19PK3320Q5980 PM Switchgear - Solicitation_Beta.Sam.pdf
PDF 861 KB Posted
- Solicitation number
- 19PK33-20-Q-5980
- Issued by
-
Department of State
About this file
This solicitation requests preventive maintenance services for medium voltage switchgear at the U.S. Embassy in Islamabad, Pakistan. The services include annual preventive maintenance according to a statement of work. The contract type is firm fixed price for a base year and four one-year options. Offerors must submit pricing for the base year and each option year. The Department of State is the contracting agency. Quotes are due by October 7, 2020 and the notice to proceed will be issued within ten days of award. The selected contractor must have experience maintaining similar electrical equipment and hold applicable licenses.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| PR9090213 PM Switchgear - JOFOC.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
U.S. Embassy, Islamabad.
September 08, 2020
Dear Prospective Offeror:
SUBJECT: Solicitation Number 19PK33-20-Q-5980 for Annual Preventive Maintenance
Services for Medium Voltage Switchgear (Eaton) at U.S. Embassy Islamabad, Pakistan.
The Embassy of the United States of America invites you to submit a quotation for Routine
Switchgear Maintenance.
Your quotation must be submitted through courier services if they are operating in the country by then or email to Islamabad-GSO-Contracting@state.gov using subject (19PK33-20-Q-5980)" on or before October 07, 2020, 1500Hours. No quotation will be accepted after this time.
In order for a quotation to be considered, you must also complete and submit the following:
1. SF-1449 duly filled, signed by the quoter
2. Section 1 pricing;
3. Section 5, Representations and Certifications;
4. Additional information as required in Section 3.
Note: “If you are from a country with an international agreement or tax treaty with the United States, please ensure 52.229-11 is completed and W-14 is submitted with your offer.”
Direct any questions regarding this solicitation to Contracting Officer, GSO-Procurement &
Contracting Unit by letter or by telephone at 051-201-5752 during regular business hours.
Sincerely, David H. Haskett
Contracting Officer for the
United States of America
TABLE OF CONTENTS
Section 1 - The Schedule
• SF 1449 cover sheet
• Continuation To SF-1449, RFQ Number 19PK33-20-Q-5980, Prices, Block 23
• Continuation To SF-1449, RFQ Number 19PK33-20-Q-5980, Schedule of
Supplies/Services, Block 20 Description/Specifications/Work Statement
• Description/Specifications/Performance Work Statement, Government Furnished
Property
• Attachment I -List of Equipment to be Maintained
Section 2 - Contract Clauses
• Contract Clauses
• Addendum to Contract Clauses - FAR and DOSAR Clauses not Prescribed in Part 12
Section 3 - Solicitation Provisions
• Solicitation Provisions
• Addendum to Solicitation Provisions - FAR and DOSAR Provisions not Prescribed in
Part 12
Section 4 - Evaluation Factors
• Evaluation Factors
• Addendum to Evaluation Factors - FAR and DOSAR Provisions not Prescribed in
Part 12
Section 5 - Representations and Certifications
• Offeror Representations and Certifications
• Addendum to Offeror Representations and Certifications - FAR and DOSAR
Provisions not Prescribed in Part 12
SECTION 1 - THE SCHEDULE
CONTINUATION TO SF-1449
RFQ NUMBER 19PK33-20-Q-5980
PRICES, BLOCK 23
1.0. PERFORMANCE WORK STATEMENT:
The U.S. Embassy in Islamabad requires services from an authorized distributor/dealer to maintain medium voltage equipment in safe, reliable, and efficient operating condition. The contract type is a firm fixed price contract for routine maintenance services paid at the annually rate below. These rates include all costs associated with providing switchgear maintenance services in accordance with manufacturer’s warranty including materials, labor, insurance (see
FAR 52.228-4 and 52.228-5), overhead and profit. The contract will be for a base year, with four one-year optional periods of performance in accordance with Statement of Work (SOW).
2.0 PRICING:
James Zadroga 9/11 Victims Health and Compensation Act of 2010 Notice:
Unless a Waiver or Exception applies, payments subsequent to this procurement are subject to an Excise
Tax of 2% pursuant to 26 U.S.C. 5000C.
If your offer is from one of the excepted countries please provide the W-14 form with your offer.
https://www.irs.gov/forms-pubs/about-form-w-14 https://www.irs.gov/instructions/iw14
2.1 Value Added Tax (VAT):
Since Value Added Tax (VAT) is not levied in Pakistan so should not be applicable to this contract and shall not be included in the CLIN rates.
https://www.irs.gov/forms-pubs/about-form-w-14 https://www.irs.gov/instructions/iw14
2.2 Base Year:
The Contractor shall provide the services shown below for the base period of the contract, starting on the date stated in the Notice to proceed and continuing for a period of 12 months.
The fixed unit prices, estimated quantities, and ceiling for each category are:
CLIN
Description Type of services
No. of service
Unit price / service
(US$)
Total per year
(US$)
Annual Preventive Maintenance Services for Medium Voltage Switchgear in accordance with Statement of Work (SOW) and Attachment 01.
Annually Once annually
(01 per year)
2.3 Option Year 1:
The Contractor shall provide the services shown below for Option Year 1, starting one year after the date stated in the Notice to Proceed and continuing for a period of 12 months.
services
No. of service
Unit price / service
(US$)
Total per year
(US$)
Annual Preventive Maintenance Services for Medium Voltage Switchgear in accordance with Statement of Work (SOW) and Attachment 01.
2.4 Option Year 2:
The Contractor shall provide the services shown below for Option Year 2, starting two years after the date stated in the Notice to Proceed and continuing for a Period of 12 months.
services
No. of service
Unit price / service
(US$)
Total per year
(US$)
Annual Preventive Maintenance Services for Medium Voltage Switchgear in accordance with Statement of Work (SOW) and Attachment 01.
2.5 Option Year 3:
The Contractor shall provide the services shown below for Option Year 3, starting three years services
No. of service
Unit price / service
(US$)
Total per year
(US$)
Annual Preventive Maintenance Services for Medium Voltage Switchgear in accordance with Statement of Work (SOW) and Attachment 01.
