This is a Questions & Answers document for solicitation 19PE5025Q0011 regarding an accessibility upgrade project at the U.S. Embassy Chief of Mission Residence in Lima, Peru. The document contains 67 questions and answers covering technical specifications, working conditions, and project requirements.
Key details include: working hours are 8:00-17:00 Monday-Friday; bid guarantee is not required; PVC pipes are acceptable instead of galvanized iron; locally available lighting fixtures meeting UL/CUL listings will be considered; portable bathrooms are required; contractor must provide an English-speaking Project Manager; proposal due date is January 15th; contractors can have two parking spaces on Roca Garcia Street; the contractor is responsible for removing and restoring landscaping (except decorative plants); and simultaneous work fronts are preferred over sequential work. The document includes technical drawings showing details of women's restroom modifications, electrical plans, and ceiling details, with specific measurements and material specifications provided.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| II-C Solicitation amendment.pdf | ||
| II-F Solicitation document.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
19PE5025Q0011 - Lima - CMR Accessibility Upgrade Project
Questions and answers
Q1. Can the government clarify if a bid guarantee is required with the proposal response?
A1. It is not required.
Q2. For the expansion of the women's bathroom (disabled), the measurement of the wall adjacent to the office (2.30m) does not match the field measurement (1.50m). Will the field measurements be respected?
A2. The 1.50 measurement refers to the existing drywall portion of the wall, not to the total width of the 2.30-meter bathroom. These 2.30m dimensions must be respected as designed.
Q3. The measurement of the opening of door P-2 of the men's bathroom indicated in the opening table is 1.10m wide, but the measurement in the field is 1.00m. Will the current location and width of the door be respected?
A3. Please consider the below indication
Q4. In the men's bathroom, to the left side of the entrance door, the wall where the toilet rests measures 0.90 CM and the plans read 1.00m plus 0.15cm of the width of the Drywall partition.
Will the field measurements be respected?
A4. Yes. See Question 3.
Q5. Can you please clarify if offerors are required to complete all seven pages of Attachment 2 or only the first page of Attachment 2?
A5. Only the Summary page of attachment 2.
Q6. Attachment 1 – Statement of Work, Section 2.0 General Requirements, paragraph 2.2.1 states that normal operations will take place from 08:00 to 17:00, Monday through Friday.
However, this contradicts Exhibit 1 – Project Specifications, Section 011005, Construction
Execution and Coordination of Work, Section 1.4 Project Site Hours of Operations, which specifies, “Work hours shall be 7:00 am to 6:00 pm” (18:00). Can the government please clarify the working hours for this project?
A6. Per Statement of Work from 08:00 to 17:00, Monday through Friday. Work hours to be reviewed weekly according to the progress of the project
Q7. Regarding drainage pipes, the general notes of plan P-01, state, “ALL VISIBLE DRAINAGE
PIPES AND FITTINGS MUST BE MADE OF GALVANIZED IRON.” However, the women’s accessible restroom will have pipes hanging and visible. In the basement, it was observed that PVC drainage pipes are already in place. Can the same approach be maintained by using heavy-duty
PVC for the hanging lines?
A7. YES. PVC is acceptable
Q8. If possible, please indicate the origin of the porcelain tiles planned for the project and specify the supplier with whom the designer worked.
A8. FERRETI/DECORCENTER.
Q9. • Applicable Codes: per site visit indication, project is intended to be executed with local procurement, and drawings indicate national (Perú) codes are to be complied with. However, solicitation document STATEMENT OF WORK, PG 47 indicate compliance to International
Codes, and note reads: “Work not in compliance with the IBC and NEC shall be deemed not in compliance with the Contract.”. Please confirm which codes are to be complied with.
A9. Please refer Statement of Work item 1.4. Any IBC and NEC compliance is specified.
Q10. During site visit indication was made that light bollards for the pathway outside would be provide by the Government. Please confirm no provision is to be made under proposal budget for supply of these bollards.
A10. Light bollards are Government Furnish and Contractor Install (GFCI).
Q11. Please confirm bollards to be installed are per KIM Lighting B30LED.
A11. Bollards are GFCI. It may be KIM Lighting or similar
Q12. Please confirm if Government will also provide the ramp embedded light KIM LLF60 which is UL listed.
