QA 19MX5724Q0004 Main Electrical System.pdf
PDF 67 KB Posted
- Attached to
- NCC Main Electrical System Distribution Maintenance Services Federal contract opportunity
- Solicitation number
- 19MX5724Q0004
- Issued by
- Department of State
About this file
This document contains Questions and Answers (Q&A) related to Solicitation Number 19MX5724Q0004 for NCC Main Electrical System Maintenance Services. The key details are:
The solicitation is seeking professional services and contractor cost proposals to perform annual preventive maintenance and servicing of the Consulate's main electrical systems, including medium voltage substation equipment, main electrical switchgears, and MV transformer maintenance. The contract will be for a one-year period with four one-year option periods. The Q&A covers various technical details such as testing requirements for pad-mounted transformers, circuit breakers, and medium voltage cables. It also addresses administrative requirements like SAM registration for foreign companies. The solicitation is issued by the Department of State.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Site visit minute 19MX5724Q0004.pdf | ||
| SF-1449 RFQ 19MX57-24-Q-0004.docx | DOCX document | |
| RFQ 19MX5724Q0004 NCC Main Electrica System MS.pdf | ||
| Letter to offerors RFQ 19MX5724Q0004.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
QUESTIONS AND ANSWERS
TO SOLICITATION NUMBER
19MX5724 Q 0004
NCC MAIN ELECTRICAL SYSTEM MAINTENANCE SERVICE
Q & A RFQ 19MX5724Q0004
NCC Main Electrical System SBU - CONTRACTING AND ACQUISITIONS Maintenance Service
1- Q- Pad Mounted Transformer – Will the maintenance include Dielectric Oil Test Analysis?
A- Yes, this will be included in the annual PM. The test result should be informed to the Post as soon as the results are ready.
2- Q- Pad Mounted Transformer – What electrical test will be required for the transformer?
TTR, Megger, Power Factor?
A.- On page 25 of the SoW indicates the next points:
1. Perform an insulation resistance Test.
2. Perform a power factor test.
3. Perform a high potential test at no more than 60 percent of the test voltage for a new transformer.
Follow the rules in ANSI C57.1290. Test primary to secondary and ground, and secondary to primary and ground.
3-Q- Electromagnetic Circuit Breakers – What is the right model, the spec indicates Siemens/Russelectric, however Russelectric is the panel integrator not the manufacturer nor a model Number, the Circuit breaker looks like is a CUBICLE 3WL11 or something like that, can you clarify please.
A.- The CB models are WL series Catalog No. S2A432V, S2A308N, S2A320U, S2A332V.
4-Q- Electromagnetic Circuit Breakers – Should we include the following tests?
Long Time Delay, Short time delay, instantaneous, ground fault of just cleaning and adjustments?
A.- These tests are not included in the SOW.
5-Q- Are the MV cables from the disconnecting switch to the transformer will be also tested?
Usually a VLF test is required, is not shown in the scope of work, will it be required?
A.- For this SOW the VLF cable test won’t be included but needs to take Megger readings between the contact blades and ground at the MV switch.
6-Q- Thermographic analysis – Will the thermographic analysis be required as a predictive maintenance for the panels?
A.- Yes, the analysis results should be included in the work report after each service. The report should include the certificate of the equipment and the electrical technician who performs these activities.
7-Q-Grounding system – is the test part of this proposal?
A.- No.
QUESTIONS AND ANSWERS
TO SOLICITATION NUMBER
19MX5724 Q 0004
NCC MAIN ELECTRICAL SYSTEM MAINTENANCE SERVICE
Q & A RFQ 19MX5724Q0004
NCC Main Electrical System SBU - CONTRACTING AND ACQUISITIONS Maintenance Service
8-Q- Sam Registration number – We enter the indicated website to register our company in the SAM (system for award management) apparently, as a foreign company it redirect us to an NCAGE code, is this correct?
A- Yes, you will have to register in SAM, NCAGE and you will get your Unique entity ID.
We will provide a step by step guide for the registration process.
9-Q- CFE’s incoming feeder power service disconnection charge.
CFE Charges a service disconnecting gee if a service disconnection is required to perform the maintenance, will that charge be paid separately or should we include it in the proposal?
A.- The CFE’s fees/authorization for the disconnection services are paid by the US Consulate.