2.6 Option Year 4:
The Contractor shall provide the services shown below for Option Year 4, starting four years services
No. of service
Unit price / service
(US$)
Total per year
(US$)
Annual Preventive Maintenance Services for Medium Voltage Switchgear in accordance with Statement of Work (SOW) and Attachment 01.
2.7 Total for All Years:
Base Year Total
Option Year 1 Total
Option Year 2 Total
Option Year 3 Total
Option Year 4 Total
GRAND TOTAL OF BASE YEAR PLUS ALL OPTION YEARS
3.0 NOTICE TO PROCEED:
After contract award and submission of acceptable insurance certificates and copies of all applicable licenses and permits, the Contracting Officer will issue a Notice to Proceed. The
Notice to Proceed will establish a date (a minimum of ten (10) days from date of contract award unless the Contractor agrees to an earlier date) on which performance shall start.
CONTINUATION/ADDENDUM TO SF-1449
RFQ NUMBER 19PK33-20-Q-5980
SCHEDULE OF SUPPLIES/SERVICES, BLOCK 20
DESCRIPTION/SPECIFICATION/WORK STATEMENT
1. GENERAL INFORMATION:
The United States Embassy Islamabad requires professional services and contractor cost proposals to perform preventive maintenance services of the facility’s electrical switchgear(s).
2. PROJECT REQUIREMENTS:
The Contractor shall perform preventive maintenance as described in this STATEMENT OF
WORK. The objective of scheduled preventive maintenance is to eliminate system malfunction, breakdown and deterioration when units are activated/running.
DESCRIPTION OF EQUIPMENT *:
*The attached equipment list provides details of the equipment to be maintained.
Note: See Attachment 01 - Equipment List
3. GENERAL REQUIREMENTS:
The Contractor shall provide the labor, tools, and materials required to perform all preventive maintenance as outlined in this SOW. Embassy staff have service manuals for switchgears on-site. The contractor shall confirm government provided manuals are complete and current and provide the Contracting Officer’s Representative (COR) a listing of any missing or out of date manuals. The technician shall sign off on every task specified in the Statement of Work and will provide a typewritten copy of their report to the COR or the COR's designate within five business days of each maintenance visit.
4. SCOPE OF WORK - - ELECTRICAL SWITCHGEAR PREVENTIVE MAINTENANCE
Contractor shall provide all materials, supervision, labor, tools and equipment to perform preventive maintenance. All personnel working in the vicinity shall wear and /or use appropriate safety protection while all work is performed. Any questions or injuries shall be brought to the attention of the Post COR and Occupation Safety and Health Officer (POSHO) immediately.
Material Safety Data Sheets (MSDS) for all HAZMAT shall be provided by the Contractor.
Copies shall be provided to the COR for approval.
The systems and components to be maintained include power conducting equipment such as switches, circuit breakers, fuses and control systems such as control panels, current transformers and protective relays. The attached equipment list provides details.
1. The contractor shall provide the COR with a list of necessary parts and materials.
2. The contractor shall provide emergency assistance for switchgear support, priced at an hourly rate, within 24 hours of being contacted by the COR.
3. The Government will not provide equipment for switchgear testing: Circuit breaker lifting truck, multimeter, current leakage tester, power meter, megger, vacuum blower, wire stripper, wrench, etc. If any discrepancies are found with the switchgear(s) that are not covered under this scope of work then the contractor shall provide the following:
a) Detailed report noting the discrepancy found.
b) Bill of Materials (BOM) to include component name, quantity, part #, and price for any repair material required and material lead time.
c) The contractor shall provide emergency assistance for switchgear support within 24 hours of being contacted by the COR.
d) Price quote for repair labor.
At a minimum, the following work must be done:
➢ SAFETY & SPECIAL INSTRUCTIONS:
1. Use appropriate personal protective equipment (PPE) when performing work
2. Check all work areas, tools, and equipment to ensure unsafe conditions are eliminated or guarded against.
3. Follow site safety procedures.
4. Schedule maintenance with operating personnel and affected offices (security).
5. Follow approved lockout/tag out procedures.
6. Lockout and disconnect the main power before tightening the main supply lugs in order to avoid the hazard of electrical shock, which could result in serious personal injury or death.
7. Review and follow the manufacturer’s instructions.
8. Record results in the equipment history log.
9. Remove lockout/tag out in accordance with appropriate procedures.
10. Report all incidents and near miss incidents to COR and assist as requested in the investigation and corrective action.
At a minimum, the contractor shall comply with the following:
• Contractor shall submit to the COR for review, work sheet/checklist that will be used for performing maintenance service.
• A discrepancy report shall be submitted to the COR immediately upon discovery of any condition that could result in equipment failure.
➢ MAINTENANCE PROCEDURES:
• Switchgears is composed of power conducting equipment such as switches, circuit breakers, fuses and control systems such as control panels, current transformers and protective relays. It is an essential component of the Diplomatic Facility’s Electrical Supply System.
• The contract does not replace the need for operator level checks and inspections. There may be items pertinent to the operation of the system which are not included in this SOW.
• Manufacturer’s recommendations should be followed and supersede recommendations in this list. Note: contractor should make confirm these before finalizing contract.
• The manufacturer’s maintenance schedules can be taken directly from equipment operations and maintenance manual and used in place of the list below.
• Before each consecutive interval is performed, all maintenance from the previous intervals must be performed.
The purpose of this Statement of Work is to ensure the switchgear(s) for this facility are maintained according to manufacturer’s recommendations to ensure the readiness and proper operation of the system.
Coordination of scheduling maintenance shall begin 90 days in advance. (Intent: Contractor needs to make contact with post to begin scheduling and outage coordination 90 days in advance).
A. Annual Schedule:
I. Step-One, Visual Inspection:
(i) Confirm working space and clearance is maintained around all the electrical gear per the
National Electrical Code (NEC) requirements.
(ii) Check that the electrical room is free from foreign articles not associated with the room.
(iii) Perform visual and mechanical inspection to ensure the proper operation of all factory and vender installed meters, breakers and remote power monitoring equipment associated with the switch gear.
(iv) Inspect the entire switchgear for loose parts or connections. Slight discoloration or tarnish of the silver plate is normal and of no concern. Severe discoloration of the silver plate is a sign of an improper or loose contact and overheating.
(v) Inspect physical, electrical, and mechanical condition including evidence of moisture or corona.