A12. No. Per design, fixtures are contractor provided
Q13. Cutsheet provided for the lighting fixtures indicated on the drawings show UL, CUL listings, and do not seem to be locally available. Please confirm locally available equivalent will be acceptable or if contractor needs to account for imported fixtures.
A13. Locally available fixtures meting UL, CUL listings will be considered
Q14. Please confirm if there is any restriction of using materials fabricated in China.
A15. Most China Products do not meet specifications
Q15. Please confirm if there is any restriction for using labor from Venezuela.
A15. NO
Q16. Please confirm if panels and junction boxes need to meet UL.
A16. Will consider equivalents
Q17. Please confirm the grounding pit for the electrical panelboard to be relocated will be abandoned.
A17. Confirmed per design
Q18. Drawings show ADA doors opening towards the outside of the restrooms. Please confirm if these doors are electrically operated.
A18. Per design, doors are not electrically operated
Q19. Plumbing drawings indicate visible (exposed) drainage shall be of galvanized iron, suggestion is made to use SCH 40 PVC instead to facilitate installation. Please confirm if
Government will entertain this option.
A19. Yes, PVC is acceptable
Q20. Plumbing notes indicate PPR for hot water, suggestion is to use CPVC for hot water to facilitate installation. Please confirm if Government will entertain this option.
A20. Yes, CPVC is acceptable
Q21. Plumbing notes indicate PPR for cold water, suggestion is to use VC for cold water to facilitate installation. Please confirm if Government will entertain this option.
A21. PVC is acceptable
Q22. Please confirm on finishes that if color indicated is not available a similar product may be submitted.
A22. Confirm finishes as indicated in design.
Q23. Please confirm construction site will need to be enclosed during all the execution of the project.
A23. Contractor must propose site enclosure plan for exterior and interior works.
Q24. Please confirm, if necessary, additional penetration for drainage connections and/or plumbing can be carried out on site.
A24. Yes. Please follow design documents
Q25. Please confirm contractor can account for a desk and chair to be located on the main patio next to the ramp construction site as discussed on the site visit.
A25. Please incorporate into site enclosure plan
Q26. Please confirm the contractor workers will be allowed use of the security staff restrooms.
A26. Portable bathrooms will be required and must be incorporated in the site enclosure plan.
Q27. Please confirm that Residence Facilities Gardener will carry out any landscaping necessary.
Contractor will only account for removing the landscaping necessary for the laydown and construction areas.
A27. Contractor is responsible for removing the needed landscaping for the construction.
Contractor is responsible for restoring to the original condition the grass area. Government is responsible for decorative plants.
Q28. Please confirm simultaneous work fronts are preferred by the Government and project is not necessary to be done sequentially.
A28. Yes, it is preferred
Q29. Please confirm if parking of key personnel will be allowed on the Roca Garcia Street.
A29. Limit of two cars for key personnel
Q30. Please confirm access for workers and trucks for material delivery and concrete mixers if needed, will be by the Roca Garcia Street.
A30. Confirmed
Q31. We would like to request for an extension of the due date on the proposal submission.
A31. Due date on Jan 15th
Q32. For the contractor personnel on site for the project, please confirm if we are to follow
G.5.3.: “The Contractor shall provide an English speaking supervisor on site at all times.” only, or is the contractor also to consider all requirements per specification section 011005 1.2 ON-
SITE STAFF REQUIREMENTS A, B and C, to include Project Manager, SSI, QCM, SSHO and administrative personnel. Please confirm.
A32. Confirmed. Project Manager must be English speaker. Site supervisor is not required
Q33. For the toilets and other plumbing fixture indicated, we understand current lead time in
Perú is around 120 days. Please confirm there will be an option to present equivalent/similar models to meet the project designated time frame.
A33. Confirm
Q34. Please confirm payment terms : advanced payment, number of days after submitting monthly progress request.
A34. Please refer to Section F, paragraph b), subparagraph Payment
Q35. As part of Peruvian regulations, is it also necessary to obtain the CAR insurance POLICY?
A35. Please refer to Section G. An insurance policy to cover against material damage and third-party liability at work place is required.
