, and motor.
b. Inspect electrical wiring, motor, and controls for signs of over-heating, broken insulation, loose or corroded connections, or damaged conduit.
c. Check for evidence of leaks.
d. Check alignment of coupling and security of base-plate mounting bolts.
3. Lubricate pump (if applicable).
4. Conduct operational test of the circulating pump.
a. Start pump. Check flanges and fittings for leaks.
b. Check for unusual noise or vibration.
c. Return the unit to service.
5. Check the motor.
a. Inspect electrical wiring, motor, and controls for signs of over-heating, broken insulation, loose or corroded connections, or damaged conduit.
b. Meggar check motor, record results.
c. Check running current and voltage for each phase, record results.
6. Lubricate the motor (if applicable). NOTES: DO NOT OVERGREASE THE
MOTOR. USE MOTOR RATED GREASE. DO NOT USE PUMP GREASE IN THE
MOTOR.
1. Schedule outage with operating personnel.
2. Follow site and manufacturer’s safety procedures.
3. Record and report any equipment damage or deficiencies found during this maintenance task.
PR12390722 19PK4024Q5020 KHI-FAC: PMSC for Potable and HVAC Water Treatment System at U.S. Consulate General, Karachi
4. Record all test results in the component maintenance log.
5. Obtain and review manufacturers operation and maintenance instructions.
ii. Maintenance Description:
1. Check the system for proper performance.
2. Service the system.
3. Check the backwash flow controller for proper operation.
4. Evaluate filter media for replacement (as applicable)
iii. Maintenance Procedures (General)
1. Cycle the backwash flow controller and verify proper operation (as applicable).
2. Evaluate any media for replacement.
3. Conduct water quality testing to verify maintenance of water quality treatment goals as specified by section 10 of this contract. Have treated water tested by a certified laboratory for an analysis of the following parameters: pH, alkalinity, aluminum, calcium, copper, bromide, fluoride, nitrite, nitrate, orthophosphate, silica, strontium, iron, manganese, lead, magnesium, sodium, chloride, total hardness, total dissolved solids (TDS), turbidity, free chlorine, coliform bacteria, HPC, and temperature.
iv. Maintenance Procedures
1. Check backwash filter
2. Check softening
3. Flush softening
4. Check dosage/metering
5. Adjust dosage/metering
6. Measure water hardness and adjust system to achieve desired hardness level.
7. Measure water conductivity
8. Measure water pH number
9. Check pressure gauges for proper operation
10. Check density of brine solution in salt tank
11. Check operation of float control in brine
12. Inspect water softening piping, fittings and valves for leaks
13. Lubricate valves and motors
14. Inspect softener base and brine tank for corrosion and repair as needed
15. Check operation of automatic fill valve in brine tank
16. Check electrical wiring and phasing
17. Check cleanliness
18. Check control system
19. Check system functioning
20. Measure turbidity, free chlorine residual, iron, manganese, total dissolved solids
(TDS), alkalinity, and temperature of finished water
PR12390722 19PK4024Q5020 KHI-FAC: PMSC for Potable and HVAC Water Treatment System at U.S. Consulate General, Karachi
Controllers: Chemical and Other Treatment Processes (for example: Chlorine addition, Reverse Osmosis (R/O) treatment, pH adjustment, corrosion inhibitor addition), and Pumps (Circulation and Well)
i. Safety & Special Instructions
1. Schedule outage with operating personnel.
2. Perform applicable lockout/tag-out steps of site safety procedures.
3. Record and report equipment damage or deficiencies.
4. Review and follow the manufacturer OM instructions.
5. Record results in the equipment history log.
ii. Maintenance Description:
1. Clean and inspect controller.
2. Operational test controller.
iii. Maintenance Procedures:
1. Visually inspect for broken parts, contact arcing, or any evidence of overheating.
2. Check line and load connections for tightness (check manufacturer instructions for torque specifications).
3. Check mounting screws for tightness.
4. Check all control wiring connections for tightness.
5. Check all timers/clocks for proper operation.
6. Clean interior and exterior of cabinet.
7. Energize circuit and check operation of the controller. Verify each controlled circuit operates properly.
8. Replace burned out pilot lights. Check alarm and remote indicators where applicable.
9. Evaluate UPS Power supplies for replacement.
Pump, Water (Submersible)
1. Schedule outage with operating personnel.
2. Follow site and manufacturer’s safety procedures.
3. Record and report any equipment damage or deficiencies found while performing this maintenance task.
4. Record all test results in the component maintenance log.
5. Obtain and review manufacturer operating and maintenance instructions.
6. All tests shall conform to the manufacturers test procedures and standard values.
ii. Maintenance Description:
1. Test the pump. (Semi- Annual)
iii. Maintenance Procedures:
1. Inspect electrical wiring for damage.
2. For recirculation pumps, verify pump is pumping at capacity.
3. For jockey pumps, verify pump is pumping at the required pressure.
PR12390722 19PK4024Q5020 KHI-FAC: PMSC for Potable and HVAC Water Treatment System at U.S. Consulate General, Karachi
4. Measure actual current draw and compare to nameplate readings.
5. Measure voltage at the pump and compare to nameplate readings.
6. Meggar test the motor.
Water Tanks with Controls (Above and Underground)
1. Perform applicable lockout/tag-out steps of site safety procedures to ensure machinery will not start.
2. Schedule outage with operating personnel.
3. Follow site and manufacturer’s safety procedures.
4. Record and report to the post any equipment damage or deficiencies found while performing this maintenance task.
5. Record all test results in the component maintenance log.
6. Obtain and review manufacturer operation and maintenance instructions.
7. All tests shall conform to the manufacturer test procedures and standard values.
ii. Maintenance Description:
1. Test operation of sluice gate.
2. Operational test of the water tank
3. Test operation of controls.
iii. Maintenance Procedures:
1. Examine visible interior of tank including fittings, hatches, ladders, manholes, and hand-holes for signs of corrosion, and correct as indicated.
2. Clean, test and inspect sight glasses, valves, fittings, drains and controls.
3. Clean and inspect tank level control panel.
a.…
This is the start of the file's text. The full file is on GovTribe.