(vi) Inspect that all filters are in place, and the vents are clear.
(vii) Clear loose dust and dirt using an industrial vacuum cleaner or lint free cloth. Wipe off the insulation with a clean cloth.
(viii) Check to see that all anchor bolts and other structural bolts are tight.
(ix) Check for undue noise and vibration.
(x) Check for evidence of loose bolted connections.
II. Step-Two, Verification:
(i) Compare the installed metering measurements with voltage and power readings from a True
RMS meter. Make calibration corrections as necessary to ensure accurate voltage and power readings.
(ii) Verify the switchgear circuit breakers sizing match the drawings.
(iii) Verify the proper labeling of all the breakers in the switchgear. .
(iv) Verify operation of heaters and thermostats, if used
(v) Verify that the Post as-built drawings (electrical one-line) match the switchgear distribution.
Make “Red Ink” corrections on a paper copy as necessary. Inform the COR and FM of any discrepancies or changes to the drawings.
(vi) Verify that the required NFPA70-E safety equipment is available and in good condition for local staff to use.
(vii) Refer to the manufacture’s recommendations for additional maintenance requirements.
III. Step-Three, Inspect/Clean/Correct:
1. Schedule power outage of equipment for cleaning. Coordinate any required outage with the
COR and FM.
2. Perform proper Lock-out/Tag-out and ensure the system is de-energized before removing panel covers and exposing any electrical bus or cabling. Under no circumstances should the equipment be energized during the maintenance operation.
(a) Photo of equipment locked and tagged out is required in final report documentation.
3. Inspect anchorage, alignment, grounding for the equipment.
4. Perform infrared testing on all conductor connections, buss terminations. Record hot spots on digital format for review.
5. Inspect the bus bar connections and insulating barrier(s) for damage.
6. Inspect the cable load connectors, standoff insulators, primary contact supports, and all accessible cable terminations for indications of insulation deterioration. Vacuum each compartment and wipe off all insulation.
7. As applicable perform function tests on breakers, test trip units and settings. Replace any faulty batteries, fuses, or switches.
8. Clean each compartment. Check for damage, excessive wear, or corrosion
9. Lubricate the primary and ground contacts and all moving joints (shutters, mechanism-operated cell (MOC), truck-operated cell (TOC), etc.) Inspect the chains/sprocket and the lifting rail of lift truck, if used for normal operation. Lubricate per manufacturer recommendations.
10. Spot check and correct any loose components or connections.
11. Torque loose connections identified during the infrared test or during inspection.
12. Confirm correct operation and sequencing of electrical and mechanical interlock systems.
13. Apply appropriate dielectric lubrication on moving current-carrying parts and on moving and sliding surfaces. All friction surfaces and articulation in the circuit breaker, disconnector and earthing switch drives must be lubricated. Refer to manufacturer’s recommendations for approved lubricants and points of lubrication.
14. Correct any faulty, damaged, discolored, and worn components using government provided spares.
15. Exercise all active components.
16. Inspect mechanical indicating devices for correct operation.
17. Inspect all power control transformers for physical damage, cracked insulation, broken leads, tightness of connections, defective wiring, proper overload protection, and overall general wiring.
18. Follow the manufactures recommendations for additional maintenance requirements.
19. Clean or replace any air filters present.
20. Make calibration corrections as necessary to ensure accurate voltage and power readings on permanently installed switchgear metering.
21. Check all control circuits by tugging on each wire to verify a snug fit.
22. Insert all of the circuit breakers to the test/disconnected position with their secondary control power plugs engaged and close the compartment doors. Connect the control power source.
23. Close the main source of power and operate each circuit breaker electrically in the test/disconnected position.
24. Operate the switch several times manually to verify that it is operating properly.
25. Remove lockout/tag out in accordance with appropriate procedures.
26. After re-energizing the equipment ensure that all components are up and functioning properly. Make the COR and FM aware of all components that are not functioning properly.
B. Additional maintenance required per manufacturers recommendations and service interval:
1. Electrical Tests – perform the following every 2 years:
• Perform insulation resistance tests for one minute on each bus section, phasetophase and phasetoground. Minimum test voltage is 2500VDC and minimum insulation resistance is 5000 mega ohms.
• Test all control and instrument transformers.
• Determine accuracy of all meters and calibrate watthour meters.
• Verify function of control transfer relays located in switchgear with multiple power sources.
• Verify function of synchronizing system.
• Tests relays for proper operation and record settings.
• Perform a ground resistance test.
C. Additional:
1. The contractor shall supply to post:
• Troubleshooting and repair manuals for Switchgear (s).
Spare Parts and Expendables Inventory.
• Minimum required expendable and common parts to be maintained on site by the contractor for normal maintenance such as: breakers, indicators, fuses, connectors, oil, chemicals, filters, grease, and sealant.
5. INSURANCE REQUIREMENTS
5.1 Personal Injury, Property Loss or Damage (Liability). The Contractor assumes absolute responsibility and liability for any and all personal injuries or death and property damage or losses suffered due to negligence of the Contractor's personnel in the performance of this contract
The Contractor's assumption of absolute liability is independent of any insurance policies.
5.2 Insurance. The Contractor, at its own expense, shall provide and maintain during the entire period of performance of this contract, whatever insurance is legally necessary. The Contractor shall carry the following minimum insurance:
Comprehensive General Liability
Bodily Injury $500 per occurrence $5,000 cumulative
Property Damage $500 per occurrence $5,000 cumulative
5.3 Worker's Compensation Insurance. The Contractor agrees to provide all employees with worker's compensation benefits as required by the laws of either the country in which the employees are working or the employee's native country, whichever offers greater benefits, following FAR 52.228-4 “Worker’s Compensation and War-Hazard Insurance Overseas”.
6. PERMITS
The Contractor shall maintain in full force and affect all permits, licenses, and appointments required for the prosecution of work under this contract at no additional cost to the Government.
The Contractor shall obtain these permits, licenses, and appointments in compliance with host country laws.
7. LOCAL LAW REGISTRATION
If the local law or decree requires that one or both parties to the contract register the contract with the designated authorities to ensure compliance with this law or decree, the entire burden of this registration shall rest upon the Contractor. Any local or other taxes which may be assessed against the contract shall be payable by the Contractor without Government reimbursement.