Q36. Please confirm whether all dismantled items will be delivered to the client with an inventory sheet.
A36. Part of the demolition
Q37. Specify whether extended working hours (into the evening) or night shifts (7:00 pm to
6:00 am) are allowed.
A37.Extended working hours will be required Government approval.
Q38. Indicate if there are any restrictions or requirements from the client regarding work on
Sundays and public holidays/American holidays.
A38. See answer Q37.
Q39. Confirm whether we need to consider restricted hours and days in our work schedule due to the Client's regulations or procedures. If applicable, please provide a calendar with the indicated restrictions.
A39. Yes, there will be restrictions.
Q40. Please confirm that all furniture and furnishing at foyer, office and toilets (women and men ) would be clear by the client before construction day one.
A40. Confirmed
Q41. Please confirm that all plants and garden would be remove before construction day one.
Please landscaping works are not included.
A41. See answer Q27
Q42. Confirm if complementary items can be added to the submitted list based on the bidder's evaluation. This will allow for a more detailed proposal.
A42. Confirmed
Q43. Confirm whether, in some cases, the unit of measurement for an item can be modified, as greater detail can sometimes be provided when the item is not listed as a global unit.
A43. YES
Q44. Confirm whether, in cases where non-commercial specifications are included in the provided items, these can be replaced with similar commercial products available locally.
A44. Confirmed and approved through submittals
Q45. Confirm whether it will be possible to schedule power, water, air conditioning, and/or data outages to take the existing systems and networks out of service for an extended period, if necessary. All existing services (water, sewer and power ) may be use by the contractor without cost.
A45. Any outage needs to be approved in advance.
Q46. Define which requirements will be requested for the entry of staff and workers.
A46. Staff and workers identification will be required in advance.
Q47. Confirm if the drywall ceiling of the office and the women’s restroom hall will remain, as this ceiling is part of the restroom expansion.
A47. The drywall ceiling in the restroom hall must be replaced. The existing office ceiling should be maintained and included the materials required for the modification of the closets.
Q48. Provide more details about the two closets in the office. The only reference available is plan AE-14, which does not show any internal compartments.
A48. Contractor must include in the proposal the change of door closets. It must be also considered interior shelves. Shop drawing will be required for approval.
Q49. Confirm the width of door P-09 as 0.865m. According to the technical standard A.120 of the RNE, access doors must have a minimum clear width of 1.00m, and the door frame must not invade the accessible route.
A49. The door complies with the ADA standard, where the minimum width is 32 inches or
813mm.
Q50 Further details are needed for doors P-08 and P-07 located in the women's restroom
(description of hinges, lock and handle).
A50. Yes, it refers to the floor that must be replaced in the hall space.
Q51. Confirm whether the finish of item 01.02.03.02 "Floor finish with marble slabs of 0.02m thickness" of 1m² applies to the perimeter of the hall room (red-hatched area).
A51. Yes.
Q52. Confirm whether the cabinet of the sinks will have the same finish as the partitions for the toilets (laminated MDP in Maple Gravel finish) as seen in the renders on the plan AE-27.
A52. Yes
Q53. Indicate where the finishes described in the item 01.03.06.04 and 03.03.06.03 "PVC Wall
Panel" will be applied, as it appears in the budget items for both restrooms although is not mentioned in any plan.
A53. Do not include those finishes.
Q54. Confirm whether a submittal for luminaires is no longer required since the especifications required are part of the documentation reached.
A54. It is required for all fixtures except for light bollards.
Q55. Confirm if sanitary facilities will be provided.
A55. See Answer Q26
Q56. Confirm the exact location of the entrance door to the men’s restroom (P-02), as the actual field measurement of the wall was 0.90 m and not 1.15 m.
A56. See answer Question 3
Q57 Confirm whether window V-03 will be shifted by 0.23m, as observed in the floor plan.
A57. No window location will be modified
Q58. Indicate the type of flushometer to be used for the urinal, as well as the types of P-traps and Sewage accessories for the sinks. Such especifications ar not mentioned nor in the price structure or any plan.
A58. To be proposed by construction submittal
Q59. Indicate the area where the item 03.01.01 "Exterior wall tiling" will be applied on the ramp.
A59. The item refers to plastering or "terrajeo."
