This is a Questions and Answers document for RFQ 19NO60260011 issued by the U.S. Embassy in Oslo, Norway on August 3, 2026, regarding the supply, delivery, and installation of a tent.
The RFQ requires a turnkey project for a 48 square meter tent with full site preparation and foundation work completed by the contractor at no additional cost to the government. The contractor bears full responsibility for all excavation, grading, geotextile installation, crushed gravel placement, compaction, and footing preparation. The contractor must obtain all required permits, licenses, and appointments in compliance with Norwegian host country laws, with no guidance available from the Embassy. The project completion deadline is 60 calendar days after contract award, with this period encompassing all project activities including engineering, permitting, shipping, customs clearance, and site readiness. Work must be scheduled during normal business hours of 08:00–16:00 hours, Monday through Friday, excluding local and bank holidays, unless advance approval is obtained from the Contracting Officer's Representative. Site access is restricted to a single vehicle gate measuring 3.6 meters in width, and the site contains numerous 100-year-old protected trees on the access path. Personnel security requirements and standards of conduct apply per Section 1 of the solicitation. Regarding technical specifications, the contractor should follow the RFQ specifications and the tent manufacturer's recommendations rather than attempting to comply with Norwegian building code design loads (NS-EN 1991), as the RFQ does not specify wind and snow load capacity values.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| SF 30 (Final).pdf | ||
| RFQ 19N06026Q0011_Supply Delivery and Installation of Tent (Final Signed).pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Embassy of the United States of America
Oslo, Norway August 3, 2026
Questions and Answers for RFQ 19NO60260011 -
Supply, Delivery and Installation of Tent
1. QUESTION:
The Request for Quotation states” with permits”. Please confirm who is responsible for obtaining the required permits in Oslo, Norway. If the Contractor is responsible, can the Embassy provide any guidance regarding the local permitting process?
ANSWER:
In SECTION 1, SCHEDULE OF SUPPLIES/SERVICES – No. 8 PERMITS states that the Contractor shall maintain in full force and affect all permits, licenses, and appointments required for the prosecution of work under this contract at no additional cost to the Government. The Contractor shall obtain these permits, licenses, and appointments in compliance with host country laws.
The Embassy has no means to provide guidance and help regarding obtaining permits.
2. QUESTION:
Site Preparation and Foundation Work. Confirm whether the contractor is responsible for all excavation, grading, geotextile installation, crushed gravel placement, compaction, and footing preparation, or if any of this work will be completed by the Government prior to installation.
In SECTION 1, SCHEDULE OF SUPPLIES/SERVICES, - No. 2.2 INSTALLATION OF WORK, & No. 22.2.1 Tent Foundation Area (48 m² Tent Footprint) states that the contractor is responsible for all preparation of ground. This is a turnkey project for the Embassy.
3. QUESTION:
Please provide any available information regarding site conditions as outlined below.
a. Site access restrictions
The site features a singular vehicle access gate measuring 3 meters and 60 cm in width. There are also numerous 100-year-old protected trees on the path leading to the site on which the tent will be erected.
b. Security requirements
Please see SECTION 1, SCHEDULE OF SUPPLIES/SERVICES, - No. 5, Access to Government Buildings and Standards of Conduct. 5.2 Personnel Security.
c. Working hour limitations Please see SECTION 1, SCHEDULE OF SUPPLIES/SERVICES, - No. 4, Hours of Performance. The Contractor shall schedule all work during normal business hours which are defines as 08:00- 16:00 hours, Monday to Friday, excluding local holidays and bank holidays, unless approved in advance by the Contracting Officers Representative (COR).
d. Any other conditions that may affect installation Please refer to the requirements and specifications required by the solicitation.
4. QUESTION:
The request for quotation requires completion within 60 calendar days after contract award. Please confirm whether this period includes engineering, permitting, shipping, customs clearance, and site readiness.
Sixty (60) days includes all project activities.
5. QUESTION:
The RFQ specifies wind resistance: approximately 0.72 kN/m², snow load capacity: 5.0–
5.5 kg/ft². The manufacturer has advised that these values do not appear to align with the design loads typically used for Oslo under the applicable Norwegian standards (NS-EN 1991).
Could you please confirm whether the tent should be designed to the values stated in the RFQ, or whether it should comply with the applicable Norwegian building code design loads for the project location?
The RFQ does not specify the wind and snow load capacity. Please follow the specifications as outlined in the RFQ and the manufacturer’s recommendation of the tent that you are quoting.