8. GOVERNMENT FURNISHED PROPERTY/EQUIPMENT
RESERVED
9. QUALITY ASSURANCE AND SURVEILLANCE PLAN (QASP)
9.1 This plan provides an effective method to promote satisfactory contractor performance. The
QASP provides a method for the Contracting Officer's Representative (COR) to monitor
Contractor performance, advise the Contractor of unsatisfactory performance, and notify the
Contracting Officer of continued unsatisfactory performance. The Contractor, not the
Government, is responsible for management and quality control to meet the terms of the contract.
The role of the Government is to monitor quality to ensure that contract standards are achieved.
Performance Objective Scope of Work Para Performance Threshold
Services.
Performs all preventive maintenance services for medium voltage switchgear set forth in the scope of work.
1. thru 9.
All required services are performed and no more than one
(1) customer complaint is received per month.
9.2 Surveillance. The COR will receive and document all complaints from Government personnel regarding the services provided. If appropriate, the COR will send the complaints to the Contractor for corrective action.
9.3 Standard. The performance standard is that the Government receives no more than one (1) customer complaint per month. The COR shall notify the Contracting Officer of the complaints so that the Contracting Officer may take appropriate action to enforce the inspection clause (FAR
52.212-4, Contract Terms and Conditions-Commercial Items), if any of the services exceed the standard.
9.4. Procedures.
9.4.1 If any Government personnel observe unacceptable services, either incomplete work or required services not being performed they should immediately contact the COR.
9.4.2 The COR will complete appropriate documentation to record the complaint.
9.4.3 If the COR determines the complaint is invalid, the COR will advise the complainant. The
COR will retain the annotated copy of the written complaint for his/her files.
9.4.4 If the COR determines the complaint is valid, the COR will inform the Contractor and give the Contractor additional time to correct the defect, if additional time is available. The COR shall determine how much time is reasonable.
9.4.5 The COR shall, as a minimum, orally notify the Contractor of any valid complaints.
9.4.6 If the Contractor disagrees with the complaint after investigation of the site and challenges the validity of the complaint, the Contractor will notify the COR. The COR will review the matter to determine the validity of the complaint.
9.4.7 The COR will consider complaints as resolved unless notified otherwise by the complainant.
9.4.8 Repeat customer complaints are not permitted for any services. If a repeat customer complaint is received for the same deficiency during the service period, the COR will contact the Contracting Officer for appropriate action under the Inspection clause.
Attachment 01-Equipment List:
National Electrical Code (NEC) Medium Voltage Equipment Detail
S# Location Equipment Specifications Panel Tag Qty Drawing
Reference
DEMARC MV
SWITCHGEAR
DM - SGR
Medium
Voltage
Switchgear
Assembly
1-Medium Voltage Switchgear
Assembly: 1200A, 15KV
SWITCHGEAR, Eaton
2-SEL Protective Relays
3-Power Monitoring System
4-Control system
UTA1,
MA1, TA1,
UTC1,
TB1, MB1,
UTB1
4-NOB,
E621
NOB MV
SWITCHGEAR
SUB B SGR
Medium
Voltage
Switchgear
Assembly
1-Medium Voltage Switchgear
Assembly: 1200A, 15KV
SWITCHGEAR, Eaton
2-SEL Protective Relays
3-Power Monitoring System
4-Control system
MF1, SPR,
F1B, T3A, T2A, MT2,
T2B, T3B, F2B, SPR,
MF2
4-NOB:
E621, 1-CMPD:
E-602
UTL MV
SWITCHGEAR
Medium
Voltage
Switchgear
Assembly
1-Medium Voltage Switchgear
Assembly: 1200A, 15KV
SWITCHGEAR, Kohler
2-SEL Protective Relays
3-POWER Monitoring System
4-Control system
UTM1,
GT1, F1A,
UB1, G1,
G2, G3, LB1, MT1,
LB2, G4,
G5, G6, UTM2,
GT2, F2A,
UB2
8-UTL,
E622
NOB
BASEMENT
Transformer
3000kVA, 11KV/ 400/230V, 6.75%Z, CG Power System USA T3A, T3B 2
1-CMPD:
E-602
NOB
BASEMENT
Transformer
2000kVA, 11KV/400/230V, 5.75%Z, CG Power System USA T2A, T2B 2
1-CMPD:
E-602
UTILITY
YARD
Transformer
1500kVA, 11KV/ 400V, 5.75%Z, CG Power System T1A, T1B 2
1-CMPD:
E-601
UTILITY
YARD
Transformer
(Load
Bank)
2000kVA, 11KV/400/230V, 5.75%Z, CG Power System
Load Bank
Transformer
1-CMPD:
E-601
8 SUB-C Transformer 2500kVA, 11KV/ 400/231V, 5.80%Z, CG Power System USA T4A, T4B 2
9 SUB-D Transformer 3750kVA, 11KV/ 400/231V, 9.07%Z, CG Power System USA T5A, T5B 2
10 SUB-C VFI
3PHASE, 15KV, MODEL: VFI-
7, Sr.#: CP570916619, EATON
COOPER POWER 1
11 SUB-D VFI
3PHASE, 15KV, MODEL: VFI-
7, Sr.#: CP570916620, EATON
COOPER POWER 1
12 Warehousde-2 Transformer 2000kVA, 11KV/400/230V, 5.75%Z, CG Power System USA 1
13 Warehouse-2 VFI
3PHASE, 15KV, MODEL: VFI-
7, Sr.#: EATON COOPER
POWER 1
END OF STATEMENT OF WORK
SECTION 2 - CONTRACT CLAUSES
FAR 52.212-4 CONTRACT TERMS AND CONDITIONS – COMMERCIAL ITEMS
(OCT 2018) AND (DEVIATION 2017-02) (JUNE 2017) , is incorporated by reference (see SF-1449, Block 27A)
52.212-5 CONTRACT TERMS AND CONDITIONS REQUIRED TO IMPLEMENT STATUTES OR
EXECUTIVE ORDERS—COMMERCIAL ITEMS (AUG 2020)
52.212-5 Contract Terms and Conditions Required to Implement Statutes or Executive
Orders-Commercial Items (Aug 2020)
(a) The Contractor shall comply with the following Federal Acquisition Regulation (FAR) clauses, which are incorporated in this contract by reference, to implement provisions of law or
Executive orders applicable to acquisitions of commercial items:
(1) 52.203-19, Prohibition on Requiring Certain Internal Confidentiality Agreements or
Statements (Jan 2017) (section 743 of Division E, Title VII, of the Consolidated and Further
Continuing Appropriations Act, 2015 (Pub. L. 113-235) and its successor provisions in subsequent appropriations acts (and as extended in continuing resolutions)).