Q60. Confirm whether the partitions for restrooms and urinals will be made of MDP (as shown in the plans) or metallic carpentry (as mentioned in the price structure).
A60. MDP with metallic structure
Q61. For the construction joints in the floor slab, a gap of 30mm is indicated, apparently this is a fairly large width for the application of the Sikaflex sealant, please indicate the exact detail for this procedure.
A61. To be clarified during the construction.
Q62. The plan SE-11 shows a detail of the wall with construction joints that cannot be seen in the elevations or sections. Please indicate the location and finishing detail of them, which are
25mm wide.
A62. Expansion joints are specified in the drawings. To be clarified during the construction
Q63. Will the electrical panel to be relocated called TF-B1R be a new panel? or existing one will be used adding only circuit c-6?.
A63. Refer to electrical drawings. Panel to be relocated
Q64. Please specify exactly the type of geogrid to be used in the free space between the facade of the house and the ramp.
A64. Proper Geogrid to be submitted by contractor according to the construction requirements and approved by Government
Q65. Please provide more details of the bases for the garden lights
A65. It will be required a shop drawing according to the type of fixture
Q66 To place the aluminum rail for the LED lighting strip inside the basewall embedded in the base of the wall, it will be difficult to place because it is impossible to insert a drill into the 10 cm height to place the fixing screws. Please clarify if another procedure can be used, such as using glue.
A66. It will be required a shop drawing.
Q67. Regarding the finish, what is the tile (terrazzo) thickness and the location of the expansion joint between the tiles to avoid fissures/cracking?
A67. The tile thickness and location of expansion joints are specified in the drawings.
Women's Restroom
FF: ±0.00
Women's Restroom
FF: ±0.00
Office
FF: ±0.00
Drywall Ceiling
Porcelanato/Porcelain Fortune Beige Mate Forja gris/Gray Grout 60x120 cm
New Storage Porcelanato/Porcelain Cera Blu Notte
Forja gris/Gray Grout 24 X 6 cmFloor patching and cutting
Lock With Puller Matte Bronze Finish
Finish Floor
Sub Floor
Drywall Ceiling Drywall
1 2 3
Drywall Ceiling Drywall
Toilet:
Reach Curve - Kohler
500 445
200900
CD-1
V-04
P-05
P-01
P-06
P-07
P-03!
P-04
V-05V-06 V-01
V-03
V-02
V-08 V-07
P-08
P-09
1 2 3 6 74 5
A C
B
C
A
B
Office
FF: ±0.00
Foyer
FF: ±0.00
Entrance
FF: -0.34
Men's Restroom
FF: +0.00
New Storage
Women's Restroom
FF: +0.15
FF: +0.00
Foyer
FF: ±0.00
Entrance
FF: -0.34
P-02 b' b c a a'
1' 2'
2'1' a a' b c c'
1 2 3 3' b'
2.1 2.1'
0 1 2
EXISTING Ceiling Tile 600x600mm
Cut Ceiling Tile
EXISTING Vertical Stud 64mm
350 610150
Edge Molding "L"
Cross T
Glass Wool Vertical Stud C Type Plasterboard 12mm
CEILING DETAIL CD-1
1:20
AE-12
SECTION a-a' - WOMEN'S RESTROOM
PROJECT
CHIEF OF MISSION RESIDENCE
DESIGN SUBMITTAL
LOCATION
SANTA BEATRIZ, LIMA, PERÚ
SHEET
ARQ. MARTÍN GRANIZO JIMENEZ
ARQ. IRENE YAURI MERINO
ARQ. ROSABELLA ÁLVAREZ-CALDERÓN
ACCESSIBLE RESTROOMS
Consultoría en Patrimonio y Ciudad
ARQ. CARLOS TORRES FLORES
CAP 14982
HEAD ARCHITECT:
RESEARCH AND DESIGN TEAM:
DATE
SCALE
DECEMBER 2024
ARQ. TERESA MONTOYA ROBLES
PIERO GOYZUETA ROVEGNO
KATHERIN CAMPOS HUAMANI
NICOLAS RAMIREZ VILLACORTA
NICOLE PEREDA LASTRA
THAIS MURGUEYTIO BUSTAMANTE
OFFICE TEAM:
SECTION a-a' WOMEN'S RESTROOM
ESC: 1/20
AutoCAD SHX Text
OBSERVATIONS
AutoCAD SHX Text
PROYECTO PATRIMONIO
AutoCAD SHX Text pat.com.pe
E AIR EXTRACTOR LOW
NOISE 200x200 mm
MR Type Drywall Ceiling
L: 30W
Existing lightning fixture
LUM-01
New Pendant Light
GFCI OUTLET
h.according to the specifications of the equipment to be connected)
Downlight LED 30W or similar with single-phase transformer 220V/110V
Flush Mounted Sconce LED 40W or similar with single-phase transformer 220V/110V
L: 40W
D CEILING VENTILATION
DIFFUSER GRID
150x150mm Metal Finish
EXISTING AXIAL FAN
MOTION SENSOR for AIR
EXTRACTOR
FC: +3.25
New Pendant Light
FC: +2.80
Existing Chandelier light
New GFCI Outlet
PVC electrical conduit arrives and descends
Existing ceiling tile
Removed lightning fixture
Existing lightning fixture
E
L: 30W
L: 30W
L: 30W
L: 30W
L: 30W
L: 30WL: 30W
L: 30W
L: 30W L: 30W
L: 30W
New GFCI Outlet
FC: +2.80
e e e e fff b c d c b
2Sb,c g g g
2Sd,e
2Sf,g b
6" circular ventilation duct galvanized steel sheet
CEILING
VENTILATION
DIFFUSER
GRILLE
D
CEILING AIR
EXTRACTOR
Switch Controlled
EXISTING AXIAL
FAN IN
WINDOWS
250CFM
New Pendant
Light
6" Circular ventilation duct galvanized steel sheet
1200 1200
740 740
CD-1
see AE-12
0 1 2 3m 1:25
E-02
ELECTRICAL PLAN/ WOMEN'S
RESTROOMS
PROJECT
CHIEF OF MISSION RESIDENCE
DESIGN SUBMITTAL
LOCATION
SANTA BEATRIZ, LIMA, PERÚ
SHEET
ARQ. MARTÍN GRANIZO JIMENEZ
ARQ. IRENE YAURI MERINO
ARQ. ROSABELLA ÁLVAREZ-CALDERÓN
ACCESSIBLE RESTROOMS
Consultoría en Patrimonio y Ciudad
ARQ. CARLOS TORRES FLORES
CAP 14982
HEAD ARCHITECT:
RESEARCH AND DESIGN TEAM:
DATE
SCALE
DECEMBER 2024
ARQ. TERESA MONTOYA ROBLES
PIERO GOYZUETA ROVEGNO
KATHERIN CAMPOS HUAMANI
NICOLAS RAMIREZ VILLACORTA
NICOLE PEREDA LASTRA
THAIS MURGUEYTIO BUSTAMANTE
OFFICE TEAM:
ING. JHONATAN NUÑEZ CHUMACERO
CIP 238079
ELECTRICAL ENGINEER
E-01 Electrical / Women’s Restroom
ESC: 1/25
AutoCAD SHX Text
IIT
AutoCAD SHX Text
IIT
AutoCAD SHX Text
IIT
AutoCAD SHX Text
IIT
AutoCAD SHX Text
DP1-T5
AutoCAD SHX Text
OBSERVATIONS
AutoCAD SHX Text
SHEET
AutoCAD SHX Text
PROYECTO PATRIMONIO
AutoCAD SHX Text pat.com.pe
| II-H Questions & Answers |
| CEILING DETAIL CD-1 |
| 12.19.24 CMR-TASK 04-CAD RESTROOMS ARCHITECTURE + SPECIALTIES FINAL-AE12-W RESTROOM SECTION -1EN20 |
| Sheets and Views |
| AE12-W RESTROOM SECTION -1EN20 |
| 12.19.24 CMR-TASK 04-CAD RESTROOMS ARCHITECTURE + SPECIALTIES FINAL-E-02-ELECTRICAL PLAN WOMEN'S |
| Sheets and Views |
| E-02-ELECTRICAL PLAN WOMEN'S |
File details come from the government source that posted it. Updated .