26Q0019_Questions and Answers.pdf

PDF 124 KB Posted

Attached to
RFQ 19PE5026Q0019 - Lima VNET Contract
Solicitation number
19PE5026Q0019
Issued by

About this file

This document is a Questions & Answers attachment to RFQ 19PE5026Q0019 for the Lima VNET Contract, addressing clarifications on equipment requirements and service implementation timelines.

The American Embassy in Lima requires CISCO Catalyst 9000 series networking equipment as a minimum specification, with the Catalyst 9200 Series Managed Switch (24/48 ports) featuring 2 ports fiber SFP module and 24 RJ45 ports at 1GB serving as the baseline equipment. The RFQ also specifies SFP/media converters rated for 1000 MBPS rental costs. Regarding service implementation, the requested timeframe for ISP service access deployment at the Embassy after contract execution is a firm 30-day requirement, with no extension allowance provided despite potential delays associated with importing Cisco equipment. The ISP will maintain full administrative control and configuration authority over the two routers that carry the circuits; the American Embassy in Lima's router is explicitly excluded from this solicitation and is not subject to ISP tampering or configuration. The document references a network diagram (Attachment 1, page 68) depicting the VNET topology with ISP01 Tunnel 6 and associated equipment layout.

View the file

Other files

File Type Posted
26Q0019_RFQ Package.pdf PDF
Att2_C-SCRM Questionnaire and C-SCRM Software Producer Attestation Form.xlsx XLSX spreadsheet

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RFQ 19PE5026Q0019 – Lima VNET Contract

Questions & Answers

1. STATEMENT OF WORK. Equipment/page 9

Cisco Router Rental Cost

1) Cisco Catalyst 9200 Series Managed Swithc 24/48 ports (minimum requirement)

* 2 Ports Fiber SFP module

* 24 RJ45 PORTS, 1GB

2) SFP/MEDIA CONVERTERS 1000 MBPS RENT COST

Question: Please confirm if we are required to use the Cisco Catalyst 9200

Series Managed Switch 24/28 or if we can provide another switch model.

Answer: The American Embassy in Lima requires CISCO devices. At least

Catalyst 9000 series.

2. 3.2 Equipment & Supplies

Time required for the ISP to provide service access at the Embassy after the contract is signed/page 9

30 days

Question: Please confirm if the 30 days mentioned are mandatory or if more time could be provided, taking into account the import time of the requested

Cisco equipment.

Answer: The requested timeframe for service implementation is 30 days.

3. Diagram

Attachment 1 – Diagram / page 68

Question: Please confirm that the embassy router will not be tampered with or configured by the ISP, as this is equipment provided to us by the ISP.

Answer: The answer to your question is no. The ISP will fully administered and control the two routers to carry the circuits. The American Embassy in

Lima router is not part of the present solicitation.