(2) 52.204-23, Prohibition on Contracting for Hardware, Software, and Services
Developed or Provided by Kaspersky Lab and Other Covered Entities (Jul 2018) (Section 1634 of Pub. L. 115-91).
(3) 52.204-25, Prohibition on Contracting for Certain Telecommunications and Video
Surveillance Services or Equipment. (Aug 2020) (Section 889(a)(1)(A) of Pub. L. 115-232).
(4) 52.209-10, Prohibition on Contracting with Inverted Domestic Corporations (Nov
2015).
(5) 52.233-3, Protest After Award (Aug 1996) (31 U.S.C. 3553).
(6) 52.233-4, Applicable Law for Breach of Contract Claim (Oct 2004) (Public Laws 108-
77 and 108-78 ( 19 U.S.C. 3805 note)).
(b) The Contractor shall comply with the FAR clauses in this paragraph (b) that the
Contracting Officer has indicated as being incorporated in this contract by reference to implement provisions of law or Executive orders applicable to acquisitions of commercial items:
[Contracting Officer check as appropriate.]
_X_ (1) 52.203-6, Restrictions on Subcontractor Sales to the Government (June 2020), with Alternate I (Oct 1995) (41 U.S.C. 4704 and 10 U.S.C. 2402).
__ (2) 52.203-13, Contractor Code of Business Ethics and Conduct (Jun
2020) (41 U.S.C. 3509)).
__ (3) 52.203-15, Whistleblower Protections under the American Recovery and
Reinvestment Act of 2009 (Jun 2010) (Section 1553 of Pub. L. 111-5). (Applies to contracts funded by the American Recovery and Reinvestment Act of 2009.)
_X_ (4) 52.204-10, Reporting Executive Compensation and First-Tier Subcontract
Awards (Jun 2020) (Pub. L. 109-282) ( 31 U.S.C. 6101 note).
__ (5) [Reserved].
_X_ (6) 52.204-14, Service Contract Reporting Requirements (Oct 2016) (Pub. L. 111-
117, section 743 of Div. C).
https://www.acquisition.gov/far/part-52#FAR_52_203_19 https://www.acquisition.gov/far/part-52#FAR_52_204_23 https://www.acquisition.gov/far/part-52#FAR_52_204_25 https://www.acquisition.gov/far/part-52#FAR_52_209_10 https://www.acquisition.gov/far/part-52#FAR_52_233_3 http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 https://www.acquisition.gov/far/part-52#FAR_52_233_4 http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 https://www.acquisition.gov/far/part-52#FAR_52_203_6 http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 https://www.acquisition.gov/far/part-52#FAR_52_203_13 http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 https://www.acquisition.gov/far/part-52#FAR_52_203_15 https://www.acquisition.gov/far/part-52#FAR_52_204_10 http://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title31-section6101&num=0&edition=prelim https://www.acquisition.gov/far/part-52#FAR_52_204_14
_X_ (7) 52.204-15, Service Contract Reporting Requirements for Indefinite-Delivery
Contracts (Oct 2016) (Pub. L. 111-117, section 743 of Div. C).
_X_ (8) 52.209-6, Protecting the Government’s Interest When Subcontracting with
Contractors Debarred, Suspended, or Proposed for Debarment. (Jun
2020) (31 U.S.C. 6101 note).
_X_ (9) 52.209-9, Updates of Publicly Available Information Regarding Responsibility
Matters (Oct 2018) (41 U.S.C. 2313).
__ (10) [Reserved].
__ (11)
(i) 52.219-3, Notice of HUBZone Set-Aside or Sole-Source Award (Mar 2020) (15 U.S.C. 657a).
__ (ii) Alternate I (Mar 2020) of 52.219-3.
__ (12)
(i) 52.219-4, Notice of Price Evaluation Preference for HUBZone Small Business Concerns (Mar
2020) (if the offeror elects to waive the preference, it shall so indicate in its offer)
(15 U.S.C. 657a).
__ (ii) Alternate I (Mar 2020) of 52.219-4.
__ (13) [Reserved]
__ (14)
(i) 52.219-6, Notice of Total Small Business Set-Aside (Mar 2020) (15 U.S.C. 644).
__ (ii) Alternate I (Mar 2020) of 52.219-6.
__ (15)
(i) 52.219-7, Notice of Partial Small Business Set-Aside (Mar 2020) (15 U.S.C. 644).
__ (ii) Alternate I (Mar 2020) of 52.219-7.
__ (16) 52.219-8, Utilization of Small Business Concerns (Oct
2018) (15 U.S.C. 637(d)(2) and (3)).
__ (17)
(i) 52.219-9, Small Business Subcontracting Plan (Jun 2020) (15 U.S.C. 637(d)(4)).
__ (ii) Alternate I (Nov 2016) of 52.219-9.
__ (iii) Alternate II (Nov 2016) of 52.219-9.
__ (iv) Alternate III (Jun 2020) of 52.219-9.
__ (v) Alternate IV (Jun 2020) of 52.219-9
__ (18)
(i) 52.219-13, Notice of Set-Aside of Orders (Mar 2020) (15 U.S.C. 644(r)).
(ii) Alternate I (Mar 2020) of 52.219-13.
__ (19) 52.219-14, Limitations on Subcontracting (Mar 2020) (15 U.S.C. 637(a)(14)).
__ (20) 52.219-16, Liquidated Damages-Subcontracting Plan (Jan
1999) (15 U.S.C. 637(d)(4)(F)(i)).
__ (21) 52.219-27, Notice of Service-Disabled Veteran-Owned Small Business Set-
Aside (Mar 2020) (15 U.S.C. 657f).
__ (22)
(i) 52.219-28, Post Award Small Business Program Rerepresentation (May
2020) (15 U.S.C. 632(a)(2)).
(ii) Alternate I (MAR 2020) of 52.219-28.
__ (23) 52.219-29, Notice of Set-Aside for, or Sole Source Award to, Economically
Disadvantaged Women-Owned Small Business Concerns (Mar 2020) (15 U.S.C. 637(m)).
https://www.acquisition.gov/far/part-52#FAR_52_204_15 https://www.acquisition.gov/far/part-52#FAR_52_209_6 http://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title31-section6101&num=0&edition=prelim https://www.acquisition.gov/far/part-52#FAR_52_209_9 http://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title41-section2313&num=0&edition=prelim https://www.acquisition.gov/far/part-52#FAR_52_219_3 http://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title15-section637a&num=0&edition=prelim https://www.acquisition.gov/far/part-52#FAR_52_219_3 https://www.acquisition.gov/far/part-52#FAR_52_219_4 http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 https://www.acquisition.gov/far/part-52#FAR_52_219_4 https://www.acquisition.gov/far/part-52#FAR_52_219_6 http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 https://www.acquisition.gov/far/part-52#FAR_52_219_6 https://www.acquisition.gov/far/part-52#FAR_52_219_7 http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 https://www.acquisition.gov/far/part-52#FAR_52_219_7 https://www.acquisition.gov/far/part-52#FAR_52_219_8 http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 https://www.acquisition.gov/far/part-52#FAR_52_219_9 http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 https://www.acquisition.gov/far/part-52#FAR_52_219_9 https://www.acquisition.gov/far/part-52#FAR_52_219_9 https://www.acquisition.gov/far/part-52#FAR_52_219_9 https://www.acquisition.gov/far/part-52#FAR_52_219_9 https://www.acquisition.gov/far/part-52#FAR_52_219_13 http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 https://www.acquisition.gov/far/part-52#FAR_52_219_13 https://www.acquisition.gov/far/part-52#FAR_52_219_14 http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 https://www.acquisition.gov/far/part-52#FAR_52_219_16 http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 https://www.acquisition.gov/far/part-52#FAR_52_219_27 http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 https://www.acquisition.gov/far/part-52#FAR_52_219_28 http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 https://www.acquisition.gov/far/part-52#FAR_52_219_28 https://www.acquisition.gov/far/part-52#FAR_52_219_29 http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3
__ (24) 52.219-30, Notice of Set-Aside for, or Sole Source Award to, Women-Owned
Small Business Concerns Eligible Under the Women-Owned Small Business Program
(Mar2020) (15 U.S.C. 637(m)).
__ (25) 52.219-32, Orders Issued Directly Under Small Business Reserves (Mar
2020) (15 U.S.C. 644(r)).
__ (26) 52.219-33, Nonmanufacturer Rule (Mar 2020) (15U.S.C. 637(a)(17)).
__ (27) 52.222-3, Convict Labor (Jun 2003) (E.O.11755).
_X_ (28) 52.222-19, Child Labor-Cooperation with Authorities and
Remedies (Jan2020) (E.O.13126).
_X_ (29) 52.222-21, Prohibition of Segregated Facilities (Apr 2015).
_X_ (30)
(i) 52.222-26, Equal Opportunity (Sep 2016) (E.O.11246).
__ (ii) Alternate I (Feb 1999) of 52.222-26.
__ (31)
(i) 52.222-35, Equal Opportunity for Veterans (Jun 2020) (38 U.S.C. 4212).
__ (ii) Alternate I (Jul 2014) of 52.222-35.
__ (32)
(i) 52.222-36, Equal Opportunity for Workers with Disabilities (Jun 2020) (29 U.S.C. 793).
__ (ii) Alternate I (Jul 2014) of 52.222-36.
__ (33) 52.222-37, Employment Reports on Veterans (Jun 2020) (38 U.S.C. 4212).
__ (34) 52.222-40, Notification of Employee Rights Under the National Labor Relations
Act (Dec 2010) (E.O. 13496).
_X_ (35)
(i) 52.222-50, Combating Trafficking in Persons (Jan 2019) (22 U.S.C. chapter 78 and E.O.
13627).
__ (ii) Alternate I (Mar 2015) of 52.222-50 (22 U.S.C. chapter 78 and E.O. 13627).
__ (36) 52.222-54, Employment Eligibility Verification (Oct 2015). (Executive Order
12989). (Not applicable to the acquisition of commercially available off-the-shelf items or certain other types of commercial items as prescribed in 22.1803.)
__ (37)
(i) 52.223-9, Estimate of Percentage of Recovered Material Content for EPA–Designated Items
(May 2008) ( 42 U.S.C. 6962(c)(3)(A)(ii)). (Not applicable to the acquisition of commercially available off-the-shelf items.)
__ (ii) Alternate I (May 2008) of 52.223-9 (42 U.S.C. 6962(i)(2)(C)). (Not applicable to the acquisition of commercially available off-the-shelf items.)
__ (38) 52.223-11, Ozone-Depleting Substances and High Global Warming Potential
Hydrofluorocarbons (Jun 2016) (E.O. 13693).
__ (39) 52.223-12, Maintenance, Service, Repair, or Disposal of Refrigeration Equipment and Air Conditioners (Jun 2016) (E.O. 13693).
__ (40)
(i) 52.223-13, Acquisition of EPEAT®-Registered Imaging Equipment (Jun 2014) (E.O.s 13423 and 13514).
__ (ii) Alternate I (Oct 2015) of 52.223-13.
__ (41)
(i) 52.223-14, Acquisition of EPEAT®-Registered Televisions (Jun 2014) (E.O.s 13423 and
13514).
__ (ii) Alternate I (Jun2014) of 52.223-14.
https://www.acquisition.gov/far/part-52#FAR_52_219_30 http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 https://www.acquisition.gov/far/part-52#FAR_52_219_32 https://www.govinfo.gov/content/pkg/USCODE-2018-title15/html/USCODE-2018-title15-chap14A-sec644.htm https://www.acquisition.gov/far/part-52#FAR_52_219_33 https://www.govinfo.gov/content/pkg/USCODE-2018-title15/html/USCODE-2018-title15-chap14A-sec637.htm https://www.acquisition.gov/far/part-52#FAR_52_222_3 https://www.acquisition.gov/far/part-52#FAR_52_222_19 https://www.acquisition.gov/far/part-52#FAR_52_222_21 https://www.acquisition.gov/far/part-52#FAR_52_222_26 https://www.acquisition.gov/far/part-52#FAR_52_222_26 https://www.acquisition.gov/far/part-52#FAR_52_222_35 http://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title38-section4212&num=0&edition=prelim https://www.acquisition.gov/far/part-52#FAR_52_222_35 https://www.acquisition.gov/far/part-52#FAR_52_222_36 http://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title29-section793&num=0&edition=prelim https://www.acquisition.gov/far/part-52#FAR_52_222_36 https://www.acquisition.gov/far/part-52#FAR_52_222_37 http://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title38-section4212&num=0&edition=prelim https://www.acquisition.gov/far/part-52#FAR_52_222_40 https://www.acquisition.gov/far/part-52#FAR_52_222_50 http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 https://www.acquisition.gov/far/part-52#FAR_52_222_50 http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 https://www.acquisition.gov/far/part-52#FAR_52_222_54 https://www.acquisition.gov/far/part-22#FAR_22_1803 https://www.acquisition.gov/far/part-52#FAR_52_223_9 http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 https://www.acquisition.gov/far/part-52#FAR_52_223_9 http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 https://www.acquisition.gov/far/part-52#FAR_52_223_11 https://www.acquisition.gov/far/part-52#FAR_52_223_12 https://www.acquisition.gov/far/part-52#FAR_52_223_13 https://www.acquisition.gov/far/part-52#FAR_52_223_13 https://www.acquisition.gov/far/part-52#FAR_52_223_14 https://www.acquisition.gov/far/part-52#FAR_52_223_14
__ (42) 52.223-15, Energy Efficiency in Energy-Consuming Products (May
2020) (42 U.S.C. 8259b).
__ (43)
(i) 52.223-16, Acquisition of EPEAT®-Registered Personal Computer Products (Oct
2015) (E.O.s 13423 and 13514).
__ (ii) Alternate I (Jun 2014) of 52.223-16.
_X_ (44) 52.223-18, Encouraging Contractor Policies to Ban Text Messaging While
Driving (Jun 2020) (E.O. 13513).
__ (45) 52.223-20, Aerosols (Jun 2016) (E.O. 13693).
__ (46) 52.223-21, Foams (Jun2016) (E.O. 13693).
__ (47)
(i) 52.224-3 Privacy Training (Jan 2017) (5 U.S.C. 552 a).
__ (ii) Alternate I (Jan 2017) of 52.224-3.
__ (48) 52.225-1, Buy American-Supplies (May 2014) (41 U.S.C. chapter 83).
__ (49)
(i) 52.225-3, Buy American-Free Trade Agreements-Israeli Trade Act (May
2014) (41 U.S.C.chapter83, 19 U.S.C. 3301 note, 19 U.S.C. 2112 note, 19 U.S.C. 3805 note, 19
U.S.C. 4001 note, Pub. L. 103-182, 108-77, 108-78, 108-286, 108-302, 109-53, 109-169, 109-
283, 110-138, 112-41, 112-42, and 112-43.
__ (ii) Alternate I (May 2014) of 52.225-3.
__ (iii) Alternate II (May 2014) of 52.225-3.
__ (iv) Alternate III (May 2014) of 52.225-3.
_X_ (50) 52.225-5, Trade Agreements (Oct 2019) (19 U.S.C. 2501, et seq., 19 U.S.C. 3301 note).
_X_ (51) 52.225-13, Restrictions on Certain Foreign Purchases (Jun 2008) (E.O.’s, proclamations, and statutes administered by the Office of Foreign Assets Control of the
Department of the Treasury).
__ (52) 52.225-26, Contractors Performing Private Security Functions Outside the United
States (Oct 2016) (Section 862, as amended, of the National Defense Authorization Act for
Fiscal Year 2008; 10 U.S.C. 2302Note).
__ (53) 52.226-4, Notice of Disaster or Emergency Area Set-Aside (Nov2007)
(42 U.S.C. 5150).
__ (54) 52.226-5, Restrictions on Subcontracting Outside Disaster or Emergency Area
(Nov2007) (42 U.S.C. 5150).
_X_ (55) 52.229-12, Tax on Certain Foreign Procurements (Jun 2020).
__ (56) 52.232-29, Terms for Financing of Purchases of Commercial Items (Feb
2002) (41 U.S.C. 4505, 10 U.S.C. 2307(f)).
_X_ (57) 52.232-30, Installment Payments for Commercial Items (Jan2017)
(41 U.S.C. 4505, 10 U.S.C. 2307(f)).
__ (58) 52.232-33, Payment by Electronic Funds Transfer-System for Award
Management (Oct2018) (31 U.S.C. 3332).
__ (59) 52.232-34, Payment by Electronic Funds Transfer-Other than System for Award
Management (Jul 2013) (31 U.S.C. 3332).
__ (60) 52.232-36, Payment by Third Party (May 2014) (31 U.S.C. 3332).
__ (61) 52.239-1, Privacy or Security Safeguards (Aug 1996) (5 U.S.C. 552a).
__ (62) 52.242-5, Payments to Small Business Subcontractors (Jan
2017) (15 U.S.C. 637(d)(13)).
https://www.acquisition.gov/far/part-52#FAR_52_223_15 http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 https://www.acquisition.gov/far/part-52#FAR_52_223_16 https://www.acquisition.gov/far/part-52#FAR_52_223_16 https://www.acquisition.gov/far/part-52#FAR_52_223_18 https://www.acquisition.gov/far/part-52#FAR_52_223_20 https://www.acquisition.gov/far/part-52#FAR_52_223_21 https://www.acquisition.gov/far/part-52#FAR_52_224_3 https://www.acquisition.gov/far/part-52#FAR_52_224_3 https://www.acquisition.gov/far/part-52#FAR_52_225_1 http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 https://www.acquisition.gov/far/part-52#FAR_52_225_3 http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 https://www.acquisition.gov/far/part-52#FAR_52_225_3 https://www.acquisition.gov/far/part-52#FAR_52_225_3 https://www.acquisition.gov/far/part-52#FAR_52_225_3 https://www.acquisition.gov/far/part-52#FAR_52_225_5 http://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title19-section2501&num=0&edition=prelim http://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title19-section3301&num=0&edition=prelim https://www.acquisition.gov/far/part-52#FAR_52_225_13 https://www.acquisition.gov/far/part-52#FAR_52_225_26 http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 https://www.acquisition.gov/far/part-52#FAR_52_226_4 http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 https://www.acquisition.gov/far/part-52#FAR_52_226_5 http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 https://www.acquisition.gov/far/part-52#FAR_52_229_12 https://www.acquisition.gov/far/part-52#FAR_52_232_29 http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 https://www.acquisition.gov/far/part-52#FAR_52_232_30 http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 https://www.acquisition.gov/far/part-52#FAR_52_232_33 http://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title31-section3332&num=0&edition=prelim https://www.acquisition.gov/far/part-52#FAR_52_232_34 http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 https://www.acquisition.gov/far/part-52#FAR_52_232_36 http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 https://www.acquisition.gov/far/part-52#FAR_52_239_1 http://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title5-section552a&num=0&edition=prelim https://www.acquisition.gov/far/part-52#FAR_52_242_5
__ (63)
(i) 52.247-64, Preference for Privately Owned U.S.-Flag Commercial Vessels (Feb
2006) (46 U.S.C. Appx. 1241(b) and 10 U.S.C. 2631).
__ (ii) Alternate I (Apr 2003) of 52.247-64.
__ (iii) Alternate II (Feb 2006) of 52.247-64.
(c) The Contractor shall comply with the FAR clauses in this paragraph (c), applicable to commercial services, that the Contracting Officer has indicated as being incorporated in this contract by reference to implement provisions of law or Executive orders applicable to acquisitions of commercial items:
[Contracting Officer check as appropriate.]
__ (1) 52.222-41, Service Contract Labor Standards (Aug 2018) (41 U.S.C. chapter67).
__ (2) 52.222-42, Statement of Equivalent Rates for Federal Hires (May
2014) (29 U.S.C. 206 and 41 U.S.C. chapter 67).
__ (3) 52.222-43, Fair Labor Standards Act and Service Contract Labor Standards-Price
Adjustment (Multiple Year and Option Contracts) (Aug
2018) (29 U.S.C. 206 and 41 U.S.C. chapter 67).
__ (4) 52.222-44, Fair Labor Standards Act and Service Contract Labor Standards-Price
Adjustment (May 2014) ( 29U.S.C.206 and 41 U.S.C. chapter 67).
__ (5) 52.222-51, Exemption from Application of the Service Contract Labor Standards to Contracts for Maintenance, Calibration, or Repair of Certain Equipment-Requirements (May
2014) (41 U.S.C. chapter 67).
__ (6) 52.222-53, Exemption from Application of the Service Contract Labor Standards to Contracts for Certain Services-Requirements (May 2014) (41 U.S.C. chapter 67).
__ (7) 52.222-55, Minimum Wages Under Executive Order 13658 (Dec 2015).
__ (8) 52.222-62, Paid Sick Leave Under Executive Order 13706 (Jan 2017) (E.O.
13706).
__ (9) 52.226-6, Promoting Excess Food Donation to Nonprofit Organizations (Jun 2020)
(42 U.S.C. 1792).
(d) Comptroller General Examination of Record. The Contractor shall comply with the provisions of this paragraph (d) if this contract was awarded using other than sealed bid, is in excess of the simplified acquisition threshold, as defined in FAR 2.101, on the date of award of this contract, and does not contain the clause at 52.215-2, Audit and Records-Negotiation.
(1) The Comptroller General of the United States, or an authorized representative of the
Comptroller General, shall have access to and right to examine any of the Contractor’s directly pertinent records involving transactions related to this contract.
(2) The Contractor shall make available at its offices at all reasonable times the records, materials, and other evidence for examination, audit, or reproduction, until 3 years after final payment under this contract or for any shorter period specified in FAR subpart 4.7, Contractor
Records Retention, of the other clauses of this contract. If this contract is completely or partially terminated, the records relating to the work terminated shall be made available for 3 years after any resulting final termination settlement. Records relating to appeals under the disputes clause or to litigation or the settlement of claims arising under or relating to this contract shall be made available until such appeals, litigation, or claims are finally resolved.
(3) As used in this clause, records include books, documents, accounting procedures and practices, and other data, regardless of type and regardless of form. This does not require the
Contractor to create or maintain any record that the Contractor does not maintain in the ordinary course of business or pursuant to a provision of law.
https://www.acquisition.gov/far/part-52#FAR_52_247_64 http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 https://www.acquisition.gov/far/part-52#FAR_52_247_64 https://www.acquisition.gov/far/part-52#FAR_52_247_64 https://www.acquisition.gov/far/part-52#FAR_52_222_41 http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 https://www.acquisition.gov/far/part-52#FAR_52_222_42 http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 https://www.acquisition.gov/far/part-52#FAR_52_222_43 http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 https://www.acquisition.gov/far/part-52#FAR_52_222_44 http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 https://www.acquisition.gov/far/part-52#FAR_52_222_51 http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 https://www.acquisition.gov/far/part-52#FAR_52_222_53 http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 https://www.acquisition.gov/far/part-52#FAR_52_222_55 https://www.acquisition.gov/far/part-52#FAR_52_222_62 https://www.acquisition.gov/far/part-52#FAR_52_226_6 http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 https://www.acquisition.gov/far/part-2#FAR_2_101 https://www.acquisition.gov/far/part-52#FAR_52_215_2 https://www.acquisition.gov/far/part-4#FAR_Subpart_4_7
(e)
(1) Notwithstanding the requirements of the clauses in paragraphs (a), (b), (c), and (d) of this clause, the Contractor is not required to flow down any FAR clause, other than those in this paragraph (e)(1) in a subcontract for commercial items. Unless otherwise indicated below, the extent of the flow down shall be as required by the clause-
(i) 52.203-13, Contractor Code of Business Ethics and Conduct (Jun
2020) (41 U.S.C. 3509).
(ii) 52.203-19, Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements (Jan 2017) (section 743 of Division E, Title VII, of the Consolidated and Further
Continuing Appropriations Act, 2015 (Pub. L. 113-235) and its successor provisions in subsequent appropriations acts (and as extended in continuing resolutions)).
(iii) 52.204-23, Prohibition on Contracting for Hardware, Software, and Services
Developed or Provided by Kaspersky Lab and Other Covered…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .